leon johnson hall passenger elevators compliance … l j... · service elevator. no work note:...
TRANSCRIPT
![Page 1: LEON JOHNSON HALL PASSENGER ELEVATORS COMPLIANCE … L J... · service elevator. no work note: coordinate project staging with owner control unit 1 control unit 2 hoist machine 1](https://reader031.vdocument.in/reader031/viewer/2022011916/5fd4d2da8ab3d8622e38d6c6/html5/thumbnails/1.jpg)
A.F.F. ABOVE FINISHEDFLOOR
OAHU. AIR HANDLING UNITALT. ALTERNATEALUM. ALUMINUMAMP. AMPEREAPPROX. APPROXIMATEAPT. APARTMENTARCH. ARCHITECT
B BELOW FINISHFLOOR
B.O. BOTTOM OFBD. BOARDBLDG. BUILDINGBM. BEAMBOT. BOTTOMBRG. BEARINGBSMT. BASEMENTBTUH BRITISH THERMAL
UNIT PER HOUR
C.O. CLEAN OUTCAP. CAPACITYCFCI CONTRACTOR FURNISHED,
CONTRACTOR INSTALLEDCFOI CONTRACTOR FURNISHED,
OWNER INSTALLEDCL CENTERLINECLG. CEILINGCLO. CLOSETCLR. CLEARCMU CONCRETE MASONRY UNITCOL. COLUMNCONC. CONCRETECONST. CONSTRUCTIONCONT. CONTINUOUSCORR. CORRIDORCPT CARPETCT CERAMIC TILECW COLD WATER
D.S. DOWNSPOUTDBL. DOUBLEDEPT. DEPARTMENTDF DRINKING FOUNTAINDIA.,D. DIAMETERDIAG. DIAGONALDIM. DIMENSIONDISP. DISPENSERDIST. DISTANCEDN DOWNDTL. DETAILDW DISHWASHER
E EASTEA. EACHE.I.F.S. EXTERIOR INSULATION
FINISH SYSTEME.J. EXPANSION JOINTELEC. ELECTRICALELEV. ELEVATIONEMERG. EMERGENCYEPDM ETHYLENE PROPYLENE
DIENEMONOMEREPS EXTRUDED
POLYSTYRENEEQ. EQUALEQUIP. EQUIPMENTEXIST EXISTINGEXT. EXTERIOR
F.C.O. FLOOR CLEAN OUTFD FLOOR DRAINFE FIRE EXTINGUISHERFEC FIRE EXTINGUISHER
CABINETF.F.E. FINISH FLOOR
ELEVATIONFIN. FINISHFLR. FLOORFLUOR. FLUORESCENTFT. FOOT, FEETFTG. FOOTINGFURN. FURNACE, FURNITURE
GA. GAUGEGALV. GALVANIZEDG.C. GENERAL
CONTRACTORG.C.O. GROUND CLEAN OUTG.D. GARBAGE DISPOSALGFI GROUND FAULT
INTERRUPTERGLU-LAM GLUE LAMINATED
WOODGND GROUNDGPM GALLONS PER MINUTEGWB. GYPSUM WALL BOARDG.E.J. GUTTER EXPANSION
JOINT
HDWR. HARDWAREHM HOLLOW METALHORIZ. HORIZONTALHR. HOURHT. HEIGHTHVAC HEATING, VENTILATING,
& AIR CONDITIONINGHW HOT WATER
IN. INCHESINFO. INFORMATIONINST. INSTALLATIONINSUL. INSULATIONINT. INTERIOR
JAN. JANITORJST JOISTJT. JOINT
K.O. KNOCK OUTKIP 1000 POUNDSKIT. KITCHEN
LAB. LABORATORYLAM. LAMINATEDLBS. POUNDSLH LEFT HAND
MACH. MACHINEMAINT. MAINTENANCEMATL MATERIALMAX. MAXIMUMMECH. MECHANICALMEZZ. MEZZANINEMFR. MANUFACTURERMIN. MINIMUMMIR MIRRORMISC. MISCELLANEOUSMTL METAL
N NORTHN.I.C. NOT IN CONTRACTN.T.S. NOT TO SCALENO.,# NUMBER
O.C. ON CENTEROFOI OWNER FURNISHED, OWNER
INSTALLEDOFCI OWNER FURNISHED,
CONTRACTOR INSTALLEDOFF. OFFICEOPNG OPENINGOSB ORIENTED STRAND BOARDOZ. OUNCE
P.C. PRECASTPART. PARTITIONPERP. PERPENDICULARPLAM PLASTIC LAMINATEPLAS. PLASTICPLY PLYWOODPR. PAIRPREFAB PREFABRICATEDPSF POUNDS PER SQUARE
FOOTPSI POUNDS PER SQUARE
INCHPT PAINTPTD PAPER TOWEL
DISPENSER
QT QUARRY TILE
R. RADIUSR.C.P. REFLECTED CEILING
PLANR.O. ROUGH OPENINGR.O.W. RIGHT OF WAYRD ROOF DRAINREBAR REINFORCING BARRECEPT. RECEPTIONREFL. REFLECTEDREG REGISTEREDREINF. REINFORCEDREQ'D REQUIREDREV. REVISIONRF REFRIGERATORRH RIGHT HANDRM ROOMRR RESTROOM
S. SEALEDS. SOUTHSAN. SANITARYSC SOLIDCORESCHED SCHEDULESD SOAP DISPENSERSEC. SECONDSECT. SECTIONSHT SHEETSHTG SHEETINGSPEC. SPECIFICATIONSQ. SQUARESS STAINLESS STEELSTC SOUND TRANSMISSION
LEVELSTL STEELSTRUCT. STRUCTURALSURF. SURFACESUSP. SUSPENDEDSVF SHEET VINYL FLOORING
T&B TOP & BOTTOMT&G TONGUE & GROOVETEL. TELEPHONETEMP. TEMPORARYTER TERRAZZOT.F.E. TOP OF FOOTING
ELEVATIONT.O. TOP OF FOOTINGTPD TOILET PAPER
DISPENSERTV TELEVISIONTYP. TYPICAL
U.L. UNDERWRITER'SLABORATORY
UNFIN. UNFINISHEDUNO UNLESS NOTED OTHERWISEUTIL. UTILITY
VAR. VARIESVB VINYLBASEVCT VINYL COMPOSITION
TILEVERT. VERTICALVEST. VESTIBULE
W WESTW/ WITHW/O WITH OUTWC WATER CLOSETWD WOODWH WATER HEATERWT. WEIGHTW.W.F. WELDED WIRE
FABRIC
A
B
C
D
E
G
H
I
K
L
N
P
Q
R
S
T
U
V
W
J
M
O
ABBREVIATIONS
F
ROOM NAME
100
100A
A
I-2
A0.0
1A
2
A0.0
3
A0.0
4
A0.0
A0.05
A0.0
1A
1D
1C
1B
BUILDING ELEVATIONS
BUILDING SECTION
WALL SECTION
DETAIL REFERENCE
DETAIL CALLOUT
INTERIOR ELEVATIONS
GWB
10' - 0" A.F.F.
WALL TYPE
WINDOW TAG
DOOR TAG
ROOM TAG
CEILING TAG
KEYNOTE INDICATOR
NORTHNORTH ARROW
?
