laxmi construction company engineering … · to become leading engineering and construction...
TRANSCRIPT
To become leading Engineering and Construction company of India in our Segments of Interest by providing and constantly identifying and delivering better services that combines Technical & cost effective solutions at lower cost to our valued customers by creating innovative and value engineered solutions.
Vision
Mission
Meets the specific customer requirement through Superior customer focus and thereby improving our customer's productivity with the best Industrial Engineering and Constructions solutions & their integration, reliability and services. Thus, we strive to
With our strong emphasis on intellectual property by hiring and nurturing the best people in the industry, we provide solutions for growth and continuous improvement in productivity to our entire customers, thereby becoming their “Vendor of choice”. To achieve this, we at Laxmi Construction Company follow stringent quality regimen and also develop industry best, ethical & moral standards to make ourselves unique from our competitors.
Focusing on current industrial trends, by providing our technical expertise, we always aim to be market leaders.
Customer Perspective
Differentiator
Market Leadership
The values followed at Laxmi Construction Company have its genesis in the firm belief of the founder of the company Mr. Ajay Kumar Singh and same being carried forward by the Proprietor Mr. Dibakar Kumar. The aim has always been to contribute in the development of our society and surrounding, with environment friendly, world class, high quality Engineering and Constructions solutions. For this, we are dedicated to excellence & follow high ethical standards.
Competence
Dynamic Development
Respect for Individual
Ideas, Knowledge, energy, resources & risk taking are our drivers. We are high performing team. We always develop people with “CAN DO” Attitude and build strong intellectual property by hiring and nurturing the best people in the industry.
We believe in “INNOVATION” that is coming up with new thoughts to maintain our long term & win-win relationship with our customers, while focusing on Execution Excellence.
Our Employees own part of the company to have a complete share in our success. We always value diversity & treat people as we would like to be treated ourselves.
Values
deliver top quality services to our clients and to exceed client expectations.
2. FINANCIAL1. BASIC INFORMATION
PROPRIETOR
PROJECT CORDINATORFINANCIAL /
COMMERCIAL COORDINATOR
SITE-IN-CHARGE ACCOUNTS OFFICER
SITE ENGINEERMATERIAL / STORE SUPERVISOR
SUPERVISOR SUPERVISORSUPERVISOR
TECHNICAL / SKILLED / UNSKILLED WORKERS
Organization Chart
1.1
1.2
1.31.41.51.6
1.7
1.8
1.92.02.1
Company Name
Contact Person
Type of CompanyCapacityPANVAT Registration No. (Bihar)Central Sales TaxRegistration No.Service Tax Registration No.PF Registration No.
ESIC Registration No.Tan Registration No.
: M/S Laxmi Construction Co.: Shri Dibakar Kumar: Shri Ajay Kumar Singh: Proprietorship: Medium Scale: AELPK7326Q: 10361990081
: 10361990178
: AELPK7326QST001
: BR/MUZ/20090: PTNL00376F: 42000106920001019
2.1
2.2
2.3
Authorized & Paid up Capital
Name of The Banker
Annual Turnover
: Rs. 50.65 Lakh
: STATE BANK OF INDIA Barauni Refinery Campus Branch Dist.: Begusarai – 851 114. (Bihar)
: Assessment Year. 2011-12 - Rs.187.02 Lakh 2012-13 – Rs.133.10 Lakh 2013-14 – Rs.133.12 Lakh
Laxmi Construction Company with its professionally managed group of technology innovator and engineers, is an emerging leader in Engineering and Construction segment in India. We have executed various project works since 1997 and have established a strong reputation within our markets for executing large complex projects and for providing turnkey solutions to our clients. Laxmi Construction Company's approach and methodology towards project management and its Streamlined, cost-effective, state-of-the-art systems & processes have helped the company to deliver projects on time and within budget, while adhering to strict quality control and safety measures meeting the strict expectation of customers.
Starting with core business in Fabrication and Erection of structural, it has diversified into areas like Industrial Piping, Installation of Equipments, Conveyor System, Boiler, Installation of Fire Protection System, Instrumentation and Electrical, Column Internals, Civil work (Pipe support, Switchyard etc.).
