MINIMUM PROGRAMREQUIREMENTS
LAST UPDATED
January 2011
-
8/6/2019 LEED MPRs
2/6
LEED 2009
Minimum Program RequirementsApply to
LEED 2009 for New Construction and Major Renovations, LEED 2009 for Core & Shelldevelopment, LEED 2009 for Schools, LEED 2009 for Commercial Interiors, and LEED
2009 for Existing Buildings: Operations & Maintenance, LEED for Retail NewConstruction, LEED for Retail Commercial Interiors, LEED for Healthcare
Do not apply to LEED for Homes, LEED for Neighborhood Development, or anyLEED rating system adopted prior to 2009
Version January 2011
The only change made in this version is the indication that the MPRs apply to recentlylaunched rating systems. These rating systems include: LEED for Retail NewConstruction, LEED for Retail Commercial Interiors, and LEED for Healthcare
INTRODUCTIONThis document identifies the MPRs, or minimum characteristics that a project mustpossess in order to be eligible for LEED Certification. These requirements define thetypes of buildings that the LEED Green Building Rating Systems were designed toevaluate, and taken together serve three goals: to give clear guidance to customers, toprotect the integrity of the LEED program, and to reduce complications that occur duringthe LEED certification process. The requirements in this document will apply to all those,and only those projects seeking to demonstrate conformance with the rating systems
listed above.
Definitions, exceptions, and more extensive guidance relating to these MPRs areavailable in a separate document titled: LEED 2009 MPR Supplemental Guidance. Termsthat are italicized and underlined here are defined in the Supplemental Guidancedocument (they are marked as such only the first time that they appear).
At this time U.S. Green Building Council, Inc. has authorized the Green BuildingCertification Institute (GBCI) to confer LEED Certification. GBCI has agreed to considerrequests for exceptions to MPRs that are not already defined in the LEED 2009 MPRSupplemental Guidance document on a case-by-case basis for special circumstances.
In addition to complying with the MPRs, a project must also demonstrate compliance with
all rating system requirements in order to achieve LEED Certification.
http://www.usgbc.org/ShowFile.aspx?DocumentID=6473http://www.usgbc.org/ShowFile.aspx?DocumentID=6473 -
8/6/2019 LEED MPRs
3/6
1.
NewRetaiThe LbounbuildinThiscommthe buready
ExistThe Lprojec
buildinlocallocateinitialCertifi
All RA lapsthat rresultare re
2.OR
All RAll LElocatioequiplifetim
New
HealtLEEDrenoventire
ComThe Lspacechara
UST C
Construcl New CEED projectary, and allg-related enondition muencement ofilding receivefor use.
ing BuildiED project
t work, and
g and the Luilding-relat. This cond
LEED-EB:ation.
ating Syste in a projecsults from
in non-compediated as
UST BSPACE
ating SystED projectsn on alreadyent, or vehimay pursue
Construct
hcareprojects mution, of at le
y.
mercial IntEED projects within theteristics: ow
MPLY
tion, Cornstructiobuilding orproject workironmental l
st be satisfischematics a certificat
gs: O&Muilding, all oall normal
ED projectd environmition must be&M perform
emsts compliancn unforesee
liance with thoon as feasi
A CO
emsust be desiexisting lanles. No builLEED Certif
ion, Core
st include tast one com
eriors, Rescope mustsame buil
ership, man
ITH E
& Shelln, Retail space, all omust comp
ws and regued from theesign, which
of occupan
ther real probuilding ope
oundary muntal laws ansatisfied fro
ance period
e with a builn and unavis MPR. Subly possible.
PLET
gned for, cod. LEED pring or spaceication.
& Shell, S
e new, groercial, instit
tail Cominclude aing with rgement, lea
VIRO
, SchoolsCommercher real prly with applilations in pladate of LE
ever comesyor similar
erty within trations occu
st comply witd regulation
the commthrough the
ding-relatedoidable circuch lapses sh
, PERM
structed on, jects shall nthat is desi
hools, R
und-up desiutional, or hi
mercial Inomplete intgards to ae, or party
MENT
, Commeial Interiorperty withincable federace where theED projectfirst, up andfficial indicat
e LEED projrring within
h applicablein place w
ncement of texpiration
nvironmentmstance shall be excus
ANENT
and operateot consist ofned to move
tail New
n and consh-rise reside
eriors,rior space
t least oneall separatio
L LAW
cial Inters, Healthcthe LEED pl, state, andproject is loegistrationuntil the dation that it is f
ect boundarthe LEED p
federal, statere the projhe LEED prate of the
l law or regull not neced so long a
BUILDI
d on a permmobile strucat any point
Construc
truction, orntial building
istinct fromof the foll.
iors,arerojectlocalated.r the
e thatit and
, anyroject
, andect isjectsLEED
lationsarilythey
NG
anenttures,in its
tion,
majorin its
otherowing
-
8/6/2019 LEED MPRs
4/6
ExistLEEDreside
3.