1B
1C
1D
MO
NT
AN
AS
TA
TE
UN
IV
ER
SIT
Y
Printe
d O
n:
PPA#18-2067
REV. DESCRIPTION DATE
REVIEWED BY:
DRAWN BY :
LE
ON
JO
HN
SO
N H
AL
LP
ASSE
NG
ER
EL
EV
AT
OR
S
CO
MP
LIA
NC
E U
PG
RA
DE
S
DATE
SHEET
SHEET TITLE
SLA
TE
AR
CH
ITE
CTU
RE
, IN
C.
14
70
N. R
OB
ER
TS
ST.
HE
LE
NA
, M
ON
TA
NA
59
60
1
T |
40
6.4
57
.03
60
WW
W.S
LA
TE
AR
CH
ITE
CTU
RE
.CO
M
5/1
9/2
019
11
:44
:25
AM
G0.1
05/20/2019
COVER SHEET
KAA
SWC
TEAM MEMBERS
GRAPHIC SYMBOLS
VICINITY MAP
NORTH
SITE
INDEX OF DRAWINGS
LEON JOHNSON HALL PASSENGER ELEVATORS COMPLIANCE UPGRADES
BOZEMAN, MT
MONTANA STATE UNIVERSITY
PROJECT SPECIFIC NOTES
MONTANA STATE UNIVERSITYCAMPUS PLANNING, DESIGN, AND CONSTRUCTIONPLEW BUILDING, 113BOZEMAN, MT 59717TEL: 406.994.5413CONTACT: BILL MACKIN
SLATE ARCHITECTURE1470 NORTH ROBERTS STREETHELENA, MT 59601TEL: 406.457.0360CONTACT: SCOTT CROMWELL, AIA
MORRISON-MAIERLE2880 TECHNOLOGY BLVD. WBOZEMAN, MONTANA 59718TEL: 406.587.0721CONTACT: JAY FISCHER, P.E.
MORRISON-MAIERLE2880 TECHNOLOGY BLVD. W BOZEMAN, MONTANA 59718TEL: 406.587.0721CONTACT: RYAN MARONEY, P.E.
MATTHEW CARR, P.E.
1. THE DOCUMENTS CONSIST OF THESE DRAWINGS AND SPECIFICATIONS MANUAL EXCLUSIVELY.2. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NEW MATERIALS (U.N.O.) AND QUALIFIED CRAFTS PERSONS TO COMPLETE THE WORK.3. DOCUMENTS SHOW THE DESIGN INTENT OF THE PROJECT AND MAY NOT SHOW MINOR DETAILS OF PROPOSED INSTALLATIONS. THE INCLUSION OF THESE
MINOR DETAILS IS IMPLIED TO PROVIDE A COMPLETE PROJECT AND ARE TO BE INCLUDED AS PART OF THE BID.4. IT IS THE GENERAL CONTRACTORS RESPONSIBILITY TO INSPECT THE SITE AND EXISTING CONDITIONS PRIOR TO PROCEEDING WITH EACH INSTALLATION OF
PART OF THE WORK. DISCREPANCIES MUST BE REPORTED TO THE ARCHITECT PRIOR TO PROCEEDING. 5. THE GENERAL CONTRACTOR IS TO COORDINATE THE INSTALLATION OF MATERIALS AND WORK OF OTHERS WHO ARE NOT SUB-CONTRACTORS TO THE G.C.,
YET ARE REQUIRED TO PROVIDE A COMPLETE PROJECT. AREAS OF WORK REQUIRING COORDINATION INCLUDE BUT ARE NOT LIMITED TO THOSE INDICATED AS N.I.C. IN THE CONSTRUCTION DOCUMENTS.
6. DIMENSIONS ARE SHOWN ON THE DRAWINGS. DO NOT SCALE THE DRAWINGS.7. ALL DIMENSIONS ARE DETERMINED AS FOLLOWS: EXISTING CONSTRUCTION: FACE OF EXISTING WALL MATERIAL. SIPS PANELS: OUTSIDE FACE OF OSB. NEW
CONSTRUCTION: FACE OF STUD.8. ALL HEIGHTS ARE DIMENSIONAL FROM THE TOP OF FINISHED FLOOR (A.F.F.) UNLESS NOTED OTHERWISE.9. ALL SHOP DRAWINGS DIMENSIONS TO BE CHECKED AND VERIFIED IN THE FIELD BY THE CONTRACTOR.10. IN THE CASE OF CONTRADICTIONS, ASSUME THE MORE COSTLY APPROACH FOR BIDDING PURPOSES. BRING ALL CONTRADICTIONS TO THE ATTENTION OF
THE ARCHITECT.11. WHERE CONDITION OF FINISH ARISES THAT NO DETAIL OR NOTE COVERS, MATCH DETAIL TO EXISTING SITUATION OF SIMILAR CONDITION12. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE REPAIR AND REFINISHING OF ALL HOLES OR DAMAGE ENCOUNTERED IN WORK AS A
RESULT OF NECESSARY CUTTING, PATCHING, OR DEMOLITION BY ALL TRADES PERFORMING WORK.13. GENERAL CONTRACTOR TO PROVIDE ALL REQUIRED BLOCKING, ANCHORAGES FOR ACCESSORIES, MILLWORK, GRAB BARS, MECHANICAL AND ELECTRICAL
ITEMS.14. WHERE COLUMNS AND STUD WALLS ALIGN, GYPSUM BOARD TO BE CONTINUOUS OVER COLUMNS.15. SEAL ALL PENETRATIONS IN FLOORS, WALLS AND ROOF TIGHT AROUND DUCTS, PIPES, VENTS, SOIL-PIPES, TRAPS, ETC. CONTRACTOR TO COORDINATE.16. ALL MECHANICAL AND ELECTRICAL LINES TO BE INSTALLED TIGHT TO STRUCTURE WHERE POSSIBLE IN ALL INSTANCES. 17. IN PAINTED OR FINISHED ROOMS, ALL HORIZONTAL AND VERTICAL PIPING AND CONDUITS SHALL BE FURRED TO MATCH ROOM FINISH AS INDICATED.WHEN DUCT WORK, PIPES, MECHANICAL UNITS, JUNCTION BOXES AND CONDUIT ARE EXPOSED IN PAINTED ROOMS, PAINT TO MATCH ADJACENT FINISH.
OWNER: ARCHITECT: STRUCTURAL: M.E.P.:
ARCHITECTURAL
A2.1 ENLARGED FLOOR PLANS
A2.2 ELEVATOR CAB FINISH PLANS
MECHANICAL
M1.1 MECHANICAL SPECIFICATIONS & LEGENDS
M2.1 MECHANICAL PLAN
ELECTRICAL
E1.1 ELECTRICAL SPECIFICATIONS & LEGENDS
E2.1 ELECTRICAL PLAN
GENERAL
G0.1 COVER SHEET
![Page 2: LEON JOHNSON HALL PASSENGER ELEVATORS COMPLIANCE … L J... · service elevator. no work note: coordinate project staging with owner control unit 1 control unit 2 hoist machine 1](https://reader031.vdocument.in/reader031/viewer/2022011916/5fd4d2da8ab3d8622e38d6c6/html5/thumbnails/2.jpg)
901
900A
902
11"
3/16 3-12
UP
ROOF ACCESS
STAIRS TO 8TH FLOOR
AREA OF WORK
ELEVATOR SHAFT
TO ELEVATOR PENTHOUSE
SERVICE ELEVATOR. NO WORK
NOTE:
COORDINATE PROJECT STAGING WITH OWNER
CONTROL UNIT 2CONTROL UNIT 1
HOIST MACHINE 2HOIST MACHINE 1
5' -
4"
4' -
4"
4' -
2"
7 04 0
20' - 0"
12' -
6"
NOTE:
NEW ELEVATOR MACHINERY DEPICTED IS FOR REFERENCE ONLY. NEW MACHINERY LAYOUT TO BE PROVIDED BY ELEVATOR CONTRACTOR
ELEVATOR CABS TO REMAIN AND RECEIVE NEW FINISHES.
