lecture 24 bmp certification
TRANSCRIPT
![Page 1: lecture 24 bmp certification](https://reader031.vdocument.in/reader031/viewer/2022032801/623dbafaa1e360028b7f22fb/html5/thumbnails/1.jpg)
8/9/2021
1
SilvicultureFORS 3347
Instructor: Dr. Jeremy Stovall
Lecture 24:
Silvicultural Systems – Forestry BMP’s & Certification
Best Management Practices (BMPs)
• Forestry BMP Bluebook for Texas• http://txforestservice.tamu.edu/main/article.aspx?i
d=71
• Best Management Practices (BMPs) are practices developed to reduce nonpoint pollution in response to the Clean Water Act requirements
FORS 3347 Lecture 24 Revised 10.12.2020 2
Erosion involves 3 basic processes
• Detachment: We use BMPs to minimize detachment.
• Transport: We use BMPs to alter transport
• Deposition: We use BMPs to cause deposition before it reaches the stream
3FORS 3347 Lecture 24 Revised 10.12.2020
![Page 2: lecture 24 bmp certification](https://reader031.vdocument.in/reader031/viewer/2022032801/623dbafaa1e360028b7f22fb/html5/thumbnails/2.jpg)
8/9/2021
2
Detachment BMPs
4FORS 3347 Lecture 24 Revised 10.12.2020
Transport BMPs
5FORS 3347 Lecture 24 Revised 10.12.2020
Deposition BMPs
6FORS 3347 Lecture 24 Revised 10.12.2020
![Page 3: lecture 24 bmp certification](https://reader031.vdocument.in/reader031/viewer/2022032801/623dbafaa1e360028b7f22fb/html5/thumbnails/3.jpg)
8/9/2021
3
Cutting trees has only a small impact
FORS 3347 Lecture 24 Revised 10.12.2020 7
Preharvest Planning• Streams and stream crossings
• SMZs
• Topography
• Existing roads
• Future roads, decks, trails
• Sensitive areas
• Viewsheds
8FORS 3347 Lecture 24 Revised 10.12.2020
Preharvest Training
• Results in 2 MAJOR changes:• More use of topo maps
• Planning for stream crossings
FORS 3347 Lecture 24 Revised 10.12.2020 9
Trained Control
BMP implementation 90% 86%
Landowner satisfaction 87.5% 80%
Weather related down‐time 25 d / yr 33 d / yr(Shaffer and Meade 1997)
![Page 4: lecture 24 bmp certification](https://reader031.vdocument.in/reader031/viewer/2022032801/623dbafaa1e360028b7f22fb/html5/thumbnails/4.jpg)
8/9/2021
4
Getting Water Off Roads• Road Template
• Insloped• Outsloped
• Structures• Waterbars• Rolling Dips• Broad based dips• Water turnouts• Ditches and culverts• Daylight• Gravel• Laps• Seeding
10FORS 3347 Lecture 24 Revised 10.12.2020
R3. Road Template Terminology
Sidehill or Cut and FillInsloped with Ditch
Outsloped
Through Cut
Through Fill
Full Bench
11FORS 3347 Lecture 24 Revised 10.12.2020
Water Bars on Skid Trails
12FORS 3347 Lecture 24 Revised 10.12.2020
![Page 5: lecture 24 bmp certification](https://reader031.vdocument.in/reader031/viewer/2022032801/623dbafaa1e360028b7f22fb/html5/thumbnails/5.jpg)
8/9/2021
5
Rolling Dips
• Used on roads w/ light, infrequent traffic
• Not for use when hauling
• Shorter & deeper than rolling dip
• Very difficult to construct properly
13FORS 3347 Lecture 24 Revised 10.12.2020
Water Turnouts
• Use on temporary and secondary roads
• Make use of topography
• Will fill over time
• Can create gullies
• Used with wing ditches and sediment traps
14FORS 3347 Lecture 24 Revised 10.12.2020
Ditches and Culverts
• For insloped situations can provide adequate drainage
• Expensive
• Require maintenance
15FORS 3347 Lecture 24 Revised 10.12.2020
![Page 6: lecture 24 bmp certification](https://reader031.vdocument.in/reader031/viewer/2022032801/623dbafaa1e360028b7f22fb/html5/thumbnails/6.jpg)
8/9/2021
6
Daylighting a Road
FORS 3347 Lecture 24 Revised 10.12.2020 16
Site Closure A Key to BMP Success
– 1‐8 Years Post‐Harvest– Harvest areas were recovered
– Roads and skid trails continued to erode
– Road closure not long‐term in many cases
– ORV traffic MAJOR problem with closure
FORS 3347 Lecture 24 Revised 10.12.2020 17
(Christopher 2002)
Stream Crossing BMPs
• Type of crossing
• Location of crossing
• Approaches
• Water/erosion control structures
• Permanency
• Stream channel alterations
• Permits?
