leecvdoc

4
Lee Roberts 10 Ramsden Street Rhymney Gwent NP22 5NZ Tel: home 01685 842 223 /work 07966770559 E-mail: [email protected] [email protected] Personal Profile. A skilled supervisor with many years of ‘hands on’ experience in the construction and civil engineering industries. I have worked on a wide variety of projects such as road construction, rail works, land reclamation projects, and flood defence schemes. I enjoy the challenge of a supervisory role, where I have developed excellent communication skills with people at all levels. I pride myself on giving 100 percent focus to my job at all times. History May 2009 –present Skanska UK Civils Junction 19 M1 improvement scheme Senior General Foreman: Roadwork Team. My duties involve the supervision of three general foreman, 1 section foreman, and two trainee foreman. Within my team we look after all drainage,gantry,and roadwork operations ‘I also liaise with the agents, section engineers and attend program and sub-contractors safety meetings.my role also involve supervising

Upload: lee-roberts

Post on 12-Apr-2017

109 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Leecvdoc

Lee Roberts10 Ramsden Street

RhymneyGwent

NP22 5NZTel: home 01685 842 223 /work 07966770559

E-mail: [email protected] [email protected]

Personal Profile.

A skilled supervisor with many years of ‘hands on’ experience in the construction and civil engineering industries. I have worked on a wide variety of projects such as road construction, rail works, land reclamation projects, and flood defence schemes.I enjoy the challenge of a supervisory role, where I have developed excellent communication skills with people at all levels. I pride myself on giving 100 percent focus to my job at all times.

History

May 2009 –present Skanska UK CivilsJunction 19 M1 improvement schemeSenior General Foreman: Roadwork Team. My duties involve the supervision of three general foreman, 1 section foreman, and two trainee foreman. Within my team we look after all drainage,gantry,and roadwork operations ‘I also liaise with the agents, section engineers and attend program and sub-contractors safety meetings.my role also involve supervising the sub-contractors on site, from slip form paving to the barrier installation to the trenchless drilling. I look after all the issues in the compound, and make sure all our health and safety procedures are in place and followed.

M25 LUS Section5 j23-26General Foreman: Roadwork Team.My duties include the supervision of PQ Concrete operations using direct employed gangs of 35 people including fixers.hand lay,and prep gangs.I also supervised sub contractors on the direct drilling operations including all prep work for this activitie.I carrie out regular safety tours of the site and attend programe and progress meetings.

Page 2: Leecvdoc

I manage my plant and labour on a daily basis as cost is just important as delivering a safely done and quality product. M25 DBFO Widening, j16 to j23.General Foreman: Roadwork Team. My duties include the supervision of PQ Concrete operations. Initially I was responsible for the direct employed ‘Hand Lay’ concrete gangs. My role has now expanded to include supervision of the slipforming sub contractor, constructing CSB Wall, Slotdrain, Surface Water Channel, and Smooth Face Retaining Wall. The M25 widening is a fast paced project aiming to deliver 36 Kms. of four lane motorway, in 36 months. Presently the project is ahead of time and well within budget. A recent independent safety audit returned a score of 100 percent compliance with Skanska safety management systems. This is the first time that a Skanska project has achieved this. I am proud to be part of the team involved in implementing the safety systems.

August 2006-May 2009 Morgan EST/Amec M1 Widening, j25 to j27. Nottingham.Section Foreman: I supervised the earthworks, drainage, comms, sign bases and vehicle restraint sub contractors, approximately 12 gangs at its peak. Working closely with the sub contract supervisors, I ensured that the health, safety, quality and environment systems are in place and maintained, and that accurate daily records are kept. Upper Forth Crossing: Kincardine, Scotland.Section Foreman: Supervision of a directly employed workforce, responsible for the construction of the approach roads to the new viaduct.I was also involved with the construction of the drainage and communication ducts systems, reinforced earth walls; pre cast concrete sea walls and all hard and soft landscaping works. All works using clear and defined engineering specifications to produce quality products. Terminal 5 Heathrow.Senior GangerThe scheme was to provide Heathrow airport with a new terminal. My duties were the supervision of the installation of large diameter deep drainage and culvert systems, using various proprietary shoring equipment. I was also involved with the construction of approximately five miles of electrical and communication ducts, with associated large pre cast concrete draw pits. I was expected to keep accurate daily records of the works completed. Being a member of the behavioural based team, I was responsible for site safety and completed regular safety tours and attended

Page 3: Leecvdoc

safety meetings with Amec and BAA safety advisors.

Interests and Hobbies.I enjoy sport as I am a competitive person and I used to play rugby for a local club. I also enjoy re-building bikes and cars and would like to re-build a classic bike one day. I also breed and show English bull dogs,

Training and qualificationsCITB: SMSTS, IOSH Safety Management, IOSH Accident and Investigation First Aid (4 Day),NRSWA Site Supervisor, Scaffolding Inspection. NVQ level 2, NVQ Level 3 Site Supervision.CITB 360 Excavator, Dumper, Roller,Full driving licenseTemporary Works Co-ordinator.Mewps for managers. Risk assessment and permit writing.S.E.A.T.S. Training