PASSIVE HOUSETHOUGHTS FROM SOMEONE WHO’S BEEN THERE
(and may not be going back !)
Ed O’Donoghue
![Page 2: Lessons Learned - Passive House Construction](https://reader036.vdocument.in/reader036/viewer/2022062522/5887688d1a28ab22358b4ef3/html5/thumbnails/2.jpg)
OVERVIEW• Introduction• Preparing for a high quality build• Real World Issues• Overarching issues • DISCUSSION
![Page 3: Lessons Learned - Passive House Construction](https://reader036.vdocument.in/reader036/viewer/2022062522/5887688d1a28ab22358b4ef3/html5/thumbnails/3.jpg)
INTRODUCTION
• ME WHEE………….
• WHY BUILD QUALITY HIGH PERFORMANCE BUILDINGS ?
• DON’T UNDERESTIMATE THE IMPACT YOU CAN HAVE
![Page 4: Lessons Learned - Passive House Construction](https://reader036.vdocument.in/reader036/viewer/2022062522/5887688d1a28ab22358b4ef3/html5/thumbnails/4.jpg)
INTRODUCTION
HELP
![Page 5: Lessons Learned - Passive House Construction](https://reader036.vdocument.in/reader036/viewer/2022062522/5887688d1a28ab22358b4ef3/html5/thumbnails/5.jpg)
Preparing for a High Quality Build
![Page 6: Lessons Learned - Passive House Construction](https://reader036.vdocument.in/reader036/viewer/2022062522/5887688d1a28ab22358b4ef3/html5/thumbnails/6.jpg)
Preparing for a High Quality Build• COLLABORATION
• IF YOU HAVEN’T DRAWN IT YOU HAVEN’T THOUGHT ABOUT IT
• MOTIVATE, EDUCATE, EDUCATE, EDUCATE
• BE PREPARED TO COMMIT TO ON SITE MONITORING
![Page 7: Lessons Learned - Passive House Construction](https://reader036.vdocument.in/reader036/viewer/2022062522/5887688d1a28ab22358b4ef3/html5/thumbnails/7.jpg)
REAL WORLD ISSUES - FOUNDATIONS
SAWTOOTH EPS FOUNDATION G/L ELEMENT FOUNDATION
![Page 8: Lessons Learned - Passive House Construction](https://reader036.vdocument.in/reader036/viewer/2022062522/5887688d1a28ab22358b4ef3/html5/thumbnails/8.jpg)
REAL WORLD ISSUES - FOUNDATIONS
![Page 9: Lessons Learned - Passive House Construction](https://reader036.vdocument.in/reader036/viewer/2022062522/5887688d1a28ab22358b4ef3/html5/thumbnails/9.jpg)
REAL WORLD ISSUES - FOUNDATIONS
• Evolution of traditional method• No specialist knowledge• Thermal block MUST be kept dry• €130/m2 average cost • Transferable to timber frame
1 2 3 40
20
40
60
80
100
120
140
160
180
TRADITIONAL STRIP FOUNDATION ψ = - 0.122 W/mK
€/m2Average
![Page 10: Lessons Learned - Passive House Construction](https://reader036.vdocument.in/reader036/viewer/2022062522/5887688d1a28ab22358b4ef3/html5/thumbnails/10.jpg)
REAL WORLD ISSUES - FOUNDATIONS• If UFH then 150mm screed depth ok• Standardised look-up table calculations for wide cavities• Window & Door threshold details – be brave• Plan service exits, especially first floor• Collaboration between radon protection, thermal block and damp
proof requirements
![Page 11: Lessons Learned - Passive House Construction](https://reader036.vdocument.in/reader036/viewer/2022062522/5887688d1a28ab22358b4ef3/html5/thumbnails/11.jpg)
REAL WORLD ISSUES - TEAM
• Knowledge of Passive House limited to architectural team member• Structural engineers are not aware of the issues and……….• Project team is normally contractor & client post build• Design competence and supervision is not valued• Site foreman is Passive House champion – they rule by fear• Construction industry does not do quality• Construction industry does not do education• Spirit of collaboration does not exist• Electrical & mechanical services is not considered in residential design
![Page 12: Lessons Learned - Passive House Construction](https://reader036.vdocument.in/reader036/viewer/2022062522/5887688d1a28ab22358b4ef3/html5/thumbnails/12.jpg)
REAL WORLD ISSUES - DETAILS
• ACD’s suck• Key to success is junction detailing• Raise the bar – can we draw these details in 3D ?• Standardise details, calculate them and share• Done right they can save money
![Page 13: Lessons Learned - Passive House Construction](https://reader036.vdocument.in/reader036/viewer/2022062522/5887688d1a28ab22358b4ef3/html5/thumbnails/13.jpg)
REAL WORLD ISSUES - VENTILATION• Locate unit close to external wall• Keep inside thermal envelope• Adopt commercial level detailing to design• Commission in accordance with PHPP requirements• Understand airtight sealing and insulation requirements of ducting• Design needed pre-build to ensure efficient layout & operation
![Page 14: Lessons Learned - Passive House Construction](https://reader036.vdocument.in/reader036/viewer/2022062522/5887688d1a28ab22358b4ef3/html5/thumbnails/14.jpg)
REAL WORLD ISSUES - AIRTIGHTNESS• Designer responsible for strategy and detailing at junctions• Good design = cheap and effective on site• 0.6 ACH very very difficult on double leaf cavity • Timber frame is best solution from a QA point of view• Learn by doing• Ensure certified product is used & operatives formally trained
![Page 15: Lessons Learned - Passive House Construction](https://reader036.vdocument.in/reader036/viewer/2022062522/5887688d1a28ab22358b4ef3/html5/thumbnails/15.jpg)
OVERARCHING ISSUES
• There will always be resistance to change – be brave• Quality assurance and education are a challenge• Passive House exacts standards far beyond conventional expectations• Communication of Passive House needs to improve• This is a good thing to do – stick with it• It’s a movement and a community• Your grandchildren will thank you• BE POSITIVE