BACKER ROD AND SEALANT ALL WALL NEW WALL PENETRATIONS
MASONRY OPENING, OPENING TO BE AT
NEAREST BLOCK COURSING AND CAPTURES EX'G
VENT OPENING
(E) BRICK VENEER AND CMU WALL ASSEMBLY
NEW ELEVATOR MACHINERY, SEE
MECHANICAL
4' -
0"
4' -
4"
5' -
6"
MASONRY OPENING, OPENING TO BE AT NEAREST BLOCK COURSING
7 04 0
DEMO CONTROL UNIT 2, PREP FOR NEW
DEMO HOIST MACHINE 2, PREP FOR NEW
DEMO HOIST MACHINE 1, PREP FOR NEW
5' -
4"
4' -
4"
DEMO OPENING AT NEAREST MASONRY UNIT, PREP FOR DOOR
NOTE:
DIMENSIONED HEIGHTS TAKEN FROM FINISH FLOOR OF PENTHOUSE
ELEVATOR CABS TO REMAIN AND RECEIVE NEW FINISHES
CONCRETE FLOOR TO BE PATCHED AND REPAIRD AS REQUIRED
DEMO OPENING FOR 4'-0" X 7'-0"
DOOR TO NEAREST MASONRY COURSE APPROPRIATE FOR
NEW DOOR
PENTHOUSE
DEMO CONTROL UNIT 2, PREP FOR NEW
EX'G ELECTRICAL/DATA. NO WORK. PROTECT DURING CONSTRUCTION
EX'G ELECTRICAL/DATA. NO WORK. PROTECT DURING CONSTRUCTION
EX'G BRICK VENEER AND CMU WALL ASSEMBLY
4' -
0"
4' -
4"
DEMO OPENING FOR 4'-0" X 7'-0" DOOR TO NEAREST MASONRY COURSE APPROPRIATE FOR NEW DOOR
A.F.F.
2' x 4' ACT
8' - 9 1/2"
DEMO EX'G CEILING TILE PER ASBESTOS ABATEMENT PROCEDURES, PREP FOR NEW
NOTE:
DIMENSIONED HEIGHTS TAKEN FROM FINISH FLOOR OF PENTHOUSE
ELEVATOR CABS TO REMAIN AND RECEIVE NEW FINISHES
PENTHOUSE
(E) 6 1/2" X 12" W-FLANGE STEEL BEAM
7' - 6"
B.O. BEAM
GENERAL DEMOLITION NOTES
1. SEE SPECIFICATIONS FOR A DETAILED SCHEDULE OF SELECTIVE DEMOLITION ITEMS.
2. ALL EQUIPMENT, FURNITURE, ETC. LEFT IN AREAS WHERE DEMOLITION IS TO COMMENCE IS TO BE COORDINATED WITH OWNER, PRIOR TO REMOVING FROM THE PREMISES.
3. PROTECT ALL ITEMS/ELEMENTS NOT SPECIFIED AS BEING DEMO'D, AND PATCH AND REPAIR ALL DAMAGED ITEMS/ELEMENTS TO REMAIN.
4. PATCH AND INFILL ALL MECHANICAL, ELECTRICAL & PLUMBING WORK THAT ARE OUTLINED IN THEIR SHEETS, EVEN IF NOT CALLED OUT IN THE ARCHITECTURAL SHEETS.
5. THE CONTRACTOR SHALL PROVIDE ALL DEMOLITION INCIDENTAL TO OR REQUIRED FOR NEW AND RENOVATION CONSTRUCTION WHETHER OR NOT IT IS SPECIFICALLY NOTED, INCLUDING, BUT NOT LIMITED TO, ALL OTHER WORK THAT MIGHT REASONABLY BE REQUIRED TO BE REMOVED IN PREPARATION FOR SPECIFIED FINISHES. DEMOLITION SHALL BE PERFORMED IN A MANNER THAT WILL NOT DAMAGE ANY ITEMS OR SURFACES INDICATED TO REMAIN. ITEMS OR SURFACES SHALL BE PATCHED IF NECESSARY TO PROVIDE A SUITABLE SUB-STRATA FOR NEW FINISHES.
6. PRIOR TO BIDDING, THE CONTRACTOR SHALL VISIT THE FACILITY AND THOROUGHLY FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS.
7. THE CONTRACTOR SHALL MAINTAIN AND ADHERE TO ALL CURRENT LIFE-SAFETY AND INTERIM LIFE-SAFETY RULES AND REGULATIONS THROUGHOUT THE CONSTRUCTION OF THIS PROJECT.
SYMBOL LEGEND
EXISTING CEILING/FLOOR IS TO BE DEMOLISHED, FIELD VERIFY TYPES AND CONDITIONS
EXISTING WALL/ITEM/ELEMENT TO BE DEMOLISHED, FIELD VERIFY TYPES AND CONDITIONS
EXISTING WALL/ITEM/ELEMENT TO REMAIN AND BE PROTECTED, FIELD VERIFY TYPES AND CONDITIONS
GENERAL NOTES
1. THE INTENT OF THE DRAWINGS IS TO PROVIDE INFORMATION FOR CONSTRUCTION. IT IS IMPORTANT FOR THE CONTRACTOR TO VERIFY FIELD DIMENSIONS AND CONDITIONS BEFORE EXECUTION OF THE WORK. CONTACT THE ARCHITECT SHOULD DISCREPANCIES EXIST.
2. CONTRACTOR AND SUBCONTRACTORS SHALL PROVIDE ALL LABOR, MATERIALS AND EQUIPMENT TO COMPLETE ALL WORK SHOWN ON PLANS, CALLED FOR IN SPECIFICATION, OR REASONABLY IMPLIED FOR A COMPLETE INSTALLATION EVEN THOUGH NEITHER SHOWN ON PLANS OR CALLED OUT IN SPECIFICATIONS.
3. ALL NEW WALLS ARE TO EXTEND TO DECK, UNLESS OTHERWISE NOTED.
4. WHERE FLOOR IS TRANSITIONING TO A DIFFERENT MATERIAL, INSTALL A TRANSITION STRIP.
5. DIMENSIONS ARE FROM FACE OF EXISTING WALL FINISH, OR FACE OF NEW STUD UNLESS OTHERWISE NOTES.
6. DEBRIS SHALL BE PROMPTLY REMOVED FROM THE BUILDING AND THE SITE AND DISPOSED OF IN A LEGAL MANNER. SURFACES IN THE CONSTRUCTION AREA SHALL BE MAINTAINED IN A BROOM CLEAN CONDITION AT THE END OF EACH WORK DAY.
