Filename: Letter to EPA -Addl Comments on Vent Installation - Final.doc Page 1 of 4 December 16, 2009 Mr. Chris Villarreal Project Manager U.S. EPA Region 6 1445 Ross Ave. (6SF-TS) Dallas Texas, 75202 Subject: Vent Installation Leon Valley Veterinary Clinic 6701 Bandera Road Leon Valley, Texas Dear Mr. Villarreal: On October 6, 2009, the EPA issued comments on the installation of vents at the Leon Valley Veterinary Clinic. These comments were in response to the proposed work plan for installation of vents presented in an STC letter dated September 24, 2009. Thank you for your timely response. After receiving your comments, we engaged a plumber to locate sewer lines in the Veterinary Clinic and we are now ready to authorize a contractor to install the vents at the two original proposed locations noted in the work plan. Before proceeding, we are seeking EPA’s approval of the proposed work. EPA’s letter of October 6, 2009 also requested certain information concerning the PID surveys of the Vet Clinic, the condition of the slab, and other items. This letter also addresses these issues and this information is presented below. PID SURVEY Section 1 of the EPA Comment letter presents 11 questions concerning the PID surveys of the building. A copy of EPA letter is attached for reference. Answers to each of the 11 questions are presented below. STC Environmental Services Inc. Environmental Scientists and Engineers 4754 RESEARCH DRIVE SAN ANTONIO, TEXAS 78240 Office (210) 696-6286 / FAX (210) 696-8761 002447

Upload: others

Post on 31-Jul-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Letter to EPA -Addl Comments on Vent Installation - Final · 2021. 6. 14. · EPA letter dated October 6, 2009. Based on the camera inspection, we are now prepared to install the

Filename: Letter to EPA -Addl Comments on Vent Installation - Final.doc Page 1 of 4

December 16, 2009 Mr. Chris Villarreal Project Manager U.S. EPA Region 6 1445 Ross Ave. (6SF-TS) Dallas Texas, 75202 Subject: Vent Installation

Leon Valley Veterinary Clinic 6701 Bandera Road Leon Valley, Texas

Dear Mr. Villarreal: On October 6, 2009, the EPA issued comments on the installation of vents at the Leon Valley Veterinary Clinic. These comments were in response to the proposed work plan for installation of vents presented in an STC letter dated September 24, 2009. Thank you for your timely response. After receiving your comments, we engaged a plumber to locate sewer lines in the Veterinary Clinic and we are now ready to authorize a contractor to install the vents at the two original proposed locations noted in the work plan. Before proceeding, we are seeking EPA’s approval of the proposed work. EPA’s letter of October 6, 2009 also requested certain information concerning the PID surveys of the Vet Clinic, the condition of the slab, and other items. This letter also addresses these issues and this information is presented below. PID SURVEY Section 1 of the EPA Comment letter presents 11 questions concerning the PID surveys of the building. A copy of EPA letter is attached for reference. Answers to each of the 11 questions are presented below.

STC Environmental Services Inc. Environmental Scientists and Engineers

4754 RESEARCH DRIVE SAN ANTONIO, TEXAS 78240 Office (210) 696-6286 / FAX (210) 696-8761

002447

Page 2: Letter to EPA -Addl Comments on Vent Installation - Final · 2021. 6. 14. · EPA letter dated October 6, 2009. Based on the camera inspection, we are now prepared to install the

STC Environmental Services, Inc.

Filename: Letter to EPA -Addl Comments on Vent Installation - Final.doc Page 2 of 4

1. There is no substantive additional information concerning the PID Surveys. 2. The model of the PID was a Mini Rae 3000. 3. The PID was calibrated. The calibrations sheets for the two surveys are attached. 4. The PID was calibrated on 6/4/09 and 7/21/09 with Isobutylene. Additional details are

presented on the attached calibration sheets. 5. All accessible weep holes were sampled during the June event. The July event did not

include weep holes inside the fenced area which showed no detectable levels during the June event. Sampling locations for the two surveys are shown on Figures 1 and 2.

