lambton area water supply system 1215 fort street …

15
1 3 4 5 6 7 8 A B C D E F G H I J 2 9 10 11 12 13 14 15 A B C D E F G H I J SHEET NAME DRAWING NAME CLIENT/PROJECT LOCATION CHECKED APPROVED STAMP STAMP SCALE DATE CREATED FILE NO. REV DRAWING NO. SHEET NO. REV REVISION ISSUED FOR DATE BY APPR. 750 Oakdale Road, Unit 54 Toronto, Ontario M3N 2Z4 voice: (416) 748-6222 fax: (416) 748-0344 www.buildinginnovation.com of 50A Jackson Street West Hamilton, Ontario L8P 1L4 voice: (289) 389-5555 [email protected] DESIGNED DRAWN 1 3 4 5 6 7 8 2 9 10 11 12 13 14 15 CLIENT ACCT PROJECT TYPE BUILDING MEASURE SET SHEET - - These drawings are to be viewed in colour only. These drawings are to be read in conjunction with other drawings and design documents. Lambton Area Water Supply System 1215 Fort Street Point Edward, Ontario N7V 1M2 www.lawss.org Review Review Oct 11, 2018 Nov 2, 2018 JH JH JD JD - A B Tender Nov 9, 2018 JH JD JD JH JD 1215 Fort Street LAWSS Admin Office Key Plan General Information JD HVAC Oct 01, 2018 Point Edward, ON N7V 1M2 01 04 G01 B BI 3191 DG 121 001 01 01 NTS These drawings are issued solely for the purpose indicated and are not to be used for construction unless designated as such and sealed by a professional engineer. LAMBTON AREA WATER SUPPLY SYSTEM 1215 FORT STREET POINT EDWARD, ONTARIO N7V 1M2 ADMIN OFFICE HVAC LAWSS 18-04 NOVEMBER 2018

Upload: others

Post on 24-Mar-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

1 3 4 5 6 7 8

A

B

C

D

E

F

G

H

I

J

2 9 10 11 12 13 14 15

A

B

C

D

E

F

G

H

I

J

SHEET NAME

DRAWING NAME

CLIENT/PROJECT LOCATION

CHECKED APPROVED

STAMP STAMP

SCALEDATE CREATED

FILE NO. REVDRAWING NO.

SHEET NO.

REV REVISION ISSUED FOR DATE BY APPR.

750 Oakdale Road, Unit 54

Toronto, Ontario M3N 2Z4

voice: (416) 748-6222

fax: (416) 748-0344

www.buildinginnovation.com

of

50A Jackson Street West

Hamilton, Ontario L8P 1L4

voice: (289) 389-5555

[email protected]

DESIGNED DRAWN

1 3 4 5 6 7 82 9 10 11 12 13 14 15

CLIENT

ACCT PROJECT TYPE BUILDING MEASURE SET SHEET

- -

These draw

ings are to be view

ed in colour only. T

hese draw

ings are to be read in conjunction w

ith other draw

ings and design docum

ents.

Lambton Area Water Supply System

1215 Fort Street

Point Edward, Ontario N7V 1M2

www.lawss.org

Review

Review

Oct 11, 2018

Nov 2, 2018

JH

JH

JD

JD

-

A

B Tender Nov 9, 2018 JH JD

JD JH JD

1215 Fort StreetLAWSS Admin Office

Key Plan

General Information

JD

HVAC

Oct 01, 2018

Point Edward, ON N7V 1M2

01 04

G01BBI 3191 DG 121 001 01 01

NTS

These drawings are issued solely for the purpose indicated and are not to

be used for construction unless designated as such and sealed by a

professional engineer.

LAMBTON AREA WATER SUPPLY SYSTEM

1215 FORT STREET

POINT EDWARD, ONTARIO N7V 1M2

ADMIN OFFICE HVAC

LAWSS 18-04

NOVEMBER 2018

1 3 4 5 6 7 8

A

B

C

D

E

F

G

H

I

J

2 9 10 11 12 13 14 15

A

B

C

D

E

F

G

H

I

J

SHEET NAME

DRAWING NAME

CLIENT/PROJECT LOCATION

CHECKED APPROVED

STAMP STAMP

SCALEDATE CREATED

FILE NO. REVDRAWING NO.

SHEET NO.

REV REVISION ISSUED FOR DATE BY APPR.

750 Oakdale Road, Unit 54

Toronto, Ontario M3N 2Z4

voice: (416) 748-6222

fax: (416) 748-0344

www.buildinginnovation.com

of

50A Jackson Street West

Hamilton, Ontario L8P 1L4

voice: (289) 389-5555

[email protected]

DESIGNED DRAWN

1 3 4 5 6 7 82 9 10 11 12 13 14 15

CLIENT

ACCT PROJECT TYPE BUILDING MEASURE SET SHEET

- -

These draw

ings are to be view

ed in colour only. T

hese draw

ings are to be read in conjunction w

ith other draw

ings and design docum

ents.

Lambton Area Water Supply System

1215 Fort Street

Point Edward, Ontario N7V 1M2

www.lawss.org

Review

Review

Oct 11, 2018

Nov 2, 2018

JH

JH

JD

JD

-

A

B Tender Nov 9, 2018 JH JD

JD JH JD

1215 Fort StreetLAWSS Admin Office

Legend

General Information

JD

HVAC

Oct 01, 2018

Point Edward, ON N7V 1M2

02 04

G01BBI 3191 DG 121 001 01 02

NTS

These drawings are issued solely for the purpose indicated and are not to

be used for construction unless designated as such and sealed by a

professional engineer.

Drawing List Piping Symbol Legend

Pump Constant Speed

Pump Variable Speed

Check Valve (Unspecified Type)

Pressure Reducing Valve

Reduced Pressure Backflow Preventer

Double Check Backflow Preventer

Temperature/Pressure Relief Valve

Valve (Unspecified Type)

Ball Valve

Butterfly Valve Lug Type

Needle Valve

Gate Valve

Balancing Valve c/w Measuring Ports

Valve with Locking Handle

Control Valve 2-Way

Control Valve 3-WayControl Valve Temperature Actuated OperatorControl Valve Pressure Actuated OperatorSolenoid Valve 2-Way

Gas Regulator with Internal Exercise

Gas Regulator with External Exercise

Union

Flange

Flange with Blank Off Plate

Grooved Coupling

End Cap Square

End Cap Round

Braided Hose Flex Connector

Vibration Coupling

Expansion Joint

Automatic Air Vent

Manual Air Vent

Combined Air Vent/Vacuum BreakerDisc Steam Trap

F/T Float or Thermostatic Steam Trap

Sight Glass

LWCO Low Water Cut Off

Roof Drain

Floor Drain

Expansion Tank

Reducer

Temperature Switch

Humidity

Pressure

Liquid Flow Meter

Thermowell

Drain with Cap

Receptacle

Split-Wired Receptacle

Dedicated Receptacle

Single Pole Switch

Weather Proof Switch

Supply Air Rectangular Opening

Return Air Rectangular Opening

Supply Air Round Opening

Return Air Round Opening

Round Cross Section

Centrifugal Fan

Axial Fan

Flexible Duct Connection

Ducting Symbol Legend

Damper and Actuator

Data Port

Telephone Port

Telephone/Data Port

Combination Balancing/Check Valve

T Type Strainer

Combination Strainer/Flow Diffuser

Stop Check Valve

Y Type Strainer

Swing Check Valve

Wafer Check Valve

Globe Valve

Plug Valve

Automatic Flow Limiting Valve c/w Measuring PortsCombination Automatic Flow Limiting Valve/Ball Valve

Combination Strainer/Ball Valve

Strainer (Unspecified Type)

RD

FD

AA

AM

AV

D

H

HP

F10A

Circuit Breaker

Fuse30

15 Fused Disconnect

Non-Fused Disconnect

Combination Motor Starter

VFD Variable Frequency Drive

HP 1-Phase Motor

3-Phase Motor

Contactor (N.O. Shown)

Overload

Fused Disconnect

Neut Condensate Neutralization

Filter Sidestream Filter

Feeder Chemical Pot Feeder

Air Air Scoop

Air Air Seperator

Duct Air Flow and Temperature Monitoring

ECS Electrical Current Switch

Temperature

Temperature Switch High Limit

Flow

Temperature/Humidity

Level

Temperature/Pressure

F T

Vacuum BreakerVB

P

T

Device (unless otherwise indicated) with stem shown.

Temperature Switch Low Limit

Post Indicator Valve

RP

DCVA

H

P

T/H

T/P

Project Scope Summary:The following is an overview of other Work and is not complete. Contract Documents in their entirety fully describe Work, including items that may only be listed here.1. Demolish existing services as indicated.2. Modify heating water distribution system piping including relocating electric heating boiler and boiler pump.3. Provide 2 rooftop air handlers including structural design, structural reinforcement, roofing, curbs.4. Structural design is delegated to Contractor. Contractor to retain professional engineering.5. Provide fans including return fan, exhaust fan.6. Provide ductwork including diffusers, grilles.7. Provide electrical services as required.8. Provide building automation services including expansion of existing, modification of graphics, sequences, programming, trending.9. Perform air and hydronic testing and balancing.10. Provide fully functional systems that are complete and ready for intended use and effect.

Design Boundaries:1. Existing air distribution, including VAV boxes and diffusers, are being reused except where critical to modify. Site reviews and testing during and after construction may identify some parts that require additional rework

3 Way Switch

Electrical Symbol Legend

Device (unless otherwise indicated) with Tag ‘A’ shown.

Turbidity

4 Way Switch

Dimmer Switch

3 Way Dimmer Switch

Dewpoint

3

4

D

3D

WP

Indicator Symbol Legend

ThermometerGauge (unless otherwise indicated) with stem shown.

