BNL - FNAL - LBNL - SLAC. LHQ Status and Plan Giorgio Ambrosio Fermilab. 1 st HiLumi LHC / LARP Collaboration Meeting CERN November 16-18, 2011. LHQ Task Leaders: Coil Fabrication + Instrum & Traces – J. Schmalzle (BNL), R. Bossert (FNAL) , … (LBNL) - PowerPoint PPT PresentationTRANSCRIPT
1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 11
LHQ Status and PlanGiorgio Ambrosio
Fermilab
1st HiLumi LHC / LARP Collaboration MeetingCERN
November 16-18, 2011
BNL - FNAL - LBNL - SLAC
LHQ Task Leaders:Coil Fabrication + Instrum & Traces – J. Schmalzle (BNL), R. Bossert (FNAL), … (LBNL)Mechanical Structure & Assembly – H. Felice (LBNL)Test preparation and test – G. Chlachidize (FNAL)
1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 22
Long QuadrupoleLQS3.7 m long90 mm bore
Long High-Field Quadrupole (LHQ)3.7 m long - 120 mm bore
Magnet Development Chart
Completed
Ongoing
Starting
85%~30%
1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 33
Length Scale-up Projects in LARP
Long QuadrupoleLQS3.7 m long90 mm bore
Long High-Field Quadrupole (LHQ)120 mm bore – Length TBD (3.5-4.5m)
Long QuadrupoleLQS3.7 m long90 mm bore
Long High-Field Quadrupole (LHQ)120 mm bore – Length TBD (3.5-4.5m)
SM
TQS
HQ
LR
LQS
LHQ
• From 0.3 m to 4 m• Started in 2005, competed in 2008• Racetrack coils, shell based structure
• From 1 m to 4 m• Started in 2007, exp. completion 2012• 90 mm aperture cos2q coils • Structure alignment
• From 1 m to 4 m• Starting in 2011, exp. completion 2015• 120 mm aperture cos2q coils• Full coil and structure alignment
1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 44
LHQ Features & Goals• LHQ is the main “Nb3Sn technology demonstrator”
—For technology selection for the LHC IR upgrade—Deadline: 2015
• Aperture: 120 mm (as HQ)• Coil length: 3.4 m (as LQ)• Success criteria:
— Nominal gradient = 80% of SSL based on extracted strands• HQ/LHQ Grad ~ 160/175 T/m (@ 4.2/1.9 K)
— Quenches to nominal gradient: 3— Quenches to 110% of nominal gradient: 10— Quenches to nominal gradient after therm. cycle: 1— Magnetic requirements from HL-LHC Design Study
1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 55
Conductor• Strand for LHQ01:
— 0.778 mm — OST RRP 108/127
• Jc: > 2650 A/mm2 (4.2K 12T)• Jc: > 1400 A/mm2 (4.2K 15T)• Cu/non_Cu: 1.22• Effective Filament size: ~52 um
• Strand for LHQ02:— OST RRP 108/127, 144/169, 192/217— Effective Filament size: ~52, ~44, ~38 um— Jc may go down with smaller filament size— The US CDP needs feedback now for this choice
1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 66
Cable and Insulation• Cable:
— With 25 um stainless steel core— See “HQ cable development” by D. Dietderich
• Insulation:— 0.1 mm per side— Braided S2 glass
• Tests in progress with NEEW (optimization of thickness and coverage)
1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 77
Cross Section
• LHQ X-Section = Revised HQ X-Section— thinner and less wide cable— thicker layer-layer insulation
• 250 um 500 um
• Task force for coil parts adjustments— Goal: more robust design
• ES: replace saddles after heat treatment with insulation-covered saddles
• ES: improve insulation around trace-leads solder joints
1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 88
Coil Fabrication Technology
• Same coil fabrication technology of revised HQ— winding (Ti-Al-V pole parts)— curing of ceramic binder (CTD 1202)— potting (CTD 101K)— reaction (T = 210, 400, 6xx °C)
• Last plateau temperature depends on strand type
• Long coil features: — gaps among pole pieces (for longitudinal diff. CTE)
• 4 mm/m as in latest HQ coils— Lifting and handling procedures used for LQ coils
1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 99
Supporting Structure
• Supporting structure:— X-section: LHQ = HQ
• With holes for cooling (TBD) — Scale up-features similar
to LQ• Segmented shell (4)• Al-collars, pads and yoke
made of laminations• Masters and keys 2m long
• Structure with more accelerator features under development in the HQ program
1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 1010
Quench Protection• Analysis performed with QuenchPro and Roxie• Experimental data from HQ (1m) and LQ (4m)
— LHQ can be protected by extracting some energy (R = 40 mW)and using LQ type heaters on coil ID and OD—T peak < 400 K (without quench back)— V max < 1000 V
0
5
10
15
20
25
30
2 4 6 8 10 12 14 16
MIIT
S (A^
2*s*
10^6
)
Quench current (kA)
HQ simulation without PH and 40 mOhm Dump HQ simulation without PH and 30 mOhm dumpHQ01c test without PH HQ01c test with PH (1-4 circuits connected)HQ01b test HQ01d test (all PH circ. Connected)HQ sim. PH150W 26 ms 40 mOhm
Detection and PH delay 10 ms, Rdump delay 10+10 ms
6
8
10
12
14
16
18
20
22
4000 6000 8000 10000 12000 14000 16000 18000 20000
MIIT
S
Current
LHQ-quenchpro - 40 mohm
LHQ - ROXIE - 40 mhm
LHQ-quenchpro-40 mohm-OLPH
LHQ - ROXIE - 40 mOhm - OLPH
"LHQ - ROXIE - 30 mOhm - QP comparison"LHQ - quenchpro - 30 mohm
1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 1111
FNAL structural plate
FOUR SUSPENSION RODS
Test
• Test at FNAL VMTF:— T = 4.6 – 2.3 K
• no superfluid He with present top plate— support similar to HQ test at CERN
— new He recovery line— new warm bore for magnetic
measurements:• 63-68 mm ID
1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 1212
Fabrication and Test Plan• Cable:
— Cabling: LBNL— Insulation: NEEW (or other vendor)
• Coils:— Winding & curing: FNAL— Reaction & potting: BNL, LBNL— Instrumentation: BNL, FNAL, LBNL— Shipment structure (long version of HQ one): BNL
• Structure:— Pre-assembly & magnet assembly: LBNL— Shipment similar to LQ
• Test:— Warm and cold measurements: FNAL
1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 1313
LHQ Schedule
| 2012 | 2013 | 2014 | 2015
Practice coils
Coil test in mirror
Structure develop. & mech. model
LHQ01 coils (5)
LHQ01 assembly & test
LHQ01b assembly & test
LHQ02 coils (5), assembly & test
10 coils, 1 coil test, 3 magnet tests by the middle of 2015
1st HiLumi LHC / LARP Collaboration Mtg, Nov. 16, 2011 LHQ Status and Plans – G. Ambrosio 1414
Conclusions
• The LHQ is LARP’s last step for demonstrating Nb3Sn technology for the LHC Luminosity Upgrade
• It builds upon the whole LARP R&D (HQ, LQ, …) with contributions from other programs
• LHQ magnet test results are expected in 2014 - 15
For more Luminosity at the LHC