7. THE CONTRACTOR SHALL PROVIDE ALL DEMOLITION INCIDENTAL TO OR REQUIRED FOR NEW AND RENOVATION CONSTRUCTION WHETHER OR NOT IT IS SPECIFICALLY NOTED, INCLUDING, BUT NOT LIMITED TO, ALL OTHER WORK THAT MIGHT REASONABLY BE REQUIRED TO BE REMOVED IN PREPARATION FOR SPECIFIED FINISHES. DEMOLITION SHALL BE PERFORMED IN A MANNER THAT WILL NOT DAMAGE ANY ITEMS OR SURFACES INDICATED TO REMAIN. ITEMS OR SURFACES SHALL BE PATCHED IF NECESSARY TO PROVIDE A SUITABLE SUB-STRATA FOR NEW FINISHES.
SYMBOL LEGEND
NEW WALL/ITEM/ELEMENT TO BE CONSTRUCTED, FIELD VERIFY TYPES AND CONDITIONS
EXISTING WALL/ITEM/ELEMENT TO REMAIN AND BE PROTECTED, FIELD VERIFY TYPES AND CONDITIONS
TYPE 'A'
7' -
0"
2" 4' - 0"
2" 4"
(E) CMU WALL ASSEMBLY, VERIFY THICKNESS
L5X3X3/8" (LLV) GALVANIZED STEEL HEADER W/ 8" BEARING EA. SIDE OF OPENING
3/8" X CONT. GALVANIZED STEEL PLATE
(E) BRICK VENEER
L3X3X3/8" GALVANIZED STEEL VENEER SUPPORT, W/ 6" MIN.
BEARING EA. SIDE OF OPENING
HEADER
(E) RIGID INSULATION
NOTE 1. CONSTRUCTION SEQUENCE: SAW CUT HORIZONTALLY TO ALLOW ANGLE TO BE INSERTED INTO CMU WALL PRIOR TO REMOVING ANY MASONRY. INSERT ANGLE ON EACH SIDE OF OPENING (ENSURE 8” MIN BEARING PROVIDED AT EACH SIDE OF OPENING) PRIOR TO REMOVING MASONRY. ONCE STEEL SUPPORT ANGLES ARE INSTALLED, REMOVE MASONRY TO EXTENTS AS INDICATED. INSERT CONTINUOUS PLATE BELOW AND PROVIDE STITCH WELDING PER DETAIL.
STEEL ANGLE REINFORCMENT
HOLLOW METAL FRAME FOR MASONRY OPENING, SEE SCHEDULE
DOOR, SEE SCHEDULE
SPRAY FOAM INSULATION
4"
EX'G CMU WALL ASSEMBLY
ADD ONE WEEP HOLE TO EACH SIDE OF OPENING
EX'G FACE BRICK
WELD DOOR FRAME TO STEEL OPENING SUPPORT
HOLLOW METAL FRAME FOR MASONRY OPENING, SEE SCHEDULE
DOOR, SEE SCHEDULE
2"
EX'G CMU WALL ASSEMBLY
SPRAY FOAM INSULATION
EX'G FACE BRICK
STEEL ANGLE, CASE CORNERS
STEEL ANGLE, CASE CORNERS
FACE BRICK BEYOND
THRESHOLD
EXTERIORINTERIOR
AUTOMATIC DROP BOTTOM
HARDWARE SET - "H1"
- 1 1/2 PAIR HINGES- 1 CLOSER -EXTRA HEAVY DUTY ARM W/ HOLD OPEN- 1 LEVER LOCKSET - STOREROOM FUNCTION- 1 BLANK (EXTERIOR)- 1 SET OF SILENCERS
HARDWARE SCHEDULE
MO
NT
AN
AS
TA
TE
UN
IV
ER
SIT
Y
Printe
d O
n:
PPA#18-2067
REV. DESCRIPTION DATE
REVIEWED BY:
DRAWN BY :
DATE
SHEET
SHEET TITLE
SLA
TE
AR
CH
ITE
CTU
RE
, IN
C.
14
70
N. R
OB
ER
TS
ST.
HE
LE
NA
, M
ON
TA
NA
59
60
1
T |
40
6.4
57
.03
60
WW
W.S
LA
TE
AR
CH
ITE
CTU
RE
.CO
M
5/1
9/2
019
11
:44
:24
AM
A2.1
05/20/2019
ENLARGED FLOORPLANS
Author
Checker
1/4" = 1'-0"3 NINTH FLOOR
1/4" = 1'-0"4 PENTHOUSE FLOOR PLAN
1/4" = 1'-0"1 DEMOLITION PENTHOUSE PLAN 1/4" = 1'-0"2 DEMOLITION PENTHOUSE REFLECTED CEILING PLAN
NORTH
NORTH
NORTH
DOOR SCHEDULE
DOOR NO. TYPE
DOOR FRAME FIRERATING HARDWARE
DETAILS
COMMENTSTHICKNESS WIDTH HEIGHT MATERIAL FINISH MATERIAL FINISH HEAD JAMB SILL
104 A 1 3/4" 4' - 0" 7' - 0" INSULATED HM PNT HM PNT NA H1 7/A2.1 8/A2.1 6/A2.1
105 A 1 3/4" 4' - 0" 7' - 0" INSULATED HM PNT HM PNT NA H1 7/A2.1 8/A2.1 6/A2.1
1/4" = 1'-0"
DOOR AND FRAME ELEVATION
1" = 1'-0"5 MASONRY OPENING DETAIL - STRUCTURAL
3" = 1'-0"7 EXTERIOR MASONRY HM DOOR DETAIL - HEAD3" = 1'-0"8 EXTERIOR MASONRY HM DOOR DETAIL - JAMB
3" = 1'-0"6 HM DOOR THREASHOLD DETAIL
LE
ON
JO
HN
SO
N H
AL
LP
ASSE
NG
ER
EL
EV
AT
OR
S
CO
MP
LIA
NC
E U
PG
RA
DE
S
![Page 3: LEON JOHNSON HALL PASSENGER ELEVATORS COMPLIANCE … L J... · service elevator. no work note: coordinate project staging with owner control unit 1 control unit 2 hoist machine 1](https://reader031.vdocument.in/reader031/viewer/2022011916/5fd4d2da8ab3d8622e38d6c6/html5/thumbnails/3.jpg)
DEMO CONTROL PANEL, PREP FOR NEW
DEMO EX'G PANELS. PREP FOR NEW
PREP SURFACE FOR NEW PAINT,
ENTIRE CAB
DEMO EX'G RAIL, PREP FOR NEW
DEMO EX'G FLOORING, PREP
FOR NEW
DEMO CONTROL PANEL, PREP FOR NEW
DEMO EX'G PANELS. PREP FOR NEW
PREP SURFACE FOR NEW PAINT,
ENTIRE CAB
DEMO EX'G RAIL, PREP FOR NEW
DEMO EX'G FLOORING, PREP
FOR NEW
ELEVATOR CAB #1ELEVATOR CAB #2
NOTE:
- DEMOLITION IS FOR FINISHES ONLY. EX'G ELEVATOR CABS TO REMAIN- DEMOLITION TO APPLY TO BOTH ELEVATOR CABS- ELEVATOR CAB DIMENSIONS TO BE FIELD VERIFIED BY CONTRACTOR
DEMO EX'G CEILING
DIFFUSERS AND LIGHTS, PREP
FOR NEW
DEMO EX'G CEILING
DIFFUSERS AND LIGHTS, PREP
FOR NEW
6' -
7"
2' - 3 3/4"
PNT CAB, PNT-1
SHEET VINYL FLOORING
REVEAL PANEL, PROVIDE COLOR SAMPLES TO ARCHITECT
(N) LED LIGHTS W/ WHITE TRANSLUCENT DIFFUSERS, MATCH EX'G
NEW CAR OPERATING PANEL, MEET ADA REQUIREMENTS, PROVIDE EMERGENCY PHONE SERVICE
NEW LIGHT
SHEET VINYL FLOORING
NEW POSITION INDICATOR
(N) LED LIGHTS W/ WHITE TRANSLUCENT DIFFUSERS, MATCH EX'G DESIGN
REVEAL PANEL, PROVIDE COLOR SAMPLES TO ARCHITECT
2" FLATBAR RAIL, BRUSHED STAINLESS STEEL #4
(N) LED LIGHTS W/ WHITE TRANSLUCENT DIFFUSERS, MATCH EX'G DESIGN
SHEET VINYL FLOORING
GENERAL FINISH NOTES
1. THE INTENT OF THE DRAWINGS IS TO PROVIDE INFORMATION FOR CONSTRUCTION. IT IS IMPORTANT FOR THE CONTRACTOR TO VERIFY FIELD DIMENSIONS AND CONDITIONS BEFORE EXECUTION OF THE WORK. CONTACT THE ARCHITECT SHOULD DISCREPANCIES EXIST.