Controls Symbol Legend

System / SYSTEMSystem / SYSTEM

Line and Label LegendREPRESENTATION NAME

System / SYSTEM

Existing to be RemovedBoundary Work (Not Part of This Work At This Time)Existing to be ReusedNew to be ProvidedNot in Current Viewing Plane

Existing to be RemovedExisting to be ReusedNew To be Provided

Typical Flow DirectionCommunication Network (may be wiring including power)Control Signals (may be wiring including power)Controller Internal Signals

T

A

TS

TS-LL

TS-HL

F

L

U

D

A

F

Liquid Volume MeterV

Electric MeterEM

DRAWING & DRAWING NAME REV SHEET & SHEET NAME DRAWING SET TYPE BLDG MEAS

G01 General Information B 01 Key Plan BI 3130 DG121-001-01 Gnrl 121 00102 Legend03 Schedules04 Schedules

M01 Mechanical Systems B 01 Main Floor Existing Layout BI 3130 DM121-001-01 Mech 121 00102 Main Floor Retrofit Layout03 Upper Floor, Roof Existing Layout04 Upper Floor, Roof Retrofit Layout05 Mech. Rm Existing Layout06 Mech. Rm Retrofit Layout07 Heating System Schematics08 Details

E01 Electrical Systems B 01 Electrical Schematics BI 3130 DE121-001-01 Elec 121 001C01 Controls B 01 Notes and Existing Points List BI 3130 DC121-001-01 Ctrl 121 001

02 Retrofit Points List

NOTES:

1. Drawing names represent drawings sets to convey Work and are not intended to be trade specific. Contract documents in their entirety fully describe Work.

PIPING SCHEDULE 1,2 ,3

SERVICE PIPES INSULATION AND JACKETS OTHER

TAG DESCRIPTION F LUID TYPE 4 OPERATING MATERIAL JOINTS RATED F INISH INSULAT. THICKNESS 5 JACKET 6 F INISH TEXT BAND

PRESS. TEMP. PRESS. TEMP. TYPE/ (Envi ronment: INC) (Defaul t: TY PE/ LETTERS/

[psig] [°F] [psig] [°F] hi. COLOUR [in] ALU ) COLOUR BACKGRO.

MUW Makeup Water From Potable Water Source <= 150 >= 40 to < 105 CO-T-LH Soldered 150 212 MF< NPS 1-1/2: 1

>= NPS 1-1/2: 1-1/2IN: PVC

AMB/OUT: Provide electric heat trace

cables under insulation.HBS

HBR

BHS

BHR

Heating Boiler Supply

Heating Boiler Return

Building Heating Supply

Building Heating Return

Treated Water, 30% Propylene

Glycol<= 150 >= 140 to < 200 CS-P-E40

<= NPS 2: Threaded

> NPS 2: Welded150 250 MF

< NPS 1-1/2: 1-1/2

>= NPS 1-1/2: 2IN: PVC

SLD Service Loop DrainInfrequent Service Fluids and

Gases, Air<= 150 >= 105 to < 180 CS-P-E40

<= NPS 2: Threaded

> NPS 2: Welded150 212

Paint

BlackInsulate to protect other surfaces and occupants.

NOTES & DEF INITIONS:

1. Refer to specifications and other design documents for other requirements, including definitions of terms, words, and acronyms. For other piping not specifically indicated, match above indicated requirements based on similar piping.

2. Environment types for locations: IN=Indoor space (either INC or INU). INC=Indoor conditioned to >= 60-°F to < 105-°F. INU=Indoor unconditioned. AMB=Ambient outdoor temperature and humidity. OUT=Outdoor.

3. Refer to other design documents for other location types, including: BUR=Buried. NAT=Natatorium. SEA=Sea/ocean side.

4. Air from outdoors at various AMB and OUT conditions, including condensation, local atmospheric contaminants, dust.

5. Insulation thickness for indicated environments and Operating Temp. For INU, add 1/2-in additional insulation to thickness required. For other locations and conditions, add 1-in additional insulation to thickness required. Review final requirements with Engineer.

6. Provide jacket Type AL jacket when insulation is required for all environments unless otherwise indicated. Where PVC jacket is indicated, and piping routing results in ambient/radiant temperatures high enough to damage or warp PVC, use other jackets including AL.

TBD=To Be Determined AL=Aluminum Colours to ASME-A13.1.

CO=Copper EF=Flexible Elastomeric Foam CAN=Canvas

CS=Carbon Steel ISO= Closed Cell Polyisocyanurate CPVC=Chlorinated Polyvinyl Chloride

-P=Pipe MF=Mineral Fibre PE=Polyethylene

-C=Corrugated PVC=Polyvinyl Chloride

-E=Electric Resistance Welded SS=Stainless Steel

-G-Galvanized

-S=Seamless

##=Schedule##

##=PressureClass##

-T=Tube

-C=Corrugated

J=Jacketed

-S=Seamless

-G=Type G

-K=Type K

-L=Type L

H=Hard

DUCTWORK SCHEDULE 1,2 ,3

SERVICE DUCTS INSULATION, LINERS AND JACKETS OTHER

TAG/ DESCRIPTION FLUID OPERATING TY PE MATERIAL CLASS F INISH TYPE THICKNESS R-VALUE F ACING JACKET F INISH

LINE TY PE PRESS. TEMP. PRESS. TY PE/ (Envi ron: INC) [h·ft2·°F/ TYPE/

COLOUR [inWC] [°F] [inWC] COLOUR [in] Btu] min. COLOUR

Bl ue Supply Air >= 50 to < 105 Rectangular GS 3 MF-B1.5

OUT:2IN: FSK 5 OUT: COM

Round GS 3 MF-W 2 IN: FSK 5Flex - Insulated AL 1 MF 6 IN:PE

Purpl e Transfer Air >= 50 to < 105 Rectangular GS 1 MF-L 1-1/2

Orange Return Air >= 50 to < 105 Rectangular GS 3 MF-B1.5

OUT:2IN: FSK 5 OUT: COM

Round GS 2 MF-W 4 2 IN: FSK 5Pi nk Exhaust Air >= 50 to < 105 Rectangular GS 2 MF-B 4 1-1/2 IN: FSK 5

Round GS 2 MF-W 4 2 IN: FSK 5

NOTES & DEF INITIONS:

1. Refer to specifications and other design documents for other requirements, including definitions of terms, words, and acronyms.

2. Environment types for locations: IN=Indoor space (either INC or INU). INC=Indoor conditioned to >= 60-°F to < 105-°F. INU=Indoor unconditioned. AMB=Ambient outdoor temperature and humidity. OUT=Outdoor.

3. Refer to other design documents for other location types, including: BUR=Buried. NAT=Natatorium. SEA=Sea/ocean side.

4. Exhaust/Return: Insulate duct within 6-ft of exterior and unconditioned openings. Add 1-in to indicated insulation thickness.

5. Supply/Exhaust/Return: Provide canvas jacket in exposed locations including mechanical rooms. Paint as required. Review colour with Owner.

TBD=To Be Determined TBD=To Be Determined

AL=Aluminum ISO=Closed Cell Polyisocyanurate FSK=Foil Scrim Kraft

CS=Carbon Steel MF=Mineral Fibre PSK=Poly Scrim Kraft

FC=Fibreglass Cloth -B=Board AL=Aluminum

GS=Galvanized Steel -L=Liner CAN=Canvas

PVC=Polyvinyl Chloride -W=Wrap COM=Composite Membrane

SS=Stainless Steel PE=Polyethylene

PVC=Polyvinyl Chloride

SS=Stainless Steel

Width x Height

Flow (cfm)TagDiffuser Flow Tag

1 3 4 5 6 7 8

A

B

C

D

E

F

G

H

I

J

2 9 10 11 12 13 14 15

A

B

C

D

E

F

G

H

I

J

SHEET NAME

DRAWING NAME

CLIENT/PROJECT LOCATION

CHECKED APPROVED

STAMP STAMP

SCALEDATE CREATED

FILE NO. REVDRAWING NO.

SHEET NO.

REV REVISION ISSUED FOR DATE BY APPR.

750 Oakdale Road, Unit 54

Toronto, Ontario M3N 2Z4

voice: (416) 748-6222

fax: (416) 748-0344

www.buildinginnovation.com

of

50A Jackson Street West

Hamilton, Ontario L8P 1L4

voice: (289) 389-5555

[email protected]

DESIGNED DRAWN

1 3 4 5 6 7 82 9 10 11 12 13 14 15

CLIENT

ACCT PROJECT TYPE BUILDING MEASURE SET SHEET

- -

These draw

ings are to be view

ed in colour only. T

hese draw

ings are to be read in conjunction w

ith other draw

ings and design docum

ents.

Lambton Area Water Supply System

1215 Fort Street

Point Edward, Ontario N7V 1M2

www.lawss.org

Review

Review

Oct 11, 2018

Nov 2, 2018

JH

JH

JD

JD

-

A

B Tender Nov 9, 2018 JH JD

JD JH JD

1215 Fort StreetLAWSS Admin Office

Schedules

General Information

JD

HVAC

Oct 01, 2018

Point Edward, ON N7V 1M2

03 04

G01BBI 3191 DG 121 001 01 03

NTS

These drawings are issued solely for the purpose indicated and are not to

be used for construction unless designated as such and sealed by a

professional engineer.

BOILER SCHEDULE 1

TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE CAPACITY SOURCE SINK SERVICE F LU ID RATED OTHER 2

INPUT OUTPUT ENERGY FLUID TEMP. F LOW PRESS. PRESS. TEMP.[#] [kW] [kW] TY PE [°F] in [°F] out [USgpm] [Δ-ftWC] [psig] [°F] hi./lo.