6. No cracks in the slab were identified. The majority of the building has vinyl sheet

flooring which would tend to obscure any minor cracks. 7. No cracks were surveyed with the PID. 8. The survey on June 4, 2009 occurred between the hours of approximately 8AM and

noon. The survey on July 22, 2009 occurred between the hours of approximately 7AM and 9AM.

9. Outdoor air temperatures on June 4, 2009 in San Antonio ranged from 70 to 92 degrees

Fahrenheit. Outdoor air temperatures on July 22, 2009 in San Antonio ranged from 79 to 102 degrees Fahrenheit.

10. Average AM humidity on June 4, 2009 was 88%. Average AM humidity on July 22,

2009 was 86%. 11. Air conditioning was running/cycling at the time of each survey.

Section 1 of the EPA Comment letter notes Sample Location P was not retested on July 22, 2009. Sample P was taken from the drain opening at the bottom of the sink. A P-Trap is evident under the sink. A P-Trap typically contains water that acts as a vapor barrier and prevents sewer gas from entering the indoor air space. The PID readings found at Sample P may therefore be attributed to some chemical or cleaning agent washed down the drain and not indicative of PCE vapors. For these reasons, no drain openings were re-tested during the July event. Section 1 of the EPA Comment letter also requests weep hole numbers also be presented on the corresponding figures. These revisions are shown on Figures 1 and 2.

002448

Page 3: Letter to EPA -Addl Comments on Vent Installation - Final · 2021. 6. 14. · EPA letter dated October 6, 2009. Based on the camera inspection, we are now prepared to install the

STC Environmental Services, Inc.

Filename: Letter to EPA -Addl Comments on Vent Installation - Final.doc Page 3 of 4

CAMERA INSPECTION OF SEWER LINES E.L. Smith Plumbing of San Antonio performed a camera inspection of the sewer lines at the Vet Clinic on November 20, 2009. This camera inspection revealed a sanitary sewer line exits the building at a point near the front entrance to the building on the southeast side of the structure. The work by E.L. Smith also located the larger lines under the slab of the Vet Clinic. This work revealed the larger main line under the slab extends to the northwest portion of the building where a cleanout is located on the exterior wall on the kennel area. These main lines are shown on Figure 3. Smaller lines for several sinks and other plumbing fixtures were not identified. However, estimated locations of these secondary lines are shown on Figure 4. PROPOSED VENT LOCATIONS It is proposed that two sub-slab depressurization vents will be installed at the northwest corner of the building near the kennel area (SSD-3) and near the crack in the northern building wall (SSD-4). The location of SSD-3 has been changed slightly to reflect the results of the camera survey. All others conditions and specifications noted in the September 24, 2009 work plan remain unchanged. The location of the vents is shown on Figure 4. Section 2 of the EPA Comment letter presents several questions concerning the proposed vents. These questions are addressed in the outline below. • If feasible, the vent near the kennel area (SSD-3) will terminate in any permeable sewer

backfill material that may be present near the clean out and sewer line in this area. This same approach was taken for the vents near the Cash Advance lease space. The vents at the Cash Advance lease space (SSD-1 and SSD-2) are shown on Figure 5.

• The screened section of SSD-1 terminates in sand backfill associated with a sewer line

that exits the building at this point. SSD-2 does not terminate in sand backfill but is located near sewer lines associated with a commode and sink in this area.

• A similar approach is being taken at the Vet Clinic. SSD-3 is likely to terminate in sand

backfill around the sewer line. SSD-4 may not terminate in sand backfill but is located near a sink feature and a location where vapors were detected in weep holes in June 2009.

Also, in the selection the location of the vents, please note the following additional information was considered.

002449

Page 4: Letter to EPA -Addl Comments on Vent Installation - Final · 2021. 6. 14. · EPA letter dated October 6, 2009. Based on the camera inspection, we are now prepared to install the

STC Environmental Services, Inc.

