Lean Six Sigma
An Introductionby
Tracy Owens
Exercise 1
You are in the basement and there are three light switches on the wall numbered 1, 2, 3.
Each switch is connected to one light bulb upstairs, where I am. They are labeled A, B, C.
You stay in the basement for five minutes and then come upstairs and tell me exactly which switch corresponds to each light bulb.
If you are wrong, you owe me $80,000.
If you are right, I’ll give you a Pez candy dispenser.
How do you decide?
Agenda
• Six Sigma
• Six Sigma Project Leadership
• Lean
• Kaizen Events
• Prevention
• Innovation
Six Sigma
How do We Measure Performance?
Sigma…What is Sigma?
Sigma is a Greek letter that is a
statistical unit of measurement - it
measures the variability of the data
as represented by standard
deviation. Sigma is used to indicate
how much of the products or
services falls within the
customers’ requirements.
Reducing variation is the key to Six Sigma
Goal Posts
2 sigma:
69.146% of products and/or services meet customer
requirements with 308,538 defects per million opportunities
How Consistently Are You Meeting
Your Customer’s Needs?
4 sigma:
99.379% of products and/or services meet customer
requirements ...
but there are still 6,210 defects per million opportunities
6 sigma:
99.99966% – As close to flaw-free as a business can get,
with just 3.4 defects per million opportunities in your product
or service
Common Process Maps
• High-Level Map
• Flowchart
• SIPOC(Suppliers, Inputs, Processes, Outputs, Customers)
Sales BillingRepairService
step
1
step
2
step
3
step
4
Sub- process
9
Step
10
Step
11
step
5Choice
Step
8
step
6
step
7
Department
1
Department
2
Department
3
Department
4
S I P O C
Suppliers
Inputs
Process
Outputs
Customers
A useful tool for:
• Scoping your project
• Listing process
variables
• Identifying team
members
• Building other Six
Sigma project tools
Order Entry Process SIPOC
Backup service reps in
case entry is delayed
Order data ready for
entry into system
Order entry staff
(customer service)
Legible text and usable
format
Marketing Dept needs
promotion data
Pricing revisions; codes
for special / promotion
Order entry staff
(customer service)
Product availability
dates
End customerInitial Invoice sent
End customerShipment notification
sent
End customerReserve Note
document sent
Order entry staff and
end customer
Estimated ship date for
this order
Outputs Customers
Table of production
schedules by category
Our Supply Chain
function
Initial Invoice template
and required data
Our Accounts
Receivable team
Shipment confirmation
template and data
Order entry staff
Reserve Note template
and required data
Order entry staff
Estimated production
or availability
Our production
operations
Current catalog or
promotion / special
Our Account
Manager
Product codes,
quantity and prices
Customer’s
purchasing agent
Purchase order sent
via fax, e-mail, or EDI
Customer’s
purchasing agent
Suppliers Inputs Process Steps
Order is sent
Confirm order
details
Check product
availability
Prepare
Reserve Note
Confirm
shipment date
Prepare
Initial Invoice
Qtyavailable?
Infoaccurate?
NO
NO
YES
YES
Reporting
Process
Pre Close
Activities
(1)
External
P&Ls
(5)
Consol
P&Ls
(6)
Review &
Sign Off
(7)
Start: Finish:
P
S I P
Supplier(s): Input(s):
O
Output(s):
C
Customer(s):
• Accountants
• Acct. Systems Unit
• Cost Center Managers
• Management
• External Companies
• HQ
• Sub-system feeds
• System J/Es
• Excel Uploads: Manual
J/Es
• Database(s
• Edit/Error Reports
• Responsibility Reports
• Detailed Trial Balances
• Preliminary P&Ls
• Finalized P&Ls
• Consolidated P&L
• CFO and Senior Mgt.
• Accounting
• Treasury
• Budget
• Corporate HQ
• Management
• Cost Center Managers
Soft
Close
(3)
Hard
Close
(4)
Consolidated
P&L To HQ
(8)
Prelim
Close
(2)
Closing Process Example
A New SIPOC
The Trigger answers:
WHY do we start
taking this action?
The Objective answers:
WHY is this action
important?
Suppliers
Inputs
Triggers
Process Steps
Objectives
Outputs
Customers
Note: This is NOT just a license to resist!