FORS 3347 Lecture 24 Revised 10.12.2020 18
![Page 7: lecture 24 bmp certification](https://reader031.vdocument.in/reader031/viewer/2022032801/623dbafaa1e360028b7f22fb/html5/thumbnails/7.jpg)
8/9/2021
7
Stream Cro$$ings
Skidder Bridge
Culvert
Reinforced Ford
Pole Bridge
19FORS 3347 Lecture 24 Revised 10.12.2020
AVOID WHENEVER POSSIBLE!!!
Stream Crossings
• Control of water on approaches at least as important as crossing type.
• Portable bridges minimize in‐stream disturbances.
• Installation and maintenance of crossings as important as crossing type
FORS 3347 Lecture 24 Revised 10.12.2020 20
Streamside Management Zone BMPs
• SMZ types
• Stream type
• Width
• Management
• Forested SMZs in ag environs
21FORS 3347 Lecture 24 Revised 10.12.2020
![Page 8: lecture 24 bmp certification](https://reader031.vdocument.in/reader031/viewer/2022032801/623dbafaa1e360028b7f22fb/html5/thumbnails/8.jpg)
8/9/2021
8
Streamside Management Zones
• Perennial & intermittent streams• Flow > 30% of year• 50 feet on each side measured from stream bank
• Can harvest to 50 ft2 / acre residual in SMZ
• 50 & 50
• Ephemeral streams• Carry water less than 30% of year• Do not Require SMZ
FORS 3347 Lecture 24 Revised 10.12.2020 22
Site Preparation & Afforestation BMPs
• Mechanical
• Chemical
• Fire
23FORS 3347 Lecture 24 Revised 10.12.2020
Harvesting BMPs
• Minimize rutting/bare soil
• Redistribute slash
• Wide Tires
• Shovel logging
• Forwarders
• Cable system
• Helicopter
FORS 3347 Lecture 24 Revised 10.12.2020 24
![Page 9: lecture 24 bmp certification](https://reader031.vdocument.in/reader031/viewer/2022032801/623dbafaa1e360028b7f22fb/html5/thumbnails/9.jpg)
8/9/2021
9
Intermediate Operations
• Thinning
• TSI operations
• Fertilization
• Pesticide applications
• Fire control
• Road maintenance
FORS 3347 Lecture 24 Revised 10.12.2020 25
Wetland (Federal) BMPs
• Silvicultural Exemption• Ongoing• Normal silvicultural operations
• Follow BMPs• Federal mandatory, state implied
• Minimal alteration of hydrology
• No introduction of Toxins
• Need Permit to convert listed bottomland types to pine plantations
26FORS 3347 Lecture 24 Revised 10.12.2020
Positive Effects of BMP Investments
• Improved water quality
• Sustained site productivity
• Legal compliance
• Public/Landowner approval
• Professional improvement
• Fewer days lost to weather related down‐time
27FORS 3347 Lecture 24 Revised 10.12.2020
![Page 10: lecture 24 bmp certification](https://reader031.vdocument.in/reader031/viewer/2022032801/623dbafaa1e360028b7f22fb/html5/thumbnails/10.jpg)
8/9/2021
10
Putting it all together: Implementing BMPs
• Study applicable maps and conduct on the ground reconnaissance of the harvest area
• Identify and mark required SMZs
• Locate and flag log decks
• Locate and mark logging road stream crossing
• Locate and mark logging road entrance points from public roads
• Locate logging road control points• Places a logging road must either connect or avoid
• Locate and flag the logging road
• Locate and flag designated skid trails, if necessary
• Specify logging road construction standards
• Specify stream crossing structures (culverts, ford, bridge)
• Schedule operations and harvest patterns to best fit site conditions
• Specify close down requirements
28FORS 3347 Lecture 24 Revised 10.12.2020
Forest Certification
FORS 3347 Lecture 24 Revised 10.12.2020 29
SFI
FSC vs. SFI
FORS 3347 Lecture 24 Revised 10.12.2020 30
• FSC: 120 M Acres in North America (2010)
• SFI: 193 M Acres in North America (2010)
• Also recognizes American Tree Farm & Canadian Standards Association: brings total to 383 M acres
![Page 11: lecture 24 bmp certification](https://reader031.vdocument.in/reader031/viewer/2022032801/623dbafaa1e360028b7f22fb/html5/thumbnails/11.jpg)
8/9/2021
11
Steps to Certify (SFI)
1. Submit application
2. Contact accredited certification body
3. Implement SFI standards
4. On‐site audit (2‐4 days) by several experts
5. Complete surveillance audits every 12 months, full re‐certificatonevery 3 years
FORS 3347 Lecture 24 Revised 10.12.2020 31
Audit Findings (SFI)
• Conformance• Certificate issued
• Major nonconformity• No certificate issued until corrective action has been implemented and approved by lead auditor
• Minor nonconformity• No certificate issued until corrective action plan has been created to resolve issue within one year and has been approved by lead auditor