NewO&M
1.
2.
3.
4.
5.
ComIf anythat la
4.RE
NewO&MThe Lgross
ComThe Lgross
ing Buildiprojects mu
ntial building
UST U
Construc, Retail
The LEEDwith and sincluding aLEED proj
The LEEDthan thatsupports nLEED projthe buildinarea on trequiremento Site AreAny givenbuilding.Gerrymanunreasonashapes for
mercial Int
land was ornd must be i
UST CUIREM
Construc, Retail EED projectfloor area.
mercial IntEED projectfloor area.
gs: O&Mt include at
in its entirety
E A RE
tion, Corew Constproject bounupports norll land that wct.
project bounhich owns trmal buildincts locateds on campue campust is in conflicRatio, thenarcel of real
eringof a LEly exclude
the sole purp
eriors, Re
ill be disturbcluded withi
MPLYENTS
tion, Corew Const
must include
eriors, Remust includ
least one e.
ASON
and Shruction, Hdary must inal building
as or will be
dary may note LEED prooperations f
n a campuss become Lwould be it with MPR #MPR #7 will tproperty ma
ED project bsections of lose of compl
ail Com
ed for the puthe LEED p
ITH M
and Shruction, Ha minimum
tail Coma minimum
isting comm
BLE SI
ell, Schoealthcareclude all cooperations f
disturbed for
include lan ject unless tor the LEEDmust have prED certifiedcluded with
7, Must Comake precedey only be attr
oundary is pand to creatying with pre
ercial Inte
rpose of undroject bound
INIMUM
ell, Schoealthcareof 1,000 sq
mercial Inof 250 squ
ercial, institu
E BOU
ls, Existi
tiguous landor the LEEthe purpose
that is ownat land is aproject buildioject bounda, then 100%in a LEEDply with Minince.ibuted to a si
ohibited: thee boundarierequisites or
iors
ertaking thery.
FLOO
ls, Existi
are feet (93
eriorsre feet (22
tional, or hig
NDARY
ng Buildi
that is assoproject bui
of undertaki
d by a partysociated wit
ng.ries such thaof the grosboundary. Ium Building
ngle LEED p
boundary min unreaso
credits.
EED project
AREA
ng Buildi
square mete
square mete
h-rise
ngs:
iatedilding,g the
otherh and
t if allland
f thisArea
roject
y notnable
, then
ngs:
rs) of
rs) of
-
8/6/2019 LEED MPRs
5/6
5. MNewRetaiFull TiThe Lcalculless tcateg
ExistFull TiThe Lcalculless tcategMinimThe Lsysteperiodimme
6.ENAll RAll cerwholestartsunder
the bMaintfree, acollectcarry f
UST CO
Construcl New Cme EquivaleEED projectted as an aan 1 annury may not b
ing Buildime EquivaleEED projectted as an aan 1 annury may not b
um OccupanEED projects must be othat includeiately preced
UST CRGY A
ating Systtified projectsproject eneron the dateNew Constru
ilding is awanance. Sharccessible, anion of informorward if the
PLY WI
tion, Cornstructiot Occupancmust serv
nual averaglized FTE,e earned (th
gs: O&Mt Occupancmust serv
nual averaglized FTE,e earned (th
y Ratemust be in
perating at aall performa
ing the first s
MMITND WA
emsmust commy and water
that the LEEction, Core
rded certificing this datad secure onliation directlybuilding or s
TH MINI
& Shelln, Retail
1 or morein order toptional credprerequisite
1 or morein order toptional credprerequisite
a state of tcapacity necnce periodsubmission fo
O SHAER US
it to sharingusage dataD project beShell, Scho
tion if certifincludes sune tool or, iffrom servicace change
UM OC
, SchoolsCommerc
Full Timese LEED inits from thes must still b
Full Timese LEED inits from thes must still b
pical physicessary to seas well as atr a review.
RING WGE D
ith USGBCfor a periodgins typicalols, or Com
ing under Epplying infornecessary, ta
or utility prownership
CUPAN
, Commeial Interior
Equivalent (its entirety. IfIndoor Enviearned).
Equivalent (its entirety. IfIndoor Enviearned).
al occupancrve the curreleast the 12
HOLE-TA
and/or GBCIf at least 5hysical occercial Interio
xisting Buildiation on aking any actividers. Thisr lessee.
Y RATE
cial Inters, Healthc
TE) occupthe project sronmental Q
TE) occupthe project sronmental Q
, and all bt occupants,ontinuous m
UILDIN
all availableears. Thispancy if cerrs, or the dat
ngs: Operatiregular basion to authoricommitment
S
iors,are
nt(s),ervesuality
nt(s),ervesuality
ildingfor a
onths
G
ctualeriodifyinge that
ns &in ae themust
-
8/6/2019 LEED MPRs
6/6