InnovationinDesignCreditCatalogCurrently,projectspursuingLEEDCertificationhavetheopportunitytoearnuptofourpoints
for two typesof credits in the Innovation&DesignProcess (ID) credit category:exemplary
performance related to existing LEED credits and innovative performance. This document
pertainstoinnovativeperformance.
Innovation in Design credits for innovative performance are awarded for comprehensive
strategieswhichdemonstratequantifiableenvironmentalbenefitsnotspecificallyaddressed
bycurrentLEEDRatingSystems. Whensubmittingan IDcredit,project teamsmustoutline
the proposed credit intent, requirement(s) for compliance, and submittal(s) necessary to
demonstratecompliance,
as
well
as
provide
asummary
of
potential
design
approaches
that
maybeusedtomeettherequirements.
ThefollowingisacatalogofIDcreditssubmittedbyprojectsbeforethesummerof2007. This
document isawork inprogressand ismeantasabrainstorming toolonly toassistproject
teams in thedevelopmentofnew ID credits. Itdoes not set anyprecedent tobeupheld
during a LEED Certification Review. The information found here is a staff summary of
information provided by review teams and should not be considered a detailed or
comprehensiveportrayaloftheoriginalcreditsubmittal. Forofficialrulings inadvanceofa
LEED Certification Review, customers should utilize the Credit Interpretation Ruling (CIR)
procedure.ApplicationsforLEEDCertificationandanyassociated IDcreditsubmittalswillbe
thoroughly reviewedandscrutinizedbasedonUSGBCMemberballotedandapprovedLEED
RatingSystems,aswellasCIRsapprovedbytheTechnicalAdvisoryGroups(TAGs). Fordetails
abouttheLEEDCertificationprocess,pleasevisitwww.usgbc.org/leed.
Formore informationon IDcredits,pleasedownloadtheGuidanceon Innovation inDesign
(ID)Creditshere:http://www.usgbc.org/Docs/LEEDdocs/IDcredit_guidance_final.pdf
U.S.GreenBuildingCouncil
LastupdatedMarch2008
http://www.usgbc.org/leedhttp://www.usgbc.org/Docs/LEEDdocs/IDcredit_guidance_final.pdfhttp://www.usgbc.org/Docs/LEEDdocs/IDcredit_guidance_final.pdfhttp://www.usgbc.org/leed -
7/27/2019 LEED Past ID Credits
2/32
Legend
CIR/ID Cat. RS CreditTitle A/DIntent Summaryo
submittedRequirements Summaryo
originallysSubmittals Summaryo
originallypRuling ForCIRs,th
maybeabbshouldrefepostedonlhttp://www
MSPageID=
Fordeniedruling. Intebrokenout
C
CreditTitleRatingSystemunderwhichtheIDcreditorCIRwasoriginallysubmittedNewConstruction(NC)ExisitingBuilding(EB)Core&Shell(CS)CommericalInterior(CI)
ExistingLEEDcreditcategory,ifany,thataddressesissuessimilartothoseintheproposedIDcreditorCIRSustainableSites(SS)WaterEfficiency(WE)Energy&Atmosphere(EA)Materials&Resources(MR)EnvironmentalQuality(EQ)
TypeofsubmittalInnovationinDesignCredit(ID)CreditInterpretationRequest(CIR)
IndicateswhetheranIDcreditwasawardedordeniedasoriginallysubmittedbytheprojectteam
-
7/27/2019 LEED Past ID Credits
3/32
CIR/ID CAT. RS CREDITTITLE A/DIntent Conserveresources,andintegratethebuildingandenvironment.
Requirements Significantlyreducetheuseofrawmaterialsandintegratesitefeatureswiththenatural
environment. Avoidthefabrication,transportationandconstructionimpactsbyusing
locallyrecoveredboulders;Usenativerawmaterialstosatisfystructuralsecurity
requirements.
Submittals Narrativedescribingdesignapproach
Photosofbuildingperimetersignificantlycoveredbyboulders
Intent Reducesitedisturbance.
Requirements Implement
a
tunnel
boring
strategy.Submittals Narrativeandcalculationsdemonstratingenvironmentalbenefitsandsignificanceof
tunnelboringversusextensivetrenching
Intent Preserveopenspaceandreducematerialsuse.
Requirements Preserveopenspacebylocatingabuildingontopofthecampuschilledwaterreservoir
tank.Sizethestoragetankwith30"thickconcretewallsandsteelsuperstructureto
supportthebuildingabove. Maintainorenhancepedestrianaccess.
Submittals
ID SS NC Integrated
Development
D Ruling ProposalforanIDcreditfortheproject'scollaborativedevelopmentwiththelocal
municipality. Theprojectprovidedcalculationsdemonstratingasiteareareductionof
60.4%asaresultofthiscollaboration. Whilethecollaborationoutlinedislaudable,itdoes
notrepresentaninnovativeapproachwithquantifiableenvironmentalbenefits.
Intent Reducearecognizedhazardandimproveoccupanthealth.
Requirements Demonstratethatneitherstate,norlocalbuildingcodesrequireradonmitigation. Perform
Radonmitigationmeasuresincludingsoildepressurization,buildingpressurizationand
sealingradonentryroutesintothebuilding. OutlineO&Mproceduresandguidelinesfor
measuringradonlevels.
Submittals TextfromEPA/625/R92/016:RadonPreventionintheDesignandConstructionofSchools
A
A
A
SITEDISTURBANCEREDUCTION
SITERESTORATIONANDREMEDIATION
CREDITDESCRIPTION
NCSS
NCSS
NCSS
RadonMitigationNC AID SS
ReduceSite
Disturbance
InnovativeSiting
ReduceSite
Disturbance
Tunneling
ID
ID
ID
andOtherLargeBuildings
Narrativedescribingmeasuresimplementedandtheeffectivenessofthesemeasures
Intent
Description Theprojectispursuinganinnovationcreditfordonating190acresofopenspaceupstream
oftheprojectsitetothelocalmunicipality,andprotectingthislandthroughaconservation
easementwiththealandtrustasavoluntarymeasureseparatefromrequiredwetland
mitigation. Whilenotphysicallyconnectedtothesite,thedocumentationdemonstrates
theconnectionbetweentheprojectsiteandtheopenspacearea,bothecologicallyand
financially.Thenarrativeexplainsthattheopenspaceareaispartoftheviewofthe
projectandthenearbytown,andisupstreamfromtheprojectintheassociated
watershed.
Submittals Narrativedescribingdonationandmitigationefforts
Descriptionofthenetenvironmentalbenefitsoftheopenspace,includingadetailed
explanationofvoluntarymitigationefforts
Intent
Requirements Demonstrateexceptionalperformanceregardingpreventionorreductionofcoastalwater
pollution.
Submittals SignedcertificateindicatingsuccessfulimplementationoftheCleanMarinasCalifornia
program,acomprehensivethirdpartyprogram
Intent
Requirements Remediatethefullparcelareaversuslimitingremediationeffortstotheimmediateproject
area.
Submittals Letterfromlocal,stateorfederalgovernmentagencyclassifyingasaBrownfieldsite
Copyoftheremediationreport
Narrativenotingdimensionsofsiteareainrelationtototalparcelsize
A
Donationand
ProtectionofOpen
Space
Brownfield
Remediationof
AdjacentNon
ProjectSite
CleanMarina
Program
NC
A
A
ID
ID NCSS
SS
SSID NC
U.S. Green Building Council Updated March 2008 1 of 30
-
7/27/2019 LEED Past ID Credits
4/32
CIR/ID CAT. RS CREDITTITLE A/D CREDITDESCRIPTIONIntent
Requirements Useprivatefundstorehabilitateapublicaccessiblegreenwayforrecreationalactivities
suchasbiking,jogging,androllerblading. Demonstrateacomprehensiveapproachto
rehabilitationincludingtheuseofnativevegetationandstormwaterbioswales.
Submittals Narrativedescribingdecisiontopreservethespaceandtherebyprovideunimpeded
publicaccesstotrails
Descriptionofrehabilitationeffortstoentireportionofcanalthatrunsthroughthe
campus(notjustportionadjacenttoprojectsite)andassociatedquantifiable
environmentalbenefits
Ruling Itistruethatmigratorybirdsarenotspecificallyaddressed,butseveralrelevant
statementsarecontainedintheReferenceGuide(formattedversionofJune2001,page
40),"Considertheimpactsoftheproposeddevelopmentonexistingnaturalandbuilt
systemsandproposemitigationstonegativeimpacts."Thisprojecthasobviously
consideredtheimpactsandhasproposedglazingtomitigatethenegativeeffects.Also,the
intentoftheSustainableSitesReducedSiteDisturbance(SSCredit5.1)statesunderthe
creditintent,"Conserveexistingnaturalareasandrestoredamagedareastoprovide
habitatandpromotediversity."TheDesignApproachsectionoftheReferenceGuide
states,"surveyexistingecosystems"andanecosystemisdefinedintheReferenceGuideas
"abasicunitofnaturethatincludesacommunityoforganismsandtheirnonliving
environmentlinkedbybiological,chemicalandphysicalprocess,"whichcertainlyincludes
theairabovetheland.
Theproject'sevaluationofthesite"airspace"inrelationtomigratingbirds,andthe
mitigatingeffectsofspecialglazingareconsideredeffortstoreducesitedisturbance,
whichshouldqualifyundertheexistingcredit.However,therequirementsandsubmittals
forthecreditareclearlyrelatedtotheLAND,andthereforearenotwrittentoacceptthe
additionalinformationprovided.Also,becauseoftheexistingrequirementsforthiscredit,
thisprojectisattempting"exceptionalperformanceaboverequirements"setbyLEED.
A
CIR SS NC
FAUNAPROTECTION
ID SS
MinimizeImpacton
AvianMigration
Canal
Rehabilitation
NC
Therefore,thisprojectshouldattemptaninnovationcreditbasedonexemplary
performance.
Requirements Allthedocumentationasstatedintheinquirymustbeprovidedwithspecialemphasison
professionalstudiesperformedshowing,1)impactsofdevelopmentonindigenouswildlife,
and2)environmentalbenefitstotheindigenouswildlifeoftheproposedmitigation. A
narrative
is
required
that
includes
the
intent,
requirements,
submittals
and
design
approachused.Foryourproject,supportingdocumentsshouldincludespecs,drawings
showingtheglazing,andcutsheetsforglazingthatclearlyindicatethemitigatingfeatures
ofdangertomigratingbirds.
Intent Mitigatehazardouswildlife/humancontactonsite.
Requirements Developandimplementacomprehensivewildlifemanagementprogram
Providetrashstorageareasthatare"animalproof"
Designlandscapetominimizeattractionofanimalsbyutilizingrecommended
noninvasive/nativeplantingsthatdonotattractlargemammals
Designentrybafflesystemstopreventanimalsfromaccessingonsitecommonareas
Submittals Narrativedescribingwildlife,frequencyofanimalencountersonsiteandinsurrounding
areas,andmeasurable/quantifiableenvironmentalbenefitsoftheprogram
Detaileddescriptionofimplementedmeasuresincludingwildlifeeducation,analysisof
wildlife
encounters,
plant
selection
to
discourage
wildlife
visitation,
analysis
of
wildlife
migrationcorridors
ID SS NC Habit atforUrban
Wildlife
D Ruling Theintentofthiscreditistoprovideahealthyandsafeurbanwildlifehabitatonthe
projectsite. Althoughtheproject'seffortstoaccommodateurbanwildlifeshouldbe
commended,aninnovationcreditcannotbeawarded. Sincethisprojectwasoriginallya
greenfieldsite,itisassumedthatthepredevelopmentconditionsweremoreconduciveto
supportingwildlifehabitat. Withoutanyquantifiabledatatocontradictthisassumption,
thiscreditcannotbeawarded.
