lean practitioner session 1 presented by the dps continuous improvement team
DESCRIPTION
Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team. SBOE – ’ 13-’14 School Year. Context. Provide tools for SBOE projects Provide support and mentoring during projects Ensure projects are complete and sustainable Prepare for Aspen Challenge. Introductions. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/1.jpg)
Lean Practitioner Session 1Presented by the DPS Continuous Improvement Team
SBOE – ’13-’14 School Year
![Page 2: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/2.jpg)
Context
• Provide tools for SBOE projects
• Provide support and mentoring during projects
• Ensure projects are complete and sustainable
• Prepare for Aspen Challenge
![Page 3: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/3.jpg)
Introductions
• Veronica Bradsby
• Kathryn McIver
• Joy Peak
• Katie Wolters
![Page 4: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/4.jpg)
Mentor Assignments
• Veronica Bradsby– West, North, Lincoln, Bruce Randolph
• Kathryn McIver– South, JFK, CLA, TJ
• Joy Peak– East, DCIS, DSA
• Katie Wolters– George Washington, CEC, Montbello, MLK
![Page 5: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/5.jpg)
Goals
• Write a problem statement
• Complete a scoping document
• Complete a project charter
• Assign follow-up tasks
GOAL
![Page 6: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/6.jpg)
Roles
• CI Mentors– Share expertise of CI tools– Act as neutral facilitators– Keep teams on track to achieve goals
• School Teams– Participate and ask questions– Work toward project goals
![Page 7: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/7.jpg)
Agenda
• Introduction to CI• Review of tonight’s tools• Project Work– Problem Statement– Project Scoping– Project Charter– Follow up tasks
• Closing
![Page 8: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/8.jpg)
Please…
• Use technology for note-taking if you wish, but refrain from other technological tasks during our time together
• Silence cell phones• Assume positive intent• Ask questions! (If you’re wondering, others
are as well)
![Page 9: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/9.jpg)
lkfjasl;kfjal;sdkfja;lsdkfj
Continuous Improvement at DPS
Every Child Succeeds
Mentor, Educate and Support the schools and departments of DPS.
Increase Efficiency
Improve Services
Generate Cost
Savings
Continuous improvement methodologies:Lean, Agile, and Lean Six Sigma
Continuous Improvement Team Mission:
![Page 10: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/10.jpg)
Lean Practitioner?
• This year you will be able to complete a Lean Practitioner Certification.
– Eliminate Waste– Increase Efficiency– Save Time– Save Money– Lead Continuous Improvement Projects
![Page 11: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/11.jpg)
What will I Learn?
• You will…– Learn how to identify and scope Continuous
Improvement Projects– Learn how to use Lean tools– Learn how to implement and sustain your
solutions– Learn how to apply Lean tools in a variety of
settings
![Page 12: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/12.jpg)
Will I use what I learn?
• Once you’ve earned your Lean Practitioner Certification you will have the skills necessary to complete additional projects– In your school– In the district– At home– Almost anywhere!
![Page 13: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/13.jpg)
How do we start?
• Concept• Investigate
• Design• Perform• Sustain
This is also known as
DMAIC
![Page 14: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/14.jpg)
Problem Statement
• Your problem statement should clearly communicate information essential to the project.
![Page 15: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/15.jpg)
What
• What is the problem?
Customers are unhappy with our
pizza delivery.
![Page 16: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/16.jpg)
Where?
• Where does the problem occur?
Customers who have pizza
delivered from our Elm St. location are
unhappy.
![Page 17: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/17.jpg)
When
• When did the problem start? Has it always existed? Is there a pattern?
Customers who have had pizza delivered
from our Elm St. location since May
are unhappy.
![Page 18: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/18.jpg)
How extensive?
• Complaints have increased 25%.
Customers who have had pizza delivered
from our Elm St. location since May are unhappy. Complaints
in that time have increased 25%.
![Page 19: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/19.jpg)
How do you know?
