LIDL UKI GMBH
PROPOSED LIDL FOODSTORE, FRASER ROAD, ERITH
TRANSPORT ASSESSMENT FEBRUARY 2018
Proposed Lidl Foodstore, Fraser Road, Erith
Proposed Lidl Foodstore, Fraser Road, Erith Transport Assessment
Project No: J323173
Belsyre Court 57 Woodstock Road Oxford OX2 6HJ
( 01865 389 440
* [email protected] modetransport.co.uk
Prepared by: Approved by:
Simon Kerswell-Jensen
& Chris Holdup
Laura Fitzgerald
Document Status: Live Issue Number: v1.5 Date: 9 February 2017
File Reference: 180209 323173 ta v1.5.docx
C) Copyright mode transport limited. All rights reserved.
This report has been prepared for the exclusive use of the commissioning party and unless otherwise agreed in writing
mode transport limited, no other party may copy, reproduce, distribute, make use of, or rely on the contents of the report.
No liability is accepted by mode transport limited for any use of this report, other than for the purposes for which it was
originally prepared and provided.
Opinions and information provided in this report are on the basis of mode transport limited using due skill, care and
diligence in the preparation of the same and no explicit warranty is provided as to their accuracy. It should be noted and is
expressly stated that no independent verification of any of the documents or information supplied to mode transport limited
has been made.
Proposed Lidl Foodstore, Fraser Road, Erith
Contents
1 Introduction 1
1.1 Report Context 1 1.2 Report Purpose 2 1.3 Report Objective 2 1.4 Report Structure 3
2 Transport Policy 5
2.1 Objective 5 2.2 National Policy 5 2.3 Regional Policy 6 2.4 Local Policy 9 2.5 Summary 11
3 Existing Site and Operations 12
3.1 Objective 12 3.2 Location 12 3.3 Permitted Use and Occupiers 13 3.4 Access and Parking Arrangements 13 3.5 Typical Operations 14 3.6 Summary 14
4 Sustainable Accessibility 16
4.1 Objective 16 4.2 Potential for Uptake 16 4.3 Walking 17 4.4 Cycling 17 4.5 Bus Services 18 4.6 Rail Services 20 4.7 Transport Connectivity 20 4.8 Summary 22
5 Development Proposals 23
5.1 Objective 23 5.2 Development Schedule 23 5.3 Car Parking Provision 23 5.4 Electric Vehicle Charging Points 24 5.5 Cycle Parking 25 5.6 Access Arrangements 26 5.7 Servicing Arrangements 26
6 Assessment Methodology and Scope 27
6.1 Objective 27 6.2 Assessment Methodology 27 6.3 Scope of Network and Time Periods 28 6.4 Summary 29
7 Baseline Traffic Flows 30
7.1 Objective 30 7.2 Erith Quarry Transport Assessment Traffic Flows 30 7.3 2017 Traffic Surveys 30 7.4 2022 Weekday Peak Hour 32 7.5 2022 Saturday Lidl Peak Hour 36 7.6 2022 Sunday Lidl Peak Hour 37 7.7 Matrices and Network Diagrams 38 7.8 Summary 38
8 Trip Generation 39
8.1 Introduction 39 8.2 Existing Site Use 39
Proposed Lidl Foodstore, Fraser Road, Erith
8.3 Net Traffic Generation 46 8.4 Development Trip Types 48 8.5 Mode Share 50 8.6 Summary 51
9 Net Traffic Distribution and Assignment 52
9.1 Objective 52 9.2 Distribution and Assignment by Trip Types 52 9.3 Net Turning Movements on the Network 54 9.4 Summary 54
10 Junction Capacity Testing 55 10.1 Objective 55 10.2 Assessment Scenarios 55 10.3 Assumed Infrastructure 55 10.4 Modelling Results 56 10.5 Summary 61
11 Personal Injury Collision Analysis 62
12 Conclusions and Recommendation 65
12.1 Conclusions 65 12.2 Recommendation 66
Appendix A Site Layout Plan
Appendix B TFL Bus Spider Diagram
Appendix C PTAL Outputs
Appendix D TIM Outputs
Appendix E Swept Path Analysis Drawing
Appendix F Full Traffic Survey Data (ATC+ MCC)
Appendix G 2022 Baseline Data
Appendix H Lidl Operational Data
Appendix I TRICS Outputs
Appendix J Net Development Traffic
Appendix K Total Traffic
Appendix L Junctions Geometries
Appendix M Arcady and Picady Outputs
Appendix N PIC Data
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 1
1 Introduction 1.1 Report Context
1.1.1 This Transport Assessment (TA) has been prepared by mode transport planning (mode)
on behalf of Lidl UKI GmbH (Lidl). It supports a full planning application submitted by Lidl,
for the proposed redevelopment of five non-food retail units with a proposed Lidl foodstore
at the Madford Trading Park in Erith, London Borough of Bexley. The application site is
located as per Figure 1.1.