SS NC WildlifeFriendly
Design
ID A
U.S. Green Building Council Updated March 2008 2 of 30
-
7/27/2019 LEED Past ID Credits
5/32
CIR/ID CAT. RS CREDITTITLE A/D CREDITDESCRIPTIONIntent Minimizeimpactonavianmigration.
Requirements Performresearchonriskstoriparianandmigratorybirds
Takemajoravianmigrationroutesintoaccountwhenchoosingnonreflectiveglazing.
Submittals Proven'birdfriendly'glassusedinbuildingbuiltinmajormigrationroute.
Intent Ensureproperprotectionofendangeredspecies.
Requirements Providebaselinedataandfiveyearsofpostconstructionmonitoringof
threatened/endangeredcommunitiesvulnerabletoimpactsassociatedwithproject
construction.
Submittals Copyofendangeredspeciessurvey,apostconstruction1yearmonitoringreport,
baselinemonitoringreport,andrareplantsurvey
Intent
Requirements Rescuenativeandadaptedplantspriortoconstructionandrelocateonsite.
Submittals Photoinventoryofexistingtrees
Detailedtreemitigationplanoutliningissuesandproposedsolutionsforrelocation
includinginventoryandsitingandcommunityinvolvement
Arboristinspectionreport
Summaryofprocess,costsandresults
Intent Conservenativeandadaptedspecies,enhancecommunityinvolvement.
Requirements Removenativeandadaptedplantspriortoconstructionandrelocatethemonsite. Utilize
acommunitybasedapproachwherevolunteerscollect,careforandreplantvegetation.
Notethatthiscreditisapprovedontheconditionthattheprojectisnotreceivingcreditfor
PlantRescueactivitiesunderMRc2:ResourceReuse.
Submittals Narrativedescribingplantrescueefforts
Photographsofrescue/relocationactivities
Intent
Requirements Save,stockpileandreplantthenativetreesandgroundcovernecessarilyremovedduring
A
A
A
SS NC
SS
SS
A
ANC
NC MinimizeImpacton
AvianMigration
Monitor
Threatened&
Endangered
Species
VegetationSalvage
PlantRescue
TreeRelocation
ID
ID
ID
ID
ID
FLORAPROTECTION
SS NC
NCSS
construction. Mulchlargertreesthatcannotbesavedanddistributeoverlandscaped
areasorusefortrailmaintenancebarriers.
Submittals Narrativedescribingmeasures
ID SS NC InnovativeTree
Preservation
D Ruling Theprojectusedapipeburstingtechniquetoinstallanewsewerline,inlieuoftheless
costlytraditionalexcavationandlayintechnique. Thebenefitwassaving4trees,including
twomatureginkgobilobatreesandtwomatureelmtrees.
Whilethepreservationofexistingtreesdoeshaveapositiveimpactontheenvironmental
andlocallandscape,projectsmustdemonstratesignificantenvironmentalachievementto
earnapointforinnovationanddesign. Retainingseveralmaturetreesonacampusduring
thecourseofabuildingrenovationandadditiondoesnotrepresentaninnovativedesign
strategyoracomprehensiveapproach.
Intent Rehabilitatelandscapepreviouslydominatedbyinvasivespecies,therebysupportinglocal
fauna,improvingthehealthofnativetreesandpreventingthefurtherspreadofnonnative
vegetation.
Requirements Demonstrateacomprehensiveplantoclearthesurroundingenvironmentofinvasive
exoticplantspecies.
Submittals Narrativedescribingstrategiestoremoveinvasiveplantspecies
Intent Implementaregenerativealternativetotypicalrecyclingascommercialcompost.
Requirements Utilizetherecycledsite'svegetativeconstructionwastefortherestorationofdisturbed
sitesandcreatingwildlifehabitatoffsite.
Submittals Photographs
Narrativedepictinghowlogsandrootwadsareusedtocreateshelteredfeedingpoolsby
changingwaterpatternsthatincreaseoxygencontentandhabitatforinsectsandlarvae
thatserveasprincipalfoodsourcesforyoungfrysalmon.
A
A
ClearingofInvasive
Species
ID RestorativeUseof
VegetativeWaste
NCSS
SS NC
ID
U.S. Green Building Council Updated March 2008 3 of 30
-
7/27/2019 LEED Past ID Credits
6/32
CIR/ID CAT. RS CREDITTITLE A/D CREDITDESCRIPTIONRuling Aninnovationpointwillbeawardedifbothcreditcomplianceoptionscanbesuccessfully
implementedanddocumentedindependentlyofeachother.
Intent Reducepollutionandlanddevelopmentimpactsfromautomobileuse.
Requirements AchievebothcomponentsofSSc4.3:ProvideAlternativefuelvehiclesfor3%ofbuilding
occupantsandprovidepreferredparkingforthesevehicles,ANDinstalledalternativefuel
refuelingstationsfor3%ofthetotalvehiclecapacityofthesite.
Submittals LEEDlettertemplateandproofofownershipof,or2yearleaseagreementfor,alternative
fuelvehiclesandcalculationsindicatingthealternativefuelvehicleswillserve3%of
buildingoccupants
Sitedrawingsofparkingplanhighlightingpreferredparkingforalternativefuelvehicles.
LEEDletterTemplatewithspecificationsandsitedrawingshighlightingalternativefuel
refuelingstations
Calculationsdemonstratingthatthesefacilitiesaccommodate3%ormoreofthetotal
vehicleparkingcapacity.
Intent Reducepollutionandlanddevelopmentimpactsfromautomobileuse.
Requirements AchievebothcomponentsofSSc4.3:ProvideAlternativefuelvehiclesfor3%ofbuilding
occupantsandprovidepreferredparkingforthesevehicles,ANDinstalledalternativefuel
refuelingstationsfor3%ofthetotalvehiclecapacityofthesite.
Submittals Aphotographofthealternativefuelrefuelingstation
Thetitleforanelectricvehicle
Siteplanshowingpreferredparkingforthevehicle.
Intent Reducepollutionandlanddevelopmentimpactsfromautomobileuse.
Requirements MakeahybridZipcaravailabletoemployeesforworkrelateduse
DesignatepreferredparkingforZipcarcarsharinguseonly
Submittals Narrativedescribingprogram
Zipcarpurchaseorder
Site lan indicatin dedicated Zi car arkin s ace ad acent to site and dedicated arkin
A
A
ALTERNATIVEFUEL
AlternativeFuel
Vehicleand
RefuelingStation
AlternativeFuel
Vehicles Zipcar
AlternativeFuel
Vehicles
NCSSCIR
NCSS
NCSS
ID
ID
spaceforZipcarcarsharinguseonly
ID SS NC Alternative
Transportation
OnlineTool(TRex
Tamer)
D Ruling Thistoolwaspartofaninnovationcreditachievedbyapreviousproject. Thetool
complementedachievementofothertransportationgoalsandhelpedaddress
transportationissuesgeneratedbyconstructionoftherestofthecampus. While
developmentofthetoolforthispurposewasinnovative,subsequentprojectssimply
"plugin"tothetoolanddonotnecessarilycontributetoitsdevelopment. Furthermore,
the
tool
is
meant
to
contribute
to
additional
trip
reduction
as
part
of
an
effective
achievementstrategyinSSc4credits. Ifthesestrategiesarenotinplace,thesignificanceof
thetoolisreduced. Thejustificationforachievementbythepreviousprojectdependedin
nosmallpartonthefactthatthetoolwentbeyondtherequirementsofSSc4.1 Inthis
case,theprojecthasnotmetthebasicrequirementsofSSc4.1norexceededthese
guidelines.
Intent
Requirements Conductatransportationstudyresultinginanextensionofaresidentialstreetintheform
ofathreemeterwidepedestrianandbicycletrailtothesite,inlieuofaCityrequirement
ofwideninganotherstreet,essentiallypreservingtheneighborhoodscaleandaddinga
positiveelementtotheneighborhood,ratherthanjustmakingabiggerstreet. Designthe
extensiontoincludeextrabikeracks,extendedbusroutes,communityinvolvement,new
mixedusezoningandrecreationalamenitiesonsite.
Submittals
TRANSPORTATIONMANAGEMENT
NCSS AID Sustainable
Transportation
Study
U.S. Green Building Council Updated March 2008 4 of 30
-
7/27/2019 LEED Past ID Credits
7/32
CIR/ID CAT. RS CREDITTITLE A/D CREDITDESCRIPTIONCIR SS NC Alternative
Transportation
ManagementPlan
Ruling
(excerpt)
Useoftheregionalcarpooldatabasecontributestowardexemplaryperformance,if
personalizedcarpoolmatchlistsareprovidedforallcurrentoccupants,aswellasfornew
occupants,andthe"guaranteedridehome"programisimplemented.Theprojectislikely
tobeawardedtheinnovationpointaslongas:
1. SSCredits4.1,4.2,and4.4areachieved
2. Thecommitmentrequirementslistedbelowaremet
3. Allcommitmentsareadequatelyandofficiallydocumented.
Thetransitsubsidizationprogramcancounttowardexemplaryperformanceinrelationto
SS
Credit
4.1,
Public
Transportation
access,
if
a
5
year
(or
longer)
agreement
has
been
signedandacopyoftheagreementissubmittedwiththeLEEDapplication.Transittrip
planningalsocountstowardexemplaryperformance.Statethenumberofemployeesthat
areinitiallyprovidedpersonalizedtripinformationanddocumentthepolicies/procedures
thatensurethesameservicefornewemployees.
Bikepurchasesubsidiesforbikecommuterscontributetowardexemplaryperformanceifa
commitmentforatleast5yearsor50bicycles(whichevercomesfirst)isshownviaLEED
applicationsubmittals.
Intent
Requirements DevelopaTransportationManagementPlanprovidingbuildingoccupantswithincentives
tocarpoolandusealternativetransportation.
Submittals AcompanylifetimeletterofcommitmenttotheTransportationManagementPlan Documentationofthepoliciesandproceduresofacomprehensiveplan
Calculationofnumberofemployeesparticipatingineachpartoftheplancomparedto
thetotalemployeebase
CIR SS NC Alternative
Transportation
Ruling Anapplicantwillbeawardedaninnovationpointforexemplaryperformanceinalternative
transportationbyinstitutingacomprehensivetransportationmanagementplan(or
AID SS Alternative
Transportation
ManagementPlan
NC
anagemen an programas escr e a ove ,prov e epro ec ac eves reeou o e our re
4subcredits,ANDisabletodemonstratethattherequirementsaremetandall
commitmentsareadequatelyandofficiallydocumented.
Intent Encourageuseofalternativetransportationthroughrewardincentives.
Requirements Documentacomprehensivetransportationplanalongwithachievementofaminimumof
threeSSc4baselinecredits.
Submittals Detailednarrativedescribingthetransportationmanagementprogram
IntentRequirements DocumentSSCredit3.1,3.2and3.3. Adequatelyandofficiallydocumentcommitment
requirementsasoutlinedintheCIR.
Submittals Regionalcarpooldatabasewithpersonalizedmatchlists;
Officialdocumentationforataleastafiveyearcommitmenttotheprograms;
Documentationforthenumberofemployeesthatareinitiallyprovidedpersonalizedtrip
information
Documentationofthepolicies/proceduresthatensurethesameservicefornew
employees.