Filename: Letter to EPA -Addl Comments on Vent Installation - Final.doc Page 4 of 4

1. Both vents are located relatively close to Beacon Probe location M14 (See Figure 5). This location showed one of the highest levels of vapor during the study. Therefore, it is possible that both vents may reduce vapors in this area.

2. Beacon sample K16 also showed an elevated level of vapor. This area is located near the

point where the sewer line exits the building. This location was also considered for vent installation. However, no vapors were found in weep holes near K-16, which is located near the main entrance to the facility. Installation of a vent in this area is therefore also an atheistic concern. Based on these conditions, placing a vent near the other end of the main sewer line was considered a more optimal location.

SUMMARY This report presents the results of a camera inspection and addressees questions presented in the EPA letter dated October 6, 2009. Based on the camera inspection, we are now prepared to install the vents. We are seeking EPA concurrence with this work prior to proceeding. If you have any questions, please do not hesitate to contact me at (210) 696-6288. Respectfully, _____________________________ Craig Tribley P.G. Vice President CAPM 00022 Attachments: Tables 1-2 Figures 1-5 PID Calibration Sheets Copy of EPA Letter dated October 6, 2009

002450

Page 5: Letter to EPA -Addl Comments on Vent Installation - Final · 2021. 6. 14. · EPA letter dated October 6, 2009. Based on the camera inspection, we are now prepared to install the

STC Environmental Services Inc..Environmental Scientists and Engineers FIG. 1

File Name: Figure 5 - PID June 2009.SKFSEPT 2009

x x

x

x

x

x x x

x

x

Fenced Dog Run

VI-107-CSA

VI-108-CSA

46.1

50.7

1247

161

0.0

0.0

2.5

0.4

0.0

0.0

0.0

3.4

0.0

0.0

0.0

0.0

4.4

Dog Kennels

Exam RM Two Exam RM One

Surgery

Receptionist / Waiting area

FrontBathroom

0 10 ft.

Treatment Room

PID READINGS - JUNE 2009

LEGEND

sink/drain sewerpenetration

Electrical Outlet and Wall Switches Weep Hole

12.0

Vet Lab

A cB

ED

F

G

JH

I

K

L

L

L

M

NO

P

Q Q

R1 R2

S

Baseboard

WH-

1

WH-

2W

H-3

WH-

4W

H-5

WH-

6W

H-7

WH-

8W

H-9

WH-10

WH-11WH-12

WH-13

WH-14

WH-15

WH-16

WH-17

002451

Page 6: Letter to EPA -Addl Comments on Vent Installation - Final · 2021. 6. 14. · EPA letter dated October 6, 2009. Based on the camera inspection, we are now prepared to install the

STC Environmental Services Inc..Environmental Scientists and Engineers

File Name: Figure 6 - PID July 2009.SKF SEPT 2009

x x

x

x

x

x x x

x

x

Fenced Dog Run

VI-107-CSA

VI-108-CSA

0.0

0.0

0.0

0.0

0.0

0.0

Dog KennelsExam Rm 2 Exam Rm 1

Surgery

Receptionist / Waiting area

Bathroom

0 10

Prep Area

LEGENDSink/drain sewer penetration

Electrical outlet

Weep hole in brick veneer

Vet Lab

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.4 ppm

0.7 ppm

FIG. 2PID READINGS - JULY 2009

AB

DBaseboard

C

E

F

H

G

I

J

L

L

L

M S

WH-

2W

H-3

WH-

4W

H-5

WH-

6W

H-7

WH-

8W

H-9

WH-11WH-12

WH-13

WH-14

WH-15

002452

Page 7: Letter to EPA -Addl Comments on Vent Installation - Final · 2021. 6. 14. · EPA letter dated October 6, 2009. Based on the camera inspection, we are now prepared to install the

STC Environmental Services Inc..Environmental Scientists and Engineers

File Name: Figure 3 - Sewer Line Map.SKFDec 2009

FIG. 3SEWER LINE LOCATIONS

Leon Valle~ Vel Clinic6701 Bandera RoadSan Anlonio, TX78238

"DRAWING IS NOT TO SCALE"

cia Craig Trible~

4754 Research Dr.San Anlonio, TX78240

1U:t to City Maini (4"6')