Figure 1.1: Site Location Plan
1.1.2 The proposed Lidl foodstore comprises a Gross Internal Area (GIA) of 2211m2 (with
1405m2 sales area) with provision for 111 car parking spaces and 38 cycle parking spaces.
Access would be provided from a new priority junction onto the existing Wickes shared
access road, which connects with Fraser Road. The proposed site layout is attached as
Appendix A.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 2
1.2 Report Purpose
1.2.1 The purpose of this TA is to assess the transport implications of the development proposals
as a change of the sites use and its layout. It should be read in conjunction with the Staff
Travel Plan (STP), Car Park Management Plan (CPMP), and Servicing Management Plan
(SMP), prepared by mode.
1.2.2 The scope and methodology for the assessment has been informed by pre-application
dialogue with London Borough of Bexley (LBB) highways officers. References are made
where necessary clarifying matters that have been discussed / agreed with LBB.
1.3 Report Objective
1.3.1 This TA aims to demonstrate that the following transport matters have been assessed and
where beneficial to do so, agreed with LBB prior to the submission of the planning
application:
§ The development proposals align well with National, Regional and Local planning
policy in transport terms;
§ The application site is well located to encourage uptake of sustainable travel by future
staff and customers of the proposed Lidl foodstore, supported by the accompanying
STP;
§ Baseline and future baseline traffic flows on the local network have been derived from
suitable sources via committed development proposal schemes and up-to-date traffic
surveys;
§ The net change in vehicle trips expected to be generated at the application site has
been quantified by undertaking traffic surveys of the existing uses and comparing with
trip rates recorded at similar existing Lidl food stores;
§ Detailed junction models have been prepared for key local junctions, where testing of
post-development junction performance has been considered necessary (including the
proposed site access); and
§ The proposed site layout and access arrangements accommodate all anticipated site
users in terms of parking and access by walking, cycling, public transport, car, service
vehicles (and other modes of transport where identified).
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 3
1.4 Report Structure
1.4.1 In-line with the above report purpose and objective, as well as best practice for the
preparation of transport assessments, this report has been prepared with the following
structure:
§ Chapter 2: Transport Policy provides an overview of the relevant national, regional
and local transport policies against which the development proposals have been
assessed;
§ Chapter 3: Existing Site and Operations provides a description of the existing
conditions at the site in terms of its location, permitted use, access and parking, as well
as typical operations;
§ Chapter 4: Sustainability Accessibility details the accessibility of the application site
by all sustainable travel modes, including reference to PTAL and travel time mapping;
§ Chapter 5: Development Proposals describes and justifies the development
proposals in terms of site layout, car and cycle parking provision, access and servicing
arrangements;
§ Chapter 6: Assessment Methodology outlines the means for assessing the
development proposal’s impact on the local road network by defining the scope in
terms of assessed time periods and junctions, quantifying baseline traffic in a future
year, existing and development traffic generation, distribution / assignment of net
development traffic by trip type and detailed modelling assessments measuring the net
traffic impact;
§ Chapter 7: Baseline Traffic Flows confirms the data sources of the baseline traffic
flows, as agreed with LBB highways officers, as well as the calculations and
assumptions made to derive turning movements within the assessment scope;
§ Chapter 8: Trip Generation quantifies the vehicle trip generation for the existing and
proposed site uses, providing net traffic movements expected on the local road
network, also differentiated by types of trip. An illustrative mode share of total people
trips is also provided;
§ Chapter 9: Net Traffic Distribution and Assignment summarises the assumptions
made for distributing / assignment net traffic movements within the assessment scope
by the four types of trip;
§ Chapter 10: Junction Capacity Testing measures the traffic impacts of the proposed
development by presenting the findings of detailed modelling assessments at junctions
within the assessment scope (including the site access);
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 4
§ Chapter 11: Personal Injury Collisions provides a review of personal injury collisions
(PICs) recorded in the last 5 years in proximity to the development proposals. These
are related to the development proposals and measured traffic impact in terms of
whether the development proposals are likely to exacerbate any existing PIC trends on
the network;
§ Chapter 12: Summary and Conclusions provides a summary of the report and
presents conclusions relevant to the consideration of the planning application in
transport terms.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 5
2 Transport Policy 2.1 Objective
2.1.1 This chapter sets out the following National and Local transport policy relevant to the
development proposals, in order to highlight where the planning application is compliant
with policy in transport terms:
§ The National Planning Policy Framework (NPPF);
§ The London Plan, Spatial Development Strategy for Greater London; and
§ The London Borough of Bexley Core Strategy.
