lecture 27 just-in-time manufacturing books introduction to materials management, sixth edition, j....

40
Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College, Emeritus, Stephen N. Chapman, Ph.D., CFPIM, North Carolina State University, Lloyd M. Clive, P.E., CFPIM, Fleming College Operations Management for Competitive Advantage, 11th Edition, by Chase, Jacobs, and Aquilano, 2005, N.Y.: McGraw-Hill/Irwin. Operations Management, 11/E, Jay Heizer, Texas Lutheran University, Barry Render, Graduate School of Business, Rollins College, Prentice Hall

Upload: sydney-skinner

Post on 16-Jan-2016

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Lecture 27

Just-in-Time Manufacturing

Books• Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming

College, Emeritus, Stephen N. Chapman, Ph.D., CFPIM, North Carolina State University, Lloyd M. Clive, P.E., CFPIM, Fleming College

• Operations Management for Competitive Advantage, 11th Edition, by Chase, Jacobs, and Aquilano, 2005, N.Y.: McGraw-Hill/Irwin.

• Operations Management, 11/E, Jay Heizer, Texas Lutheran University, Barry Render, Graduate School of Business, Rollins College, Prentice Hall

Page 2: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Objectives

• Origin of JIT• Supply Chain• Characteristics of JIT• Importance of JIT• JIT, TPS, Lean Production• Eliminating Waste• Seven Sources of Waste• 5S’s• Function of JIT inventory• Supplier partnership• Advantages of setup reduction• Sources of variability• JIT and competitive advantage

Page 3: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Toyota Motor Corporation

Largest vehicle manufacturer in the world with annual sales of over 9 million vehicles

Success due to two techniques, JIT and TPS

Continual problem solving is central to JIT

Eliminating excess inventory makes problems immediately evident

Page 4: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Toyota Motor Corporation

Central to TPS is a continuing effort to produce products under ideal conditions

Respect for people is fundamental Small building but high levels of

production Subassemblies are transferred to the

assembly line on a JIT basis High quality and low assembly time per

vehicle

Page 5: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Origins of JIT

The Toyota Production System

by Taiichi Ohno

Various titles by Shigeo Shingo

Page 6: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Supply Chain (Logistics System)

SUPPLIERS

MANUFACTURERDISTRIBUTION SYSTEM

CUSTOMERPhysical

Supply

Manufacturing Planning and Control

Physical Distribution

DOMINANT FLOW OF PRODUCTS AND SERVICES

DOMINANT FLOW OF DEMAND & DESIGN INFORMATION

Page 7: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Characteristics of JIT Environments

• Flow manufacturing• Process flexibility• Total quality management• Total productive maintenance

Page 8: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Characteristics of JIT Environments

• Uninterrupted flow• Continuous process improvement• Supplier partnerships• Total employee involvement

Page 9: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Importance of JIT

JIT is not primarily an inventory reduction program. Its primary purpose is to focus attention on problems.

Page 10: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Deming on: JIT

The great advantage of the [JIT] system is the discipline behind it - processes in control; quality, quantity, and regularity predictable.

Out of the Crisis

Page 11: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Just-In-Time, TPS, and Lean Operations

JIT is a philosophy of continuous and forced problem solving via a focus on throughput and reduced inventory

TPS emphasizes continuous improvement, respect for people, and standard work practices

Lean production supplies the customer with their exact wants when the customer wants it without waste

Page 12: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Just-In-Time, TPS, and Lean Operations

JIT emphasizes forced problem solving

TPS emphasizes employee learning and empowerment in an assembly-line environment

Lean operations emphasize understanding the customer

Page 13: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Eliminate Waste

Waste is anything that does not add value from the customer point of view

Storage, inspection, delay, waiting in queues, and defective products do not add value and are 100% waste

Page 14: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Ohno’s Seven Wastes

Overproduction Queues Transportation Inventory Motion Overprocessing Defective products

Page 15: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Seven Sources of Waste

• The process• Methods• Movement• Product defects• Waiting time• Over-production• Inventory

Page 16: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Eliminate Waste

Other resources such as energy, water, and air are often wasted

Efficient, ethical, and socially responsible production minimizes inputs, reduces waste

Traditional “housekeeping” has been expanded to the 5 Ss

Page 17: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

5S’s

• Sort:Organization (Seiri)• Set in order: Orderliness (Seiton)• Shine: Cleanliness (Shitsuke)• Standardized Cleanup (Seiso)• Sustain: Discipline (Seiketsu)