SUPPLIERS INPUTS PROCESS OUTPUTS CUSTOMER
Sales database and
CRM
Sales and customer
stats
Research Region
2-3 weeks
Current performance
evalAudit Team
and previous reportsRaw data and data
from other Regions
Prepare for Visit
3-5 days
Detailed list of audit
objectives
Leadership team and
Audit teamCalendar planning
Travel to Site
1 day
On-site for impact of
the audit
Leadership team and
Audit team
Kickoff Meeting
1 full day
Set for objectives and
cooperationRegion Office
Individual leadership
team
HQ Interviews
1 week
Verified list of
improvement opps
Individual field
leaders
Field Interviews
2 weeks
Verified details with
field staff
Executive summary /
notes
Close Meeting
half day
Highlights shared
with HQ team
Full interview resultsCompile Results
3-4 days
General & Specific
Regional Results
Format of previous
reports
Write Report
2-3 weeks
Report observations
and advice
Region Office and
Sales VP
INPUTS TRIGGER PROCESS OBJECTIVE OUTPUTS
Sales and customer
stats
Bi-Annual Review
Frequent enough??
Research Region
2-3 weeksAccuracy
Current performance
eval
Raw data and data
from other Regions
No trigger, routinely
scheduled
Prepare for Visit
3-5 days
Prepare site visit
issues
Detailed list of audit
objectives
Calendar planningFaceToFace- how
we've always done it
Travel to Site
1 day
Irony - the visit is a
burden
On-site for impact of
the audit
Leadership team and
Audit team
Official kickoff for
Region team
Kickoff Meeting
1 full day
It's been 2 years;
Limited Value
Set for objectives and
cooperation
Individual leadership
team
Need to verify local
performance
HQ Interviews
1 week
Don't they know their
performance?!
Verified list of
improvement opps
Individual field
leaders
Need to calibrate field
processes
Field Interviews
2 weeks
Best behavior during
audit
Verified details with
field staff
Executive summary /
notes
Presentation of
findings
Conduct Close
Meeting
Present findings
(any new findings?)
Highlights shared
with HQ team
Full interview resultsReport is due within
one month
Compile Results
3-4 days
Prepare the most
complete report
General & Specific
Regional Results
Format of previous
reports
Report so Region can
take action
Write Report
2-3 weeksRead every page!
Report observations
and advice
Revised Approach
• Output (Y)
• Effect
• Symptom
• Monitor
• Inputs (X’s)
• Cause
• Problem
• Control
Six Sigma focuses on the causes
Y = f(x1+X2+ x3)
The Focus of Six Sigma
Pareto Chart
Categorized issues ranked in order
from the most impact to the least
The bigger the bar, the bigger the
problem
Yes, the biggest problems demand
your attention
But there are successes to be
found in the lower bars as well.
Exercise 2
Count the number of times you see the letter f in the
paragraph below -- you have 30 seconds:
The necessity of training farm hands for first-class
farms in the fatherly handling of farm livestock is
foremost in the minds of farm owners. Since the
forefathers of the farm owners trained the farm hands
for first-class farms in the fatherly handling of farm
livestock, the farm owners feel they should carry on
with the family tradition of training farm hands of first-
class farms in the fatherly handling of farm livestock
because they believe it is the basis of good
fundamental farm management.
Six Sigma Projects
Business
Problem
Statistical
Problem
Business
Solution
Statistical
Solution
Potential
Root
Causes
Identified
Root
Causes
Verified
Translating Processes
Process Analysis Paths
Articulate the Problem
Statement
Identify and Study
the Variables
Map the Process and
Analyze for Value
Develop and Test
Solutions
Select and Implement
the Best Solutions
Two Paths
Process Analysis
Map the Process and
conduct Value Add
analysis
Generate a Fishbone
chart and ask 5 Whys
Data Analysis
Identify the variables
that impact the output
of the process
Validate root causes in
order to reduce
variation and defects
Elements of the Methodology Expectations
Focuses on “real problems” directly
related to the customer and the
bottom-line
Realized project results in 4-6 months
Utilizes multiple tools and techniques
including statistics
Sustains improvement over the long-term
Disseminates improvement throughout
the organization
Is an instigator of continuous change
• Define
• Measure
• Analyze
• Improve
• Control
CO
MM
UN
ICA
TIO
NS
Improvement Methodology
6s Involvement
How can 6s help?