2. CONTRACTOR AND SUBCONTRACTORS SHALL PROVIDE ALL LABOR, MATERIALS AND EQUIPMENT TO COMPLETE ALL WORK SHOWN ON PLANS, CALLED FOR IN SPECIFICATION, OR REASONABLY IMPLIED FOR A COMPLETE INSTALLATION EVEN THOUGH NEITHER SHOWN ON PLANS OR CALLED OUT IN SPECIFICATIONS.
3. WHERE CARPET IS TRANSITIONING TO EXISTING FLOOR FINISH THAT IS ANYTHING OTHER THAN CARPET, INSTALL A TRANSITION STRIP.
REPLACE HALL POSITION INDICATORS AT EACH STOP (8).
NEW HALL CALL CONTROL PUSH BUTTONS (8).
MO
NT
AN
AS
TA
TE
UN
IV
ER
SIT
Y
Printe
d O
n:
PPA#18-2067
REV. DESCRIPTION DATE
REVIEWED BY:
DRAWN BY :
LE
ON
JO
HN
SO
N H
AL
LP
ASSE
NG
ER
EL
EV
AT
OR
S
CO
MP
LIA
NC
E U
PG
RA
DE
S
DATE
SHEET
SHEET TITLE
SLA
TE
AR
CH
ITE
CTU
RE
, IN
C.
14
70
N. R
OB
ER
TS
ST.
HE
LE
NA
, M
ON
TA
NA
59
60
1
T |
40
6.4
57
.03
60
WW
W.S
LA
TE
AR
CH
ITE
CTU
RE
.CO
M
5/1
9/2
019
11
:44
:25
AM
A2.2
05/20/2019
ELEVATOR CABFINISH PLANS
Author
Checker
NORTH
3/4" = 1'-0"1 DEMOLITION ELEVATOR CAB
3/4" = 1'-0"3 INTERIOR BACK ELEVATION3/4" = 1'-0"4 INTERIOR FRONT DOOR ELEVATION
3/4" = 1'-0"5 INTERIOR SIDE ELEVATION
3/4" = 1'-0"2 ELEVATOR CAB PLANS
ELEVATOR CAB #2 ELEVATOR CAB #1
NEW CONTROL PANELBRUSHED STAINLESS STEEL
SHEET VINYL FLOORING
2" FLATBAR RAILBRUSHED STAINLESS STEEL #4
REVEAL PANEL PER MANUFACTURER
SUPPLY FINISH SAMPLES TO ARCHITECT
CAB FINISH PNT- 1
NEW CONTROL PANELBRUSHED STAINLESS STEEL
SHEET VINYL FLOORING
2" FLATBAR RAILBRUSHED STAINLESS STEEL #4
REVEAL PANEL PER MANUFACTURER
SUPPLY FINISH SAMPLES TO ARCHITECT
CAB FINISH PNT- 1
3/4" = 1'-0"6 ELEVATOR LOBBY ELEVATION (EACH FLOOR)
NOTE: ELEVATOR CABS TO RECEIVE NEW LED LIGHT FIXTURES AND DIFFUSERS SIMILAR TO EXISTING
![Page 4: LEON JOHNSON HALL PASSENGER ELEVATORS COMPLIANCE … L J... · service elevator. no work note: coordinate project staging with owner control unit 1 control unit 2 hoist machine 1](https://reader031.vdocument.in/reader031/viewer/2022011916/5fd4d2da8ab3d8622e38d6c6/html5/thumbnails/4.jpg)
PPA#18-2067
LE
ON
JO
HN
SO
N H
AL
LP
ASSE
NG
ER
EL
EV
AT
OR
S
CO
MP
LIA
NC
E U
PG
RA
DE
S
![Page 5: LEON JOHNSON HALL PASSENGER ELEVATORS COMPLIANCE … L J... · service elevator. no work note: coordinate project staging with owner control unit 1 control unit 2 hoist machine 1](https://reader031.vdocument.in/reader031/viewer/2022011916/5fd4d2da8ab3d8622e38d6c6/html5/thumbnails/5.jpg)
PPA#18-2067
LE
ON
JO
HN
SO
N H
AL
LP
ASSE
NG
ER
EL
EV
AT
OR
S
CO
MP
LIA
NC
E U
PG
RA
DE
S
![Page 6: LEON JOHNSON HALL PASSENGER ELEVATORS COMPLIANCE … L J... · service elevator. no work note: coordinate project staging with owner control unit 1 control unit 2 hoist machine 1](https://reader031.vdocument.in/reader031/viewer/2022011916/5fd4d2da8ab3d8622e38d6c6/html5/thumbnails/6.jpg)
Prin
te
d O
n:
REV. DESCRIPTION DATEREVIEWED BY:DRAWN BY:
LE
ON
JO
HN
SO
N H
AL
LE
LE
VA
TO
R U
PG
RA
DE
DATE
SHEET
SHEET TITLESLATE#18081
SLAT
E AR
CHIT
ECTU
RE, I
NC.
1470
N. R
OBER
TS S
T.H
ELEN
A, M
ONTA
NA
5960
1
T |
406.
457.
0360
WW
W.S
LATE
ARCH
ITEC
TURE
.COM
MO
NT
AN
AST
AT
E U
NIV
ER
SIT
Y
4/5
/2
01
9 8
:5
7:0
8 A
M
E1.1
05/20/2019
ELECTRICAL
SPECIFICATIONS &
LEGENDS
RPMRJH
RACEWAY:
· MINIMUM RACEWAY SIZE: 3/4-INCH TRADE SIZE.
OUTDOORS:
· EXPOSED CONDUIT: RIGID STEEL CONDUIT.
· CONCEALED CONDUIT, ABOVE GROUND: EMT.
· CONNECTION TO VIBRATING EQUIPMENT (INCLUDING TRANSFORMERS AND HYDRAULIC, PNEUMATIC, ELECTRIC
SOLENOID, OR MOTOR-DRIVEN EQUIPMENT): LFMC.