Laxmi Construction Company offers a thoroughly professional approach at every step and has participated actively in the diversification and expansion program of its customers to create a viable industrial base in that part of India where economic development were only a dream before the entry of our customers.
Company Profile
We are skillfully assisted by a team of experienced professionals and young technocrats who put their dedicated and professional approach at every step.In addition to this, we have experienced team members at different levels of:
Our Teammates also encompass quality control inspectors, logistics and transportation personnel and other skilled workmen. They have in-dept understanding for the products, manufacturing and related services.
1. Engineering and Programming2. Designing3. Manufacturing4. Erection & Installation5. Supervisors and Technicians
Our unit is based in a spacious area wherein we have all the facilities which are required for qualitative production. At our unit, we have following major machine & tools.
1. Hydraulic Bending, Cutting & Punching Machines
2. Hydraulic C Frame Machines
3. Sheet cutting & Bending Machines
4. Welding, Drilling & Grinding Machines
5. Fabrication, Shearing Machine, Angle Cutter, Drill Machine, Grinder Sander, Die & Tools, Assembly Cutting Machine.
TeamInfrastructure
We have expert & dedicated team for Fabrication and Erection of structural, Industrial Piping, Installation of Equipments, Conveyor System, Boiler, Installation of Fire Protection System, Instrumentation and Electrical, Column Internals, Civil work (Pipe support, Switchyard etc.).. Due to these strengths we are providing the best & cost effective solution in various segments of industries. We also work as a consultant for our customer to help them to take right decisions for optimal uses of resourses and to deliver quality products.
As a part of our quality assurance program, Laxmi Construction Company follows
Quality Assurance
Strengths
Our Expertise / Services:Fabrication and Erection of structuralIndustrial PipingInstallation of EquipmentsConveyor SystemBoilerInstallation of Fire Protection SystemInstrumentation and ElectricalColumn InternalsCivil work (Pipe support, Switchyard etc.)Industrial PaintingFoundation worksGeneral order supply and Manpower
1.2.3.4.5.6.7.8.9.10.11.12.
GalleryGallery
Our Clients
IOCL BARAUNI REFINERY
IOCL BARAUNI REFINERY
IOCL BARAUNI REFINERY
IOCL GUJARAT REFINERY
IOCL GUJARAT REFINERY
IOCL BARAUNI REFINERY
IOCL GUJARAT REFINERY
11417450
14703827
1170000.00
10002210
3888260.4
4679824.1
9337017.9
23854318 dtd 16.04.2013
23801931 dtd 12.02.2013
23892033 dtd 08.06.2013
23947134 dtd 23.08.2013
23842604 dtd 30.03.2013
23689158 dtd 28.08.2012
23665913 dtd 20.07.2012
Mechanical Piping, Installation of High Volumn Long Range Monitors (HVLRMs) and other misc. jobs at Barauni Refinery.
Replacement of Coker equipment (Column K2 Top), Vessel, E-1 & E-11, relocation of Exchanger EE-11), Piping, stractural and allied miscellaneous jobs at Coker - A of Barauni Refinery.
Mobilization of 300MT crane for replacement of column overhead piping at AVU-I shutdown
Hot and Cold jobs at GRE/GRSPF Units of Gujarat Refinery.
Mechanical, Stractural and Civil works for Re-routing of 10" Natural Gas Line from Underground to aboveground at Gujarat Refinery.
Hot & Cold job related to furnace of Coker-B during shutdown of Coker-B at Barauni Refinery
Hot and Cold jobs at MSQ/LAB/GRE/GRSPF/WS&E/Headworks/Township Units at Gujarat Refinery
2013
2013
2013
2013
2013
2012
2012
1.
2.
3.
4.
5.
6.
7.
S.No Year Description W.O No & DateContract Amount
Name of Organization
Our Clients
Mechanical Piping Installation of Make Up Water Heater (MUWH) in Heat Recovery Steam Generator (HRSG) & other miscellaneous jobs at Barauni Refinery
Hot & Cold job related to furnace of AVU - I during shutdown of AVU-I at Barauni Refinery
Inter Connecting piping job between existing tie in point at TPS and BHEL terminal points at Battery Limit at Barauni Refinery.