• Define - Gather facts regarding the exact question to
be answered
• Measure - Establish our baseline performance and
collect meaningful data relevant to the problem
• Analyze - All about finding the real root cause(s) and
the key to solving our problem
• Improve - Evaluate possible solutions based on their
impact on performance
• Control - Quantify the change in performance and
make sure the improvement is sustained
The Methodology
• Identify the problem
• Scope the project
• Set goals (measurable)
• Establish team
• Map the process
• Gather data
• Measure performance
• Determine baseline performance
• Data stratification & analysis
• Determine root cause
• Collect additional data (as needed) to validate root cause
• Generate solutions
• Evaluate & select solutions
• Implement solutions
• Monitor the results
• Document procedures
• Institutionalize changes
• Transition to process owners
Define Measure DefineImprove ControlAnalyze
Steps To Achieve & Sustain Change
6s Involvement
How can 6s help?
• Define
• Measure
• Analyze
• Improve
• Control
How can 6s help?
• Define - “I know what the problem is!”
• Measure
• Analyze
• Improve - “Fix it like this, and move on!”
• ControlHow do you know that was really the whole problem?
How do you know the full magnitude of the problem?
How do you know what was really causing the problem?
How do you know that the improvement will continue?
How do you know if you even fixed it at all??
Key 6s TermsKey project stakeholder
Reviews projects / removes obstacles
Full time Process Improvement
Works with project teams & champions to ensure
project execution
Full time Process Improvement
Executes projects & coaches GBs
Part-time process improvement project manager
Typically executes process specific projects
Critical process measures as identified by our
customers
Formal sponsor reviews held with the project team,
sponsor, and MBB to determine the project status
and “pass” through to the next stage
Critical Customer
Requirement
Tollgates
Master Black Belt
(MBB)
Champion/
Sponsor
Black Belt (BB)
Green Belt (GB)
Purpose
Success
Criteria
Activities
Business
Impact
Boundaries
Who &
What
B usiness C ase
W hy should w e do th is?
O pportunity Statem ent
W hat ‘pain’ are w e
experiencing?
W hat is w rong?
G oal Statem ent
W hat are our im provem ent
objectives and targets?
Project Scope
W hat authority do w e have?
W hat processes are w e
addressing?
W hat is not w ithin scope?
Project P lan
H ow are w e going to get
this done?
W hen are w e going to
com plete the w ork?
T eam Selection
W ho are the team m em bers?
W hat responsibilities w ill
they have?
Team Charter
A Team Charter is a fundamental and critical
component to a Six Sigma Team.
What is the Best Way to Make Sure a
Project Fails??
Lean
Exercise 3
Team 1 – write your name on 1 and pass
Team 2 – write your name on 3 and pass
Team 3 – write your name on all 6 and pass
What is Lean ?
The objective is to align the entire performance of the
Value Stream with the customer
A set of tools , which takes human, material and customer
requirements into account to deliver on time to the customers
requirement at the lowest cost
Decision making based on facts, decision making carried out at the
desk level often employing visual management as an integral part
of the management system
A structured methodology for continuous improvement which is
hinged on 5 basic principles
A business philosophy and strategy, developed by recognised
leaders in world class quality
A methodology which employs basic problem solving techniques
Our opportunities are massive, as most of what we do doesn’t add value!
• What is the customer willing to pay for?
• Value Added (VA)
• Who are your customers ?
• What’s their definition of value ?
• Typically <1% of our effort adds value!
• Everything else is non-value added!
(whether it’s needed or not !)
• Non-Value Added (NVA)
• Waste (‘Muda’)
• Typically >99% of everything we do is
‘waste’!
Value is Defined by Customers
Lean Techniques
Focus on 7 wastes (muda: non-value-adding work)
Intelligent automation and just-in-time production
5S: Sort, Set, Shine, Standardize, Sustain
• Define Value in the eyes of the Customer
• Map the Value Stream
• Align the Value Stream to Flow
• Pull goods and services through the Value Stream
• Strive for Perfection at every step
5S - Five Japanese Words
Translated for use in the western world
1. Seiri – (Sort, in English)
2. Seiton – (Set, Set in Order)
3. Seiso – (Shine)
4. Seiketsu – (Standardize)
5. Shitsuke – (Sustain)
1 2 3 4 5 6 7
9 10 11 12 13 14
15 16 17 18 19 20 21
22 24 25 26 27 28
29 30
5S: A simple Test
Which numbers are missing between 1-30?
