GENERAL NOTES:1. GENERAL:
A. THESE NOTES, AND OTHER DRAWING NOTES CONTAINED WITHIN, ARE PROVIDEDTO MEET SPECIFIC REQUIREMENTS AND TO SUPPLEMENT THE CONTRACTSPECIFICATIONS. THESE NOTES NEITHER REPLACE NOR OVERRIDE THEPROVISIONS AND REQUIREMENTS OF THE CONTRACT SPECIFICATIONS.
B. CONTRACTOR SHALL COORDINATE ALL STRUCTURAL WORK WITH WORK SHOWNON ALL OTHER DRAWINGS.
C. CONTRACTOR SHALL VERIFY ALL DIMENSIONS OF EXISTING CONSTRUCTION ANDREPORT ANY DISCREPANCIES FROM THE CONTRACT DRAWINGS TO THEARCHITECT AND THE ENGINEER PRIOR TO COMMENCING WITH WORK. SCALINGOF WORKING DIMENSIONS FROM THE STRUCTURAL DRAWINGS IS PROHIBITED.
D. CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHEDSTRUCTURE. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MEANS AND METHODSOF CONSTRUCTION INCLUDING, BUT NOT LIMITED TO, SHORING AND TEMPORARYBRACING. CONTRACTOR SHALL UNDERTAKE ALL NECESSARY MEASURES TO ENSURESAFETY OF ALL PERSONS AND STRUCTURES AT THE SITE AND ADJACENT TO THE SITE.VISITS TO THE SITE BY THE OWNER OR THE ENGINEER SHALL NOT RELIEVE THECONTRACTOR OF SUCH RESPONSIBILITY.
E. IF CERTAIN FEATURES ARE NOT FULLY SHOWN OR CALLED FOR ON THE CONTRACTDRAWINGS OR SPECIFICATIONS, THEIR CONSTRUCTION SHALL BE OF THE SAMECHARACTER AS FOR SIMILAR CONDITIONS THAT ARE SHOWN OR CALLED FOR, WITHTHE APPROVAL OF THE ENGINEER. WHERE SECTIONS VARY, CONTRACTOR SHALLPROVIDE FOR SMOOTH TRANSITIONS BETWEEN THEM, UNLESS NOTED OTHERWISE.
F. ALL PRODUCTS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS'WRITTEN INSTRUCTIONS AND RECOMMENDATIONS, UNLESS NOTED OTHERWISE.
G. ELEVATION 100'-0" CORRESPONDS TO THE FINISH CONCRETE SLAB ELEVATIONAT THE GROUND FLOOR.
2. DESIGN STANDARDSA. PRINCIPAL CODE OF RECORD: INTERNATIONAL BUILDING CODE 2006.B. ASCE 7, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES, 2005.C. ACI 318-08, BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE.D. ACI 530/ASCE 5/TMS 402, BUILDING CODE REQUIREMENTS FOR MASONRY
STRUCTURES, 2005.E. AISC STEEL CONSTRUCTION MANUAL, 13th EDITION, 2005.F. AISI COLD-FORMED STEEL DESIGN MANUAL, 2007.
E. ELEVATOR LOADS1. ELEVATOR LOADS TO THE SUPPORTING STRUCTURE SHALL BE PROVIDED TO THE
STRUCTURAL ENGINEER BY THE CONTRACTOR.F. SNOW LOAD
1. GROUND SNOW LOAD: 20 PSF2. FLAT-ROOF SNOW LOAD: 22 PSF3. EXPOSURE FACTOR: 1.04. IMPORTANCE FACTOR: 1.15. THERMAL FACTOR: 1.0
G. WIND LOAD1. BASIC WIND SPEED: 90 MPH (3 - SECOND GUST)2. IMPORTANCE FACTOR: 1.153. EXPOSURE CATEGORY: B4. BUILDING CONDITION: ENCLOSED5. TOPOGRAPHIC FACTOR: 1.0
H. SEISMIC LOAD1. MAXIMUM CONSIDERED EARTHQUAKE SPECTRAL RESPONSE ACCELERATIONS Ss = 0.133g,
S1 = 0.055g2. DESIGN EARTHQUAKE SPECTRAL RESPONSE ACCELERATIONS Sds = 0.106g, Sd1 = 0.062g.3. IMPORTANCE FACTOR: 1.254. SITE CLASS: C5. SEISMIC DESIGN CATEGORY: A6. BASIC SEISMIC FORCE RESISTING SYSTEM: ORDINARY REINFORCED CONCRETE MOMENT
FRAMES.7. RESPONSE MODIFICATION FACTOR: R = 38. DESIGN BASE SHEAR (1.0E): AREA "A" = 138 KIPS.
AREA "B" = 129 KIPS.9. ANALYSIS PROCEDURE: PER DESIGN REQUIREMENTS FOR SEISMIC DESIGN CATEGORY A.
5. GEOTECHNICAL INFORMATIONA. SOURCE: GEOTECHNICAL ENGINEERING REPORT BY GEOSOURCE, LLC DATED SEPTEMBER 12, 2012.B. SITE PREPARATION
1. EXCAVATION, FILL, AND BACKFILL SHALL BE IN ACCORDANCE WITH THE CONTRACTDRAWINGS AND SPECIFICATIONS.
2. CONTRACTOR SHALL NOTIFY THE ENGINEER WHEN LOOSEOR SOFT SOILS ARE EXPOSED WHERE SLABS, MATS, OR FOOTINGS ARE TO BE PLACEDSO THAT A DETERMINATION MAY BE MADE REGARDING IMPROVEMENT OF THISPOTENTIALLY UNDESIRABLE CONDITION.
3. CONTRACTOR SHALL EXPECT TO ENCOUNTER GROUND WATER DURING CONSTRUCTION.ALL DEWATERING SHALL BE THE RESPONSIBLITY OF THE CONTRACTOR.
C. SOIL CHARACTERISTICS1. UNIT WEIGHT: 120 PCF SATURATED.2. WATER TABLE DEPTH: VARIES
D. LATERAL EARTH PRESSURE1. AT-REST CONDITION, Ko: 55 PCF, EQUIVALENT FLUID, AT BASEMENT WALLS.2. ACTIVE CONDITION, Ka: 45 PCF, EQUIVALENT FLUID, AT BASEMENT WALLS.3. PASSIVE CONDITION, Kp: 360 PCF, EQUIVALENT FLUID.4. THE PRESSURES LISTED ABOVE ARE BASED ON FREE DRAINING GRANUILAR BACKFILL
MATERIAL WITH NO BUILDUP OF ANY HYDROSTATIC PRESSURE BEHIND THE WALL.5. THE PRESSURES LISTED ABOVE DO NOT INCLUDE THE INFLUENCE OF ANY TYPE OF
SURCHARGE LOADS IN OR ADJACENT TO WALL BACKFILL.E. SLAB-ON-GRADE, SHALLOW FOUNDATION, AND FOOTING DESIGN PARAMETERS
1. MODULUS OF SUBGRADE REACTION: 100 PCI.2. ALLOWABLE BEARING CAPACITIES
a. GRAVITY LOADS: 2500 PSF.3. FROST DEPTH: 3'-0".4. CONCRETE-SOIL COEFFICIENT OF FRICTION: 0.28.5. MINIMUM STABILITY FACTORS OF SAFETY
a. OVERTURNING: 1.5b. UPLIFT: 1.5c. SLIDING: 1.5.
F. DRILLED SHAFTS1. DRILLED SHAFTS SHALL BE PROVIDED IN ACCORDANCE WITH THE CONTRACT
SPECIFICATIONS, SECTION 316329. CONTRACTOR SHALL CONFORM TO ACI 336.1 AND 336.3,UNLESS NOTED OTHERWISE.
2. MINIMUM DRILLED SHAFT DESIGN CAPACITIES ON UNWEATHERED BEDROCK.a. COMPRESSION:
50,000 PSF ALLOWABLE END BEARING WITH A MINIMUM OF 10 FEET SOCKET INTOTHE UNWEATHERED BEDROCK BEARING STRATUM.2,000 PSF ALLOWABLE SHAFT SKIN FRICTION FOR THE PIER PORTION SOCKETED INUNWEATHERED BEDROCK.
b. UPLIFT:2,000 PSF ALLOWABLE SHAFT SKIN FRICTION FOR THE PIER PORTION SOCKETEDIN UNWEATHERED BEDROCK.
c. SHEAR: 25 KIPS ALLOWABLE WITH A EMBEDMENT LENGTH OF AT LEAST 15 FEET.G. FIELD OBSERVATION:
A FIELD REPRESENTATIVE OF THE GEOTECHNICAL ENGINEER SHALL REGULARLY OBSERVE ANDMONITOR THE EXCAVATION AND GRADING OPERATIONS AND PERFORM FIELD DENSITY TESTS TODOCUMENT THE COMPACTION AND MOISTURE CONTENT REQUIREMENTS ARE BEING ACHIEVED.
3. FORMWORKa. CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGN, ENGINEERING, STRUCTURAL
ADEQUACY, AND CONSTRUCTION OF ALL CONCRETE FORMWORK IN ACCORDANCEWITH THE CONTRACT SPECIFICATIONS.
b. COORDINATE ALL CONCRETE WORK WITH THE PLACEMENT OF PIPING, INSERTS,FLOOR DRAINS, AND OTHER EMBEDDED ITEMS INDICATED ON THE CONTRACTDRAWINGS OR IN THE CONTRACT SPECIFICATIONS.
c. ALL NEW OR EXISTING PIPING OR UTILITIES PASSING THROUGH NEW CONCRETESHALL BE SLEEVED 1/2" CLEAR ALL AROUND, UNLESS NOTED OTHERWISE.CONTRACTOR SHALL PROVIDE MEASURES TO ENSURE THAT SLEEVES REMAINFREE OF DEBRIS AND WATER DURING CONSTRUCTION.
d. PROVIDE 3/4" CHAMFER STRIPS ON ALL EDGES OF EXPOSED CONCRETE, UNLESSNOTED OTHERWISE.
e. WITH THE EXPLICIT PRIOR APPROVAL IN WRITING OF THE ENGINEER,COLUMN AND WALL FOOTINGS MAY BE EARTH-FORMEDUSING UNDISTURBED NATIVE SOIL. PROVIDE A MINIMUM EXCAVATION WIDTH 4"GREATER THAN INDICATED, AND A DEPTH 2" GREATER THAN INDICATED.
4. REINFORCING STEELa. BARS: ASTM A615 GRADE 60 (ASTM A706 GRADE 60 FOR WELDABLE BARS).b. WELDED WIRE FABRIC: ASTM A185, SHEET, Fy = 65KSI.c. DEFORMED BAR ANCHORS (DBA): ASTM A496, Fy = 70 KSId. CONTRACTOR SHALL DETAIL AND PLACE ALL REINFORCEMENT IN ACCORDANCE WITH
ACI SP-66, ACI 301, ACI 318, AND CRSI MANUAL OF STANDARD PRACTICE.e. MINIMUM CONCRETE CLEAR COVER OVER REINFORCEMENT SHALL BE AS FOLLOWS,
UNLESS NOTED OTHERWISE:(1) CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: 3".(2) CONCRETE EXPOSED TO EARTH OR WEATHER: #6 THROUGH #11 BARS - 2"; #5
AND SMALLER BARS, WELDED WIRE FABRIC - 1 1/2".(3) CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH THE GROUND:
SLABS AND WALLS - 3/4"; BEAMS AND COLUMNS, PRIMARY REINFORCEMENT, TIES,STIRRUPS, SPIRALS - 1 1/2".
f. PROVIDE ADDITIONAL REINFORCEMENT AT ALL OPENINGS AND CORNER BARS AT ALLINTERSECTING GRADE BEAMS, WALLS, AND CURBS IN ACCORDANCE WITH THE STANDARDDETAILS ON DRAWING S300, UNLESS NOTED OTHERWISE.
5. JOINTSa. LOCATE ALL CONSTRUCTION, CONTRACTION, ISOLATION, EXPANSION, AND OTHER JOINTS
AS INDICATED OR SPECIFIED, OR OTHERWISE APPROVED BY THE ENGINEER.b. SURFACES OF ALL HORIZONTAL AND VERTICAL CONSTRUCTION JOINTS SHALL BE CLEANED
OF LAITANCE AND SHALL EXPOSE CLEAN COARSE AGGREGATE SOLIDLY EMBEDDED INMORTAR MIX. JUST PRIOR TO DEPOSITING CONCRETE, SURFACE OF CONSTRUCTION JOINTSHALL BE THOROUGHLY CLEANED AND WETTED.
c. THESE PROVISIONS SHALL ALSO APPLY WHEN NEW CONCRETE IS PLACED AGAINST EXISTINGCONCRETE. IN ADDITION, EXISTING CONCRETE SURFACE SHALL BE ADEQUATELY PREPAREDBY APPLICATION OF A BONDING AGENT.
d. PROVIDE WATERSTOPS AT CONCRETE JOINTS WHERE INDICATED ON THE CONTRACT DRAWINGS.C. REINFORCED MASONRY: SECTION 042000
1. REINFORCED MASONRY SHALL BE CONSTRUCTED IN ACCORDANCE WITH ACI/ASCE/TMS CODEAND SPECIFICATION.
2. MASONRYa. UNITS: ASTM C90 TYPE I, MINIMUM NET AREA COMPRESSIVE STRENGTH = 1900 PSI.b. MORTAR: ASTM C270, TYPE S.c. MINIMUM SPECIFIED COMPRESSIVE STRENGTH: f'm = 1500 PSI.
3. REINFORCING STEELa. BARS: ASTM A615 GRADE 60 (ASTM A706 GRADE 60 FOR WELDABLE BARS).b. MINIMUM CLEAR DISTANCE TO ANY FACE OF MASONRY UNIT OR FORMED SURFACE: 1/2".c. MINIMUM LAP SPLICE LENGTH: 48 BAR DIAMETERS.
4. GROUTa. PROPERTIES: COARSE GROUT PER ASTM C476, MINIMUM COMPRESSIVE STRENGTH =
2000 PSI, SLUMP = 8" TO 11".b. FULLY GROUT ALL CELLS CONTAINING REINFORCING STEEL AND ALL CELLS LOCATED
BELOW GRADE. PROVIDE MASONRY UNITS WITH MINIMUM SPACE INCELLS TO RECEIVE GROUT OF 3" x 3" AND ALIGN THESE CELLS TO PROVIDEUNOBSTRUCTED OPENINGS.
c. PLACE GROUT WITHIN 1 1/2 HOURS AFTER ADDING MIX-DESIGNED WATER AND PRIOR TOINITIAL SET. GROUT CONTINUOUSLY BETWEEN CONTROL JOINTS USING POUR HEIGHTSNOT EXCEEDING 12 FT AND LIFTS NOT EXCEEDING 5 FT, WITH NO INTERRUPTIONSEXCEEDING 1 HOUR.
d. CONSOLIDATE GROUT IN ASSEMBLED WALLS BY MECHANICAL VIBRATION AT THE TIMEOF PLACEMENT. RECONSOLIDATE GROUT BY MECHANICAL VIBRATION AFTER INITIALWATER LOSS AND SETTLEMENT HAS OCCURRED.
3. SPECIAL INSPECTIONSA. REQUIRED IN ACCORDANCE WITH IBC SECTION 1704.
1. FREQUENCY: CONTINUOUS UNLESS SPECIFICALLY PERMITTED BY THEPRINCIPAL CODE OF RECORD TO BE PERIODIC.
2. SPECIAL INSPECTOR: QUALIFIED PERSON WHO HAS DEMONSTRATEDCOMPETENCE TO THE SATISFACTION OF THE BUILDING OFFICIAL.
B. SOILS: SITE PREPARATION, EARTHWORK (COMPACTION AND MOISTURE CONTENT)BEARING SURFACES OF FOOTINGS, FILL MATERIALS AND PLACEMENT, ANDEVALUATION OF IN-PLACE DENSITY.
C. DRILLED PIER FOUNDATIONS: MATERIALS, INSTALLATION, BEARING DEPTHAND TESTING.
D. CONCRETE CONSTRUCTION1. MIX DESIGN AND MATERIALS.2. INSTALLATION OF EMBEDDED ANCHOR BOLTS.3. PLACEMENT, CURING, AND PROTECTION TECHNIQUES.4. SAMPLING AND TESTING DURING PLACEMENT.5. STRENGTH VERIFICATION, AIR CONTENT AND SLUMP.6. PRECAST MEMBER FABRICATION, ERECTION, AND CONNECTIONS.7. PROTECTION DURING COLD OR HOT WEATHER.8. EXCEPTIONS: NONSTRUCTURAL SLAB-ON-GRADE.
E. REINFORCING AND PRESTRESSING STEEL1. TYPE, SIZE, AND GRADE.2. WELDING AND MECHANICAL SPLICING.3. PLACEMENT, STRESSING, AND GROUTING.
F. MASONRY CONSTRUCTION1. MATERIALS, INCLUDING PROPORTIONS OF MORTAR AND GROUT.2. MORTAR JOINTS, INCLUDING JOINT REINFORCEMENT.3. REINFORCEMENT AND ANCHOR TYPES, SIZES, AND LOCATIONS.4. GROUT SPACES AND PLACEMENT OF REINFORCMENT.5. GROUT PLACEMENT.6. PREPARATION AND TAKING OF PRISMS AND/OR TEST SPECIMENS.7. STRENGTH VERIFICATION.8. PROTECTION DURING COLD OR HOT WEATHER.
G. STEEL CONSTRUCTION1. IN-PLANT FABRICATIONS OR FABRICATOR CERTIFICATION.2. MATERIALS, INCLUDING WELD FILLERS AND HIGH-STRENGTH BOLTS.3. WELDING AND HIGH-STRENGTH BOLT INSTALLATION.4. SHEAR CONNECTORS FOR COMPOSITE CONSTRUCTION.5. EXPANSION AND ADHESIVE ANCHORS.6. FRAMING AND JOINT DETAILS, INCLUDING BRACING AND STIFFENERS.7. STEEL FLOOR AND ROOF DECK AND ATTACHMENTS.8. COLD-FORMED STEEL FRAMING INSTALLATION AND FASTENERS.
H. SPRAYED FIRE-RESISTIVE MATERIALS: MEMBER SURFACE CONDITIONS, APPLICATIONTECHNIQUES, THICKNESS, DENSITY, AND BOND STRENGTH.
4. DESIGN LOADSA. OCCUPANCY CLASSIFICATION : CATEGORY IIIB. DEAD LOAD
1. ACTUAL WEIGHT OF STRUCTURAL MEMBERS.2. NON-STRUCTURAL COMPONENTS WHICH ARE PERMANENTLY ATTACHED TO
THE STRUCTURE.3. AN ALLOWANCE OF 15PSF HAS BEEN MADE FOR HANGING CEILING AND
ELECTRICAL/MECHANICAL EQUIPMENT SUCH AS HAVC DUCTWORK, PIPES ANDSPRINKLER SYSTEM.
C. LIVE LOAD1. FLOORS SHALL BE DESIGNED TO SUPPORT THE UNIFORMLY DISTRIBUTED LOADS
LISTED BELOW OR A 2000 LBS CONCENTRATED LOAD DISTRIBUTED OVER ANAREA 2.5 FEET BY 2.5 FEET AND LOCATED SO AS TO PRODUCE THE MAXIMUMLOAD EFFECT IN THE STRUCTURE.
2. UNIFORM FLOOR LIVE LOAD:a. OFFICE (GENERAL USE): 50 PSF + 15 PSF PARTITIONb. CLASSROOMS: 40 PSF + 15 PSF PARTITIONc. LARGE MULTI-PURPOSE CLASSROOMS: 100 PSFd. LABORATORY: 100 PSFe. MECHANICAL AND AHU SPACE: 150 PSFf. LOBBIES, STAIRS AND CORRIDORS: 100 PSFg. STORAGE SPACE: 150 PSFh. CORRIDOR AT GROUND LEVEL: 100 PSF
CORRIDOR ABOVE GROND LEVEL: 80 PSFi. ROOF: 20 PSF
D. EQUIPMENT LOADS1. AS INDICATED FOR EQUIPMENT WEIGHING IN EXCESS OF 250 LBS. FRAMING AND
FOUNDATIONS ARE DESIGNED FOR EQUIPMENT WHICH SATISFIES THE CONTRACTSPECIFICATIONS.
2. IF EQUIPMENT FURNISHED IS HEAVIER THAN THE WEIGHTS INDICATED, ORREQUIRES STRUCTURAL CHANGES FOR ANY OTHER REASON, CONTRACTOR SHALLPROVIDE ENGINEERING DESIGN CALCULATIONS AND ADDITIONAL STRUCTURALWORK NECESSARY TO SUPPORT ALL LOADS IN ACCORDANCE WITH THE DESIGNSTANDARDS SPECIFIED ABOVE, AT NO ADDITIONAL COST TO THE OWNER AND WITHNO INCREASE IN CONTRACT TIME.
6. MATERIALS: SEE THE CONTRACT SPECIFICATIONS FOR COMPLETE REQUIREMENTSAND COMPLY WITH ALL APPLICABLE OSHA REGULATIONSA. REINFORCED CONCRETE: SECTIONS 031000, 031500, 032000, 033000
1. REINFORCED CONCRETE SHALL BE PREPARED AND PLACED INACCORDANCE WITH ACI MANUAL OF CONCRETE PRACTICE.
2. CONCRETEa. UNLESS NOTED OTHERWISE: MINIMUM 28-DAY COMPRESSIVE STRENGTH
f'c = 4000 PSI, NORMAL WEIGHT.b. DRILLED SHAFT FOUNDATIONS: MINIMUM 28-DAY COMPRESSIVE STRENGTH
f'c = 5000 PSI, NORMAL WEIGHT.c. SLABS ON GRADE: MINIMUM 28-DAY COMPRESSIVE STRENGTH f'c = 4000 PSI,
NORMAL WEIGHT.d. ELEVATED SLABS AND BEAMS: MINIMUM 28-DAY COMPRESSIVE STRENGTH
f'c = 5000 PSI, NORMAL WEIGHTe. COLUMNS: MINIMUM 28-DAY COMPRESSIVE STRENGTH f'c = 5000 PSI,
NORMAL WEIGHT.f. WALLS: MINIMUM 28-DAY COMPRESSIVE STRENGTH f'c = 5000 PSI,
NORMAL WEIGHT.
5. VERTICAL REINFORCEMENT, UNLESS NOTED OTHERWISEa. PROVIDE 1-#5 VERTICAL AT A MAXIMUM SPACING OF 32", UNLESS NOTED OTHERWISE.b. PROVIDE ADDITIONAL VERTICAL REINFORCEMENT AT EACH SIDE OF CONTROL JOINTS,
AT INTERSECTIONS OF WALLS, AND AT EACH SIDE OF ANY MASONRY OPENING GREATERTHAN 10" IN WIDTH.
c. ALL VERTICAL REINFORCEMENT SHALL BE CONTINUOUS FOR FULL HEIGHT OF WALL,EXCEPT WHERE A BAR IS INTERRUPTED BY A STEEL MEMBER, PROVIDE SAME SIZE BARON EACH SIDE OF OPENING WITH LAP SPLICES ABOVE AND BELOW.
d. PROVIDE FOUNDATION DOWEL OF THE SAME SIZE FOR EACH VERTICAL REINFORCINGBAR. DOWELS SHALL BE CAST INTO SUPPORTING CONCRETE. LENGTHOF DOWEL EXTENDING INTO WALL SHALL BE A MINIMUM OF 2" GREATER THAN LAPSPLICE LENGTH SPECIFIED ABOVE.
6. HORIZONTAL JOINT REINFORCEMENTa. PROVIDE LADDER TYPE AT EVERY OTHER COURSE OR AT A MAXIMUM SPACING OF 16".b. BEGIN AT TOP OF FIRST BLOCK COURSE.
7. BOND BEAMS, UNLESS NOTED OTHERWISEa. CONSTRUCT USING 2-#5 HORIZONTAL, UNLESS NOTED OTHERWISE.b. PROVIDE CONTINUOUSLY AT BOTTOM COURSE OF WALL, WITHIN 16" OF TOP OF WALL,
AT EACH BEARING ELEVATION OF STEEL MEMBERS SUPPORTED BY WALL, AT OTHERLOCATIONS INDICATED, AND AT A MAXIMUM SPACING OF 48".
c. PROVIDE BELOW ALL MASONRY OPENINGS AND EXTEND A MINIMUM OF 24" BEYONDEACH SIDE OF OPENING.
8. VERTICAL CONTROL JOINTS, UNLESS NOTED OTHERWISEa. LOCATE AT CHANGES IN WALL HEIGHT OR THICKNESS, AT A MAXIMUM SPACING OF
20 FT OR 1.5 TIMES THE WALL HEIGHT, WHICHEVER IS LESS, AND AT APPROXIMATELY 1/2THE MAXIMUM SPACING FROM WALL INTERSECTIONS. DO NOT LOCATE AT WALLOPENINGS OR IN ELEVATOR SHAFTS.
b. USE PREMOLDED CONTROL JOINT KEY INSERTS WITH SASH BLOCKS. USE CORRUGATEDMETAL SEPARATORS AT BOND BEAM LOCATIONS.
c. DISCONTINUE ALL HORIZONTAL REINFORCEMENT AT VERTICAL CONTROL JOINTS.D. STRUCTURAL AND MISCELLANEOUS STEEL: SECTIONS 051200, 055000
1. STRUCTURAL AND MISCELLANEOUS STEEL SHALL BE FABRICATED AND ERECTED INACCORDANCE WITH AISC STEEL CONSTRUCTION MANUAL, 13th EDITION.