2.2 National Policy
2.2.1 The National Planning Policy Framework (NPPF) sets out the Government’s planning
policies for England and how they there are expected to be applied.
2.2.2 The NPPF presumes in favour of sustainable development and is a material consideration
in planning decisions. Twelve core land-use planning principle are put forward to underpin
both plan-making and decision-taking, one of which is to “actively manage patterns of
growth to make the fullest possible use of public transport, walking and cycling, and focus
significant development in locations which are or can be made sustainable.”
2.2.3 Paragraph 32 addresses the relationship between development and sustainable transport
as follows:
“All developments that generate significant amounts of movement should be
supported by a transport statement or transport assessment. Plans and decisions
should take account of whether:
§ The opportunities for sustainable transport modes have been taken up depending on
the nature and location of the site, to reduce the need for major transport infrastructure;
§ Safe and sustainable access to the site can be achieved for all people; and
§ Improvements can be undertaken within the transport network that cost effectively limit
the significant impacts of the development. Development should only be prevented or
refused on transport grounds where the residual cumulative impacts of development
are severe.”
2.2.4 Paragraph 35 suggests that developments should be located and designed where practical
to among other things, give priority to pedestrian and cycle movements, have access to
high quality public transport facilities, create safe and secure layouts which minimise
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 6
conflicts between traffic and cyclists or pedestrians and consider the needs of people with
disabilities by all modes of transport.
2.2.5 It is noted that paragraph 36 that travel plans will provide a key tool in facilitating there
objective and all development that generate significant amounts of movements should
provide one.
2.2.6 Paragraph 37 encourages planning policies that aim for a balance of land uses within their
area so that people can be encouraged to minimise journey lengths for employment,
shopping, leisure, education and other activities.
2.2.7 Off street parking provision is referred to by paragraph 39, which says that in setting local
parking standards for development, local planning authorities should take into account
accessibility; the type, mix and use of the development; the availability of and opportunities
for public transport; local car ownership levels; and an overall need to reduce the use of
high-emission vehicles.
2.3 Regional Policy
2.3.1 ‘The London Plan; The Spatial Development Strategy for London consolidated with
alterations since 2011’ was adopted by the Mayor of London in March 2016. It sets out and
integrated economic, environmental, transport and social framework for the development
of London over the 20-25 years.
2.3.2 One of the Mayor’s six objectives for London, which is reiterated in Policy 1.1 in terms of
delivering the strategic vision and objectives for London is:
“A city where it is easy, safe and convenient for everyone to access jobs,
opportunities and facilities with an effective and effective transport system which
actively encourages more walking and cycling, makes better use of the Thames
and supports delivery of all the objectives of this plan.”
2.3.3 Policy 6.1 identifies the strategic approach to integrating transport and development and
states that the Mayor will work with relevant partners to encourage the closer integration of
transport and development:
“Encouraging patterns and nodes of development that reduce the need to travel
especially by car;
Seeking to improve the capacity and accessibility of public transport, walking and
cycling, particularly in areas of greatest demand;
Supporting development that generates high levels of trips at locations with high
levels of public transport accessibility and/or capacity, either currently or via
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 7
committed funded improvements including where appropriate, those provided by
developments through the use of planning obligations; and
Supporting measure that encourage shifts to more sustainable modes and
appropriate demand management.”
2.3.4 Policy 6.3 considers the assessment of effects of development on transport capacity and
states:
“a. Development proposals should ensure that impacts on transport capacity and
the transport network, at both a corridor and local level are assessed. Development
should not adversely affect safety on transport network…
c. Transport assessments will be required in accordance with TfL’s Transport
Assessment Best Practice Guidance for major planning applications. Workplace
and/or residential travel plans should be provided for planning applications
exceeding the thresholds in, and produced in accordance with, the relevant TfL
guidance. Construction logistics plans and delivery and servicing plans should be
secured in line with the London Freight Plan and should be co-ordinated with Travel
Plans.”
