lhq status and plan giorgio ambrosio fermilab

14
1 st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 1 LHQ Status and Plan Giorgio Ambrosio Fermilab 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011 BNL - FNAL - LBNL - SLAC ask Leaders: Fabrication + Instrum & Traces – J. Schmalzle (BNL), R. Bossert (FNAL) , … (LBNL) nical Structure & Assembly – H. Felice (LBNL) preparation and test – G. Chlachidize (FNAL)

Upload: emiko

Post on 23-Feb-2016

53 views

Category:

Documents


0 download

DESCRIPTION

BNL - FNAL - LBNL - SLAC. LHQ Status and Plan Giorgio Ambrosio Fermilab. 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011. LHQ Task Leaders: Coil Fabrication + Instrum & Traces – J. Schmalzle (BNL), R. Bossert (FNAL) , … (LBNL) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: LHQ Status and Plan Giorgio Ambrosio Fermilab

1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 11

LHQ Status and PlanGiorgio Ambrosio

Fermilab

1st HiLumi LHC / LARP Collaboration MeetingCERN

November 16-18, 2011

BNL - FNAL - LBNL - SLAC

LHQ Task Leaders:Coil Fabrication + Instrum & Traces – J. Schmalzle (BNL), R. Bossert (FNAL), … (LBNL)Mechanical Structure & Assembly – H. Felice (LBNL)Test preparation and test – G. Chlachidize (FNAL)

Page 2: LHQ Status and Plan Giorgio Ambrosio Fermilab

1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 22

Long QuadrupoleLQS3.7 m long90 mm bore

Long High-Field Quadrupole (LHQ)3.7 m long - 120 mm bore

Magnet Development Chart

Completed

Ongoing

Starting

85%~30%

Page 3: LHQ Status and Plan Giorgio Ambrosio Fermilab

1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 33

Length Scale-up Projects in LARP

Long QuadrupoleLQS3.7 m long90 mm bore

Long High-Field Quadrupole (LHQ)120 mm bore – Length TBD (3.5-4.5m)

Long QuadrupoleLQS3.7 m long90 mm bore

Long High-Field Quadrupole (LHQ)120 mm bore – Length TBD (3.5-4.5m)

SM

TQS

HQ

LR

LQS

LHQ

• From 0.3 m to 4 m• Started in 2005, competed in 2008• Racetrack coils, shell based structure

• From 1 m to 4 m• Started in 2007, exp. completion 2012• 90 mm aperture cos2q coils • Structure alignment

• From 1 m to 4 m• Starting in 2011, exp. completion 2015• 120 mm aperture cos2q coils• Full coil and structure alignment

Page 4: LHQ Status and Plan Giorgio Ambrosio Fermilab

1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 44

LHQ Features & Goals• LHQ is the main “Nb3Sn technology demonstrator”

—For technology selection for the LHC IR upgrade—Deadline: 2015

• Aperture: 120 mm (as HQ)• Coil length: 3.4 m (as LQ)• Success criteria:

— Nominal gradient = 80% of SSL based on extracted strands• HQ/LHQ Grad ~ 160/175 T/m (@ 4.2/1.9 K)

— Quenches to nominal gradient: 3— Quenches to 110% of nominal gradient: 10— Quenches to nominal gradient after therm. cycle: 1— Magnetic requirements from HL-LHC Design Study

Page 5: LHQ Status and Plan Giorgio Ambrosio Fermilab

1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 55

Conductor• Strand for LHQ01:

— 0.778 mm — OST RRP 108/127

• Jc: > 2650 A/mm2 (4.2K 12T)• Jc: > 1400 A/mm2 (4.2K 15T)• Cu/non_Cu: 1.22• Effective Filament size: ~52 um

• Strand for LHQ02:— OST RRP 108/127, 144/169, 192/217— Effective Filament size: ~52, ~44, ~38 um— Jc may go down with smaller filament size— The US CDP needs feedback now for this choice

Page 6: LHQ Status and Plan Giorgio Ambrosio Fermilab

1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 66

Cable and Insulation• Cable:

— With 25 um stainless steel core— See “HQ cable development” by D. Dietderich

• Insulation:— 0.1 mm per side— Braided S2 glass

• Tests in progress with NEEW (optimization of thickness and coverage)

Page 7: LHQ Status and Plan Giorgio Ambrosio Fermilab

1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 77

Cross Section

• LHQ X-Section = Revised HQ X-Section— thinner and less wide cable— thicker layer-layer insulation

