Page 1: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify
Page 2: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

COMPANY INFORMATIONS

2

LCM Italia, established in1986, is a fast-growingCompany specialized in thedesign and production of API6D and API 6A Floating andTrunnion Mounted Ball Valvesfor Oil, Chemical,Petrochemical, Pipeline,Natural Gas and WaterIndustries, Off-shore and On-shore Plants, all over theworld.

L.C.M. Italia is located in thetown of Vanzaghello, about20 km (12 miles) north-westof Milan, close to theMalpensa airport area andto the main railway stations,in the industrial heart of Italy.

The production unit extendsover 19,200 m2 (206,667 sqft) of covered area, plus8,000 m2 (88,000 sq ft) ofopen yard.Offices account for a further1,650 m2 (18,000 sq ft).

Page 3: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

PRODUCTION RANGE

From 1/2" to 60" Size

ANSI 150 to 2500 / API 3000 to 10000

CS/LTCS/Austenitic/SS/DSS/SDSS/6MoNi-Alloys/Titanium

Split BodyTop Entry

Fully WeldedMultiway

DBBMSV

Rising StemSoft Seated/Metal Seated

CRA welding overlay

ENP/Carbide/Epoxy Coatings

Manual/Pneumatic/Hydraulic/Electric Motor/ROV Operated

3

Page 4: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

LCM STAFF

4

Assembling/testing, 28

Machining/Welding, 14

Warehouse

&Shipping, 10

Supply Chain, 9

Production/Planning, 4

Technical Department, 12

QA/QC, 9

PM / Contract Adm., 9

IT, 1HSE, 1

Accounting/Finance, 10 Application/Cost Dpt, 4 Sales/Marketing, 8

Managers, 7

Department Number

Assembling/testing 28

Machining/Welding 14

Warehouse &Shipping 10

Supply Chain 9

Production/Planning 4

Technical Department 12

QA/QC 9

PM / Contract Adm. 9

IT 1

HSE 1

Accounting/Finance 10

Application/Cost Dpt 4

Sales/Marketing 8

Managers 7

Tot 126

Over 21

11 - 20

6 -10

0 - 5

Seniority

Over 21 11 - 20 6 -10 0 - 5

Manager, 7

White Collars,

60

Blue Collars,

51

Temporaly, 8

LCM STAFF

Manager

White Collars

Blue Collars

Temporaly

Page 5: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

TURNOVER TREND

5

1986 1998 1999 2008 2009

Registration ISO 9001 QMS

API 6D/6ASIL

Certification

New factoryIncreasedcapacity

2017

New building expansion

Page 6: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

10Y TREND VALVES PRODUCED, AVERAGE SIZE & TURNOVER [M€]

6

YearProduced

ValvesTurnover

Ave. Size

2009 25.439 29.835.821,63 3,752010 17.533 35.949.838,37 5,812011 10.394 25.206.228,08 4,992012 21.957 42.782.309,62 3,472013 15.190 43.682.754,59 4,662014 11.724 42.363.778,08 5,002015 9.742 44.935.327,91 6,162016 8.752 54.362.534,65 5,692017 14.764 78.029.473,93 3,322018 4.519 73.413.033,19 8,35

25,439

17,533

10,394

21,957

15,190

11,7249,742

8,752

14,764

4,519

2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

3.75

5.814.99

3.47

4.66 5.00

6.165.69

3.32

8.35

1 2 3 4 5 6 7 8 9 10

0

10

20

30

40

50

60

70

80

90

Page 7: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

LCM WORLDWIDE VALVE’S INSTALLATION PRESENCE

7

Page 8: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

LCM APPROVAL & REGISTRATION (END USERs)

8

Page 9: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

9

LCM APPROVAL & REGISTRATION (END USERs)

Page 10: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

10

LCM APPROVAL & REGISTRATION (END USERs)

Page 11: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

LCM APPROVAL & REGISTRATION (END USERs)