2. TEMPORARY ERECTION BRACING SHALL BE DESIGNED AND PROVIDED BY THE CONTRACTORAS REQUIRED AND SHALL NOT BE REMOVED UNTIL ALL PERMANENT LATERAL-LOAD-RESISTINGELEMENTS AND CONNECTIONS ARE COMPLETELY INSTALLED.
3. WIDE FLANGE SHAPES AND TEES: ASTM A992, Fy = 50 KSI.4. OTHER SHAPES, PLATES, AND THREADED RODS
a. ASTM A36, Fy = 36 KSI, UNLESS NOTED OTHERWISE.b. ASTM A572 GRADE 50, Fy = 50 KSI, WHERE INDICATED AS "(50)".
5. SQUARE AND RECTANGULAR HOLLOW STRUCTURAL SECTIONS: ASTM A500 GRADEB, Fy = 46 KSI.
6. ROUND HOLLOW STRUCTURAL SECTIONS: ASTM A500 GRADE B, Fy = 42 KSI.7. PIPE: ASTM A53 TYPE E OR S, GRADE B, Fy = 35 KSI.8. BOLTS
a. 3/4" DIAMETER ASTM A325, UNLESS NOTED OTHERWISE.b. FRAMING CONNECTIONS: PRETENSIONED JOINTS
WITH STANDARD HOLES, UNLESSNOTED OTHERWISE.
c. BRACING CONNECTIONS: SLIP-CRITICAL JOINTSWITH STANDARD HOLES, UNLESS NOTED OTHERWISE.
d. SLIP-CRITICAL JOINTS SHALL HAVE CLASS B FAYING SURFACES WITH SLIPCHECKED AT THE SERVICEABILITY LIMIT-STATE.
e. ON ONE SIDE OF EACH DOUBLE CONNECTION OF BEAMS TO A COLUMN WEB OR AGIRDER WEB DIRECTLY OVER A COLUMN, PROVIDE A TEMPORARY SEAT ANGLEATTACHED TO COLUMN OR GIRDER WEB AND TO BOTTOM FLANGE OF BEAM. MINIMUMSEAT CONNECTION SHALL BE L4x3x3/8 LLH WITH TWO 3/4" DIAMETER A307 OR A325-STBOLTS EACH LEG. SINGLE AND DOUBLE STAGGERED CONNECTIONS ARE PROHIBITEDWITHOUT THE EXPLICIT PRIOR APPROVAL IN WRITING OF THE STRUCTURAL ENGINEER OFRECORD.
9. WELDING: IN ACCORDANCE WITH AWS D1.1 USING E70 ELECTRODE WITH LOW HYDROGENWHEN REQUIRED.
10. ALL DOUBLE ANGLE MEMBERS SHALL HAVE SPACER PLATES TO COMPLY WITH AISCPARAGRAPH E4.a. THICKNESS: TO MATCH END GUSSET PLATES.b. MINIMUM ATTACHMENT: CONNECT TO HEEL AND TOE OF EACH ANGLE USING 3/16" x 1"
LONG FILLET WELDS.11. SHEAR CONNECTIONS
a. COLD-FINISHED STEEL CONFORMING TO ASTM A108, GRADE 1015 OR 1020. AWS D1.1TYPE B WITH MINIMUM TENSILE STRENGTH Fu = 65 KSI.
b. SHEAR CONNECTORS FOR COMPOSITE DECK SLAB SHALL BE 3/4" HEADED STUD,UNLESS NOTED OTHERWISE.
c. ALL STUDS LOCATED SO AS TO OBSTRUCT WALKING SURFACES OF BEAMS OR JOISTSSHALL BE FIELD INSTALLED.
12. ANCHOR BOLTSa. ASTM F1554 GRADE 36 UNLESS SPECIFICALLY NOTED AS GRADE 55.b. LOCATE ANCHOR BOLTS ACCURATELY, SET WITH TEMPLATES, AND SECURELY HOLD IN
POSITION WHILE PLACINGCONCRETE. PROTECT IN-PLACE ANCHOR BOLTS FROM CONSTRUCTION ACTIVITY.
c. THE FOLLOWING ARE PROHIBITED WITHOUT THE EXPLICIT PRIOR APPROVAL IN WRITINGOF THE STRUCTURAL ENGINEER OF RECORD:(1) INSERTING ANCHOR BOLTS INTO FRESH OR PARTIALLY HARDENED CONCRETE.(2) SUBSTITUTING POST-INSTALLED ANCHORS WHERE EMBEDDED ANCHOR BOLTS
ARE INDICATED.(3) REPAIRING, REPLACING, OR MODIFYING INSTALLED ANCHOR BOLTS.
13. POST-INSTALLED ANCHORSa. CONCRETE ANCHORS: CARBON STEEL MANUALLY EXPANDED WEDGE TYPE,
UNLESS NOTED OTHERWISE.b. ADHESIVE ANCHORS: ASTM A36 CARBON STEEL THREADED ROD WITH VINYL
URETHANE METHACRYLATE RESIN ADHESIVE, UNLESS NOTED OTHERWISE.c. MASONRY ANCHORS: ASTM A36 CARBON STEEL
THREADED ROD WITH CYLINDRICAL WIRE MESH SCREEN TUBE AND INJECTABLE HYBRIDADHESIVE, UNLESS NOTED OTHERWISE.
14. GROUT: CEMENTITIOUS HIGH-STRENGTH NONSHRINK WITH MINIMUM COMPRESSIVESTRENGTH = 8000 PSI AT 28 DAY.
E. STEEL DECK: SECTIONS 0531231. STEEL DECK, ATTACHMENTS, AND ACCESSORIES SHALL BE DESIGNED, FABRICATED,
AND INSTALLED IN ACCORDANCE WITH SDI MANUALS AND AISI COLD-FORMED STEELDESIGN MANUAL.
2. ROOF DECKa. DECK TYPE PER ROOF PLAN CONFORMING TO ASTM A653 WITH Fy = 33 KSI
Fy = 33 KSI, GALVANIZED G903. ALL STEEL DECK AND DECK ATTACHMENTS SHALL BE CAPABLE OF RESISTING THE WIND
UPLIFT LOADS AND DIAPHRAGM SHEARS.4. ALL STEEL DECK SHALL CROSS A MINIMUM OF TWO SPANS. MINIMUM LENGTH OF END
LAPS AND BEARING AT EXTERIOR SUPPORTS SHALL BE 2". MINIMUM LENGTH OF BEARINGAT INTERIOR SUPPORTS SHALL BE 4".
5. ALL STEEL DECK SHALL BE SUPPORTED AT EDGES OF OPENINGS AND AROUNDCOLUMNS. ADDITIONAL SUPPORT STEEL SHALL BE PROVIDED BY CONTRACTOR ASREQUIRED AND FABRICATED SO THAT DECK RUNS CONTINOUSLY OVER MINOROPENINGS, WHICH SHALL NOT BE CUT UNTIL NEEDED BY OTHER TRADES.
6. MINIMUM STEEL DECK ATTACHMENT SHALL BE AS FOLLOWS:a. DECK SHALL BE FASTENED AT EACH END AND AT INTERMEDIATE SUPPORTS
BY 5/8" DIAMETER PUDDLE WELDS AT A MAXIMUM SPACING OF12" WITH AMINIMUM OF TWO WELDS PER UNIT AT EACH SUPPORT.
b. SIDE LAP CONNECTIONS SHALL BE MADE AT SEAMS USING #10 SCREWS ATA MAXIMUM SPACING OF 36".
c. CONNECTIONS ALONG SIDE BOUNDARIES, RIDGE PLATES, AND ROOF SUBFRAMING SHALL BE MADE AT 12" ON CENTER MAXIMUM.
d. PNEUMATIC FASTENERS AND/OR SCREWS SHALL NOT BE SUBSTITUTED WHEREWELDS ARE SPECIFIED, BUT MAY BE USED IN TEMPORARY ATTACHMENT OFSTEEL DECK.
F. COLD-FORMED STEEL FRAMING: SECTION 0540001. COLD-FORMED STEEL FRAMING SHALL BE DESIGNED, FABRICATED, AND ERECTED IN
ACCORDANCE WITH AISI COLD-FORMED STEEL DESIGN MANUAL AND SSMA OR LGSIPUBLICATIONS AS APPLICABLE.
2. SHAPE DESIGNATIONSa. STUDS, JOISTS, TRACK, CHANNELS, AND FURRING CHANNELS: PER SSMA
PRODUCT TECHNICAL INFORMATION, INDICATING MEMBER DEPTH, STYLE,FLANGE WIDTH, AND MATERIAL THICKNESS.
b. PURLINS, GIRTS, EAVE STRUTS, AND OTHER MEMBERS: PER LGSI LIGHT GAGESTRUCTURAL STEEL FRAMING SYSTEM DESIGN HANDBOOK, INDICATING MEMBERDEPTH, FLANGE WIDTH(S), SLOPE FOR EAVE STRUTS ONLY, STYLE, AND NOMINALGAGE.
3. FRAMING MEMBERSa. ASTM A653 GRADE 33, Fy = 33 KSI, UNLESS
NOTED OTHERWISE.b. ASTM A653 GRADE 50, Fy = 50 KSI, FOR MATERIAL THICKNESS 54 MILS OR
GREATER AND WHERE INDICATED AS "(50)".c. ALL LGSI SHAPES SHALL HAVE MINIMUM YIELD STRENGTH OF 55 KSI AND
MINIMUM ULTIMATE STRENGTH OF 67.7 KSI.4. FINISH
a. STEEL CONFORMING TO ASTM A653: HOT-DIP GALVANIZE TO PROVIDE A COATINGCLASS OF G90.
5. MECHANICAL FASTENERS: CORROSION-RESISTANT-COATED, SELF-DRILLING, SELF-THREADING STEEL DRILL SCREWS WITH LOW PROFILE HEADS BENEATH SHEATHING ANDMANUFACTURER'S STANDARD HEADS ELSEWHERE
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:29:
34 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
GENERAL NOTES -SHEET 1
S001
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
ABBREVIATIONS:AA - ALUMINUM ASSOCIATIONAB - ANCHOR BOLTABT - ABOUTACI - AMERICAN CONCRETE
INSTITUTEADH - ADHESIVEAGGR - AGGREGATEAHR - ANCHORAISI - AMERICAN IRON AND
STEEL INSTITUTEAISC - AMERICAN INSTITUTE OF
STEEL CONSTRUCTIONAL - ALUMINUMALTN - ALTERNATEANSI - AMERICAN NATIONAL
STANDARDS INSTITUTEAPPROX - APPROXIMATEARCH - ARCHITECTASTM - AMERICAN SOCIETY FOR
TESTING OF MATERIALSAWS - AMERICAN WELDING
SOCIETYBC - BOLT CIRCLEBETW - BETWEENBLDG - BUILDINGBM - BEAMBO - BOTTOM OFBOS - BOTTOM OF STEELBOT - BOTTOMB/P - BASE OF PIERBRG - BEARINGBRKT - BRACKETCAP - CAPACITYC/C - CENTER TO CENTERCL - CENTER LINECF - CUBIC FEETCHKR - CHECKERCIR - CIRCLECJ - CONSTRUCTION JOINTCLR - CLEARCLJ - CONTROL JOINTCMU - CONCRETE MASONRY UNITCO - CONCRETE OPENINGCOMP - COMPRESSIONCONC - CONCRETECONT - CONTINUOUSCONTR - CONTRACTCOL - COLUMNCONN - CONNECTIONCOTR - CONTRACTING OFFICERCOR - CORNERCOORD - COORDINATECRSI - CONCRETE REINFORCING
STEEL INSTITUTECTR - CENTERCTRD - CENTEREDCY - CUBIC YARDDBL - DOUBLEDET - DETAILDIAG - DIAGONALDIA - DIAMETERDIM - DIMENSIONDK - DECKINGDL - DEAD LOADDN - DOWNDWL - DOWELDWG - DRAWINGE - EASTEA - EACHED - EQUIPMENT DRAINEF - EACH FACEEJ - EXPANSION JOINTEL - ELEVATIONELEC - ELECTRICALELEV - ELEVATOREMBED - EMBEDMENTEQ - EQUALEQUIV - EQUIVALENTEQ SP - EQUALLY SPACEDEQUIP - EQUIPMENTEXIST - EXISTINGEXP - EXPANSIONEXT - EXTERIOREW - EACH WAYFAB - FABRICATEFD - FLOOR DRAINFDN - FOUNDATIONFTG - FOOTINGFF - FAR FACEFL - FLOORFLG - FLANGEFNSH - FINISHFS - FAR SIDEFT - FEETFUT - FUTUREGA - GAGEGALV - GALVANIZEGB - GRADE BEAMGND - GROUNDGR - GRADEGRTG - GRATINGH - SLAB THICKNESSHEF - HORIZONTAL EACH
FACEHEX - HEXAGONHG - HIGH
HK - HOOKHR - HANDRAILHPT - HIGH POINTHORIZ - HORIZONTALHS - HIGH STRENGTHIBC - INTERNATIONAL
BUILDING CODEID - INSIDE DIAMETERIF - INSIDE FACEIJ - ISOLATION JOINTIN - INCHESINTR - INTERIORINVT - INVERTIR - INSIDE RADIUSJT - JOINTKB - KNEE BRACEKPL - KICK PLATEKSI - KIPS PER
SQUARE INCHL - ANGLELAD - LADDERLB - POUNDLD - DEVELOPMENT LENGTHLG - LONGLL - LIVE LOADLLH - LONG LEG HORIZONTALLLO - LONG LEG OUTSTANDINGLLV - LONG LEG VERTICALLONG - LONGITUDINALLPT - LOW POINTLNTL - LINTELLS - LAP SPLICEMATL - MATERIALMAX - MAXIMUMMC - MOMENT CONNECTIONMECH - MECHANICALMEZZ - MEZZANINEMFR - MANUFACTURERMH - MANHOLEMIN - MINIMUMMISC - MISCELLANEOUSMK - MARKMO - MASONRY OPENINGN - NORTHNA - NOT APPLICABLENE - NORTHEASTNF - NEAR FACENOM - NOMINALNW - NORTHWESTNIC - NOT IN CONTRACTNTS - NOT TO SCALENO - NUMBERNS - NEAR SIDEOC - ON CENTEROD - OUTSIDE DIAMETEROF - OUTSIDE FACEOPNG - OPENINGOPP - OPPOSITEOSHA - OCCUPATIONAL SAFETY
AND HEALTH ADMINISTRATIONOZ - OUNCEPCF - POUNDS PER CUBIC FOOTPED - PEDESTALPEN - PENETRATEPEMP - PRE-ENGINEERED METAL
BUILDINGPERP - PERPINDICULARPJNT - PROJECTIONPL - PLATEPLC - PLACESPREFAB - PREFABRICATEDPS - PIPE SUPPORTPSF - POUNDS PER SQUARE FOOTPSI - POUNDS PER SQUARE INCHPVC - POLYVINYL CHLORIDER - RISERRAD - RADIUSRD - ROOF DRAINREF - REFERENCEREINF - REINFORCEREQD - REQUIREDREV - REVISIONRM - ROOMS - SOUTHSB - SHEAR BARSCHED - SCHEDULESE - SOUTHEASTSECT - SECTIONSH - SHEETSIM - SIMILARSF - SWAY FRAMESLO - SHORT LEG OUTSTANDINGSLP - SLOPESLV - SLEEVESP - SPACESPEC - SPECIFICATIONSQ - SQUARESST - STAINLESS STEELSTD - STANDARDSTL - STEELSTIF - STIFFENERSTIR - STIRRUPSTR - STRAIGHTSTRL - STRUCTURALSTRUC - STRUCTURESW - SOUTHWESTSYMM - SYMMETRICAL
T - TONTEMP - TEMPORARYTHK - THICKTHRU - THROUGHTHD - THREADT/ - TOP OFTOB - TOP OF BOLTT/C ORTOC - TOP OF CONCRETETOG - TOP OF GRATINGT/STL ORTOS - TOP OF STEELT/P - TOP OF PIERT&B - TOP AND BOTTOMTRD - TREADTYP - TYPICALUNO - UNLESS NOTED
OTHERWISEVAR - VARIESVERT - VERTICALVEF - VERTICAL EACH FACEW - WESTWD - WIDEW/ - WITHW/O - WITHOUTWP - WORK POINTWS - WATERSTOPWT - WEIGHTWWF - WELDED WIRE
FABRICWDT - WIDTH@ - AT& - AND# - POUNDS OR NUMBER% - PERCENT
ELEVATION CALLOUT EXAMPLEDETAIL CALLOUT EXAMPLESECTION CALLOUT EXAMPLE
SECTION, DETAIL, AND ELEVATIONIDENTIFICATION SYSTEM
SECTION, DETAIL, AND ELEVATIONSYMBOL IDENTIFIERS
DRAWING SEQUENCE NUMBERINDICATES WHERE TITLE ISLOCATED (MAY NOT BEPRESENT IF CALLOUT ANDTITLE ARE ON THE SAMEDRAWING)
LETTER ORNUMBERDESIGNATORONE OR TWO CHARACTER
DISCIPLINE DESIGNATOR(MAY NOT BE PRESENT IFCALLOUT AND TITLE AREON DRAWINGS WITHINTHE SAME DISCIPLINE)
THE WORD "SECTION" MAY BE REPLACEDWITH "ELEVATION" OR "DETAIL"
SECTION, DETAIL, OR ELEVATION TITLE EXAMPLE
1S001
AS001
SECTION
1S001
AS001
AS001
PIER
COLUMN ABOVE
42"/10'-0"/99'-0"
PIER DIAMETER
MINIMUM SOCKET DEPTHINTO BEARING BEDROCK
TOP OF PIER ELEVATION
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:29:
35 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
GENERAL NOTES -SHEET 2
S002
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
PIER LEGEND
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
STANDARD REINFORCEMENT DETAILS
VERTICAL WALL TO SLAB CORNERAND INTERSECTION REINFORCEMENT DETAILS
SEE CORNER REINFORCEMENT NOTE 3
CORNER REINFORCEMENT NOTES:1. UNLESS OTHERWISE INDICATED, THE CONTRACTOR HAS
THE OPTION OF REINFORCING CORNERS IN ACCORDANCEWITH OPTION #1 OR OPTION #2.
2. UNLESS OTHERWISE INDICATED, THE CONTRACTOR HASTHE OPTION OF CONSTRUCTING INTERSECTIONS WITHOR WITHOUT CONSTRUCTION JOINTS. REINFORCE PERAPPLICABLE DETAIL.
3. INDICATES CONTRACTOR OPTION: WITH ORWITHOUT LAP SPLICE AT THESE LOCATIONS.
ELEVATION
VERT REINFNOT SHOWN
ELEVATION
DOWEL
VERT REINFNOT SHOWN
VERT REINFNOT SHOWN
ELEVATION ELEVATION
DOWEL TYP
VERT REINFNOT SHOWN
LAP
SPLI
CE
LAP
SPLI
CE
LAPSPLICE
LAP
SPLI
CE
LAP
SPLI
CE
LAP SPLICE
HORIZONTAL WALL REINFORCEMENT DETAILSINTERSECTIONS
SEE CORNER REINFORCEMENT NOTE 2
PLANWITHOUT CJ
PLANWITH CJ
PLANWITHOUT CJ
PLANWITH CJ
VERT REINFNOT SHOWN
VERT REINFNOT SHOWN
VERT REINFNOT SHOWN
VERT REINFNOT SHOWN
DOWEL TYP
LAP
SPLI
CE
STD 90°HOOK UNO
DOWEL
HORIZONTAL WALL REINFORCEMENT DETAILSCORNERS
SEE CORNER REINFORCEMENT NOTE 1
PLANOPTION #1
PLANOPTION #2
PLANOPTION #1
PLANOPTION #2
VERT REINFNOT SHOWN
VERT REINFNOT SHOWN
VERT REINFNOT SHOWN
VERT REINFNOT SHOWN
LAP SPLICE LAP SPLICE
LAP
SPLI
CE
CORNER BAR
STD 90°HOOKWHEREINDICATED
LAP SPLICE LAP SPLICE
LAP
SPLI
CE
STD 90°HOOKWHEREINDICATED
STD 90°HOOK UNO
STD 90°HOOK UNO
STD 90°HOOK UNO
STD 90°HOOK UNO
STD 90°HOOK UNO
LAP
SPLI
CE
1
1FILL AROUND COLUMN AFTERFLOOR IS CAST AND COLUMNSARE CARRYING FULL DEAD LOAD
CONSTRCTION ORCONTRACTION JOINT
COLUMNCONC OR STEELPER PLAN
SEE PLAN FOR SLAB
(2) #4 EACH SIDE
PREFORMED JOINTFILLER
SLAB-ON-GRADE ISOLATIONJOINT AT COLUMN
6"
TYP
11
SEE PLAN FOR SLAB
FILL AROUND COLUMN AFTERFLOOR IS CAST AND COLUMNSARE CARRING FULL DEAD LOAD
CONSTRUCTION ORCONTRACTION JOINT
(2) #4 EA SIDE
COLUMNCONC OR STEELPER PLAN
PREFORMED JOINTFILLER
EDGE OF GRADEBEAM AND SLAB
SLAB-ON-GRADE ISOLATIONJOINT AT COLUMN
ELEVATOR SILLANGLE AS REQ'DBY ELEVATOR MFR.
L6x6x0'-6" @ 2'-6" OCW/ (2) 1/2" DIA HDDSTUDS
ELEVATOR MFR.
AS REQ'D BY
ELEV
ATO
R M
FR.
AS R
EQ'D
BY
TYPICAL ELEVATOR SILL ANGLE
SLAB REINFPER PLAN
VAPOR BARRIER
ROUND SMOOTH 3/4"x16"DOWELS @12" OC - PAINTAND GREASE ONE END
CJ-1 TYPICAL SLAB-ON-GROUNDCONTRACTION JOINT
FREE DRAINING GRANULARLEVELING COURSE PERPLAN
H
H/2
MAX3"
SEALED (SAWED)1/8" TO 1/4'
0' -
1 1/
4" REINF CLR COVERFROM TOP 1 1/2"
S003A
COMPACTED SUBGRADEMATERIAL PER PLAN
SLAB REINFPER PLAN
VAPOR BARRIERROUND SMOOTH 3/4"x16"DOWELS @12" OC - PAINTAND GREASE ONE END
CJ-2 TYPICAL SLAB-ON-GROUNDCONSTRUCTION JOINT
FREE DRAINING GRANULARLEVELING COURSE PER PLAN
0' -
1 1/
4" REINF CLR COVERFROM TOP 1 1/2"H
H/2
3" MAX
SEALED (SAWED)1/8" TO 1/4"
S003A
COMPACTED SUBGRADEMATERIAL PER PLAN
SEALANT
SEALED JOINT FACE
BACKUP ROD ORPOLYETHYLENESTRIP
INITIAL SAWCUT
SEE SLAB JOINT DETAIL*
0' -
6"*
0' - 1"*
2" T
YP
"D"
1 #5 x 5'-0"TOP & BOTTOM (TYP)
ADDITIONAL BARSPER NOTE 7
ADDITIONAL BARSPER NOTE 7
WALL/SLABUNSLEEVED OPENING
NOTES:1. MINIMUM LENGTH OF ALL BARS SHALL BE "D" + 3'-6" WITH BARS
CENTERED ON OPENING.2. FOR OPENINGS LESS THAN 12" IN DIAMETER, THE ADD BARS ARE
NOT REQUIRED IF NO REINFORCING IS CUT BY THE OPENING.3. SHORT SPAN OF SLAB = LESSER DISTANCE BETWEEN SUPPORT
MEMBERS.4. REINFORCE OPENINGS WITH "D" LARGER THAN 3'-0" AS INDICATED ON
THE DRAWINGS. IF NOT INDICATED, CONTACT THE ENGINEER.5. FOR CONCRETE OPENINGS THROUGH STEEL DECKING, BLOCK
OUT CONCRETE WITHIN OPENING WITH STYROFOAM OR OTHERAPPROVED MATERIAL AND SEAL WITH DUCT TAPE. CUT DECK TOMATCH INSIDE DIMENSIONS OF OPENING AFTER CONCRETE HAS SETFOR 7 DAYS.
6. METAL DECKING HOLES AND OPENINGS SHALL NOT BE CUT UNTILIMMEDIATELY PRIOR TO BEING PERMANENTLY FILLED WITH THEEQUIPMENT OR STRUCTURE INTENDED TO FULFILL ITS SPECIFICUSE OR SHALL BE IMMEDIATELY COVERED. SEE OSHA SECTION29CFR1926 SUBPART R.
7. TOTAL AMOUNT OF REINFORCING IN EACH DIRECTION THAT AREINTERRUPTED BY THE OPENING MUST BE REPLACED BYADDITIONAL BARS WITH EQUAL OR GREATER AMOUNTS OFREINFORCEMENT. ADDITIONAL BARS SHALL BE PLACED EQUALAMOUNTS ON EITHER SIDE OF THE OPENINGS.
6' -
6"5'
- 10
"SH
OR
T SP
AN O
F C
ON
C
1 #5 x5'-0" LG.TOP & BOTTOM (TYP)
ADDITIONAL BARSPER NOTE 7
ADDITIONAL BARSPER NOTE 7
WALL/SLABUNSLEEVED OPENING
NOTES:1. MINIMUM LENGTH OF ALL BARS SHALL BE ("L" OR "W") + 3'-6" WITH
BARS CENTERED ON OPENING.2. FOR OPENINGS ("L" OR "W") LESS THAN 12", THE ADD BARS ARE NOT
REQUIRED IF NO REINFORCING IS CUT BY THE OPENING.3. SHORT SPAN OF CONC = LESSER DISTANCE BETWEEN SUPPORT
MEMBERS.4. REINFORCE OPENINGS WITH "L" OR "W" LARGER THAN 3'-0" AS
INDICATED ON THE DRAWINGS. IF NOT INDICATED, CONTACT THEENGINEER.