2.3.5 Policy 6.13 sets out the expected parking standards for London, and states:
“The Mayor wishes to see an appropriate balance being struck between promoting
new development and preventing excessive car parking provision that can
undermine cycling, walking and public transport use.”
In addition, developments in all parts of London must: a) ensure that 1 in 5 spaces
(both active and passive) provide an electrical charging point to encourage the
uptake of electric vehicles
b) provide parking for disabled people in line with (Table 6.2 London plan)
c) meet the minimum cycle parking standards set out in (Table 6.3 London Plan)
d) provide for the needs of businesses for delivery and servicing.”
The Replacement Plan 2017 (Draft)
2.3.6 The new London Plan 2017 (Replacement Plan) has been published for public consultation
until March 2018. Whilst not an adopted document, it does provide an indication of the
direction of planning policy at the regional level in the future, and is a material consideration
for planning applications.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 8
2.3.7 Draft policy T1 relates to the strategic approach to transport during the plan period, with
the Mayor targeting that 80% of all trips in London be made by foot, cycle or public transport
in 2041. The policy also states the following in relation to new development:
“All development should make the most effective use of land, reflecting its
connectivity and accessibility by existing and future public transport, walking and
cycling routes, and ensure that any impacts on London’s transport networks and
supporting infrastructure are mitigated.”
2.3.8 Draft policy T4 relates to assessing and mitigating transport impacts
§ “Development plans and development proposals should reflect and be integrated with
current and planned transport access, capacity and connectivity.
§ Transport assessments should be submitted with development proposals to ensure
that any impacts on the capacity of the transport network (including impacts on
pedestrians and the cycle network), at the local, network-wide and strategic level, are
fully assessed. Transport assessments should focus on embedding the Healthy Streets
Approach within, and in the vicinity of, new development. Travel plans, parking design
and management plans, construction logistics plans and delivery and servicing plans
will be required in accordance with relevant Transport for London guidance.
§ Where appropriate, mitigation, either through direct provision of public transport,
walking and cycling facilities and highways improvements or through financial
contributions, will be required to address any adverse transport impacts that are
identified.
§ Where the ability to absorb increased travel demand through active travel modes has
been exhausted, existing public transport capacity is insufficient to allow for the travel
generated by proposed developments, and no firm plans and funding exist for an
increase in capacity to cater for the increased demand, planning permission may be
contingent on the provision of necessary public transport and active travel
infrastructure.”
2.3.9 Draft policy T6 Car Parking
§ “Where car parking is provided in new developments, provision should be made for
infrastructure for electric or other Ultra-Low Emission vehicles.
§ A Car Park Design and Management Plan should be submitted alongside all
applications which include car parking provision, indicating how the car parking will be
designed and managed, with reference to Transport for London guidance on car
parking management and car parking design.”
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 9
2.3.10 Draft policy T3 ‘Retail Parking’
2.3.11 The parking policies vary from the existing adopted London Plan to the draft Replacement
Plan, with car parking for the site subject to a standard of one space per 75 square metres
within ‘Outer London Opportunity Areas’ (of which Erith would be within). The cycle parking
standards would remain the same across both plan versions.
2.3.12 Due to the Draft London plan still being within an early consultation phase, the draft policies
are considered an indication of the broad direction of London policy in the future. As this
remains unadopted policy and there is uncertainty regarding its application in this location
for this foodstore land use, the current London Plan policies are considered to be more
relevant at the time of planning application submission.
2.4 Local Policy
2.4.1 Local policy is contained within the LBB Local Plan, which consists of a number of
documents forming the Development Plan. These include the Core Strategy, adopted in
February 2012, and Saved Policies of the LBB Unitary Development Plan adopted in 2004.
2.4.2 The key objective of the Core Strategy document is to:
“To promote development that assists regeneration and renewal within the borough
and enhances the quality of life of all Bexley residents, and encourage development
that promotes social inclusion, addresses local social and economic needs and
provides a better environment.”
2.4.3 Regarding transport, the Core Strategy contains a vision for sustainable transport in the
Borough. This seeks to:
“Promote sustainable forms of transport and seek to reduce the need to travel by
ensuring that jobs and other facilities are easily accessible to homes, and work
towards a more comprehensive, high-quality and integrated transport system,
which better meets the needs of residential businesses and visitors to Bexley.”