26 2 15 22 29 28 14
17 11 9 7 13 19 27
30 20 6 24 3 1 12
5 25 10 21 18 4 16
VALUE STREAM TO THE
CUSTOMER
Processes which provide product value in the customer’s eyes
Features or characteristics the customer will pay for
WASTE THE CUSTOMER PAYS FOR
• Excess travel distances
• Test and inspection
Waste scattered throughout the value stream
• Excess inventory• Scrap and Rework• Wait time• Excess handling
Unlocking the Hidden Factory
Lean Six Sigma
SPEED &EFFICIENCY
QUALITY & EFFECTIVENESS
+
Lean and Six Sigma Complement Each other Exceptionally Well
While Lean and Six Sigma Share a basic quality improvement toolset
•Lean is well equipped to address WASTE and optimize the Value Stream
in ways which Six Sigma is not
•Six Sigma is better placed to deal with complex quality issues and reduce
process variation; it employs a very capable toolset to achieve this
Why Blend Lean and Six Sigma ?
Lean and Six Sigma Together
Many
improvements
can be made
using Lean every
day
Lean techniques are
useful when making
improvements in a Six
Sigma project
Some problems will be more
difficult to solve, so you will
start a Six Sigma DMAIC
ProjectDefine
Measure
AnalyzeImprove
Control
Lean
Lean
Then you start again
with Lean and look for
more opportunities to
eliminate waste
Lean Focus
–Which process steps add value?
Prepare to do Step 1
Do the job
Step 1
Re-work what we didn’t get right in step 1
Move to step 2
Prepare to do Step 2
Do the job
Step 2
Re-work what we didn’t get right in step 2
Move to step 3
You need to see the waste before you can even think about how to get rid of it!
• Which process steps don’t add value?
Example: Car Repairs
–Which process steps add value?
Wait for a technician
Evaluate car and diagnose the problem
Wait for a repair work
station to open
Move to repair work station
Order parts needed for
repair
Complete the repair
Test and rework the
repair
Prepare paperwork for
file
• Which process steps don’t add value?
Overproduction
Waiting TransportationInappropriate
processingDefects
Inventory Unnecessary motions
The ‘7 Wastes’
Definitions of 7 Wastes•Waiting – any time spent waiting is not productive and waiting needs to be
minimized. Waiting means the operator waiting for work to do and also the product
waiting to be worked on.
•Transportation – movement of the product while in production including delivery from
one work station to the next and movement into a warehouse. It is important to
emphasize that this is movement of materials, not movement of the operator, which is
Unnecessary Motions, listed below.
•Inappropriate Processing – doing more work than the customer needs.
•Defects – any error or mistake that needs to be corrected causes a loss of value
and, be definition, waste.
•Overproduction – while an economic batch quantity is often prescribed, the resulting
finished goods inventory is not valuable to the company until a customer orders or
buys it.
•Inventory – while an economic batch quantity is often prescribed, the raw materials
and work-in-process inventory cost money and do not generate value for the
company until a customer places an order.
•Unnecessary Motions – movement of the operator to do the job. Walking across the
shop floor to get a tool from the tool room takes time that could be spent producing
valuable finished goods.
7 Wastes Analysis worksheet7 Waste
category
Process
StepDescription
Time
LostHow to Impact
(example)
Unnecessary
Motions
Test for
air leaks
Operator must step off
the assembly line to get
the leak tester
11 to 16
minutes
per shift
Attach leak tester to a
tether above the work
station
Eighth Waste
• Often listed as the 8th Waste of Lean:
• Underutilization of Human Talents
• Using your people for less than their potential value
• Assigning basic work to an advanced employee
• Not inviting employees to contribute new ideas or not
taking their ideas seriously
• The Seven Wastes of Lean are all observable, tangible
value stream wastes that can be actively controlled and
minimized
• The 8th waste is difficult to quantify and, further, it is
difficult to say if an employee will agree that s/he is being
used in the most valuable manner
Kaizen Events
... and you have got 12 halls, many
employees and you are very
successful
You go on a world tour for 3 months...
You get an update every Monday with the
latest status of the key figures…
What does the report say?