Page 18: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

The 5 Ss

Sort/segregate – when in doubt, throw it out Simplify/straighten – methods analysis tools Shine/sweep – clean daily Standardize – remove variations from processes Sustain/self-discipline – review work and recognize

progress

Page 19: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

The 5 Ss

Sort/segregate – when in doubt, throw it out Simplify/straighten – methods analysis tools Shine/sweep – clean daily Standardize – remove variations from processes Sustain/self-discipline – review work and recognize

progressTwo additional Ss Safety – build in good practices Support/maintenance – reduce

variability and unplanned downtime

Page 20: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

JIT

Two Basic Questions

How much to order?

When to order?

Page 21: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

The Functions of Inventory

• To meet anticipated demand• To de-couple production and distribution

processes• To take advantage of quantity discounts• To hedge against inflation• To protect against stockouts• To permit operations to continue smoothly

Page 22: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Types of Inventory

• Raw Material Inventory• Work-In-Process Inventory (WIP)• Finished Goods Inventory• Maintenance/Repair/Operating Supplies (MRO)

Page 23: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Inventory Turns

• Inventory turns: a measure of how effectively inventories are being used. The ratio of Annual Cost of Goods Sold divided by average inventory in dollars

Page 24: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Just-in-Time Inventory

• Just-in-time inventory is the minimum inventory necessary to keep a perfect system running.

The exact amount of goods arrive at the moment they are needed, not a minute before or a minute after the units are required.

Page 25: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Supplier Partnerships

• Commitment• Communication• Change• Principles• Time together• Appreciation / Feedback

Page 26: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Advantages of Setup Reduction

• Reduced EOQ• Reduced queue & mfg. Lead time• Reduced WIP• Improved quality• Improved process and material flow

Page 27: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Inventory Management Terms

• Holding Costs– The costs associated with holding or “carrying” inventory over

time.• Ordering Costs

– Includes costs of supplies, forms, order processing, clerical support, etc.

• Setup Costs– The costs to prepare a machine or process for manufacturing

an order.• Safety Stock

– Extra stock held to prevent a stockout, held for uneven demand.

Page 28: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Danger of Blind JIT Implementation

• Coupling your customers to problems• Inadequate resources to address problems in a

timely manner

Page 29: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Remove Variability

JIT systems require managers to reduce variability caused by both internal and external factors

Variability is any deviation from the optimum process

Inventory hides variability Less variability results in less waste

Page 30: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Sources of Variability

1. Incomplete or inaccurate drawings or specifications

2. Poor production processes resulting in incorrect quantities, late, or non-conforming units

3. Unknown customer demands

Page 31: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Sources of Variability

1. Incomplete or inaccurate drawings or specifications

2. Poor production processes resulting in incorrect quantities, late, or non-conforming units

3. Unknown customer demandsBoth JIT and inventory reduction are

effective tools in identifying causes of

variability

Page 32: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Improve Throughput

The time it takes to move an order from receipt to delivery

The time between the arrival of raw materials and the shipping of the finished order is called manufacturing cycle time

A pull system increases throughput

Page 33: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Improve Throughput

By pulling material in small lots, inventory cushions are removed, exposing problems and emphasizing continual improvement

Manufacturing cycle time is reduced Push systems dump orders on the

downstream stations regardless of the need

Page 34: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Just-In-Time (JIT)

• Powerful strategy for improving operations• Materials arrive where they

are needed when they are needed

• Identifying problems and driving out waste reduces costs and variability and improves throughput

• Requires a meaningful buyer-supplier relationship

Page 35: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

JIT and Competitive Advantage

Page 36: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

JIT and Competitive Advantage

Page 37: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

JIT Partnerships

JIT partnerships exist when a supplier and purchaser work together to remove waste and drive down costs

Four goals of JIT partnerships are: Removal of unnecessary activities Removal of in-plant inventory Removal of in-transit inventory Improved quality and reliability

Page 38: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

JIT Partnerships

Page 39: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

Concerns of Suppliers

Diversification – ties to only one customer increases risk

Scheduling – don’t believe customers can create a smooth schedule

Changes – short lead times mean engineering or specification changes can create problems

Quality – limited by capital budgets, processes, or technology

Lot sizes – small lot sizes may transfer costs to suppliers

Page 40: Lecture 27 Just-in-Time Manufacturing Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,

End of Lecture 27