Intent
Requirements AnalyzetheCO2emissionsgeneratedbyemployeeautomobilecommuting:comparethe
actualemployee/staffmileagetraveledtoaremodeledbuildingontheexistingsitevs.
severalproposedsitesfornewconstruction. ConvertmileagetoCO2emissions.
Usetheresultstodeterminethefinalprojectlocation.
Submittals CalculationsofCO2emissionsperlocationpossibilitiesandcomparisontoexistingsite
location
A
A
AID
NC
CI Transportation
managementplan
Alternative
Transportation
ManagementPlan
Employee
Reductionof
GreenhouseGas
Emissions
ID
ID
NCSS
SS
SS
U.S. Green Building Council Updated March 2008 5 of 30
-
7/27/2019 LEED Past ID Credits
8/32
CIR/ID CAT. RS CREDITTITLE A/D CREDITDESCRIPTIONIntent Reducefuelconsumption,trucktrafficattheproject,andNoxandparticulatepollution.
Requirements Utilizearailspurversusconventionaltrucktransportationformovingfreight. Provide
documentationwhichdemonstratestheenvironmentalbenefitsofthisstrategy.
Submittals Documentationofthe percentageofrailtripsversussimilartrucktripsgeneratedbythe
facility.
Narrativedescribinghowthesiteselectionprocessaddressedtransportationissuesand
describealternatesitesconsidered. T
Sitealternativesstudy,environmentalimpactofsiteselected,amountofavoided
Intent Reducepollutionandlanddevelopmentimpactsfromautomobileuse
Requirements Providestablespaceforasignificantnumberofemployeessavedbythisfacility.
Submittals Descriptionoffacilities
CalculationofFTEserved
Intent ReducecommutingandfacilitatethedisposalofobsoleteITtechnology.
Requirements Implementaworkfromhomepolicy
Submittals Detailedcalculationsofnumberofbuildingoccupantsworkingfromhomeandresulting
environmentalimpacts
Narrativedescribingtechnologyemployedtofacilitatethisprogram
Intent
Requirements Designandinstallaverticallandscapingsystemwhoseareaisatleast50%ofthebuilding
floorarea.
Submittals Narrativedescribingnativelandscapingselections,andthebenefitsofthescreenfor
migratingbirdspeciesandlocalinsects
Intent Reduceenvironmentalimpactsoflandscapeinstallationandmaintenance.
Requirements DevelopandimplementanExteriorSiteManagementPlan
In"LandscapeMaintenanceSpecifications"demonstrateproceduresandpoliciesfor
implementingexteriorIPMandxeriscapingincluding:
1.Applicationofpreemergentherbicides
A
A
A
A
LANDSCAPE/SITEMANAGEMENT
SS
SS
ID A
SSID
ID
NC
NC ExteriorSite
Management
WorkfromHome
Program
Alternative
Transportation
EquestrianFacility
Alternative
Transportation
Cargo
Vertical
landscaping
NC
NCSS
ID SS
ID
NC
.
use
3.LimitedandtargetspecificherbicideapplicationfollowingIPMprocedures
4.Applicationofslowreleasefertilizerbasedonsoilanalysis
5.Installationofcompostedmaterialandnaturalsurfactantinplantingbeds
6.Applicationofmycorrhizalfungiandbeneficialbacteriatohelprootgrowth
7.Organicfertilization
8.Pinestrawmulchapplications
9.
Mulching
and
composting
of
landscape
debris
In"SnowRemovalandIceControl"describesnowandiceremovalproceduresutilizing
riversandorpotassiumandmagnesiumchloridetractioncontrolproductsthatareless
damagingtoplantsthantypicalsodiumandcalciumchlorideproducts
Submittals DetailednarrativedescribingIPMprogram
Copyof"SnowRemovalandIceControlAgreement"
Intent Promotethedevelopmentofvegetatedroofsystems.
Requirements Installandcontinuouslymonitorstormwaterrunofffromanecoroofsystem
Utilizedataaspartoffacultycurriculumanduseforongoingeducationandresearch
Quantifybothstormwatervolumereductionsandrunoffwaterqualityfromaninstalled
ecoroofandcompareagainstdatafromtraditionalroofs
Submittals Detaileddescriptionofthemonitoringsystemconfiguration,monitoringoutput,
procedures Descriptionofadditionalmonitoringtomeasureenergyandthermalperformance
benefits
Narrativedescribingthelongtermquantifiableenvironmentalbenefitsotheinstalled
system
SS/
WE
NC EcoRoof
Monitoring
ID A
U.S. Green Building Council Updated March 2008 6 of 30
-
7/27/2019 LEED Past ID Credits
9/32
CIR/ID CAT. RS CREDITTITLE A/D CREDITDESCRIPTIONIntent
Requirements DevelopaOrganicLandscapingandPestManagementProgramthatutilizespestcontrol
use/riskreductionstrategiesthatareconsideredsaferthansyntheticchemicalcontrols
andeliminatesorreducestheuseofherbicidesandfertilizersandimplementingxeriscape
principles. IncludebothinteriorandexteriorIPM.
Submittals Detaileddescriptionofprogramincludingstrategiestoreducetheuseofpesticides,
herbicidesandfertilizers
Landscapeplanshowingxeriscapeprinciples
Plantlist
Specificationsandwarrantyforatermitecontrolsystem
Intent
Requirements Utilizeorganiclandscapepractices.
Submittals Listofappropriateorganicmethodsandproductsthatcanbeusedinlieuofstandard
chemicalapplicationsincludingapprovedandbannedlandscapeapplicationmaterials
CopyofLandscapeMaintenancecontractrequiringorganiclandscapepracticeswith
specificcontractualrequirements,specificlistofapprovedproductsandorganicstrategies
fortypicalmaintenanceofregionspecificissues
Intent Reducetoxicchemicaluse,enhancesoilhealth,reducehumanexposuretochemical
spraying.
Requirements Eliminatetheuseofallsyntheticfertilizer,toxicchemicalpesticidesandherbicides. Only
usenaturalorganicfertilizers,soilamendmentsandtreatments.
Submittals Programdescriptionandcontractorspecificationscitinguseoforganicproducts
Intent Promotepositivelandscapingmethodsandcreatearesourcetothecommunity.
Requirements Designandimplementacomprehensivecampusapproachtosustainablelandscapingand
documentthefollowingbenefits:
Providethecampuswithitsownrenewablesourceofnative&adaptiveplantingmaterial
tomeetcampuslandscapingneeds
A
A
A
A
ID
SS/
EQ
NC
NC
NC
ID Organiclandscape
management
Organic
Landscapingand
IPMProgram
ID
Organiclandscape
management
Sustainable
LandscapeProgram
NCSSID
SS
SS
Advocateandplanactionrelatedtothereductionofpotablewateruseforirrigation
Reducetransportationimpacts,environmentalfootprintsandcostsassociatedwith
acquiringplantmaterialfromexternalsources.
Providevalueandenvironmentalbenefittothecommunitythroughtreeplantingsand
nativeplantdonations
Submittals Narrativedescribingthesustainablelandscapingplan
Intent
Requirements Irrigateandmaintainapatchofpubliclandusingharvestedrainwater. Describetotalarea
oflandmaintained,addedvaluetotheneighboringcommunityanddemonstratethatthe
projectownerhasnoformalagreementwiththecitybutmaintainsthepubliclandbased
ongoodfaith.
Submittals Calculationoftotalareaoflandbeingmaintained
Narrativedescribingmaintenanceactivitiesincludingregularmowing,regularwatering,
andgraffitiremovalandassociatedcommunityandpedestrianbenefitsinaformerdrug
activityzone
Photographs
Intent Eliminatetheneedfordeicingchemicalsthatwouldotherwiseendupinthestormwater
system.
Requirements Designandincorporateanonpolluting,energyefficientsnowmeltingsystemthatutilizes
cityprovidedwastesteamtomeltsnowandreducetheneedforchemicalsorother
snowmeltingprocedures.
Submittals Narrativedescribingtheinstalledsystemandoperationoftheheatexchanger
A
A
PublicSpace
Maintenance
SnowMelting
System
ID
ID NC
NC
SS
SS
U.S. Green Building Council Updated March 2008 7 of 30
-
7/27/2019 LEED Past ID Credits
10/32
CIR/ID CAT. RS CREDITTITLE A/D CREDITDESCRIPTIONID SS NC TenantDesignand
Construction
Guidelines
D Ruling TheprojectteamhassubmittedanIDproposalforthedevelopmentofTenantDesign,
ConstructionandOccupancyGuidelinesforspacesthatarenotfullyfittedoutpriorto
certification. TheguidelinesprovidetenantswithcriteriaforcompliancewithLEEDNC
creditsthathavebeenpursuedbythebasebuildingandinitialtenantimprovement
spaces.
Projectswithpartialbuildoutoftenantspacespriortosubmittalmustprovidetenant
guidelinesinordertocomplywiththebasebuildingandbuildingcreditsubmittalsand
maintaintheintegrityoftheinitialLEEDstatus. Asthetenantguidelinesarerequired,a
separateIDcreditcannotbeawarded.
Ruling Aninnovationpointmaybeawardedfornonchemicalwatertreatment.
Intent Toreducechemicaland/orpotentiallyhazardousdischargesfromtheprojectsite.
Requirements Usechemicalfreewatertreatmenttechnologyinplaceofchemicaltreatmentinsiteor
building relatedsystemsandclearlydocumentthatthestrategyprovidesasignificant
environmentalbenefit.
Submittals Descriptionofthewatertreatmentsystemusedandadiagramofhowthesystemworks
including:
1. Theenvironmentalbenefitofthealternativesystemoveraconventionalsystem.
2. Thechemicalsandtheirquantitieseliminatedthroughtheuseofthisalternative
process.
3. Theamountoftreatedwaterdischargedordisposedofandinwhatquantitiesversus
non
treated
water4. Theamountofwastewatergenerated,theamountoftreatedversusnontreatedwater
Intent Toreducechemicaland/orpotentiallyhazardousdischargesfromtheprojectsite.
Requirements Installawatertreatmentsystemthatrequiresnochemicaltreatmentstomaintain100%
efficientoperation,andclearlydocumenttheenvironmentalbenefitsofthesystem,
includingamountofwastewatergenerated,theamountoftreatedversusnontreated
TENANTGUIDELINES
A
WATERTREATMENT
CIR NonChemical
WaterTreatment:
CIR
NonChemical
WaterTreatment
Pulsedpower
NCWE
NCWEID
water,thequantityandimpactofeachavoidedchemical.
Submittals Narrativeoutliningperformanceandenvironmentalbenefits
Manufacturerinformation
Comparativespreadsheetdetailingwaterandchemicaluseforthebasesystemcompared
tothedesignsystemusingabsolutevalues
Ruling PulsedpowerprocesswatertreatmentinHVACequipment,whileacontroversial
technology,mayqualifyforaninnovationcredit.
Intent Reducetheimpactofpotentiallyhazardouschemicaldischargestotheenvironmentby
eliminatingconventionalmeansofprocesswatertreatmentinHVACequipment. Reduce
amountofwaterconsumptionfromconventionalrecirculatingwatersystemssuchas
coolingtowers,hydronicHVACsystems,orprocesswatersystemsbydecreasingtheneed
formakeupwatercausedbyevaporationandsystemblowdown(orbleed).
Requirements Provideanintegralchemicalfreewatertreatmenttechnologyinplaceofconventional
watertreatmentwhichusespotentiallytoxicchemicalswhichmayalsoproducepotentially
hazardouschemicalbyproducts.