Q2' C/O

'.., , -

..•._---"...L__ _

Creek

/

o~

g g 13' outside will-- runs out to Bandera Road

..~ ...L·3'6;;l

.,. I~~.

q;..... F-=-... -- -)-

L~...L LH :----,------!

f---Jf­I-

~,.,D. 6" x4"

I-_---'-__---'- L ---.J '"--;-::::"'C,.,.,.X'>",,;=~'ty M,'o

BaMara Road

002453

Page 8: Letter to EPA -Addl Comments on Vent Installation - Final · 2021. 6. 14. · EPA letter dated October 6, 2009. Based on the camera inspection, we are now prepared to install the

STC Environmental Services Inc..Environmental Scientists and Engineers

N

0

x

Dog Kennels

Exam RM Two Exam RM One

Surgery

Treatment RoomFile Name: Figure 7 - Vent Details - Plan View.SKFSept 2009

VENT LOCATIONS FIG. 4

5 ft

x

x

x

x

xxxxxxxxx

x

x

x

x

x

x

x

x

x

x

x

x

xx x x x

SSD Vent 4Secured to exterior brickveneer - vent placed near crack in veneer and location where PID readingof 1247 ppm was found at weep hole in June 2009

Vapor Barrier40 mil plastic sheeting -

1 foot below surface- 5 foot radius around vent - new sod placed in this area

Grass

AC AC

Chain Link - Outdoor Dog Run

Grass

Sewer Cleanout on Exterior Wall

Floor Drains

Sink

SinkSink

Sink

Tub

Gras

s

SSD Vent 3Co

ncre

te S

ide W

alk

Sink

Water line

OH Electric

Vapor Barrier

Door

Main sewer line under slab - location confirmed by camerainspection

Estimated secondary line - exact locationnot known

Sink, floor drainor tub

LEGEND

002454

Page 9: Letter to EPA -Addl Comments on Vent Installation - Final · 2021. 6. 14. · EPA letter dated October 6, 2009. Based on the camera inspection, we are now prepared to install the

SAN ANTONIO, TEXAS 78240

Environmental Services Inc. Environmental Scientists and Engineers

4754 RESEARCH DRIVE

STCOFFICE ( 210 ) 696 - 6286 / FAX ( 210 ) 696 - 8761 email: [email protected]

STC VENTS AND BEACON SURVEY23595 FIG. 5

SSD Vent 4

SSD Vent 3

SSD Vent 1

SSD Vent 2

Existing Sewer Line

002455

Page 10: Letter to EPA -Addl Comments on Vent Installation - Final · 2021. 6. 14. · EPA letter dated October 6, 2009. Based on the camera inspection, we are now prepared to install the

Table 1Leon Valley Veterinary Clinic

PID ReadingsJune 4, 2009

Location PID Reading Map Location

Front wall hall socket 0.0 A

Front bathroom sink, hot & cold piping, sewer water

penetration0.0, 0.0, 0.0, 0.0 B

Front bathroom wall baseboard 0.0 C

Front bathroom sewer 0.0 D

Front bathroomroom mopcloset sink 0.0 E

Front storage closet baseboards 0.0 F

Exam RM two sink drain, hot & cold piping 0.0, 0.0, 0.0 G

Exam RM two wall socket 0.0 H

Exam RM two counter socket 0.0 I

Exam RM two baseboard 0.0 J

Vet Lab sink 0.0 K

Receptionist/ Waiting room wall sockets (3) 0.0, 0.0, 0.0 L

Washer drain 0.0 M

Sink on entrance to surgery, hot & cold piping 0.0, 0.0, 0.0 N

Treatment room tub drain and piping 0.0, 0.0 O

sink near fridge 12.0 P

Dog kennel wall switches (2) 0.0, 0.0 Q

Dog kennel drain 0.0 R1

Dog kennel drain 0.0 R2

Filename: Tables 1 and -2 Vet Clinic - PID Readings.xlsTab: Table 1

Page: 1 of 2002456

Page 11: Letter to EPA -Addl Comments on Vent Installation - Final · 2021. 6. 14. · EPA letter dated October 6, 2009. Based on the camera inspection, we are now prepared to install the

