lauriston final case study
TRANSCRIPT
-
7/27/2019 LAURISTON Final Case Study
1/35
GROUP MEMBERSKANIKASAUMYA
ARJUN
HARSHIT
CASE STUDY
-
7/27/2019 LAURISTON Final Case Study
2/35
LOCATION:Rutland Road,
South Hackney,London
-
7/27/2019 LAURISTON Final Case Study
3/35
LAURISTON PRIMARYSCHOOL
-
7/27/2019 LAURISTON Final Case Study
4/35
-
7/27/2019 LAURISTON Final Case Study
5/35
Lobby withart
floyer
Library
Main hall
Receptionclassroom
Play space
Officer chamber
Stairs to1 st floor
Court yard
Kitchen
storage
WC Cloak
room
Covered playarea
Enviromentalgarden
WC
-
7/27/2019 LAURISTON Final Case Study
6/35
Stairs to1 st floor
Playdesk
Activityspace
Terracegarden
Classroom
Cloakroom
Way tosecond
floor
Lobby
WC
-
7/27/2019 LAURISTON Final Case Study
7/35
SECOND
FLOOR
Lobby
Cloakroom
WC
Adminroom Staffroom
Staff
terrace
Classroom
Atrium
Shadedresource
space
Grouproom
WC
-
7/27/2019 LAURISTON Final Case Study
8/35
MEADOWCROFT GRIFFIN ARCHITECTS, London, UK
TREETOP SCHOOL: The three storey 'tree house' solution achieved this by raising theclassroom block as a linear bridge structure relating to the canopies of the existingtrees
-
7/27/2019 LAURISTON Final Case Study
9/35
SAUMYA WALA COLOUREDPLAN
Surrounded by RutlandRoad (to the north) andMorpeth Road (to thesouth), the backs of buildings on morpeth grove(to the west) and lauristonroad (to the east).
The area is mainlyresidential, with commercialuses on the ground floor of buildings on LauristonRoad.
-
7/27/2019 LAURISTON Final Case Study
10/35
-
7/27/2019 LAURISTON Final Case Study
11/35
-
7/27/2019 LAURISTON Final Case Study
12/35
-
7/27/2019 LAURISTON Final Case Study
13/35
WEST ELEVATION
EAST ELEVATION
-
7/27/2019 LAURISTON Final Case Study
14/35
NORTH ELEVATION
-
7/27/2019 LAURISTON Final Case Study
15/35
-
7/27/2019 LAURISTON Final Case Study
16/35
-
7/27/2019 LAURISTON Final Case Study
17/35
-
7/27/2019 LAURISTON Final Case Study
18/35
Floors Adopted scheme 117mm thick floor spanning 2.9m withtwo intermediate460x 240mm glulam beams
Walls Single Storey = 95mm thick Double/Triple Storey 117mm thick
-
7/27/2019 LAURISTON Final Case Study
19/35
Flexibility with mix of solid wall + glulam frameUse of Timber as an exposed Finish
Panelised Timber FramingPanelised solid cross-laminated timberCombination of concrete frame and timber panels
-
7/27/2019 LAURISTON Final Case Study
20/35
PHASE 1 RE-BUILDING OF SCHOOL-KEEPERS HOUSE
-
7/27/2019 LAURISTON Final Case Study
21/35
-
7/27/2019 LAURISTON Final Case Study
22/35
PHASE 3 FIRST PHASE OF MAIN SCHOOL BUILD. ON COMPLETIONPUPILS AND STAFF DECANTED FROM EXISTING SCHOOL TO NEWBUILDING
-
7/27/2019 LAURISTON Final Case Study
23/35
PHASE 4 - DEMOLITION OF EXISTING SCHOOL AND SECOND PHASEOF MAIN SCHOOL BUILDING
-
7/27/2019 LAURISTON Final Case Study
24/35
CREATION OF A FUTURE SCHOOL THAT IS COHESIVE, EXEMPLARYINNOVATIVE LEARNING ENVIRONMENT.
FLEXIBILITY OF LEARNING SPACES.
-
7/27/2019 LAURISTON Final Case Study
25/35
FOCUS OF DESIGN APPROACH TOCREATE AN INSPIRING BUILDING THATGENERATES ENTHUSIASM FOR CHILDREN
AND ADULTS ALIKE.
ALL CLASSROOMS ARE NATURALLYVENTILATED VIA ACOUSTICLOUVRES AT THE FAADE AND
DISCREET CHIMNEYS TO THE REAR.
-
7/27/2019 LAURISTON Final Case Study
26/35
DIVERSE OUTDOORPLAYSPACE
YOUNGER CLASSES ARELOCATED ON GROUND LEVELFOR FREE FLOW ACCESS TOOUTSIDE PLAY.
-
7/27/2019 LAURISTON Final Case Study
27/35
COMFORTABLESEATING PROVIDED.
-
7/27/2019 LAURISTON Final Case Study
28/35
A LOT OF FREE SPACESPROVIDED FOR OTHER
ACTIVITIES.
-
7/27/2019 LAURISTON Final Case Study
29/35
-
7/27/2019 LAURISTON Final Case Study
30/35
THIS HAS RECENTLY BEEN RECOGNISED BY THREE PRESTIGIOUSAWARDS FROM THE BRITISH COUNCIL FOR:
SCHOOL ENVIRONMENTS BEST OF BRITISH SCHOOLS 2011
WINNING THE BEST PRIMARY SCHOOL OF THE YEAR AWARD ANDTHE HEALTHY SCHOOLS AWARD, AND
SUSTAINABLE SCHOOL OF THE YEAR AWARD.
-
7/27/2019 LAURISTON Final Case Study
31/35
-
7/27/2019 LAURISTON Final Case Study
32/35
-
7/27/2019 LAURISTON Final Case Study
33/35
-
7/27/2019 LAURISTON Final Case Study
34/35
-
7/27/2019 LAURISTON Final Case Study
35/35