Submittals Aletterfromtheprojectengineerdescribingthechemicalfreewatertreatmentsystem
usedandhowthesystemworks
Narrativespecificallystatingtheenvironmentalbenefitsofusingthechemicalfree
processinplaceoftheconventionalchemicalwatertreatmentsystem,specificchemicals
andtheirestimatedquantitieseliminatedbysubstitutingthechemicalfreeprocess,and
themethodsandquantitiesofprocesswaterdischargeasanestimateofpotentialwater
savings.
Proofthatthe technologyworks:acopyofathirdpartyanalysis,lettersfromatleasttwo
ofthevendor'spreviousclientsthatconfirmthesuccessfuloperationofthisequipment.
ANonChemical
WaterTreatment
Pulsedpower
NCWECIR
U.S. Green Building Council Updated March 2008 8 of 30
-
7/27/2019 LEED Past ID Credits
11/32
CIR/ID CAT. RS CREDITTITLE A/D CREDITDESCRIPTIONIntent
Requirements Installachemicalfreewatertreatmentsystemforbuildingprocesswater.
Submittals Detailednarrativedescribingtheinstalledozonetreatmentsystem
Descriptionofthechemicalreductionsfromatypicalwatertreatmentsystemand
domesticwatersavings
Quantitativeanalysis
Ruling Itispossibletoachieveaninnovationcreditforreducingprocesswaterontheproject.In
ordertoachievethiscredit,awholebuildingapproachtoprocesswatermustbeused
(including
washing
machines,
dish
washers,
drinking
fountains,
cooling
towers,
etc.)
The
projectmustdemonstrateaprocesswatersavingsthatisequaltoorgreaterthan10%of
theregulatedwaterusageascalculatedinWEc3.Theprojectshouldobtaininformationon
theaverageamountofwateruseforeachtypeofequipmenttodetermineanappropriate
baselineanddemonstratethattheincreasedefficiencycomparedtothebaselineexceeds
the10%WEc3threshold.
Submittals 1. Narrativeexplainingwhatstrategieswereusedandhowthebaselinewasdeveloped.
2. Calculationsdemonstratingperformancecomparedtothebaseline.
3. Cutsheetsshowingwaterusageofequipmentused.
Intent
Requirements Demonstrateprocesswatersavingsequaltoorgreaterthan10%oftheregulatedwater
useascalculatedinWEc3.
Submittals
Intent Reducetheamountofwatersenttothesewersystem.
Requirements Divertprocesswatertoaheatexchangerforheatingandcoolingbypassingprocesswater
throughadoublewalledheatexchangerforheating/coolingbeforereturningtowater
treatmentloop.
Submittals Detaileddescriptionofcondensercoolingwaterloopforheatpumpsdesignedtoutilize
waterfromawatertreatmentprocesswatersupply
A
A
A
WATERREUSE/REDUCTION
NonChemical
WaterTreatment
Ozone
ProcessWater
Savings:CIR
ProcessWater
Savings
ProcessWater
Savings
ID WE NC
NCWEID
CIR WE NC
ID WE NC
Intent
Requirements Designandimplementinnovativesystemsandproceduresforcleaninganimalfacilities.
Submittals Detaileddescriptionofanimalfacilitycleaningsystemsandproceduresincludingawater
efficientdishandclotheswashersandatoiletfixturetoflushanimalwaste
Calculationofprocesswatersavingscomparedtoabaselinecase
Intent reducethepotablewaterconsumptionforprocessloadssuchasvehicle,golfcartand
equipmentwashes.Requirements Installawashwaterclarifier. Provideinformationonthepercentageandquantityofwater
reusedineachwashcycle.Providecalculationstodemonstratethatthewaterrecycledby
usingthissystemresultsinwatersavingsthatareequivalenttoatleast10%ofthetotal
annualbuildingwaterusageidentifiedinWEc3.
Submittals
Intent Reduceunregulatedkitchenwaterusageandreduceamountofhotwaterutilized.
Requirements Installprerinsesprayvalvesonallsprayrinsestations. Demonstrateaprocesswater
savingsthatisequaltoorgreaterthan10%oftheregulatedwaterusageascalculatedin
WEc3.
Submittals Narrativedescribingthevalves
Productcutsheet
Floorplanlocatingvalves
Calculations
A
A
AProcessWater
Savings
ReduceKitchen
Water
Consumption
NC
Processwater
savings Wash
WaterClarifier
ID WE
NC
ID WE NC
ID WE
U.S. Green Building Council Updated March 2008 9 of 30
-
7/27/2019 LEED Past ID Credits
12/32
CIR/ID CAT. RS CREDITTITLE A/D CREDITDESCRIPTIONIntent
Requirements Designadomestichotwatersystemtoprovidehotwateronlytoareaswithinthebuilding
thatrequireitforoperationalpurposes
Inareasthatrequirewater,butnothotwater,providepipingfornonheatedwater
Demonstrateacomprehensiveapproachtothedesignofadomestichotwatersystem
thatshowsquantifiablematerialsreductionandenvironmentalbenefits
Submittals Calculationsofmaterialsavingsandestimatedenergysavingsfromreducedhotwater
circulationandheatingdemand
Narrativewithdetaileddescriptionofhotwatersystemdesign
CIR EA NC PlugloadEnergy
Savings
Ruling PlugloadsarespecificallyexcludedfromEAc1,butitislikelythatacomprehensivestrategy
toaddressplugloadenergysavingswillwarrantaninnovationcreditIFenergysavings
equatetoatleast5%ofthetotalbuildingenergyload(thesameincrementallottedto
eachpointinEACredit1).
Intent
Requirements Demonstratesavingsequaltoatleast5%oftheregulatedbuildingenergybudgetusedin
EAc1withanonregulatedloadasdefinedinASHRAE90.11999.
Submittals
AdditionalInfo Examplesofprevioussubmittals:laboratoryload,refrigerationheatrecoverysystem,LCD
monitors
Intent
Requirements SignificantlyexceedcreditrequirementsofEAc1:OptimizeEnergyPerformance.
Submittals
ID EA NC IntegratedCentral
Plant
D Ruling Theprojectteamseekscreditforconnectingnonregulatedloadstothecentralplant
ratherthanusing"incrementalpackagedequipment". Thedocumentationdoesnot
establishthisequipmentasareasonabledesignalternative. Further,becausethecentral
plantisthemodeledbaselinecase,itseemsdoubtfulthatmeasuredandverifiable
documentationcouldbeprovidetosupportthisassertion.
Althoughcentralplantselectionhasanimpactonoverallenergyperformance,this
A
A
ENERGY
CONSERVATION
ID
NC
A
ID
DomesticHot
WaterReduction
ProcessEnergy
Savings
100%EnergyCost
budgetReduction
NC
EA
ID WE
EA NC
categoryofenergysavingsisnotrecognizedbytheLEEDsystem. Itisimpossibleforthe
USGBCtoevaluatetheappropriatenessorapplicabilityofthemanytheoreticalbaselines
towhichaprojectmightbecompared. Instead,theUSGBChasadoptedASHRAE90.1and
Title214whichmakespecificassumptionsaboutenergyperformancecomparedto
appropriatebaselinesinaformalizedway.
Intent Reduceenergyuseandlifecyclecosts;improveproductivity.
Requirements Useflatscreenmonitors,anonregulatedloadinASHRAE90.11999notcoveredinEAc1.
Submittals Productinformation Informationandcalculationsofenergysavingscomparedtototalbuildingenergy,
reducedHVACloadsassociatedwithofficewideimplementationofLCDmonitors,
productivityimprovementsandlifecyclebenefits
Intent Reduceenergyuse.
Requirements Installcarbonmonoxidesensorsandvariablespeedcontrolsingaragetooffsetcontinuous
fanenergy,anonregulatedloadinASHRAE90.11999notcoveredinEAc2
Submittals
Intent
Requirements Implementrefrigerationpowermonitoring,refrigerationsystemsimprovementsandhot
waterreclamationfromrefrigerationcompressorrackstoheatdomestichotwater,
refrigerantleakdetection,andfiberopticlightinginthewalkincooler. Includeaircooled
condenserswithvariablespeedcontrol,efficientcloseapproachcondenser,floating
suctionpressuretomaintainfixturetemperatureandhighefficiencyfanmotorsfordisplay
cases. Demonstratesavingsequaltoatleast5%oftheregulatedbuildingenergybudget
usedinEAc1.
Submittals ECBtableshowingenergysavingsassociatedwitheachmeasureaswellasthetotal
energysavingsamountasapercentageofregulatedload
A
A
ANC
EAID NC
ID EA NC
Processenergy
savings:
Refrigeration
ID EA
ProcessEnergy
Savings:LCD
Monitors
Nonregulated
EnergySavings:CO
monitorsand
VariableSpeed
U.S. Green Building Council Updated March 2008 10 of 30
-
7/27/2019 LEED Past ID Credits
13/32
CIR/ID CAT. RS CREDITTITLE A/D CREDITDESCRIPTIONIntent
Requirements Installbuildingelevatorswithinnovativetechnologythatdoesnotusehydraulicfluid,
eliminatingtheneedforamachineroomandreducingtheenergyrequired. Demonstrate
theassociatedreductionofenergyuse.
Submittals Calculationofenergysavingsassociatedwithelevatorchoice
Copyofproductinformationfromthemanufacturerincludingenvironmentalbenefits
ID EA NC Vari ableSpeed
DriveTech
D Ruling TheprojectteamseeksanIDcreditforutilizingvariablefrequencydrives(VFDs)toreduce
energyusage. Submitteddocumentationincludesanarrative,amemorandumfromthe
project's
HVAC
engineer
describing
energy
reductions
achieved
in
general
via
VFDs,
and
a
copyoftheproject'sspecificationsforVariableFrequencyControllers. Theconceptof
employingVFDsisagoodexampleofanenergysavingstrategy,althoughitrepresentsa
fairlycommonapproach. Further,thisstrategycontributestocreditsearnedbytheoverall
buildingunderEAc1. Sincetheproposedconceptisalreadycoveredunderanexisting
LEEDcredit,anIDcreditwillnotbeawarded.
Intent
Requirements RequiretenantstoinstallEnergyStarratingappliances.
Submittals Calculationsdemonstratingenergysavingsasapercentageofthetotalbuildingenergyuse,
bothregulatedandunregulated
Intent ProvidesignificantsavingsinheatingandchilledwaterandreduceCO2emissions.
Requirements Provide100%ofprojectneedswithacentralcogenerationfacility
Useheatfromthecogensystemforanabsorptionchillerthatistheprimarysourcefor
chilledwater
Submittals
Intent
Requirements Designandinstallanextensivelightingcontrolsystem. Demonstratesavingsequaltoat
least5%oftheregulatedbuildingenergybudgetusedinEAc1.
Submittals Calculationofenergysavingsassociatedwithlightingdesign
ID EA NC HVACChiller D Ruling Connecttoacentralchillerandhightemperaturewatersysteminlieuofindividual
A
A
A
ANCID
ID EA ProcessEnergy
Savings:Energy
Star
CogenerationPlant
ProcessEnergy
Savings:Lighting
Control
ProcessEnergy
Savings:Elevator
NC
NC
EA
EA
ID EA
ID
NC
System systemsdedicatedtothisbuilding. Thoughtheuseofacentralizedcooling/heatingsystem
isanoteworthyaccomplishment,itdoesnotconstituteaninnovationcredit.