B-1 Heating Boiler 304A Stor. Rm Modi fy Electric Treat.Wat.

HEAT PUMP SCHEDULE 1

TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE CAPACITY SOURCE SERVICE FOTHER 2

INPUT OUTPUT ENERGY FLUID[#] [kW] [kW] TY PE

HP-1 Heat Pump Water to Water 304A Stor. Rm Demol i sh Electric Treat.Wat.

CUSTOM VENTILATION CAB INET SCHEDULE 1

TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE SERVICE OPERATING POINTS RATED OTHER 2

FLU ID SUPPLY F LOW RETURN F LOW OUTDOOR F LOW PRESS. TEMP.[#] TY PE [cfm] min. [cfm] max. [cfm] min. [cfm] max. [cfm] min. [cfm] max. [inWC] ESP [inWC] TSP [°F] hi./lo.

AHU-1 Air Handler Custom 302 Mech. Rm Demol i sh Air

PACKAGED VENTILATION UNIT SCHEDULE 1

TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE SERVICE SELECTION POINTS HEATING COOLING RATED OTHER 2

FLU ID SUPPLY PRESS. OUTDOOR SOURCE CAPACITY IN/OUT SUPPLY CAPACITY EER SUPPLY PRESS. TEMP.[#] TY PE [cfm] [Δ-inWC] [cfm] ENERGY [MBtu/hr] [MBtu/hr] [°F] [TR] out min. [°F] [inWC] ESP [inWC] TSP [°F] hi./lo.

RTU-1 Rooftop Air Handler Mixed Air, Cool/Heat Roof Provi de Air 950 1 ESP 150 Elec. - 20478 80 3 12.5 55 RTU-1_SF. RTU-1_EF

RTU-2 Rooftop Air Handler Mixed Air, Cool Only Roof Provi de Air 6537 3 ESP 500 - - - - 15 12.1 55 RTU-2_SF

FAN SCHEDULE 1

TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE SERVICE SELECTION POINT RUN-OUT POINT DIMENSIONS RATED SOUND OTHER 2

FLU ID F LOW PRESS. SPEED EF F . F LOW PRESS. EF F . W-DIA./H WHEEL PRESS. TEMP. [sones]@[#] TY PE [cfm] [Δ-inWC] [rpm] [%] [cfm] [Δ-inWC] [%] [in] [in] [inWC] [°F] hi./lo. [cfm]

EF-7 Exhaust Fan Inline 302 Mech. Rm Demol i sh Air

RF-1 Return Fan Inline, Axial 302 Mech. Rm Demol i sh Air

RTU-1_SF Supply Fan Plenum Roof Provi de Air 950 1.5 TSP 1868 12 Provided with equipment.

RTU-1_EF Exhaust Fan Plenum Roof Provi de Air 950 0.3 ESP 1156 12 Provided with equipment.

RTU-2_SF Supply Fan Plenum Roof Provi de Air 6537 4.3 TSP 1579 24 Provided with equipment.

RTU-2_RF Return Fan Inline, Mixed Flow 302 Mech. Rm Provi de Air 6000 1 TSP 1544 26

EF-7 Exhaust Fan Inline, Centrifugal 302 Mech. Rm Provi de Air 608 0.75 ESP 1664

VENTILATION LIQU ID COIL SCHEDULE 1

TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE CAPACITY SOURCE SERVICE LIQU ID SINK SERVICE FLU ID DIMENSIONS OTHER 2

TOTAL SENSIBLE LIQU ID TEMP. F LOW PRESS. FLU ID TEMP. F LOW PRESS. WIDTH HEIGHT[#] [MBtu/hr] [%] TY PE [°F] in [°F] out [USgpm] [Δ-ftWC] TY PE [°F] db/wb [°F] db/wb [cfm] [Δ-inWC] [in] finned [in] finned

VAV7_RC Reheat Coil 201 Corridor Demol i sh Treat.Wat. Air

VAV9B2_RC Reheat Coil 201C Office Demol i sh Treat.Wat. Air

VAVx_RC Reheat Coil Various Existing Treat.Wat. Air

VARIABLE AIR VOLUME BOX SCHEDULE 1

TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE SERVICE OPERATING RANGE INLET OUTLET SOUND RATED OTHER 2

FLU ID FLOW W-DIA./L W-DIA./L DNC/RNC @ TIP @ MAX .FLOW PRESS. TEMP.[#] TY PE [cfm] min. [cfm] max. [in] [in] [NC] max. [Δ-inWC] [NC] max. [Δ-inWC] [inWC] [°F] hi./lo.

VAV7 Variable Air Volume Box Single Duct Various Demol i sh Air 10/10 31/25 1.0 38/33 3.0

VAV9B2 Variable Air Volume Box Single Duct Various Demol i sh Air 10/10 30/25 1.0 33/33 3.0

VAVx Variable Air Volume Box 10 Single Duct Various Existing Air 97 530 6 10/10 28/28 1.0 35/37 3.0

DEF INITIONS: DNC=Discharge Noise Criteria, RNC=Radiated Noise Criteria, TIP=Terminal Inlet Pressure

DIFF USER, GRILLE, REGISTER SCHEDULE 1

TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE SERVICE F LU ID MOUNT DIMENSIONS NECK SOUND RATED OTHER 2

FLU ID TEMP. F LOW PRESS. TY PE WIDTH LENGTH W-DIA./L PRESS. TEMP.[#] TY PE [°F] [cfm] [Δ-ftWC] [in] [in] [in] [NC] max. [inWC] [°F] hi./lo.

S1 Supply Duct Diffuser 2 Square Cone Various Provi de Air As Ind. 24 24 10

T1 Transfer Duct Diffuser 4 Grille - Eggcrate Various Provi de Air As Ind. 12 24 12/24

ELECTRIC CONVECTIVE HEATER SCHEDULE 1

TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE CAPAC. SOURCE SINK SERVICE F LU ID RATED OTHER 2

OUTPUT ENERGY FLU ID TEMP. F LOW PRESS. PRESS. TEMP.[#] [MBtu/hr] TY PE [°F] in [°F] out [cfm] [Δ-ftWC] [psig] [°F] hi./lo.

PHx Baseboard Convect. 15 Various Existing Electric Air

ELECTRIC FORCED F LOW HEATER SCHEDULE 1

TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE CAPAC. SOURCE SINK SERVICE F LU ID RATED OTHER 2

OUTPUT ENERGY FLU ID TEMP. F LOW PRESS. PRESS. TEMP.[#] [MBtu/hr] TY PE [°F] in [°F] out [cfm] [Δ-ftWC] [psig] [°F] hi./lo.

FC1 Unit Heater 201 Corridor Existing Electric Air

PUMP SCHEDULE 1

TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE SERVICE SELECTION POINT RUN-OUT POINT SIZE RATED OTHER 2

LIQU ID F LOW PRESS. EF F . F LOW PRESS. EF F . S/D/H PRESS. TEMP.[#] TY PE [USgpm] [Δ-ftWC] [%] [USgpm] [Δ-ftWC] [%] [in.dia.] [psig] [°F] hi./lo.

P-2 Pump Vertical Inline 302 Mech. Rm Demol i sh Treat.Wat.

P-3 Pump Vertical Inline 302 Mech. Rm Demol i sh Treat.Wat.

BP-1 Htg. Boiler Pump Inline Circulator 304A Stor. Rm Demol i sh Treat.Wat.

P-1 Bldg. Htg. Pump Vertical Inline 302 Mech. Rm Existing Treat.Wat.

DEF INITIONS: S=Suction, D=Discharge, H=Housing

LIQU ID HEAT EXCHANGER SCHEDULE 1

TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE CAPAC. SOURCE SERVICE LIQU ID SINK SERVICE LIQU ID RATED OTHER 2

TOTAL LIQU ID TEMP. F LOW PRESS. FLU ID TEMP. F LOW PRESS. PRESS. TEMP.[#] [MBtu/hr] TY PE [°F] in [°F] out [USgpm] [Δ-ftWC] TY PE [°F] in [°F] out [USgpm] [Δ-ftWC] [psig] [°F] hi./lo.

HX-1 Heat Exchanger Plate and Frame 302 Mech. Rm Demol i sh Treat.Wat. Treat.Wat.

LIQU ID EXPANSION TANK SCHEDULE 1

TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE SERVICE ORIENT. VOLUME RATED OTHER 2

LIQU ID TANK ACCEPT. PRESS. TEMP.[#] TY PE [USgal] [USgal] [psig] [°F] hi./lo.

ET1 Expansion Tank Diaphragm 302 Mech. Rm Existing Pot.Wat. Vert.

ET2 Expansion Tank Full Acceptance Bladde 302 Mech. Rm Demol i sh Gly. Vert.

LIQU ID CONTROL VALVE SCHEDULE 1

TAG DESCRIPTION QUAN. TYPE LOCATION SCOPE SERVICE LIQU ID SIZE RATED OTHER 2

LIQU ID F LOW PRESS. Cv PRESS. TEMP.[#] TY PE [USgpm] [Δ-psi] [in.dia.] [psig] [°F] hi./lo.

VAVx_CV Control Valve 10 2-way Ball Various Existing Treat.Wat.

VAVx_CV Control Valve 2 2-way Ball Various Demol i sh Treat.Wat.

CV-x Control Valve 2 2-way Ball Various Existing Treat.Wat.

NOTES:1. Refer to specifications and other design documents for other requirements, including definitions of terms, words, and acronyms.