· BOXES AND ENCLOSURES, ABOVE GROUND: NEMA 250, TYPE 3R.
INDOOR:
· EXPOSED, NOT SUBJECT TO PHISICAL DAMAGE: EMT.
· EXPOSED AND SUBJECT TO SEVERE PHYSICAL DAMAGE: RIGID STEEL CONDUIT.
· CONCEALED IN NEW CEILINGS AND INTERIOR WALLS AND PARTITIONS: EMT.
· CONNECTION TO VIBRATING EQUIPMENT (INCLUDING TRANSFORMERS AND HYDRAULIC, PNEUMATIC, ELECTRIC
SOLENOID, OR MOTOR-DRIVEN EQUIPMENT): FMC, EXCEPT USE LFMC IN DAMP OR WET LOCATIONS.
· DAMP OR WET LOCATIONS: RIGID STEEL CONDUIT.
· BOXES AND ENCLOSURES: NEMA 250, TYPE 1, EXCEPT USE NEMA 250, TYPE 3R, NONMETALLIC IN DAMP OR WET
LOCATIONS.
· RACEWAY FITTINGS: COMPATIBLE WITH RACEWAYS AND SUITABLE FOR USE AND LOCATION.
· RIGID AND INTERMEDIATE STEEL CONDUIT: USE THREADED RIGID STEEL CONDUIT FITTINGS, UNLESS NOTED
OTHERWISE.
CONDUCTORS:
· ALL CONDUCTORS IN RACEWAY: TYPE THHN-THWN, SINGLE CONDUCTORS.
· COPPER. SOLID FOR NO. 10 AWG AND SMALLER, STRANDED FOR NO. 8 AWG AND LARGER.
· CONCEALED IN NEW CEILINGS AND WALLS: TYPE THHN-THWN, SINGLE CONDUCTORS.
PANELBOARDS:
· ALL PANELBOARDS SHALL BE FULLY RATED.
· ALL PANELBOARDS AND DISCONNECTS TO BE HARD-LABELED (HARD PLASTIC ENGRAVED).
DISCONNECTS:
· ALL DISCONNECTS SHALL BE HEAVY DUTY RATED.
WIRING DEVICES:
GFCI RECEPTACLES:
· GENERAL DESCRIPTION: STRAIGHT BLADE, NON-FEED-THROUGH TYPE. COMPLY WITH NEMA WD 1, NEMA WD 6, UL 498,
AND UL 943, CLASS A, AND INCLUDE INDICATOR LIGHT THAT IS LIGHTED WHEN DEVICE IS TRIPPED.
· DUPLEX GFCI CONVENIENCE RECEPTACLES: 125 V, 20 A.
· COOPER: GF20.
· UNFINISHED SPACES: PROVIDE GRAY DEVICE IN 4-SQUARE BOX WITH GALVANIZED STEEL COVERS.
· FINISHED SPACES: PROVIDE WHITE DEVICE IN 4-SQUARE BOX WITH WHITE NYLON COVERS.
SWITCHES:
· 120/277V 20A: COMPLY WITH NEMA WD 1 AND UL20.
· COOPER: 2221 (SINGLE POLE)
· HUBBELL: CS1221 (SINGLE POLE)
· LEVITON: 1221-2 (SINGLE POLE)
FIRE ALARM:
· EXISTING SYSTEM IS SIMPLEX-GRINNELL (JCI).
· COORDINATE ALL REQUIREMENTS FOR SYSTEM TIE-IN WITH SIMPLEX-GRINNELL (JCI) PRIOR TO BID.
ELECTRICAL SPECIFICATIONS
1. PRIOR TO BID CONTRACTOR SHALL VISIT THE SITE. NOT ALL WORK REQUIRED
TO COMPLETE THE PROJECT IS SHOWN ON THE DRAWINGS. THE CONTRACTOR
SHALL BECOME THOROUGHLY FAMILIAR WITH ALL THE WORK REQUIRED TO
COMPLETE THE PROJECT IN ADDITION TO THE LOCAL CONDITIONS AND INCLUDE
SAID WORK IN THE BID.
2. GENERAL WORK PRACTICES FOR ELECTRICAL CONSTRUCTION SHALL BE IN
ACCORDANCE WITH NECA 1, "STANDARD PRACTICES FOR GOOD WORKMANSHIP
IN ELECTRICAL CONTRACTING." THIS PUBLICATION IS AVAILABLE FROM NECA BY
TELEPHONE AT 301-215-4500 OR ON-LINE AT WWW.NECANET.ORG.
3. CONDUCTORS ARE SIZED PER THE 75 DEGREE C RATING COLUMN OF NEC
TABLE 310.16. IF THE TERMINAL USED FOR A TERMINATION OF A PARTICULAR
CONDUCTOR IS NOT MARKED, OR THE TERMINAL IS MARKED FOR 60 DEGREE C
CONDUCTORS, IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO EITHER
ADJUST THE AMPACITY OF THE CONDUCTOR TO MATCH THE 60 DEGREE
COLUMN OF TABLE 310.16, OR REPLACE THE TERMINAL WITH ONE RATED FOR
AT LEAST 75 DEGREES C.
4. FOR CIRCUIT RUNS EXTENDING BEYOND 300 LINEAR FEET. CONDUCTOR SIZE
SHALL BE A MINIMUM OF #10 CU.
5. DURING DEMOLITION, THE CONTRACTOR SHALL NOTE ALL EXISTING RACEWAY
(BOTH SURFACE AND CONCEALED) TO THE EXTENT POSSIBLE. THESE
RACEWAYS SHALL BE REUSED TO THE GREATEST EXTENT POSSIBLE TO
ENSURE A CLEAN FINISHED PRODUCT.
6. CONTRACTOR SHALL REMOVE, TRANSPORT, AND LEGALLY DISPOSE OF LAMPS
AND BALLASTS OFF-SITE. IT IS ASSUMED THE BALLASTS DO NOT CONTAIN PCBs.
CONTRACTOR SHALL NOTIFY OWNER IMMEDIATELY IT IF IS SUSPECTED THAT
BALLASTS CONTAIN PCBs.
7. ALL POWER INTERRUPTIONS SHALL BE COORDINATED WITH OWNER. ANY
DISRUPTION OF WORKERS IN THE SPACE SHALL BE KEPT TO A MINIMUM AND BE
COORDINATED WITH THE OWNER PRIOR TO WORK COMMENCING IN THAT
SPACE.
8. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH 120V BRANCH
CIRCUIT.
9. ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY
EXISTING CIRCUITS THAT ARE INTENDED TO REMAIN THAT ARE CUT OR
INTERRUPTED AS PART OF THE DEMOLITION PROCESS. PROVISION FOR THIS
WORK SHALL BE INCLUDED IN THE BID.
10. ELECTRICAL DRAWINGS SHOWING EXISTING BUILDING CONDITIONS ARE BASED
ON RECORD DRAWINGS AND SITE VISITS. IF ACTUAL EXISTING CONDITIONS
DIFFER FROM THOSE SHOWN ON DRAWINGS, PLEASE NOTIFY ENGINEER.