Intent
Requirements Implementwaterandenergysavingstechnologywithatwofoldprocessrelatedutility
system. Treatproductwaterusingnanofiltrationtechnologyinplaceoffilteringmunicipal
waterusingareverseosmosisfiltrationprocess. Installamethanegasfueledboilerandan
anaerobicbioreactortotreatthewastewater. Usethemethanebiproductfromthe
anaerobicbioreactortofueltheboiler.
Submittals Narrativedescribingtheprocessrelatedutilitysystem
Intent
Requirements PurchaseEnergyStarcompliantofficeequipmentandcalculatetheassociated%energy
savingsandresultingcoolingsystemsdownsizingaccordingtotheanticipatedheatload
savings.Submittals Narrativedescribingpurchasingdecisions
Calculationofenergysavings
Copiesofpurchaseordersandpaymentinvoices
Intent
Requirements Demonstratea5%energysavingsfromEnergyStarcompliantappliancesbasedonthe
followingcalculation:
Compare:DesignCasebuildingenergyuse(regulatedloads)+energyusefromastandard
appliancepackage
To:
Design
Case
building
energy
use
(regulated
loads)
+
energy
use
from
the
installed
appliancepackage(includingEnergyStarandnonEnergyStarappliances)
Submittals
A
A
A
APPLIANCES
ID
ID EA
NC
ProcessSystems
Resource
Conservation
EnergyStar
Appliances
EnergyStar
Appliances
EA
ID EA NC
NC
U.S. Green Building Council Updated March 2008 11 of 30
-
7/27/2019 LEED Past ID Credits
14/32
CIR/ID CAT. RS CREDITTITLE A/D CREDITDESCRIPTIONIntent
Requirements Utilizeelectricalmaterialsthatarehalogenfreewithnotoxicity,flammability,CFCs,
pollutants,orcadmium
Submittals
Intent Spurinterestinthelocaldesignandbuildingcommunityforwaterlesstechnology.
Descriptions Earlyinthedesignprocess,theprojectteamfoundthatwaterlessurinalswerenotallowed
forinstallationinbuildingsduetoprohibitionsintheStateHealthCode.Throughmeetings
withapplicableregulatoryofficials,theprojectteamreceivedapprovaltoconducta
12monthtestofwaterlessurinalsinanexistinglibraryfacility.Asaresultofthistest
program,
the
project
team
was
able
to
effect
changes
in
the
health
code
to
allow
widespreaduseofwaterlessurinalsinthenewlibraryproject.
Submittals
Intent
Requirements
Submittals Manufacturerconfirmationofmercurycontent
Calculationsofmercurycontent
Intent
Requirements Commissionthebuildingenvelopeinadditiontoa"fairamountofattentionpaidtothe
shelldesignduringthedesignreviewprocess".
Submittals Narrativedescribingcommissioningprocessandissuesfound
Buildingshellconstructionchecklist
ID EA NC BuildingEnvelope
Commissioning
D Ruling Includingtheenvelopeinthesystemstobecommissionedontheprojectdoesnotwarrant
theawardofaninnovationcreditasthisisalreadycoveredinEAp1. Forsomebuilding
ownersandcommissioningproviders,buildingenvelopecommissioningisconsidered
standardpractice.
Intent Toimproveindoorairqualityforenhancedoccupantsafetyandcomfort.
Requiremetns DemonstratethatcommissioningandfullANSI/ASHRAE1101995testingperformedonall
fumehoodsintheprojectandtheimplementationofproceduresaboveandbeyond
conventional ractice.
A
A
ANC
NC
ID WE NC
A
A
COMMISSIONING
ID Commissioning
FumeHood
Commissioning
BuildingShell
HalogenFree
Electrical
Equipment
WaterlessUrinal
Demonstration
Process
LowMercury
Lighting
ID MR
ID EQ
NC
NCEA
EAID
Submittals LetterfromfumehoodCxagentstatingthatcommissioninghasbeenperformedper
ASHRAE100standards
Alistofallfumehoodsintheproject
Ruling Thefollowingproposalisacceptable.
Whilefumehoodcommissioningisnotaninnovativepractice(fumehoodsroutinely
receivesomeformoftestingduringT&Bsuchasfacevelocityandsmokevisualization),
ASHRAE110includesatracergascontainmenttestandisreasontoawardaninnovation
credit.Intent Ensurehealthandsafetyofemployees.
RequirementsDesignlaboratoriestoensurecontaminantsarecontainedandworkersareprotected.
ConductfumehoodcommissioningthatincludesASHRAE110MethodofTesting
PerformanceofLaboratoryFumeHoods(1995)onALLinstalledfumehoods.Thisisto
includeratingsforAsManufactured(AM)andAsInstalled(AI)asdefinedbelow.Scopeof
testingtoinclude6.1FlowVisualization,6.2FaceVelocityMeasurementsand7.0Tracer
GasTestProcedures.ThehoodperformanceratingfortheTracerGasTestprocedureshall
beatleast4.0AI0.1asspecifiedinASHRAE110.
Inadditiontotheabove,thefumehoodcommissioningwillincluderatingsforAs
Manufactured(AM)andAsInstalled(AI)asdefinedbelow.
"AsManufactured"(AM):conductedatthehoodmanufacturer'slocation,testonlythe
designofthehoodindependentofthelaboratoryenvironment.
"AsInstalled"(AI):conductedafterinstallation,testingandbalancing,butbefore
occupationbytheuser.Submittals ProvideLEEDLetterTemplate,signedbytheOwnerorIndependentCommissioningAgent
asappropriate,confirmingthattherequiredcommissioningtaskshavebeensuccessfully
executedorwillbeprovidedunderexistingcontract.Identifywherethefumehood
commissioningworkisspecifiedbyincludingthecommissioningdocumentnameand
relevantsectionnumber.SupplementalSubmittals:Provideareportthatdescribesthe
fumehoodcommissioningwork.
Commissioning
FumeHood
CIR NCEA
U.S. Green Building Council Updated March 2008 12 of 30
-
7/27/2019 LEED Past ID Credits
15/32
CIR/ID CAT. RS CREDITTITLE A/D CREDITDESCRIPTIONIntent Reduceoverallbuildingenergyconsumption
Requirements Implementanaggressiveschedulethatshowsmonthlydecommissioning. Providea
revisedenergymodelthataccountsforanalteredfumehoodoperationschedule
demonstratingthatsavingsfromtheheatrecoverysystemarereducedasaresultoffewer
operatinghoursandairflowandsavingsassociatedwithcooling,heatingandfans
increased.
Submittals Decommissioningschedule
CalculationofEstimatedannualenergysavingsfromdecommissioning
Intent Demonstrateacomprehensivegreenhouseemissionreductionstrategythatrepresents
significantenvironmentalandoccupantbenefit.
Requirements Purchaserenewablecertificates tooffsetautomobileCO2emissions,includingall
combustiontypeequipment.
Submittals
ID EA NC ClimateNeutral
Carpeting
D Ruling Theprojecthasspecifiedandinstalledaclimateneutralcarpetformorethan75%ofthe
floorareaofthenewbuilding. Documentationcertifiesthat100%oftheeCO2associated
withtheproductionofthiscarpethasbeenoffsetbythepurchaseofcarbonoffsets. The
purchasehasresultedinaCO2offsetof35tons.
InordertobeapplicableforanIDpoint,aprojectmustsetanappropriatethresholdan
providedocumentationshowingcomprehensive,wholebuildingapproachforemissions
offsets. SelectionofoneproductdoesnotinanditselfqualifyforanIDpoint.
ID EA N C Climate
Neutral
FacilityD Ruling The
project
team
proposes
an
ID
credit
for
a
climate
neutral
building.
At
this
time,
USGBC
isunabletodevelopaconsensusonwhetheritisappropriatetousestateaverageCO2
emissionsnumbersversusinterstate/gridaverageemissionsnumberswhencalculating
baselineCOsemissions. Duetotheuncertaintysurroundingtheissue,theEATAGcannot
supportawardofthisIDcredit. Severalissuesneedtobeaddressedtofurtherthis
discussion:
1. The ublic buildin and CO2 reductions renewables elements should disa re ated
A
A
CO2EMISSIONSREDUCTION
Decommissioning
FumeHood
NC
CarbonOffsetNCEAID
EAID
2. TheTRCcontractonlygivestwoyearsofCO2reduction. Theassociatedenvironmental
benefitsshouldbespreadoveralonger,relevantperiod(e.g.20years)ifnobinding
commitmenttolongtermpurchaseofgreenpowerexists.
3. SomeoftheenvironmentalattributesassociatedwiththisIDcreditmaybe
doublecountedintheawardofthegreenpowercredit.
Intent
Requirements Trackofficeelectricity,naturalgas,refrigerantleakage,employeecommutingandbusiness
travel,andoffsetwithRenewableenergyCredits(RECs)forGreenecertifiedrenewable
ower.Submittals EPAClimateLeaderForm
NarrativedescribingmethodologyforGreenhouseGasInventoryProcess
Ruling ThefollowingsubmittalmaywarrantanIDcredit
Intent Encouragethedevelopmentanduseofenergytechnologiesonanetzeropollutionbasis.
Requirements Engageinatwoyearcontracttopurchasecarbonoffsetsfornaturalgasuse,fueloil,or
onsitecoalburningsystems. Calculatetheamountofgreenhouseoffsetthatwouldbe
achievedbyyourprojectifyoufollowedthegreenpowercreditrequirements,and
demonstratethatyourgreentagstrategyachievesthesameresultwithrespectto
greenhouseimpacts.
Submittals AcopyoftheGreenecertifiedtwoyearoffsetpurchasecontract..
Calculation
showing
anticipated
greenhouse
offset
A
ANCEA CarbonOffset:CIR
CI CarbonNeutral
Office
ID EA
CIR
U.S. Green Building Council Updated March 2008 13 of 30
-
7/27/2019 LEED Past ID Credits
16/32
CIR/ID CAT. RS CREDITTITLE A/D CREDITDESCRIPTIONID EA NC Carbon
Sequestration
D Ruling Theownerhassetaside41acresofforestlandtooffset1%ofCO2emissionsfromenergy
usedattheconferencecenter. Theforestareaselectedwassizedbasedonannualenergy
consumption. Themassofcarbonestimatedtobesequesteredis36,278lb/yr,basedon
annualabsorptionrateof100g/m2/yr. Thecapacityoftheforestwouldallowitto
sequesterthatamountannuallyfor200years.
Thethresholdofsequestering1%ofcarbonemissionswasbaseduponthecostof
achievingEAc6. CostcomparisonsbetweencreditsarenottypicallysuitablecriteriaforID
creditthresholds. However,restoringdegradedforeststoincreaseregionalandglobal
carbon
sinks
is
an
environmentally
positive
strategy
and
the
extent
of
land
is
significant.
Whileanyeffortundertakentooffsetemissionsassociatedwithbuildingoperationsis
laudable,a1%offsetdoesnotrepresentasignificantthreshold. Pastprecedenthas
determinedthatanoffsetofgreaterthan15%mayearnaLEEDIDcredit.
Intent ReduceCO2emissionsassociatedwithenergyuse;utilizeindustrialbyproductsforsource
energy;reducelifecycleimpactassociatedwithshortertransmissiondistancesforutilities.
Requirements SelectaprojectsiteforitsproximitytothenearbyCMSelectricitygeneratingfacilitythat
usesacombinationofwastegasesfromanonsiteblastfurnaceandnaturalgas,using
cleanerenergyandreducingdependenceonlongdistancetransmissionlines. Linkneeds
andwasteswithinanindustrialzoneandoutlinetheassociatedenvironmentalbenefits.
