laser institute of america presentation_reduced font

21
Fabrication of a Hermetic Micro Stimulator JESSE SINGH ALFRED E. MANN INSTITUE OF BIOMEDICAL ENGINEERING UNIVERSITY OF SOUTHERN CALIFORNIA

Upload: jasspreet-jesse-singh

Post on 15-Apr-2017

81 views

Category:

Documents


0 download

TRANSCRIPT

Fabrication of a Hermetic Micro Stimulator

JESSE SINGH

ALFRED E. MANN INSTITUE

OF BIOMEDICAL ENGINEERING

UNIVERSITY OF SOUTHERN CALIFORNIA

BIONTM

HOW IT GOES TOGETHER

QUESTION !!

Small Volume

Very Long Service Life

High Voltage

Metal Feedthroughs

And how is it done presently……

Why is Packaging Critical ???

CURRENT ASSEMBLY TREE

CURRENT PACKAGING

Nd:YAG LASER

CO2 LASER Work Bench

Nd:YAG laser

He Leak Detector

He Back Fill Station

PROBLEMS ???

Batch Process

Multiple Stations

Multiple handing of a part

Mishandling

Contamination of parts

PROPOSED SOLUTION………

PROPOSED PACKAGING

NO CHANGE OF WORKSTATION

WHAT’S NEW ??

Continuous Process

Single Station Operation

One Time Handling of Parts

ASSEMBLY TREE FOR IWS

HOW WILL IT BE DONE

Synchronous Rotation

YAG Laser

Source &

Sighting Camera

Vacuu Chuck

To Helium Leak Detector

Lens/Mirror

Assembly

Integrated Work Station (IWS)

WELD SCHEDULE

7 TOTAL WELDS

CO2 WELDS

SYNRAD Model

48-2-28. J version.

28W Maximum O/P

10.6 0.3 micron wavelength

Power Stability 5%

Nd:YAG WELD

LuxStar100 by GSI Lumonics.

1.06 micron output wavelength.

0.012” min spot size.

Stabilized power output using “WeldPerfect”.

0.75mm/0.030”

Weld Spot Size: 0.3 mm/0.012”

1mm/0.040”

NOSE CONE

Slip fit over the Vacuum Chuck Head

Easy and Simple Operation

Glass Capillary

Nose Cone Vacuum

Chuck

VACUUM CHUCK

Leak Testing & Backfill Unit Integration

Reduced handing of the parts

Easy to use toggle clamps for Vacuum line

Simple Backfill for Inert Gas

Tube IN TO He Leak Detector

CONTROL SOFTWARE

Single Station PC control

Inbuilt Safety Interlocks

Critical Component Continuous Status Check

All Weld Parameters Automatically Recorded

Automatic Recording of He Leak Test Results

User Friendly Graphical User Interface

IMPROVEMENTS

No Change of Station

Continuous Production Line

Reduced Production Time

Increased Reliability

One Time Handling of Components

Enhanced Operator Safety

Automatic Traveler Generation

ACKNOWLEDGEMENT

Alfred E. Mann Institute

for Biomedical Engineering

@ University of Southern California, Los Angeles.

QUESTIONS & COMMENTS…