  • 7/27/2019 Lean Vision

    1/3

    Critical success factors to get Lean Sigma engrained

    into the culture of Tension Temecula

    1. All meetings should follow the SQWD frameworka. Make sure the notion of Safety, Quality, Waste, and Downtime are the main

    Categories of discussion at any meeting. Fit discussion points into one of

    these categories.

    2. Incorporate Visual Factory:a. Post SOPs and Standard Work documents to be consistent with entire

    organization (example below)

    i.3. Discuss project results and Continuous Improvement ideas, on a regular basis, for

    each of the following (i.e; how are we performing, what obstacles can be

    removed):

    a. Outer roll wasteb. Roll core wastec. External set upd. Paper trackinge. Scalesf. Washupg. QIPh. 5S

    4. Gemba Walksa. Identify safety, quality, waste, or downtime (inefficiencies) to attackb. Ask Jack to come up with ideas to improve an area

    5. Ask the supervisors to run a 5S event with my help6. Ask the foremen to run a 5S event with my help

  • 7/27/2019 Lean Vision

    2/3

    7. Completely 5S the machine shop and parts area.a. Get Gil, Wayne, Jack, Kevin, Neal, all the working foremen, Steve Smith, and

    John Maruska to get that area of the plant under control.

    8. Perform at least one audit per week. Adjust schedules if necessary. Ask Neal andKevin to help WF perform the audits

    My vision of Lean Sigma at Tension in 2015

    1. All production managers have been involved in process improvement initiatives.2. Each work cell is in the sustain phase of 5S: Offices, common areas, machines

    a. All associates have been trained and participate in 5S activitiesb. All foremen and supervisors have led at least 1 5S eventc. Production Managers have led at least 1 5S event

  • 7/27/2019 Lean Vision

    3/3

    3. All machines are standardized with tables, ink carts, gum carts, and tools4. Associates communicate ideas for process improvement to PMs who then works

    with the black belt to turn it into a business case

    5. Evidence of Visual Factory is obvious to outsiders6.

    Standard Work sheets are commonplace and work is not done without having one

    7. Adjusters communicate with supervisors and foremen when tools are missing ratherthan pillaging other machines

    8. Participate in Total Productive Maintenance (TPM). Define and follow a process formaintenance

    9. All machines have scales, and all adjusters understand what absolute 0 is and how toset it on the machines

    10.A training matrix is visible and continually updated11.Gaylords and inspection are not necessary to our workflow. Waste and defects have

    been minimized to a level where having them is too expensive.

    12.Adjusters use tags to check out specialty tools.13.Offline training is available to those who wish to progress14.TVs are used to reinforce messages of safety, quality, waste, and downtime15.Record keeping is accurate and consistent