PROJECT NOTES
ELECTRICAL SYMBOL LEGEND
SYMBOL DESCRIPTIONS
MOUNTING
HEIGHT, UNO
PANEL AND CIRCUIT DESIGNATION ARE SHOWN NEXT TO EACH DEVICE (PANEL NAME - CIRCUIT NUMBER). BRANCH
CIRCUIT WIRE SIZE IS #12 UNLESS NOTED OTHERWISE. A SINGLE INSULATED GREEN GROUND CONDUCTOR SHALL
BE PROVIDED WITH EACH HOME RUN. PROVIDE A SEPARATE NEUTRAL FOR EACH CIRCUIT. HOME RUNS SHALL HAVE
NO MORE THAN THREE CIRCUITS. LINE VOLTAGE AND LOW VOLTAGE WIRING IS NOT SHOWN ON PLANS.
MOTOR CONNECTION
METER
LINE BREAK
KEY NOTE. REFER TO SPECIFIC NOTE ON SAME DRAWING SHEET.
SURFACE FLUORESCENT TO SCALE. STEM INDICATES WALL MOUNTED.
SWITCH:
SINGLE POLE 46"
MOTION DETECTOR. WATT STOPPER DLM LMDC-100 DUAL TECHNOLOGY CEILING MOUNT OR EQUAL.
WALL MOTION DETECTOR. WATT STOPPER DLM LMDX-100 DUAL TECHNOLOGY WALL MOUNT OR EQUAL 46"
PHOTOCELL. WATT STOPPER DLM LMLS-400 CEILING MOUNT OR EQUAL
DUPLEX RECEPTACLE. 18"
4PLEX RECEPTACLE. 18"
JUNCTION BOX
FUSED DISCONNECT SWITCH
MERSEN POWER MODULE
BRANCH CIRCUIT PANELBOARD
BREAKER
GROUNDING BUS
PUSHBUTTON 54"
FIRE ALARM MANUAL STATION 46"
HORN/STROBE 82"
STROBE 82"
DOOR HOLDER
RATE-OF-RISE HEAT DETECTOR
SMOKE DETECTOR
SMOKE DETECTOR "D" INDICATES DUCT DETECTOR. DUCT DETECTOR FURNISHED BY ELEC, INSTALLED BY MECH,
AND WIRED BY ELEC.
ANALOG TELEPHONE OUTLET WITH TWO ANALOG CABLE DROPS U.N.O. (1)
18"
TELEPHONE/DATA OUTLET WITH TWO DATA AND ONE VOICE CABLE DROPS. U.N.O. (1)18"
NOTE (1): FOR EACH TELEPHONE AND/OR DATA OUTLET, INSTALL REQUIRED BACKCAN, CONDUIT (1" MINIMUM) w/
INSULATED THROAT BUSHING AND PULL CORD, TO ACCESSIBLE SPACE BELOW OR ABOVE CEILINGS, UNLESS NOTED
OTHERWISE.
1. THESE SYMBOLS COMPRISE A STANDARD LIST; NOT ALL SYMBOLS APPEAR ON THIS PROJECT.
2. ALL MOUNTING HEIGHTS ARE TO CENTER OF DEVICE ABOVE FINISHED FLOOR. MOUNTING HEIGHTS INDICATED ON
ARCHITECTURAL WALL ELEVATIONS OR AS NOTED SPECIFICALLY ON THE DRAWINGS OR IN THE SPECIFICATIONS
SHALL TAKE PRECEDENCE OVER MOUNTING HEIGHTS LISTED.
DEVICE
P - 1
M
D
D
P
J
F
F
F
D
H
SD
SD
D
1
ELECTRICAL ABBREVIATIONS
A, AMPAMPERES
AF AMP FUSE
AS AMP SWITCH
C CONDUIT / RACEWAY
CKT CIRCUIT
CU COPPER
EX EXISTING
FA FIRE ALARM
GFI GROUND FAULT INTERRUPTER
GND GROUND
J-BOX JUNCTION BOX
KAIC THOUSAND AMP INTERRUPTING CURRENT
MLO MAIN LUG ONLY
P POLE
PH PHASE
REC RECEPTACLE
TTB TELEPHONE TERMINAL BOARD
V VOLT
W WATTS
WP WEATHERPROOF
RYAN P.
MARONEY
No. 60006 PE
M
O
N
TA
N
A
L
I
C
E
NS
E
D
P
R
O
F
E
S
S
I
O
NA
L
E
N
G
I
N
E
E
R
CON
STRU
CTIO
N D
RAW
ING
S
PPA#18-2067
LE
ON
JO
HN
SO
N H
AL
LP
ASSE
NG
ER
EL
EV
AT
OR
S
CO
MP
LIA
NC
E U
PG
RA
DE
S
![Page 7: LEON JOHNSON HALL PASSENGER ELEVATORS COMPLIANCE … L J... · service elevator. no work note: coordinate project staging with owner control unit 1 control unit 2 hoist machine 1](https://reader031.vdocument.in/reader031/viewer/2022011916/5fd4d2da8ab3d8622e38d6c6/html5/thumbnails/7.jpg)
901
900A
902
7
0
4
0
PENTHOUSE
KEYNOTES
1. EXISTING ELEVATOR CONTROLS TO BE DEMOLISHED.
2. EXISTING ELEVATOR MOTORS TO BE DEMOLISHED.
3. DEMO EXISTING ELECTRICAL DISCONNECTS. KEEP EXISTING FEEDERS
FROM THIS LOCATION BACK TO 480V PANEL FOR REUSE WITH NEW
ELEVATORS.
4. DEMO FLUORESCENT LIGHT FIXTURES. SALVAGE CIRCUIT & CONTROL
FOR REUSE.
5. PROVIDE NEW FUSED DISCONNECT. SEE DETAIL 4 ON SHEET E2.1.
REUSE EXISTING FEEDER FROM EXISTING 480V PANEL AS DESCRIBED IN
KEYNOTE 3.
6. CIRCUIT CAR 1 LIGHTS AND CONTROLS AS SHOWN.
7. CIRCUIT CAR 2 LIGHTS AND CONTROLS AS SHOWN.
8. PROVIDE 1" CONDUIT W/ PULL STRING TO TTB LOCATED ON MAIN FLOOR.
COORDINATE W/ MSU IT AND PROVIDE THE REQUIRED TELEPHONE
CABLING.
9. PROVIDE (4) #3 AND #8 GND IN 1
1
4
"C, FROM MERSEN POWER MODULE TO
CONTROLLER.
10.REPLACE EXISTING 120V DUPLEX RECEPTACLE WITH NEW 120V 20A GFI
DUPLEX RECEPTACLE
11.SEE GENERAL NOTE F AND DETAIL 4. INSTALL NEW INTELLIGENT
RELAY(S) FOR ELEVATOR CONTROLS AND CONNECT ALL EXISTING
SMOKE DETECTOR(S) AS REQUIRED.
12.REPLACE (4) EXISTING STRIP FIXTURES IN PENTHOUSE. PROVIDE NEW
LED LUMINAIRE COOPER METALUX 4SLSTP4040DD-UNV, OR APPROVED
EQUAL. REUSE EXISTING LIGHTING CONTROL & CIRCUIT IN ROOM.
13.PROVIDE FEEDER BETWEEN CU-1 & FC-1:
3
4
"C, (2) #12, #12 GND.
14.PROVIDE FEEDER BETWEEN CU-2 & FC-2:
3
4
"C, (2) #12, #12 GND.