Table 1Leon Valley Veterinary Clinic

PID ReadingsJune 4, 2009

Location PID Reading Map Location

Light Switch entrance to treatment room 0.0 S

VI-108-CSA 0.0 VI-108-CSA

VI-107-CSA 0.0 VI-107-CSA

Weep Hole 1 0.0 WH-1

Weep Hole 2 46.1 WH-2

Weep Hole 3 50.7 WH-3

Weep Hole 4 1247 WH-4

Weep Hole 5 161 WH-5

Weep Hole 6 0.0 WH-6

Weep Hole 7 0.0 WH-7

Weep Hole 8 2.5 WH-8

Weep Hole 9 0.4 WH-9

Weep Hole 10 4.4 WH-10

Weep Hole 11 0.0 WH-11

Weep Hole 12 0.0 WH-12

Weep Hole 13 0.0 WH-13

Weep Hole 14 3.4 WH-14

Weep Hole 15 0.0 WH-15

Weep Hole 16 0.0 WH-16

Weep Hole 17 0.0 WH-17

Filename: Tables 1 and -2 Vet Clinic - PID Readings.xlsTab: Table 1

Page: 2 of 2002457

Page 12: Letter to EPA -Addl Comments on Vent Installation - Final · 2021. 6. 14. · EPA letter dated October 6, 2009. Based on the camera inspection, we are now prepared to install the

Table 2Leon Valley Veterinary Clinic

PID ReadingsJuly 22, 2009

Location PID Reading(ppm) Map Location

Front wall hall socket 0.0 A

Front bathroom sink, hot & cold piping, sewer water

penetration0.0, 0.0, 0.0, 0.0 B

Front bathroom wall baseboard 0.0 C

Front bathroom sewer 0.0 D

Front bathroomroom mopcloset sink 0.0 E

Front storage closet baseboards 0.0 F

Exam RM two sink drain, hot & cold piping 0.0, 0.0, 0.0 G

Exam RM two wall socket 0.0 H

Exam RM two counter socket 0.0 I

Exam RM two baseboard 0.0 J

Receptionist/ Waiting room wall sockets (3) 0.0, 0.0, 0.0 L

Washer drain 0.0 M

Light Switch entrance to treatment room 0.0 S

VI-108-CSA 0.7 VI-108-CSA

VI-107-CSA 0.4 VI-107-CSA

Filename: Tables 1 and -2 Vet Clinic - PID Readings.xlsTab: Table 2

Page: 1 of 2002458

Page 13: Letter to EPA -Addl Comments on Vent Installation - Final · 2021. 6. 14. · EPA letter dated October 6, 2009. Based on the camera inspection, we are now prepared to install the

Table 2Leon Valley Veterinary Clinic

PID ReadingsJuly 22, 2009

Location PID Reading(ppm) Map Location

Weep Hole 2 0.0 WH-2

Weep Hole 3 0.0 WH-3

Weep Hole 4 0.0 WH-4

Weep Hole 5 0.0 WH-5

Weep Hole 6 0.0 WH-6

Weep Hole 7 0.0 WH-7

Weep Hole 8 0.0 WH-8

Weep Hole 9 0.0 WH-9

Weep Hole 11 0.0 WH-10

Weep Hole 12 0.0 WH-11

Weep Hole 13 0.0 WH-12

Weep Hole 14 0.0 WH-13

Weep Hole 15 0.0 WH-14

Filename: Tables 1 and -2 Vet Clinic - PID Readings.xlsTab: Table 2

Page: 2 of 2002459

Page 14: Letter to EPA -Addl Comments on Vent Installation - Final · 2021. 6. 14. · EPA letter dated October 6, 2009. Based on the camera inspection, we are now prepared to install the

r"' ..