Piping job for RCO Unloading Facility at Barauni Refinery (Part-A & Part-B)
PO For Manpower Supply
PO For A/G Piping Work
Installation, Modification and Commissioning of Staged Flare System at IOCL, Barauni Refinery
P.O for Manpower and Supply of Car for recovery of Oil from Oily Sludge Processing at IOCL Barauni
Installation of column internal in 608 - c - 04 of ATU at Barauni Refinery
2012
2012
2012
2011
2011
2011
2011
2011
2010
8.
9
10.
11.
12.
13.
14.
15.
16.
IOCL BARAUNI REFINERY
IOCL BARAUNI REFINERY
IOCL BARAUNI REFINERY
IOCL BARAUNI REFINERY
IOCL BARAUNI REFINERY
Punj Lloyd Ltd
Punj Lloyd Ltd
Airoil Flaregas (I) Pvt Ltd
Evergreen Environmental
Technology Pte Ltd
IOCL BARAUNI REFINERY
1334143.5
3196610.2
2354270.6
4026311.00
1877105.4
2,12,329.99
10,47,961.00
4709346.00
21,00,000.00
23650965 dtd 29.06.2012
23574189 dtd 11.03.2012
23553679 dtd 15.02.2012
23304410 dtd 01.02.11
23312107 dtd 09.02.11
PEIN09/307465
PEIN09/310714
AFIL/BR/FLARE/002 dtd 23.09.11
……
23171028 dtd 22.06.10
S.No Year Description W.O No & DateContract Amount
Name of Organization
Our Clients
Balmer Lawrie & Co. Ltd
Balmer Lawrie & Co. Ltd
Balmer Lawrie & Co. Ltd
NASIM AHSAN CONSTRUCTION PVT.
LTD.
IOCL BARAUNI REFINERY
IOCL BARAUNI REFINERY
IOCL BARAUNI REFINERY
IOCL BARAUNI REFINERY
13,10,942.08
1,28,925.00
6,00,000.00
57,47,000.00
8,33,913.98
10,00,000.00
48,26,019.33
62,49,428.78
ROFS/Lagoon-III/PO-09 dtd 25.10.10
ROFS/Lagoon-III/PO-09A dtd 11.01.11
ROFS/2K10/07/PO-10 dtd 29.10.10
NAC/RO/2010-11/716 dtd 30.04.10
23016721 dtd 01.10.2009
17926308 dtd 27.04.09
17925391 dtd 24.04.09
177776402 dtd 25.06.08
Design, Fabrication, Testing & Supply of Sludge Holding Tank, Mixing Tank and Recovered Oil Tank with all accessories.
Design, Fabrication, Testing & Supply of Sludge Holding Tank, Mixing Tank and Recovered Oil Tank with all accessories. (Amend)
Mechanical & Electrical Erection Work for Lagoon Sludge Processing Unit at IOCL, Barauni Refinery.
Mechanical & Piping works for CRU/NSU Revamp & DHDT at Barauni Refinery.
Piping and Allied Civil Jobs for Routing of Heavy Naptha to Ex AVUs at Barauni Refinery.
External Cleaning of Air Fin Cooler at Barauni Refinery
Out site battery limit (OSBL) piping jobs related to Amine Treating Unit at Barauni Refinery
Piping job for New MS Tank at Barauni Refinery
2010
2010
2010
2010
2009
2009
2009
2008
17.
18.
19.
20.
21.
22.
23.
24.
S.No Year Description W.O No & DateContract Amount
Name of Organization
Our Clients
JNS/AMK/WO dtd 26.04.06
17521571 dtd 30.01.07
LPO-009 dtd 14.12.06
LPO-016 dtd 08.01.07
17376058 dtd 20.03.06
17362651 dtd 20.02.06
17339560 DTD 27.12.05
17322056 DTD 24.11.05
M/s J.N Singh & Co.