5. FOR CONCRETE OPENINGS THROUGH STEEL DECKING, BLOCK OUTCONCRETE WITHIN OPENING WITH STYROFOAM OR OTHER APPROVEDMATERIAL AND SEAL WITH DUCT TAPE. CUT DECK TO MATCH INSIDEDIMENSIONS OF OPENING AFTER CONCRETE HAS SET FOR 7 DAYS.
6. METAL DECKING HOLES AND OPENINGS SHALL NOT BE CUT UNTILIMMEDIATELY PRIOR TO BEING PERMANENTLY FILLED WITH THEEQUIPMENT OR STRUCTURE INTENDED TO FULFILL ITS SPECIFICUSE OR SHALL BE IMMEDIATELY COVERED. SEE OSHA SECTION29CFR1926 SUBPART R.
7. TOTAL AMOUNT OF REINFORCING IN EACH DIRECTION THAT AREINTERRUPTED BY THE OPENING MUST BE REPLACED BYADDITIONAL BARS WITH EQUAL OR GREATER AMOUNTS OFREINFORCEMENT. ADDITIONAL BARS SHALL BE PLACED EQUALAMOUNTS ON EITHER SIDE OF THE OPENINGS.
6' -
6"
SHO
RT
SPAN
OF
CO
NC
2" TYP
"W"
"L"
OTHER THANTOP BARS
f'c = 4000 PSI
MINIMUM BAR TENSION DEVELOPMENT AND LAP SPLICELENGTHS IN INCHES
19
4037
5448
24
3225
31
LAPCLASS TOP BARS
8#3
#8
#10#11
#9
#5
#7#6
#4
19
2527
22
121517
10
GRADE 60 DEFORMED & UNCOATED BARSIN NORMAL WEIGHT CONCRETE
Ldh (INCHES)BAR SIZE
Ldh
CRITICALSECTION
Ldh
0' -
0 1/
8"
4d
TYPICAL REINFORCING DEVELOPMENT AND SPLICES
MINIMUM BAR TENSION DEVELOPMENT (EMBEDMENT)LENGTH, Ldh, WITH STANDARD END HOOKS
f'c = 4000 PSI7
17
2224
20
111315
9
Ldh (INCHES)f'c = 5000 PSI
6
16
2022
18
101214
8
Ldh (INCHES)f'c = 6000 PSI
12db
bN
O. 3
TH
RO
UG
H N
O. 8
0' -
0 1/
8"0'
- 0
1/8"
0' -
0 1/
8"
0' -
0 1/
8"
5db
NO
. 9, N
O. 1
0, A
ND
NO
. 11 0'
- 0
1/8"
0' -
0 1/
8"
6db
NO
. 14,
AN
D N
O. 1
8
HOOKED BAR DETAILS FOR DEVELPMENT OF STANDARD HOOKS
#3
#11
#10
#8
#9
#6
#7
#4
#5
BARSIZE
ABABABABABABABABAB
CASE 1 CASE 2 CASE 1 CASE 2
OTHER THANTOP BARS
f'c = 5000 PSI
TOP BARS
CASE 1 CASE 2 CASE 1 CASE 2
OTHER THANTOP BARS
f'c = 6000 PSI
TOP BARS
CASE 1 CASE 2 CASE 1 CASE 2
70628070917910287113
28
6056
8172
3637
47
10693121105136118153131170
48
15
3129
4237
19
2519
24
544862547061796787
22
4743
6356
2829
36
8171938110591118101131
37
17
3633
4943
2222
28
6355726381709178101
29
25
5450
7365
3333
42
948310894122105137117152
43
13
2826
3733
1717
22
494355486354706078
22
19
4238
5650
2526
32
73648372948110590117
33
15
3331
4440
2020
25
585166577464837193
26
23
4946
6659
3031
38
8676988511196125107139
40
12
2524
3431
1516
20
443951445749645571
20
18
3835
5146
2324
29
6658766685749682107
31
NOTES:1. TABULATED LENGTHS ARE IN INCHES.2. TENSION DEVELOPMENT LENGTHS AND TENSION LAP SPLICE LENGTHS ARE CALCULATED PER
ACI 318-08.3. TABULATED VALUES FOR BEAMS OR COLUMNS ARE BASED ON TRANSVERSE REINFORCEMENT
AND CONCRETE COVER MEETING MINIMUM CODE REQUIREMENTS.4. CASES 1 AND 2, WHICH DEPEND ON THE TYPE OF STRUCTURAL MEMBER, CONCRETE COVER AND
CENTER-TO-CENTER SPACING OF THE BARS, ARE DEFINED AS:
5. TOP BARS ARE HORIZONTAL BARS WITH MORE THAN 12" OF CONCRETE CAST BELOW THE BARS.6. THE TENSION DEVELOPMENT LENGTH, Ld, IS EQUAL TO THE TABULATED "CLASS A" LAP SPLICE LENGTH.
BEAMS AND COLUMNS
ALL OTHERS
CASE 1 CONCRETE COVER AT LEAST 1.0d AND c.-c. SPACING AT LEAST 2.0 dCASE 2CASE 1CASE 2
b bCONCRETE COVER LESS THAN 1.0d AND c.-c. SPACING LESS THAN 2.0 db bCONCRETE COVER AT LEAST 1.0d AND c.-c. SPACING AT LEAST 3.0 db bCONCRETE COVER LESS THAN 1.0d AND c.-c. SPACING LESS THAN 3.0 db b
SLAB REINFPER PLAN
VAPOR BARRIER
TYPICAL SLAB-ON-GRADE DETAIL
FREE DRAINING GRANULARLEVELING COURSE PER PLAN
REINF CLR COVERFROM TOP 1 1/2"
COMPACTED SUBGRADEMATERIAL PER PLAN
SLAB REINFPER PLAN
SLAB-ON-GRADE PER PLAN
TOP OF SLABPER PLAN
SLAB
TH
ICKN
ESS
PER
PLA
N
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:29:
39 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
TYPICAL CONCRETEDETAILS - SHEET 1
S003
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
S003AJOINT DETAIL
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
(3) #4 BOTTOM CONT
STRINGER LOCATIONPER ARCH
L4x4x3/8 W/ ANCHOR PER ARCH
SLAB REINF PER PLAN
1'-6" 1'-6"
TOP OF SLABEL PER PLAN
VAPOR BARRIER
1'-2
" 1' - 0" 1' - 0"
3" C
LR C
OVE
R
(1) #4 @ 16" OC
THICKENED SLAB-ON-GRADEAT STAIR
(3) #4 BOTTOM CONT
SLAB REINF PER PLAN
1'-6" 1'-6"
TOP OF SLABEL PER PLAN
VAPOR BARRIER
1'-2
"
1' - 0" 1' - 0"
3" C
LR C
OVE
R
(1) #4 @ 16" OC
THICKENED SLAB-ON-GRADEAT CMU
DOWELS TO MATCHVERT REINF
CMU WALL PER PLAN
TOP OF SLAB
MID-SPAN
CLCL
BEAM AND REINFPER PLAN & SCHEDULE
NOTES:1. CONCRETE CLEAR COVER REFER TO GENERAL NOTES SHEET.2. SLAB THICKNESS AND REINFORCEMENT PER PLAN.
x x x x x x x x x x x x x x
SLAB REINF W/ CONT WELDEDWIRE FABRIC (WWF), DRAPEDW/ CLEAR COVER AT TOPAND BOTTOM RESPECTIVELY
SLAB REINF W/ CONT WELDEDWIRE FABRIC (WWF), DRAPEDW/ CLEAR COVER AT TOPAND BOTTOM RESPECTIVELY
DIAGONAL BARS AT SLABRE-ENTRANT CORNER
(1) #5 x 5'-0" LONGTOP & BOTTOM, TYP
SLAB PER PLAN
EDGE OFSLAB (TYP)
(TYP)6" CHAMFERED
CORNER (TYP)
EQUIPMENTBY OTHERS
#3 @ 12"OC EA WAY
KINETIC NOISE CONTROL WEDGETYPE ANCHORS. 3/8" DIA W/ 3" EMBEDMENTINTO SUPPORTING SLAB. SEE NOTES #2AND #3 FOR ADDITIONAL REQUIREMENTS
SLAB PER PLAN0' -
6"
CO
NTR
ACTO
R S
HAL
L VE
RIF
YW
/ MEC
HAN
ICAL
DES
IGN
DO
CU
MEN
T FO
R P
AD T
HIC
KNES
SR
EQU
IRED
, 4" M
IN &
6" M
AX
CO
VER
1" C
LR
3"TOP OF SLABPER PLAN
NOTES:1. CONTRACTOR SHALL VERIFY PAD SIZE AND LOCATION WITH MECHANICAL
AND ARCHITECTURAL DESIGN DOCUMENTS PRIOR TO PLACING CONCRETE PAD.2. CONTRACTOR SHALL VERIFY WITH THE EQUIPMENT SUPPLIER FOR QUANTITY
AND LOCATIONS OF THE ANCHORS.3. CONTRACTOR SHALL FOLLOW ANCHOR SUPPLIER'S SPECIFICATIONS AND
TECHNICAL GUIDE FOR ANCHOR INSTALLATION.
TYP
4 1/
2"
T/SLAB ELSEE PLAN
EMBED L6x6x3/8 x 1'-3"W/ (3) 1/2" DIA HEADEDSTUDS @ 0'-8" LONG EA LEG
MIN L4x4x1/2 x 0'-8"
HANGER BY STAIR SUPPLIER.COORDINATE W/ ARCHDRAWINGS FOR LOCATION
SLAB REINFPER PLAN
TYPICAL STEEL STAIRHANGER AT CONCRETE BEAM
STAIR STRINGER
CONNECTION BYSTAIR SUPPLIER SLAB REINF
PER PLAN
EMBED PL 1/2"x8"x0'-8" W/(4) 1/2" DIA x 0'-6" LONGHEADED STUDS
BEAM & RENIF PERPLAN & SCHEDULE
8"
SLAB REINFPER PLAN
ELEVATOR SILL ANGLE ASREQ'D BY ELEVATOR MFGR
EMBED PL 1/2"x6"x0'-8"W/ (2) 1/2" DIA x 6" LONGHEADED STUDS AT 2'-0"OCAND AT EACH END
BEAM & REINF PERSCHEDULE AND PLAN
0' -
2 5/
8"
AS R
EQ'D
BY
ELEV
ATO
R M
FGR
0' - 7" AS REQ'D BYELEVATOR MFGR
TYPICAL ELEVATOR SILL ATCONCRETE BEAM
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:29:
42 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
TYPICAL CONCRETEDETAILS - SHEET 2
S004
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
TYPICAL CONCRETE SLAB REINF LAYOUT
TYPICAL HOUSE KEEPING PAD ON SLABTYPICAL STEEL STAIR AT CONCRETE BEAM
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
CONCRETE MASONRY UNIT (CMU) NOTES:A. GENERAL
1. ENGINEERED MASONRY IS DESIGNED IN ACCORDANCE WITH"BUILDING CODE REQUIREMENTS FOR MASONRY STRUCTURES"ACI 530/ ASCE 5/ TMS 402, 2005
2. UNITS: ASTM C90, TYPE II NORMAL WEIGHT EXCEPT OVEN-DRYWEIGHT SHALL NOT BE LESS THAN 119 PCF.COMPRESIVE STRENGTH = 1900 PSI MINIMUMMORTAR: ASTM C270 TYPE S = 1800 PSIASSEMBLY/PRISM MINIMUM COMPRESSIVE STRENGTH, f'm = 1500 PSIGROUT: ASTM C476, MINIMUM COMPRESSIVE STRENGTH = 2000 PSI,SLUMP = 8" to 11".REINFORCING STEEL BARS: ASTM A615 GRADE 60.
3. FULLY GROUT ALL CELLS CONTAINING REINFORCING STEEL ORANCHORS.
4. CONSOLIDATE GROUT IN ASSEMBLED WALLS.5. USE FULL CONTACT LAP SPLICES FOR REINFORCING STEEL IN CMU
WALLS AS FOLLOWS:#4 BARS: MINIMUM 24 INCHES#5 BARS: MINIMUM 30 INCHES#6 BARS: MINIMUM 36 INCHES
6. WHERE STRUCTURAL STEEL MEMBERS PENETRATE CMU WALLS,PROVIDED FIRE RESISTIVE CLOSURE AS REQUIRED ALLOWING FOR1 INCH CLEARANCE AROUND STEEL. PACK WITH FIRE SAFINGINSULATION AND INSTALL A 22 GAGE GALVANIZED SHEET METALENCLOSURE SECURED TO WALL. SEAL ALL AROUND WITH FIRE-RESISTIVE SEALANT.
7. USE RUNNING BOND PATTERN, UNLESS INDICATED OTHERWISE8. PROVIDE SUPPORT AT THE TOP OF WALLS, UNLESS INDICATED
OTHERWISE. SEE NOTE E.B. VERTICAL REINFORCING
1. UNLESS NOTED OTHERWISE INDICATED, PROVIDE (1) #5 VERTICALCENTERED IN THE WALL AT THE FOLLOWING SPACING: 32"
2. PROVIDE AN ADDITIONAL VERTICAL REINFORCEMENT AT EACH SIDEOF CONTROL JOINTS, AT INTERSECTION OF EXTERIOR WALLS, ANDAT EACH SIDE OF ALL MASONRY OPENINGS GREATER THAN 10" INWIDTH. IN OPENINGS MORE THAN 24" PROVIDE ADDITIONAL VERTICALREINFORCEMENT IN TWO ADJACENT CELLS ON EACH SIDE OF THEOPENING. ADDED VERTICAL REINFORCEMENT SHALL BE CONTINUOUSFOR THE FULL HEIGHT OF WALL UNO. SEE ADD BAR DETAIL ON THIS
DWG.3. PROVIDE FOUNDATION DOWEL SAME SIZE AND LOCATION AS VERTICAL
BARS IN THE WALL ABOVE. SHALL BE LOCATED AT EACH VERTICALWALL REINFORCEMENT AND SHALL EXTEND A MINIMUM OF 18" (450mm)INTO THE CONCRETE FOUNDATION WALL. AT THICKENED SLABS,EXTEND DOWELS TO WITHIN 2" (50mm) OF THE BOTTOM OF SLAB ANDPROVIDE A STANDARD 90° HOOK.
4. EXTEND ALL VERTICAL BARS FROM THE BOTTOM COURSE THROUGHTHE TOP MOST BOND BEAM.
5. PROVIDE VERTICAL REINFORCEMENT IN ALL CELLS UNDER AND ONEON EACH SIDE IF A CONCRETE BEAM IS SUPPORTED BY MASONRY WALL(LOAD BEARING WALLS ONLY).
C. HORIZONTAL REINFORCING1. CONSTRUCT BOND BEAMS USING (2) #5 HORIZONTAL UNO.2. PROVIDE BOND BEAMS AT 4'-0" MAX VERTICAL SPACING WHERE NOT
INDICATED ON DRAWING, OR AT OTHER ELEVATIONS AS INDICATED.3. LOCATE BOND BEAMS AT THE BOTTOM-MOST COURSE AND THE
TOP-MOST OR AT THE SECOND FROM TOP-MOST COURSE AS PRACTICAL.4. PROVIDE BOND BEAM BELOW ALL MASONRY OPENINGS AND EXTEND
A MINIMUM OF 16" BEYOND EACH SIDE OF OPENING.5. DISCONTINUE BOND BEAM REINFORCEMENT AT WALL CONTROL JOINTS
EXCEPT AT ELEVATED FLOOR AND ROOF LEVELS.6. PROVIDE HORIZONTAL JOINT REINFORCEMENT AT EVERY OTHER
COURSE OR A MAXIMUM 16" SPACING. BEGIN JOINT REINFORCINGAT THE TOP OF SECOND BLOCK COURSE ABOVE FLOOR SLAB.
7. DISCONTINUE HORIZONTAL JOINT REINFORCEMENT AT CONTROL JOINTS.D. CONTROL JOINT
1. USE PREMOLDED CONTROL JOINT KEY INSERTS WITH SASH BLOCK;USE CORRUGATED METAL SEPARATOR AT BOND BEAM LOCATIONS.
2. LOCATE CONTROL JOINT WHERE INDICATED ON THE ARCHITECTURALFLOOR PLANS; OR WHEN NOT INDICATED AS LISTED BELOW:a. LOCATE APPROXIMATELY 1/2 THE WALL HEIGHT FROM WALL
INTERSECTIONS. LOCATE AT SPACING NOT GREATER THAN 24'-0"IN INTERIOR WALLS; 15'-0" IN EXTERIOR WALLS.
b. AVOID CREATING SLIP PLANES AT DOOR OR WINDOW LOCATIONS.c. LOCATE ABOVE EXPANSION AND CONTROL JOINTS IN SUPPORTING
CONCRETE FLOOR, BEAMS, OR WALLS.d. DO NOT PROVIDE INTERMEDIATE CONTROL JOINTS IN PARAPET WALLS
UNLESS SO INDICATED ON THE ARCHITECTURAL DRAWINGS.3. EXPANSION / CONTRACTION JOINTS:
a. PROVIDE A MINIMUM 3/4" GAP BETWEEN THE TOP OF THE CMU WALLAND THE BOTTOM OF THE CONCRETE STRUCTURE, EXCEPT AT LOADBEARING WALLS.
b. PROVIDE A MINIMUM 3/4" GAP BETWEEN THE END OF AN INTERIOR CMUWALL AND THE SIDE OF A CONCRETE BEAM.
c. PROVIDE CONTINUOUS COMPRESSIBLE FILLER OR FIRE SAFEINGINSULATION AS REQUIRED (FULL WIDTH AND FULL LENGTH) OF THESAME THICKNESS AS THE JOINT.
E. TOP CLIP SUPPORTS:1. PROVIDE BENT PLATE SUPPORTS OR DIAGONAL BRACING SUPPORT AT
EVERY VERTICAL REINFORCEMENT LOCATION AND AS LISTED BELOW,EXCEPT AT LOAD-BEARING WALLS.
2. LOCATE AT DISCONTINUOUS ENDS OF WALLS, AT EACH SIDE OF INTERMEDIATECONTROL JOINTS, AND AT EACH SIDE ABOVE OPENINGS WIDER THAN 6'-6".
3. TWO CELLS UNDER EACH TOP CLIP SHALL BE FULLY GROUTED. SOLIDMASONRY UNITS MAY BE PROVIDED.
F. LINTELS:1. PROVIDE MASONRY LINTELS ABOVE OPENINGS IN MASONRY WALLS AS
REQUIRED. SEE DETAILS ON THIS DRAWING.
WALLCONTROLJOINT
STEEL BEAMSEE NOTE A.6
LINTEL
DOWEL (TYP)SEE NOTE B.3
T.O. WALL
FLOOR
CONTINUOUS WIREREINFORCING @1'-4" O.C. VERTSEE NOTE C.6
BOND BEAMW/ (2) #5HORIZONTALREINF
FULL HEIGHT VERTICALREINFORCING AT BEARINGOF LINTEL (TYP) PROVIDEONE VERT BAR FORLINTEL L-1; TWO VERTICALBARS FOR LINTEL-2 TYPICAL VERTICAL
REINFORCING FILLCELLS W/ GROUTSEE NOTE B.1TYPICAL CMU WALL ELEVATION
1' -
4"
TYPICAL BOND BEAM
VERTICALREINF. AS REQ'D.FILL WITHGROUTCMU LINTELW/ (2) #5
METAL LATH SCREEN
8"
8"
TYPICAL FOR MASONRY OPENINGS UPTO 4'-0" WIDE. PROVIDE 8" BEARINGAT EACH END.
LINTEL L-1
VERTICALREINF. AS REQ'D.FILL WITHGROUTCMU LINTELW/ (2) #5
ALTERNATING 2"HOOK DIRECTION
8"
8"
TYPICAL FOR MASONRY OPENINGSGREATER THAN 4'-0" TO 10'-0" WIDE.PROVIDE 16" BEARING AT EACH END.
LINTEL L-2
VERTICALREINF. AS REQ'D.FILL WITHGROUTCMU LINTELW/ (2) #5
ALTERNATING 2"HOOK DIRECTION
2 C
OU
RSE
S H
IGH
CONT JOINT REINFAT 1'-4" OC VERT
VERT REINFFILL CELLSW/ GROUT
CMU WALL
TYPICAL CMU WALL CORNER DETAIL
BOND BEAMREINFORCEMENT
CMU WALL
STD 90° HOOK
VERT WALLREINF (TYP)
TYPICAL CMU WALL CORNER DETAILAT BOND BEAMS
LAPSPLICE
CONT JOINT REINFAT 1'-4" OC VERTDISCONTINUE ATWALL INTERSECTION
VERT WALL REINF FILLCELLS W/ GROUT
RAKE MORTAR BACK& FILL W/ SEALANTEACH SIDE
CMU WALLS
CONT JOINT REINFAT 1'-4" OC VERTDISCONTINUE ATWALL INTERSECTION
1 1/2"x1/4" STEELANCHOR STRAP@ 16" OC VERT
TYPICAL CMU WALL INTERSECTION DETAIL
3"
2'-0
"
3"
LAP SPLICE LAP SPLICE
LAP
SPLI
CE
BOND BEAM REINF
VERT WALL REINF
CMU WALL
TYPICAL CMU WALL INTERSECTION DETAILAT BOND BEAMS
TYPICAL CMU WALL REINFORCING
VERT WALL REINFCENTERED IN CELL,FILL CELL W/ GROUT CMU WALL
CONT JOINT REINFAT 1'-4" OC VERT
VERT REINFFILL CELLW/ GROUT
CONT JOINT REINFORCINGAT 1'-4" OC VERT DISCONTINUEAT CONTROL JOINT
PREMOLDED CONTROLJOINT KEY INSERT
CONTROL JOINT(PROVIDE JOINTSEALANT EA SIDE)
TYPICAL CONTROL JOINT DETAIL
CMU WALL
CMU WALL
18 GAGE CORRUGATEDMETAL SEPERATOR
DISCONTINUE BONDBEAM REINFORCEMENTAT CONTROL JOINTSEE NOTE C.5
VERT REBARFILL CELLSW/ GROUT
TYPICAL CONTROL JOINT DETAILAT BOND BEAMS
1' - 4"OPENING WIDTH
1'-0" TO 4'-0" 1' - 4"
OPE
NIN
G H
EIG
HT
AS R
EQU
IRED
#5 VERT ADD BARS FULLHEIGHT. FILL CMU CELLSBOTH SIDES OF OPENINGSEE NOTE B.2
BOND BEAM W/(2) #5 CONTINUOUS
CONTINOUS WIREREINFORCEMENT
MASONRY LINTEL
TYPICAL NON-LOAD BEARING CMU WALL CLOSUREDETAIL AT ROOF DECK WALL PARALLEL TO FLUTES
ROOF DECK ORMETAL ROOFING
FIRE RATEDSEALANT
FILL VOID AT TOP OFCMU WALL W/ FIRESAFING INSULATION
GROUT SOLID ATVERTICAL RST
CMU BOND BEAMW/ (2) #5 CONT
VERT WALLREINFORCEMENTEXTEND FULLHEIGHT THRUBOND BEAMS
METAL LATH SCREEN
CONTINUOUS WIREREINFORCEMENTAT 16" OC VERT
TYPICAL NON-LOAD BEARING CMU WALL CLOSUREDETAIL AT ROOF DECK WALL PARALLEL TO JOIST
ROOF DECK ORMETAL ROOFING
20 GA SHEET METALCLOSURE BOTH SIDESANCHOR TO CONCRETEBLOCKFILL VOID AT TOP OFCMU WALL W/ FIRESAFING INSULATION
CMU BOND BEAMW/ (2) #5 CONTVERT WALLREINFORCEMENTEXTEND FULL HEIGHTTHRU BOND BEAMS
METAL LATH SCREEN
CONTINUOUS WIREREINFORCEMENTAT 16" OC VERT
STEEL ROOFPURLIN
CONTINUOUSL4x4x1/8 ANCHOREDTO PURLINS
COMPRESS ROOFINSULATION
TYPICAL NON-LOAD BEARING CMU WALL CLOSUREDETAIL AT ROOF DECK WALL PERPINDICULAR TO FLUTES
ROOF DECK ORMETAL ROOFING
FIRE RATEDSEALANT
FILL VOID AT TOP OFCMU WALL W/ FIRESAFING INSULATION
CMU BOND BEAMW/ (2) #5 CONT
VERT WALLREINFORCEMENTEXTEND FULLHEIGHT THRUBOND BEAMS
METAL LATH SCREEN
CONTINUOUS WIREREINFORCEMENTAT 16" OC VERT
1"
GROUT SOLIDAT VERT RST
FILL VOID AT TOP OFCMU WALL W/ FIRESAFING INSULATION
GROUT SOLID ATVERTICAL RST
CMU BOND BEAMW/ (2) #5 CONT
VERT WALLREINFORCEMENTEXTEND FULLHEIGHT THRUBOND BEAMS
METAL LATH SCREEN
CONTINUOUS WIREREINFORCEMENTAT 16" OC VERT
L4x4x1/4x1'-0" CENTERON BLOCK WITH VERT BARS
ROOF DECK ORMETAL ROOFING
ROOF PURLIN
TYPICAL CMU WALL CLOSURE DETAIL AT ROOF DECKWALL PERPENDICULAR TO PURLIN
1"
TYPICAL NON-LOAD BEARING CMU WALL CLOSUREDETAIL AT ROOF DECK WALL PERPINDICULAR TO FLUTES
ROOF DECK ORMETAL ROOFING
FIRE RATEDSEALANT
FILL VOID AT TOP OFCMU WALL W/ FIRESAFING INSULATION
CMU BOND BEAMW/ (2) #5 CONT
VERT WALLREINFORCEMENTEXTEND FULLHEIGHT THRUBOND BEAMS
METAL LATH SCREEN
CONTINUOUS WIREREINFORCEMENTAT 16" OC VERT
1"
GROUT SOLIDAT VERT RST
FIRE STOPSYSTEM
ROOF DECK ORMETAL ROOFING
ROOF PURLIN
L4x4 CMU WALL
AT ROOF PURLIN AT WALL GIRT
FIRE STOPSYSTEM
WALLGIRT
WALLPANEL
NOTCH CMU WALLAS REQUIRED TOCLEAR WALL GIRT
VERT RST FULL HEIGHT
CMU WALL
FILL VOID WITH FIRE RATEDCOMPRESSIBLE FILLER PERARCH SPECIFICATION
L5x3x3/8 (LLV) OR EQUIVALENT BENT PLATE0'-8" LG EACH SIDE OF WALL @ EVERYVERT REINF LOCATIONS W/ (1) 5/8" DIA EXPANCHOR (3" MIN EMBED)
BOND BEAM PER NOTE
VERT REINF IN FULLYGROUTED CELL PERNOTE
CONCRETE SLAB ABOVE
TOP OF WALL
NON-LOAD BEARING CMU WALL TOCONCRETE SLAB TYPICAL DETAIL
NTS
BOTTOM OFCONCRETE SLAB
FILL VOID WITH FIRE RATEDCOMPRESSIBLE FILLER PERARCHITECTURAL SPECIFICATION
L5x3x3/8 (LLV) OR EQUIVALENTBENT PLATE 0'-8" LG @EVERY VERT REINF LOCATIONW/ (1) 5/8" DIA EXP ANCHOR(3" MIN EMBED)
BOND BEAM
VERT REINF W/ FULLYGROUTED CELL PER NOTE
SLAB AND BEAM PERPLAN (REINF NOTSHOWN FOR CLARITY)
NON-LOAD BEARING CMU WALL TOCONCRETE SLAB TYPICAL DETAIL
NTS
3 1/2"
MIN
0'-3
1/2
" 0'
- 2"
1" M
IN
MIN
0' -
3"
PLATE 3/8" THK. x 0'-8" LG @EVERY VERT REINF LOCATIONSW/(1)-5/8" DIA EXP ANCHOR(3" MIN EMBED)
LAP
LEN
GTH
CONCRETE SLAB ANDREINF. PER PLAN
CONTINUOUS BOND BEAMBOTTOM COURSE
CMU WALL, SEE ARCH
DOWEL TO MATCHVERTICAL REINFORCING
VERTICAL REINFORCING
ALTERNATE DIRECTION OF DOWELHOOK
TYPICAL CMU WALL @ SLABNTS
MIN1"
TOP OF SLABPER PLAN
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:29:
46 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
TYPICAL MASONRYDETAILS
S005
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
TYPICAL WALL OPENING REINFORCING
NOT TO SCALE NOT TO SCALE
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
GENERAL NOTES:1. ALL DETAILS AND NOTES ON THIS DRAWING ARE BURNS & McDONNELL STANDARDS,
WITHOUT RESPECT TO CONTRACT. USE ONLY THOSE TYPES CALLED FOR ON PLANS,OR AS REQUIRED TO ACCOMPLISH THE WORK.