• We know there must be a problem because other locations have not seen an increase in the number of complaints.
Customers who have had pizza delivered from our Elm
St. location since May are unhappy. Complaints in that
time have increased 25%, while our other locations have
seen no change
![Page 20: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/20.jpg)
Problem Statement
Putting it all together…• What?• Where?• When?• How much?• How do you know?
Customers who have had pizza delivered from
our Elm St. location since May are unhappy. Complaints in that time
have increased 25%, while our other locations
have seen no change
![Page 21: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/21.jpg)
Exercise
• Take a few minutes to write your problem statement
• Having trouble? Ask one of our CI mentors
![Page 22: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/22.jpg)
Problem Statement
Remember…• What?• Where?• When?• How much?• How do you know?
Customers who have had pizza delivered from
our Elm St. location since May are unhappy. Complaints in that time
have increased 25%, while our other locations
have seen no change
![Page 23: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/23.jpg)
Share Out
• Would anyone like to share the problem statement for your project?
![Page 24: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/24.jpg)
Scope
• What do we mean by scope?
![Page 25: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/25.jpg)
Scope
• Defines the boundaries of a project.– Keep goals specific– It is okay to consider some things out of scope!• 9th Graders vs. ALL students• Unexcused absences during 1st period vs. ALL absences
![Page 26: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/26.jpg)
Scope
• Avoid “Scope Creep”• Do not allow your project to grow
uncontrollably. Record additional ideas and use them for future projects.
![Page 27: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/27.jpg)
Scope
• Remember – A problem can appear to be the size of an elephant. Control your scope. It’s far easier to eat an elephant one bite at a time!
• http://timemanagementninja.com/2011/01/how-to-eat-an-elephant-in-10-minutes/
![Page 28: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/28.jpg)
Scoping Document
![Page 29: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/29.jpg)
Project Name
• Give a name that communicates the intent of your project.
Apple Orange
![Page 30: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/30.jpg)
Executive Sponsor
• Role:– Own the vision, direction, integration and results of the project– Lead the culture change
• Responsibilities:– Ensure the CI project goals are linked to district goals– Maintain linkage between business strategy and selected projects– The Executive Sponsor’s support of the project sets the stage for the
success of the project– Understand, at a high level, the progress of team activities
• Pitfalls:– A project that is not clearly supported by the Executive Sponsor is unlikely to be successful.
![Page 31: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/31.jpg)
Department
• For all SBOE projects, your ‘Department’ will be your school.
![Page 32: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/32.jpg)
Date Completed
• Today is: September 18, 2013
September
18
![Page 33: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/33.jpg)
Your Turn
![Page 34: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/34.jpg)
Context and Purpose
• Describe the business problem that is driving the project. – This will be the problem statement you already
created!
• Tell why the project is important and how it fits into the bigger picture.– Add a comment to your problem statement telling
WHY it’s important to solve the problem.
![Page 35: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/35.jpg)
Context and Purpose
• Example:
• Customers who have had pizza delivered from our Elm St. location since May are unhappy. Complaints in that time have increased 25%, while our other locations have seen no change in customer satisfaction. This is concerning because we have noticed a drop in the number of delivery orders at our Elm St. location.
![Page 36: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/36.jpg)
Your Turn
![Page 37: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/37.jpg)
Goal(s) of the Project
• S.M.A.R.T. goals are important.
![Page 38: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/38.jpg)
Goal(s) of the Project
• Specific – The project scope needs to be accurate and leave no doubt as to what the project will achieve.
• Measurable – How will you know when the project is complete?
• Attainable & Actionable – Make the project as small as possible. Remember eating the elephant. It is far easier to manage a few smaller projects than one big one. A good goal statement will include an action word.
• Realistic – Make the project easy to deliver, if it is over complicated then it is likely to hit problems.
• Timely – Does the project have to be complete by a certain date? If so put it in the scope that the project has to be complete by that date.