FarrWest Environmental Supply, Inc.PHOTO-IONIZATION DETECTOR

INSTRUMENT MODEL ~k $tJlX) SERIAL NUMBER 5q;.. .. ()oO l.[8"r

COMPANYNAME stc £"'11" SrI/f. CONTACT PERSON xsf:"PHONE NUMBER

RENTAL PERIOD FROM: TO:

RETIJRN SHll' DECLARED VALUE: $ SHIPPING WEIGlIT;

pm

0/' CARRYING CASE

.

~ PIlOBI! .a '" tn" ..vTAMP

( ~11.7eVLAMP~ ~ OPERATOR MANUAL"" ~ BATTERYCHAR.p~ V HYDROPHOBIC FILTER

~. BATTERY rp.,atrr~ I!d:,

..~c1Udecl) .,;;

[] ISOBUTYLENE ppm PSI .... .ATORCl HEXANE jlgJ--- (] -------ppm---. --- I

/~" _....,

INSTRUMENT INSPBClED BY: TODAY'S DATE: ~:ll-(/'j7'

CALlBRAT10N GAS: 100 ppm lsobutylq

~mfiRUMENT BEADINGS:

FRESH AIR· tf() PPM . -....

ISOBUTYLEN'E- /~t2:PM //7 iAfi11COMMENTS: #;0'

FarrWest Environmental Supply, Inc. CHECKS EACH INSTRUMENT IN OUR SERVICE DEPARTMENT ACCORDING TOMANUFACTIJRERS SPECIFICATIONS. SHJPPING AND ENVIRONMENTAL CONDmONS MAY AFFECT CALlliRATION;FarrWest Environmental Supply, Inc. RECOMMENDS TIlAT YOU CALIBRATE TIlE INSTRUMENT TO MANUFACTURESSPECIFICATIONS PRIOR TO USE.

PICKED UP BY : DATE: RETURNED BY: "pATE:

(;13 39l;;1d lS3M~~l;;I.:l L68199S131(; 131:11 61313(;/(;1/131

002460

Page 15: Letter to EPA -Addl Comments on Vent Installation - Final · 2021. 6. 14. · EPA letter dated October 6, 2009. Based on the camera inspection, we are now prepared to install the

~, ~, -

, ,~"

FarrWest Environmental Supply, Inc.PHOTO-IONIZATION DETECTOR

INSTRUMENT MODEL IY1 inl k 3lJ.Y) SERIAL NUMBER ~~-rol';).?q

COMPANYNAME SIC CONTACT PERSON --S~nPHONE NUMBER

,

RENTAL PERIOD FROM:' /tilDq TO;

REnJRN SHIP DECLARED VALUE: $ SlDPPlNG WEIGIIT:..

PID

~ CARRYING CASE

~ PROBE10.6 eV LAMP

~ 11.7 eV LAMP ~ OPERATOR. MANUAL .BATTERY CHARGER HYDROPHOBIC FILTER. ( ::l')

aY BATI'ERY ·81LL, VOLTS LJ Other

GASES ( if jnchldcd) - ".

LJ ISOBUlYLENE ppm DCT 0 "ToRr::J HEXANE ~ PSI LJ ----- ----1NS~~~T'INSPECTBD BY~ ]>JerSt>h TODAY'SDATE:~ -..

CALIBRAnON GAS: 100 ppm IsobutyleneINSTRUMENT BEAWGS:

FRESH AIR· D.I PPM

ISOBUTYLENE- q'l.8 PPM

. ICOMMENTS: &Dci.FarrWest Environmental Supply, Inc. CHECKS EACH INSTRUMENT IN OUR SERVICE DEPARTMENT ACCORDING TOMANUFACTURERS SPECIFICATIONS. SHIPPING AND ENVIRONMENTAL CONDlT10NS MAY AFFECT CAUBRAnON;FarrWest Environmental Supply, Inc. RECOMMENDS nIAT YOU CALIBRATE 11iE INSTRUMENT TO MANUFACTIJRESSPECIFICATIONS PRIOR TO USE.