2. ITEMS WHICH ARE TO BE FURNISHED AND INSTALLED BY SAPERATE CONTRACTS AREIDENTIFIED AND LABELED FOR EACH CONTRACT.
3. UNLESS OTHERWISE INDICATED, CONNECTIONS FOR BEAMS SHOWN ON OTHERDRAWINGS SHALL CONFORM TO THE REQUIREMENTS DEFINED BELOW.
NOTES:1. UNLESS NOTED OTHERWISE ALL BEAMS ON COLUMN ROW SHALL
BE IN ACCORDANCE WITH TABLE 10-2 CASE 1 WITH SHOP WELDS.2. THE NUMBER INDICATES THE MINIMUM NUMBER OF ROWS OF HIGH
STRENGTH BOLTS FOR THAT END CONNECTION. END CONNECTIONSSHALL BE STANDARD "FRAMED BEAM" CONNECTIONSPER TABLE 10-1 CASE 1 OF AISC STEEL CONSTRUCTION MANUAL13TH EDITION. AT CONTRACTORS OPTION UNLESS OTHERWISEINDICATED THE FOLLOWING MINIMUMS APPLY TO TABLE 10-1 CONNECTIONS.
0' -
2"
0' - 2"
0' -
2"
0' - 2"
G G¹
GG
G & G¹ = 2" MIN FOR STD HOLES (G¹ = 1 1/4" MIN FOR BEAMS LESSTHAN A W12).G & G¹ = 2 1/4" MIN FOR OVERSIZED AND SHORT SLOTTED HOLES(G¹ = 1 3/8" MIN FOR BEAMS LESS THAN A W12).MINIMUM CLIP ANGLE THICKNESS SHALL BE 5/16" BEAM TO BEAMCONNECTION.MINIMUM CLIP ANGLE THICKNESS SHALL BE 3/8" BEAM TOCOLUMN CONNECTION.TABLE 10-2 CASE 1 WELDS TO BE 3/16"
3. WHERE NO STANDARD "FRAMED BEAM" CONNECTIONS SYMBOL ( X )IS INDICATED BEAM END CONNECTIONS SHALL BE IN ACCORDANCEWITH THESE NOTES AND WITH THE FOLLOWING MINIMUM NUMBEROF HIGH STRENGTH BOLTS:
C6, W6, OR LESS = 2 ROWS W21 = 4 ROWSC8 OR W8 = 2 ROWS W24 = 5 ROWSC10 OR W10 = 2 ROWS W27 = 6 ROWSC12 OR W12 = 2 ROWS W30 = 7 ROWSW14 = 3 ROWS W33 = 8 ROWSC15 OR W16 = 3 ROWS W36 = 8 ROWSW 18 = 4 ROWS
4. THE NUMBER OF BOLTS AND NUMBER OF ROWS OF BOLTS INDICATEDOR STATED IS THE MINIMUM NUMBER OF BOLTS OR ROWS. PROVIDEADDITIONAL BOLTS OR CONNECTION DEVICES, IF NECESSARY, TOCOMPLY WITH OSHA REGULATION 29CFR1926 SUBPART R-STEELERECTION.
5. ROWS OF BOLTS: THE NUMBER OF FASTENERS IN A VERTICAL ROW.6. BEAM CONNECTIONS ARE BASED ON THE USE OF STANDARD,
OVERSIZED OR SHORT-SLOTTED HOLES AS DEFINED BY AISC STEELCONSTRUCTION MANUAL 13TH EDITION. LONG-SLOTTED HOLES ARENOT PERMITTED.
7. BEAM CONNECTIONS GAGE SHALL BE 5 1/2" MAX GAGE MAY BEREDUCED AT FABRICATORS OPTION.
8. MINIMUM SPACING BETWEEN BOLTS SHALL COMPLY WITH AISCSTEEL CONSTRUCTION MANUAL 13TH EDITION.
W16X26 (c)
STEEL BEAM SIZE
X
STANDARD "FRAMED BEAM"CONNECTION SYMBOL SEENOTES BELOW
STANDARD FRAMED BEAM CONNECTIONS
INDICATES CAMBER
(20)QUANTITY OF SHEARCONNECTORS EQUALLYSPACED ON BEAM TOP FLANGE
XX XX
BRACED FRAME LOCATION
LOCATE STUDS ASSHOWN FOR PAIRSOF STUDS. LOCATESINGLE STUD ONCENTERLINE OF WEB
FLOOR DECK PER PLAN
GIRDER PER PLAN
FLOOR DECKPER PLAN
BEAM PER PLAN
STUD PLACEMENT NOTES:1. BEAMS (PERPENDICULAR TO DECK): PLACE STUDS UNIFORMLY
ALONG LENGTH WITH REMAINDER PLACED AT FLUTES EACH ENDOF BEAM IN EQUAL NUMBERS.
2. GIRDERS (PARALLEL TO DECK): NUMBER IN PARENTHESES (X) PERPLAN TO BE UNIFORMLY PLACED ALONG LENGTH OF GIRDER.
3. MAXIMUM LONGITUDINAL SPACING = 36" (DECK MUST BE ATTACHEDTO BEAM FLANGE BY PUDDLE WELDS IF THE STUD SPACING EXCEEDS 18")
4. MINIMUM LONGITUDINAL SPACING = 6" STUD DIAMETERMINIMUM TRANSVERSE SPACING = 4" STUD DIAMETER
5. 5 1/2" MINIMUM FLANGE WIDTH FOR 2 ROWS OF STUDS.
CLR
CO
VER
PRIMARY REINFPER PLAN
SHEAR CONNECTOR PERPLAN & GENERAL NOTES
FLOOR DECK PER PLAN
CHAIR REQ'DTO SECUREREINF IN PLACE BEAM PER PLAN
TOP OF STEELPER PLAN
PRIMARY REINFPER PLAN 1"
GIRDER PER PLAN
TOP OF STEELPER PLAN
CLR
CO
VER
PRIMARY REINFPER PLAN
SHEAR CONNECTOR PERPLAN & GENERAL NOTES
FLOOR DECK PER PLAN
ADD'L REINF PER PLANCENTERED OVER GIRDER
1"
PRIMARY REINFPER PLAN
USE THIS DETAIL FOR STIFFENERS AT ALL LOCATIONSON DRAWINGS INDICATED AS "STIFF PL'S" UNO
NOTE:
WIDE FLANGE MEMBER
STIFFENER PL'S TO BE OFTHICKNESS INDICATEDFULL DEPTH OF BEAM
TO MATCH MEMBER DIM
THREADS (2D+3" SINGLE NUT)THREADS (3D+3" DOUBLE NUTS)
PL 1/2" x 3" SQSQUARE PL
3'-0"1 1/2" 4" PL 1" x 6" SQ10"3/4"
D2"A B
WELD 3 PTS
SQUARE PL
BOLT PROJECTION
BOLT DIAMETERD =
P =
K =
DAMAGE LAST THREAD TOPREVENT REMOVAL OF NUT
SCHEDULE
REMARKS
TOP OF CONCRETEPER PLAN
CIRCULAR 2" x 3/8" WASHERCIRCULAR 3 1/2" x 5/8" WASHER
DAMAGE LAST THREAD TOPREVENT REMOVAL OF NUT
BOTTOM OF BASE PLEL PER SCHEDULE
BA
K
D
P
HEAVY HEX NUTWITH WASHER
GROUT
1S-006
SECTION 1S-006NOT TO SCALE
2'-0"MAX
1'-2
"M
AX
C4x5.4 (FLANGES DOWN)FASTENED TO UNDERSIDEOF DECK W/ #12 GALVSELF-DRILLING SCREWAT EACH FLUTE. EXTENDC4 A MIN OF 3 FLUTES ONEACH SIDE OF OPENING
JOIST OR BEAM
UP TO 24" OPENINGPERPINDICULAR TO DECK
OPENING GREATER THAN24" AND UP TO 60"
C4X5.4 AT EDGE OFOPENING ATUNDERSIDEOF DECKC4x5.4 SPANBETWEENSTEEL JOISTOR BEAM.
JOIST OR BEAM
OPENINGS BETWFLUTES. NOREINF REQ'D
14 GAGE GALVSTEEL PL FASTENEDTO DECK FLUTESTOP OR BOT
2 FLUTES MINTO REMAINBETWEENOPENINGS
OPENINGBETWEENFLUTES
OPENING CUTTINGONE FLUTE ONLY
. 1" 1" .
STL BM/JOIST
L4x4x1/4x0'-6"
METAL ROOF DECK
C4x5.4
3/163/16
3/16 1"3/16 1'
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:29:
49 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
TYPICAL STEELDETAILS
S006
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
COMPOSITE DECK SHEAR CONNECTORS
DECK PERPENDICULAR TO BEAM DECK PARALLEL TO BEAM TYPICAL STIFFENER DETAIL
ANCHOR ROD DETAIL
TYPICAL FLOOR/ROOF OPENING DETAIL
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
DIAMETER(INCHES)
REINFORCEMENTVERTICAL HORIZONTAL
END BEARINGPRESSURE REMARKS
DRILLED PIER SCHEDULE
48
54
50 KSF
50 KSF
3" C
LR
BEAR
ING
STR
ATU
M
MIN
10'
-0" P
ENET
RAT
ION
INTO
UN
WEA
THER
ED
SEE
PLA N
PIER
DIA
MET
ER
TEN
SIO
N L
AP
CLA
SS "B
"
TEN
SIO
N L
AP
CLA
SS "B
"
3"
3"
3"
UNWEATHERED BEDROCKBEARING STRATUM
(3) SETS ADDITIONALHORIZ TIES(TOP & BOTTOM)
T/PIER EL.SEE PLAN
T/SLAB EL.SEE PLAN
AT COLUMN LOCATIONS,DOWELS TO BE SAME SIZE& QUANTITY AS VERTICALREINF OF COLUMN. DOWELSAT GRADE BEAM & WALLLOCATIONS, REFER TO GRADEBEAM & WALL SECTIONS & DETAILS.WHERE NO DOWELS ARE SHOWNIN DETAILS & SECTIONS, PROVIDE(6) #6 DOWELS W/ STADARD HOOK.
DIA
LAP
48 B
AR
SEE PIER SCHEDULEFOR VERTICAL ANDHORIZONTAL TIES
SEE PIER SCHEDULEFOR VERTICAL ANDHORIZONTAL TIES
SEE COLUMN SCHEDULE FORSIZE AND REINFORCING DETAILS
SEE TYP SLAB-ON-GRADEAT COLUMN DETAIL
DOWELS TO MATCHCOLUMN VERTICALS
T/PIER ELSEE PLAN
T/SLAB ELSEE PLAN
ISOLATION JOINT
TEN
SIO
N L
AP
CLA
SS "B
"
TEN
SIO
N L
AP
CLA
SS "B
"
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:29:
50 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
TYPICAL FOUNDATIONDETAILS - SHEET 1
S007
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
DRILLED PIER TYPICAL DETAIL
PIER TO CONCRETE COLUMN TRANSITIONNOT TO SCLE
NOT TO SCLE
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
#4@12"OC DOWEL (TYP)3'-0"
3'-0
"
ELEVATED STRUCTURALFLOOR SLAP PER PLAN
WALL PER PLAN(RENF NOT SHOWNFOR CLARITY)
JOINT FILLER (TYP)
SLAB-ON-GRADEPER PLAN
GRANULAR DRAINAGEFILL PER PLAN
VAPOR BARRIER
COMPACT SUBGRADEPER PLAN
GRADE BEAM PER PLAN
PIER PER PLAN
MIN
2' - 0"
WATER STOP
WATERPROOFINGPER ARCH
SLOPE FINISHED GRADE
AWAY FROM BUILDING.
FREE DRAINING GRANULARBACKFILL ENCAPSULATEDIN SUITABLE FILTER FABRICPER GEOTECHNICALENGINEERING REPORT
SELECTBACKFILL SOIL
DRAINLINE WRAPPED W/FILTER FABRIC PERPLUMBING DESIGN DOCUMENT
TOP OF SLABPER PLAN
TOP OF SLABPER PLAN
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:29:
52 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
TYPICAL FOUNDATIONDETAILS - SHEET 2
S008
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
BASEMENT AND BELOW GRADE WALLNOT TO SCALE
EQUALLY SPACEDVERTICAL BARS
CLR COVER PER
GENERAL NOTES, TYP
TIES -LAP48 BAR DIA
TYPE 100 TYPE 102(8) EQ SPACED VERTICAL BARS
TYPE 103(12) EQ SPACED VERTICAL BARS
GENERAL NOTESCLR COVER PER
GENERAL NOTESCLR COVER PER
TYP, UNO TYP, UNO
TYPE 101(4) EQ SPACED VERTICAL BARS
GENERAL NOTESCLR COVER PER
TYP, UNO
FOUNDATION REINFNOT SHOWN FOR CLARITY
DOWELS TO MATCHCOLUMN VERT REINF
TOP OF DRILLED PIEROR GRADE BEAM PER PLAN
GROUND SLABPER PLAN
2"
TEN
SIO
N L
AP (T
YP)
CLA
SS "B
"
SCH
EDU
LE, T
Y PTI
E SP
ACIN
G P
ER
SLAB/BEAM PER PLAN(REINF NOT SHOWNFOR CLARITY), TYP
INTERMEDIATE FLOORTOP OF SLABPER PLAN
VERTICAL BAR BENDSLOPE PER ACI (TYP)
ROOFTOP OF SLABPER PLAN
2"
TEN
SIO
N L
AP (T
YP)
CLA
SS "B
"
TYP
2"
TIES @ 6"OC MAXWITH IN FLOORCONSTRUCTION
ADDITIONAL (3) SETS OF TIES@ 3"OC TOP & BOTTOM OFCOLUMN, TYP
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:29:
54 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
TYPICAL CONCRETECOLUMN DETAILS
S009
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
TYPICAL CONCRETE COLUMN SECTION
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
STIRRUP SCHEDULENTS
S2 S4
SPAC
ING
PER
NO
TE 3
& 4
SPACINGPER NOTE 1 & 4
NOTE:1. MINIMUM CLEAR SPACING BETWEEN PARALLEL BARS IN A LAYER SHALL
NOT BE LESS THAN THE GREATER OF BAR DIAMETER OR 1".2. REINFORCEMENT SHALL BE PROVIDED IN A SINGLE LAYER UNLESS
MULTIPLE LAYERS ARE REQUIRED TO MEET CLEAR SPACINGREQUIREMENTS OF NOTE 1.
3. WHERE PARALLEL BARS ARE PLACED IN TWO OR MORE LAYERS, BARS INTHE UPPER LAYER SHALL BE PLACED DIRECTLY ABOVE BARS IN THEBOTTOM LAYER WITH A CLEAR SPACING NOT BE LESS THAN 1".
4. CLEAR SPACING REQUIREMENTS SHALL ALSO APPLY TO CLEAR SPACINGBETWEEN CONTACT LAP SPLICE AND ADJACENT SPLICES OR BARS.
5. SPACING REQUIREMENTS APPLY TO TOP AND BOTTOM BARS
TYPICAL LONGITUDINAL BAR SPACING DETAILNTS
BEAM BAR TYPE AND DETAILSBEAM
BAR TYPE
TOP BARTYPE "B"
END SUPPORT
TOP BARTYPE "C"
INTERIOR SUPPORT
TOP BARTYPE "D"
INTERIOR SUPPORT
TOP BARTYPE "E"
SINGLE SPAN
TOP BARTYPE "F"
END SPAN
TOP BARTYPE "G"
INTERIOR SPAN
TOP BARTYPE "H"
INTERIOR SPAN
BOTTOM BARTYPE "K"
INTERIOR SPAN
BOTTOM BARTYPE "L"
SINGLE SPAN
BOTTOM BARTYPE "M"
END SPAN
BOTTOM BARTYPE "N"
END SPAN
BOTTOM BARTYPE "Q"
INTERIOR SPAN
BOTTOM BARTYPE "R"
END SPAN
ADJACENT CLEAR SPAN (Lв)COLUMN/
WALL/GIRDER
ADJACENT CLEAR SPAN (Lᴀ)COLUMN/
WALL/GIRDER
ADJACENT CLEAR SPAN (Lс)
NOTE 1
TOP BARTYPE "A"
END SUPPORT TYP2" CLR
0' -
4"
4" CLR TO BOTTOMOF BEAM
END OFCANTILEVER
EXTEND TO ENDOF CANTILEVER
Lᴀ/3NOTE 5 TYPALL HOOKS
NOTE 1
CL SPAN
CL SPAN
NOTE 1
CL SPAN
Lᴄ/3Lᴀ/3
0' -
4"
4" CLR TO BOTTOMOF BEAM
END OFCANTILEVER
EXTEND TO ENDOF CANTILEVER
0' -
4"
4" CLR TO BOTTOMOF BEAM
END OFCANTILEVER
EXTEND TO ENDOF CANTILEVER
NOTE 1
CL SPAN
NOTE 1
CL SPAN
NOTE 1
CL SPAN
NOTE 3NOTE 2
CL SUPPORT
NOTE 4NOTE 4
CL SUPPORT
TYP2" CLR
CL SUPPORT
NOTE 4
Lᴀ/101' - 0" MIN
Lᴀ/10Lᴀ/10
END OFCANTILEVER
NOTE 4
CL SUPPORT
FACE OF SUPPORTFACE OF SUPPORT
NOTES:1. CLASS "B" TENSION LAP (TOP) SPLICE.2. Lв/3 OR Lᴀ/3 WHICHEVER IS GREATER.3. Lᴀ/3 OR Lᴄ/3 WHICHEVER IS GREATER.4. CLASS "B" TENSION LAP SPLICE.5. STANDARD ACI 9O DEG HOOK OR 180 DEG HOOK AS REQUIRED, UNLESS NOTED OTHERWISE.6. ALL BARS ARE TO BE HOOKED AT DISCONTINUOUS AND CANTILEVERED END, UNLESS NOTED OTHERWISE.
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:29:
55 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
TYPICAL CONCRETEBEAM DETAILS
S010
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
UP
L M N P
7
6
5
4
3
M.5L.5
2' - 7 1/2"B
S300
AS300
CS300
6.4
6.5
3.5
4.7
N.6
AA
11' -
9"
10' -
3"
14' -
0"
8' -
0"10
' - 0
"8'
- 0"
3' -
0"
11' -
0"
11' - 0" 11' - 0" 11' - 0" 11' - 0" 12' - 2 1/8" 9' - 9 7/8"
15.31°
48" /10' - 0" /83' - 0"
48" /10' - 0" /83' - 0"
48" /10' - 0" /83' - 0"
48" /10' - 0" /83' - 0"
48" /10' - 0" /83' - 0"
48" /10' - 0" /83' - 0" 48" /10' - 0" /83' - 0"
48" /10' - 0" /83' - 0"
SLAB-ON-GRADE
DS300
2' - 3"
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:29:
58 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
BASEMENT ANDFOUNDATION PLAN -
AREA B
S010B
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
PLANS100
1
SCALE IN FEET
0 4' 8' 16'
NOTES:1. FOR GENERAL NOTES AND TYPICAL STRUCTURAL DETAILS,
REFER TO THE FOLLOWING SHEETS:a. S001 - GENERAL NOTES - SHEET 1b. S002 - GENERAL NOTES - SHEET 2c. S003 - STANDARD CONCRETE DETAILS - SHEET 1d. S004 - STANDARD CONCRETE DETAILS - SHEET 2e. S005 - STANDARD MASONRY DETAILSf. S006 - STANDARD STEEL DETAILSg. S007 - TYPICAL FOUNDATION DETAILS - SHEET 1h. S008 - TYPICAL FOUNDATION DETAILS - SHEET 2i. S009 - STANDARD CONCRETE COLUMN DETAILSj. S010 - TYPICAL CONCRETE BEAM DETAILS
2. REFER TO SHEET S700 FOR CONCRETE BEAM SCHEDULE3. REFER TO SHEET S600 FOR CONCRETE COLUMN SCHEDULE4. UNLESS NOTED OTHERWISE, DRILLED PIERS SHALL BE CENTERED
ON COLUMN ABOVE. WHEN NO COLUMN ABOVE IS PRESENT,DRILLED PIERS SHALL BE CENTERED ON THE GRADE BEAM ASSHOWN ON PLAN, UNLESS NOTED OTHERWISE.
5. TOP OF BASEMENT SLAB ELEVATION = 84’-0” (TOP OF GROUNDSLAB ELEVATION = 100’-0” WHICH CORRESPONDS TO CIVIL DRAWINGELEVATION 955’-0”).
6. BASEMENT SLAB-ON-GRADE IS 6” THICK CONCRETE SLAB REINFORCEDWITH #4 @ 16” O.C. EACH WAY CONTINUOUS. PLACE REINFORCEMENTWITH 1-1/2” CLEAR COVER FROM TOP OF SLAB AND PROVIDE ADEQUATEMEANS OF CHAIRING AND ACCESSORY STEEL AS REQUIRED TO SECURE POSITION.
7. BASEMENT SLAB-ON-GRADE SHALL BE PLACED ON VAPOR RETARDER PERSPECIFICATION OVER A MINIMUM OF 12” OF CRUSHED ROCK TO PROVIDE ADRAINAGE LAYER AND LEVELING COURSE IN ACCORDANCE WITH THEGEOTECHNICAL ENGINEERING REPORT. A LAYER OF BIAXIAL GEOGRID, ASDESCRIBED IN THE GEOTECHNICAL ENGINEERING REPORT, SHALL BE PLACEDBETWEEN THE SUBGRADE AND THE CRUSHED ROCK DRAINAGE LAYER.
8. UNDERSLAB DRAIN LINES SHALL BE PROVIDED AND PLACED IN ACCORDANCEWITH THE GEOTECHNICAL ENGINEERING REPORT.
9. DRAIN LINES AROUND THE INSIDE PERIMETER OF THE BASEMENT WALLS(WITH PROPERLY SPACED CROSS DRAIN LINES) SHALL BE PROVIDED ANDPLACED IN ACCORDANCE WITH THE GEOTECHNICAL ENGINEERING REPORT.