Weekly report:
Number of sold tickets
by film
by daytime
by seat category
by adults, children, reduced
tickets
Employees
Overtime
by workplace
Revenue
by screening
by week day
Example: Imagine yourself as a
cinema owner.....
Number of sold tickets
by film
by daytime
by seat category
by adults, children, reduced
tickets
Employees
Overtime
by workplace
revenue
by screening
by week day
Popcorn (fresh & warm)
enough parking spaces
close by
huge screens and a high
sound quality
clean toilets
good view from all seats
price
Mismatch?
Tools for Process Analysis
Two primary tools you can use in Process Analysis
Brown Paper Study
Fishbone Chart – or Ishikawa Diagram
Machine Personnel
MaterialEnvironmentMethods
Measure
RESPONSE/
PROBLEM
Brown Paper Study
–Named for the heavy paper affixed to the wall
for use in the exercise
–The process being studied is drawn on the
paper or illustrated using sticky notes
Conducting the Brown Paper Study
First time through: Map the process in detail
• Use flowchart symbols and swim lanes to depict the various
departments and people involved
Second time through: Record the time needed to complete
each process step, and the time between steps
Third time through: Evaluate each process step as Value
Added or Non-Value Added
Fourth time through: Identify “Quick Win” opportunities
Take action on the items that can be addressed now
Value Added • Customer is
willing to pay for it
• Changes the product or delivers the service
• Done right the first time
• A Quick Win can be defined as
– FAST - a change in a process that takes less than a 2 weeks to fix
– CHEAP - should not cost anything
– EASY - can be fixed by one person and when completed does not
require extensive training to explain the change
• Quick wins may come out of process mapping
Quick Wins
Brown Paper VA/NVA ExerciseConducted in Groups of 5-7 People
–On a flip chart post the process map for a
repeating, common process at your site(note: flip chart paper can be spread on a
table top if sufficient wall space is not available)
–Go through the process map 3 more times:Evaluate the time required for each step
Assess each step as Value Added or Non-Value Added
Look for Quick Wins that can be made immediately
–De-brief on the Brown Paper process
as a full group
5 Mins
15 Mins
5 Mins
Lean Process ImprovementValue-Added and Non-Value-Added Analysis
Fishbone DiagramThe Fishbone Diagram is also known as “Cause & Effect
Diagram” or “Ishikawa Diagram”
CAUSES
(Sources of Variation or Variables)
Machine Personnel
MaterialEnvironmentMethods
Measure
RESPONSE/
PROBLEM
The “5 Whys” techniques can also be used and shown on
this diagram
Create FishboneIn Groups of 4-5
Use a Flipchart page to draw the Fishbone Diagram
Write the effect in the head of the fish:
Why are deliveries not timely?
Label the bones:
Methods, Materials, Machines, Measures, Environment, Personnel
Brainstorm and list possible causes for late deliveries in the
appropriate channel (bone)
Items that you suspect as principle root causes of the
problem should be circled for further investigation
15 Mins
Fishbone - Next Steps
Creating the Fishbone is not the end of analysis
Next step is to identify the possible root causes
that are most likely to be real root causes:
Reflected in the voice of the customer
Revealed through data collection
Repeating or chronic problems
Then analyze them further to determine real root
causes of defects, variation, and waste in the
process
55
The 5 Whys
After listing possible causes of defects and
variation on the Fishbone chart, take the next step
to uncover the real root causes through process
analysis
Ask “Why does this occur?” for every item you
need to study further
For each answer provided, continue to ask “Why
does that happen?” or “Why do we do it that way?”
It is not uncommon to have to ask “Why?” five or
more times to find something actionable
56
Develop the Future State
Pre-event Event Post-event
• Identify issues
• Communicate
Expectations
• Identify
Participants
• Prepare Business
Leaders
• Business Leadership
sets challenge
• Define expectations
• Team Building
• Skill Building
• Issue Priority
• Facilitated Problem
Solving Teams
• Develop
Recommendations
• Make Presentation
• Individual, Team &
Leader commitments
• Implement follow-
up mechanisms
• Provide necessary
support
• Communication:
• Headlines
• Newspapers
• Videos!!
The Kaizen Event Format
Prevention
1. Process Map
Start
Step 1
Step 2
Step 3
Re-work 1
Final Step
Re-work 2
Check
End
Input for
each step
X1, X2
X3
X4
X5
X6, X7
Output from
each step
Y1
Y2
Y3
Y4
Final Y
2. Cause and Effects Diagram
Why does the
Final Y have
defects?