11

Page 12: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

MAJOR CLIENTS- EPC

12

Page 13: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

LCM ITALIA reference list

13

UAESHAH GAS – GASCORUWAIS - GASCOEXPANSION BAB GAS COMPRESSION – ADCOADG II - GASCOHABSHAN – GASCOHABSHAN 5 - GASCOBOROUGEBOROUGE IIBOROUGE IIINASR & UMM LULU Development Project Phase 1 - ADMA OPCOINTEGRATED GAS DEVELOPMENT PROJECT – ADMAZAKUM FACILITIES UZ-FFD PROJECT - THAMMAMA II, WAD PHASE I – ZADCOZAKUM GAS LIFT OPERABILITY UPGRADE PRJ 8151 WORK PACK IVUMM LULU Development Project Phase 2 - ADMA OPCOEGYPTQASR COMPRESSION PROJECT – KHALDABALTIM NORTH I PLATFORM – PETROBELSALAM GAS TRAINS 3 & 4 – KHALDAPTB Belayim, New Land Oil Treatment Train Project – PETROBELASSIL AND KARAM Gas Development Project – BAPETCONORTH IDKU FIELD DEVELOPMENT – NIPETCO – SUEZ OIL COMPANY3267-200 WDDM, Main Compression Station, Phase VII - BURULLUS

BOLIVIAPLANTA DE EXTRACCION DE LICUABLES DE GRAN CHACO - YACIMENTOS PETROLIFEROS FISCALES BOLIVIANOSMEXICOALLACCIO A PIATTAFORMA GUATZACUALCO – PEMEXVAROIUS PRODUCTION PLATFORMS FOR LITORAL – PEMEXITALYVAL D’AGRI – ENIKOREAHEAVY OIL UPGRADING PROJECT (HOU) - HYUNDAI OILBANKLIBYAWAFA PROJECT – MELLITAHVARIUOS INSTALLATION - Western Lybia GasMALAYSIASARAWAK GAS DEVELOPMENT PROJECT – Murphy Oil & Petronas CarigaliSamarang Re-development (Phase 1) - Schlumberger - Petronas CarigaliTANGGA BARAT CLUSTER (TBC) DEVELOPMENT - SCOMI NATCO - PetronasCarigaliINDONESIAJANGKRIK COMPLEX PROJECT – ENI MUARA BAKAUAUSTRALIAQUEENSLAND CURTIS LNG – BG GROUPTHE NETHERLANDSZUIDNENDING PROJECT – ZuidwendingUNDERGROUND STORAGE EPE II – NOUNITHACA Energy (UK) LTD-Jacky Wellhead Platform - Iv-Oil & Gas

Page 14: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

LCM ITALIA reference list

14

INDIAB SERIES AND N15 & N16 6 WELL PLATFORM PROJECT – ONGCMSP PLATFORM - ONGCDEEN DAYAL FIELD DEVELOPMENT PROJECT PROCESS CUM LIVING QUARTERS PLATFORM (PLQP) - GSPCKAZAKHSTANKASHAGAN PROJECT – AGIP KCOKARACHAGANAK PROJECT – AGIP KCOZhaikmunai CGTU-3 - ZhaikmunaiVENEZUELAPIGAP III – PDVSAPIGAP IV – PDVSAALGERIAEL-MERK – SONATRACHCAFC – SONATRACHMENZEL LEDJMET (MLE) – SONATRACHIN SALAH GAS – SONATRACHIN AMENAS – SONATRACH/BP/STATOILVARIUS INSTALLATIONS – CAMEGVARIUS INSTALLATIONS - OURHOUDVARIUS INSTALLATIONS – BIR BERKINESAFIR – SONELGAZELR1 Haoud El Hamra - Sonatrach

SAUDI ARABIATASNEE• AL JUBAILPETRORABIGH• EPPE/LLDPE RABIGH• Rabigh II Refining and Petrochemical project Naphta and Aromatics

package (RP2) SAHARA• PDH/PP AL JUBAIL (SA) EPC

ARAMCO DIRECT POs FOR FIELD USE • ABU SAFAH• SHEDGUM • MANIFA• KHURSANIYAH• SHAYBAH• JUAYMAH PLANT

ARAMCO PROJECTS THROUGH EPC• JAZAN IGCC PKG2 – SNAMPROGETTI/SAIPEM• Jazan Refinery and Terminal Project - SEPCO• Jazan Refinery projects department - South Tank Farm & Gas Treatment Division

(EPC-02) - Hyundai Arabia Company LLC• KARAN 45 – McDERMOTT• ABU SAFAH AND MARJAN – McDERMOTT• Master Gas system Expansion Phase I – PALL INTERNATIONALL• Jubail II Project - PALL INTERNATIONALL• Kaec-Rabigh II Project - PALL INTERNATIONALL• Saudi Oil modular skid - GULF STEEL WORKS• Saudi Oil modular skid – AES ARABIALTD• Saudi Oil modular skid – PETRONASH• SNP/STAR LTA MIRJAN & ZULUF 2 NEW CRPO - SNAMPROGETTI/SAIPEM• Shaybah Combined Cycle Power Generation Project – SEPCO• Umm Wu'al EPC Project Ammonia Plant – DAELIM• LTA with McDermott-Saipem-L&T