10.PROVIDE ADDITIONAL SLAB REINFORCEMENT, PER SHEET S004, AT ALLRE-ENTRANT CORNERS.
11.DO NOT BACK FILL BASEMENT WALLS UNTIL BASEMENT FRAMING ANDGROUND FLOOR FRAMING ARE CAST AND CONCRETE REACHES 75% OF ITSDESIGN STRENGTH.
12.EARTHWORK AND SITE PREPARATION SHALL BE IN ACCORDANCE WITH THESPECIFICATIONS AND THE RECOMMENDATIONS AS DESCRIBED IN THEGEOTECHNICAL ENGINEERING REPORT.
13.CONTRACTOR SHALL VERIFY WITH ARCHITECTURAL DESIGN DOCUMENT FOREDGE OF SLAB, STAIR, AND ELEVATOR PIT AND SHAFT DIMENSIONS PRIORTO CONSTRUCTION.
14.CONTRACTOR SHALL VERIFY ALL UNDERGROUND UTILITIES AS WELL ASREQUIRED SLAB AND BASEMENT WALL PENETRATIONS WITH ARCHITECTURAL,MECHANICAL, ELECTRICAL, AND CIVIL DESIGN DOCUMENT PRIOR TO CONSTRUCTION.
15.CONTRACTOR SHALL REFER TO DESIGN DOCUMENT OF ALL OTHER DESIGNDISCIPLINES FOR ANY ADDITIONAL ITEMS THAT ARE REQUIRED TO BE CAST INTOCONCRETE PRIOR TO CONSTRUCTION.
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
NORTH
UP
DN
UP
DN
UP
A.5 B.5 C.5 DB C D.5 E F G H J K L M N P P.2 Q
15
14
13
10.4
12
11
10
9
8
7
6
5
4
3
2
1
A L.5
AREA
A -
S100
A
AREA
B -
S100
B
R
6.4
6.5
E.9
E.5
3.5
E.8 H.5
4.7
N.6
Q.5
P.5
P.9P.7
BB
AA
4.9
S010B1
@ BASEMENT FLOOR
F.5
EXISTING FACILITY
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:30:
02 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
GROUND FLOORPLAN - OVERALL
S100
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
GROUND FLOOR PLAN - 0VERALL
SCALE IN FEET
0 8' 16' 32'
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
KEY PLAN
A B
C
NORTH
UP
A.5 B.5 C.5 DB C D.5 E F G H
12
11
10
9
8
7
6
5
4
3
2
1
A
CS304
ES304
DS304
AS304
5'-0"x5'-0" GRADE BEAM (TYP),TOP OF BEAM EL 99'-0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0" 48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /94' - 0" 48" /10' - 0" /94' - 0" 48" /10' - 0" /94' - 0" 48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"48" /10' - 0" /99' - 0"
48" /10' - 0" /94' - 0"
48" /10' - 0" /94' - 0"48" /10' - 0" /99' - 0"48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0" 48" /10' - 0" /99' - 0" 48" /10' - 0" /99' - 0"
48" /10' - 0" /94' - 0"
48" /10' - 0" /94' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /94' - 0"48" /10' - 0" /94' - 0"48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0" 48" /10' - 0" /99' - 0" 48" /10' - 0" /94' - 0"
48" /10' - 0" /94' - 0"
48" /10' - 0" /99' - 0"48" /10' - 0" /99' - 0"
48" /10' - 0" /94' - 0"
48" /10' - 0" /94' - 0"
48" /10' - 0" /94' - 0"
48" /10' - 0" /94' - 0"
48" /10' - 0" /94' - 0"48" /10' - 0" /99' - 0"48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0" 48" /10' - 0" /99' - 0"48" /10' - 0" /99' - 0" 48" /10' - 0" /99' - 0"
48" /10' - 0" /94' - 0"
48" /10' - 0" /99' - 0" 48" /10' - 0" /99' - 0"
SLAB-ON-GRADE
AREA
A -
S100
A
AREA
B -
S100
B
6.4
6.5
E.9E.5
3.5
E.8
4.7
11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 22' - 0" 11' - 0" 11' - 0" 11' - 0" 8' - 11"
2' - 1"
11' - 0" 11' - 0" 22' - 0"
11' -
0"
22' -
0"
11' -
9"
10' -
3"
14' -
0"
8' -
0"10
' - 0
"8'
- 0"
3' -
0"
11' -
0"
11' -
0"
11' -
0"
11' -
0"
22' -
0"
7' -
0"
THICKENEDSLAB-ON-GRADEAT IMAGING LAB AREA.SLAB SHALL BEISOLATED FROM THESURROUNDING SLABAREAS
BS304
3' - 0" *
F.5
EDGE OF EXISTINGSLAB. FIELD VERIFY
48" /10' - 0" /94' - 0"
48" /10' - 0" /94' - 0"
48" /10' - 0" /94' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /94' - 0"
48" /10' - 0" /94' - 0"
1'-0" THICK WALL @ELEVATOR PIT (TYP)
HS304
NOTES:1. FOR GENERAL NOTES AND TYPICAL STRUCTURAL DETAILS, REFER TO THE
FOLLOWING SHEETS:a. S001 - GENERAL NOTES - SHEET 1b. S002 - GENERAL NOTES - SHEET 2c. S003 - STANDARD CONCRETE DETAILS - SHEET 1d. S004 - STANDARD CONCRETE DETAILS - SHEET 2e. S005 - STANDARD MASONRY DETAILSf. S006 - STANDARD STEEL DETAILSg. S007 - TYPICAL FOUNDATION DETAILS - SHEET 1h. S008 - TYPICAL FOUNDATION DETAILS - SHEET 2i. S009 - STANDARD CONCRETE COLUMN DETAILSj. S010 - TYPICAL CONCRETE BEAM DETAILS
2. REFER TO SHEET S700 FOR CONCRETE BEAM SCHEDULE3. REFER TO SHEET S600 FOR CONCRETE COLUMN SCHEDULE4. UNLESS NOTED OTHERWISE, DRILLED PIERS SHALL BE CENTERED ON COLUMN
ABOVE. WHEN NO COLUMN ABOVE IS PRESENT, DRILLED PIERS SHALL BECENTERED ON THE GRADE BEAM AS SHOWN ON PLAN, UNLESS NOTED OTHERWISE.
5. TOP OF GROUND SLAB ELEVATION = 100’-0” (CORRESPONDS TO CIVIL DRAWINGELEVATION 955’-0”), UNLESS NOTED OTHERWISE.
6. UNLESS NOTED OTHERWISE, GROUND FLOOR SLAB-ON-GRADE IS 5” THICKCONCRETE SLAB REINFORCED WITH #3 @ 12” O.C. EACH WAY CONTINUOUS. PLACEREINFORCEMENT WITH 1-1/2” CLEAR COVER FROM TOP OF SLAB AND PROVIDEADEQUATE MEANS OF CHAIRING AND ACCESSORY STEEL AS REQUIRED TOSECURE POSITION.
7. GROUND FLOOR SLAB-ON-GRADE SHALL BE PLACED ON VAPOR RETARDER PERSPECIFICATION ON MINIMUM OF 4” THICK FREE DRAINING GRANULAR MATERIALLEVELING COURSE ON MINIMUM 18” OF LOW VOLUME CHANGE SUBGRADE MATERIALIN ACCORDANCE WITH THE GEOTECHNICAL ENGINEERING REPORT.
8. PROVIDE ADDITIONAL SLAB REINFORCEMENT, PER SHEET S004, AT ALLRE-ENTRANT CORNERS.
9. DO NOT BACK FILL BELOW GRADE WALLS UNTIL BASEMENT FRAMING, GROUNDFLOOR FRAMING, AND LEVEL 1 CONCRETE FLOOR ARE CAST AND CONCRETEREACHES 75% OF ITS DESIGN STRENGTH.
10.EARTHWORK AND SITE PREPARATION SHALL BE IN ACCORDANCE WITH THESPECIFICATIONS AND THE RECOMMENDATIONS AS DESCRIBED IN THE GEOTECHNICALENGINEERING REPORT.
11.CONTRACTOR SHALL VERIFY WITH ARCHITECTURAL DESIGN DOCUMENT FOR EDGEOF SLAB, STAIR, AND ELEVATOR PIT AND SHAFT DIMENSIONS PRIOR TO CONSTRUCTION.
12.CONTRACTOR SHALL VERIFY ALL UNDERGROUND UTILITIES AS WELL AS REQUIREDSLAB AND BASEMENT WALL PENETRATIONS WITH ARCHITECTURAL, MECHANICAL,ELECTRICAL, AND CIVIL DESIGN DOCUMENT PRIOR TO CONSTRUCTION.
13.CONTRACTOR SHALL REFER TO DESIGN DOCUMENT OF ALL OTHER DESIGN DISCIPLINESFOR ANY ADDITIONAL ITEMS THAT ARE REQUIRED TO BE CAST INTO CONCRETE PRIORTO CONSTRUCTION.
14.CONTRACTOR SHALL VERIFY SIZE AND LOCATION OF ALL EQUIPMENT HOUSEKEEPINGPADS WITH MECHANICAL AND ELECTRICAL DESIGN DOCUMENTS.
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:30:
05 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
GROUND FLOORPLAN - AREA A
S100A
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
GROUND FLOOR PLAN - AREA A
SCALE IN FEET
0 4' 8' 16'
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
KEY PLAN
A B
C
NORTH
UP
DN
UP
H J K L M N P P.2 Q
13
10.4
12
11
10
9
8
7
6
5
4
3
2
1
M.5L.5
AREA
A -
S100
A
AREA
B -
S100
B
1'-0" THICK STRUCTURALELEVATED SLAB OVER BASEMENT
48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0" 48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"
54" /10' - 0" /99' - 0"
48" /10' - 0" /94' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0" 48" /10' - 0" /99' - 0"
SLAB-ON-GRADE
R
6.4
6.5
3.5
H.5
4.7
N.6 Q.5P.5 P.9P.7
BB
AA
48" /10' - 0" /99' - 0" 48" /10' - 0" /99' - 0" 48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0" 48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0"
48" /10' - 0" /99' - 0" 48" /10' - 0" /99' - 0" 48" /10' - 0" /99' - 0"
11' -
0"
22' -
0"
11' -
9"
10' -
3"
14' -
0"
8' -
0"10
' - 0
"8'
- 0"
3' -
0"11
' - 0
"11
' - 0
"11
' - 0
"11
' - 0
"22
' - 0
"7'
- 0"
11' -
4"
13' -
0"
15.31° 24.69°
11' - 0" 11' - 0" 22' - 0" 22' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 12' - 2 1/8" 9' - 9 7/8"
3' - 5 1/2"
11' - 5 15/16"5' - 0 9/16"
5' - 2 5/8" 2' - 2 7/8"
13' - 0 3/8" 10' - 11 5/8"
4.9
2' -
3 1/
4"
GS304
FS304
1'-0" THICK WALL @ELEVATOR PIT (TYP)
NOTES:1. FOR GENERAL NOTES AND TYPICAL STRUCTURAL DETAILS, REFER TO THE
FOLLOWING SHEETS:a. S001 - GENERAL NOTES - SHEET 1b. S002 - GENERAL NOTES - SHEET 2c. S003 - STANDARD CONCRETE DETAILS - SHEET 1d. S004 - STANDARD CONCRETE DETAILS - SHEET 2e. S005 - STANDARD MASONRY DETAILSf. S006 - STANDARD STEEL DETAILSg. S007 - TYPICAL FOUNDATION DETAILS - SHEET 1h. S008 - TYPICAL FOUNDATION DETAILS - SHEET 2i. S009 - STANDARD CONCRETE COLUMN DETAILSj. S010 - TYPICAL CONCRETE BEAM DETAILS
2. REFER TO SHEET S700 FOR CONCRETE BEAM SCHEDULE3. REFER TO SHEET S600 FOR CONCRETE COLUMN SCHEDULE4. UNLESS NOTED OTHERWISE, DRILLED PIERS SHALL BE CENTERED ON COLUMN
ABOVE. WHEN NO COLUMN ABOVE IS PRESENT, DRILLED PIERS SHALL BECENTERED ON THE GRADE BEAM AS SHOWN ON PLAN, UNLESS NOTED OTHERWISE.
5. TOP OF GROUND SLAB ELEVATION = 100’-0” (CORRESPONDS TO CIVIL DRAWINGELEVATION 955’-0”), UNLESS NOTED OTHERWISE.
6. UNLESS NOTED OTHERWISE, GROUND FLOOR SLAB-ON-GRADE IS 5” THICKCONCRETE SLAB REINFORCED WITH #3 @ 12” O.C. EACH WAY CONTINUOUS. PLACEREINFORCEMENT WITH 1-1/2” CLEAR COVER FROM TOP OF SLAB AND PROVIDEADEQUATE MEANS OF CHAIRING AND ACCESSORY STEEL AS REQUIRED TOSECURE POSITION.
7. GROUND FLOOR SLAB-ON-GRADE SHALL BE PLACED ON VAPOR RETARDER PERSPECIFICATION ON MINIMUM OF 4” THICK FREE DRAINING GRANULAR MATERIALLEVELING COURSE ON MINIMUM 18” OF LOW VOLUME CHANGE SUBGRADE MATERIALIN ACCORDANCE WITH THE GEOTECHNICAL ENGINEERING REPORT.
8. PROVIDE ADDITIONAL SLAB REINFORCEMENT, PER SHEET S004, AT ALLRE-ENTRANT CORNERS.
9. DO NOT BACK FILL BELOW GRADE WALLS UNTIL BASEMENT FRAMING, GROUNDFLOOR FRAMING, AND LEVEL 1 CONCRETE FLOOR ARE CAST AND CONCRETEREACHES 75% OF ITS DESIGN STRENGTH.
10.EARTHWORK AND SITE PREPARATION SHALL BE IN ACCORDANCE WITH THESPECIFICATIONS AND THE RECOMMENDATIONS AS DESCRIBED IN THE GEOTECHNICALENGINEERING REPORT.
11.CONTRACTOR SHALL VERIFY WITH ARCHITECTURAL DESIGN DOCUMENT FOR EDGEOF SLAB, STAIR, AND ELEVATOR PIT AND SHAFT DIMENSIONS PRIOR TO CONSTRUCTION.
12.CONTRACTOR SHALL VERIFY ALL UNDERGROUND UTILITIES AS WELL AS REQUIREDSLAB AND BASEMENT WALL PENETRATIONS WITH ARCHITECTURAL, MECHANICAL,ELECTRICAL, AND CIVIL DESIGN DOCUMENT PRIOR TO CONSTRUCTION.
13.CONTRACTOR SHALL REFER TO DESIGN DOCUMENT OF ALL OTHER DESIGN DISCIPLINESFOR ANY ADDITIONAL ITEMS THAT ARE REQUIRED TO BE CAST INTO CONCRETE PRIORTO CONSTRUCTION.
14.CONTRACTOR SHALL VERIFY SIZE AND LOCATION OF ALL EQUIPMENT HOUSEKEEPINGPADS WITH MECHANICAL AND ELECTRICAL DESIGN DOCUMENTS.
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:30:
07 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
GROUND FLOORPLAN - AREA B
S100B
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
GROUND FLOOR PLAN - AREA B
SCALE IN FEET
0 4' 8' 16'
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
KEY PLAN
A B
C
DN
DN
DN
UP
A.5 B.5 C.5 DB C D.5 E F G H J K L M N P P.2 Q
15
14
13
10.4
12
11
10
9
8
7
6
5
4
3
2
1
A L.5
AREA
A -
S101
A
AREA
B -
S101
B
AREA C - S101C
AREA B - S101B
R
6.4
6.5
E.9
E.5
3.5
E.8 H.5
4.7
N.6
Q.5
P.5
P.9P.7
BB
AA
4.9
F.5
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:30:
11 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
FIRST FLOORFRAMING PLAN -
OVERALL
S101
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
FIRST FLOOR FRAMING - OVERALL PLAN
SCALE IN FEET
0 8' 16' 32'
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
KEY PLAN
A B
C
NORTH
DN
A.5 B.5 C.5 DB C D.5 E F G H
12
11
10
9
8
7
6
5
4
3
2
1
A
AREA
A -
S101
A
AREA
B -
S101
B
JOINT, TYPEXPANSION
AS310
BS310
DS310
ES310B1
001
B100
1
B100
1
B100
1
B1002 B100
1
B1002
B100
1
G1001 G1002 G1003 G1004 G1005 G1006
G1006G1005G1004G1003G1002G1007
B100
3
B100
1
B100
1
B100
1
B100
1
B100
1
B100
1
B100
1
B100
1
B100
1
B100
1
B100
1
B100
1
B100
1
B100
1
B100
3
B100
3
B100
3
B100
3
B100
3
B100
3
B100
3
B100
3
B100
3
B100
3
B100
3
B100
3
B100
3
B100
3
B100
3
B100
3
B100
3
B100
3
B100
3
B100
3
B100
3
G1007
B100
4
B100
4B1
005
B100
1
B100
1
B100
1
B100
1
B100
1
B100
1
B100
1
B100
1
B100
1
B100
1
B100
1
B100
1
B100
1
B100
1
B100
1
B100
1
B100
1
B100
1
G1008 G1009 G1010 G1011 G1012 G1013
B100
3
B100
3
B1003
B1003
B1003
B1003
B1003
B1003
B1003
B1001
B1001
B1001
B1001
B1001
B1001
B1001
B1001
B1001
B1001
B1001
B1001
B1001
B1001
B1001
B1001
B1001
B1001
B1001
B1001
B1001
B1001
B1001
B1001
B1001
B1003
B1003
B1003
B1003
B1003
B1003
B1003
B100
5
B1006B1007
B100
2
G10
14
G10
14
G10
14
B100
3
G10
15
G10
15
G10
15
G10
15
G10
16
G10
16
G10
17G
1017
G10
18
G10
19
G10
19
G10
19
G10
20
G1021
G10
22
G10
23
B100
8
B100
8
B100
8
B100
8
B100
8
B100
8
B100
8B1
008
B100
8
B100
8
B100
8
B100
8
B100
8
B100
8
B100
8
B100
8
B100
9
B100
9
B100
9
B100
9
B100
9
B100
9
B100
9B1
009
B101
0B1
011
B101
2B1
012
G1024 G1024
G1024G1024
G1024 G1024
G10
25G
1025
G1025
G1025
G1025
G10
26G
1026
6.4
6.5
E.9E.5
3.5
4.7
11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 22' - 0" 11' - 0" 11' - 0" 11' - 0" 8' - 11"2' - 1"11' - 0" 11' - 0" 22' - 0"
11' -
0"
22' -
0"
11' -
9"
10' -
3"
14' -
0"
8' -
0"10
' - 0
"8'
- 0"
3' -
0"11
' - 0
"11
' - 0
"11
' - 0
"11
' - 0
"22
' - 0
"7'
- 0"
CS310
24' - 5"
8' -
0" 21' - 5"
8' -
0"
F.5NOTES:1. FOR GENERAL NOTES AND TYPICAL STRUCTURAL DETAILS, REFER TO THE
FOLLOWING SHEETS:a. S001 - GENERAL NOTES - SHEET 1b. S002 - GENERAL NOTES - SHEET 2c. S003 - STANDARD CONCRETE DETAILS - SHEET 1d. S004 - STANDARD CONCRETE DETAILS - SHEET 2e. S005 - STANDARD MASONRY DETAILSf. S006 - STANDARD STEEL DETAILSg. S007 - TYPICAL FOUNDATION DETAILS - SHEET 1h. S008 - TYPICAL FOUNDATION DETAILS - SHEET 2i. S009 - STANDARD CONCRETE COLUMN DETAILSj. S010 - TYPICAL CONCRETE BEAM DETAILS
2. REFER TO SHEET S700 FOR CONCRETE BEAM SCHEDULE3. REFER TO SHEET S600 FOR CONCRETE COLUMN SCHEDULE4. UNLESS NOTED OTHERWISE, DRILLED PIERS SHALL BE CENTERED ON
COLUMN ABOVE. WHEN NO COLUMN ABOVE IS PRESENT, DRILLED PIERSSHALL BE CENTERED ON THE GRADE BEAM AS SHOWN ON PLAN, UNLESSNOTED OTHERWISE.
5. TOP OF CONCRETE FLOOR SLAB ELEVATION = 116’-0”, UNLESSNOTED OTHERWISE.
6. FLOOR FRAMING SYSTEM CONSISTS OF MONOLITHICALLY CAST-IN-PLACECONCRETE SLAB AND BEAMS. CONCRETE SLAB IS 5” THICK WITH WELDEDWIRE REINFORCING 4X4 – W4.0 X W4.0, SHEETS ONLY. STEEL AREA SHALLMEET 0.120 SQUARE INCHES PER FOOT IN EACH DIRECTION. REFER TO SHEETS004 FOR TYPICAL SLAB DETAIL WITH REIFORCING PROFILE.
7. PROVIDE ADDITIONAL SLAB REINFORCEMENT, PER SHEET S004, AT ALLRE-ENTRANT CORNERS.
8. CONTRACTOR SHALL VERIFY WITH ARCHITECTURAL DESIGN DOCUMENT FOREDGE OF SLAB, STAIR, AND ELEVATOR PIT AND SHAFT DIMENSIONS PRIORTO CONSTRUCTION.
9. CONTRACTOR SHALL VERIFY ALL SLAB PENETRATIONS WITH ARCHITECTURAL,MECHANICAL, AND ELECTRICAL DESIGN DOCUMENT PRIOR TO CONSTRUCTION.
10.CONTRACTOR SHALL REFER TO DESIGN DOCUMENT OF ALL OTHER DESIGNDISCIPLINES FOR ANY ADDITIONAL ITEMS THAT ARE REQUIRED TO BE CASTINTO CONCRETE PRIOR TO CONSTRUCTION.
11.MECHANICAL AND ELECTRICAL SLAB OPENINGS SHALL BE PRE-FORMED ORSLEEVED WITH ADDITIONAL REIFORCEMENT PER STANDARD CONCRETE DETAILS.CORING AND POST-DRILLING OF POURED SLAB IS PROHIBITED WITHOUT PRIORAPPROVAL BY THE ENGINEER.
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:30:
15 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
FIRST FLOORFRAMING PLAN -
AREA A
S101A
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
FIRST FLOOR FRAMING PLAN - AREA A
SCALE IN FEET
0 4' 8' 16'
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
KEY PLAN
A B
C
NORTH
DN
DN
H J K L M N P P.2 Q
13
10.4
12
11
10
9
8
7
6
5
4
3
2
1
M.5L.5
FS310
AREA
A -
S101
A
AREA
B -
S101
B
AREA C - S101C
AREA B - S101B
8' -
0"
SLAB-ON-GRADE
BS311
CS311
GS310
B101
0
B101
0
B101
0
B101
0
B101
0
B101
0
B101
0
B101
0
B101
0
B101
0
B101
0
B101
0
B101
0
B101
0
B101
0
B101
0
B101
0
B101
0
B101
0
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B101
1
B1011
B101
2
B101
2
B101
2
B101
2
B101
2
B101
2
B101
2
B101
2
B101
2
B101
2
B101
2
B101
2
B101
2B1
012
B101
2
B101
2
B101
2
B101
2
B101
2
B101
2
B101
2
B101
2
B101
2B1
013
B101
2B1
013
B101
2
B101
2
B101
2
B101
2
B101
2
B101
2
B101
3
B101
3
B101
3
B101
3
B101
3
B101
3
B1012 B1011 B1012 B1012 B101
3
B101
2
B101
3
B101
2B1
013
48" /10' - 0"
48" /10' - 0"48" /10' - 0"
G10
25G
1025
G1025
G1025
G1025
G10
26
G102
6
G1026
G1026
G1026 G1026G1026G1026G1026G1026
G1026
G1026
G1026
G1027 G1027 G1027 G1025
G1025
G1025G1025
G1025
G1025
G1025G1025 G1025
G1026
G10
26G
1026
G1026
G1028
B101
2
G1028
R
6.4
6.5
3.5
H.5
4.7
N.6 Q.5P.5 P.9P.7
BB
AA
4.9
50.0
0°
15.31°
11' -
0"
22' -
0"
11' -
9"
10' -
3"
14' -
0"
8' -
0"10
' - 0
"8'
- 0"
3' -
0"11
' - 0
"11
' - 0
"11
' - 0
"11
' - 0
"22
' - 0
"7'
- 0"
11' - 0" 11' - 0" 22' - 0" 22' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 12' - 2 1/8" 9' - 9 7/8"
3' - 5 1/2"
11' - 5 15/16"
5' - 0 9/16" 5' - 2 5/8"2' - 2 7/8"
13' - 0 3/8" 10' - 11 5/8"
13' -
0"
7' -
0"11
' - 4
"
12' -
3 1
/4"
11' -
4"
G1027
G1028
B101
2
B101
2
B101
2
B101
2
B101
2
B101
3
5" SLAB-ON-GRADE PERNOTE 6 ON SHEET S100B.
NOTES:1. FOR GENERAL NOTES AND TYPICAL STRUCTURAL DETAILS, REFER TO THE
FOLLOWING SHEETS:a. S001 - GENERAL NOTES - SHEET 1b. S002 - GENERAL NOTES - SHEET 2c. S003 - STANDARD CONCRETE DETAILS - SHEET 1d. S004 - STANDARD CONCRETE DETAILS - SHEET 2e. S005 - STANDARD MASONRY DETAILSf. S006 - STANDARD STEEL DETAILSg. S007 - TYPICAL FOUNDATION DETAILS - SHEET 1h. S008 - TYPICAL FOUNDATION DETAILS - SHEET 2i. S009 - STANDARD CONCRETE COLUMN DETAILSj. S010 - TYPICAL CONCRETE BEAM DETAILS
2. REFER TO SHEET S700 FOR CONCRETE BEAM SCHEDULE3. REFER TO SHEET S600 FOR CONCRETE COLUMN SCHEDULE4. UNLESS NOTED OTHERWISE, DRILLED PIERS SHALL BE CENTERED ON
COLUMN ABOVE. WHEN NO COLUMN ABOVE IS PRESENT, DRILLED PIERSSHALL BE CENTERED ON THE GRADE BEAM AS SHOWN ON PLAN, UNLESSNOTED OTHERWISE.