Category 1 Category 3Category 2
Category 4 Category 5 Category 6
R1 R2 R25R3
R4=X6 R16 R13 R21=X3R18 R11
R9 R17
R10 R18 R24R14 R5 R8
R23 R7 R20R19=X1
R22 R6=X4 R16R15 R12
Reasons = R__
Some reasons will tie
directly to inputs from
the process map
3. Failure Modes and Effects Analysis
Step
from
Process
Map
Failure
Mode
defect in Y__
Cause
from
Fishbone
Frequency
1 sometimes
3 often
9 always
Severity
1 minor
3 major
9 critical
Detectability
1 easy to detect
3 difficult
9 rare detection
RPN
multiply
across the
3 factors
Action
Step 1 Defect 1 R1
R19
1
3
3
3
1
9
3
81
Step 2 Defect 2 R21
R25
R18
3
9
1
9
9
1
9
9
9
243
729
9
Step 3 Defect 3 R6 3 3 1 9
Check
Step
Defect 4
Defect 5
R12
R20
9
3
1
3
1
3
9
27
Re-
work
Defect 6
Defect 7
R16
R23
R2
9
3
1
9
1
1
3
3
1
243
9
1
Final
Step
Defect 8 R4 1 9 9 81
RPN: Risk Prioritization Number
Tying them together
1.Map the process
2.Identify defects in each process step
3.List the possible causes for defects using the
Fishbone chart
4.Validate which reasons are real root causes
5.Prepare FMEA and calculate RPNs
6.Develop action plans to improve frequency,
severity, and detectability
7.Start again by mapping the improved process
Example – Painting Truck Doors
Blow dry
the door
Door is
built
Spray 2nd
coat
Air dry 10
minutes
Spray first
coat
Defects?
Queue for
assembly
Queue for
2nd coat
Detail
errors
Input for
each step
Door, Dryer
Paint, Nozzle
Clean Air
Paint, Nozzle
Tester
Output from
each step
Clean, Dry Door
First Coat
Defect-Free First Coat
Second Coat
Defect-Free 2nd Coat
Door Ready for Installation
Example – Painting Truck Doors
Why does the
Painted door
have defects?
Pace of WorkStaffing
Environment Application Method Paint Quality
Clean Air Side to side Paint brandSmoking vs. up/down
Lint cloths Clean ColorTemperature nozzles
Dryer 2nd coat clarity
One person 2nd shiftvs two Line
stoppageSupervisor
Movement present
Some reasons will tie
directly to inputs from
the process map
Example – Painting Truck Doors
Step
from
Process
Map
Failure
Mode
defect in Y__
Cause
from
Fishbone
Frequency
1 sometimes
3 often
9 always
Severity
1 minor
3 major
9 critical
Detectability
1 easy to detect
3 difficult
9 rare detection
RPN
multiply
across the
3 factors
Action
Blow
Dry
Damp
Door
Dryer
problem
1 9 9 81 Scheduled
maintenance
First
Coat
Run,
Drip
Side to
side
3 9 3 81 Reinforce
performance
Air Dry Damp
Door
Clean
air
1 1 9 9 Air filter
frequency
2nd
Coat
Run,
Drip
Org Peel
2nd coat
clarity
Nozzles
9
3
3
9
3
9
81
243
Use UV lights
.
Sched maint
Re-
work
Primer
show thru
Damage
Stop
Staff
Move
3
3
1
9
1
1
9
3
1
243
9
1
Inspect sooner
Backup pers
Door pads
Queue Damage
Scratch
Move-
ment
1 9 9 81 Door pads
every time
RPN: Risk Prioritization Number
Example – New Process Map
Blow dry
the door
Door is
built
Spray 2nd
coat
Air dry 10
minutes
Spray first
coat
Defects?
Queue for
assembly
Queue for
2nd coat
Detail
errors
Instructions for
each step
Check maintenance
record
“Paint side to side
from top to bottom”
Check air filter
change record
Use UV lights
Check nozzle
maintenance record
Test immediately Always use door pads!
Always use door pads!