SubmittalsID EA NC GlassIntegrated
Photovoltaics
D Ruling Theprojectteamseeksaninnovationcreditforinstallingbuildingintegratedphotovoltaic
technologyinthesouthfacingatriumcurtainwall. Sincethissystem'sprovisionsfor
shading,views,daylighting,andrenewableenergygenerationcontributetoearningpoints
underEAc1,EAc2,andEQc8,aninnovationpointwillnotbeawarded. AsstatedbytheID
guidancepublishedontheUSGBCwebsite,"Innovationcreditsarenotawardedfortheuse
A
RENEWABLE/ALTERNATIVEENERGY
SS/
EA
ID NC IndustrialEcology
Approach
existingLEEDcredit."
ID EA NC BIPVandCavity
WallSystem
D Ruling BuildingIntegratedPhotovoltaicsystemthatwasinstalledasacomponentoftheglass
curtainwall. Theprojectshouldbecommendedforutilizingopportunitiesfor
incorporatingrenewableenergytechnologiesintotheproject. However,BIPVsystemsare
alreadyrecognizedandcontributetowardspointsunderEAc1andEAc2.
ID EA NC EmergencyBackup
GeneratorwithBio
Diesel
D Ruling Theprojecthasinstalledanemergencybackupgeneratoronsiteandstatesthatitwill
operateusingbiodieselfuel. Theprojectteamhasprovidedadditionalinformation
regarding
the
frequency
of
generator
testing
as
well
as
a
plan
to
phase
in
the
use
of
biodieselfortwoadditionalgeneratorsattheHondacampus. However,no
documentationisprovidedregardingatwoyearpurchaseagreementasrequestedinthe
preliminaryreview. Theprovideddocumentationdoesnotdemonstrateacommitment,or
ensurethatbiodieselwillbeusedatthisinstallationforatleasttwoyearsasrequiredby
precedent.
ID MR NC Historic
Preservation
D Ruling Althoughtheprojectmayprovideanexcellentexampleoftheintegrationofbuildingreuse
andcontemporarygreenbuildingstandards,themeasuresdonotinthemselvesor
combinedcontributetosignificantenvironmentalbenefitsnorextraordinarysavingsnot
alreadyrecognizedinotherLEEDcategories(MRc1).
ID MR NC AdaptiveReuse D Ruling ThedeveloperworkedwiththeCityandStateHistoricPreservationCommissionsto
reestablishwindowglazingstandardsthatmeetenergyefficiencyminimumswhilealso
maintaininghistoricrelevancetothestructure. Thedeveloperwasabletoestablisha
low
E
glass
suitable
for
historic
projects.
The
USGBC
recognizes
that
the
process
of
working
withlocalandstatehistoricalreviewboardscanbechallengingandthereisoftentension
betweenretainingwindowsthatarehistoricallyaccurateandtheneedtoprovideabetter,
moreenergyefficientwindow. However,havinglowEwindowsapprovedforthisspecific
projectwillnotnecessarilymakeiteasierforotherprojectstogetsimilarapprovals. Credit
denied.
HISTORICPRESERVATION/ADAPTIVEREUSE
U.S. Green Building Council Updated March 2008 14 of 30
-
7/27/2019 LEED Past ID Credits
17/32
CIR/ID CAT. RS CREDITTITLE A/D CREDITDESCRIPTIONIntent Extendtheusefullifeofanexistingbuildingandreduceconstructionwaste.
Requirements Moveanexistingbuildingfromthesiteratherthandemolishitinthecourseofthisproject.
Submittals
Intent Extendtheusefullifeandmaintainthehistoricvalueofanexistingbuildingandreduce
constructionwaste.
Requirements Relocateahistoricbuildingevenifnotrequiredbycode.
Submittals Aletterfromtheconstructionmanagerstatingthatthebuildingrelocationwasnot
performedduetocoderequirement
Narrative,photographsandamapdocumentingtherelocation
Intent
Requirements Implementarecyclingprogramthatallowsbuildingoccupantstorecyclecompost,cassette
tapes,computerdisks,eyeglasses,batteries,licenseplates,Styrofoampackingandother
timesnotincludedintheMRprerequisite. Provideallemployeeswithaguidebookon
wastereduction,reuse,recyclingandcomposting. Clearlymarkrecyclingbins.
Submittals Contractorletterofagreementwiththerecyclingcompany/letteroutliningtherecycling
programandcompany'scommitmenttoit
Calculationofpercentofmaterialcostorweight,notincludingitemsfromtheMR
prerequisite
CIR NC ExemplaryWaste
ReductionProgram
Ruling Theintentofinstitutinganexemplarywastereductionprogramisgood,buttheproposed
requirementisnotsufficienttomeasureperformance.InordertoachieveanInnovation
Credit,theprojectneedstoshowsubstantialandmeasurableenvironmentalbenefit.The
projectwillneedtopresentacomprehensiveapproachandbenchmarkperformance
againstarelevantstandardorinstitutionalizedprogram.Previously,projectshaveachieved
aninnovationcreditbycalculatingtheamountofmaterialrecyclingachievedbyMRp1and
thencalculatingthepercentimprovementoverthatrecyclingratetheyachievedby
recycling/reusingadditionalmaterials.
A
WASTEMANAGEMENT RECYCLE/REUSE/SALVAGE
A
A
NC
BuildingRelocation
Historic
BuildingRelocation
OccupantRecycling
NC
ID
ID MR NC
ID
MR/
SS
MR/
SS
ntent
Requirements Implementthreestrategiestolimittheamountofconstruction,decreasetheamountof
materialsused,andtoensurethatmaterialscouldbeeasilydeconstructedforreuse
and/orrecylingattheendoflife:
1. Reducebuildingsquarefootagebyaddressingprogrammaticrequirementswithexterior
spacesinsteadofinteriorrooms.Quantifyenergyandmaterialsconservationtoshowthe
environmentalbenefitofdecreasingtheamountofconditionedspace.
2. Reducematerialsbyleavingstructuralsystemsexposed,eliminatingflooringover
concrete
slabs
and
eliminating
ceiling
tiles
from
much
of
the
building.
3. Selectrecyclablematerialsforbuildingconstruction;leavejointsexposedinorderto
facilitatefuturedeconstruction,reuseandrecycling.
Submittals Calculationofenergysavingsandmaterialsconservationsasaresultofdecreasingthe
amountofconditionedspace
ID MR NC LocalDisposalof
ExcavatedSoiland
Rock
D Ruling Aninnovationcredithasbeensubmittedforthelocaldisposalofexcavationwaste. A
narrativewithcalculationsofvehiclemilesreducedasaresultoflocaldisposalwas
included. Whileitiscommendabletoreducetheamountoftransportationassociatedwith
disposalofmaterials,soilandbedrockareexcludedfromMRc2sincestandardearthwork
andexcavationpracticestypicallyreusethematerialonsiteortransporttoothersites.
Duetotheweightandvolumeofsoilandbedrock,itisrarelydisposedofinlandfills. An
innovationcreditcannotbeawardedsincethisisnotallowedunderexistingLEEDcredit
MRc2.1andMRc2.2
ater a s
minimization/
recyclability
U.S. Green Building Council Updated March 2008 15 of 30
-
7/27/2019 LEED Past ID Credits
18/32
CIR/ID CAT. RS CREDITTITLE A/D CREDITDESCRIPTIONCIR MR NC Comprehensive
RecyclingProgram
Ruling InadditiontothedoublingofthePrerequisite1minimummaterialsbenchmark(byweight,
volumeorrecyclingrate),anoverallcampuswiderecyclingrateof40%mustbeachieved
inordertoqualifyforthepoint(40%istakenfromLEEDEBMRc5).Landscapewastemust
notbefactoredintothevolumeofwastecollected,asitisstandardpractice(andoften
regulated)tocompostlandscapingwasteinsteadofsendingittolandfill.Allregulated
wastesmustalsobeexcluded.
Theprojectmustdemonstratethatacomprehensiverecyclingprogramisinplaceatthe
campus.Documentationmightincludecopiesofthewastestreamaudits,aswellasthe
waste
reduction
policy
implemented
on
campus
to
reduce
waste
stream
through
source
reductionpurchasingstrategies,collectionequipment,andrecyclingeducationfor
studentsandstaff.
Intent
Requirements Provideeachemployeewith2insulated,washablemugsforuseintheoffice. Replacesoft
drinkmachinesthatdispensecannedbeverageswithafountaindrinkdispenser.
Submittals CalculationbasedonFTEoccupantsofthelbsofwaste/persondivertedannually
Intent
Requirements Developabaselineforoperationalwastereductionbasedonthematerialsincludedinthe
requirementsforMRp1andcalculatetheadditionalamountofreuse/recyclingbasedon
additionalmaterialsincludedinthecampusrecyclingprogram.
Submittals
ID MR NC OnsiteMaterial
Miningand
Production
D Ruling Thenarrativedescribestheonsiteaggregatebaserockproductionwhichwascreated
fromtheexistingriverstonelocatedinthesite'swaterqualitypond. Whileitisgood
buildingpracticetoreusematerialsonsite,reprocessedrockisnotconsideredan
innovativetechnology. ThisisconsistentwiththeMRc23/4/2004CIR. However,this
materialcanbeincludedunderMRc5calculations,countingitasaggregatethatisboth
locallyharvestedandmanufactured.
Intent Reducewastestream.
Requirements ImplementaWasteManagementMasterPlanandcomprehensiverecyclingprogram.
A
A
A
WasteReduction
WasteReduction,
Operations
NC Waste
Management
ID
ID
ID
MR
MR
MR NC
NC
DoubletheMRp1minimummaterialsbenchmarkbyweight,volumeorrecyclingrateAND
achieveacampuswiderecyclingrateof40%. Donotincludelandscapeorregulatedwaste
inwastevolumecalculations.
Submittals NarrativedescribingtheWasteManagementMasterPlanandrecyclingeffortsonthe
campus
Copyofwastestreamaudit
Copyofthewastereductionpolicyaddressingsourcereductionpurchasingstrategies,
collectionequipment,staffandstudentrecyclingeducationefforts
Intent
Requirements Developaprogramwheresurplusitemsfromvariousconstructionprojectsthattheowner
buildsarecollectedandputtouseinfutureprojects. Materialssalvagedandreusedto
includecaulkandsealants,adhesives,miscellaneousplywoodandlumber,paintsand
lacquers,roofingmaterialsandfasteners.
Submittals Narrativedescribingprogram
RepresentativeInventorylist
Intent Reducetheamountofmaterialfromtheformerlocationgoingtolandfill.
Requirements Implementawastemanagementplanforexistingofficespacematerialandoffice
equipmentrecyclingprogram. Demonstratethe"quantifiableenvironmentalbenefits.
Submittals
A
AOfficeSpace
Materialand
Equipment
RecyclingProgram
ResourceReuse
Program
CI
MasterPlan
ID
ID NC
MR
MR
U.S. Green Building Council Updated March 2008 16 of 30
-
7/27/2019 LEED Past ID Credits
19/32
CIR/ID CAT. RS CREDITTITLE A/D CREDITDESCRIPTIONIntent
Requirements Clearlydefineanddemonstratescope,quantifiableenvironmentalbenefits,and
comprehensiveprogrammingandrequirementsforongoingapplication.
Submittals Narrativedescribingpreconsumerfoodwastecompostingprocess,associatedsignage,
facilityconstructionandoperation,andeconomicandeducationalopportunities
Calculationsofspecifictonnageofmaterialdivertedfromlandfillasaresultofthe
compostingfacility
CopyofprojectapplicationforOutstandingSchoolProgramAwardforrecyclingprogram,
including
food
waste.