2.4.4 Policy CS15 states that the council will work to achieve a comprehensive high quality, safe,
integrated and sustainable transport system through the following actions:
“A. Increasing the capacity, frequency, accessibility and safety of established bus
and rail facilities;
F. Initiating or supporting the future development of major new transport
infrastructure proposals within or affecting Bexley, including the north Bexley
transit, DLR, river passenger services and crossing, and London underground
extensions to Bexley so as to explore, by continued negotiations with TfL a firm
basis for the further progression of these emerging schemes;
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 10
G. Adopting a parking policy that addresses the need for appropriate controls to
secure a sustainable environment within the borough, whilst recognising the need
to help viable development in town centres and major employment areas;
H. Improving the efficiency and promoting the sustainability freight movement in the
borough, the protection of viable safeguarded wharves on the River Thames, and
ensuring the construction and preservation of rail freight interchange facilities and
new wharves where this does not prejudice other objectives of the core strategy;
I. Encouraging walking and cycling within the borough through implementation of
local strategic walking and cycling programs, school travel plans, local safety
schemes and the provision of facilities within the development proposals and
environmental improvement projects;
J. Developing priority road schemes, where they assist regeneration and/or reduce
congestion, whilst generally promoting modal shift away from the use of the car;
and
k. Effectively maintaining and managing the existing highway network to ensure the
free flow of traffic, improve the environment, in particular air quality, and promote
safety, health and wellbeing.”
2.4.5 Policy CS16 relates to reducing the need to travel and the impact of travel:
“The council will seek to minimise the ned for and distances people travel, thereby
reducing the time cost and environmental effects of transportation and improving
accessibility and quality of life for Bexley residents by ensuring developments are
equipped to benefit from new technology, which helps generate more sustainable
travel patterns;
Promoting the provision of life/work accommodation in appropriate developments;
and
Promoting travel awareness campaigns, workplace travel plans, area based travel
plans and car clubs.”
2.4.6 Saved polices T1 and T2 of the LBB UDP require major development to be accompanied
by a Transport Assessment and Travel Plan.
2.4.7 Saved Policies T17 and T18 relate to parking and state that provision of off-street car
parking spaces should be made within the development, where retail and leisure
developments are located in or on the edge of town centre, the council may allow parking
spaces additional to the maximum standards.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 11
2.5 Summary
2.5.1 National, regional and local level transport policy clearly encourages new development to
be located in areas that are readily accessible on foot, cycle and by public transport, making
use of available sites within built up locations.
2.5.2 The proposed Lidl foodstore offers a realistic choice of access to public transport, walking
and cycling, building on the existing foodstore operation. The site further benefits from its
location close to the principal road network, enabling easy access for commercial vehicles
away from sensitive local access roads.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 12
3 Existing Site and Operations 3.1 Objective
3.1.1 This chapter describes the existing use at the application site, in terms of its location,
permitted use and occupiers, access and parking arrangements, as well as typical
operations.
3.1.2 With the support of baseline data collection detailed in Chapter 4, this chapter provides
context for subsequent consideration of how the development proposals are expected to
change the application site. This is both in terms of its layout and its impact on the local
road network.
3.2 Location
3.2.1 The application site is located on the western side of the Madford Trading Park, on the
southern side of Fraser Road (A206) and opposite the Europa Trading Estate.
3.2.2 A Wickes retail store is located on the eastern side of the Madford Trading Park and shares
the single vehicle access for customers of the trading park onto Fraser Road.
3.2.3 Immediately to the west of the site is Erith Quarry. This is being redeveloped with the
erection of 600 residential units, a primary school and a space for non-residential use (LBB
planning reference: 14/02155/OUT). The outlying areas of the application site are primarily
residential in nature.
3.2.4 More strategically, the application site is located approximately 760 metres west of the river
Thames, 5.8 kilometres north-west of Dartford and 5.3 kilometres north of Bexleyheath.
Belvedere is approximately 2 kilometres west of the site, which is where the nearest Lidl
distribution centre is located. The location of the site in context of the wider local area is
provided in Figure 3.1.
3.2.5 The location of the application site in terms of its accessibility from surrounding areas by
sustainable travel modes is detailed in Chapter 4.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 13
Figure 3.1 Wider Local Area
3.3 Permitted Use and Occupiers
3.3.1 The Madford Trading Park was granted planning permission in May 2000 [98/00234/FUL].
This included a 1,937m2 GIA building for non-food retail located within the application site,
with the remainder of the trading park comprising the Wickes retail store to the east.
