Lessons learned from a multi- million dollar, state-of-the-art distribution automation system upgrade project at California State University Fresno (OP038) Erik Brandstaedter – G&W Electric Co. Jeff Prickett – California State University Fresno August 31, 2016, Raleigh, NC

Upload: others

Post on 09-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Lessons learned from a multi- million dollar, state-of …...Lessons learned from a multi-million dollar, state-of-the-art distribution automation system upgrade project at California

Lessons learned from a multi-million dollar, state-of-the-art distribution automation system upgrade project at California State University Fresno (OP038) Erik Brandstaedter – G&W Electric Co. Jeff Prickett – California State University Fresno August 31, 2016, Raleigh, NC

Page 2: Lessons learned from a multi- million dollar, state-of …...Lessons learned from a multi-million dollar, state-of-the-art distribution automation system upgrade project at California

AGENDA

FRESNO STATE QUICK FACTS REASONS FOR UPGRADE UPGRADE GOALS PROJECT TEAM UPGRADE RESULTS LESSONS LEARNED

2

Page 3: Lessons learned from a multi- million dollar, state-of …...Lessons learned from a multi-million dollar, state-of-the-art distribution automation system upgrade project at California

FRESNO STATE QUICK FACTS

• 1 of 23 campuses in California State University system

• Central California • 388 acres

Main Campus • 1,011 acres

University Farm • 24,136 students /

2,334 staff (2015) 3

Page 4: Lessons learned from a multi- million dollar, state-of …...Lessons learned from a multi-million dollar, state-of-the-art distribution automation system upgrade project at California

REASONS FOR UPGRADE

• Aging electrical infrastructure, installed in 1960s

• Operator safety concerns • Mixed electrical systems of

4.16kV and 12kV • Capacity issues due to

campus growth and new buildings

• Major outages on somewhat regular basis every 6-12 months

• Long restoration times anywhere between 8-72 hours

4

Page 5: Lessons learned from a multi- million dollar, state-of …...Lessons learned from a multi-million dollar, state-of-the-art distribution automation system upgrade project at California

REASONS FOR UPGRADE

5

01/01/2013: Failed main switch leads to campus-wide, 3-day outage

Page 6: Lessons learned from a multi- million dollar, state-of …...Lessons learned from a multi-million dollar, state-of-the-art distribution automation system upgrade project at California

UPGRADE GOALS

• Increase system reliability • Improve operator safety • Reduce power restoration times • Implement future-proof solution to

accommodate campus growth • Add remote monitoring and control

capabilities • Deliver turnkey solution

6

Page 7: Lessons learned from a multi- million dollar, state-of …...Lessons learned from a multi-million dollar, state-of-the-art distribution automation system upgrade project at California

PROJECT TEAM

7

Page 8: Lessons learned from a multi- million dollar, state-of …...Lessons learned from a multi-million dollar, state-of-the-art distribution automation system upgrade project at California

UPGRADE RESULTS OVERVIEW

• 12kV loop feeder distribution system with 4 distribution loops + spare

8

Page 9: Lessons learned from a multi- million dollar, state-of …...Lessons learned from a multi-million dollar, state-of-the-art distribution automation system upgrade project at California

UPGRADE RESULTS NEW 12kV OPEN LOOP SYSTEM

9

Page 10: Lessons learned from a multi- million dollar, state-of …...Lessons learned from a multi-million dollar, state-of-the-art distribution automation system upgrade project at California

UPGRADE RESULTS OVERVIEW

• 12kV loop feeder distribution system with 4 distribution loops + spare

• Qty. 32 padmount switches with relays for protection and control

10

Page 11: Lessons learned from a multi- million dollar, state-of …...Lessons learned from a multi-million dollar, state-of-the-art distribution automation system upgrade project at California

UPGRADE RESULTS PADMOUNT SWITCHES

11

Page 12: Lessons learned from a multi- million dollar, state-of …...Lessons learned from a multi-million dollar, state-of-the-art distribution automation system upgrade project at California

UPGRADE RESULTS OVERVIEW • 12kV loop feeder distribution system

with 4 distribution loops + spare • Qty. 32 padmount switches with relays

for protection and control • New main switchgear building

– Arc-resistant, metal-clad 12kV switchgear with feeder protection relays

– Control cabinets with redundant RTU and substation computer for HMI

• Qty. 60 manholes • Qty. 68 12kV building transformers

12

Page 13: Lessons learned from a multi- million dollar, state-of …...Lessons learned from a multi-million dollar, state-of-the-art distribution automation system upgrade project at California

UPGRADE RESULTS MAIN SWITCHGEAR BUILDING

13

Page 14: Lessons learned from a multi- million dollar, state-of …...Lessons learned from a multi-million dollar, state-of-the-art distribution automation system upgrade project at California

UPGRADE RESULTS 12kV SWITCHGEAR & CONTROLS

14

Page 15: Lessons learned from a multi- million dollar, state-of …...Lessons learned from a multi-million dollar, state-of-the-art distribution automation system upgrade project at California

UPGRADE RESULTS COMMUNICATIONS & CONTROLS

15

Page 16: Lessons learned from a multi- million dollar, state-of …...Lessons learned from a multi-million dollar, state-of-the-art distribution automation system upgrade project at California

UPGRADE RESULTS HUMAN MACHINE INTERFACE

16

Page 17: Lessons learned from a multi- million dollar, state-of …...Lessons learned from a multi-million dollar, state-of-the-art distribution automation system upgrade project at California

UPGRADE RESULTS STATE-OF-THE-ART SOLUTION

• Open loop automation scheme with FLISR and LOV functionality Reduces power restoration times

from hours and days to seconds • Remote monitoring and control via HMI

from substation building and office Improves operator safety

• Best-in-class components Increases system reliability

• Communication via multi-mode fiber ring using IEC 61850 and GOOSE messaging Open protocol supports future-proof solution

17

Page 18: Lessons learned from a multi- million dollar, state-of …...Lessons learned from a multi-million dollar, state-of-the-art distribution automation system upgrade project at California

LESSONS LEARNED COORDINATION & PLANNING • Project specifications vs. end-user

expectations • Construction drawings with

dimensions for padmount switches and transformers – Bolt-down locations and space for

control cabinets • Planning for commissioning, testing,

start-up – Outage schedules

• Factory Acceptance Test (FAT) 18

Page 19: Lessons learned from a multi- million dollar, state-of …...Lessons learned from a multi-million dollar, state-of-the-art distribution automation system upgrade project at California

LESSONS LEARNED COLLABORATION & COOPERATION

• Power for switch controls –Generators vs. energizing loops

• Availability of test sets –Current and voltage injections

• Operator training

19

Page 20: Lessons learned from a multi- million dollar, state-of …...Lessons learned from a multi-million dollar, state-of-the-art distribution automation system upgrade project at California

LESSONS LEARNED

20

Page 21: Lessons learned from a multi- million dollar, state-of …...Lessons learned from a multi-million dollar, state-of-the-art distribution automation system upgrade project at California

21