Photographsofcompostfacilityconstructionandoperation
Intent Reducetheamountoforganicwasteanddiscardedfood.
Requirements ImplementaFoodWasteReductionProgram.
Submittals Narrativedescribingfoodwastereductionprogramandquantifiablefoodwaste
reductions
Intent
Requirements Implementaninhousegreenprogramfeaturingcomposting,leftoverfooddonationsand
customerrecyclingareas. Demonstraterecyclingratesof25%oftotalmaterialsbeyond
NCMRp1.
Submittals
CIR MR NC ClimateNeutral
Materials/
Products
Ruling Inordertoachieveaninnovationcredit,theprojectmustadoptacomprehensiveapproach
toGreenHouseGasreduction.Additionally,anappropriateperformancethresholdshould
beproposedtomeasurethesuccessofthecredit.Apossibleapproachwouldbeto:
1. DeterminetheGreenHouseGas(GHG)impactofthebuildingorfirm,AND
2. UseClimateNeutralproductsforaminimumof1%ofthetotalbuildingmaterialsbased
oncost.
MATERIALSELECTION
NCMR
MR
A
A
AMR
ID
ID
NC
ID
ORGANICWASTE
FoodComposting
Facility
FoodWaste
Reduction
CI Recyclingand
Composting
Program
Intent Reduceinstallerandoccupantexposuretoodorous,potentiallyirritatingand/orharmful
aircontaminantsfromindustrialmaintenancecoatings.
Requirements UselowVOCindustrialmaintenancecoatingsthatmeetorexceedtheSouthCoastAir
ManagementDistrictRule113. Demonstrateextensiveuseoftheseproducts.
Submittals Lettersignedbythearchitectstatingthatallinteriorindustrialmaintenancecoatings
addressedbytheSCAMDCRule113meettheVOClimitsofthisstandard
CopyoftheSCAMDCVOClimits
Product
information
stating
VOC
content Verificationthattheuseoftheseproductsisnotacoderequirementandnot
industrystandardpractice
Calculationsshowingthattheseinteriorcoatingswereappliedtoasignificant%ofthe
interiorsurfacescomparedtotheircoatings
ListofallexteriorcoatingsshowingtheirVOCperformanceandtherelative%ofsurfaces
coveredbytheselowVOCproducts
ID NC OpenPlanOffice
Design
D Ruling Openplanning,sharedfilingandmodularfurniturearecommoninthecurrent
marketplaceadonotconstituteaninnovation. Raisedaccessfloorsdonotincludeunder
floorairdistributionwhichwouldreducetheamountofconstructioninvolvedwith
rearrangingductworkduringspacereconfiguration. Raisedaccessfloorswhichprovide
flexibilityforcablingneedsonlydonotqualify.
Intent Reducetheimpactofthebuilding.
Requirements Identifyopportunitiestoreducetheneedforbuiltspaceincludingsharedfacilitiesand
betterlocation.
Submittals Narrativedescribingspecificmeasuresthatleadtoareductioninbuiltareaandspecific
environmentaladvantagesofthereduction
A
A
MATERIALUSEREDUCTION
Building
Downsizing
LowVOCMaterials
Maintenance
Coatings
NCID MR
NCEQID
U.S. Green Building Council Updated March 2008 17 of 30
-
7/27/2019 LEED Past ID Credits
20/32
CIR/ID CAT. RS CREDITTITLE A/D CREDITDESCRIPTIONID EQ NC UnderfloorAir
DistributionSystem
D Ruling Astheprojectindicates,underfloorairdistributionsystemscontributetoenvironmental
performanceinanumberofcategories,includingenergyefficiency,increasedventilation
effectiveness,andimprovedindividualcontrolandcomfort.Alloftheseadvantagesare
recognizedwithintheLEEDcreditstructure.Toachieveaninnovationcreditforameasure
alreadyrecognizedbyLEED,itisnecessarytodemonstratethattheprojectachieved
environmentalperformancesignificantlybeyondtheachievementalreadyaddressedby
theexistingcreditstructure.InthecaseofLEEDVersion2.0,underfloorventilationsystems
factorintoatleastthreeexistingcreditcategories,includingtheenergyperformance
categoryrepresenting10points.Theprojecthasnotdemonstratedanachievement
substantially
beyond
those
already
recognized
by
LEED
for
underfloor
distribution
systems.
Also,thesesystemsarebecomingmoreandmorecommon. Althoughtheprojectclearly
wenttosomelengthtocarefullyevaluatethissystembeforeadoptingit,theuseofan
underfloorsystemdoesnotinitselfrepresentaninnovation.
Ruling The20%benchmarkforwoodusereductionisappropriateforthebuildingtype.Itis
importanttoestablishabaselineagainstwhichthereductionismeasured.
Intent Minimizethetotalquantityofnewwoodusedinwoodframedbuildings.
Requirements Implementwoodefficientdesign,detailing,specification,constructionpracticesand
verification
ID MR NC ProgramReduction D Ruling Developingasmaller,moreefficientbuildingdoesnotmeritaLEEDinnovationcredit. This
isastandardgoalinthearchitecturalprogrammingstage. Creditdenied.
ID MR NC LessMaterialsin
Lab
D Ruling Reducingtheuseofsomefinishmaterialsisnotadesigninnovationinandofitself. Sucha
strategymustbepartofacomprehensive,buildingwidedesignefforttominimizematerial
use,andmustdemonstratethattheresultsofthiseffortweresignificantrelativetooverall
materialsuse. ForaLEEDinnovationcredit,itisnecessarytoclearlyidentifymeasurable
goalsandachievementrequirementswithrespecttomaterialsuse,thenprovide
documentationthatthesegoalshavebeenachieved.
ID MR NC Adaptability D Ruling Basedonthedocumentationprovided,theapplicanthasnotaddressedtheenvironmental
MR NC WoodUse
Reduction
CIR
.
reducestheneedforrelocationandrenovation,butdoesnotquantifyorclearly
demonstratethatsignificantenvironmentalbenefitsareachieved.
ID MR NC InteriorFinish
MaterialReduction
D Ruling Eliminateinteriorelementsthroughreductionofflooring,ceilingandwallmaterial. Use
structureasfinishandleavemasonryandconcretesurfacesexposed. Establishabuilding
baselineandcomparetothedesigncase.
The
baseline
used
does
not
take
into
consideration
all
materials
incorporated
in
the
buildingbutratherfocusesonspecificarchitecturalelements.
ID M R NC Expos edStructure D Ruling Theintentofthiscreditistodesignastructuralframingsystemthatminimizestheuseof
materials,decreasestheoverallmaterialandexposesstructuralcomponents. Reducing
theamountofmaterialusedisanimportantstrategyingreenbuilding. However,the
practiceoftyingthesteelandconcretetogetherintoacompositesystemtoreducethe
amountofsteelrequiredisjustgoodstructuraldesignpractice. A5%decreaseintotal
steelusedoesnotconstituteaninnovation. ToqualifyforanIDcreditforreducing
buildingmaterialusage,previousprojectshavedemonstratedsignificantlylarger
reductionsintotalbuildingmaterials,implementingcomprehensive,innovativestrategies
suchastensilestructuresthatreducedtotalbuildingvolumeaswellastotalbuilding
materialscomparedtoconventionalstructuralsystems.
CIR CI Strategicspace
planning
Ruling Theapplicantisproposinganinnovationanddesignprocesscreditforstrategic
architectural
and
furniture
product
choices
and
future
scenarios
planning
which
will
maximizeadaptabilityovertimeandminimizewastecausedbyheavychurnrates;an
interiorinfrastructurethatwillremainconstantover23floors,amongvariouslinesof
business,andovertimefortheproject.Thisinfrastructureconsistsofazonedspaceplan,
modularityofallproducts,systemsandmaterials,moveablewalls,limitedhard
construction,andasystemsandloosefurniture"kitofparts".Whilethisstrategicspace
planninghasclearadvantages,itissimplygoodfacilitiesmanagementpracticeforatenant
suchasthiswherechurnisinevitable.Theproposedstrategydoesnotwarrantthe
awardofaninnovationcredit.
U.S. Green Building Council Updated March 2008 18 of 30
-
7/27/2019 LEED Past ID Credits
21/32
CIR/ID CAT. RS CREDITTITLE A/D CREDITDESCRIPTIONIntent
Requirements Demonstratequantifiablesavingsassociatedwithadvancedframingsystemsincluding
centerframingof24"andopenwoodtrusses.
Submittals Narrativeoutliningbasecasecomparedtodesigncase
Lumbarpurchaseinvoices
ID MR NC FlexibleInterior
Design
D Ruling TheprojectutilizedaSMEDdemountablewallsysteminlieuofpainteddrywallandmetal
partitions. Thecalculationsdoenottakeintoaccounttheembodiedenergyoranyofthe
otherenvironmentalimpactindicatorsofafullLCAofthedemountablepartitions'
manufacture,useordisposal. Inotherwords,nobenchmarkcasehasbeenestablished.
Typically,
such
a
"one
product"
approach
does
not
constitute
innovation
Intent Reduceenvironmentalimpactsassociatedwithstructuralmaterialmanufacturingand
transportation.
Requirements Implementacomprehensivedesignapproachtodevelopa"diagrid"diagonalstructural
systemandreducerequiredrawmaterials whilemaintainingstructuralintegrity.
Submittals Detailednarrativedescribingstructuralsystemandthedesignapproach
Calculationsofmaterialsusereductionsbyweightcomparedtoconventionalsteel
momentframestructureofthesamesizeandconfiguration
Intent Reducetheuseofaveryhighembodiedenergymaterial.
Requirements Useawasteproduct,flyash,toreplacePortlandcement. Providecylindertesting
demonstratingtheeffectivenessofthesubstitution.
Ruling FlyashmustREPLACEcementcontent,notjustbeaddedasafiller. TheCreditRuling
Committeehassuggestedthatathresholdof40%REPLACEMENTofcementwithflyash.
Regardlessofthepercentused,flyashcontentwouldcounttowardMRCredit4;Recycled
ContentMaterials.
Intent DiminishthelifecycleCO2emissionsassociatedwithsitecastconcretebyreplacinglarge
quantitiesPortlandcementwithflyash.
AdvancedFraming
Systems
MR
MR
ID NC
A
A
MR
CIR MR BlendedCement
Flyash:
NC
A
BLENDEDCEMENT
EfficientUseof
StructuralMaterial
BlendedCement
Flyash
ID
NC
NC
ID
Ruling AninnovationpointwillbeawardedforreducingtotalPortlandcementcontentof
castinplaceconcrete.
Intent Aminimumof40%reductionofCO2byweightforallcastinplaceconcretemustbe
demonstratedagainststandardbaselinemixes.
Demonstratethatcastinplaceconcretemakesupasignificantportionoftheworkonthe
project apointwillnotbeawardedfornegligiblequantitiesinrelationtothetotalwork.
Forpurposesofthiscredit,thefollowingmustbeapplied:
One
pound
of
Portland
cement
is
equivalent
to
one
pound
of
CO2. Baselinemixesshallbestandard,28daystrengthregionalmixdesigns.
Temperaturerangeshallbeaccountedforanddocumented.Documentationforcold
weathermixdesignsshallincludetemperatureondayofpour.
PozzolansallowedfordisplacementofPortlandcementareflyash,groundgranulated
blastfurnaceslag(ggbfs),silicafume,andricehullash.