2. Additional requirments including features, options, notes.

BOILER SCHEDULE (ELECTRICAL)TAG DESCRIPTION LOCATION LOAD RATINGS

VOLTAGE POWER[VAC/ø/Hz] [kW]

B-1 Heating Boiler 304A Stor. Rm 575/3/60 84

HEAT PUMP SCHEDULE (ELECTRICAL)TAG DESCRIPTION LOCATION LOAD RATINGS

VOLTAGE CURRENT[VAC/ø/Hz] [A]

HP-1 Heat Pump Mech. Room 208/3/60

CUSTOM VENTILATION CAB INET SCHEDULE (ELECTRICAL)TAG DESCRIPTION LOCATION LOAD RATINGS OTHER 2

VOLTAGE CURRENT[VAC/ø/Hz] [A]

AHU-1 Air Handler 302 Mech. Rm 575/3/60

PACKAGED VENTILATION UNIT SCHEDULE (ELECTRICAL)TAG DESCRIPTION LOCATION LOAD RATINGS OTHER 2

VOLTAGE CURRENT[VAC/ø/Hz] [A]

RTU-1 Rooftop Air Handler Roof 208/3/60 22.9 Refer to components for individual loads.

RTU-2 Rooftop Air Handler Roof 575/3/60 33.3 Refer to components for individual loads.

FAN SCHEDULE (ELECTRICAL)TAG DESCRIPTION LOCATION LOAD RATINGS CONTROL FEATURES/EQUIPMENT MOTOR

VOLTAGE CURRENT SCOPE TY PE OTHER 2 SCOPE TY PE RATED SPEED OTHER 2[VAC/ø/Hz] [A] [hp] [rpm]

EF-7 Exhaust Fan 302 Mech. Rm 208/1/60 Pr ovi de Motor Controller Demol i sh Induction

RF-1 Exhaust Fan 302 Mech. Rm 575/3/60 Demol i sh Var. Freq. Drive Demol i sh Induction

RTU-1_SF Exhaust Fan Roof 575/3/60 Pr ovi de ECM Provi de ECM, TEFC 1.3 Provided with equipme

RTU-1_EF Exhaust Fan Roof 575/3/60 Pr ovi de ECM Provi de ECM, TEFC 1.3 Provided with equipme

RTU-2_SF Exhaust Fan Roof 575/3/60 Pr ovi de Var. Freq. Drive Provi de Induction, TEFC 10 Provided with equipme

RTU-2_RF Exhaust Fan 302 Mech. Rm 575/3/60 Modi fy Var. Freq. Drive Provi de Induction, TEFC 2

EF-7 Exhaust Fan 302 Mech. Rm 115/1/60 Pr ovi de Disconnect Provi de Induction 0.3

ELECTRIC CONVECTIVE HEATER SCHEDULE (ELECTRICAL)TAG DESCRIPTION LOCATION

VOLTAGE CURRENT QUAN. MAKE/MODEL TY PE RATED OTHER 2

[VAC/ø/Hz] [A] [#] [A]

PHx Baseboard Convect. Various 575/3/60

ELECTRIC FORCED F LOW HEATER SCHEDULE (ELECTRICAL)TAG DESCRIPTION LOCATION CONTROL FEATURES/EQUIPMENT MOTOR

VOLTAGE CURRENT SCOPE TY PE OTHER 2 SCOPE TY PE RATED SPEED OTHER 2[VAC/ø/Hz] [A] [hp] [rpm]

FC1 Unit Heater 201 Corridor

PUMP SCHEDULE (ELECTRICAL)TAG DESCRIPTION LOCATION CONTROL FEATURES/EQUIPMENT MOTOR

VOLTAGE CURRENT SCOPE TY PE OTHER 2 SCOPE TY PE RATED SPEED OTHER 2[VAC/ø/Hz] [A] [hp] [rpm]

P-2 Pump 302 Mech. Rm

P-3 Pump 302 Mech. Rm

BP-1 Htg. Boiler Pump 304A Stor. Rm

P-1 Bldg. Htg. Pump 302 Mech. Rm

1 3 4 5 6 7 8

A

B

C

D

E

F

G

H

I

J

2 9 10 11 12 13 14 15

A

B

C

D

E

F

G

H

I

J

SHEET NAME

DRAWING NAME

CLIENT/PROJECT LOCATION

CHECKED APPROVED

STAMP STAMP

SCALEDATE CREATED

FILE NO. REVDRAWING NO.

SHEET NO.

REV REVISION ISSUED FOR DATE BY APPR.

750 Oakdale Road, Unit 54

Toronto, Ontario M3N 2Z4

voice: (416) 748-6222

fax: (416) 748-0344

www.buildinginnovation.com

of

50A Jackson Street West

Hamilton, Ontario L8P 1L4

voice: (289) 389-5555

[email protected]

DESIGNED DRAWN

1 3 4 5 6 7 82 9 10 11 12 13 14 15

CLIENT

ACCT PROJECT TYPE BUILDING MEASURE SET SHEET

- -

These draw

ings are to be view

ed in colour only. T

hese draw

ings are to be read in conjunction w

ith other draw

ings and design docum

ents.

Lambton Area Water Supply System

1215 Fort Street

Point Edward, Ontario N7V 1M2

www.lawss.org

Review

Review

Oct 11, 2018

Nov 2, 2018

JH

JH

JD

JD

-

A

B Tender Nov 9, 2018 JH JD

JD JH JD

1215 Fort StreetLAWSS Admin Office

Schedules

General Information

JD

HVAC

Oct 01, 2018

Point Edward, ON N7V 1M2

04 04

G01BBI 3191 DG 121 001 01 04

NTS

These drawings are issued solely for the purpose indicated and are not to

be used for construction unless designated as such and sealed by a

professional engineer.

AIR TERMINAL BOX SCHEDULE - RTU2

BOX NAME ZONES SERVED MAX COOLING AIRFLOW

MIN AIRFLOW

OTHER

[cfm] [cfm]

VAV1 202 - Office 852 140

VAV2 203 - Office 348 50

VAV3 204 - Conference Room 1,527 204

VAV4 215 - LUNCH ROOM,216 - CORRIDOR 912 273

VAV5 210 - LABORATORY 1,275 364

VAV6 218 - Office 113 65

VAV8 212 - MENS WASHROOM,214 - MENS LOCKERS 335 183

VAV9A 201C - Office 768 200

VAV9B 201B - Office 511 50

VAV9C 201 - CORRIDOR,205 - CORRIDOR 623 337

Zone Schedule

ZONE TAG ZONE NAME ZONE FLOOR AREA(Az )

OCCUPANCY CATEGORY AIR CLASS AREA COMPONENT

(Va)

ZONE POPULATION

(Pz )

PEOPLE COMPONENT

(Vp)

ZONE OUTDOOR

AIRFLOW (Voz )

SUPPLY TERMINALS

[ft2] [cfm] [person] [cfm] [cfm]

201 - CORRIDOR Corridor 459 Corridors 1 27.1 0.0 0.0 27.1 VAV9C

201B - Office Office 127 Office space 1 7.5 0.6 3.1 10.6 VAV9B

201C - Office Office 192 Office space 1 11.3 0.9 4.7 16.0 VAV9A

202 - Office Office 246 Office space 1 14.5 1.1 6.1 20.6 VAV1

203 - Office Office 156 Office space 1 9.2 0.7 3.8 13.0 VAV2

204 - Conference Room Conference Room 402 Conference/meeting 1 23.7 18.7 98.9 122.6 VAV3

205 - CORRIDOR Corridor 348 Corridors 1 20.6 0.0 0.0 20.6 VAV9C

206 - WOMENS WASHROOM Womens Washroom 119 (Toilets - public) 2 0.0 0.0 0.0 0.0

207 - WOMENS LOCKERS Womens Lockers 86 Break rooms (Locker Rooms) 2 5.1 2.0 10.6 15.6

210 - LABORATORY Laboratory 502 Office space 1 29.6 2.3 12.3 42.0 VAV5

212 - MENS WASHROOM Mens Washroom 198 (Toilets - public) 2 0.0 0.0 0.0 0.0 VAV8

214 - MENS LOCKERS Mens Lockers 313 Break rooms (Locker Rooms) 2 18.5 7.3 38.5 57.0 VAV8

215 - LUNCH ROOM Lunch Room 155 Break rooms 1 9.1 3.6 19.1 28.2 VAV4

216 - CORRIDOR Corridor 468 Corridors 1 27.6 0.0 0.0 27.6 VAV4

218 - Office Office 173 Office space 1 10.2 0.8 4.3 14.5 VAV6

220 - Control Room Control Room 959 Office space 1 56.6 4.5 23.6 80.2 RTU1

0 5 10 15 20 25ft

T

1 3 4 5 6 7 8

A

B

C

D

E

F

G

H

I

J

2 9 10 11 12 13 14 15

A

B

C

D

E

F

G

H

I

J

SHEET NAME

DRAWING NAME

CLIENT/PROJECT LOCATION

CHECKED APPROVED

STAMP STAMP

SCALEDATE CREATED

FILE NO. REVDRAWING NO.

SHEET NO.

REV REVISION ISSUED FOR DATE BY APPR.

750 Oakdale Road, Unit 54

Toronto, Ontario M3N 2Z4

voice: (416) 748-6222

fax: (416) 748-0344

www.buildinginnovation.com

of

50A Jackson Street West

Hamilton, Ontario L8P 1L4

voice: (289) 389-5555

[email protected]

DESIGNED DRAWN

1 3 4 5 6 7 82 9 10 11 12 13 14 15

CLIENT

ACCT PROJECT TYPE BUILDING MEASURE SET SHEET

- -

These draw

ings are to be view

ed in colour only. T

hese draw

ings are to be read in conjunction w

ith other draw

ings and design docum

ents.

