Page 1: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

1

Lean And Kanban From The Trenches

Vijay Bandaru

Page 2: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

2

Page 3: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

Who We Are & What Is Our Business?

3

Page 4: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

Why Transformation?

4

Page 5: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

EXISTING STRUCTURE REVISED STRUCTURE

Structural Change

5

Page 6: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

Structural Change

6

Page 7: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

Product 2

Product 3

Product 1

Service 1

Service 2 FORWARD ENGINEERING

SUSTENANCE ENGINEERING

Production Engineering Team

Earlier Working Model

7

Page 8: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

Vision

Dev’s goal is to implement the

features/ changes

Ops goal is to keep the site

stable and fast

C

O

N

F

U

S

I

O

N

Earlier Working Model (contd..)

8

Page 9: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

Product 2

Product 3 Product 1

Service 2

Service 1

SLA

Production Engineering Team

Vision

DEV, QA, PEG, BCM, DAG,

INFRA

LeanOps Inception

9

Page 10: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

Business Representatives

Global DevOps Backlog

------------

------------

-------------

---------------

------------

---------------------

----

----

-------

---------

Chief Product Owner

Area Backlog

------------

------------

---------------------

----

----

-------

---------

Area Backlog

------------

------------

---------------------

----

----

-------

---------

Area Backlog

------------

------------

---------------------

----

----

-------

---------

Area Product Owner

.

.

.

Fire Chief

Fire Chief

Fire Chief

- -

- -

Scrum Master

Scrum Master

Scrum Master

- -

Area Product Owner

Area Product Owner

LeanOps Structure

10

Page 11: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

4 WEEKS CADENCE CADENCE PLANNING

Discuss the Important Area for the cadence

Set the goals for the Cadence

No SLA Violation for P01/P04

All approved CRs must be deployed within one Business day

CR cycle time should not be more than 3 days

Define/Refine WIP Limits

On-demand Backlog Grooming

CADENCE CLOSURE

Goal Oriented Approach

11

Page 12: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

Swim Lanes Expedite Incidents, Problems &

Defects Releases, Changes Projects Maintenance WIP Limits Cross Skilling Pair deployments Daily Stand up @ Board Automation Continuous Flow Track Impediments

Kanban Board

12

Page 13: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

Initial Challenges

13

F

S

N

P

Page 14: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

How Did We Address The Challenges?

14

Page 15: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

Elimin

ate W

aste

Bu

ild Q

uality-in

Co

ntin

uo

us

Imp

rove

me

nt

Important Lean Principles

15

Page 16: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

Eliminate Waste

16

Page 17: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

Value Stream Mapping – An Example

17

Page 18: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

Build Quality- In

18

Page 19: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

Continuous Improvement

19

Page 20: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

Set the Stage

Gather data

Generate insights

Decide what to do

Close retro

From VersionOne and Snow

What went well, What went wrong, Try New

Collect and prioritize action items

Cadence Closure & Retrospectives

20

Page 21: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

Incidents created per week Incidents closed per week

CR Cycle Time Incident distribution by SLA

Metrics - Efficiency

21

Page 22: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

22

Metrics – Effectiveness, Quality & Others

Average Effort (for incidents based on category)

% of On Time Delivery (met the SLA)

% of First Time Right

Value Add Time & Non Value Add Time

% System Availability

Customer Satisfaction

Inflow Vs Outflow of Incidents

Team Happiness Index

Page 23: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

Best Practices Implemented

23

Page 24: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

Release duration is reduced from 2 months to 2 weeks

Reduced downtime from 8 hours to <2 hours

Improved quality

Reduced rework

Increased FTR

Enhanced Customer Satisfaction

Feature Teams

Achievements

24

Page 25: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

Achievements

25

Page 26: Lean And Kanban From The Trenches by Vijay Bandaru - Lean India Summit

www.vijaybandaru.com

[email protected] +91-9848032144

Thank you

26