5. TOP OF CONCRETE FLOOR SLAB ELEVATION = 116’-0”, UNLESSNOTED OTHERWISE.
6. FLOOR FRAMING SYSTEM CONSISTS OF MONOLITHICALLY CAST-IN-PLACECONCRETE SLAB AND BEAMS. CONCRETE SLAB IS 5” THICK WITH WELDEDWIRE REINFORCING 4X4 – W4.0 X W4.0, SHEETS ONLY. STEEL AREA SHALLMEET 0.120 SQUARE INCHES PER FOOT IN EACH DIRECTION. REFER TO SHEETS004 FOR TYPICAL SLAB DETAIL WITH REIFORCING PROFILE.
7. PROVIDE ADDITIONAL SLAB REINFORCEMENT, PER SHEET S004, AT ALLRE-ENTRANT CORNERS.
8. CONTRACTOR SHALL VERIFY WITH ARCHITECTURAL DESIGN DOCUMENT FOREDGE OF SLAB, STAIR, AND ELEVATOR PIT AND SHAFT DIMENSIONS PRIORTO CONSTRUCTION.
9. CONTRACTOR SHALL VERIFY ALL SLAB PENETRATIONS WITH ARCHITECTURAL,MECHANICAL, AND ELECTRICAL DESIGN DOCUMENT PRIOR TO CONSTRUCTION.
10.CONTRACTOR SHALL REFER TO DESIGN DOCUMENT OF ALL OTHER DESIGNDISCIPLINES FOR ANY ADDITIONAL ITEMS THAT ARE REQUIRED TO BE CASTINTO CONCRETE PRIOR TO CONSTRUCTION.
11.MECHANICAL AND ELECTRICAL SLAB OPENINGS SHALL BE PRE-FORMED ORSLEEVED WITH ADDITIONAL REIFORCEMENT PER STANDARD CONCRETE DETAILS.CORING AND POST-DRILLING OF POURED SLAB IS PROHIBITED WITHOUT PRIORAPPROVAL BY THE ENGINEER.
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:30:
17 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
FIRST FLOORFRAMING PLAN -
AREA B
S101B
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
FIRST FLOOR FRAMING PLAN - AREA B
SCALE IN FEET
0 4' 8' 16'
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
KEY PLAN
A B
C
NORTH
M N P P.2 Q
15
14
13
12
M.5L.5
AREA C - S101C
AREA B - S101B
48" /10' - 0" /113' - 4"48" /10' - 0" /113' - 4"48" /10' - 0" /113' - 4"
48" /10' - 0" /113' - 4"48" /10' - 0" /113' - 4"48" /10' - 0" /113' - 4"
48" /10' - 0" /113' - 4"
48" /10' - 0" /113' - 4"
5'-0"x5'-0" GRADE BEAM (TYP)TOP OF BEAM EL 118'-4"
SLAB-ON-GRADE
AS311
JS310
HS310
GS310
N.6 P.5 P.9P.7
11' -
4"
23' -
6 1
/2"
11' -
0"
11' - 0" 11' - 0" 11' - 0" 12' - 2 1/8" 9' - 9 7/8"
3' - 5 1/2"
11' - 5 15/16"
5' - 0 9/16" 5' - 2 5/8"
2' - 2 7/8"
5" SLAB-ON-GRADE PERNOTE 6 ON SHEET S100BTOP OF SLAB 119'-4" TOMATCH FLOOR OF EXISTINGLIBRARY. FIELD VERIFY
NOTES:1. FOR GENERAL NOTES AND TYPICAL STRUCTURAL DETAILS, REFER TO THE
FOLLOWING SHEETS:a. S001 - GENERAL NOTES - SHEET 1b. S002 - GENERAL NOTES - SHEET 2c. S003 - STANDARD CONCRETE DETAILS - SHEET 1d. S004 - STANDARD CONCRETE DETAILS - SHEET 2e. S005 - STANDARD MASONRY DETAILSf. S006 - STANDARD STEEL DETAILSg. S007 - TYPICAL FOUNDATION DETAILS - SHEET 1h. S008 - TYPICAL FOUNDATION DETAILS - SHEET 2i. S009 - STANDARD CONCRETE COLUMN DETAILSj. S010 - TYPICAL CONCRETE BEAM DETAILS
2. REFER TO SHEET S700 FOR CONCRETE BEAM SCHEDULE3. REFER TO SHEET S600 FOR CONCRETE COLUMN SCHEDULE4. UNLESS NOTED OTHERWISE, DRILLED PIERS SHALL BE CENTERED ON
COLUMN ABOVE. WHEN NO COLUMN ABOVE IS PRESENT, DRILLED PIERSSHALL BE CENTERED ON THE GRADE BEAM AS SHOWN ON PLAN, UNLESSNOTED OTHERWISE.
5. TOP OF CONCRETE FLOOR SLAB ELEVATION = 116’-0”, UNLESSNOTED OTHERWISE.
6. FLOOR FRAMING SYSTEM CONSISTS OF MONOLITHICALLY CAST-IN-PLACECONCRETE SLAB AND BEAMS. CONCRETE SLAB IS 5” THICK WITH WELDEDWIRE REINFORCING 4X4 – W4.0 X W4.0, SHEETS ONLY. STEEL AREA SHALLMEET 0.120 SQUARE INCHES PER FOOT IN EACH DIRECTION. REFER TO SHEETS004 FOR TYPICAL SLAB DETAIL WITH REIFORCING PROFILE.
7. PROVIDE ADDITIONAL SLAB REINFORCEMENT, PER SHEET S004, AT ALLRE-ENTRANT CORNERS.
8. CONTRACTOR SHALL VERIFY WITH ARCHITECTURAL DESIGN DOCUMENT FOREDGE OF SLAB, STAIR, AND ELEVATOR PIT AND SHAFT DIMENSIONS PRIORTO CONSTRUCTION.
9. CONTRACTOR SHALL VERIFY ALL SLAB PENETRATIONS WITH ARCHITECTURAL,MECHANICAL, AND ELECTRICAL DESIGN DOCUMENT PRIOR TO CONSTRUCTION.
10.CONTRACTOR SHALL REFER TO DESIGN DOCUMENT OF ALL OTHER DESIGNDISCIPLINES FOR ANY ADDITIONAL ITEMS THAT ARE REQUIRED TO BE CASTINTO CONCRETE PRIOR TO CONSTRUCTION.
11.MECHANICAL AND ELECTRICAL SLAB OPENINGS SHALL BE PRE-FORMED ORSLEEVED WITH ADDITIONAL REIFORCEMENT PER STANDARD CONCRETE DETAILS.CORING AND POST-DRILLING OF POURED SLAB IS PROHIBITED WITHOUT PRIORAPPROVAL BY THE ENGINEER.
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:30:
17 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
FIRST FLOORFRAMING PLAN -
AREA C
S101C
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
FIRST FLOOR FRAMING PLAN - AREA C
SCALE IN FEET
0 4' 8' 16'
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
KEY PLAN
A B
C
NORTH
UP
UP
A.5 B.5 C.5 DB C D.5 E F G H J K L M N P P.2 Q
15
14
13
10.4
12
11
10
9
8
7
6
5
4
3
2
1
A L.5
AREA
A -
S102
A
AREA
B -
S102
B
AREA C - S102C
AREA B - S102B
R
6.4
6.5
E.9
E.5
3.5
E.8 H.5
4.7
N.6
Q.5
P.5
P.9P.7
BB
AA
4.9
F.5
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:30:
20 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
SECOND FLOORFRAMING PLAN -
OVERALL
S102
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
SECOND FLOOR FRAMING PLAN - OVERALL
SCALE IN FEET
0 8' 16' 32'
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
KEY PLAN
A B
C
NORTH
A.5 B.5 C.5 DB C D.5 E F G H
12
11
10
9
8
7
6
5
4
3
2
1
A
AREA
A -
S102
A
AREA
B -
S102
B
MS320
AS320
BS320
DS320
CS320
JOINT (TYP)EXPANSION
B200
1
B200
1
B200
1
B200
1
B200
1
B200
1
B2002
B2002
B200
1
B200
1
B200
1
B200
1
B200
1
B200
1
B200
1
B200
1
B200
8
B200
3
B200
3
B200
3
B200
3
B200
3
B200
3
B200
3
B200
3
B200
3
B200
3
B200
3
B200
3
B200
3
B200
3
B200
3
B200
3
B200
3
B200
3
B200
3
B200
3
B200
3
B200
3
B200
1
B200
1
B200
1
B200
1
B200
1
B200
1
B200
1
B200
4
B200
4
B 200
4B2
005
B200
1
B200
1
B200
1
B200
1
B200
1
B200
1
B200
1
B200
1
B200
1
B200
1
B200
1
B200
1
B200
1
B200
1
B200
1
B200
1
B200
1
B200
1
B200
3
B200
3
B2003
B200
3
B2001 B2001
B2001
B2001
B2001
B2001
B2001
B2001
B2001
B2001
B2001
B2001
B2001
B2001
B2001
B2001
B2001
B2001
B2001
B2001
B2001
B2001
B2003
B2003
B2003
B2003
B2003
B2003
B2003
B2003
B2003
B2003
B2003
B2003
B2003
B200
2
B2001
B2001
B2001
B200
6
B2007 B2008
G2001 G2002 G2003 G2004 G2005 G2006
G2006
G2006
G2005
G2005
G2004
G2004
G2003
G2003
G2002
G2002
G2001
G2001
G2007
G2008 G2009 G2010 G2011 G2012 G2013
G20
14
G20
14
G20
14
G20
15
G20
15
G20
15
G20
15
G20
16
G20
16
G20
17
G20
16
G20
18
G20
18
G20
18
G20
18
G2019
G20
20
G20
20
6.4
6.5
E.9E.5
3.5
E.8
4.7
B200
9 B200
9
B200
9
B200
9
B200
9
B200
9
B200
9
B200
9B2
009
B200
9
B200
9
B200
9
B200
9
B200
9
B200
9
B200
9
B200
9
B200
9
B200
9
B200
9
B200
9
B200
9
B200
9
B200
9
G2021 G2021
G2021G2021
G2021 G2021
G2021 G2021 G2022
G2022
G20
22G
2022
G2022
G20
21G
2023
G20
24
B201
0B2
012
B201
1B2
011
11' -
0"
22' -
0"
11' -
9"
10' -
3"
14' -
0"
8' -
0"10
' - 0
"8'
- 0"
3' -
0"11
' - 0
"11
' - 0
"11
' - 0
"11
' - 0
"22
' - 0
"7'
- 0"
11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 22' - 0" 11' - 0" 11' - 0" 11' - 0" 8' - 11"2' - 1"
11' - 0" 11' - 0" 22' - 0"
3' - 0"
21' - 5"
8' -
0"24' - 5"
8' -
0"
F.5
B200
2 B200
2
NOTES:1. FOR GENERAL NOTES AND TYPICAL STRUCTURAL DETAILS, REFER TO
THE FOLLOWING SHEETS:a. S001 - GENERAL NOTES - SHEET 1b. S002 - GENERAL NOTES - SHEET 2c. S003 - STANDARD CONCRETE DETAILS - SHEET 1d. S004 - STANDARD CONCRETE DETAILS - SHEET 2e. S005 - STANDARD MASONRY DETAILSf. S006 - STANDARD STEEL DETAILSg. S007 - TYPICAL FOUNDATION DETAILS - SHEET 1h. S008 - TYPICAL FOUNDATION DETAILS - SHEET 2i. S009 - STANDRAD CONCRETE COLUMN DETAILSj. S010 - TYPICAL CONCRETE BEAM DETAILS
2. REFER TO SHEET S700 FOR CONCRETE BEAM SCHEDULE3. REFER TO SHEET S600 FOR CONCRETE COLUMN SCHEDULE4. UNLESS NOTED OTHERWISE, DRILLED PIERS SHALL BE CENTERED ON
COLUMN ABOVE. WHEN NO COLUMN ABOVE IS PRESENT, DRILLED PIERSSHALL BE CENTERED ON THE GRADE BEAM AS SHOWN ON PLAN,UNLESS NOTED OTHERWISE.
5. TOP OF CONCRETE FLOOR SLAB ELEVATION = 132’-0”, UNLESSNOTED OTHERWISE.
6. FLOOR FRAMING SYSTEM CONSISTS OF MONOLITHICALLY CAST-IN-PLACECONCRETE SLAB AND BEAMS. CONCRETE SLAB IS 5” THICK WITH WELDEDWIRE REINFORCING 4X4 – W4.0 X W4.0, SHEETS ONLY. STEEL AREA SHALLMEET 0.120 SQUARE INCHES PER FOOT IN EACH DIRECTION. REFER TOSHEET S004 FOR TYPICAL SLAB DETAIL WITH REIFORCING PROFILE.
7. PROVIDE ADDITIONAL SLAB REINFORCEMENT, PER SHEET S004, AT ALLRE-ENTRANT CORNERS.
8. CONTRACTOR SHALL VERIFY WITH ARCHITECTURAL DESIGN DOCUMENTFOR EDGE OF SLAB, STAIR, AND ELEVATOR PIT AND SHAFT DIMENSIONSPRIOR TO CONSTRUCTION.
9. CONTRACTOR SHALL VERIFY ALL SLAB PENETRATIONS WITH ARCHITECTURAL,MECHANICAL, AND ELECTRICAL DESIGN DOCUMENT PRIOR TO CONSTRUCTION.
10.CONTRACTOR SHALL REFER TO DESIGN DOCUMENT OF ALL OTHER DESIGNDISCIPLINES FOR ANY ADDITIONAL ITEMS THAT ARE REQUIRED TO BE CAST INTO CONCRETE PRIOR TO CONSTRUCTION.
11.MECHANICAL AND ELECTRICAL SLAB OPENINGS SHALL BE PRE-FORMED ORSLEEVED WITH ADDITIONAL REIFORCEMENT PER STANDARD CONCRETEDETAILS. CORING AND POST-DRILLING OF POURED SLAB IS PROHIBITEDWITHOUT PRIOR APPROVAL BY THE ENGINEER.
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:30:
23 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
SECOND FLOORFRAMING PLAN -
AREA A
S102A
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
SECOND FLOOR FRAMING PLAN - AREA A
SCALE IN FEET
0 4' 8' 16'
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
KEY PLAN
A B
C
NORTH
H J K L M N P P.2 Q
10.4
12
11
10
9
8
7
6
5
4
3
M.5L.5
AREA
A -
S102
A
AREA
B -
S102
B
AREA C - S102C
AREA B - S102B
JS320
ES320
KS320
LS320
R
6.4
6.5
3.5
H.5
4.7
N.6 Q.5P.5 P.9P.7
G2022
G2022
G2022
B201
0
B201
0
B201
0
B201
0
B201
0
B201
0
B201
0
B201
0
B201
0
B201
0
B201
0
B201
0
B201
0
B201
0
B201
0
B201
0
B201
0
B201
0
B201
0
G2025 G2025 G2025 G2025 G2025
G2025 G2025 G2025 G2025
G2023
G2023
G2021
G2021
G2021 G2022 G2021 G2022 G2022 G2021
G2021
G2021
G2021G2021G2021
B201
2B2
012
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2B2
012
B201
2
B201
2
B201
2
B201
1
B201
1
B201
1
B201
1
B201
1
B201
1
B201
1
B201
1
B201
1
B201
1B2
011
B201
1B2
011
B201
1
B201
1B2
011
B201
1
B201
1B2
011
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
G2022 G2021 G2022
B201
1
B201
1
B201
1
B201
1
B201
1
B201
1
B201
1
B201
1
B201
1
B2012B2012B2012
G2021
G2021
B201
1B201
1
B201
1
B201
1
G2021
G2021
B201
3
B201
3
B201
3B201
3
B2011
G2021 G2021
G2021
B201
2
B201
2
B201
2
B201
2
B201
2
B201
1
B201
1
B201
1
B201
1
B201
1
B201
1
B201
1
B201
1
B2011 B2011 B2011 B2011 B2011 B2011 B2011 B2011
BB
AA
4.9
11' -
9"
10' -
3"
14' -
0"
8' -
0"10
' - 0
"8'
- 0"
3' -
0"11
' - 0
"11
' - 0
"11
' - 0
"11
' - 0
"22
' - 0
"7'
- 0"
12' -
3 1
/4"
13' -
0"
50.0
0°
15.31°
11' - 0" 11' - 0" 22' - 0" 22' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 12' - 2 1/8" 9' - 9 7/8"
3' - 5 1/2"
11' - 5 15/16"
5' - 0 9/16" 5' - 2 5/8"2' - 2 7/8"
13' - 0 3/8" 10' - 11 5/8"
B201
1
EDGE OF SLAB
NOTES:1. FOR GENERAL NOTES AND TYPICAL STRUCTURAL DETAILS, REFER TO
THE FOLLOWING SHEETS:a. S001 - GENERAL NOTES - SHEET 1b. S002 - GENERAL NOTES - SHEET 2c. S003 - STANDARD CONCRETE DETAILS - SHEET 1d. S004 - STANDARD CONCRETE DETAILS - SHEET 2e. S005 - STANDARD MASONRY DETAILSf. S006 - STANDARD STEEL DETAILSg. S007 - TYPICAL FOUNDATION DETAILS - SHEET 1h. S008 - TYPICAL FOUNDATION DETAILS - SHEET 2i. S009 - STANDRAD CONCRETE COLUMN DETAILSj. S010 - TYPICAL CONCRETE BEAM DETAILS
2. REFER TO SHEET S700 FOR CONCRETE BEAM SCHEDULE3. REFER TO SHEET S600 FOR CONCRETE COLUMN SCHEDULE4. UNLESS NOTED OTHERWISE, DRILLED PIERS SHALL BE CENTERED ON
COLUMN ABOVE. WHEN NO COLUMN ABOVE IS PRESENT, DRILLED PIERSSHALL BE CENTERED ON THE GRADE BEAM AS SHOWN ON PLAN,UNLESS NOTED OTHERWISE.
5. TOP OF CONCRETE FLOOR SLAB ELEVATION = 132’-0”, UNLESSNOTED OTHERWISE.
6. FLOOR FRAMING SYSTEM CONSISTS OF MONOLITHICALLY CAST-IN-PLACECONCRETE SLAB AND BEAMS. CONCRETE SLAB IS 5” THICK WITH WELDEDWIRE REINFORCING 4X4 – W4.0 X W4.0, SHEETS ONLY. STEEL AREA SHALLMEET 0.120 SQUARE INCHES PER FOOT IN EACH DIRECTION. REFER TOSHEET S004 FOR TYPICAL SLAB DETAIL WITH REIFORCING PROFILE.
7. PROVIDE ADDITIONAL SLAB REINFORCEMENT, PER SHEET S004, AT ALLRE-ENTRANT CORNERS.
8. CONTRACTOR SHALL VERIFY WITH ARCHITECTURAL DESIGN DOCUMENTFOR EDGE OF SLAB, STAIR, AND ELEVATOR PIT AND SHAFT DIMENSIONSPRIOR TO CONSTRUCTION.
9. CONTRACTOR SHALL VERIFY ALL SLAB PENETRATIONS WITH ARCHITECTURAL,MECHANICAL, AND ELECTRICAL DESIGN DOCUMENT PRIOR TO CONSTRUCTION.
10.CONTRACTOR SHALL REFER TO DESIGN DOCUMENT OF ALL OTHER DESIGNDISCIPLINES FOR ANY ADDITIONAL ITEMS THAT ARE REQUIRED TO BE CAST INTO CONCRETE PRIOR TO CONSTRUCTION.
11.MECHANICAL AND ELECTRICAL SLAB OPENINGS SHALL BE PRE-FORMED ORSLEEVED WITH ADDITIONAL REIFORCEMENT PER STANDARD CONCRETEDETAILS. CORING AND POST-DRILLING OF POURED SLAB IS PROHIBITEDWITHOUT PRIOR APPROVAL BY THE ENGINEER.
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:30:
26 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
SECOND FLOORFRAMING PLAN -
AREA B
S102B
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
SECOND FLOOR FRAMING PLAN - AREA B
SCALE IN FEET
0 4' 8' 16'
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
KEY PLAN
A B
C
NORTH
L M N P P.2
15
14
13
12
M.5L.5
AREA C - S102C
AREA B - S102B
11' -
4"
23' -
6 1
/2"
11' -
0"
GS320
FS320
HS320
N.6
G2021 G2021
B201
1
B201
1
B201
1
B201
1
B201
1
B201
2
B201
2
B201
2
B201
2
B201
2
B201
2
G2021G2021
G2021
B2012
B201
1
B201
1
B201
1
B201
1
B201
1B2
011
B201
1
B201
1
B201
1
B201
1
11' - 0" 11' - 0" 11' - 0" 11' - 0" 12' - 2 1/8" 9' - 9 7/8" 3' - 5 1/2"
NOTES:1. FOR GENERAL NOTES AND TYPICAL STRUCTURAL DETAILS, REFER TO
THE FOLLOWING SHEETS:a. S001 - GENERAL NOTES - SHEET 1b. S002 - GENERAL NOTES - SHEET 2c. S003 - STANDARD CONCRETE DETAILS - SHEET 1d. S004 - STANDARD CONCRETE DETAILS - SHEET 2e. S005 - STANDARD MASONRY DETAILSf. S006 - STANDARD STEEL DETAILSg. S007 - TYPICAL FOUNDATION DETAILS - SHEET 1h. S008 - TYPICAL FOUNDATION DETAILS - SHEET 2i. S009 - STANDRAD CONCRETE COLUMN DETAILSj. S010 - TYPICAL CONCRETE BEAM DETAILS
2. REFER TO SHEET S700 FOR CONCRETE BEAM SCHEDULE3. REFER TO SHEET S600 FOR CONCRETE COLUMN SCHEDULE4. UNLESS NOTED OTHERWISE, DRILLED PIERS SHALL BE CENTERED ON
COLUMN ABOVE. WHEN NO COLUMN ABOVE IS PRESENT, DRILLED PIERSSHALL BE CENTERED ON THE GRADE BEAM AS SHOWN ON PLAN,UNLESS NOTED OTHERWISE.
5. TOP OF CONCRETE FLOOR SLAB ELEVATION = 132’-0”, UNLESSNOTED OTHERWISE.
6. FLOOR FRAMING SYSTEM CONSISTS OF MONOLITHICALLY CAST-IN-PLACECONCRETE SLAB AND BEAMS. CONCRETE SLAB IS 5” THICK WITH WELDEDWIRE REINFORCING 4X4 – W4.0 X W4.0, SHEETS ONLY. STEEL AREA SHALLMEET 0.120 SQUARE INCHES PER FOOT IN EACH DIRECTION. REFER TOSHEET S004 FOR TYPICAL SLAB DETAIL WITH REIFORCING PROFILE.
7. PROVIDE ADDITIONAL SLAB REINFORCEMENT, PER SHEET S004, AT ALLRE-ENTRANT CORNERS.
8. CONTRACTOR SHALL VERIFY WITH ARCHITECTURAL DESIGN DOCUMENTFOR EDGE OF SLAB, STAIR, AND ELEVATOR PIT AND SHAFT DIMENSIONSPRIOR TO CONSTRUCTION.
9. CONTRACTOR SHALL VERIFY ALL SLAB PENETRATIONS WITH ARCHITECTURAL,MECHANICAL, AND ELECTRICAL DESIGN DOCUMENT PRIOR TO CONSTRUCTION.
10.CONTRACTOR SHALL REFER TO DESIGN DOCUMENT OF ALL OTHER DESIGNDISCIPLINES FOR ANY ADDITIONAL ITEMS THAT ARE REQUIRED TO BE CAST INTO CONCRETE PRIOR TO CONSTRUCTION.
11.MECHANICAL AND ELECTRICAL SLAB OPENINGS SHALL BE PRE-FORMED ORSLEEVED WITH ADDITIONAL REIFORCEMENT PER STANDARD CONCRETEDETAILS. CORING AND POST-DRILLING OF POURED SLAB IS PROHIBITEDWITHOUT PRIOR APPROVAL BY THE ENGINEER.