Page 15: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

APPLICATIONS

15

Ø Pipeline/Piping: Off-Shore platforms, FPSO and On-Shore Plants (RISER-ESDV, HIPPS, SDV,

MOV, XV, Pig-Trap Isolation and Manual Isolation valves)

Ø Wellhead: Off-Shore, FPSO and On-Shore (Flow-line valves, SSV)

Ø LT/Cryo: LNG Plants, GTL Plants, Blow-down service & very cold environment (down to -250°C)

Ø HT: Steam Injection, Refinery, Petrochemical (up to +537°C)

Ø Slurry: Oil-Sand, catalyst, sandy services

Page 16: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

16

Ø The Oil & Gas market nowadays explore fields with more demanding service conditions (higherpressure/temperatures, increased H2S and CO2 contents, deeper waters etc.). In addition the newassets are requested to produce more, both in terms of capacity and efficiency and with increasedreliability (i.e. less probability of failure on demand (PFD)).

Ø In this scenario valve manufacturers are required to challenge the industry limits in terms of size,pressure rating, materials, cladding etc.

Ø Since LCM designs and engineers all of its products in-house, we can provide the maximum interms of engineering support, response time and flexibility both in the FEED and in the procurementstages.

Ø Since the company was founded, a full time engineering department has been established toeither develop new product lines or modify existing products to incorporate market demands andmeets customer specifications.

ENGINEERING COMPETENCES

Page 17: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

56” ENGINEERING STUDY

17

Our experienced and skilled technical dept is able to design all type of ball valves for on-off service acc/to client requirements and verify its accuracy through Finite element analysys (FEA). FEA analysis is used to verify the structural integrity of the valve once subject to pressure and external loads, as well as to optimize the seat to ball contact surface to obtain an uniform and constant contact pressure to ensure a reliable sealing.

Page 18: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

PROJECT MANAGEMENT PLAN

18

During order execution Project Manager will have responsibility to:

§ Follow up technical, procurement, documentation, production, testing, shipping activities maintaining duly updated the client about work progress.

§ Detect all possible subject that may have impact on the supply from all possible point of view (Quality/technical/cost/delivery/Other). Irrelevant from originator of the subject

§ Follow up the matter and coordinate all actions necessary to close the subject with mutual satisfaction.

Collection of all points that need follow up shall be listed in the actionlist that will be managed by the Project Manager and shared through actual internal meeting to LCM Dept. managers.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53

NOTE: The present Execution plan represents planning of activities relevant to execution of this specific lot of valves.

For valves Size and quantities included in this lot, our schedule will be to deliver the first valve within 38 Weeks from date of P.O.

In case of order LCM will be available to discuss with TPCL Project Team the list of Pryority items and we will provide all our effort to prepare a final Project schedule that will match with your priority needs

CLIENT:

Quantities:

- Qty 2 - NS 48"

- Qty 8 - NS 56"Project:

ACTIVITYBelow figures shall be read as number of weeks starting from date of P.O. receipt

Scope of Supply:

- Station ESD valves (INLET/OUTLET), fully

welded, trunnion mounted, casted, carbon steel

material

- Block valves, fully welded, trunnion mounted,

casted, carbon steel material

TPCL

Receipt of PO from Company / Contract ReviewPlanned

Actual

Documentation issue (First Submission)(VDRL, ITP, Drawings, Quality Procedures)

Planned

Actual

Documentation Review/Approval (By Client)(Including Drawing Approval)

Planned

Actual

Engineering and Bill of Material Planned

Actual

Long Lead Item Raw Material Procurement(Forgings: Body/Closure)

Planned

Actual

Raw Material Procurement of Trim PartsPlanned

Actual

Ready DAP Karachi Planned

Actual

Machining / Ball CladdingPlanned

Actual

Painting

Packing & Shipping (Ready Ex-works) Planned

Actual

Planned

Actual

Actual

Planned

Actual

Actuator procurement & receiving

TAPI Gas Pipeline Project

LOT AFG-1

Kick Off MeetingPlanned

Production activities(Welding / Assembling / Factory Acceptance

Test)

Planned

Actual

Page 19: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

Project management phases

19

Order Placement

Internalorder entry& Contractreview

KOM

Engineering(BOM RM &Doc subm.)

