LBT Q4 2007 Engineering Review. ETP Elevation Track Protection (oil contamination remediation). Highlights (Q4/2007). Wipers installed on Left-rear El Pad Full sheet metal enclosure tested. Open Issues. Technical Vacuum system on hold to see if wipers are practical - PowerPoint PPT PresentationTRANSCRIPT
LBT Q4 2007 Engineering LBT Q4 2007 Engineering ReviewReview
ETPETP
Elevation Track Protection Elevation Track Protection
(oil contamination (oil contamination remediation)remediation)
21-Dec-200721-Dec-2007 LBT Q4 2007 Engineering RevieLBT Q4 2007 Engineering Revieww
Highlights (Q4/2007)Highlights (Q4/2007)
Wipers installed on Left-rear El PadWipers installed on Left-rear El Pad Full sheet metal enclosure testedFull sheet metal enclosure tested
21-Dec-200721-Dec-2007 LBT Q4 2007 Engineering RevieLBT Q4 2007 Engineering Revieww
Open IssuesOpen Issues TechnicalTechnical
Vacuum system on hold to see if wipers are practicalVacuum system on hold to see if wipers are practical Spring clip still needs to be finessed in all installationsSpring clip still needs to be finessed in all installations Lateral Capillaries need characterization and length Lateral Capillaries need characterization and length
adjustmentadjustment Inboard laterals/gear clearance did not conform to model Inboard laterals/gear clearance did not conform to model
so wipers lift and leak at gear radiusso wipers lift and leak at gear radius ScheduleSchedule
NoneNone FinancialFinancial
None, cost of wipers is lowNone, cost of wipers is low ResourceResource
Mountain support pacing operationMountain support pacing operation
21-Dec-200721-Dec-2007 LBT Q4 2007 Engineering RevieLBT Q4 2007 Engineering Revieww
Progress (Q4/2007)Progress (Q4/2007)
Wipers installed on Left-rear El PadWipers installed on Left-rear El Pad Sheet metal full enclosure testedSheet metal full enclosure tested
21-Dec-200721-Dec-2007 LBT Q4 2007 Engineering RevieLBT Q4 2007 Engineering Revieww
Planning (Q1/2008)Planning (Q1/2008)
Characterize and prove system Characterize and prove system during 1during 1stst qtr. qtr.