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:30:
28 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
SECOND FLOORFRAMING PLAN -
AREA C
S102C
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
SECOND FLOOR FRAMING PLAN - AREA C
SCALE IN FEET
0 4' 8' 16'
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
KEY PLAN
A B
C
NORTH
UP
UP
A.5 B.5 C.5 DB C D.5 E F G H J K L M N P P.2 Q
15
14
13
10.4
12
11
10
9
8
7
6
5
4
3
2
1
A L.5
AREA
A -
S103
A
AREA
B -
S103
B
AREA C - S103C
AREA B - S103B
R
6.4
6.5
E.9
E.5
3.5
E.8 H.5
4.7
N.6
Q.5
P.5
P.9P.7
BB
AA
4.9
F.5
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:30:
32 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
THIRD FLOORFRAMING PLAN -
OVERALL
S103
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
THIRD FLOOR FRAMING PLAN - OVERALL
SCALE IN FEET
0 8' 16' 32'
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
KEY PLAN
A B
C
NORTH
A.5 B.5 C.5 DB C D.5 E F G H
12
11
10
9
8
7
6
5
4
3
2
1
A
AREA
A -
S103
A
AREA
B -
S103
B
JOINT (TYP)EXPANSION
B300
1
B300
1
B300
1
B300
1
B300
1
B3002
B3002
B300
1
B300
1
B300
1
B300
1
B300
1
B300
1
B300
1
B300
1
B300
1
B300
1
B300
1
B300
1
B300
1
B300
1
B300
1
B300
8
B300
3
B300
3
B300
3
B300
3
B300
3
B300
3
B300
3
B300
3
B300
3
B300
3
B300
3
B300
3
B300
3
B300
3
B300
3
B300
3
B300
3
B300
3
B300
3
B300
3
B300
3
B300
3
B300
4
B300
4
B300
5
B300
1
B300
1
B300
1
B300
1
B300
1
B300
1
B300
1
B300
1
B300
1
B300
1
B300
1
B300
1
B300
1
B300
1
B300
1
B300
1
B300
1
B300
1
B300
3
B3001 B3001B3003
B300
3
B3001
B3001
B3001
B3001
B3001
B3001
B3001
B3001
B3001
B3001
B3001
B3003
B3003
B3003
B3003
B3003
B3003
B3003
B3003
B3003
B3003
B3003
B3001
B3001
B3001
B3001
B3001
B3001
B3001
B3001
B3001
B3001
B3001
B3001 B3003
B300
6
B3007 B3008
B300
2 B3003
G3001 G3002 G3003 G3004 G3005 G3006
G3001 G3002 G3003 G3004 G3005 G3006
G3001 G3002 G3003 G3004 G3005 G3006
G3007
G3008 G3009 G3010 G3011 G3012 G3013
G30
14
G30
14
G30
14
G30
15
G30
15
G30
15
G30
15
G30
16
G30
16
G30
16
G30
16
G30
17
G30
17
G30
17
G30
17
G3018
G30
19
G30
19
6.4
6.5
E.9E.5
3.5
4.7
B300
9
B300
9
B300
9
B300
9
B300
9
B300
9
B300
9
B300
9
B300
9
B300
9
B300
9
B300
9
B300
9
B300
9
B300
9
B300
9B3
010
B301
0
B301
0
B301
0
B301
0
B301
0
B301
0
B301
0
G3020G3020
G3020 G3020
G3020G3020
G3020 G3020
G30
20G
3021
G3022
G3022
G30
22G
3022
G30
22
G3022
B301
1B3
012
B301
3B3
013
11' -
0"
22' -
0"
11' -
9"
10' -
3"
14' -
0"
8' -
0"10
' - 0
"8'
- 0"
3' -
0"11
' - 0
"11
' - 0
"11
' - 0
"11
' - 0
"22
' - 0
"7'
- 0"
11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 22' - 0" 11' - 0" 11' - 0" 11' - 0" 8' - 11"2' - 1"
22' - 0" 22' - 0"
AS330
BS330
CS330
DS330
ES330
FS330
24' - 5"
8' -
0"
B300
3 21' - 5"
8' -
0"
F.5
B300
2
B300
2
B3002
NOTES:1. FOR GENERAL NOTES AND TYPICAL STRUCTURAL DETAILS, REFER TO THE
FOLLOWING SHEETS:a. S001 - GENERAL NOTES - SHEET 1b. S002 - GENERAL NOTES - SHEET 2c. S003 - STANDARD CONCRETE DETAILS - SHEET 1d. S004 - STANDARD CONCRETE DETAILS - SHEET 2e. S005 - STANDARD MASONRY DETAILSf. S006 - STANDARD STEEL DETAILSg. S007 - TYPICAL FOUNDATION DETAILS - SHEET 1h. S008 - TYPICAL FOUNDATION DETAILS - SHEET 2i. S009 - STANDARD CONCRETE COLUMN DETAILSj. S010 - TYPICAL CONCRETE BEAM DETAILS
2. REFER TO SHEET S700 FOR CONCRETE BEAM SCHEDULE3. REFER TO SHEET S600 FOR CONCRETE COLUMN SCHEDULE4. UNLESS NOTED OTHERWISE, DRILLED PIERS SHALL BE CENTERED ON
COLUMN ABOVE. WHEN NO COLUMN ABOVE IS PRESENT, DRILLED PIERSSHALL BE CENTERED ON THE GRADE BEAM AS SHOWN ON PLAN, UNLESSNOTED OTHERWISE.
5. TOP OF CONCRETE FLOOR SLAB ELEVATION = 148’-0”, UNLESSNOTED OTHERWISE.
6. FLOOR FRAMING SYSTEM CONSISTS OF MONOLITHICALLY CAST-IN-PLACECONCRETE SLAB AND BEAMS. CONCRETE SLAB IS 5” THICK WITH WELDEDWIRE REINFORCING 4X4 – W4.0 X W4.0, SHEETS ONLY. STEEL AREA SHALLMEET 0.120 SQUARE INCHES PER FOOT IN EACH DIRECTION. REFER TO SHEETS004 FOR TYPICAL SLAB DETAIL WITH REIFORCING PROFILE.
7. PROVIDE ADDITIONAL SLAB REINFORCEMENT, PER SHEET S004, AT ALLRE-ENTRANT CORNERS.
8. CONTRACTOR SHALL VERIFY WITH ARCHITECTURAL DESIGN DOCUMENTFOR EDGE OF SLAB, STAIR, AND ELEVATOR PIT AND SHAFT DIMENSIONS PRIORTO CONSTRUCTION.
9. CONTRACTOR SHALL VERIFY ALL SLAB PENETRATIONS WITH ARCHITECTURAL,MECHANICAL, AND ELECTRICAL DESIGN DOCUMENT PRIOR TO CONSTRUCTION.
10.CONTRACTOR SHALL REFER TO DESIGN DOCUMENT OF ALL OTHER DESIGNDISCIPLINES FOR ANY ADDITIONAL ITEMS THAT ARE REQUIRED TO BE CASTINTO CONCRETE PRIOR TO CONSTRUCTION.
11.MECHANICAL AND ELECTRICAL SLAB OPENINGS SHALL BE PRE-FORMED ORSLEEVED WITH ADDITIONAL REIFORCEMENT PER STANDARD CONCRETE DETAILS.CORING AND POST-DRILLING OF POURED SLAB IS PROHIBITED WITHOUT PRIORAPPROVAL BY THE ENGINEER.
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:30:
34 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
THIRD FLOORFRAMING PLAN -
AREA A
S103A
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
THIRD FLOOR FRAMING PLAN - AREA A
SCALE IN FEET
0 4' 8' 16'
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
KEY PLAN
A B
C
NORTH
H J K L M N P P.2 Q
10.4
12
11
10
9
8
7
6
5
4
3
2
1
M.5L.5
AREA
A -
S103
A
AREA
B -
S103
B
20' -
0"
AREA C - S102C
AREA B - S102B
R
6.4
6.5
3.5
H.5
4.7
N.6 Q.5P.5 P.9P.7
G3022
G3022
G3022 G3021
G3021
G3023G3023G3023G3023G3023
G3023 G3023 G3023 G3023
B301
1
B301
1
B301
1
B301
1
B301
1
B301
1
B301
1
B301
1
B301
1
B301
1
B301
1
B301
1
B301
1
B301
1
B301
1
B301
1
B301
1
B301
1
B301
1
G3020G3020G3020G3020
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B 301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
3
B301
3
B301
3
B301
3
B301
3
B301
3
B301
3
B301
3B3
013
B301
3
B301
3
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
G3023 G3022 G3023 G3022 G3022 G3023
B3012
G3023
G3022 G3023 G3022 G3023
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
3
B301
3
B301
3
B301
3
B301
3
B301
3
B301
3
B301
3
B301
3
B301
3
B301
3B3
012
B3012
B3012
B3012 B3012
G3023
G3023
G3023
G3020 G3020 G3020
G30
20
G302
0
G3024
B301
2
B301
2
B301
2
B301
2
B301
2B3
012
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
B301
2
G3020 G3020
B301
2
B301
4
B301
4
B301
4
B301
4
BB
AA
4.9
11' -
0"
22' -
0"
11' -
9"
10' -
3"
14' -
0"
8' -
0"10
' - 0
"8'
- 0"
3' -
0"11
' - 0
"11
' - 0
"11
' - 0
"11
' - 0
"22
' - 0
"7'
- 0"
12' -
3 1
/4"
50.0
0°
15.31°
11' - 0" 11' - 0" 22' - 0" 22' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 12' - 2 1/8" 9' - 9 7/8"
3' - 5 1/2"
11' - 5 15/16"
5' - 0 9/16"5' - 2 5/8"2' - 2 7/8"
13' - 0 3/8" 10' - 11 5/8"
B301
3
NOTES:1. FOR GENERAL NOTES AND TYPICAL STRUCTURAL DETAILS, REFER TO THE
FOLLOWING SHEETS:a. S001 - GENERAL NOTES - SHEET 1b. S002 - GENERAL NOTES - SHEET 2c. S003 - STANDARD CONCRETE DETAILS - SHEET 1d. S004 - STANDARD CONCRETE DETAILS - SHEET 2e. S005 - STANDARD MASONRY DETAILSf. S006 - STANDARD STEEL DETAILSg. S007 - TYPICAL FOUNDATION DETAILS - SHEET 1h. S008 - TYPICAL FOUNDATION DETAILS - SHEET 2i. S009 - STANDARD CONCRETE COLUMN DETAILSj. S010 - TYPICAL CONCRETE BEAM DETAILS
2. REFER TO SHEET S700 FOR CONCRETE BEAM SCHEDULE3. REFER TO SHEET S600 FOR CONCRETE COLUMN SCHEDULE4. UNLESS NOTED OTHERWISE, DRILLED PIERS SHALL BE CENTERED ON
COLUMN ABOVE. WHEN NO COLUMN ABOVE IS PRESENT, DRILLED PIERSSHALL BE CENTERED ON THE GRADE BEAM AS SHOWN ON PLAN, UNLESSNOTED OTHERWISE.
5. TOP OF CONCRETE FLOOR SLAB ELEVATION = 148’-0”, UNLESSNOTED OTHERWISE.
6. FLOOR FRAMING SYSTEM CONSISTS OF MONOLITHICALLY CAST-IN-PLACECONCRETE SLAB AND BEAMS. CONCRETE SLAB IS 5” THICK WITH WELDEDWIRE REINFORCING 4X4 – W4.0 X W4.0, SHEETS ONLY. STEEL AREA SHALLMEET 0.120 SQUARE INCHES PER FOOT IN EACH DIRECTION. REFER TO SHEETS004 FOR TYPICAL SLAB DETAIL WITH REIFORCING PROFILE.
7. PROVIDE ADDITIONAL SLAB REINFORCEMENT, PER SHEET S004, AT ALLRE-ENTRANT CORNERS.
8. CONTRACTOR SHALL VERIFY WITH ARCHITECTURAL DESIGN DOCUMENTFOR EDGE OF SLAB, STAIR, AND ELEVATOR PIT AND SHAFT DIMENSIONS PRIORTO CONSTRUCTION.
9. CONTRACTOR SHALL VERIFY ALL SLAB PENETRATIONS WITH ARCHITECTURAL,MECHANICAL, AND ELECTRICAL DESIGN DOCUMENT PRIOR TO CONSTRUCTION.
10.CONTRACTOR SHALL REFER TO DESIGN DOCUMENT OF ALL OTHER DESIGNDISCIPLINES FOR ANY ADDITIONAL ITEMS THAT ARE REQUIRED TO BE CASTINTO CONCRETE PRIOR TO CONSTRUCTION.
11.MECHANICAL AND ELECTRICAL SLAB OPENINGS SHALL BE PRE-FORMED ORSLEEVED WITH ADDITIONAL REIFORCEMENT PER STANDARD CONCRETE DETAILS.CORING AND POST-DRILLING OF POURED SLAB IS PROHIBITED WITHOUT PRIORAPPROVAL BY THE ENGINEER.
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:30:
37 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
THIRD FLOORFRAMING PLAN -
AREA B
S103B
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
THIRD FLOOR FRAMING PLAN - AREA B
SCALE IN FEET
0 4' 8' 16'
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
KEY PLAN
A B
CNORTH
L M N P P.2
15
14
13
12
M.5L.5
L.5
AREA C - S102C
AREA B - S102B
11' -
4"
23' -
6 1
/2"
11' -
0"
8' -
2 1/
16"
N.6
G3020G3020
B301
3
B301
3
B301
3
B301
3
B301
3B3
014
B301
4
B301
4
B301
4
B301
4
B301
4
B301
4
B301
4
B301
4
B3014
B301
3
B301
3
B301
3
B301
3
B301
3
G3020
G3020
B301
3
B301
3
B301
3
B301
3
B301
3
G3020
11' - 0" 11' - 0" 11' - 0" 11' - 0" 12' - 2 1/8" 9' - 9 7/8"
3' - 5 1/2"
GS330
HS330
JS330
NOTES:1. FOR GENERAL NOTES AND TYPICAL STRUCTURAL DETAILS, REFER TO THE
FOLLOWING SHEETS:a. S001 - GENERAL NOTES - SHEET 1b. S002 - GENERAL NOTES - SHEET 2c. S003 - STANDARD CONCRETE DETAILS - SHEET 1d. S004 - STANDARD CONCRETE DETAILS - SHEET 2e. S005 - STANDARD MASONRY DETAILSf. S006 - STANDARD STEEL DETAILSg. S007 - TYPICAL FOUNDATION DETAILS - SHEET 1h. S008 - TYPICAL FOUNDATION DETAILS - SHEET 2i. S009 - STANDARD CONCRETE COLUMN DETAILSj. S010 - TYPICAL CONCRETE BEAM DETAILS
2. REFER TO SHEET S700 FOR CONCRETE BEAM SCHEDULE3. REFER TO SHEET S600 FOR CONCRETE COLUMN SCHEDULE4. UNLESS NOTED OTHERWISE, DRILLED PIERS SHALL BE CENTERED ON
COLUMN ABOVE. WHEN NO COLUMN ABOVE IS PRESENT, DRILLED PIERSSHALL BE CENTERED ON THE GRADE BEAM AS SHOWN ON PLAN, UNLESSNOTED OTHERWISE.
5. TOP OF CONCRETE FLOOR SLAB ELEVATION = 148’-0”, UNLESSNOTED OTHERWISE.
6. FLOOR FRAMING SYSTEM CONSISTS OF MONOLITHICALLY CAST-IN-PLACECONCRETE SLAB AND BEAMS. CONCRETE SLAB IS 5” THICK WITH WELDEDWIRE REINFORCING 4X4 – W4.0 X W4.0, SHEETS ONLY. STEEL AREA SHALLMEET 0.120 SQUARE INCHES PER FOOT IN EACH DIRECTION. REFER TO SHEETS004 FOR TYPICAL SLAB DETAIL WITH REIFORCING PROFILE.
7. PROVIDE ADDITIONAL SLAB REINFORCEMENT, PER SHEET S004, AT ALLRE-ENTRANT CORNERS.
8. CONTRACTOR SHALL VERIFY WITH ARCHITECTURAL DESIGN DOCUMENTFOR EDGE OF SLAB, STAIR, AND ELEVATOR PIT AND SHAFT DIMENSIONS PRIORTO CONSTRUCTION.
9. CONTRACTOR SHALL VERIFY ALL SLAB PENETRATIONS WITH ARCHITECTURAL,MECHANICAL, AND ELECTRICAL DESIGN DOCUMENT PRIOR TO CONSTRUCTION.
10.CONTRACTOR SHALL REFER TO DESIGN DOCUMENT OF ALL OTHER DESIGNDISCIPLINES FOR ANY ADDITIONAL ITEMS THAT ARE REQUIRED TO BE CASTINTO CONCRETE PRIOR TO CONSTRUCTION.
11.MECHANICAL AND ELECTRICAL SLAB OPENINGS SHALL BE PRE-FORMED ORSLEEVED WITH ADDITIONAL REIFORCEMENT PER STANDARD CONCRETE DETAILS.CORING AND POST-DRILLING OF POURED SLAB IS PROHIBITED WITHOUT PRIORAPPROVAL BY THE ENGINEER.
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:30:
39 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
THIRD FLOORFRAMING PLAN -
AREA C
S103C
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
SCALE IN FEET
0 4' 8' 16'
THIRD FLOOR FRAMING PLAN - AREA C
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
KEY PLAN
A B
C
NORTH
A.5 B.5 C.5 DB C D.5 E F G H J K L M N P P.2 Q
15
14
13
10.4
12
11
10
9
8
7
6
5
4
3
2
1
A L.5
AREA
A -
S103
A
AREA
B -
S103
B
AREA C - S103C
AREA B - S103B
R
6.4
6.5
E.9
E.5
3.5
E.8 H.5
4.7
N.6
Q.5
P.5
P.9P.7
BB
AA
4.9
F.5
AREA OF FUTUREROOF FRAMING.STRUCTURAL STEELWITH METAL DECK
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:30:
41 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
ROOF FRAMING PLAN- OVERALL
S104
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
ROOF FRAMING PLAN - OVERALL
SCALE IN FEET
0 8' 16' 32'
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
KEY PLAN
A B
C
NORTH
A.5 B.5 C.5 DB C D.5 E F G H
12
11
10
9
8
7
6
5
4
3
2
1
A
AREA OF FUTUREROOF FRAMING.STRUCTURAL STEELWITH METAL DECK
AREA
A -
S103
A
AREA
B -
S103
B
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B400
2
B400
2
B400
2
B400
2
B400
2
B400
2
B400
2
B400
2
B400
2
B400
2
B400
2
B400
2
B400
2
B400
2
B400
2
B400
2
B400
2
B400
2
B400
2
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B400
1
B4001 B4002 B4001
B4001
B4001
B4001
B4001
B4001
B4001
B4001
B4001
B4001
B4001
B4002
B4002
B4002
B4002
B4002
B4002
B4002
B4002
B4002
B4002
B4001
B4001
B4001
B4001
B4001
B4001
B4001
B4001
B4001
B4001
B4001
B4001
B4002
B4002
B4001
G4016
B4003
B4003
G4001 G4002 G4003 G4004 G4005
G4001 G4002 G4003 G4004 G4005
G4001 G4002 G4003 G4004 G4005
G4006 G4007 G4008 G4009 G4010
G40
11
G40
11
G40
11
G40
12
G40
12
G40
12
G40
12
G40
13
G40
13
G40
13
G40
13
G40
14
G40
14
G40
14
G40
14
G40
15
B400
4
6.4
6.5
E.9E.5
3.5
E.8
H.5
4.7
11' -
0"
22' -
0"
11' -
9"
10' -
3"
14' -
0"
8' -
0"10
' - 0
"8'
- 0"
3' -
0"11
' - 0
"11
' - 0
"11
' - 0
"11
' - 0
"22
' - 0
"7'
- 0"
11' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 22' - 0" 11' - 0" 11' - 0" 11' - 0" 8' - 11"
2' - 1"
11' - 0" 11' - 0" 22' - 0" 11' - 0"
3' - 0"
11' - 0"
AS340
F.5
B400
1
B400
1
B400
1
B400
1
B400
1
G4005
B400
2
B400
2
B400
2
B400
2
B400
2
G4005
G4005
B4001 B4002 B4001
G4010
B400
2
NOTES:1. FOR GENERAL NOTES AND TYPICAL STRUCTURAL DETAILS, REFER TO
THE FOLLOWING SHEETS:a. S001 - GENERAL NOTES - SHEET 1b. S002 - GENERAL NOTES - SHEET 2c. S003 - STANDARD CONCRETE DETAILS - SHEET 1d. S004 - STANDARD CONCRETE DETAILS - SHEET 2e. S005 - STANDARD MASONRY DETAILSf. S006 - STANDARD STEEL DETAILSg. S007 - TYPICAL FOUNDATION DETAILS - SHEET 1h. S008 - TYPICAL FOUNDATION DETAILS - SHEET 2i. S009 - STANDARD CONCRETE COLUMN DETAILSj. S010 - TYPICAL CONCRETE BEAM DETAILS
2. REFER TO SHEET S700 FOR CONCRETE BEAM SCHEDULE3. REFER TO SHEET S600 FOR CONCRETE COLUMN SCHEDULE4. UNLESS NOTED OTHERWISE, DRILLED PIERS SHALL BE CENTERED ON
COLUMN ABOVE. WHEN NO COLUMN ABOVE IS PRESENT, DRILLED PIERSSHALL BE CENTERED ON THE GRADE BEAM AS SHOWN ON PLAN,UNLESS NOTED OTHERWISE.
5. TOP OF CONCRETE FLOOR SLAB ELEVATION = 164’-0”, UNLESSNOTED OTHERWISE.
6. FLOOR FRAMING SYSTEM CONSISTS OF MONOLITHICALLY CAST-IN-PLACECONCRETE SLAB AND BEAMS. CONCRETE SLAB IS 5” THICK WITH WELDEDWIRE REINFORCING 4X4 – W4.0 X W4.0, SHEETS ONLY. STEEL AREA SHALLMEET 0.120 SQUARE INCHES PER FOOT IN EACH DIRECTION. REFER TOSHEET S004 FOR TYPICAL SLAB DETAIL WITH REIFORCING PROFILE.
7. PROVIDE ADDITIONAL SLAB REINFORCEMENT, PER SHEET S004, AT ALLRE-ENTRANT CORNERS.
8. CONTRACTOR SHALL VERIFY WITH ARCHITECTURAL DESIGN DOCUMENTFOR EDGE OF SLAB, STAIR, AND ELEVATOR PIT AND SHAFT DIMENSIONSPRIOR TO CONSTRUCTION.
9. CONTRACTOR SHALL VERIFY ALL SLAB PENETRATIONS WITH ARCHITECTURAL,MECHANICAL, AND ELECTRICAL DESIGN DOCUMENT PRIOR TO CONSTRUCTION.
10.CONTRACTOR SHALL REFER TO DESIGN DOCUMENT OF ALL OTHER DESIGNDISCIPLINES FOR ANY ADDITIONAL ITEMS THAT ARE REQUIRED TO BE CASTINTO CONCRETE PRIOR TO CONSTRUCTION.
11.MECHANICAL AND ELECTRICAL SLAB OPENINGS SHALL BE PRE-FORMED ORSLEEVED WITH ADDITIONAL REIFORCEMENT PER STANDARD CONCRETE DETAILS.CORING AND POST-DRILLING OF POURED SLAB IS PROHIBITED WITHOUTPRIOR APPROVAL BY THE ENGINEER.