15.POWER CONNECTION TO NEW CONDENSING UNIT. PROVIDE FUSED
DISCONNECT: 30AS, 20AF, NEMA 3R. CIRCUIT AS SHOWN.
16.PROVIDE NEW 60A 120/208V 1PH 3W MLO LOAD CENTER. CIRCUIT FROM
EXISTING PENTHOUSE 120/208V 3PH PANEL; PROVIDE NEW 60A 2P
BREAKER IN EXISTING PANEL. PROVIDE 1"C, (3) #6, #10 GND.
17.VERIFY AVAILABLE CAPACITY OF EXISTING PANEL PER NEC 220.87
PRIOR TO CIRCUITING NEW SUBPANEL.
18.COORDINATE DEMOLITION OF EXISTING EXHAUST FAN WITH
MECHANICAL CONTRACTOR.
ELECTRICAL GENERAL NOTES
A. IT IS ABSOLUTELY NECESSARY FOR ALL TRADES INVOLVED TO COORDINATE
WITH EACH OTHER AND VERIFY THAT THERE ARE NO CONFLICTS IN
LOCATION OF DUCTS, CONDUITS, DIFFUSERS, BOXES AND OTHER ITEMS
THROUGHOUT THIS PROJECT BEFORE FINAL PLACEMENT OF MATERIALS.
B. ALL DIMENSIONS AND EXACT UNIT LOCATIONS ARE TO BE FIELD VERIFIED.
THESE DRAWINGS REPRESENT SCHEMATIC SYSTEMS.
C. COORDINATE AVAILABLE SPACE FOR EQUIPMENT AND PIPING SYSTEMS WITH
OTHER TRADES. REFER TO ARCHITECTURAL, STRUCTURAL, PLUMBING, AND
ELEVATOR SHOP DRAWINGS FOR ADDITIONAL DETAILS NECESSARY FOR
COORDINATION.
D. COORDINATE ALL CONCRETE PENETRATIONS WITH STRUCTURAL ENGINEER
TO VERIFY HOW AND WHERE CONCRETE CAN BE CUT.
E. ALL ELECTRICAL CONNECTIONS FROM THE ELEVATOR CONTROLLER LOAD
SIDE ARE TO BE MADE BY THE ELEVATOR CONTRACTOR.
F. CONTRACTOR SHALL CONNECT EXISTING FIRE ALARM DEVICES TO NEW
ELEVATOR CONTROLLER. ENSURE FIRE ALARM MAINTAINS FULL
FUNCTIONALITY. EXISTING DEVICES INCLUDE, BUT ARE NOT LIMITED TO: THE
SMOKE DETECTORS IN THE LOBBIES OF EACH FLOOR.
G. COORDINATE WITH MSU TO ENSURE PATHWAY REMAINS INTACT TO EXISTING
ELEVATOR CAMERA.
Prin
te
d O
n:
PPA#18-2067
REV. DESCRIPTION DATEREVIEWED BY:DRAWN BY:
LE
ON
JO
HN
SO
N H
AL
LE
LE
VA
TO
R U
PG
RA
DE
DATE
SHEET
SHEET TITLESLATE#18081
SLAT
E AR
CHIT
ECTU
RE, I
NC.
1470
N. R
OBER
TS S
T.H
ELEN
A, M
ONTA
NA
5960
1
T |
406.
457.
0360
WW
W.S
LATE
ARCH
ITEC
TURE
.COM
MO
NT
AN
AST
AT
E U
NIV
ER
SIT
Y
4/5
/2
01
9 8
:5
7:0
8 A
M
E2.1
05/20/2019
ELECTRICAL PLAN
RPMRJH
1/4" = 1'-0"
2
9TH FLOOR ELECTRICAL PLAN
1/4" = 1'-0"
3
PENTHOUSE ELECTRICAL PLAN
1/4" = 1'-0"
1
ELECTRICAL DEMOLITION PLAN
NORTH
NORTH
NORTH
NEW CONTROLLER 1 NEW CONTROLLER 2
ELEVATOR
MACHINE 1
ELEVATOR
MACHINE 2
SD
11
2
2
3
4
5
5
6
7
8
9
9
10
11
12
TYP.
EXISTING
PENTHOUSE PANEL
120/208V 3PH 4W
ELEVATOR
CONTROLLER
SD
SD
SD
SD
NEW FUSED DISCONNECT
TO FACP
ELEVATOR SHAFT
TO FACP
ELEVATOR LOBBY BASEMENT
TO FACP
ELEVATOR LOBBY NINTH FLOOR
TO FACP
ELEVATOR MACHINE ROOM
120V DEDICATED CIRCUIT FOR CAR LIGHTS
120V DEDICATED CIRCUIT FOR CAR CONTROLS
LOCKABLE 20A-1P,120V GFI CIRCUIT BREAKER IN
NEW SUBPANEL, ONE FOR CONTROL CIRCUIT
AND ONE FOR CAR LIGHTS CIRCUIT.
FIRE ALARM
ANNUNCIATION
CIRCUIT IN 3/4" C.
PROVIDE 1/2"C.
TO TELEPHONE
TERMINAL BOARD
EXISTING ELEVATOR FEEDER:
REUSE
100AS
FUSE PER
MANUFACTURER
REQUIREMENT
NOTE:
IT IS THE EC's RESPONSIBILTY TO
VERIFY EXACT REQUIREMENTS OF
THE ACTUAL ELEVATOR PROVIDED,
PRIOR TO ORDERING, INCLUDING:
MAIN CIRCUIT BREAKER,
CONDUCTORS, AND FUSE SIZING.
NOTIFY ENGINEER IF THERE ARE ANY
DISCREPANCIES BETWEEN
CONSTRUCTION DRAWINGS AND THE
ACTUAL ELEVATOR REQUIREMENTS.
TYP.
N.T.S.
4
ELEVATOR ELECTRICAL DETAIL (TYP. FOR EACH ELEVATOR 1 & 2)
TYP. FOR EACH LEVEL
.
.
.
.
.
.
13
FC-1
FC-2
14
CU-1
CU-2
15
16
NEW SUBPANEL
'PP1'
PP1-1,3
PP1-2,4
15
PP1-9
PP1-5
ELEVATOR SHAFT
(PENTHOUSE ABOVE)
STAIR UP TO ELEVATOR
PENTHOUSE
ROOF
ACCESS
SERVICE ELEVATOR;
NO WORK
STAIRS TO
8TH FLR
(4) #3 CU, #8 CU GND IN 1-1/4"C
NEW
SUBPANEL
NOTE:
EXISTING FIRE ALARM IS A SIMPLEX-
GRINNELL SYSTEM. PROVIDE ALL DEVICES,
PROGRAMMING AND CONTROLS AS
REQUIRED TO TIE EXISTING FIRE ALARM
TO NEW ELEVATOR CONTROLLERS. SEE
GENERAL NOTE F.
PP1-7
PP1-11
17
RYAN P.
MARONEY
No. 60006 PE
M
O
N
TA
N
A
L
I
C
E
NS
E
D
P
R
O
F
E
S
S
I
O
NA
L
E
N
G
I
N
E
E
R
CON
STRU
CTIO
N D
RAW
ING
S
18
EXHAUST FAN (ABOVE)
PPA#18-2067
LE
ON
JO
HN
SO
N H
AL
LP
ASSE
NG
ER
EL
EV
AT
OR
S
CO
MP
LIA
NC
E U
PG
RA
DE
S