3.3.2 The non-food retail building within the application site is divided into five units. Four of the
five units are currently leased to building supply retailers, with the fifth being a car repairs
garage.
3.4 Access and Parking Arrangements
3.4.1 The application site currently has 59 car parking spaces that serve the five non-food retail
units. This provision includes six accessible parking spaces spread across the site. No
formal cycle parking spaces are currently provided for staff or visitors.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 14
3.4.2 Vehicular access is distinguished between access to the car park and servicing access to
the rear of the retail units. Access to the car park is via a bell-mouth onto the Madford
Trading Park access road shared with the Wickes retail store. The Madford Trading Park
access road adjoins Fraser Road as a priority T-junction with ghost island right turn lane
arrangement.
3.4.3 Access to the servicing area to the rear of the retail units is provided via the aforementioned
bell-mouth onto the Madford Trading Park access road. Service vehicles currently egress
onto a private road named ‘Birch Walk’, bordering the western boundary of the application
site.
3.4.4 Birch Walk adjoins Fraser Road via a semi-formal bell-mouth at its northern end, also
providing access to commercial premises to the south. Service vehicles exiting the
application site egress onto Fraser Road in this location.
3.4.5 Traffic and parking accumulation surveys have been undertaken at the application site /
Madford Trading Park / site access to inform this TA. The purpose, methodology and
findings of these surveys are detailed in Chapter 5 and applied in following assessment
chapters.
3.5 Typical Operations
3.5.1 Operations at the site are typical of the non-food retail occupiers. Day-to-day activity
comprises customer and staff arrivals and departures, for varying lengths of stay over
typical retailing hours and days.
3.5.2 For customers, travel to and from the retail units largely takes place by car / van given the
nature of the building supply retailers and car repairs garage. Given the availability of car
parking, many staff are also assumed to park on site, although as detailed in Chapter 4,
there are sustainable access opportunities for travelling to and from the site by walking,
cycling and public transport.
3.5.3 As per the aforementioned access arrangements, servicing takes place to the rear of the
five units. Each of the five occupiers are assumed to have different servicing patterns.
3.5.4 The quantum of light and heavy vehicles currently servicing the site is quantified in Chapter 8.
3.6 Summary
3.6.1 The application site comprises an established permitted use for five non-food retail
occupiers. Each occupier generates staff and customer travel and parking demand, along
with servicing to the rear of each unit.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 15
3.6.2 The application site has an established access arrangement, primarily via the Madford
Trading Park access onto Fraser Road, shared with the adjacent Wickes. This
accommodates car and HGV movements.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 16
4 Sustainable Accessibility 4.1 Objective
4.1.1 This chapter details the sustainable access connections available to the application site
and relates these to the development proposals in terms of demographic and needs of
future site users.
4.2 Potential for Uptake
4.2.1 The proposed Lidl foodstore presents an opportunity for staff and customers to make
sustainable travel choices when travelling to and from the application site.
4.2.2 A high proportion of staff are expected to be employed locally and have limited access to
on-site parking spaces. The majority of staff are therefore expected to travel to and from
the site by sustainable travel modes.
4.2.3 The majority of customers are anticipated to live in the local area on the basis that a number
of Lidl foodstores already exist in the wider area. Existing Lidl stores within 2.5km, 5km and
10km radii of the application site (south of the Thames) are demonstrated on Figure 4.1.
Figure 4.1 Existing Lidl Store Locations
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 17
4.2.4 Given the majority of journeys are expected take place over shorter distances, sustainable
travel opportunities are focused on walking, cycling and local bus journeys. Few customers
are likely to travel to the site by rail, although these have been reviewed should some staff
travel over greater distances.
4.3 Walking
4.3.1 A network of pedestrian footways link the application site with surrounding residential and
employment areas, typical of the urban environment in Erith.
4.3.2 Fraser Road provides pedestrian access to the application site from all directions and has
well-lit, standard width pedestrian footways on both sides. Crossing of Fraser Road is
enabled by a number of pedestrian crossings, comprising tactile paving, circa 2.5m islands
and reflective bollards / beacons. The closest crossing is situated immediately to the west
of the site access junction and allows a crossing to the bus stop situated on the Europa
trading estate side of Fraser Road.
4.3.3 Pedestrian footways lead into the Madford Trading Park via the radii of the access with
Fraser Road. Details relating to how this will connect into the proposed site layout are
provided in Chapter 6.
