CE 233Construction Management
Lecture 8_2
Primavera P3
Setting Up a New Project
Dr. Jae-Ho Pyeon
2
Primavera Project Planner
A widely used interactive construction
scheduling and planning software
Graphical screens and output
Simplifies the interpretation of the
scheduling documentsLeads to more effective project
management
-
7/25/2019 lecture on project management
2/17
3
What You Should Learn from This
Lesson
1. How to create a new project
2. How to add project activity data
3. How to add relationship input
4. How to schedule the project
5. How to back up the project file
6. How to restore the backup file7. How to open an existing project
4
Sample Project Data
1154Start Up and Test Elect and Mech Sys.125
757Finish Site Work135
125, 1351Final Inspection145
95, 10521Mech and Elect Finish115
85, 9528Interior Finish105
8521Rough In Elect and Mech95
7518Interior Partitions85
6528Exterior Closure75
55 FS=720Roof Slab and Beams65
455Columns55
25, 357Ground Floor Slab45
25 SS=34Under Slab Utilities35
1514Foundations25
510Clearing15
1Start Project5
PredecessorsOriginal
duration
Act iv it y descr ip tionAct iv it y ID
-
7/25/2019 lecture on project management
3/17
5
Open Primavera Project Planner
Select File
Select New
To begin a new project:
Creating a Project
File
New
6
Enter a 4
character project
name (required)
Set the planning
unit and work
week
Project Title and Company name is optional
Do not enter
A finish date
Select Add to initiate project
Enter the planned
project start date
-
7/25/2019 lecture on project management
4/17
7
Select + to enter an activity
The project should open with
this screen of the classic
schedule
layout.
Activity Input
8
Enter the first activity ID number.
Start with a number other than 1, in case
you have to add another activity.
Activity Input: ID
-
7/25/2019 lecture on project management
5/17
9
Select the field under the column heading
activity description. Enter a description for
the activity.
Activity Input: Description
10
Select the field under the column heading
Orig. Dur. Enter the duration of the activity.
Activity Input: Duration
-
7/25/2019 lecture on project management
6/17
11
Hit the enter key to complete the activity
entry. Note that the activity now appears
on the bar chart.
12
Repeat the procedure to enter additional
activities. Note that Primavera automatically
numbers the new activities with ID numbers.
In this example the interval is 10.
Enter Additional Activities
-
7/25/2019 lecture on project management
7/17
13
An activity form window can be displayed
At the bottom of the screen by selecting,
View, Activity Form.
The activity form is used to enter and display
Activity data.
Activity Form
14
Activity Form Window
-
7/25/2019 lecture on project management
8/17
15
Relationship Input
Open the Predecessors window
Pred Click + Select Activities
16
After entering all activities,
predecessors can be assigned.
Select Pred on the Activity Form
Menu bar.
Start with your first activity.
Select + to add a predecessor
to the highlighted activity.
-
7/25/2019 lecture on project management
9/17
17
The first activity does not have apredecessor. Move to the next
activity.
Select the scroll down arrow to
view a listing of all activities.
18
Select the correct predecessor
from the list.
-
7/25/2019 lecture on project management
10/17
19
Note that by default, the FS
relationship is used with a
lag of 0. However, both the
relationship and the lag may
be changed.
20
Continue through the
activity list, entering the
predecessors for each activity.
Some activities may have more
than one predecessor.
-
7/25/2019 lecture on project management
11/17
21
Note that we have selected a
SS with a 3 day lag for the
Under Slab Utilities. This is to
permit the foundation work to
advance for 3 days prior to
starting the Under Slab Utilities.
22
A FS with a 7 day lag
was used to allow sufficient
concrete strength gain.
-
7/25/2019 lecture on project management
12/17
23
Calculating the Schedule
Tools Schedule
24
After listing all activities and
entering predecessors, the
schedule calculation is obtained
by selecting the schedule icon
on the upper menu bar.
-
7/25/2019 lecture on project management
13/17
25
You must select a schedule
date. This should be theplanned start date for a new
schedule.
26
Normally we want
to view the schedule
on screen first.
-
7/25/2019 lecture on project management
14/17
27
A schedule report is
generated.
You should have only one
activity with no predecessor
and only one activity with no
successor.
This report will help you
identify errors in your
network logic.
It also gives you the scheduledcompletion date.
28
Before ending your work,
you should backup your
file to a diskette.
Select Tools,
Project Utilities,Back Up.
Backing Up a Project
Tools Project Utilities Back Up
-
7/25/2019 lecture on project management
15/17
29
You mustselect your
project and click
on the box in
the back up
column.
Compress files
(One PRX file)
30
To restore a project,
select the Tools command
followed by Project
Utilities/Restore options.
Restoring a Project
Tools Project Utilities Restore
-
7/25/2019 lecture on project management
16/17
31
Again, you must select your project and click
on the box.
32
To open a project on the hard drive,
select the File command
followed by the Open option.
Opening an Existing Project
File Open
-
7/25/2019 lecture on project management
17/17
33
Then select
your project
from the list.
Note that
projects can not
be opened from
the back up
diskette.
They must first
be restored.