lanka government network – site installation
TRANSCRIPT
Lanka Government Network –
Site Installation Castle Street Hospital for Women – Site Survey
Report
Lanka Government Network (LGN 2.0) Lanka Government Network – Site Installation
Confidential Page | 1
Contents
1. Document Control ..................................................................................................................................... 2
1.1 Document Information ....................................................................................................................... 2
1.2 Version policy ...................................................................................................................................... 2
1.3 Revision History .................................................................................................................................. 2
1.4 Circulation ........................................................................................................................................... 2
2. GOSL Organization Details ....................................................................................................................... 3
3. Site Visit Details ......................................................................................................................................... 3
4. Overall Requirement ................................................................................................................................. 4
5. Bill of Material for Overall Requirement ................................................................................................ 14
6. Additional Information ............................................................................................................................ 16
7. Endorsement ........................................................................................................................................... 18
8. Immediate Requirement ......................................................................................................................... 19
9. Bill of Material for Immediate Requirement .......................................................................................... 21
10. Design Endorsement ............................................................................................................................. 21
11. Approval ................................................................................................................................................ 22
Lanka Government Network (LGN 2.0) Lanka Government Network – Site Installation
Confidential Page | 2
1. Document Control
1.1 Document Information
Author SLT (Name of the engineer)
Approved By ICTA (Name of the officer)
1.2 Version policy
Version number level Description First Level For any significant change in the process as decided by the author.. Example vX.1,
vY.4, vZ.7 Second Level Incremented for each formal release. Example v 1.x, 2.y
Third level Incremented for review comments received by client. Example r 0.1
1.3 Revision History
Date Version Author Section Description
1.4 Circulation
Client ICTA
Any Other SLT
EZY Internal Only
Lanka Government Network (LGN 2.0) Lanka Government Network – Site Installation
Confidential Page | 3
2. GOSL Organization Details GOSL Organization name Castle Street Hospital for Women
–Colombo 08
Contact details (Name & Contact Number) Dr .Praveen De silva /0773619503
Technical contact (Name & Contact Number)
GOSL Organization address Castle street ,Colombo 08
GOSL Organization longitude/latitude
3. Site Visit Details
GOSL Organization Castle street Hospital for Women - Colombo 08
Date 28/06/2017
Time 9.30 AM
Participants EZY Nalin , Hasith (MIT)
Participants SLT M.N.M. Nishal
Participants ICTA (Optional)
Purpose Site survey to deploy Wi‐Fi for “Castle street Hospital for Women” and to Identify the AP installation locations and rack installation location.
Lanka Government Network (LGN 2.0) Lanka Government Network – Site Installation
Confidential Page | 4
4. Overall Requirement
1) Attach the building layout marked with coverage areas. Mark the coverage requested by the
organization representatives.
UTP – in BLUE Fiber – in ORANGE Data Rack – in BLACK Power DB – in RED Earth – in GREEN WiFi Coverage Area – in YELLOW
Coverage Map
New building Ground Floor
Lanka Government Network (LGN 2.0) Lanka Government Network – Site Installation
Confidential Page | 5
New building 1st floor
New building 2nd floor
Lanka Government Network (LGN 2.0) Lanka Government Network – Site Installation
Confidential Page | 6
New building 3rd floor
Ministry Building Ground floor
Lanka Government Network (LGN 2.0) Lanka Government Network – Site Installation
Confidential Page | 7
Ministry building 1st Floor
Auditorium
Lanka Government Network (LGN 2.0) Lanka Government Network – Site Installation
Confidential Page | 8
Heat Map For Coverage Area
Old building
New building Ground floor
Lanka Government Network (LGN 2.0) Lanka Government Network – Site Installation
Confidential Page | 9
New building 1st floor
New building 2nd floor
Lanka Government Network (LGN 2.0) Lanka Government Network – Site Installation
Confidential Page | 10
New building 3rd floor
Ministry building ground floor
Lanka Government Network (LGN 2.0) Lanka Government Network – Site Installation
Confidential Page | 11
Ministry building 1st floor
Auditorium
Lanka Government Network (LGN 2.0) Lanka Government Network – Site Installation
Confidential Page | 12
Existing and Requested Fiber Layout
Access Points required covering overall Requirement
Lanka Government Network (LGN 2.0) Lanka Government Network – Site Installation
Confidential Page | 13
Access Point No
Covering Area
Building/ Floor
