Lean Construction - Prefabrication
Indiana Society for Healthcare Engineering ConferenceBatesville, IN May 14, 2010
![Page 2: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/2.jpg)
Agenda
Skanska Overview
Principles of Lean
Vehicles of ChangeContractual
Building
![Page 3: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/3.jpg)
Skanska Overview
− Skanska AB – one of the world’s leading construction groups
− Skanska USA - $4.0 billion in revenues in 2009
− 33 national offices offer local services with the benefit of national resources
− Approximately 8,200 employees nationwide
− Among most financially stable and best capitalized construction firms in the world
− Market sectors include:− Healthcare− Science and technology− Government− Education− Corporate commercial
3
![Page 4: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/4.jpg)
Skanska Overview
− Healthcare is Skanska’s primary market comprising 30 percent of business
− Healthcare Center of Excellence brings national resources and expertise
− Currently $4 billion healthcare projects in U.S.
− Built nation’s first LEED Gold Certified Hospital – Providence Newberg Medical Center
4
Consistently ranked among elite construction firms in annual rankings by Engineering News-Record and Modern Healthcare
Providence Newberg Medical Center
![Page 5: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/5.jpg)
Why Lean?Waste vs. Productivity
$15.8B lost annually due to fragmentation
US Dept of Commerce Bureau of Labor Statistics
![Page 6: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/6.jpg)
Symptoms of a Broken System
![Page 7: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/7.jpg)
Reaching a New Frontier Leadership, Planning and Management
TraditionalLeadershipDictates direction
PlanningPartitioned by disciplines and is linear. Predictive and generally fixed, setting parameters for management
ManagementControls are inflexible, autocratic -processes are fixed and measures are isolated and historical
Lean Facilitates collaborative direction
Collaborative, project based and seeks to integrate efforts to eliminate negative iterations. Learns as project evolves
Develops a “network of commitments” to implement plan, evolves intelligence, measures are integrated and proactive
![Page 8: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/8.jpg)
Lean Principles
− Collaborate – really collaborate
− Early engagement of team members
− Target Value Design
− Last Planner – all parties involved in the schedule
− Elimination of waste and duplicate activities
− Implement the 5 S’s
− Continuous feedback and learning
![Page 9: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/9.jpg)
Follow the 5 S’s
![Page 10: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/10.jpg)
Project Delivery
![Page 11: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/11.jpg)
Typical Project Arrangement
Owner
ContractorDesigner
Parties actagainst each
others'interests
This relationship hasbecome increasingly
ambiguous
Reinforced by provisions of AIAand AGC “standard“ contracts.
![Page 12: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/12.jpg)
Integrated Project Delivery (IPD)
− Integrates people, systems, business structures and practices into a process that collaboratively harnesses the talents and insights of all participants to reduce waste and optimize efficiency through all phases of design, fabrication and construction.
− IPD is the process;BIM and Last Plannerare the collaborative tools
One Contract
![Page 13: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/13.jpg)
BuildingPrefabrication
![Page 14: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/14.jpg)
Common Misconceptions
− Lesser Quality
− Redundant Design Needed
− Compromises Design Creativity
SEA Project December 2009
![Page 15: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/15.jpg)
Value to User Groups
− Cost Avoidance
− Open Doors to Facility Faster
− User Input, Review and Approvals− Fewer changes
− Fewer Inconveniences− Minimal disruption to ongoing operations− Less Manpower i.e. decrease in parking needed, safety
issues, etc.
− Collaborative Team Effort
![Page 16: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/16.jpg)
American College of Healthcare Executives
16
Southeast Addition Project
Southeast Addition Project
![Page 17: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/17.jpg)
Southeast Addition Project
− 484,000 Square Feet
− 12 Stories (2 shelled for future growth)
− 178 Private Rooms
− Campus Transformation
Southeast Addition Project December 2009
![Page 18: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/18.jpg)
Patient Room Design
− 100% Private Rooms
− Standardization of Spaces for Patients/Staff
− Acuity Adaptable Patient Rooms
− Same Handed (Repetitive) Design
− Designed by Caregivers
Patient Room Rendering
![Page 19: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/19.jpg)
Understanding Prefabrication
− Prefabrication Video
![Page 20: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/20.jpg)
− 5 Patient Floors
− 3 Wings Per Floor
− Corridor of each wing is being prefabricated in a warehouse 2 miles from the project, in 3 phases− Corridor rack modules− Bathroom pods− Patient room headwalls/footwalls
Prefabrication Application
![Page 21: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/21.jpg)
Prefabricated Corridor Racks
![Page 22: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/22.jpg)
Prefabricated Corridor Racks
![Page 23: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/23.jpg)
Prefabricated Corridor Racks
Transportation from Warehouse to Jobsite
![Page 24: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/24.jpg)
InstallationPrefabricated Corridor Racks
![Page 25: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/25.jpg)
Patient Rooms
Headwall/Footwall & Bathroom
![Page 26: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/26.jpg)
Bathroom Pods/Headwalls
![Page 27: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/27.jpg)
Construction Benefits
− Improved Safety & Quality
− Cost Savings
− Reduced Manpower Peak
− Reduced Waste
− Seismic Benefits
− Increased Above Ceiling Accessibility
![Page 28: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/28.jpg)
Improved Safety
− Working on the ground instead of heightReplacement Hospital with Patient Tower – Tennessee
Square Feet 625,000
Man Hours Worked 1,005,874
On site Workers 715
LTIR 0.6
New Hospital Project – Tennessee
Square Feet 225,000
Man Hours Worked 768,529
On Site Workers 520
LTIR 0.26
Southeast Addition Project – Dayton, OH
Square Feet 485,000
Man Hours Worked 446,195
On Site Workers 310
LTIR 0
Safely working on corridor racks
LTIR Industry Average 1.9*
*OSHA Statistics from AGC of America 2007 Reports
![Page 29: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/29.jpg)
Improved Quality
− Controlled Environment
− Cleaner – Infection Control
− Materials Ordered to Specific Length
− Ductwork Installation
− Fewer Connections − Eliminates cross connections
of piping systems
Cleanliness of Warehouse
![Page 30: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/30.jpg)
Cost Savings
− Anticipate Savings up to 1-2% of Construction Cost
− Earlier Revenue Generation for MVH − 5-10% Schedule Savings
SEA Project December 2009
![Page 31: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/31.jpg)
Reduced Manpower PeakEstimated vs. Actual Manpower (Mechanical, Electrical, Plumbing)
![Page 32: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/32.jpg)
Reduced Waste
Greenfield Hospital – Ohio
Square Feet 544,443
Waste Removal Cost $138,970
New Hospital Project – Florida
Square Feet 423,000
Waste Removal Cost $200,006
New Hospital Project – Florida
Square Feet 480,000
Waste Removal Cost $490,083
Southeast Addition Project – Dayton, OH
Square Feet 485,000
Estimated Waste Removal Cost $91,000
![Page 33: Lean Construction - Prefabrication Indiana Society for Healthcare Engineering Conference Batesville, IN May 14, 2010](https://reader033.vdocument.in/reader033/viewer/2022042821/56649ceb5503460f949b648e/html5/thumbnails/33.jpg)
Other Benefits
− Seismic Benefits− Comprehensive Seismic Design vs. Traditional Seismic Bracing− Smaller Quantity Needed for Seismic Materials− Labor Installation Savings− Reduced Cost for Future Renovations