CHRISTOPHER GARNETT CHASE ROCK END CHRISTOPHER GARNETT CHASE ASE reception hatch pupil hatch roller shutter covered entrance External Canopy void l ow l evel w all 16 17 01 02 03 04 05 06 07 16 17 15 09 11 12 13 18 08 07 14 10 06 05 04 03 02 01 10 11 12 13 14 15 08 09 Staff W.C. R041 3.8 m 2 Food Store R038 5.7 m 2 PE Store R042 18.0 m 2 Kitchen R037 49.0 m 2 Lobby R039 3.1 m 2 Staff Work Room R006 14.3 m 2 Reprographics R007 12.5 m 2 Heads Office R005 16.0 m 2 General Office R004 20.6 m 2 SEN Resource Base R023 12.0 m 2 Classbase (Infant) R014 57.0 m 2 Store R015 1.5 m2 Acc. W.C. R010 3.3 m 2 Wheelchair Store (Wheelchair) 3.2 m2 Small Group Room R003 9.0 m 2 Acc. W.C. R046 3.7 m 2 Interview Room R047 6.0 m 2 Entrance Lobby R001 7.3 m 2 Hall R035 180.4 m 2 Studio R045 55.1 m 2 Library R047 67.1 m 2 Circulation (Stairs) R018 18.8 m 2 Hygiene Room R008 9.0 m 2 Cloak Area 2.5 m2 Store R013 1.5 m2 Circulation (Corridor) 54.6 m 2 Store R028 1.5 m2 Cloak Area 2.5 m2 Store R030 1.5 m2 Cloak Area 2.5 m2 Office / Meeting Room R002 9.0 m 2 Circulation (Corridor) 48.1 m 2 General Store R021 6.0 m2 Unisex W.C.s R022 18.5 m 2 Cloak Area 2.5 m2 Classbase (Infant) R027 57.0 m 2 Classbase (Infant) R029 57.0 m 2 Lift R032 2.9 m 2 Circulation R031 32.1 m 2 Classbase (Infant) R012 57.0 m 2 Cloak Area 2.5 m2 Unisex W.C.s R011 19.7 m 2 SEN Therapy MI Room R023 12.0 m 2 Server R024 6.0 m 2 Cloak Area 2.5 m2 Staff Office R040 3.0 m 2 Plant Room R044 27.9 m 2 Cleaner Store R033 3.4 m2 Small Group Room R017 9.0 m 2 External PE Store R034 4.5 m2 Servery R036 15.0 m 2 Store R020 3.0 m2 Classbase (Reception) R019 64.0 m 2 Store R025 3.0 m2 Classbase (Reception) R026 64.0 m 2 Store R016 9.8 m2 Y01 Y01 Y04 Y04 Y03 Y03 Y02 Y02 X01 X01 X02 X02 X05 X05 X03 X03 X04 X04 X06 X06 X07 X07 X08 X08 X09 X09 X10 X10 Sick Bay R019 4.0 m 2 Electrical Plant R043 7.1 m 2 WAGTAIL MEWS MARTIN HUNT DRIVE CHRISTOPHER GARNETT CHASE ROCK END PLOVER ROAD WAGTAIL MEWS MARTIN HUNT DRIVE CHRISTOPHER GARNETT CHASE PLOVER ROAD X10 X09 X08 X07 X06 X05 X04 X03 X02 X01 1 3 4 4 1 2 1 E E N N W W N Ground Floor Plan 1:200 Site Location Plan 1:250 Lakelands Brief Additional primary school places are required in the Stanway area of Colchester for September 2020. This project aims to provide suitable accommodation for a two storey, two form entry (2FE) primary school building with an all-weather pitch and 28 parking spaces. The site for the scheme is 1.14 hectars and is located within a large area of land currently being developed for housing, 4.3 miles west of Colchester, on the South East side of Stanway. The site used to be a former gravel works. The proposed 2 FE school is required to be complete by 21st August 2020. North Elevation 1:200 Primary School

Upload: others

Post on 02-Nov-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Lakelands Primary School - Essex...entry (2FE) primary school building with an all-weather pitch and 28 parking spaces. The site for the scheme is 1.14 hectars and is located within

