lca railway 07 2014

19
COMPANY PRESENTATION

Upload: roberto-molino

Post on 04-Apr-2016

241 views

Category:

Documents


6 download

DESCRIPTION

LCA BALLAURI COMPANY 40 years of experience: Mechatronic design. Sensors and Transducers. Electromechanic Applications. Lighting Systems.

TRANSCRIPT

Page 1: LCA RAILWAY 07 2014

COMPANY PRESENTATION

Page 2: LCA RAILWAY 07 2014

LCA BALLAURI COMPANY

40 years of experience: Mechatronic design Sensors and Transducers Electromechanic Applications Lighting Systems Electronic Equipment for Railway and Automotive fields

Page 3: LCA RAILWAY 07 2014

MAIN DETAILS of the COMPANY

COMPANY DEPARTMENTS •  R&D, Engineering, S&M, Quality, Supply Chain and Production,

Testing and Labs, Customer Service.

FIELDS OF ACTIVITY •  Railway Division •  Lighting Division •  Automotive Division

•  Plant and headquarter: Orbassano, Torino (Italy) •  Total plant surface 1600sqm •  Established in 1975 by Mr Ugo Ballauri •  Employees: about 20 •  Turnover: about 3M€ year, with growing trend •  ISO 9001 and ISO 14001 certificates + various customer certifications

Page 4: LCA RAILWAY 07 2014

LCA BALLAURI mission

•  Generation of value for our customers, giving them a complete service •  To give solutions with professional competence •  To deliver products with very high quality level •  Competitiveness based on knowledge, innovation, capability and research

finalised to customer problem solving •  Company ethics and respect of legislation in force

SINCE 40 YEARS WE BELIEVE IN

FURTHERMORE •  Our employees are our first value: they all believe and push our mission! •  Each activity is addressed to respect the personnel safety and the environment

With the above concepts we want to grow, facing new challenges!

Page 5: LCA RAILWAY 07 2014

LCA BALLAURI strength points

•  Internal design (R&D and Technical Dept) •  Co - design Customer/LCA BALLAURI •  On specific Customer’s request (customized products)

DESIGN

•  Performed inside: instrumental & metrological laboratory (3D measurement); •  Type tests & functional tests for validations •  Temperature tests (climatic chambers)

PROTOTIPATIONS

TESTS

•  Flexibility: in batches quantity and on-time delivery •  Lean processes

PRODUCTION, ASSEMBLY AND TESTING

•  3D printer for fast prototipations

Page 6: LCA RAILWAY 07 2014

LCA BALLAURI main Railway products

•  Speed sensor, stand alone types •  Speed sensor, bearing integrated types •  Connection systems, body-bogie •  MPQY Sensor type, transducer for rail •  Temperature sensors with or without emergency fuse, for bogie “hot axl-box” •  Temperature sensors with or without emergency fuse, for “gear-boxes” •  Multiple sensors “speed-temp-vibr” for bogie monitoring

SENSOR SYSTEMS

•  Led tubes to retrofit Fluorescent tubes •  Led ceiling lights •  Led Lighting channels •  Led Spot lights, orientable and fixed •  Strip leds •  Floor spot lights •  Led lamps

LIGHTING SYSTEMS

Different lengths, output in voltage or current, with or without connector, various lay-out, customer tailored or LCA Std.

Page 7: LCA RAILWAY 07 2014

Main references for Railway market

•  more than 30.000 units, speed sensors - various “stand alone” typologies •  more than 100.000 units, speed sensors - “bearing integrated” typologies •  more than 20.000 units,  temperature sensors •  more than 100.000 units, body-bogie system connections •  3.200 “hot axl-box” temperature sensors for AB/BT, V300Zefiro - ETR1000 HS Train, in production •  2.880 “gear box” temperature sensors for AB/BT, V300Zefiro - ETR1000 HS Train, in production