![Page 39: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/39.jpg)
Goal(s) of the Project
• Our goal is to decrease the number of unsatisfied delivery customers per quarter at the Elm St. location of Mr. Pizza by 30%, from 10 to 7 per month, as measured by the number of in-person, telephone, or electronically submitted complaints by the end of December, 2013.
![Page 40: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/40.jpg)
Your Turn
![Page 41: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/41.jpg)
Expected Benefits
• Summarize the benefits you expect to achieve as a result of completing your project.
• How will you measure success?
![Page 42: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/42.jpg)
Expected Benefits
• By completing this project we anticipate increased customer satisfaction as evidenced by decreased complaints and increased numbers of delivery orders at the Elm St. location or Mr. Pizza.
![Page 43: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/43.jpg)
Signature
• Make sure you have the full support of your executive sponsor. Share the Scoping Template with them and obtain their signature.
![Page 44: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/44.jpg)
Your Turn
![Page 45: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/45.jpg)
You’ve scoped your project!
![Page 46: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/46.jpg)
Digging Deeper
• The next step is to expand the Scoping Document into a Charter.
• A well-written charter can serve as a communication tool to ensure everyone involved with the project understands key information including scope and goals.
![Page 47: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/47.jpg)
Start at the Beginning
• Take a look at the top of the charter.
• The first 3 entries come from the Scoping Template. Let’s look at the other roles…
![Page 48: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/48.jpg)
Project ChampionRole:• Determine the scope of the CI project• Leader who is most familiar with the benefits of the project and accepts
ultimate responsibility for the success of the project
Responsibilities:• Assist the team to overcome roadblocks that come up during the project• Evaluate and accept project deliverables and benefits• Understand, at a high level, the progress of team activities• Identify areas of concern to the Process Owner and CI Facilitator• Report project activity to the Executive Sponsor
Pitfalls:• If Champions are not actively driving project results and future project
identification, CI will struggle in the organization.
![Page 49: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/49.jpg)
Project Champion
• Who is your Project Champion?• Take a moment to discuss in your teams. • What makes them the right person?
Our Project Champion will be the regional manager for Mr. Pizza. She
regularly reviews the data for all of the Mr. Pizza locations in the area.
![Page 50: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/50.jpg)
Process OwnerRole:• Project leader and change agent for a process that they are responsible for or have an interest
in.
Responsibilities:• Lead the team members through the CI process • Schedule and lead team meetings and reviews• Complete a Project Charter to identify tangible results that the project will deliver• Follow up with team members on action items and project tasks to ensure timely completion• Assist the team in the implementation of the identified solution(s)• Work with the Champion to ensure the project is meeting expected outcomes• Accept responsibility for maintaining the improved process
Pitfalls:• If the process owner is not engaged throughout the project, they are unlikely to accept the
solution and responsibility for maintaining improvements when the project is over.
![Page 51: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/51.jpg)
Process Owner
• Who is your Process Owner?• Take a moment to discuss in your teams. • What makes them the right person?
Our Process Owner will be the general manager of the Elm St. location of Mr.
Pizza. He really understands the processes in place at that location and will ultimately work with the employees
to implement any changes.
![Page 52: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/52.jpg)
Core Team Members
Role:• Active member of a CI project team who represents members of the group directly
affected by the changes to the process
Responsibilities:• Attend and contribute during team meetings• Accept and execute assignments as determined by the project team• Responsible for sustaining the new process
Pitfalls:• Core team members not fully committed to the project may prevent the success of
the project.• Core team member’s lack of on-going support of the new process will hinder the
impact of project benefits.
![Page 53: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/53.jpg)
Core Team Members
• Who are your Core Team Members?• Take a moment to discuss in your teams. • What makes them the right people?
Our Core Team members will be the shift managers and lead delivery drivers of both the afternoon and
evening crews at the Elm St. location.