CH

RISTO

PHER

GA

RN

ETT CH

ASE

RO

CK

END

CH

RISTO

PHER

GA

RN

ETT CH

ASE

CH

RISTO

PHER

GA

RN

ETT CH

ASE

rece

ptio

n ha

tch

pupi

l hat

ch

rolle

r shu

tter

covered entrance

External Canopy

void

low

leve

l wal

l

1617

01 02 03 04 05 06 07

1617

15

09

11 12 13

18

0807

14

1006

0504

0302

01

1011

1213

1415

08

09

Staff W.C.R0413.8 m2

Food StoreR0385.7 m2

PE StoreR04218.0 m2

KitchenR03749.0 m2

LobbyR0393.1 m2

Staff Work RoomR00614.3 m2

ReprographicsR00712.5 m2

Heads OfficeR00516.0 m2

General OfficeR00420.6 m2

SENResource BaseR02312.0 m2

Classbase (Infant)R01457.0 m2

StoreR0151.5 m2

Acc. W.C.R0103.3 m2

WheelchairStore(Wheelchair)3.2 m2

SmallGroup RoomR0039.0 m2

Acc.W.C.R0463.7 m2

InterviewRoomR0476.0 m2

Entrance LobbyR0017.3 m2

HallR035180.4 m2

StudioR04555.1 m2

LibraryR04767.1 m2

Circulation(Stairs)R01818.8 m2

Hygiene RoomR0089.0 m2

Cloak Area2.5 m2

StoreR0131.5 m2

Circulation(Corridor)54.6 m2

StoreR0281.5 m2

Cloak Area2.5 m2

StoreR0301.5 m2

Cloak Area2.5 m2

Office /Meeting RoomR0029.0 m2

Circulation(Corridor)48.1 m2

General StoreR0216.0 m2

UnisexW.C.sR02218.5 m2

Cloak Area2.5 m2

Classbase (Infant)R02757.0 m2

Classbase (Infant)R02957.0 m2

LiftR0322.9 m2

CirculationR03132.1 m2

Classbase (Infant)R01257.0 m2

Cloak Area2.5 m2

UnisexW.C.sR01119.7 m2

SEN TherapyMI RoomR02312.0 m2

ServerR0246.0 m2

Cloak Area2.5 m2

Staff OfficeR0403.0 m2

Plant RoomR04427.9 m2

Cleaner StoreR0333.4 m2

SmallGroup RoomR0179.0 m2

ExternalPE StoreR0344.5 m2

ServeryR03615.0 m2

StoreR0203.0 m2

Classbase (Reception)R01964.0 m2

StoreR0253.0 m2

Classbase (Reception)R02664.0 m2

StoreR0169.8 m2

Y01 Y01

Y04 Y04

Y03 Y03

Y02 Y02

X01

X01

X02

X02

X05

X05

X03

X03

X04

X04

X06

X06

X07

X07

X08

X08

X09

X09

X10

X10

Sick BayR0194.0 m2

Electrical PlantR0437.1 m2

WAGTAIL MEWS

MARTIN H

UNT DRIV

E

CH

RIS

TOPH

ER G

AR

NET

T C

HA

SE

RO

CK

EN

D

PLOVER

RO

AD

WAGTAIL MEWS

MARTIN H

UNT DRIV

E

CH

RIS

TOPH

ER G

AR

NET

T C

HA

SE

PLOVER

RO

AD

X10 X09 X08 X07 X06 X05 X04 X03 X02 X01

13441 2 1

EE

NN

WW

N

Ground Floor Plan 1:200

Site Location Plan 1:250

Lakelands

Brief

Additional primary school places are required in the Stanway area of Colchesterfor September 2020.

This project aims to provide suitable accommodation for a two storey, two formentry (2FE) primary school building with an all-weather pitch and 28 parkingspaces. The site for the scheme is 1.14 hectars and is located within a largearea of land currently being developed for housing, 4.3 miles west of Colchester,on the South East side of Stanway. The site used to be a former gravel works.

The proposed 2 FE school is required to be complete by 21st August 2020.

North Elevation 1:200

Primary School