• Audit reports are published online (transparency)
FORS 3347 Lecture 24 Revised 10.12.2020 32
SFI Organization
Objective
Performance Measure
Indicator
Performance Measure
Indicator Indicator Indicator
33FORS 3347 Lecture 24 Revised 10.12.2020
![Page 12: lecture 24 bmp certification](https://reader031.vdocument.in/reader031/viewer/2022032801/623dbafaa1e360028b7f22fb/html5/thumbnails/12.jpg)
8/9/2021
12
SFI Principles
1. Sustainable Forestry
2. Forest Productivity and Health
3. Protection of Water Resources
4. Protection of Biological Diversity
5. Aesthetics and Recreation
6. Protection of Special Sites
7. Responsible Fiber Sourcing Practices in North America
8. Avoidance of Controversial Sources including Illegal Logging in Offshore Fiber Sourcing
9. Legal Compliance
10. Research
11. Training and Education
12. Public Involvement
13. Transparency
14. Continual Improvement
34FORS 3347 Lecture 24 Revised 10.12.2020
SFI Objectives (2010‐2014)
• Objectives 1‐7: Forest Land Management
• Objective 8‐13: Fiber Sourcing
• Objectives 14‐20: Forest Land Management & Fiber Sourcing
35FORS 3347 Lecture 24 Revised 10.12.2020
Objective 1
To broaden the implementation of sustainable forestry by ensuring long‐term harvest levels based on the use of the best scientific information available.
36FORS 3347 Lecture 24 Revised 10.12.2020
![Page 13: lecture 24 bmp certification](https://reader031.vdocument.in/reader031/viewer/2022032801/623dbafaa1e360028b7f22fb/html5/thumbnails/13.jpg)
8/9/2021
13
Performance Measure 1.1
Program Participants shall ensure that forest management plans include long‐term harvest levels that are sustainable and consistent with appropriate growth‐and‐yield models.
37FORS 3347 Lecture 24 Revised 10.12.2020
Indicator 1
Forest management planning at a level appropriate to the size and scale of the operation, including:
a) a long‐term resources analysis;
b) a periodic or ongoing forest inventory;
c) a land classification system;
d) soils inventory and maps, where available;
e) access to growth‐and‐yield modeling capabilities;
f) up‐to‐date maps or a geographic information system (GIS);
g) recommended sustainable harvest levels for areas available for harvest; and
h) a review of non‐timber issues (e.g. recreation, tourism, pilot projects and economic incentive programs to promote water protection, carbon storage, bioenergy feedstock production, or biological diversity conservation, or to address climate‐induced ecosystem change).
38FORS 3347 Lecture 24 Revised 10.12.2020
SFI Organization
Objective
Performance Measure
Indicator
Performance Measure
Indicator Indicator Indicator
39FORS 3347 Lecture 24 Revised 10.12.2020
14
20
38
115
![Page 14: lecture 24 bmp certification](https://reader031.vdocument.in/reader031/viewer/2022032801/623dbafaa1e360028b7f22fb/html5/thumbnails/14.jpg)
8/9/2021
14
Key SFI Indicators
• Program to implement state or provincial BMPs during all phases of management activities.
• Contract provisions that specify conformance to BMPs.
• Plans that address wet‐weather events (e.g. forest inventory systems, wet‐weather tracts, definitions of acceptable operating conditions).
• Monitoring of overall BMP implementation.
FORS 3347 Lecture 24 Revised 10.12.2020 40
John Hodges, MSU, bugwood.org
Bottomland Hardwoods, Eastern VA
Key SFI Indicators
• Program Participants shall implement forest management practices to protect and maintain forest and soil productivity.
FORS 3347 Lecture 24 Revised 10.12.2020 41
Dave Powell, USDA Forest Service, bugwood.org
Forest Road, Oregon
Key SFI Indicators
• Average size of clearcut harvest areas does not exceed 120 acres (50 hectares), except when necessary to meet regulatory requirements or to respond to forest health emergencies or other natural catastrophes.
FORS 3347 Lecture 24 Revised 10.12.2020 42
Sierra Mixed Conifers
Philip McDonald, USDA Forest Service, bugwood.org
![Page 15: lecture 24 bmp certification](https://reader031.vdocument.in/reader031/viewer/2022032801/623dbafaa1e360028b7f22fb/html5/thumbnails/15.jpg)
8/9/2021
15
Key SFI Indicators
• Reforestation, unless delayed for site‐specific environmental or forest health considerations or legal requirements, through planting within two years or two planting seasons, or by planned natural regeneration methods within five years.