Lambton Area Water Supply System

1215 Fort Street

Point Edward, Ontario N7V 1M2

www.lawss.org

Review

Review

Oct 11, 2018

Nov 2, 2018

JH

JH

JD

JD

-

A

B Tender Nov 9, 2018 JH JD

JD JH JD

1215 Fort StreetLAWSS Admin Office

Main Floor Existing Layout

Mechanical Systems

JD

HVAC

Oct 01, 2018

Point Edward, ON N7V 1M2

01 08

M01BBI 1931 DM 121 001 01 01

As Shown

These drawings are issued solely for the purpose indicated and are not to

be used for construction unless designated as such and sealed by a

professional engineer.

0 5 10 15 20 25ft

1 3 4 5 6 7 8

A

B

C

D

E

F

G

H

I

J

2 9 10 11 12 13 14 15

A

B

C

D

E

F

G

H

I

J

SHEET NAME

DRAWING NAME

CLIENT/PROJECT LOCATION

CHECKED APPROVED

STAMP STAMP

SCALEDATE CREATED

FILE NO. REVDRAWING NO.

SHEET NO.

REV REVISION ISSUED FOR DATE BY APPR.

750 Oakdale Road, Unit 54

Toronto, Ontario M3N 2Z4

voice: (416) 748-6222

fax: (416) 748-0344

www.buildinginnovation.com

of

50A Jackson Street West

Hamilton, Ontario L8P 1L4

voice: (289) 389-5555

[email protected]

DESIGNED DRAWN

1 3 4 5 6 7 82 9 10 11 12 13 14 15

CLIENT

ACCT PROJECT TYPE BUILDING MEASURE SET SHEET

- -

These draw

ings are to be view

ed in colour only. T

hese draw

ings are to be read in conjunction w

ith other draw

ings and design docum

ents.

Lambton Area Water Supply System

1215 Fort Street

Point Edward, Ontario N7V 1M2

www.lawss.org

Review

Review

Oct 11, 2018

Nov 2, 2018

JH

JH

JD

JD

-

A

B Tender Nov 9, 2018 JH JD

JD JH JD

1215 Fort StreetLAWSS Admin Office

Main Floor Retrofit Layout

Mechanical Systems

JD

HVAC

Oct 01, 2018

Point Edward, ON N7V 1M2

02 08

M01BBI 3191 DM 121 001 01 02

As Shown

These drawings are issued solely for the purpose indicated and are not to

be used for construction unless designated as such and sealed by a

professional engineer.

0 5 10 15 20 25ft

1 3 4 5 6 7 8

A

B

C

D

E

F

G

H

I

J

2 9 10 11 12 13 14 15

A

B

C

D

E

F

G

H

I

J

SHEET NAME

DRAWING NAME

CLIENT/PROJECT LOCATION

CHECKED APPROVED

STAMP STAMP

SCALEDATE CREATED

FILE NO. REVDRAWING NO.

SHEET NO.

REV REVISION ISSUED FOR DATE BY APPR.

750 Oakdale Road, Unit 54

Toronto, Ontario M3N 2Z4

voice: (416) 748-6222

fax: (416) 748-0344

www.buildinginnovation.com

of

50A Jackson Street West

Hamilton, Ontario L8P 1L4

voice: (289) 389-5555

[email protected]

DESIGNED DRAWN

1 3 4 5 6 7 82 9 10 11 12 13 14 15

CLIENT

ACCT PROJECT TYPE BUILDING MEASURE SET SHEET

- -

These draw

ings are to be view

ed in colour only. T

hese draw

ings are to be read in conjunction w

ith other draw

ings and design docum

ents.

Lambton Area Water Supply System

1215 Fort Street

Point Edward, Ontario N7V 1M2

www.lawss.org

Review

Review

Oct 11, 2018

Nov 2, 2018

JH

JH

JD

JD

-

A

B Tender Nov 9, 2018 JH JD

JD JH JD

1215 Fort StreetLAWSS Admin Office

Upper Floor, Roof Existing Layout

Mechanical Systems

JD

HVAC

Oct 01, 2018

Point Edward, ON N7V 1M2

03 08

M01BBI 3191 DM 121 001 01 03

As Shown

These drawings are issued solely for the purpose indicated and are not to

be used for construction unless designated as such and sealed by a

professional engineer.

0 5 10 15 20 25ft

1 3 4 5 6 7 8

A

B

C

D

E

F

G

H

I

J

2 9 10 11 12 13 14 15

A

B

C

D

E

F

G

H

I

J

SHEET NAME

DRAWING NAME

CLIENT/PROJECT LOCATION

CHECKED APPROVED

STAMP STAMP

SCALEDATE CREATED

FILE NO. REVDRAWING NO.

SHEET NO.

REV REVISION ISSUED FOR DATE BY APPR.

750 Oakdale Road, Unit 54

Toronto, Ontario M3N 2Z4

voice: (416) 748-6222

fax: (416) 748-0344

www.buildinginnovation.com

of

50A Jackson Street West

Hamilton, Ontario L8P 1L4

voice: (289) 389-5555

[email protected]

DESIGNED DRAWN

1 3 4 5 6 7 82 9 10 11 12 13 14 15

CLIENT

ACCT PROJECT TYPE BUILDING MEASURE SET SHEET

- -

These draw

ings are to be view

ed in colour only. T

hese draw

ings are to be read in conjunction w

ith other draw

ings and design docum

ents.

Lambton Area Water Supply System

1215 Fort Street

Point Edward, Ontario N7V 1M2

www.lawss.org

Review

Review

Oct 11, 2018

Nov 2, 2018

JH

JH

JD

JD

-

A

B Tender Nov 9, 2018 JH JD

JD JH JD

1215 Fort StreetLAWSS Admin Office

Upper Floor, Roof Retrofit Layout

Mechanical Systems

JD

HVAC

Oct 01, 2018

Point Edward, ON N7V 1M2

04 08

M01BBI 3191 DM 121 001 01 04

As Shown

These drawings are issued solely for the purpose indicated and are not to

be used for construction unless designated as such and sealed by a

professional engineer.

0 1 4ft2

1 3 4 5 6 7 8

A

B

C

D

E

F

G

H

I

J

2 9 10 11 12 13 14 15

A

B

C

D

E

F

G

H

I

J

SHEET NAME

DRAWING NAME

CLIENT/PROJECT LOCATION

CHECKED APPROVED

STAMP STAMP

SCALEDATE CREATED

FILE NO. REVDRAWING NO.

SHEET NO.

REV REVISION ISSUED FOR DATE BY APPR.

750 Oakdale Road, Unit 54

Toronto, Ontario M3N 2Z4

voice: (416) 748-6222

fax: (416) 748-0344

www.buildinginnovation.com

of

50A Jackson Street West

Hamilton, Ontario L8P 1L4

voice: (289) 389-5555

[email protected]

DESIGNED DRAWN

1 3 4 5 6 7 82 9 10 11 12 13 14 15

CLIENT

ACCT PROJECT TYPE BUILDING MEASURE SET SHEET

- -

These draw

ings are to be view

ed in colour only. T

hese draw

ings are to be read in conjunction w

ith other draw

ings and design docum

ents.

Lambton Area Water Supply System

1215 Fort Street

Point Edward, Ontario N7V 1M2

www.lawss.org

Review

Review

Oct 11, 2018

Nov 2, 2018

JH

JH

JD

JD

-

A

B Tender Nov 9, 2018 JH JD

JD JH JD

1215 Fort StreetLAWSS Admin Office

Mechanical Penthouse Existing Layout

Mechanical Systems

JD

HVAC

Oct 01, 2018

Point Edward, ON N7V 1M2

05 08

M01BBI 3191 DM 121 001 01 05

As Shown

These drawings are issued solely for the purpose indicated and are not to

be used for construction unless designated as such and sealed by a

professional engineer.

0 1 4ft2

1 3 4 5 6 7 8

A

B

C

D

E

F

G

H

I

J

2 9 10 11 12 13 14 15

A

B

C

D

E

F

G

H

I

J

SHEET NAME

DRAWING NAME

CLIENT/PROJECT LOCATION

CHECKED APPROVED

STAMP STAMP

SCALEDATE CREATED

FILE NO. REVDRAWING NO.

SHEET NO.

REV REVISION ISSUED FOR DATE BY APPR.

750 Oakdale Road, Unit 54

Toronto, Ontario M3N 2Z4

voice: (416) 748-6222

fax: (416) 748-0344

www.buildinginnovation.com

of

50A Jackson Street West

Hamilton, Ontario L8P 1L4

voice: (289) 389-5555

[email protected]

DESIGNED DRAWN

1 3 4 5 6 7 82 9 10 11 12 13 14 15

CLIENT

ACCT PROJECT TYPE BUILDING MEASURE SET SHEET

- -

These draw

ings are to be view

ed in colour only. T

hese draw

ings are to be read in conjunction w

ith other draw

ings and design docum

ents.

Lambton Area Water Supply System

1215 Fort Street

Point Edward, Ontario N7V 1M2

www.lawss.org

Review

Review

Oct 11, 2018

Nov 2, 2018

JH

JH

JD

JD

-

A

B Tender Nov 9, 2018 JH JD

JD JH JD

1215 Fort StreetLAWSS Admin Office

Mechanical Penthouse Retrofit Layout

Mechanical Systems

JD

HVAC

Oct 01, 2018

Point Edward, ON N7V 1M2

06 08

M01BBI 3191 DM 121 001 01 06

As Shown

These drawings are issued solely for the purpose indicated and are not to

be used for construction unless designated as such and sealed by a

professional engineer.

1 3 4 5 6 7 8

A

B

C

D

E

F

G

H

I

J

2 9 10 11 12 13 14 15

A

B

C

D

E

F

G

H

I

J

SHEET NAME

DRAWING NAME

CLIENT/PROJECT LOCATION

CHECKED APPROVED

STAMP STAMP

SCALEDATE CREATED

FILE NO. REVDRAWING NO.