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:30:
41 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
ROOF FRAMING PLAN- AREA A
S104A
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
ROOF FRAMING PLAN - AREA A
SCALE IN FEET
0 4' 8' 16'
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
KEY PLAN
A B
C
NORTH
H J K L M N P P.2
10.4
12
11
10
9
8
7
6
5
4
M.5L.5
AREA
A -
S103
A
AREA
B -
S103
B
AREA OF FUTUREROOF FRAMING.STRUCTURAL STEELWITH METAL DECK
AREA C - S102C
AREA B - S102B
6.4
6.5
H.5
4.7
N.6
AA
4.9
14' -
0"
8' -
0"10
' - 0
"8'
- 0"
3' -
0"11
' - 0
"11
' - 0
"11
' - 0
"11
' - 0
"22
' - 0
"7'
- 0"
11' - 0" 11' - 0" 22' - 0" 22' - 0" 11' - 0" 11' - 0" 11' - 0" 11' - 0" 12' - 2 1/8" 9' - 9 7/8" 3' - 5 1/2"
13' -
0"
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:30:
42 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
ROOF FRAMING PLAN- AREA B
S104B
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
ROOF FRAMING PLAN - AREA B
SCALE IN FEET
0 4' 8' 16'
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
KEY PLAN
A B
C
NORTH
L M N P P.2
15
14
13
12
M.5L.5
AREA OF FUTUREROOF FRAMING.STRUCTURAL STEELWITH METAL DECK
AREA C - S102C
AREA B - S102B
11' -
4"
23' -
6 1
/2"
11' -
0"
N.6
11' - 0" 11' - 0" 11' - 0" 11' - 0" 12' - 2 1/8" 9' - 9 7/8"3' - 5 1/2"
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:30:
44 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
ROOF FRAMING PLAN- AREA C
S104C
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
ROOF FRAMING PLAN - AREA C
SCALE IN FEET
0 4' 8' 16'
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
KEY PLAN
A B
C
NORTH
BASEMENT84' - 0"
M
SLAB-ON-GRADEPER PLAN
GRADE BEAMPER PLAN
PIER PER PLAN
1' -
0"
CONC WALLPER PLAN
BASEMENT84' - 0"
6
1' - 8"
CONC WALLPER PLAN
SLAB-ON-GRADEPER PLAN
1' -
0"
GRADE BEAMPER PLAN
PIER PER PLAN
BASEMENT84' - 0"
2' - 3"
1' -
0"
4' - 11 7/16"
SLAB-ON-GRADEPER PLAN
CONC WALLPER PLAN
GRADE BEAMPER PLAN
PIERPER PLAN
BASEMENT84' - 0"
SLAB-ON-GRADEPER PLAN
EXISTING BUILDING
1/2" EXPANSION JOINT
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:30:
47 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
BASEMENT SECTIONSAND DETAILS
S300
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
SECTIONS010B
A
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
SECTIONS010B
B SECTIONS010B
C SECTIONS010B
D
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
GROUND FLOOR100' - 0"
D.5 E.8
1' -
0"
COLUMNPER SCHEDULE
SLAB-ON-GRADEPER PLAN
COLUMNPER SCHEDULE
GRADE BEAMPER PLAN
5' - 0"25' - 0"
1' - 0"1' - 0"1' - 0"1' - 0"
GROUND FLOOR100' - 0"
D
SLAB-ON-GRADEPER PLAN
THICKEND SLABPER PLAN
11 7/16"
JOINT1/2" ISOLATION
GROUND FLOOR100' - 0"
C
1' -
0"
SLAB-ON-GRADEPER PLAN
GRADE BEAMPER PLAN
GROUND FLOOR100' - 0"
A
1' -
0"
CONC WALLPER PLAN SLAB-ON-GRADE
PER PLAN
GRADE BEAMPER PLAN
GROUND FLOOR100' - 0"
11
1' -
0"
1' - 0" 4" 8"
SLAB-ON-GRADEPER PLAN
CONC WALLPER PLAN
CONC COLUMNPER PLAN
GRADE BEAMPER PLAN
PIER PERPLAN
GROUND FLOOR100' - 0"
EXISTINGBUILDING
JOINT1/2" EXPANSION
STRUCTURALSLAB PER PLAN
GROUND FLOOR100' - 0"
M
3' - 3 1/2"
STRUCTURALSLAB PER PLAN
CONC WALLPER PLAN
SLAB-ON-GRADEPER PLAN
1' - 11 1/2"1' - 4"
GROUND FLOOR100' - 0"
FE.9E.5 F.5
4" 1' - 0" 6"
1' -
0"
CONC COLUMNPER PLAN
GRADE BEAMPER PLAN
PIER PER PLAN
PIER PER PLAN
SLAB-ON-GRADEPER PLAN
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(a)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:30:
53 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
GROUND FLOORSECTIONS AND
DETAILS
S304
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
SECTIONS100A
A SECTIONS100A
B
SECTIONS100A
D
SECTIONS100A
C
SECTIONS100A
E SECTIONS100B
F
SECTIONS100B
G
SECTIONS100A
H
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
1ST FLOOR116' - 0"
E.8
COCN COLMUNPER PLAN
CONC SLABPER PLAN
CONC BEAMPER PLAN
CONC COLUMNPER PLAN
EXISTINGSTRUCTURE
1' - 0"
1ST FLOOR116' - 0"
C
CONC SLABPER PLAN
CONC BEAMPER PLAN
1ST FLOOR116' - 0"
A
2' -
0"
1' - 0"
RIGID FOAM
CONC SLABPER PLAN
CONC SLABPER PLAN
CONC WALLPER PLAN
4"1' - 0"
1' - 4"
1ST FLOOR116' - 0"
11
1' - 0" 4"
1' - 4"
CONC WALLPER PLAN
CONC SLABPER PLAN
CONC BEAM BEYONDPER PLAN
1ST FLOOR116' - 0"
FE.9
1' - 0"
JOINTEXPANSION
9"
9"5"8"8"
CONC BEAMPER PLAN (TYP)
CONC SLABPER PLAN
1ST FLOOR116' - 0"
12
CONC SLABPER PLAN
CONC BEAMBEYOND PER PLAN
CONC WALLPER PLAN
CONC COLUMNBEYOND PER PLAN
1' - 0" 4" 8"
1ST FLOOR116' - 0"
LEARNED - 1STFLOOR119' - 4"
12
1' - 0" 4"
1' - 4"
SLAB-ON-GRADEPER PLAN
CONC WALLPER PLAN
CONC BEAMBEYOND
LEARNED - 1STFLOOR119' - 4"
M
SLAB-ON-GRADEPER PLAN
EXISTING BUILDING
1ST FLOOR116' - 0"
LEARNED - 1STFLOOR119' - 4"
M N P
2' - 0" 22' - 0"22' - 0"
18' - 5 1/2"16' - 6 1/2" 7' - 11 1/2"5' - 5 1/2"
CONC COLUMNPER PLAN (TYP)
SLAB-ON-GRADEPER PLAN
GRADE BEAMPER PLAN
5' -
0"
PIER PER PLAN(TYP)
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(a)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:31:
00 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
FIRST FLOORSECTIONS AND
DETAILS
S310
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
SECTIONS101A
A SECTIONS101A
B SECTIONS101A
C SECTIONS101A
D
SECTIONS101A
E SECTIONS101B
F SECTIONS101B
G SECTIONS101C
H
SECTIONS101C
J
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 4'
LEARNED - 1STFLOOR119' - 4"
SLAB-ON-GRADEPER PLAN
EXISTING BUILDING 1ST FLOOR116' - 0"
LEARNED - 1STFLOOR119' - 4"
9
1' - 0" 4"
RIGID FOAM
CONC SLABPER PLAN
CONC SLABPER PLAN
CONC BEAMBEYOND
CON WALL PER PLAN
1ST FLOOR116' - 0"
EXITING BUILDING
CONC BEAMPER PLAN
CONC SLABPER PLAN
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:31:
03 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
FIRST FLOORSECTIONS AND
DETAILS
S311
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
SECTIONS101C
A SECTIONS101B
B SECTIONS101B
C
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
2ND FLOOR132' - 0"
F E.8
EXISTINGBUILDING
CONC SLABPER PLAN
CONC BEAMPER PLAN
1' - 0" 1' - 4"
2ND FLOOR132' - 0"
C
1' - 0" 1' - 4"
CONC BEAMPER PLAN
CONC SLABPER PLAN
2ND FLOOR132' - 0"
11
CONC BEAMPER PLAN
CONC SLABPER PLAN
1' - 0" 1' - 4"
2ND FLOOR132' - 0"
FE.9
1' - 0"JOINT
EXPANSION
9"
CONC BEAMPER PLAN (TYP)
CONC SLABPER PLAN
2ND FLOOR132' - 0"
12
CONC BEAMPER PLAN
CONC SLABPER PLAN
1' - 0" 1' - 4"
2ND FLOOR132' - 0"
M
CONC COLUMNPER PLAN (BEYOND)
CONC SLABPER PLAN
CONC BEAMPER PLAN
JOINT1/2" EXPANSION
EXISTING BUILDING2ND FLOOR
132' - 0"
15
CONC SLABPER PLAN
CONC BEAMPER PLAN
EXISTING BUILDING
7' - 7"
2ND FLOOR132' - 0"
PP.2
CONC BEAMPER PLAN
3' - 5 1/2"
EXISTINGBUILDING
2ND FLOOR132' - 0"
10.4
CONC BEAMPER PLAN (TYP)
5' - 10"
EXISTING BUILDING
2ND FLOOR132' - 0"
CONC BEAMPER PLAN
CONC SLABPER PLAN
EXISTING BUILDING
2ND FLOOR132' - 0"
L2' - 8"
CONC BEAMPER PLAN
EXISTING BUILDING
CONC SLABPER PLAN
2ND FLOOR132' - 0"
6
1' - 0" 1' - 4"
CONC BEAMPER PLAN
CONC SLABPER PLAN
EXISTING BUILDING
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(a)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:31:
12 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
SECOND FLOORSECTIONS AND
DETAILS
S320
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
SECTIONS102A
A SECTIONS102A
B SECTIONS102A
C SECTIONS102A
D
SECTIONS102B
E SECTIONS102C
F SECTIONS102C
G SECTIONS102C
H
SECTIONS102B
J
SECTIONS102B
K SECTIONS102B
L
SECTIONS102A
M
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
3RD FLOOR148' - 0"
2
1' - 0" 1' - 4"
CONC COLUMNBEYOND CONC SLAB
PER PLAN
CONC BEAMPER PLAN
3RD FLOOR148' - 0"
C
1' - 4"1' - 0"
CONC COLUMNBEYOND
CONC BEAMPER PLAN
CONC SLABPER PLAN
3RD FLOOR148' - 0"
A
1' - 0" 4"
CONC BEAMPER PLAN
CONC SLABPER PLAN
3RD FLOOR148' - 0"
11
1' - 0" 1' - 4"
CONC BEAMPER PLAN
CONC SLABPER PLAN
3RD FLOOR148' - 0"
11
CONC SLABPER PLAN
CONC BEAMPER PLAN
1' - 0" 1' - 4"
3RD FLOOR148' - 0"
FE.9
1' - 0"JOINT
EXPANSION
9"
CONC SLABPER PLAN
CONC BEAMPER PLAN (TYP)
3RD FLOOR148' - 0"
M
CONC SLABPER PLAN
CONC BEAMPER PLAN
1' - 0"
3RD FLOOR148' - 0"
EXISTING BUILDING
CONC BEAMPER PLAN
CONC SLABPER PLAN
3RD FLOOR148' - 0"
PCONC SLABPER PLAN
CONC BEAMPER PLAN
5" 7" 7"
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(a)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:31:
20 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
THIRD FLOORSECTIONS AND
DETAILS
S330
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
SECTIONS103A
A SECTIONS103A
B SECTIONS103A
C SECTIONS103A
D
SECTIONS103A
E SECTIONS103A
F SECTIONS103C
G SECTIONS103C
H
SECTIONS103C
J
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
SCALE IN FEET
0 1' 2' 3'
ROOF164' - 0"
2
CONC SLABPER PLAN
CONC BEAMPER PLAN
1' - 0" 1' - 0"
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:31:
22 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
ROOF LEVELSECTIONS AND
DETAILS
S340
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
PLANS104A
A
BASEMENT BASEMENT
84' - 0" 84' - 0"
GROUNDFLOOR
GROUNDFLOOR
100' - 0" 100' - 0"
1ST FLOOR 1ST FLOOR
116' - 0" 116' - 0"
2ND FLOOR 2ND FLOOR
132' - 0" 132' - 0"
3RD FLOOR 3RD FLOOR
148' - 0" 148' - 0"
ROOF ROOF
164' - 0" 164' - 0"
Column Locations A-8 A-9 A-11 A.5-6.5 B-6 B-6.5 B-8 B-9 B-11 B.5-8 B.5-9 B.5-11 C-2 C-3 C-4 C-5 C-6 C.5-1 C.5-6 C.5-8 C.5-9 C.5-11
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
BASEMENT BASEMENT
84' - 0" 84' - 0"
GROUNDFLOOR
GROUNDFLOOR
100' - 0" 100' - 0"
1ST FLOOR 1ST FLOOR
116' - 0" 116' - 0"
2ND FLOOR 2ND FLOOR
132' - 0" 132' - 0"
3RD FLOOR 3RD FLOOR
148' - 0" 148' - 0"
ROOF ROOF
164' - 0" 164' - 0"
Column Locations D-1 D-2 D-3 D-4 D-5 D-6 D-8 D-9 D-11 D.5-2 D.5-3 D.5-3.5 D.5-4 D.5-5 D.5-6 E-8 E-9 E-11 E.5-2 E.5-6 E.8-3 E.8-3.5
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(a)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:31:
24 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
COLUMN SCHEDULE
S600
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
BASEMENT BASEMENT
84' - 0" 84' - 0"
GROUNDFLOOR
GROUNDFLOOR
100' - 0" 100' - 0"
1ST FLOOR 1ST FLOOR
116' - 0" 116' - 0"
2ND FLOOR 2ND FLOOR
132' - 0" 132' - 0"
3RD FLOOR 3RD FLOOR
148' - 0" 148' - 0"
ROOF ROOF
164' - 0" 164' - 0"
Column Locations E.8-4 E.8-5 E.9-8 E.9-9 E.9-11 F-6 F-8 F-9 F-11 G-6 G-8 G-9 G-11 H-6.5 H-7 H-9 H-11 H-12 H.5-6.5 H.5-7 J-9 J-12
18 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
18 x
24
18 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
18 x
24
24 x
24
24 x
24
18 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
18 x
24
18 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
18 x
24
18 x
24
18 x
24
18 x
24
18 x
24
18 x
24
18 x
24
18 x
24
18 x
24
18 x
24
18 x
24
18 x
24
18 x
24
18 x
24
18 x
24
18 x
24
18 x
24
24 x
24
24 x
24
24 x
24
BASEMENT BASEMENT
84' - 0" 84' - 0"
GROUNDFLOOR
GROUNDFLOOR
100' - 0" 100' - 0"
1ST FLOOR 1ST FLOOR
116' - 0" 116' - 0"
2ND FLOOR 2ND FLOOR
132' - 0" 132' - 0"
3RD FLOOR 3RD FLOOR
148' - 0" 148' - 0"
ROOF ROOF
164' - 0" 164' - 0"
Column Locations K-6.5 K-7 K-9 K-12 L-6.4 L-7 L-12 L.5-4.7 L.5-6 L.5-9 M-7 M-12 M-13 M-14 M-15 M.5-4.7 M.5-6 N-4.7 N-6 N-7 N-9 N-10.4
24 x
24
24 x
24
24 x
24
24 x
24
24 x
2424
"
24 x
24
24 x
24
24 x
24
28"
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24"
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24"
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
28"
28"
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(a)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:31:
26 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
COLUMN SCHEDULE
S601
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
BASEMENT BASEMENT
84' - 0" 84' - 0"
GROUNDFLOOR
GROUNDFLOOR
100' - 0" 100' - 0"
1ST FLOOR 1ST FLOOR
116' - 0" 116' - 0"
2ND FLOOR 2ND FLOOR
132' - 0" 132' - 0"
3RD FLOOR 3RD FLOOR
148' - 0" 148' - 0"
ROOF ROOF
164' - 0" 164' - 0"
Column Locations N-12 N-13 N-14 N-15 N.6-6 P-7 P-9 P-10.4 P-13 P-14 P.7-7 P.9-4.9 Q-6 Q-9 Q-10.4 Q.5-7 R-9 R-10.4 AA-4.7 P.5-BB
24 x
24
24"
24 x
24
32"
32"
24"
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24"
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
32"
32"
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24 x
24
24"
24 x
24
24 x
24
24 x
24
24 x
24
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(a)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:31:
27 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
COLUMN SCHEDULE
S602
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:31:
30 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
CONCRETE BEAMSCHEDULE - FIRST
FLOOR
S701
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
1ST FLOOR CONCRETE BEAM SCHEDULE
MARK
SIZE MAIN REINFORCEMENT MAIN REINFORCEMENT MAIN REINFORCEMENT STIRRUPS (TYPICAL) STIRRUPS (END)
REMARKSWIDTH DEPTHTOP BARS @ LEFT SUPPORT BOTTOM BARS TOP BARS @ RIGHT SUPPORT
SIZE SPACING TYPE SIZE SPACING TYPE DISTANCE# & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPEB1001 1' - 4" 3' - 0"B1002 1' - 0" 2' - 0"B1003 1' - 4" 2' - 0"B1004 1' - 4" 3' - 0"B1005 1' - 4" 3' - 0"B1006 1' - 4" 3' - 0"B1007 1' - 4" 3' - 0"B1008 1' - 2" 2' - 2"B1009 1' - 2" 2' - 2"B1010 1' - 4" 2' - 8"B1011 1' - 2" 2' - 0"B1012 1' - 2" 2' - 0"B1013 1' - 2" 2' - 0"
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:31:
33 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
CONCRETE BEAMSCHEDULE - SECOND
FLOOR
S702
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
2ND FLOOR CONCRETE BEAM SCHEDULE
MARK
SIZE MAIN REINFORCEMENT MAIN REINFORCEMENT MAIN REINFORCEMENT STIRRUPS (TYPICAL) STIRRUPS (END)
REMARKSWIDTH DEPTHTOP BARS @ LEFT SUPPORT BOTTOM BARS TOP BARS @ RIGHT SUPPORT
SIZE SPACING TYPE SIZE SPACING TYPE DISTANCE# & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPEB2001 1' - 4" 3' - 0"B2002 1' - 0" 2' - 0"B2003 1' - 4" 2' - 0"B2004 1' - 4" 3' - 0"B2005 1' - 6" 3' - 0"B2006 1' - 4" 3' - 0"B2007 1' - 4" 3' - 0"B2008 1' - 4" 3' - 0"B2009 1' - 2" 2' - 2"B2010 1' - 4" 2' - 8"B2011 1' - 2" 2' - 0"B2012 1' - 2" 2' - 0"B2013 1' - 2" 2' - 0"
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:31:
36 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
CONCRETE BEAMSCHEDULE - THIRD
FLOOR
S703
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
3RD FLOOR CONCRETE BEAM SCHEDULE
MARK
SIZE MAIN REINFORCEMENT MAIN REINFORCEMENT MAIN REINFORCEMENT STIRRUPS (TYPICAL) STIRRUPS (END)
REMARKSWIDTH DEPTHTOP BARS @ LEFT SUPPORT BOTTOM BARS TOP BARS @ RIGHT SUPPORT
SIZE SPACING TYPE SIZE SPACING TYPE DISTANCE# & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPEB3001 1' - 4" 3' - 0"B3002 1' - 0" 2' - 0"B3003 1' - 4" 2' - 0"B3004 1' - 4" 3' - 0"B3005 1' - 4" 3' - 0"B3006 1' - 4" 3' - 0"B3007 1' - 4" 3' - 0"B3008 1' - 4" 3' - 0"B3009 1' - 2" 2' - 2"B3010 1' - 2" 2' - 2"B3011 1' - 4" 2' - 8"B3012 1' - 2" 2' - 0"B3013 1' - 2" 2' - 0"B3014 1' - 2" 2' - 0"
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:31:
39 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
CONCRETE BEAMSCHEDULE - ROOF
LEVEL
S704
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
ROOF LEVEL CONCRETE BEAM SCHEDULE
MARK
SIZE MAIN REINFORCEMENT MAIN REINFORCEMENT MAIN REINFORCEMENT STIRRUPS (TYPICAL) STIRRUPS (END)
REMARKSWIDTH DEPTHTOP BARS @ LEFT SUPPORT BOTTOM BARS TOP BARS @ RIGHT SUPPORT
SIZE SPACING TYPE SIZE SPACING TYPE DISTANCE# & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPEB4001 1' - 4" 2' - 0"B4002 1' - 4" 2' - 0"B4003 1' - 4" 2' - 0"B4004 1' - 4" 2' - 0"
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:31:
42 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
CONCRETE GIRDERSCHEDULE - FIRST
FLOOR
S711
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
1ST FLOOR CONCRETE GIRDER SCHEDULE
MARK
SIZE MAIN REINFORCEMENT MAIN REINFORCEMENT MAIN REINFORCEMENT STIRRUPS (TYPICAL) STIRRUPS (END)
REMARKSWIDTH DEPTHTOP BARS @ LEFT SUPPORT BOTTOM BARS TOP BARS @ RIGHT SUPPORT
SIZE SPACING TYPE SIZE SPACING TYPE DISTANCE# & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPEG1001 2' - 4" 3' - 0"G1002 2' - 4" 3' - 0"G1003 2' - 4" 3' - 0"G1004 2' - 4" 3' - 0"G1005 2' - 4" 3' - 0"G1006 2' - 4" 3' - 0"G1007 2' - 4" 3' - 0"G1008 2' - 4" 3' - 0"G1009 2' - 4" 3' - 0"G1010 2' - 4" 3' - 0"G1011 2' - 4" 3' - 0"G1012 2' - 4" 3' - 0"G1013 2' - 4" 3' - 0"G1014 2' - 4" 3' - 0"G1015 2' - 4" 3' - 0"G1016 2' - 4" 3' - 0"G1017 2' - 4" 3' - 0"G1018 2' - 4" 3' - 0"G1019 2' - 4" 3' - 0"G1020 2' - 4" 3' - 0"G1021 2' - 4" 3' - 0"G1022 2' - 4" 3' - 0"G1023 2' - 4" 3' - 0"G1024 2' - 4" 2' - 2"G1025 2' - 4" 2' - 2"G1026 2' - 4" 2' - 2"G1027 2' - 4" 2' - 8"G1028 2' - 4" 2' - 2"
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:31:
45 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
CONCRETE GIRDERSCHEDULE - SECOND
FLOOR
S712
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
2ND FLOOR CONCRETE GIRDER SCHEDULE
MARK
SIZE MAIN REINFORCEMENT MAIN REINFORCEMENT MAIN REINFORCEMENT STIRRUPS (TYPICAL) STIRRUPS (END)
REMARKSWIDTH DEPTHTOP BARS @ LEFT SUPPORT BOTTOM BARS TOP BARS @ RIGHT SUPPORT
SIZE SPACING TYPE SIZE SPACING TYPE DISTANCE# & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPEG2001 2' - 4" 3' - 0"G2002 2' - 4" 3' - 0"G2003 2' - 4" 3' - 0"G2004 2' - 4" 3' - 0"G2005 2' - 4" 3' - 0"G2006 2' - 4" 3' - 0"G2007 2' - 4" 3' - 0"G2008 2' - 4" 3' - 0"G2009 2' - 4" 3' - 0"G2010 2' - 4" 3' - 0"G2011 2' - 4" 3' - 0"G2012 2' - 4" 3' - 0"G2013 2' - 4" 3' - 0"G2014 2' - 4" 3' - 0"G2015 2' - 4" 3' - 0"G2016 2' - 4" 3' - 0"G2017 2' - 4" 3' - 0"G2018 2' - 4" 3' - 0"G2019 2' - 4" 3' - 0"G2020 2' - 4" 3' - 0"G2021 2' - 4" 2' - 2"G2022 2' - 4" 2' - 2"G2023 2' - 4" 2' - 2"G2024 2' - 4" 2' - 2"G2025 2' - 4" 2' - 8"
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(c)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:31:
48 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
CONCRETE GIRDERSCHEDULE - THIRD
FLOOR
S713
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
3RD FLOOR CONCRETE GIRDER SCHEDULE
MARK
SIZE MAIN REINFORCEMENT MAIN REINFORCEMENT MAIN REINFORCEMENT STIRRUPS (TYPICAL) STIRRUPS (END)
REMARKSWIDTH DEPTHTOP BARS @ LEFT SUPPORT BOTTOM BARS TOP BARS @ RIGHT SUPPORT
SIZE SPACING TYPE SIZE SPACING TYPE DISTANCE# & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPEG3001 2' - 4" 3' - 0"G3002 2' - 4" 3' - 0"G3003 2' - 4" 3' - 0"G3004 2' - 4" 3' - 0"G3005 2' - 4" 3' - 0"G3006 2' - 4" 3' - 0"G3007 2' - 4" 3' - 0"G3008 2' - 4" 3' - 0"G3009 2' - 4" 3' - 0"G3010 2' - 4" 3' - 0"G3011 2' - 4" 3' - 0"G3012 2' - 4" 3' - 0"G3013 2' - 4" 3' - 0"G3014 2' - 4" 3' - 0"G3015 2' - 4" 3' - 0"G3016 2' - 4" 3' - 0"G3017 2' - 4" 3' - 0"G3018 2' - 4" 3' - 0"G3019 2' - 4" 3' - 0"G3020 2' - 4" 2' - 2"G3021 2' - 4" 2' - 2"G3022 2' - 4" 2' - 2"G3023 2' - 4" 2' - 8"G3024 2' - 4" 2' - 2"
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
DAT
E PR
INTE
D:
FILE
PAT
H:
TREANOR NO.
A-011898(a)
THE
UNIV
ERSI
TY O
F KA
NSAS
LEEP
2LA
WR
ENC
E, K
S 66
405
BUIL
DIN
G N
UM
BER
682
00-0
0088
DAT
E:D
RAW
N B
Y:C
HEC
KED
BY:
REV
:
Dep
artm
ent o
f Adm
inis
tratio
nO
ffice
of F
acilit
ies
& Pr
oper
ty M
anag
emen
tLa
ndon
Sta
te O
ffice
Bui
ldin
g90
0 SW
Jac
kson
, Sui
te 6
00To
peka
, Kan
sas
6661
2-12
20Te
leph
one
785-
296-
8899
Fax
785-
296-
8898
KU # 088-8941
D
C
B
A
123456
E
123456
D
C
B
A
E
LEAR
NED
HALL
ENG
INEE
RING
EXP
ANSI
ON
PHAS
E 2
2012 Treanor Architects, P.A.c
ARCHITECTURAL:
M.E.P:
CIVIL/CHILLER ENGINEER
LANDSCAPE:
STRUCTURAL:
LABORATORY PLANNER:
RESEARCH FACILITIES DESIGN
2/14
/201
3 11
:31:
50 A
MC
:\Rev
it_Pr
ojec
ts\U
nivK
ansa
s\68
150\
Mod
els\
STR
UC
\681
50_S
_tm
oes.
rvt
CONCRETE GIRDERSCHEDULE - ROOF
LEVEL
S714
02.1
4.20
13
DESIGNDEVELOPMENT
68150
T. M
oes
J. F
ei
SHEE
T IS
SUE
/ REV
ISIO
NN
O.
DES
CR
IPTI
ON
DAT
E
ROOF LEVEL CONCRETE GIRDER SCHEDULE
MARK
SIZE MAIN REINFORCEMENT MAIN REINFORCEMENT MAIN REINFORCEMENT STIRRUPS (TYPICAL) STIRRUPS (END)
REMARKSWIDTH DEPTHTOP BARS @ LEFT SUPPORT BOTTOM BARS TOP BARS @ RIGHT SUPPORT
SIZE SPACING TYPE SIZE SPACING TYPE DISTANCE# & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPE # & SIZE TYPEG4001 2' - 4" 2' - 0"G4002 2' - 4" 2' - 0"G4003 2' - 4" 2' - 0"G4004 2' - 4" 2' - 0"G4005 2' - 4" 2' - 0"G4006 2' - 4" 2' - 0"G4007 2' - 4" 2' - 0"G4008 2' - 4" 2' - 0"G4009 2' - 4" 2' - 0"G4010 2' - 4" 2' - 0"G4011 2' - 4" 2' - 0"G4012 2' - 4" 2' - 0"G4013 2' - 4" 2' - 0"G4014 2' - 4" 2' - 0"G4015 2' - 4" 2' - 0"G4016 2' - 4" 2' - 0"