FORS 3347 Lecture 24 Revised 10.12.2020 43
David Stephens, bugwood.org
Loblolly Pine
Key SFI Indicators
• Trees in clearcut harvest areas are at least 3 years old or 5 feet(1.5 meters) high at the desired level of stocking before adjacent areas are clearcut, or as appropriate to address operational and economic considerations, alternative methods to reach the performance measure are utilized by the Program Participant.
FORS 3347 Lecture 24 Revised 10.12.2020 44
Weyerhaeuser , Arkansas
Key SFI Indicators
• Clear criteria to judge adequate regeneration and appropriate actions to correct understockedareas and achieve acceptable species composition and stocking rates for both planting and natural regeneration.
FORS 3347 Lecture 24 Revised 10.12.2020 45
David Moorhead, UGA, bugwood.org
Loblolly Pine
![Page 16: lecture 24 bmp certification](https://reader031.vdocument.in/reader031/viewer/2022032801/623dbafaa1e360028b7f22fb/html5/thumbnails/16.jpg)
8/9/2021
16
Key SFI Indicators
• Minimized plantings of exotic tree species, and research showing that exotic tree species, planted operationally, pose minimal risk.
FORS 3347 Lecture 24 Revised 10.12.2020 46
Forest & Kim Starr, Star Env., bugwood.org
Eucalyptus, HI
Key SFI Indicators
• Retention of vigorous trees during partial harvesting, consistent with scientific silvicultural standards for the area.
FORS 3347 Lecture 24 Revised 10.12.2020 47
David Moorhead, UGA, bugwood.org
Longleaf Pine Shelterwood, GA
Key SFI Indicators
• Program to address visual quality management.
• Incorporation of aesthetic considerations in harvesting, road, landing design and management, and other management activities where visual impacts are a concern.
FORS 3347 Lecture 24 Revised 10.12.2020 48
![Page 17: lecture 24 bmp certification](https://reader031.vdocument.in/reader031/viewer/2022032801/623dbafaa1e360028b7f22fb/html5/thumbnails/17.jpg)
8/9/2021
17
Key SFI Indicators
• Program Participants shall minimize chemical use required to achieve management objectives while protecting employees, neighbors, the public and the environment, including wildlife and aquatic habitats.
FORS 3347 Lecture 24 Revised 10.12.2020 49
USDA Forest Service, bugwood.org
Monterey Pine, NZ
Tree Farm System
FORS 3347 Lecture 24 Revised 10.12.2020 50
• Oldest certification system – 1941
• 74,000 tree farms
• 20.5 million acres in US
• Apply through TFA
Tree Farm System
Selected Landowner Requirements
1. Acreage ranging from 10 to 10,000 acres
2. Ownership must be privately held and not publicly traded (can be municipalities, schools, private universities, watersheds, state government organizations, small local businesses)
3. Owner must clearly exhibit commitment to sustainable management though management objectives or management plan
FORS 3347 Lecture 24 Revised 10.12.2020 51
![Page 18: lecture 24 bmp certification](https://reader031.vdocument.in/reader031/viewer/2022032801/623dbafaa1e360028b7f22fb/html5/thumbnails/18.jpg)
8/9/2021
18
Tree Farm System
Management Plan Must Contain:
• landowner objectives• forest condition and health• management activities/ prescriptions
• tract map
• soils and water resources• wood and fiber production• threatened and endangered species, high conservation value forests and other special sites
• invasive species and integrated pest management
FORS 3347 Lecture 24 Revised 10.12.2020 52
EQIP
• The Environmental Quality Incentives Program (EQIP) is a voluntary conservation program that promotes agricultural production and environmental quality as compatible National goals. The Natural Resources Conservation Service (NRCS) administers EQIP.
FORS 3347 Lecture 24 Revised 10.12.2020 53
EQIP
• Through EQIP, farmers and ranchers may receive financial and technical help to install or implement structural and management conservation practices on eligible agricultural land.
FORS 3347 Lecture 24 Revised 10.12.2020 54
![Page 19: lecture 24 bmp certification](https://reader031.vdocument.in/reader031/viewer/2022032801/623dbafaa1e360028b7f22fb/html5/thumbnails/19.jpg)
8/9/2021
19
EQIP
• EQIP was reauthorized in the Food, Energy and Conservation Act of 2018 (Farm Bill).
FORS 3347 Lecture 24 Revised 10.12.2020 55
EQIP
• Fund up to $300,000 over 6 year period
• Varies state by state• Varies county by county• Nacogdoches
• Timber Stand Improvement• Prescribed Burn• Firebreak• Site Prep (Mech & Chem)• Planting Stock & Costs
• High Density: 6 x 10 ft• Low Density: 8 x 12 ft
FORS 3347 Lecture 24 Revised 10.12.2020 56