IOCL BARAUNI REFINERY
Plant -Tech Midcontinent (I) Pvt
Ltd, Manglore
Plant -Tech Midcontinent (I) Pvt
Ltd, Manglore
IOCL BARAUNI REFINERY
------DO------
------DO------
------DO------
1,48,75,739.00
72,67,162.50
8,35,250.00
15,00,000.00
16,78,402.80
4,47,767.01
5,17,415.03
9,70,776.00
Execution and handing over of civil works for 220 kv sub station extension in Madhya Pradesh
Mechanical & Civil jobs for LPG treating unit at Barauni Refinery
Fabrication of 20 feet solvent tank at Braruni Refinery Site
Installation of Oily Slugs plant of our IOCL barauni Site
Maintenance of Columns & Vessels during M&I shut down of BXP units at Barauni Refinery.
Maintenance of Columns, Vessels and other related job during shut down of AVU -III & CRU units at Barauni Refinery.
Mechanical Job For Restoration of Coker-A At Barauni Refinery.
REPLACEMENT OF VACCUM COLUMN PACKING AND RELATED JOB OF AVU-I & II AT BARAUNI REFINERY.
2007
2007
2006
2006
2006
2006
2005
2005
25.
26.
27.
28.
29.
30.
31.
32.
S.No Year Description W.O No & DateContract Amount
Name of Organization
Our Clients
17296575 DTD 22.09.05
17238123 DTD 05.05.05
17189387 DTD17.01.05
17169598 DTD 03.12.04
17156082 DTD 26.10.04
17122815 DTD 19.07.04
17068151/408 DTD27.01.04
------DO------
------DO------
------DO------
------DO------
------DO------
------DO------
------DO------
1,31,627.02
12,49,000.00
25,65,618.00
4,00,720.00
14,29,236.73
21,43,837.00
2,73,252.00
DISMENTLING OF OLD H-7 & H-8 AND INSTSLLATION OF NEW PROCURED GAS OIL PUMP IN AVU-I & II AT BARAUNI REFINERY.
INSULATION FOR SCHEME RELATED TO BS-II/EURO-III EQ GR. HSD AT BARAUNI REFINERY.
PIPING AND STRUCTURAL JOBS FOR AVUs& CRU AT BARAUNI REFINERY.
WASH WATER HEATING WITH BRINE IN AVU-I & II AT BARAUNI REFINERY.
PIPING & CIVIL WORKS TO FACILITATE BITUMEN PRODUCTION DIRECTLY FROM K - 301 OF AVU - III AT Barauni Refinery.
PIPING JOB FOR BY PASSING CRU COOLING TOWER AT BARAUNI REFINERY.
MAINTENANCE (MECHANICAL JOBS) OF COKE CONVEYOR OF COKER-A AT BARAUNI REFINERY.
2005
2005
2005
2004
2004
2004
2004
33.
34.
35.
36.
37.
38.
39.
S.No Year Description W.O No & DateContract Amount
Name of Organization
17067808 DTD 29.01.04
BHEL/PSER/Barauni/WO/2835 DTD 10.11.2003.
17041484/2655 DTD 21.08.2003
17036883/2276 DTD 29.07.2003
BES/ML/2003/1313/569DTD 21.02.2003
17027971/1517 DTD 29.05.2003.
17025095/1085 DTD 16.04.2003.
Our Clients
------DO------
BHEL BARAUNI REFINERY SITE
IOCL BARAUNI REFINERY
------DO------
------DO------
------DO------
------DO------
48662.60
9500.00
5,26,212.48
1,39,706.00
66426.10
3,05,199.84
70553.65
GAS CUTTING & WELDING OF INSERT PLATES IN CONVEYOR GALLERY OF MECHANISED PETRO COKE HANDLING PROJECT IN BARAUNI REFINERY.
THERMOWELL PAD FIXING ON SH TUBES FOR METEL TEMPERATUREIN HRSG-PH II
PIPING & STRUCTURALS JOBS FOR CARRYING OUT REPAIR & REPLACEMENT AT AVU-3
MODIFICATION OF DROP OUT FACILITY (CONVEYOR K-4C) AT BARAUNI REFINERY (PART - B)
MM JOB FOR COLUMN OF AVU-II AT BARAUNI REFINERY
CIVIL & MECHANICAL MODIFICATION JOB FOR EXTENSION OF K2 CONVEYOR OF COKER - A AT BARAUNI REFINERY.