Approximate Number of
Employee Users Approximate Number of
Public Users Remark
Present Future
Recruits
AP1 Conference
room 12 50
AP2 Accountant 42
AP3
Deputy
Director
34
AP4 OPD 20 50
AP5 Pharmacy 25
AP6
Birth
registration
10 20
AP7 Word 01 40
AP8 Word 02 40
AP9
Word 03
Word 04
40
AP10 Word 06 40
AP11 Word 07 40
AP12 Word 08 40
AP13 Word 09 40
AP14 Word 10 40
AP15 ICU1 20
AP16 ICU 2 20
AP17 Operation T 50
AP18 TC-C 30
AP19 NIU 30
AP20 PBU 50
AP21 New PBU 50
AP22 Kitchen 30
AP23
IU/Matron
room
15
AP24 Blood Bank 10
AP25 LR-B 10
AP26 LR-C 10
AP27 LR-D 15
AP28 Auditorium
AP29 Auditorium 150
Lanka Government Network (LGN 2.0) Lanka Government Network – Site Installation
Confidential Page | 14
Access Point No
Covering Area
Approximate Number of
Employee Users Approximate Number of
Public Users Remark
Present Future
Recruits
AP30 New building
ground floor 50 100 Clinic Area
AP31 New building
ground floor
AP32
New building
1st floor 50 100 Clinic Area
AP33 New building
1st floor
AP34 New building
2nd floor 50 10
Training center
AP35
New building
2nd floor
AP36 New building
3rd floor 60
Lab’s
AP37 New building
3rd floor
AP38
Ministry
building
ground floor 30 30
Ministry Staff
AP39
Ministry
building
ground floor
AP40
Ministry
building 1st
floor
Conference Hall
AP41
Ministry
building 1st
floor 60 120
NICS
AP42
Ministry
building 1st
floor
5. Bill of Material for Overall Requirement
ITEM Description Total Quantity
Rack (12U, Wi – Fi related equipment’s) 09
Lanka Government Network (LGN 2.0) Lanka Government Network – Site Installation
Confidential Page | 15
Rack (10U, Fiber termination) 01
Access Points 42
Switches 09
Firewall 01
Patch Panels – UTP 09
Data Cables – UTP (Boxes/Meters) 2300Mts
Patch Codes - UTP (Rack-end) 45
UPS (1.5 KVA) 09
Fiber (Meters) 800mts
Fiber Termination Box 04
Fiber Patch codes 13
Trenching (meters) 90mts
Lanka Government Network (LGN 2.0) Lanka Government Network – Site Installation
Confidential Page | 16
6. Additional Information
Information to be obtained from site representatives / Observations
Existing internet connections ( except LGN) connected to LAN ( Type , Bandwidth )
ADSL Connection-4
Existing manageable switches ( Brand & model , warranty status )
HP core switch and access -12
No PCs connected to the existing network & No of PC within each wifi coverage area (except public)
110
No of Wi-Fi enabled PC or Laptops -
Existing IP block at site
LGN 1 Not in this location LAN IP Block -192.168.1.0/24 192.168.2.0/24 192.168.3.0 /24 192.168.10.0/24 There are 4 vlan for separate network
Special Requests Customer has prioritized two locations as following, 01.New building (Clinic area, Training area, Staff and Lab) 02.Old building (server room ,OPD ,Account, Birth Registration , Admission and director room) If we are going to implementation above two locations that we need to inter connection between switches. There are 3 racks locations in above two buildings. (Already rack locations are marked) 01.server room Old Building 02.Deputy Director room 03.New building Ground floor The fiber cable already has been laid between these two racks and they requested to use it for this option.
Lanka Government Network (LGN 2.0) Lanka Government Network – Site Installation
Confidential Page | 17
Other Observations / Special Considerations / Notes
01. Main server room Located at old building, the Customer has to terminate all external connection (Internet and telephone) in server room therefor SLT fiber link has been terminated on server room. So LGN.2 rack also mount in server room. (as per customer recommendation )
If we are considering customer prioritize, that following materials are required, Switches – 2nos Fiber Patch Cord – 4nos Racks – 2nos UPS – 2nos UTP Patch Panel – 2nos Server room switch – 3 nos Ap (Server room, Account , Director room) Deputy Director room switch -3 nos AP (Birth Registration , Admission, OPD) New building Ground floor switch - 6 nos AP (Clinic area, Training area, Staff and Lab) Total 12 AP’s 02 .Power DB located at near the server room , grounding is ok
Lanka Government Network (LGN 2.0) Lanka Government Network – Site Installation
Confidential Page | 18
7. Endorsement
Lanka Government Network (LGN 2.0) Lanka Government Network – Site Installation
Confidential Page | 19
8. Immediate Requirement
1) Attach the building layout marked with coverage areas. Mark the coverage proposed by service
provider (in line with project guide lines)
UTP – in BLUE Fiber – in ORANGE Data Rack – in BLACK Power DB – in RED Earth – in GREEN WiFi Coverage Area – in YELLOW * Mark cable lengths
Note: This is a large site which require 42 Access Points to cover the entire site. Requesting ICTA to
propose the immediate installation scope
Lanka Government Network (LGN 2.0) Lanka Government Network – Site Installation
Confidential Page | 20
Access Points required covering the immediate requirement – in line with project guidelines
Access Point No
Covering Area Building/Floor
Approximate Number of Employee Users Approximate Number
of Public Users Present
Future Recruits
LGN 1 Rack Location
LGN 2 Rack Location
SLT Rack Location
Lanka Government Network (LGN 2.0) Lanka Government Network – Site Installation
Confidential Page | 21
9. Bill of Material for Immediate Requirement
ITEM Description Total Quantity
Rack (12U, Wi – Fi related equipment’s)
Rack (10U, Fiber termination)
Access Points
Switches
Firewall
Patch Panels – UTP
Data Cables – UTP (Boxes/Meters)
Patch Codes - UTP (Rack-end)
UPS (1.5 KVA)
10. Design Endorsement
EZY Corporation
Name
Designation
Signature
Date/Time
SLT
Name
Designation
Signature
Date/Time
Lanka Government Network (LGN 2.0) Lanka Government Network – Site Installation
Confidential Page | 22
11. Approval
Approval Notes
ICTA
Name
Designation
Signature
Date/Time