4.3.4 Erith Train Station is within a 900m (approx. 9 minute) walk from the application site along
Fraser Road.
4.4 Cycling
4.4.1 Cycling provides a realistic opportunity for future staff in particular to travel over distances
greater than might otherwise be undertaken by walking to the application site.
4.4.2 Transport for London (TfL) provide cycle guides of signed cycle routes, recommended quiet
on-road routes, as well as general information about the cycle network in the area. ‘Cycle
Guide 8’ provides information on the borough of Bexley including the application site. This
has been collated as per Figure 4.2.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 18
Figure 4.2 TfL Cycle Routes (as per Cycle Guide 8)
4.4.3 Figure 4.2 indicates that the area surrounding the application site comprises a number of
cycle ways and safe roads (as informed by feedback from cyclists) that link with the local
area and wider residential areas in East / South London boroughs.
4.4.4 Erith Train Station is within a 900m (approx. 4 minute) cycle from the application site along
Fraser Road.
4.5 Bus Services
4.5.1 The nearest bus stops to the application site are located on Fraser Road and are served
by TfL bus service 99. An eastbound stop is located opposite the application site frontage,
whilst a westbound stop is located adjacent to the Wickes retail store, a short distance to
the east. A summary of the 99 bus service is provided in Table 4.1.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 19
Table 4.2 Bus Service Summary
Service Route Weekday Frequency (Daytime)
Saturday Frequency (Daytime)
Sunday Frequency (Daytime)
99
Bexleyheath,
Erith, and
Woolwich
Every 20 mins Every 20 mins Every 20
mins
4.5.2 Additional bus services 229, 602 and 669 are available on Bexley Road to the south east
of the application site. The collective bus service routes and stops in the local area are
illustrated on Figure 4.3. A TfL Bus Spider Diagram for the local area is attached in
Appendix B.
Figure 4.3 Local Bus Services
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 20
4.6 Rail Services
4.6.1 As confirmed in previous paragraphs, Erith Train Station is located within a 900m walk or
cycle from the application site, being situated to the north east of the Europa Trading
Estate.
4.6.2 Erith Train Station part of the Southeastern rail network, connecting areas of South East
London with Central London and Kent. During the day, trains typically arrive and depart
Erith Train Station every 4 – 10 mins, to direct destinations such as London Cannon Street,
Greenwich and Dartford.
4.6.3 The Southeastern rail network integrates with other rail networks, including the TfL
underground / overground network and Southern Rail, providing convenient rail access to
an array of wider places of residence.
4.7 Transport Connectivity
4.7.1 Transport for London (TfL) assesses the connectivity of areas based on the WebCAT
Toolkit, which includes an assessment of the PTAL, travel time mapping and catchment
analysis to provide an overview of the transport network for a location.
Public Transport Accessibility Level (PTAL)
4.7.2 Public Transport Accessibility Levels (PTALs) are a theoretical measure of the accessibility
of a given point to the public transport network, taking into account walk access time and
service availability. This method is a way of measuring the density of the public transport
network at a particular point.
4.7.3 Walking times are calculated from the specified point of interest to all public transport
access points including bus stops and stations within pre-defined catchments. The PTAL
incorporates a measure of service frequency to calculate an average wait time based on
the frequency of service at each public transport access point. A reliability factor is added
and the total access time is calculated. A measure known as an Equivalent Doorstep
Frequency (EDF) is then derived for each point. These are summed for all routes within the
catchment and the PTALs for the different modes are the added together to give a single
value. The PTAL is categorised in nine levels, 1a to 6b where 6b represents a high level of
accessibility and 1a, a low level of accessibility.
4.7.4 The PTAL rating at the site access is 2. The PTAL output for the 2017 base year is included
at Appendix C.
4.7.5 It should be noted that TfL acknowledges the limitations of the PTAL assessment in the
‘Assessing Transport Connectivity in London’ Guidance document, noting that it cannot
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 21
differentiate within each category and this can result in significant variations and also it is
an overall measure and cannot be used for individual public transport modes.
4.7.6 PTAL also relies on route-mapping databases to determine walking distances to bus, rail
and underground services. The PTAL calculation only includes for bus services within
640m and rail / underground services within 960m.
4.7.7 In this instance, it appears likely that the PTAL score of 2 does not recognise services at
Erith train station. Online route-finder tools do not recognise a footpath between Bexley
Road and the train station (otherwise limiting the walk to less than 900m), resulting in
walking distances greater than 960m. Should this discrepancy be mirrored in the route-
finding database used for PTAL, then this may explain the score of 2, where areas in closer
proximity of the station with similar bus provision have a score of 3.