ARC FOR MAINT OF FIXED FIRE PROTECTION SYSTEM VIZ HYDRANTS, MONITORS,WATER, WATER SPRAY SYSTEM, SEMI FIXED FOAM POURER SYSTEM etc AT B.R
2004
2003
2003
2003
2003
2003
2003
40.
41.
42.
43.
44.
45.
46.
S.No Year Description W.O No & DateContract Amount
Name of Organization
270/L0098M/331756 DTD 08.08.2002
WO/2002-03/03 DTD 31.05.2002
OGSP/45000-09005/S N PALEKAR DTD
06.10.2002
ES/ML/2002/1285/5299
DTD 11.10.2002.
PJ/W-121/84 DTD 26.03.2002
ES/ML/2001/1184/2515 DTD 01.01.2002.
DPCC/BR-EVE/09/2002/02 DTD
18.09.2002
Our Clients
GODRAJ & BOYCE MFG.CO.LTD.MUMBAI
M/S. BUILD WORK PVT. LTD.GUWAHATI
LARSEN & TOUBRO LTD
IOCL BARAUNI REFINERY
------DO------
------DO------
M/S DIVYA PRABHA CONSTRUCTION CO.
BARAUNI
1,00,000.00
49,44,430.31
30,22,182.00
2,78,505.00
1,15,000.00
2,40,240.00
51,88,223.00
REPAIRING/RECTIFICATION/MODIFICATION OF BAFFLE OF COLUMN NO. 701-C-208
REPAIR AND PAINTING OF BUILDING AT BARAUNI REFINERY TOWNSHIP (PART-A)
MANPOWER & FABRICATION SERVICES DURING PRECOMMISSIONING & COMMISSIONING IOCL BARAUNI PROJECT
MAINTENACE & REPAIR OF NEW COKE CONVEYOR SYSTEM OF COKER - A AT B.R
FACILITY DEVELOPMENT TO DROP OUT COKE IN FREE SPACE THROUGH CONVEYOR 4C
FABRICATION OF BELT CONVEYOR ITEMS OF MECHANISED PETRO COKE HANDLING PROJECT AT BARAUNI REFINERY.
ERECTION OF EQUIPMENTS IN AVU I & II FOR VACCUM EJECTOR SYSTEM AT BARAUNI REFINERY
2002
2002
2002
2002
2002
2002
2002
47.
48.
49.
50.
51.
52.
53.
S.No Year Description W.O No & DateContract Amount
Name of Organization
ES/ML/2002/1195/2962 DTD 11.02.2002.
270/L0098M/310611 DTD 16.04.2001
ES/ML/2001/1167 DTD 24.10.2001
PECL/SKB/C-626/5841/2001 DTD.
06.08.2001
EST/P-240/2207/2001 DTD 02.03.2001.
778953 DTD 05.07.2000
778952 DTD 05.07.2000
772576 DTD 01.06.2000
Our Clients
IOCL BARAUNI REFINERY
GODRAJ & BOYCE MFG.CO.LTD.,MUMBAI
IOCL BARAUNI REFINERY
PETRON ENGINEERING
CONSTRUCTION LTD., PUNE
ENSYS TECHNOLOGIES (I) PVT LTD. CHENNAI.
L&T LTD ECC DIVISION
------DO------
------DO------
22,78,000.00
2,00,000.00
1,80,287.00
21,87,606.8
44,47,170.00
1,81,550.00
1,87,500.00
1,13,454.00
ERECTION , ALIGNMENT, TESTING & COMMISSIONING OF BELT CONVEYOR, TRIPPER & OTHER ASSOCIATED ITEMS AT BARAUNI REFINERY.