SHEET NO.

REV REVISION ISSUED FOR DATE BY APPR.

750 Oakdale Road, Unit 54

Toronto, Ontario M3N 2Z4

voice: (416) 748-6222

fax: (416) 748-0344

www.buildinginnovation.com

of

50A Jackson Street West

Hamilton, Ontario L8P 1L4

voice: (289) 389-5555

[email protected]

DESIGNED DRAWN

1 3 4 5 6 7 82 9 10 11 12 13 14 15

CLIENT

ACCT PROJECT TYPE BUILDING MEASURE SET SHEET

- -

These draw

ings are to be view

ed in colour only. T

hese draw

ings are to be read in conjunction w

ith other draw

ings and design docum

ents.

Lambton Area Water Supply System

1215 Fort Street

Point Edward, Ontario N7V 1M2

www.lawss.org

Review

Review

Oct 11, 2018

Nov 2, 2018

JH

JH

JD

JD

-

A

B Tender Nov 9, 2018 JH JD

JD JH JD

1215 Fort StreetLAWSS Admin Office

Heating System Schematics

Mechanical Systems

JD

HVAC

Oct 01, 2018

Point Edward, ON N7V 1M2

07 08

M01BBI 3191 DM 121 001 01 07

NTS

These drawings are issued solely for the purpose indicated and are not to

be used for construction unless designated as such and sealed by a

professional engineer.

P

AHU1 CC

CV-3

Chemical Pot

Feeder

P-2CV-2

Filter

HP-1 Air Separator

P-1

T T

VAV4_RC

VAV5_RC

VAV8_RC

VAV6_RC

VAV7_RC

VAV4_CV

VAV5_CV

VAV8_CV

VAV6_CV

VAV7_CV

VAV9B1_RC

VAV9B2_RC

VAV9A_RC

VAV9C_RC

VAV1_RC

VAV9B1_CV

VAV9B2_CV

VAV9A_CV

VAV9C_CV

VAV1_CV

VAV2_RC

VAV3_RC

VAV2_CV

VAV3_CV

P

CV-1

RPCV-ICL-1

CV-

4

CV-

5

ET-1

HX-1

ET-2

TP-3

GFS-1

TT

CV-

HP

-1

T

FS TP

BoilerB-1

FD

H

LWCO

P

Chemical Pot

Feeder

Filter

P-1

T T

VAV5_RC

VAV8_RC

VAV6_RC

VAV9B

VAV9A

VAV9C

VAV1

VAV2

VAV3

P

CV-1

RP

ET-1

T

TP

H

BP-1

T

Retrofit Schematic

Existing Schematic

VAV4_RCVAV4_CV

VAV5_CV

VAV8_CV

VAV6_CV

VAV9B_CV

VAV9A_CV

VAV9C_CV

VAV1_CV

VAV2_CV

VAV3_CV

HBR 2-in ø

HBS 2-in ø

BH

R

BH

S

BHR

BHS

304 Storage

308 Stairwell

312 Mechanical Room

Cap in 312 Mechanical Room.

TT

FS

BoilerB-1 LWCO

Relocate electric boiler B-1From Storage Room 304A to Mechanical Room 302.

Repipe relocated VAV9B and VAV9C reheat coils as indicated including control valves, strainers.Provide services as required including piping.

304 Storage

308 Stairwell

312 Mechanical Room

1 3 4 5 6 7 8

A

B

C

D

E

F

G

H

I

J

2 9 10 11 12 13 14 15

A

B

C

D

E

F

G

H

I

J

SHEET NAME

DRAWING NAME

CLIENT/PROJECT LOCATION

CHECKED APPROVED

STAMP STAMP

SCALEDATE CREATED

FILE NO. REVDRAWING NO.

SHEET NO.

REV REVISION ISSUED FOR DATE BY APPR.

750 Oakdale Road, Unit 54

Toronto, Ontario M3N 2Z4

voice: (416) 748-6222

fax: (416) 748-0344

www.buildinginnovation.com

of

50A Jackson Street West

Hamilton, Ontario L8P 1L4

voice: (289) 389-5555

[email protected]

DESIGNED DRAWN

1 3 4 5 6 7 82 9 10 11 12 13 14 15

CLIENT

ACCT PROJECT TYPE BUILDING MEASURE SET SHEET

- -

These draw

ings are to be view

ed in colour only. T

hese draw

ings are to be read in conjunction w

ith other draw

ings and design docum

ents.

Lambton Area Water Supply System

1215 Fort Street

Point Edward, Ontario N7V 1M2

www.lawss.org

Review

Review

Oct 11, 2018

Nov 2, 2018

JH

JH

JD

JD

-

A

B Tender Nov 9, 2018 JH JD

JD JH JD

1215 Fort StreetLAWSS Admin Office

Details

Mechanical Systems

JD

HVAC

Oct 01, 2018

Point Edward, ON N7V 1M2

08 08

M01BBI 3191 DM 121 001 01 08

NTS

These drawings are issued solely for the purpose indicated and are not to

be used for construction unless designated as such and sealed by a

professional engineer.

RTU-2 Ductwork

RTU-1 Ductwork

Transfer Duct (Typical of 2)

Provide insulated roof curb.

Maximum height of 14-in.

Provide insulated roof curb.

Maximum height of 14-in.

Provide insulated blank plate for unused

portions of louver.

Provide flexible duct connector

(typical).

Seal roof penetrations.

Provide 1-in acoustic lining on

new supply and return ductwork.

Seal louver penetrations.

Provide 1-in acoustic lining on

new transfer ductwork.

1 3 4 5 6 7 8

A

B

C

D

E

F

G

H

I

J

2 9 10 11 12 13 14 15

A

B

C

D

E

F

G

H

I

J

SHEET NAME

DRAWING NAME

CLIENT/PROJECT LOCATION

CHECKED APPROVED

STAMP STAMP

SCALEDATE CREATED

FILE NO. REVDRAWING NO.

SHEET NO.

REV REVISION ISSUED FOR DATE BY APPR.

750 Oakdale Road, Unit 54

Toronto, Ontario M3N 2Z4

voice: (416) 748-6222

fax: (416) 748-0344

www.buildinginnovation.com

of

50A Jackson Street West

Hamilton, Ontario L8P 1L4

voice: (289) 389-5555

[email protected]

DESIGNED DRAWN

1 3 4 5 6 7 82 9 10 11 12 13 14 15

CLIENT

ACCT PROJECT TYPE BUILDING MEASURE SET SHEET

- -

These draw

ings are to be view

ed in colour only. T

hese draw

ings are to be read in conjunction w

ith other draw

ings and design docum

ents.

Lambton Area Water Supply System

1215 Fort Street

Point Edward, Ontario N7V 1M2

www.lawss.org

Review

Review

Oct 11, 2018

Nov 2, 2018

JH

JH

JD

JD

-

A

B Tender Nov 9, 2018 JH JD

JD JH JD

1215 Fort StreetLAWSS Admin Office

Electrical Schematics

Electrical Systems

JD

HVAC

Oct 01, 2018

Point Edward, ON N7V 1M2

01 01

E01BBI 3191 DE 121 001 01 01

NTS

These drawings are issued solely for the purpose indicated and are not to

be used for construction unless designated as such and sealed by a

professional engineer.

120/208V, 3 PH, 4 W 200AMechanical Room 302Not all loads shown.

PANEL-HC-1

Heat Pump HP-1

Pump P-2

Pump P-1

Pump P-3

VFD

1.5

1

HP-1

1.5

10

3

3P, 15A

3P, 15A

3P, 15A

3x2P, 150A

MCC-3

VFD

Supply Fan SF-1

Return Fan RF-1

Retrofit Schematic

Existing Schematic

3P

3P

347/600V, 3 PH, 600AMCC Room 217

Not all loads shown.

Pump BP-1 13P, 15A

347/600V, 3 PHMCC Room 211

Not all loads shown.

PANEL-L

B-13P

PANEL-HC-1

1.5

2

3P, 15A

3P, 15A

3x2P

3PMCC-3

VFD

RTU-2

Return Fan, RTU-2_RF

3P

3P

3P, 15A

PANEL-L

B-13P

Spare

Pump P-1

Spare

Spare

RTU-1 Dedicated Receptacle

RTU-2 Dedicated Receptacle

1P, 20AGFI

RTU-1

WP

1P, 20AGFI

WP

RTU-1 RTU-2

120/208V, 3 PH 4W, 100AMechanical Room 302Not all loads shown.

PANEL-RF1P

PANEL-RF1P

0.5

0.5

Boiler B-1 Exhaust Fan EF-7

Exhaust Fan EF-7

120/208V, 3 PH 4W, 100AMechanical Room 302Not all loads shown.

Boiler B-1

120/208V, 3 PH, 4 W 200AMechanical Room 302Not all loads shown.

347/600V, 3 PH, 600AMCC Room 217

Not all loads shown. 347/600V, 3 PHMCC Room 211

Not all loads shown.

Rewire and provide setup of existing VFD.

Relocate electric boiler B-1From Storage Room 304A to Mechanical Room 302. Provide electrical services as required.

Review

Review

Oct 11, 2018

Nov 2, 2018

JH

JH

JD

JD

-

A

B Tender Nov 9, 2018 JH JD

JD JH JD

1215 Fort StreetLAWSS Admin Office

Notes and Existing Points List

Controls

JD

HVAC

Oct 01, 2018

Point Edward, ON N7V 1M2

01 02

C01BBI 3191 DC 121 001 01 01

NTS

These drawings are issued solely for the purpose indicated and are not to

be used for construction unless designated as such and sealed by a

professional engineer.

