lcd engineering & integration detector services cavern layout

23
LCD Engineering & Integration Detector Services Cavern Layout ILD Workshop, LAL/Paris, May 22-25, 2011 Andrea Gaddi on behalf of the CERN LCD Engineering Group B. Curé, A. Gaddi, H. Gerwig, M. Herdzina, A. Hervé, N. Siegrist, F. Ramos Physics Dept. - CERN

Upload: brody-thornton

Post on 02-Jan-2016

34 views

Category:

Documents


3 download

DESCRIPTION

LCD Engineering & Integration Detector Services Cavern Layout. ILD Workshop, LAL/Paris, May 22-25, 2011. Andrea Gaddi on behalf of the CERN LCD Engineering Group B. Curé, A. Gaddi, H. Gerwig, M. Herdzina, A. Hervé, N. Siegrist, F. Ramos Physics Dept. - CERN. - PowerPoint PPT Presentation

TRANSCRIPT

LCD Engineering & IntegrationDetector Services

Cavern LayoutILD Workshop, LAL/Paris, May 22-25, 2011

Andrea Gaddion behalf of the CERN LCD Engineering GroupB. Curé, A. Gaddi, H. Gerwig, M. Herdzina, A.

Hervé, N. Siegrist, F. Ramos

Physics Dept. - CERN

Page 2May 22-25, A. Gaddi, Physics Dept. CERN

LCD Engineering & Integration

Detector engineering & integration issues.

Detector longitudinal cut-out view

Page 3May 22-25, A. Gaddi, Physics Dept. CERN

LCD Engineering & Integration

Engineering & Integration of the Detector forward region.

Page 4May 22-25, A. Gaddi, Physics Dept. CERN

LCD Engineering & Integration

Progress on the forward region design.

Integration of the different forward detectors (Lumical, Beamcal)

Integration of the beam feed-back components (BPM, Kicker)

Integration of QD0, support tube and stabilization system

Integration of the anti-solenoid & the ferromagnetic front-disk

Integration of the optical link system for QD0+detector alignment

Sectorization of the vacuum piping

Page 5May 22-25, A. Gaddi, Physics Dept. CERN

LCD Engineering & Integration

Beam-pipe sections.

Page 6May 22-25, A. Gaddi, Physics Dept. CERN

LCD Engineering & Integration

Maintenance scenario.

Page 7May 22-25, A. Gaddi, Physics Dept. CERN

LCD Engineering & Integration

Detector services.

Although the needs in terms of powering, cooling and gas-flushing have not yet been declared by sub-detectors, a minimal list of detector specific infrastructures has been set-up.Considering that caverns ventilation, main power lines and primary cooling are services provided by the machine infrastructures Group, we have focused our attention to the following services:

Sub-detector specific cooling, in the range between -20 and +20 deg C Low and high voltage power distribution to sub-detectors UPS to control PCs and sensible systems Compressed air for valve piloting closing to the detector Gas distribution for sub-detectors, including Nitrogen and dry-air flushing Detector slow-control and safety systems

To be noted that this list does not include the magnet services and the detector moving system, that are considered separately from sub-detector services.

Page 8May 22-25, A. Gaddi, Physics Dept. CERN

LCD Engineering & Integration

Detector services.

Find the best location for the service skids.Considering the issues of accessibility for maintenance, presence of stray field from the detector magnet and in order to avoid producing vibrations close to the Interaction Region, the service skids have been located on the metallic scaffolds on the cavern wall opposite to the transfer tunnel.

How to connect them to the detector platform.The link to the detector platform is done via multiple cable-chains, running underneath the cavern floor, as done at CMS. Therefore the detector stays always cabled and connected to the service skids and the floor is free from obstacles that could prevent free movement of people or machines.

Page 9May 22-25, A. Gaddi, Physics Dept. CERN

LCD Engineering & Integration

Location of detector services.

Detector services

Magnet services

Detector platformwith cable-chains

Sliding doors

Page 10May 22-25, A. Gaddi, Physics Dept. CERN

LCD Engineering & Integration

Cable-chains for detector services (CMS example).

Page 11May 22-25, A. Gaddi, Physics Dept. CERN

LCD Engineering & Integration

Underground Area Layout.

Page 12May 22-25, A. Gaddi, Physics Dept. CERN

LCD Engineering & Integration

Ø18000

31600

62000UA Top View.

Page 13May 22-25, A. Gaddi, Physics Dept. CERN

LCD Engineering & Integration

28000

56000

33500UA Cross-Section at IP.

Page 14May 22-25, A. Gaddi, Physics Dept. CERN

LCD Engineering & Integration

Page 15May 22-25, A. Gaddi, Physics Dept. CERN

LCD Engineering & Integration

Page 16May 22-25, A. Gaddi, Physics Dept. CERN

LCD Engineering & Integration

Page 17May 22-25, A. Gaddi, Physics Dept. CERN

LCD Engineering & Integration

Page 18May 22-25, A. Gaddi, Physics Dept. CERN

LCD Engineering & Integration

Page 19May 22-25, A. Gaddi, Physics Dept. CERN

LCD Engineering & Integration

Page 20May 22-25, A. Gaddi, Physics Dept. CERN

LCD Engineering & Integration

Page 21May 22-25, A. Gaddi, Physics Dept. CERN

LCD Engineering & Integration

Underground Area Ventilation.

The functionalities assured by the ventilation are the following:

Provide fresh air for personnel.

Treat air according to needs: heating, conditioning, dehumidify.

Evacuate thermal charges.

Ensure dynamic confinement between machine and accessible areas where 100% air tightness cannot be achieved.

Provide extraction capabilities.

Filtering exhaust air before releasing into the environment.

Purge of areas (after a fire).

Page 22May 22-25, A. Gaddi, Physics Dept. CERN

LCD Engineering & Integration

Ventilation sectors:

The underground area shall be divided in the following sectors:

→Cavern A (=)

→Cavern B (=)

→Bypass and interaction region (-)

→Emergency escape tunnel (+)

→Pressurised areas in shaft (+)

Courtesy M. Gastal, J. Osborne

Page 23May 22-25, A. Gaddi, Physics Dept. CERN

LCD Engineering & Integration

Detector Moving System.

A study has recently started and a first proposal is presented by M. Herdzina.