![Page 54: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/54.jpg)
Extended Team Members
Role:• Provide subject matter expertise to the project team.• Can be either a customer or a supplier of the process under review
Responsibilities:• Provide subject matter expertise to the Core Team Members• Attend meetings when their input is required
Pitfalls:• Minimizing the importance of their role on the team can adversely impact
the success of the project.
![Page 55: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/55.jpg)
Extended Team Members
• Do you know who your Extended Team Members might be?
• Take a moment to discuss in your teams. • What makes them the right people?
We may need information from other people from other locations or within the Elm St. location. We will contact
them to attend meetings as needed.
![Page 56: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/56.jpg)
C.I. MentorRole:• Practitioner of Continuous Improvement Methodology
Responsibilities:• Mentor or co-facilitate CI projects• Guide the team to discover and recommend project solutions• Assist the team with understanding data collection and analysis • Advocate for the project team and the expansion of a CI culture in the district
Pitfalls:• Success of CI projects dramatically decreases without the assistance of a CI
Facilitator.• If the team relies too much on the CI Facilitator and does not take ownership of
the project solution, long term success is compromised.
![Page 57: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/57.jpg)
Your Turn
• Fill in the following sections of your charter if you haven’t already.
![Page 58: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/58.jpg)
Business Case
• The business case states the importance of the project in relation to other strategic goals of the company (i.e. UIP, SIP, Denver Plan). The business case should be strong enough to justify using resources to find a solution.
![Page 59: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/59.jpg)
Your Turn
• Earlier in the session you identified your Problem Statement and Goal. Add those to your charter along with your Business Case.
![Page 60: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/60.jpg)
Metrics
• Primary Metric – What you will measure to determine success?
• Secondary Metric – What other success might you see?
• Consequential Metric – Are there any other measures that could be impacted as a
result of the project?
![Page 61: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/61.jpg)
Your Turn
![Page 62: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/62.jpg)
In Scope
• Think specifically about your scope. What will you address in your project?
• Example: Customer Satisfaction with delivery orders from the Elm Street Location of Mr. Pizza.
![Page 63: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/63.jpg)
Out of Scope
• Think about those things that may come up, but would be outside the scope of this project.
• Customer satisfaction with the dining areas at various Mr. Pizza locations.
• Delivery of sandwiches from the Elm St. location of Mr. Pizza.
![Page 64: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/64.jpg)
Your Turn
![Page 65: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/65.jpg)
Timeline
• Let’s just fill in the Concept line tonight!
• Begin Date: 9/18/13• End Date: 10/15/13
![Page 66: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/66.jpg)
Your Turn
![Page 67: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/67.jpg)
You’ve completed your Charter!
![Page 68: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/68.jpg)
Questions
![Page 69: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/69.jpg)
Materials Available
• dpscontinuousimprovement.wikispaces.com
![Page 70: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/70.jpg)
HomeworkWho What By When
Take Session 1 Quiz 9/27/13
Type Scoping Document 9/30/13
Type Charter 9/30/13
Schedule Monthly Meetings with Solicia
10/4/13
September meeting with Principal
10/4/13
Get Principal’s Signature on Scoping Document
10/11/13
Upload Charter to Google 10/11/13
Upload Scanned copy of Scoping Document to Google (with Signature)
10/11/13
Contact CI Mentor with questions
As needed
![Page 71: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/71.jpg)
Goals
Write a problem statement
Complete a scoping document
Complete a project charter
Assign follow-up tasks
![Page 72: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/72.jpg)
Next Month
• 8 Types of Waste• 5S• Voice of the Customer• SIPOC• Process Maps
![Page 73: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/73.jpg)
Help is Available!
• Do you know how to contact your CI mentor?
• Veronica: [email protected]• Kathryn: [email protected]• Joy: [email protected]• Katie: [email protected]
![Page 74: Lean Practitioner Session 1 Presented by the DPS Continuous Improvement Team](https://reader036.vdocument.in/reader036/viewer/2022062408/56813e6a550346895da87b5b/html5/thumbnails/74.jpg)
Exit Slip
• Please complete your exit slip before leaving.