1 3 4 5 6 7 8

A

B

C

D

E

F

G

H

I

J

2 9 10 11 12 13 14 15

A

B

C

D

E

F

G

H

I

J

SHEET NAME

DRAWING NAME

CLIENT/PROJECT LOCATION

CHECKED APPROVED

STAMP STAMP

SCALEDATE CREATED

FILE NO. REVDRAWING NO.

SHEET NO.

REV REVISION ISSUED FOR DATE BY APPR.

750 Oakdale Road, Unit 54

Toronto, Ontario M3N 2Z4

voice: (416) 748-6222

fax: (416) 748-0344

www.buildinginnovation.com

of

50A Jackson Street West

Hamilton, Ontario L8P 1L4

voice: (289) 389-5555

[email protected]

DESIGNED DRAWN

1 3 4 5 6 7 82 9 10 11 12 13 14 15

CLIENT

ACCT PROJECT TYPE BUILDING MEASURE SET SHEET

- -

These draw

ings are to be view

ed in colour only. T

hese draw

ings are to be read in conjunction w

ith other draw

ings and design docum

ents.

Lambton Area Water Supply System

1215 Fort Street

Point Edward, Ontario N7V 1M2

www.lawss.org

GENERAL NOTESINTENT Provide controls to these tables. Refer to other documents for additional requirements including other

definitions.Tables are intended to describe minimum scope, requirements, and intent of controls Work. Contractor to provide system that meets specified intent and requirements, including design, construction, and commissioning as required.Tables may not be complete. Verify types and quantities. Provide additional components as required, including additional points, controllers, devices, end devices, termination devices, power supplies, signal conditioning, repeaters, gateways, interfaces, wiring and other equipment.Other contract documents including drawings may not specifically show devices indicated in tables.

DEFINITIONSPOINT A physical signal or a parameter/variable value that may be used for information or to control systems

and equipment, including physical and virtual inputs, outputs, networks, power.CONTROLLER AND/OR INTERFACE

Name of controller and/or interface including equipment, devices. May refer to control system, controller, equipment or other interface. Actual input/output devices for each controller varies. Provide controllers to meet minimum point quantities indicated, with devices as required.

POINT TYPE Nature of point signal required: A=Analog or Modulating, D=Digital or Binary, I=Input, O=Output, NET=networked point, Blank=as required for intent and functionality. Point signal may be different from device capability.

POINT QUAN. Quantity of points required.DEVICE QUAN. Quantity of devices required. Single points may control more than one device including end devices.

Where field is blank, provide device quantities as required for that point.DEVICE TYPE AND/OR TERMINATION

Provide devices as required at termination including end devices. Includes signal conditioning as required. "Interface" means to interface to other controller or networking, including on equipment, devices.

DEVICE OPTIONS Provide device options as indicated. Where field is blank, provide all options required for intent and functionality.

FAIL MODE Indicates the preferred mode of operation upon device failure. The most probable failure (i.e., failed controller, failed relay, cut wire, etc.) should be considered when determining fail logic.

CONTROLLER/INTERFACE Provide controller for each point. This may require providing a new controller, expansion card, or reusing existing points on existing controllers (subject to approval). Includes hardware and software configuration of points and communications. Includes signal conditioning as required.

DEVICE Provide devices. Includes termination, controllers, end devices, termination devices.WIRING AND/OR TUBING Provide electrical wiring and/or fluid tubing to operate device and interface device to controller.

Includes various forms of signal conditioning, including DC power supplies, Class II transformers, transducers, interposing relays.

INTERLOCKS Design and provide required interlocks, safeties, and life safety interfaces. Includes investigation, coordination, wiring, signal conditioning, commissioning.

CALIBRATE Calibrate and test components including controllers, interfaces, signal conditioning, devices, end devices, termination devices. Field work or bench work may be required.

OTHER Additional requirements.

DEMOLISH Remove and modify as required.RELOCATE Relocate as required. Includes wiring/tubing.

SYSTEM AND POINT DESCRIPTION 1 CONTROLLER AND/OR

INTERFACE

POINT T

YPEPOIN

T QUAN.

DEVICE Q

UAN.

DEVICE T

YPE AND/OR

TERMIN

ATION

DEVICE O

PTIONS

CONTROLLER/INTERFACE

DEVICE

WIR

ING A

ND/OR TUBIN

G

INTERLOCKS

CAL IBRATE

OTHER 2

A. AHU-1 Air HandlerA1 Outdoor Air Temperature BAS AI 1 Temperature Devices - Air - Outdoor D D DA2 Return Fan VFD Modulation BAS AO 1 Interface: Variable Frequency Drive D D DA3 Return Fan Command BAS DO 1 Interface: Variable Frequency Drive D D DA4 Return Fan Status BAS DI 1 Interface: Variable Frequency Drive D D DA5 Mixed Air Dampers BAS AO 1 3 Actuators - Electronic D D DA6 Filter Status BAS DI 1 Electrical Current Switches D D DA7 Cooling Valve CV-ICL-1 BAS AO 1 Actuators - Electronic D D DA8 Supply Fan VFD Modulation BAS AO 1 Interface: Variable Frequency Drive D D DA9 Supply Fan Command BAS DO 1 Interface: Variable Frequency Drive D D DA10 Supply Fan Status BAS DI 1 Interface: Variable Frequency Drive D D DA11 Return Air CO2 Level BAS AI 1 Concentration Devices - Gas - Carbon Dioxide - Duct D D DA12 Return Air Temperature BAS AI 1 Temperature Devices - Air - Duct D D DA13 Mixed Air Temperature BAS AI 1 Temperature Devices - Air - Duct D D DA14 Mixed Air Temperatre Low Limit BAS DI 1 Temperature Switches - Air - Duct (Low Limit) D D DA15 Mixed Air Temperatre Low Limit VFD DI 1 Additional points from other devices. D D DA16 Supply Air Temperature BAS AI 1 Temperature Devices - Air - Duct D D DA17 Supply Air Static Pressure High Limit BAS DI 1 Pressure Switches - Air - Differential - High Limit D D DA18 Supply Air Static Pressure High Limit VFD DI 2 Additional points from other devices. D D DA19 Supply Air Static Pressure BAS AI 1 Pressure Devices - Air - Differential D D D

B. HP-1 Heat PumpB1 Supply Water Temperature BAS AI 1 Temperature Devices - Liquid D DB2 Return Water Temperature BAS AI 1 Temperature Devices - Liquid D DB3 P1 Command BAS DO 1 Electric Switches - Control Relay D DB4 P1 Status BAS DI 1 Electrical Current Switches D DB5 P3 Command BAS DO 1 Electric Switches - Control Relay D D DB6 P3 Status BAS DI 1 Electrical Current Switches D D DB7 Source Water Return Temperature BAS AI 1 Temperature Devices - Liquid D D DB8 Source Water Control Valve BAS AO 1 Actuators - Electronic D D DB9 Source Supply Water Temp BAS AI 1 Temperature Devices - Liquid D D DB10 Transfer Supply Glycol Temperature BAS AI 1 Temperature Devices - Liquid D D DB11 HP-1 Command BAS DO 1 Interface: Heat Pump Controller D D DB12 HP-1 Status BAS DI 1 Interface: Heat Pump Controller D D DB13 HP-1 Temperature Setpoint BAS AO 1 Interface: Heat Pump Controller D D DB14 HP-1 Heating Mode Enable BAS DO 1 Interface: Heat Pump Controller D D DB15 HP-1 Cooling Mode Enable BAS DO 1 Interface: Heat Pump Controller D D DB16 P2 Command BAS DO 1 Electric Switches - Control Relay D D DB17 P2 Status BAS DI 1 Electrical Current Switches D D DB18 Cooling Changeover Valves BAS DO 1 2 Electric Switches - Control Relay D D DB19 Heating Changeover Valves BAS DO 1 2 Electric Switches - Control Relay D D D

C. Electric Heating BoilerC1 Supply Water Setpoint BAS NET 1 Interface: Heating Boiler SequencerC2 Boiler Stage Status BAS NET 5 Interface: Heating Boiler SequencerC3 BP-1 Command BAS DO 1 Electric Switches - Control Relay D D DC4 BP-1 Status BAS DI 1 Electrical Current Switches D D D

D. VAV BoxesD1 Supply Air Temperature BAS AI 10 Temperature Devices - Air - DuctD2 Reheat Valve Open BAS DO 10 Actuators - Electronic D3 Reheat Valve Close BAS DO 10 Additional points from other devices.D4 Space Temperature BAS AI 10 Temperature Devices - Air - ZoneD5 Supply Air Damper BAS NET 10 Actuators - Electronic D6 Supply Air Flow BAS NET 10 Pressure Devices - Air - Differential

E. VAV Boxes (VAV7, VAV9B2)E1 Supply Air Temperature BAS AI 2 Temperature Devices - Air - Duct D D D DE2 Reheat Valve Open BAS DO 2 Actuators - Electronic D D D DE3 Reheat Valve Close BAS DO 2 Additional points from other devices. D D D DE4 Space Temperature BAS AI 2 Temperature Devices - Air - Zone D D D DE5 Supply Air Damper BAS NET 2 Actuators - Electronic D D D DE6 Supply Air Flow BAS NET 2 Pressure Devices - Air - Differential D D D D

F. EF-7, EF-4 Exhaust FansF1 Exhaust Fan EF-7 Command BAS DO 2 Electric Switches - Control Relay D DF2 Exhaust Fan EF-7 Status BAS DI 2 Electrical Current Switches D DF3 Exhaust Fan EF-4 Command BAS DO 2 Electric Switches - Control Relay D D D DF4 Exhaust Fan EF-4 Status BAS DI 2 Electrical Current Switches D D D DNOTES & DEFINITIONS: Scope: ●=Provide; D=Demolish; I=Included (with other parts); N=NIC (possibly by others); O=OFCI; R=Relocate

1 Refer to specifications and other design documents for other requirements, including definitions of terms, words, and acronyms.2 Additional requriements including features, options, notes.

