lcd strategy for a big 2014

10
LCD strategy for a BIG 2014

Upload: angela-alesci

Post on 26-Jun-2015

74 views

Category:

Documents


2 download

TRANSCRIPT

LCD strategy for a BIG 2014

LCD Strategy objectives

Develop LCs among the 4 programmes horizons

Support LCs on the achievement of their clusters goals

Drive the organization direction through an healthy and sustainable growth to achieve the dream goal of BIG 2014

Lc growth path

TOP

GRO

POT

RIS

oGCDP iGCDP iGIP oGIP

TOP TOP TOP

GRO GRO GRO

POT POT POT

the growth of our lcs will develop along the four

programmes horizons, starting

from our driver ogcdp, then igcdp,

igip and ogip (follow the numbers).

considering the current diversity level of the lcs,

their clusters will be assessed in all

programmes and the lcd strategies

will support them in recovering the

«gaps» they have in the model.

*eg. a lc which is GRO in iGCDP and GRO in oGCDP, should first aim to reach TOP in oGCDP.*eg. a lc in oGCDP GRO, iGCDP GRO and iGIP POT, should keep on investing more in GCDP to reach TOP, before upgrading iGIP performances.

1.

2.

3.

4.

6.

5.

7.

8.

9.

10.

11.

12.

13.

Clusters

Characteristics Goals

Focus Strategies

KPI

Driver vs Focus Programme driver

Programme focus

Check the excel: Growth Model AIESEC Italy 13-14

MC/LC Plans

Lc Independence

LCs have their own direction to follow indipendently from MC. National Alignment and Direction

Growth Model is based on national strategies and direction: its a way to drive the organization to his objectives.

BIG 2014 in numbers

oGCDP

iGCDP

iGIPoGIP

755 OGCDP680 IGCDP110 IGIP150 OGIP

451 IGCDP 501 OGCDP

MC Summer GCDP Goals

Tier LC oGCDP iGCDP IGIP oGIP

1 MI TOP GRO POT GRO

1 RT TOP POT POT POT

1 TO TOP TOP POT POT

1 VE TOP POT POT GRO

2 AN RIS TOP GRO TOP

2 NP GRO TOP POT POT

2 PA POT TOP POT POT

3 TS GRO GRO POT TOP

3 CT GRO GRO POT GRO

3 TN GRO GRO POT GRO

3 BO GRO POT POT POT

3 NFII POT GRO GRO TOP

3 GE RIS GRO POT GRO

3 BA RIS POT POT GRO

4 FE POT POT POT POT

4 PD POT POT POT POT4 PV RIS POT POT POT4 RS POT POT POT POT

The Growth State we want to achieve with the BIG

2014: In Tier 1 we have the LCs already achieved the TOP

in the first program, in Tier 2 the LCs have

achieved the TOP in the second program, in Tier 3 all the LCs have at least one program in GRO and in Tier 4 all the LCs have

all the programmes in POT.

LC Coaching

Coaching (The coach help the LCs to find the better ways/solutions to achieve their goals)

Tracking (the achievement of LCs cluster goals)

Coaching Calls ( Feb-Mar/ May-June)Coaching visit (April)

Do you have any questions?

Contact me :D

[email protected]