SENSOR SEGMENT

•  full supply "Led Lighting System" for Cab HS Train ETR1000-Italy (50 Trains) •  full supply “Led Lighting System" for Elecronic Room ETR1000-Italy (50 Trains) •  full supply Led Tubes for lighting retrofit batches MD coaches/Trenitalia fleet •  supply strip Leds for Restaurant coaches/Trenitalia fleet

LIGHTING SEGMENT

Page 8: LCA RAILWAY 07 2014

Main CUSTOMERS & PRODUCTS since 1992

COMPANY SINCE YEAR ITEMS Q.TY > 15.000 (own production)> 80.000 (co-design)

TEMPERATURE SENSORS > 20.000 BOGIE-BODY SYSTEM CONNECTIONS > 100.000

SPEED SENSOR FOR BRAKES AND WSPFAIVELEY TRANSPORT 2003 SPEED SENSORS FOR ODOMETRY

DOUBLE ELECTROVALVES > 6.000 SPEED SENSORS FOR WSP AND DOORS (for spares) > 5.000

MPQY SENSORS FOR RAILS Prototypes for TEST & VALIDATIONSCAB-LIGHTING SYSTEM FOR HS TRAIN V300 ZEFIRO

(and Electronic Room) 100 CABS

TEMPERATURE SENSOR FOR HOT AXL BOX HS TRAIN V300 ZEFIRO 3.200

BOMBARDIER 2013 TEMPERATURE SENSOR FOR GEAR-BOX HS TRAIN V300 ZEFIRO 2.880TIMKEN 2012 TEMPERATURE SENSOR > 1.000

SCHAEFFLER 2013 MULTUPLE SENSORS "SPEED-TEMP-VIBR" Prototypes for TEST & VALIDATIONS

> 30.000

TRENITALIA 2001

ANSALDO BREDA 2010

BEARING INTEGRATED SPEED SENSORS

1992SKF RAILWAY

Page 9: LCA RAILWAY 07 2014

some Railway Products: Sensors & Other devices

Gear-box Temperature Sensor

Hibrid Speed Sensor

Hot-Axl Box Temperature Sensor

Temperature Sensors

Hot-Axl Box Gear-Box

Page 10: LCA RAILWAY 07 2014

Body-Bogie connection system

some Railway Products: Sensors & Other devices

Door Speed Sensors

Speed Sensors

Some Speed Sensors with phonic wheel

Page 11: LCA RAILWAY 07 2014

some Railway Products: Prototypes under Study

Pneumatic Valve

Wheel Hub Temp. Monitoring Voltage Generator

MPQY Sensor

Page 12: LCA RAILWAY 07 2014

some Railway Products: Lighting

Esalux Led Lamp

Orientable Spotlight

Led Tube

Spotlight

Page 13: LCA RAILWAY 07 2014

some Railway Products: Lighting

Strip Led

Led Tilting Tunnel

Directional Spotlight

Led Ceiling Light

Page 14: LCA RAILWAY 07 2014

some Railway Products: Lighting

Strip Led Bistrot

Emergency Spot-Light

Led Lighting Channel

Floor Spot-Light

Page 15: LCA RAILWAY 07 2014

some Railway Products: Lighting

Dimmer for Lighting control

Timer with proximity sensor

Led Driver, 110Vdc

DC/DC 110/24V Power Supply

Page 16: LCA RAILWAY 07 2014

some Railway Products: Lighting

DC/DC 110/24V, Redundant Power Supply UPS Group with battery

Page 17: LCA RAILWAY 07 2014

Who gives us trust in Railways

Alstom / Siemens and other minor car builders: indirect customers

Page 18: LCA RAILWAY 07 2014

Where we are

Plant e HQ next to Turin motorway (Tangenziale). From the Tangenziale exit Corso Orbassano and follow direction Beinasco.

Strada del Bottone 28 – 10043 Orbassano (To) – Italia www.lcaballauri.com

Page 19: LCA RAILWAY 07 2014

LCA BALLAURI s.r.l.LCA BALLAURI s.r.l.

Thank you for your attention!