Critical Raw Materials Sub-orders placement

Engineering (Final BOM &Mach Dwgs)

PIM

Comm. Comps& Mach.Sub-orders

Critical Raw materials receipt

FinishedComps.Receipt

Ball claddingactivities

Weldingactivitieson body and closures

NDT Inspection& Assembly

Internalpressure &FAT test

Witnessedpressure

& FAT testPainting

FinalInspection IRN & certificates

Packing Shipment

Page 20: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

Supply chain - Strategic partnership

20

Ø Raw Materials Suppliers (Forging and Casting)

Ø Actuators manufacturers (Electric, Pneumatic, Hydraulic &

Gas over Oil)

Ø Other Sub-suppliers (Machining, Coating, Painting, etc.)

Our supply chain department main role is to establish and

consolidate long lasting business relations with our sub

suppliers considering them as partners towards a common

target : CUSTOMER SATISFACTION.

Our quality concept is spread out to all LCM sub suppliers who

are monitored with expediting and inspection visits by our

personnel to assure LCM QA/QC and project specification

requirements implementation.

Page 21: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

LCM ITALIA certifications

21

LCM ITALIA can operate according to the following certifications:

ØISO 9001:2008ØAPI 6D 24th editionØAPI 6A 20th editionØIEC 61508-SIL3 for the LCM complete product rangeØPED 2014/68/UE Cat.3 – Module H – DNVØATEX 2014/34/UE ØCR TU certificationsØLow Fugitive emission to ISO 15848-1 ClassA&BØFire Safe to API 6FA:1999, API 607:2010, ISO-10497:2010ØOHSAS 18001:2007ØISO 14001:2004

Page 22: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

Production

22

Ø LCM performs all the key activities in-house.Ø Rough materials are purchased from qualified sub-suppliers.Ø To guarantee the maximum elasticity and flexibility, in addition to our workshop we use

qualified sub-supplier for some machining activity.Ø Special processes like welding, plating & coating and painting are sub-contracted to “long

term” sub-suppliers and are monitored with dedicated inspection procedures. In so doingwe always assure our customers to provide the latest technologies at the current marketconditions.

Ø All sub-contracted activities are monitored by LCM’ QC inspectors to guarantee that thetechnical/quality project requirements are well satisfied and met.

Page 23: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

Manufacturing OverviewLCM ITALIA has developed the ERP ( Qui Quadra ) integrated with internal management system ( FORECAST ) which follow any requirements of our Clients and allows a severe though flexible management of both the activities connected with the job orders and the processes linked with the accounting and/or logistical flows.

The LCM ITALIA assembling department disposes of nr. 3 mounting areas, each provided with nr. 10 working positions.

1 area for large sizes of ball valves, up to 60” 1 area for medium sizes of ball valves up to 32” 1 area for small sizes of ball valves up to 12”

Depending on the models and dimensions, our production capacity reaches a number of 1200-1650 ball valves per month fully customized and individually tested generally segmented as follows: 900-1300 ball valves size up to 12” all classes 200-150 ball valves size up to 24” all classes 100-200 ball valves size up to 48” all classes Our workshop lay-out allow possibility to reach an increase of 20% – 25% production capacity. The LCM ITALIA main strengths surely are machining shop, testing department and special test dept

The machining shop is equipped as follows:

# 1 CNC saw dia. 220 # 2 CNC saw dia. 360 # 1 automatic saw dia. 420 # 3 horizontal CNC lathes Dia. 300# 3 horizontal CNC lathes Dia. 400 # 1 horizontal CNC lathe Dia. 500# 1 horizontal CNC lathe Dia. 700 # 1 vertical CNC lathe Dia. 1600# 1 horizontal machining center with 2 pallets dim. 500 x 500 # 1 horizontal machining center with 2 pallets dim. 1250 x 1250# 1 horizontal machining center with 5 pallets dim. 630 x 630 # 1 vertical machining center dim. 800 x 1600# 2 vertical machining center dim. 600 x 1200 # 2 welding MIG equipment with positioner of 750 kg and manipulator of 2 m x 2 m

The testing department is equipped as follows:

# 1 horizontal test bench up to 60” - 0÷700 bar – 2600 ton # 1 vertical test bench 3 heads up to 10” - 0÷1200 bar – 360 ton # 1vertical test bench with 2 pallets up to24” - 0÷600 bar – 600 ton # 1 horizontal test bench up to 24” - 0÷650 bar – 450 ton # 1 vertical test bench up to 12” - 6÷650 bar – 50 ton # 1horizontal test bench up to 24” - 15÷650 bar – 100 ton # 1 vertical test bench 3 heads up to 4” - 0÷650 bar – 100 ton #1 horizontal test bench up to 24” - 30÷650 bar – 250 ton # 1 vertical test bench 5 heads up to 4” - 0÷700 – 100 ton # 1 horizontal test bench up to 36” - 6÷1100 bar – 800 ton 23