• 250 um 500 um

• Task force for coil parts adjustments— Goal: more robust design

• ES: replace saddles after heat treatment with insulation-covered saddles

• ES: improve insulation around trace-leads solder joints

Page 8: LHQ Status and Plan Giorgio Ambrosio Fermilab

1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 88

Coil Fabrication Technology

• Same coil fabrication technology of revised HQ— winding (Ti-Al-V pole parts)— curing of ceramic binder (CTD 1202)— potting (CTD 101K)— reaction (T = 210, 400, 6xx °C)

• Last plateau temperature depends on strand type

• Long coil features: — gaps among pole pieces (for longitudinal diff. CTE)

• 4 mm/m as in latest HQ coils— Lifting and handling procedures used for LQ coils

Page 9: LHQ Status and Plan Giorgio Ambrosio Fermilab

1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 99

Supporting Structure

• Supporting structure:— X-section: LHQ = HQ

• With holes for cooling (TBD) — Scale up-features similar

to LQ• Segmented shell (4)• Al-collars, pads and yoke

made of laminations• Masters and keys 2m long

• Structure with more accelerator features under development in the HQ program

Page 10: LHQ Status and Plan Giorgio Ambrosio Fermilab

1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 1010

Quench Protection• Analysis performed with QuenchPro and Roxie• Experimental data from HQ (1m) and LQ (4m)

— LHQ can be protected by extracting some energy (R = 40 mW)and using LQ type heaters on coil ID and OD—T peak < 400 K (without quench back)— V max < 1000 V

0

5

10

15

20

25

30

2 4 6 8 10 12 14 16

MIIT

S (A^

2*s*

10^6

)

Quench current (kA)

HQ simulation without PH and 40 mOhm Dump HQ simulation without PH and 30 mOhm dumpHQ01c test without PH HQ01c test with PH (1-4 circuits connected)HQ01b test HQ01d test (all PH circ. Connected)HQ sim. PH150W 26 ms 40 mOhm

Detection and PH delay 10 ms, Rdump delay 10+10 ms

6

8

10

12

14

16

18

20

22

4000 6000 8000 10000 12000 14000 16000 18000 20000

MIIT

S

Current

LHQ-quenchpro - 40 mohm

LHQ - ROXIE - 40 mhm

LHQ-quenchpro-40 mohm-OLPH

LHQ - ROXIE - 40 mOhm - OLPH

"LHQ - ROXIE - 30 mOhm - QP comparison"LHQ - quenchpro - 30 mohm

Page 11: LHQ Status and Plan Giorgio Ambrosio Fermilab

1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 1111

FNAL structural plate

FOUR SUSPENSION RODS

Test

• Test at FNAL VMTF:— T = 4.6 – 2.3 K

• no superfluid He with present top plate— support similar to HQ test at CERN

— new He recovery line— new warm bore for magnetic

measurements:• 63-68 mm ID

Page 12: LHQ Status and Plan Giorgio Ambrosio Fermilab

1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 1212

Fabrication and Test Plan• Cable:

— Cabling: LBNL— Insulation: NEEW (or other vendor)

• Coils:— Winding & curing: FNAL— Reaction & potting: BNL, LBNL— Instrumentation: BNL, FNAL, LBNL— Shipment structure (long version of HQ one): BNL

• Structure:— Pre-assembly & magnet assembly: LBNL— Shipment similar to LQ

• Test:— Warm and cold measurements: FNAL

Page 13: LHQ Status and Plan Giorgio Ambrosio Fermilab

1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 1313

LHQ Schedule

| 2012 | 2013 | 2014 | 2015

Practice coils

Coil test in mirror

Structure develop. & mech. model

LHQ01 coils (5)

LHQ01 assembly & test

LHQ01b assembly & test

LHQ02 coils (5), assembly & test

10 coils, 1 coil test, 3 magnet tests by the middle of 2015

Page 14: LHQ Status and Plan Giorgio Ambrosio Fermilab

1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 1414

Conclusions

• The LHQ is LARP’s last step for demonstrating Nb3Sn technology for the LHC Luminosity Upgrade

• It builds upon the whole LARP R&D (HQ, LQ, …) with contributions from other programs

• LHQ magnet test results are expected in 2014 - 15

For more Luminosity at the LHC