Requirements Totalcubicyardsofcastinplaceconcreteforproject.
Standard28daystrengthconcretemixdesignsfromtheconcreteproducer,inaccordance
withACI301,foreachconcretemixrequiredforproject(2500psi,3000psi,5000psi,etc.)
andquantityofPortlandcementforeachmixinpoundspercubicyard.
QuantityofPortlandcementreducedand/orreplacedforeachmixinpoundspercubic
yard.
Temperatureondayofpourifcoldweathermixisused.
Calculationdemonstratingthataminimum40%averagereductionhasbeenachieved
overstandardconcretemixdesignsforthetotalofallcastinplaceconcrete.
Submittals
BlendedCement
Flyash
NCMRCIR
U.S. Green Building Council Updated March 2008 19 of 30
-
7/27/2019 LEED Past ID Credits
22/32
CIR/ID CAT. RS CREDITTITLE A/D CREDITDESCRIPTIONIntent
Requirements Establisha41%reductioninCO2byweightbydisplacingPortlandcementthroughtheuse
ofgroundgranulatedblastfurnaceslag(GGBFS).
Submittals NarrativedescribingdisplacementofPortlandcementthroughtheuseofground
granulatedblastfurnaceslagcomparedtoabaseline
CalculationofCIPconcreteasapercentageofproject'stotalmaterialsvalue
Tableoutlinin differentmixesIntent
Requirements Establisha41%reductioninCO2emissionsbyreducingPortlandcementoverbaseline
concretemixdesignsthroughtheuseofflyashandgroundgranulatedblastfurnaceslag
(GGBFS).Submittals
Intent
Requirements Establisha40%reductioninCO2emissionsbyreducingPortlandcementforallsitecast
concrete.
Submittals Narrative,calculations,purchaseorder,andconcretemixdesigns
CIR MR
/EQ
NC Furniture:CIR Ruling NonpermanentfurnituremaybeincludedinLEEDforNewConstructionv2.0andv2.1
calculations,ONLYiffurnitureisincludedintheprojectscope.Furnituremustthenbe
includedinallrelevantcreditcalculationsornoneatall.TherelevantcreditareMaterials
&Resourcescredits3through7.Acommonsenseapproachmustbetakenwhendeciding
whattoincludeasfurniture. Officesystemsandfurnitureareexpectedtobethemore
commonandapplicableproductsinthemarketplace.
BecauseofinherentcomplexitiesaddressingfurniturewithintheIndoorEnvironmental
Qualitycategory(particularlycredits3.2,4.4,8.1and8.2),theissueoffurnitureisnot
addressedinanyIEQcredits.However,projectsthatincludefurnitureinthescopeofwork
areeligibletoapplyforaninnovationcreditbasedonLEEDforCommercialInteriors
(LEEDCI)IEQcredit4.5,LowEmittingMaterials&Furniture.
FURNITURE:LOWEMITTING
A
A
ABlendedCement:
Flyash
BlendedCement:
Slag
BlendedCement:
FlyashandSlag
NC
NC
MR
MRID
ID
ID
NC
MR
CIR EQ NC Furniture:CIR Ruling ManufacturerclaimsarenotsufficienttodemonstratecomplianceforLEEDCIIEQCredit
4.5.IfthefurnitureisnotGreenGuardcertified,itmustundergoairchambertestingand
complywithspecificlimitsonemissionslevelsforTVOCs,formaldehyde,totalaldehydes
and4PCaslistedintheLEEDCIcredit. ChambertestdataorGreenGuardcertification
mustbeprovidedforallfourparametersinorderforanInnovationcredittobeachieved.
Intent Reduceindooraircontaminantsthatareodorous,potentiallyirritatingand/orharmfulto
thecomfortandwellbeingofinstallersandoccupants.
Requirements DemonstrateacomprehensiveapproachtoreducingVOClevelsinthebuildingbyselecting
lowVOCfurnitureANDachievingEQc4.14.3.
Submittals Completelistofallfurnitureinthebuilding
Documentationoffurnituremanufacturertestingandverificationofcompliancewiththe
standards
Intent Reduceindooraircontaminantsthatareodorous,potentiallyirritatingand/orharmfulto
thecomfortandwellbeingofinstallersandoccupants.
Requirements
Submittals Detailedspreadsheetlistingeachfurnitureproductandcomplianceinformation
Narrativeoutliningtheprocedureforincorporatingnonpermanentfurniture
Intent Reduceindooraircontaminantsthatareodorous,potentiallyirritatingand/orharmfulto
thecomfortandwellbeingofinstallersandoccupants.
Requirements DemonstrateprocurementofGreenGuardIndoorAirQualityCertifiedlowemitting
systems
furniture
and
seating
in
accordance
with
the
requirements
of
LEED
CI
EQ
Credit
4.5
template.Submittals LEEDCIEQCredit4.5template
Signedletterdeclaringthatallsystemsfurnitureandseatingfortheprojectare
GreenGuardCertified
Documentationofcompliancefromproductmanufacturerfortheproductsutilized
CopyoftheproductcertificationfromGreenGuard.
A
A
A
NC
NC
NC
EQ
EQ
EQ
Furniture Low
Emitting
Furniture Low
Emitting
Furniture
GreenGuard
Certified
ID
ID
ID
U.S. Green Building Council Updated March 2008 20 of 30
-
7/27/2019 LEED Past ID Credits
23/32
CIR/ID CAT. RS CREDITTITLE A/D CREDITDESCRIPTIONIntent Reduceindooraircontaminantsthatareodorous,potentiallyirritatingand/orharmfulto
thecomfortandwellbeingofinstallersandoccupants.
Requirements IntheabsenceofanyGreenGuardcertifiedlaboratorygradefurniture,specify
environmentallyfriendlylaboratoryfurniture.
Submittals Listoflaboratorysystemsfurnitureandassociatedlowemittingattributesincluding:
1. LowformaldehydeintheMDFwoodproductsforthewoodcasework
2. NoVOCpowdercoatpaintfinishonthesteelcasework
3. NoVOCExpandedPolystyreneinsulationinthesteelcasework
4. NoVOCpowdercoatfinishonthecaseworkfixtures
5. NoVOCcontentintheepoxyadhesiveusedtosecurethecountertopsandtabletops
CIR EQ NC Furniture:CIR Ruling Projectsthatincludefurnitureinthescopeofworkareeligibletoapplyforaninnovation
creditbasedonLEEDforCommercialInteriors(LEEDCI)IEQcredit4.5,LowEmitting
MaterialsFurniture. AchievementofthiscreditisindependentofLEEDNCEQcredit4,
LowEmittingMaterials.
Intent Reduceindooraircontaminantsthatareodorous,potentiallyirritatingand/orharmfulto
thecomfortandwellbeingofinstallersandoccupantsandreduceresourceimpacts
associatedwithfurnishings.
Requirements
Submittals Listofsystemsfurniture
DocumentationofGreenGuardcertification,FSCChainofCustody
Intent Reduceindooraircontaminantsthatareodorous,potentiallyirritatingand/orharmfulto
thecomfortandwellbeingofinstallersandoccupants.
Requirements DemonstrateprocurementofGreenguardIndoorAirQualityCertifiedlowemittingsystems
furnitureandseatinginaccordancewiththerequirementsofLEEDCIEQCredit4.5
template. Itemsdesignatedasoccasionalseating(e.g.conferencetablesandcafchairs)
are exem t from this re uirement.Submittals Narrativeconfirmingthatallsystemsfurnitureandseatingusedontheprojectare
Greenguardcertified
A
A
AFurniture
Greenguard
certified
NCEQ
NCEQ
NCEQ
ID
ID
Furniture Green
GuardandFSC
Certified
Furniture
GreenGuard
certifiedand
Environmentally
Friendly
ID
DocumentationofGreenGuardcertificationforsystemsfurnitureandseating
Intent Reduceresourceimpactsassociatedwithfurnishings.
Requirements Establishafurnitureselectionplanthatiscomprehensiveinscopeandhasmeasurable
environmentalimpactsasperEQc4,MRc4.
Submittals NarrativeestablishingspecificminimumstandardsforVOCcontent,recycledcontent,
reclaimedwood,andminimized/reusablepackaging
Documentationoutliningfurnitureprocurementprocedure
Documentationofsignificanceoftheenvironmentallypreferablefurniturewithrespectto
thetotalfurniturebudgetandoverallprojectbudget.
CIR MR NC Furniture:CIR Ruling TheLEEDMaterialsandResources(MR)creditslookatmaterialsusedintheconstruction
ofthebasebuildingpriortotheinstallationoffixtures,furnitureandequipment(FF&E).
Furnituredesignedasmovablethatisbolteddownforoperationalpurposes,suchasthe
classroomdesksnotedinyourinquiry,canbeomittedfromthematerialscalculations.
Typically,caseworkthatisconstructedfortheprojectandpermanentlyinstalledbythe
generalconstructioncontractorisconsideredasapartofthebuildingratherthantheFF&E
fortheproject,andshouldbeincludedinthecalculations.
Intent
Requirements Usesalvaged,refurbishedorreusedfurnitureandfurnishingsfor30%ofthetotalfurniture
andfurnishingsmaterialvalue.
Submittals LEEDCIMRc3.3LetterTemplate
Copyoftheinvoiceforrefurbishedfurniture
A
A
FURNITURE:OTHER
NCMR
/EQ
ID
Furniture:
Sustainably
Manufactured
Furniture ReuseNC
ID
MR
U.S. Green Building Council Updated March 2008 21 of 30
-
7/27/2019 LEED Past ID Credits
24/32
CIR/ID CAT. RS CREDITTITLE A/D CREDITDESCRIPTIONIntent Improveindoorairqualityandreducenegativelifecycleimpactsfromthebuilding's
furnituremanufacture,transportation,anddisposal.
Requirements ImplementaGreenFurnitureprogramthatdemonstrateshealthandenvironmental
benefitandmarkettransformation
EstablishfurniturespecificationsincludingenvironmentalchambertestingforIAQ,
durabilityrequirements,energyefficienttasklighting,flexibilityandreducedneedfor
chemicalcleaningagents
Requiremanufacturerproposalstoaddresscorporatesustainabilitycommitments,
takebackprograms,useofrecycledmaterials,toxicsreductionprograms,energyand
waterefficiencyandpacking/shippingwaste
ImplementthirdpartyworkstationassemblyandtestingforcompliancewithEPAlimits
forformaldehyde,TVOC,aldehydes,and4PC
Submittals Documentationofsignificantprocessimprovementsbyseveralmanufacturers.
Intent Reduceresourceimpactsassociatedwithfurnishings.
Requirements Providedocumentationdemonstratingthedollarvalueofthematerialsrelativetothetotal
materialscostoftheproject.
Submittals Narrativeoftheprocess,speciesandamountofwoodharvested
Documentationoftotalcostofmaterials
CIR MR NC Furniture
Definitions:CIR
Ruling Systemsfurnitureisdefinedaseitherapanelbasedworkstationcomprisedofmodular
interconnectingpanels,hangoncomponentsanddrawer/filingcomponentsora
freestandinggroupingoffurnitureitemsandtheircomponentsthathavebeendesigned
toworkinconcert.Seatingisdefinedastaskasdeskchairsusedwithsystemsfurniture.
Intent Eliminatetheneedforchemicalbasedtermitecontrolsystemsandreducetheuseof
pesticides.
Requirements Utilizenonchemicaltermitecontrol.
Submittals Narrativedescribingtypicalmethodsfortermitepreventioninvolvingchemicalpesticide
treatments
Descriptionalternativecontrolsystem