BAS=Building Automation SystemHBS=Heating Boiler SequencerVFD=Variable Frequency DriveHPC=Heat Pump ControllerTag=Refer to other schedules for component tag." " (Blank)=No specific controller required for point/signal/device.

Review

Review

Oct 11, 2018

Nov 2, 2018

JH

JH

JD

JD

-

A

B Tender Nov 9, 2018 JH JD

JD JH JD

1215 Fort StreetLAWSS Admin Office

Retrofit Points List

Controls

JD

HVAC

Oct 01, 2018

Point Edward, ON N7V 1M2

02 02

C01BBI 3191 DC 121 001 01 02

NTS

These drawings are issued solely for the purpose indicated and are not to

be used for construction unless designated as such and sealed by a

professional engineer.

1 3 4 5 6 7 8

A

B

C

D

E

F

G

H

I

J

2 9 10 11 12 13 14 15

A

B

C

D

E

F

G

H

I

J

SHEET NAME

DRAWING NAME

CLIENT/PROJECT LOCATION

CHECKED APPROVED

STAMP STAMP

SCALEDATE CREATED

FILE NO. REVDRAWING NO.

SHEET NO.

REV REVISION ISSUED FOR DATE BY APPR.

750 Oakdale Road, Unit 54

Toronto, Ontario M3N 2Z4

voice: (416) 748-6222

fax: (416) 748-0344

www.buildinginnovation.com

of

50A Jackson Street West

Hamilton, Ontario L8P 1L4

voice: (289) 389-5555

[email protected]

DESIGNED DRAWN

1 3 4 5 6 7 82 9 10 11 12 13 14 15

CLIENT

ACCT PROJECT TYPE BUILDING MEASURE SET SHEET

- -

These draw

ings are to be view

ed in colour only. T

hese draw

ings are to be read in conjunction w

ith other draw

ings and design docum

ents.

Lambton Area Water Supply System

1215 Fort Street

Point Edward, Ontario N7V 1M2

www.lawss.org

SYSTEM AND POINT DESCRIPTION 1 CONTROLLER AND/OR

INTERFACE

POINT T

YPEPOIN

T QUAN.

DEVICE Q

UAN.

DEVICE T

YPE AND/OR

TERMIN

ATION

DEVICE O

PTIONS

CONTROLLER/INTERFACE

DEVICE

WIR

ING A

ND/OR TUBIN

G

INTERLOCKS

CAL IBRATE

OTHER 2

A. RTU-1 Air HandlerA1 Discharge Air Temperature AHC AI 1 Temperature Transmitters - Air - Duct ● ● ● ● ●A2 Mixed Air Temperature AHC AI 1 Temperature Transmitters - Air - Duct ● ● ● ● ●A3 Return Air Temperature AHC AI 1 Temperature Transmitters - Air - Duct ● ● ● ● ●A4 Outdoor Air Temperature AHC AI 1 Temperature Transmitters - Air - Duct ● ● ● ● ●A5 Discharge Air Static Pressure AHC DI 1 Pressure Switches - Air - Differential - High Limit ● ● ● ● ●A6 Air Filter Pressure AHC DI 1 Pressure Switches - Air - Differential - High Limit ● ● ● ● ●A7 Outdoor Air Damper Command AHC AO 1 Actuators - Electronic ● ● ● ● ●A8 Return Air Damper Command AHC AO 1 Actuators - Electronic ● ● ● ● ●A9 Exhaust Air Damper Command AHC AO 1 Actuators - Electronic ● ● ● ● ●A10 Unit Enable/Disable BAS DO 1 Interface: Air Handler Controller ● ● ● ● ●A11 Cooling Enable/Disable BAS DO 1 Interface: Air Handler Controller ● ● ● ● ●A12 Supply Air Temperature Setpoint BAS AI 1 Interface: Air Handler Controller ● ● ● ● ●A13 Air Handler Internal Points BAS NET ALL Interface: Air Handler Controller ● ● ● ● ● Note 3

A14 Return Air Smoke Concentration AHC DI ALL Concentration Transmitters - Particulate - Optical - Vent (Optical Smoke Sensors) ● ● ● ● ● Note 5

B. RTU-2 Air HandlerB1 Discharge Air Temperature AHC AI 1 Temperature Transmitters - Air - Duct ● ● ● ● ●B2 Mixed Air Temperature AHC AI 1 Temperature Transmitters - Air - Duct ● ● ● ● ●B3 Return Air Temperature AHC AI 1 Temperature Transmitters - Air - Duct ● ● ● ● ●B4 Outdoor Air Temperature AHC AI 1 Temperature Transmitters - Air - Duct ● ● ● ● ●B5 Discharge Air Static Pressure AHC AI 1 Pressure Transmitters - Air - Differential ● ● ● ● ●B6 Discharge Air Static Pressure AHC DI 1 Pressure Switches - Air - Differential - High Limit ● ● ● ● ●B7 Air Filter Pressure AHC DI 1 Pressure Switches - Air - Differential - High Limit ● ● ● ● ●B8 Outdoor Air Damper Command AHC AO 1 Actuators - Electronic ● ● ● ● ●B9 Return Air Damper Command AHC AO 1 Actuators - Electronic ● ● ● ● ●B10 Exhaust Air Damper Command AHC AO 1 Actuators - Electronic ● ● ● ● ●B11 Discharge Air Temperature Low Limit AHC AO 1 Temperature Switches - Air - Duct (Low Limit) ● ● ● ● ●B12 Outdoor Air Temperature BAS AI 1 Temperature Devices - Air - Outdoor ●B13 Supply Air Pressure Setpoint BAS AO 1 Interface: Air Handler Controller ● ● ● ● ●B14 Unit Enable/Disable BAS DO 1 Interface: Air Handler Controller ● ● ● ● ●B15 Cooling Enable/Disable BAS DO 1 Interface: Air Handler Controller ● ● ● ● ●B16 Supply Air Temperature Setpoint BAS AI 1 Interface: Air Handler Controller ● ● ● ● ●B17 Air Handler Internal Points BAS NET ALL Interface: Air Handler Controller ● ● ● ● ● Note 3

B18 Return Fan VFD Enable BAS DO 1 Interface: Variable Frequency Drive ● ● ● ● ●B19 Return Fan VFD Command BAS AO 1 Interface: Variable Frequency Drive ● ● ● ● ●B20 Return Fan VFD Speed Feedback BAS AI 1 Interface: Variable Frequency Drive ● ● ● ● ●B21 Return Fan VFD Internal Points BAS NET ALL Interface: Variable Frequency Drive ● ● ● ● ●B22 Return Fan Pressure Sensor BAS AI 1 Pressure Transmitters - Air - Differential ● ● ● ● ●B23 Return Air Smoke Concentration AHC DI ALL Concentration Transmitters - Particulate - Optical - Vent (Optical Smoke Sensors) ● ● ● ● ● Note 5

C . Heating Boiler and Building HeatingC1 Building Heating Supply Water Temperature BAS AI 1 Temperature Devices - Liquid ● ● ●C2 Building Heating Return Water Temperature BAS AI 1 Temperature Devices - Liquid ● ● ●C3 Pump P1 Command BAS DO 1 Electric Switches - Control Relay ● ● ●C4 Pump P1 Status BAS DI 1 Electrical Current Switches ● ● ●C5 Building Heating Loop Differential Pressure BAS AI 1 Pressure Transmitters - Liquid - Differential LCD ● ● ● ● ●C6 Heating Boiler Supply Water Temperature Setpoint BAS NET 1 Interface: Heating Boiler Sequencer ● ● ● ● ● Note 4

C7 Heating Boiler Internal Points BAS NET ALL Interface: Heating Boiler Sequencer ● ● ● ● ●C8 Pump BP-1 Command BAS DO 1 Electric Switches - Control Relay ● ● ● ● ●C9 Pump BP-1 Status BAS DI 1 Electrical Current Switches ● ● ● ● ●

D. VAV BoxesD1 Supply Air Temperature BAS AI 10 Temperature Devices - Air - Duct ●D2 Reheat Valve Open BAS DO 10 Actuators - Electronic ●D3 Reheat Valve Close BAS DO 10 Additional points from other devices. ●D4 Zone Temperautre BAS AI 10 Temperature Devices - Air - Zone ●D5 Supply Air Damper BAS NET 10 Actuators - Electronic ●D6 Supply Air Flow BAS NET 10 Pressure Devices - Air - Differential ●

E. EF-7 Exhaust FansE1 Exhaust Fan EF-7 Command BAS DO 2 Electric Switches - Control Relay R ● ● ●E2 Exhaust Fan EF-7 Status BAS DI 2 Electrical Current Switches R ● ● ●NOTES & DEFINITIONS: Scope: ●=Provide; D=Demolish; I=Included (with other parts); N=NIC (possibly by others); O=OFCI; R=Relocate

1 Refer to specifications and other design documents for other requirements, including definitions of terms, words, and acronyms.2 Additional requriements including features, options, notes.3 Interface to BAS via equipment/controller BACnet interface or BACnet gateway as required. Provide BACnet gateway as required.4 Match existing devices.5 Hard wire to air handler supply fan and return fan VFDs.

BAS=Building Automation SystemHBS=Heating Boiler SequencerAHC=Air Handler ControllerVFD=Variable Frequency DriveTag=Refer to other schedules for component tag." " (Blank)=No specific controller required for point/signal/device.