PICKED UP BY : DATE: RETIJRNED BY: DATE:

lS3M~~\j.:l L681999010 Ep:ll 6000/El/01

002461

Page 16: Letter to EPA -Addl Comments on Vent Installation - Final · 2021. 6. 14. · EPA letter dated October 6, 2009. Based on the camera inspection, we are now prepared to install the

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 6

1445 Ross Avenue, Suite 1200 Dallas, Texas 75202-2733

October 6, 2009 Mr. Craig G. Tribley STC Environmental Services Inc. 4754 Research Drive San Antonio, Texas 78240 Re: Completed Actions and Proposed Vents Document Leon Valley Veterinary Clinic 6701 Bandera Road Leon Valley, Texas Mr. Tribley: Enclosed please find the Environmental Protection Agency’s comments on the Completed Actions and Proposed Vents document dated September 24, 2009. If you have any questions, please feel free to contact me at 214-665-6758. Sincerely, Chris Villarreal Remedial Project Manager Superfund Division Enclosure cc: Erich Birch, Attorney for Savings Square, Ltd. Danielle Soule, Texas Commission on Environmental Quality

002462

Page 17: Letter to EPA -Addl Comments on Vent Installation - Final · 2021. 6. 14. · EPA letter dated October 6, 2009. Based on the camera inspection, we are now prepared to install the

EPA Comments on the Completed Actions and Proposed Vents Document

October 6, 2009

1) Section 2.0 PID Survey by STC, Page 2 of 5 The section states that “A second survey was conducted on July 22, 2009, and was performed to verify and confirm the June data.” In regards to the PID surveys: Is there any additional information regarding the PID surveys? What model of PID was used? Was the PID calibrated? When and with what calibration gas? Were all identified weep holes surveyed? Were any cracks in the slab identified? Were cracks surveyed with the PID? What time of day were the surveys conducted? What were the weather conditions during each survey? Was it humid outside? For the interior building survey, was the air conditioner running? During the June 4, 2009, PID survey, 38 locations were evaluated. During the July 22, 2009 PID survey, 28 locations were evaluated. Locations evaluated in June but not in July include map locations K, N, O, P, Q, R1, R2, and weep holes 14, 15, and 16. Of note, map location P (sink near fridge) which had a PID reading of 12.0 in June was not retested in July. Figure 5 identifies seventeen weep holes. Readings for sixteen weep holes were reported in Table II. Figure should include weep hole numbers and/or text which indicates the weep hole numbering system used for the corresponding tables.

002463

Page 18: Letter to EPA -Addl Comments on Vent Installation - Final · 2021. 6. 14. · EPA letter dated October 6, 2009. Based on the camera inspection, we are now prepared to install the

2) Section 3.0 Discussion of Results and Areas Targeted for Mitigation, Page 3 of 5 Section states that “the area near the crack in the north brick veneer wall is targeted because this area may be a focal point for sub-slab vapors to escape and enter the indoor air. The sewer line exit point is targeted because permeable backfill around the sewer line could also serve as a collection point for vapor.” In regards to the area near the crack in the north brick veneer wall, based in the elevated PID readings found at this location in June and the cracks present, I agree that this area should be targeted for vapor mitigation. In regards to the second targeted location (near the sewer line exit point), is the proposed location for the vapor mitigation system close enough to the sewer cleanout to have an impact? How does the proposed location compare to the placement of the vapor mitigation system previous installed near the sewer cleanout at the Savings Square Shopping Center? Figure 7 shows the estimated location of the sewer lines on part of the building and notes that a camera inspection of the sewer line is proposed to locate a portion of the existing system. In addition to camera inspections, plumbers have other tools to identify the location of sewer lines. Knowing the location of the sewer lines for the building would provide valuable insight as to the potential for the vent system to reduce organic vapor concentrations for the entire building sub-slab and not just the area under the north end of the building.

002464