Root Cause Analysis and
Prevention1. Process Map
Start
Step 1
Step 2
Step 3
Re-work 1
Final Step
Re-work 2
Check
End
Input for
each step
X1, X2
X3
X4
X5
X6, X7
Output from
each step
Y1
Y2
Y3
Y4
Final Y
2. Cause and Effects Diagram
Why does the
Final Y have
defects?
Category 1 Category 3Category 2
Category 4 Category 5 Category 6
R1 R2 R25R3
R4=X6 R16 R13 R21=X3R18 R11
R9 R17
R10 R18 R24R14 R5 R8
R23 R7 R20R19=X1
R22 R6=X4 R16R15 R12
Reasons = R__
Some reasons will tie
directly to inputs from
the process map
3. Failure Modes and Effects Analysis
243
729
9
9
9
9
9
9
1
3
9
1
R21
R25
R18
Defect 2Step 2
3
81
1
9
3
3
1
3
R1
R19
Defect 1Step 1
9
27
1
3
1
3
9
3
R12
R20
Defect 4
Defect 5
Check
Step
9
9
1
1
3
Severity
1 minor
3 major
9 critical
9
3
3
1
1
Detectability
1 easy to detect
3 difficult
9 rare detection
81
243
9
1
9
RPN
multiply
across the
3 factors
1R4Defect 8Final
Step
9
3
1
R16
R23
R2
Defect 6
Defect 7
Re-
work
3R6Defect 3Step 3
ActionFrequency
1 sometimes
3 often
9 always
Cause
from
Fishbone
Failure
Mode
defect in Y__
Step
from
Process
Map
243
729
9
9
9
9
9
9
1
3
9
1
R21
R25
R18
Defect 2Step 2
3
81
1
9
3
3
1
3
R1
R19
Defect 1Step 1
9
27
1
3
1
3
9
3
R12
R20
Defect 4
Defect 5
Check
Step
9
9
1
1
3
Severity
1 minor
3 major
9 critical
9
3
3
1
1
Detectability
1 easy to detect
3 difficult
9 rare detection
81
243
9
1
9
RPN
multiply
across the
3 factors
1R4Defect 8Final
Step
9
3
1
R16
R23
R2
Defect 6
Defect 7
Re-
work
3R6Defect 3Step 3
ActionFrequency
1 sometimes
3 often
9 always
Cause
from
Fishbone
Failure
Mode
defect in Y__
Step
from
Process
Map
RPN: Risk Prioritization Number
4. Control Charts
Innovation
What Is a Definition of Innovation?
Innovation is:
The successful conversion of
new concepts and knowledge into
new products and processes that
deliver new customer value
in the marketplace
So, why is this important? >>>
Quality Management Division Innovation and Value Creation Technical CommitteeInnovation is Quality for Tomorrow
It is not the strongest of the species that survive,
nor the most intelligent, but ….
the one most responsive to change.- Charles Darwin
• The World is Changing – for example
– In the Market Place, Asia is growing
– Our population is Aging
– Technology is becoming Digital
– The environment is warming
We Need Innovation Because…
It’s Not Just Creativity
Creativity does not guarantee actual innovation.
– Peter Drucker
The trouble with many good ideas is that people
have the notion that their work is done, that it is
up to somebody else to make it happen. – Ted
Levitt, Harvard Business School
Almost anyone can have a good idea.
What is needed for actual innovation are
people who can assemble, coordinate,
and execute the necessary elements.
• 1) Find the Opportunity and then
• 2) Connect to Conceptual Solutions
Select the preferred Solution and then
• 3) Make the solution User Friendly
• 4) and then get it Get to Market
Showing this as a model >>>
The Innovation Process Flow Is:
Innovation Management
A team approach is needed to deliver innovations
NABC Value Proposition
The Value Proposition – NABC method*
• Need: What is the customer’s unmet need?
• Approach: What is your idea?
• Benefits: How will it help the customers?
• Competition: What’s the risk of not doing it?
Write it quickly – 3 minutes
Recite it quickly – 30 seconds
Example
Cell phone use while driving creates dangerous conditions. A hands-free device still requires the driver to dial the number. We propose voice-activated dialing for all numbers stored and also for numbers dictated while driving. With one touch, the voice-dialing app is opened. Over 98% of all speech patterns are accommodated by the software. We would charge $10 per year, and our cost is $1.98 per person based on 10,000 subscribers. Competitors are pushing speakerphones built into the car, and they are marketing in states with hand-free laws.
Additional Questions