SITE WORK - BALANCE WORK ON EQUIPMENT NO. 701-C208,204 ADND 205 FOR SAMSUNG AT IOCL BARAUNI
RAISING HEIGHT OF RETAINING WALL FOR PROTECTION OF COKE SIZER IN COKER-A AT BARAUNI REFINERY
FABRICATION & ERECTION OF STEAM TRACING LINES,DHDT REACTOR INTERNALS INSTALLATION & INSTALLATION OF TRAYS IN COLUMN.
ERECTION & COMMISSIONING OF HRSG BOILER AT OUR SITE IOCL BARAUNI REFINERY
SUPPLY OF STONE CHIPS (KODARMA)
SUPPLY OF STONE CHIPS (KODARMA)
SUPPLY OF STONE CHIPS (KODARMA)
2002
2001
2001
2001
2001
2000
2000
2000
54.
55.
56.
57.
58.
59.
60.
61.
S.No Year Description W.O No & Date Name of OrganizationContract Amount
778951 DTD 28.06.2000754998 DTD 26.07.2000754996 DTD 15.07.2000
ES/ML/2000/869/1374 DTD 22.03.2000.
ES/ML/2000/868/1375 DTD 22.03.2000.
SD/318/BR/009 DTD 01.08.2000.
482047 DTD 03.06.2000.EST/P-
203/2207/2000 DTD 24.07.2000.
EST/P-222/2206/2001 DTD 24.07.2000.
PRJ/W-101/347 DTD 01.04.1999
Our Clients
------DO------
------DO------
------DO------
IOCL BARAUNI REFINERY
------DO------
M/S. BUILD WORK PVT. LTD.,GUWAHATI
L&T LTD ECC DIVISIONENSYS
TECHNOLOGIES (I) PVT LTD. CHENNAI.
------DO------
IOCL BARAUNI REFINERY
93301.00
2,75,778.00
2,60,327.00
1,96,711.92
1,12,390.00
2,32,369.64
6,00,250.00
35,40,915.00
9,65,000.00
25803.75
SUPPLY OF SAND
SUPPLY OF SAND
SUPPLY OF SAND
STRUCTURAL PATHWAY & OTHER CHECK LIST JOBS FOR COMPLETION OF TANK JOBS AT BARAUNI REFINERY.
PIPING AROUND CRUDE TANKS AS PER REVISED OISD REQUIREMENT AT BARAUNI REFINERY.
MECHANICAL WORK FOR PRESSURISED WATER RECIRCULATION SYSTEM AT BARAUNI REFINERY.
HOOK UP & TRACING
ERECTION & COMMISSIONING OF HRSG BOILER AT OUR SITE IOCL BARAUNI REFINERY
DISMENTLING OF EXISTING COLUMN AT COKER-A REVAMP PROJECT AT IOCL BARAUNI SITE.
MODIFICATIO OF FOAM POURER COOLING WATER LINE OF TANK NO 226,231,233.
2000
2000
2000
2000
2000
2000
2000
2000
2000
1999
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
S.No Year Description W.O No & Date Name of OrganizationContract Amount
SIS/TA/0442 DTD 16.03.1998
CPFF1957/W/FF/34 DTD 03.09.1998
PRJ/P-71/98/216 DTD 23.03.1998
PRJ/W-96/96/674 DTD 09.09.1998
PRJ/W-72/809 DTD 09.09.1998
DTD 08.10.1998
BA/IOCL/HTR/LCC/02 DTD 06.11.1998
Our Clients
SANMAR INDUSTRIES LTD., CHENNAI
LARSEN & TOUBRO LTD
IOCL BARAUNI REFINERY
------DO------
------DO------
SAB TECHNICAL SERVICES (I)PVT LTD, MUMBAI
LARSEN & TOUBRO LTD
27000.00
26000.00
56167.50
25239.60
39913.81
4,00,000.00
3,21,946.00
SUPPLY, FABRICATION, ERECTION & PAINTING OF STEEL STRUCTURALS.
PROVIDE MANPOWER & MATERIALS TO MAKE AN APPROACH ROAD.
PIPING JOB FOR COOLING WATER LINE TO WHFU.
MODIFICATION OF FIRE WATER LINE & FOAM SUPPLY LINE TO STORAGE TANK NO 92,95,96 & 97
MECHANICAL PIPING FOR DRAIN CUM RE CIRCULATION LINE OF MPU.
