LAND 400 Phase 2Mounted Combat Reconnaissance Capability
LTCOL Chris McKendryCapability Manager Representative
LAND 400-2 Resident Project Office – GermanyArmoured Vehicle Division
DSEI, London10 September 2019
![Page 2: LAND 400 Phase 2](https://reader031.vdocument.in/reader031/viewer/2022012409/616a468d11a7b741a350bb5c/html5/thumbnails/2.jpg)
LAND 400 Program
LAND 400 will acquire and introduce the mounted combat vehicle systems necessary to enable the Australian Defence Force’s Combined Arms Fighting System.
LAND 400 comprises four phases:– LAND 400 Phase 1 – Scoping study and requirements development (complete)– LAND 400 Phase 2 – Mounted Combat Reconnaissance Capability
Comprising Combat Reconnaissance Vehicle (CRV) Acquisition Contract signed with Rheinmetall Defence Australia on 09 Aug 18
– LAND 400 Phase 3 – Mounted Close Combat Capability Comprising Infantry Fighting Vehicle (IFV) and Manoeuvre Support Vehicle (MSV) Open Tender released in Aug 18; closed 1 Mar 19
– LAND 400 Phase 4 – Capability Assurance Program
2
![Page 3: LAND 400 Phase 2](https://reader031.vdocument.in/reader031/viewer/2022012409/616a468d11a7b741a350bb5c/html5/thumbnails/3.jpg)
3
January 2017 – Risk Mitigation ActivityPuckapunyal Military Area
Rheinmetall Boxer CRV versus ASLAV-25
July 2017 – Risk Mitigation ActivityGraytown Proof and Experimental Establishment
May 2017 – Risk Mitigation ActivityMount Bundy Training Area
November 2016 – Risk Mitigation ActivityMonegeetta Proving Grounds
![Page 4: LAND 400 Phase 2](https://reader031.vdocument.in/reader031/viewer/2022012409/616a468d11a7b741a350bb5c/html5/thumbnails/4.jpg)
LAND 400 Phase 2Mounted Combat Reconnaisance Capability Two separate tranches of CRV deliveries:
– Block I configuration: Reconnaissance (CRV-RECON (BLOCK I)) Multi-Purpose Vehicle (CRV-MPV)
– Block II configuration: Reconnaissance (CRV-RECON (BLOCK II)) Command and Control (CRV-C2) Joint Fires & Surveillance (CRV-JFS) Repair (CRV-REP) Recovery (CRV-REC)
– Option for Ambulance (CRV-A)4
![Page 5: LAND 400 Phase 2](https://reader031.vdocument.in/reader031/viewer/2022012409/616a468d11a7b741a350bb5c/html5/thumbnails/5.jpg)
Block I - Interim MCRC
25 x Block I CRV in two variants:– 12 x CRV-RECON (Block I) vehicles based
upon the Risk Mitigation Activity (RMA) vehicle– 13 x CRV-MPV vehicles based upon the Royal
Netherlands Army “GeNieGrouP” (GNGP)Engineer Vehicle
– Interim Support Services (ISS) package forthe Block I vehicles until the CRV support contractis in effect
– Deployable capability to be in-service NLT endof 2020
5
![Page 6: LAND 400 Phase 2](https://reader031.vdocument.in/reader031/viewer/2022012409/616a468d11a7b741a350bb5c/html5/thumbnails/6.jpg)
Block II - Full MCRC
11 x Ambulance
OPTION
121 x Reconnaissance
20 x MM ISO Frames(2 powered)
10 x Recovery
2 x Recovery MM
11 x Repair
1 x Repair MM
15 x Command & Control29 x Joint Fires Surveillance
4 x Command & Control MM5 x Joint Fires Surveillance MM