Page 24: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

24

Machining shop

Page 25: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

25

Welding Machining area

Page 26: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

26

New building includes many test benches all installed in bunkers for hydrostatic/pneumatic/gas tests - horizontal and vertical installation

Page 27: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

27

New building facilities

Page 28: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

28

New building includes many test benches all installed in bunkers for hydrostatic/pneumatic/gas tests -horizontal and vertical installation

Page 29: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

29

Test bench up to 64” or 80 tons

Page 30: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

30

Cryogenic / high temperature and high pressure gas tests equipment

Page 31: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

LCM ITALIA valves pictures

31

As a prove of LCM ITALIA concrete capabilities you can find some pictures of few valves which represent the engineering value of our products.

Page 32: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

32

Model: TRUNNION SIDE ENTRYDN 36’’ RB CLASS 2500Project: UMM LULU PHASE 2 PROJECTClient: NTC (TECHNIP / NPCC JV)

Weight : 43.000 Kg

Page 33: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

33

Model: TRUNNION TOP ENTRY DN 20’’ CLASS 1500Project: SAFANIYA 4 DECKSClient: LARSEN & TOUBRO

Model: TRUNNION SIDE ENTRY DN 24’’x20” CLASS 1500Project: SULFATE REMOVAL FACILITIES PROJECTClient: ENPPI

Page 34: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

34

Model: TRUNNION SIDE ENTRY DN 16’’ CLASS 1500Project: LONG TERM AGREEMENT II TEN SFNY SLIPOVER PLATFORMSClient: McDERMOTT MIDDLE EAST, INC.

Model: TRUNNION TOP ENTRY DN 24’’x20” CLASS 900Project: BERRI FIELD-PROJECT BI-10-00909 Client: DYNAMIC INDUSTRIES INTERNATIONAL LLC

Page 35: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

35

Model: TRUNNION SIDE ENTRY HIGH TEMPERATUREDN 6’’ CLASS 2500Project: KASHAGAN FIELD DEVELOPMENT PROJECTClient: PETROFAC INTERNATIONAL LTD

Model: TRUNNION DOUBLE BLOCK AND BLEEDDN 2’’ CLASS 1500Project : 5228-AGD II PROJECT - GASCOClient: EASTERN BECHTEL CO LTD

Page 36: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

36

Model: TRUNNION SIDE ENTRYDN 48’’ CLASS 600Project: 032095-ADGD SHAH GAS EPC 2-3 MATERIALS BULK-ABU DHABIClient: SAIPEM SPA

Model : TRUNNION FULLY WELDEDDN 30’’ CLASS 600 Project : PLATAFORMA TIPO TETRAPODO DENOMINADA BP-LITORAL-T, PUENTES, TRIPODES Y QUEMADOR, SONDA DE CAMPECHE, GOLFO DE MEXICOClient: VAMICO/PEMEX

Page 37: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

37

Model: TRUNNION TOP ENTRY

DN 14’’ CLASS 2500

Project: NASR PHASE I &UMM LULU PHASE I

DEVELOPMENT PROJECT

Client: LARSEN AND TOUBRO HYDROCARBON

UPSTREAM- INT. OIL & GAS PROJECT

Model : TRUNNION TOP ENTRY

DN 30’’ CLASS 600

Project: IN AMENAS COMPRESSION PROJECT

Client: JGC

Page 38: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

38

Model: TRUNNION THREE WAY DN 8’’ CLASS 300Project : BOROUGE PE1 EXPANSION PROJECTClient: TECNIMONT

Model: TRUNNION TOP ENTRY FORGED BODYDN 9’’ CLASS 10000Project : PIGAP IIIClient: BARIVEN S.A. c/o PDVSA SERVICE B.V.

Page 39: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

39

Model: TRUNNION SIDE ENTRY WITH COMPACT ACTUATORS DN 10” & 8’’ CLASS 600 FULL DUPLEXClient: EQUINOR (STATOIL)

Page 40: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

40

Model: RISING STEM BALL VALVEDN 6’’ CLASS 600

Page 41: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

41

Model: MULTIPORT SELECTOR VALVEDN 8’’X4” CLASS 900

Page 42: LCM presentation March 2019 - RazValve Pacific...Ø Since the company was founded, a full time engineering department has been established to either develop new product lines or modify

42

Thanks for your attention