FABRICATION OF TRAY SUPPORTS RINGS BOLTING BARS, RING CHANNELS & OTHER ATTAVHMENTS REQUIRED FOR COLUMN K1,K4 & k9 of IOCL REFINERY, BARAUNI IN AVU I & II DURING S/D.
CONSTRUCTION OF REFRACTORYSHED OF OUR AVU-III AT I.O.C.L BARAUNI.
1998
1998
1998
1998
1998
1998
1998
72.
73.
74.
75.
76.
77.
78.
S.No Year Description W.O No & Date Name of OrganizationContract Amount
List Of Our Tools And Plants
Hydra 12MTTractor TrallyWelding Generator (Advani make)Welding Rectifier machineWelding TransformerArgon set (Tig Welding set)Gas Cutting setsChain Pully Block - 1 TonChain Pully Block - 3 TonChain Pully Block - 5 TonChain Pully Block - 10 TonElectric winch - 3 TonHydraulic Jak - 25 TonHydraulic Jak - 50 TonScrew Jack - 10/25 TonCheave Pully - 2 tonCheave Pully - 5 TonCheave Pully - 10 TonFull lift - 3 TonFull lift - 5 TonMax pullerSlings 1.5”Slings 2.5”Slings 2"Wire Rope 1”Wire Rope 7/8”Wire Clamp 1.5”Wire Clamp 7/8”D. Shackles 1/2T to 10T capacityD. Shackles 20T capacityD. Shackles 50T capacityTurn Buckle 1/2T to 20T capacityPully Block 1/2T to 3T capacity
1.2.3.
4.5.6.7.8.9.10.11.12.13.14.15.16.17.18.19.20.21.22.23.24.25.26.27.28.29.30.31.32.33.
34.35.36.
51.
52.53.
54.55.56.57.58.59.60.
37.38.39.
40.41.42.
43.44.45.
46.47.48.49.
50.
A.G7 GrindersG.Q.-4 GrindersF-F.2 Grinders (Fixible shaft electrical grinder)AG-4 GrindersAG-5 Grinders
Vernier callipers upto 800 mm. (Lease count - 0.01 mm.)Vernier callipers upto 300 mm. Pressure guage (0.10 Kg./Sq. cm& 0.100 Kg/sq.cm.)Filler guage (upto 600 mm)Steel scales (upto 600 mm.)D-Spanners SetRing Spanners setSocket/Box-Spanner setTorck WrenchChain Wrench
Pipe Bending Machine (Hydraulic)Pipe Vice (Heavy Duty)Bench VicePortable Drill Machine 1" (Pistol Type)Megnatic Drill 30 mmPug cutting machineElectrode drying oven Bench typeElectrode drying oven (portable)Threading tap sets (upto 56 mm)Eye Bolt (upto 56mm)Dial Indicator (Least count 0.01 mm.)Magnetic base for dial indicator
Description of EquipmentsS.No.
Description of EquipmentsS.No.
List Of Our Tools And Plants
Adjustable pipe wrenchOther hand ToolsConcrete Mixing MachneVibratorAuto LevelTheodoliteCube Test MachineScaffolding MaterialConcrete Breaker Heavy DutyCompressor MachineHydraulic Testing Machine (upto200Kg pressure)
Portable fire ExtinguishesSafety BeltSafety ShoeHand GlovesHelmetAcid cleaning ApronSafety GogglesWelding screen and HelmetWelding screen and HelmetRope Ladder
61.62.63.64.65.66.67.68.69.70.71.
72.73.74.75.76.77.78.79.80.81.
S.No.
Description of Equipments
SAFETY EQUIPMENTS
ADDRESSLAXMI CONSTRUCTION COMPANY
HEAD OFFICE:SABOURA,
P.O.-BARAUNI OIL REFINERY,DISTRICT-BEGUSARAI,
STATE BIHAR-851114
TEL. NO.: 06243-244587Cell Phone : 9431029997 / 9431417644,
9199508424E-mail : [email protected]
2nd Email : [email protected] : www.laxmiconstruction.com