4.7.8 PTAL provides a theoretical measure for public transport accessibility taking account of
access to all public transport modes. Notwithstanding the above observation on the
inclusion of rail in the PTAL score, it should be noted that the proposed Lidl foodstore does
not necessarily attract people to travel by all public transport modes available.
4.7.9 Surveys from other Lidl foodstores around London indicate that access by bus is the key
public transport mode used. As such, the inclusion or not of rail in the PTAL score of 2 is
not considered to have a material weighting on the potential for sustainable travel uptake
at the proposed Lidl foodstore.
Travel Time Mapping
4.7.10 Travel time mapping offers an opportunity to review the connectivity of a site by specific
travel modes and across all public transport modes and is available via the WebCAT TIM
online calculator.
4.7.11 A Lidl foodstore generates a relatively high proportion of bus trips to and from the store,
which is one of the main reasons why considering an overall PTAL in isolation is not
appropriate for this type of development. TIM plans have been produced for the application
site for all travel modes during both the weekday evening and peak and the daytime inter-
peak periods. Corresponding outputs are provided in Appendix D.
4.7.12 The plans indicate the accessibility of the area by showing the distance that can be travelled
within a 15-minute and 30-minute journey time from the site. This demonstrates that the
application site is accessible from closely located residential areas.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 22
4.8 Summary
4.8.1 The application site is well placed to encourage a local staff and customer base to travel to
and from the site by active and public transport travel modes. Fraser Road has good quality
pedestrian and cycle infrastructure interconnecting with wider residential areas in the
borough. Buses service the site every 20 minutes and longer distance travel is available
via Erith Train Station.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 23
5 Development Proposals 5.1 Objective
5.1.1 This chapter outlines the development proposals with respect to the proposed site layout
(attached as Appendix A). This summarises the development schedule, before detailing
car and cycle parking provision, as well as multimodal access and servicing arrangements.
5.2 Development Schedule
5.2.1 The development proposals comprise the demolition of the existing 1,937m2 non-food retail
units and development of the following a 2,211m2 Gross Internal Area (GIA) Lidl foodstore,
including 1,405m2 of sales area. This will be accompanied by the following:
§ A customer car park totalling 111 parking spaces;
§ 38 cycle parking spaces;
§ Single vehicular access onto the Madford Trading Park access road, including
pedestrian footways and zebra crossings; and
§ A HGV servicing bay adjacent to the western façade of the foodstore building.
5.3 Car Parking Provision
5.3.1 Car parking standards for new developments within the London Borough of Bexley are
contained with current London Plan. The London Plan had been consolidated and subject
to alterations, with the most recent revised version adopted in March 2016.
5.3.2 The current London Plan identifies the maximum range of car parking provision for
foodstore developments. For foodstores up to 2,500m2 GIA, within a PTAL of between 2-4
a maximum ratio of 1 space per 20-30m2 is given. This equates to between 73 – 111
spaces for the proposed 2,211m2 GIA Lidl foodstore at the application site in a PTAL of 2.
5.3.3 The proposed site layout has been prepared to recognise the above current London Plan
parking policy for retail development. It therefore includes a total of 111 parking spaces,
consisting of the following:
§ 97 standard parking spaces measuring 2.5m x 5.0m;
§ 6 Blue Badge Holder spaces (10% of total provision) measuring 3.6m x 5.0m; and
§ 8 parent and child spaces measuring 3.6m x 5.0m.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 24
5.4 Electric Vehicle Charging Points
5.4.1 The London Plan standards state that new retail developments should provide 10% active
electric vehicle parking provision, with 10% passive provision safeguarded for future use.
It does not provide any flexibility with respect to the type of charging units to be provided
nor does it recognise that rapid charging, whilst providing tangible benefit does come at a
cost in terms of electrical requirements from the grid.
5.4.2 Lidl UK is committed to providing electric vehicle points in new foodstores. seeks to utilise
rapid charges in connection with the recognised Pod Point network. However, it is not
possible to provide 10% of spaces as rapid charging points because of the cost of the units,
maintenance and the electrical input required.
5.4.3 Instead Lidl is seeking to provide two active rapid charging points in the car park with
provision for two further charging points (passive provision), replicating the offering that
has recently been unveiled in the new Lidl foodstore on Broadway, Bexleyheath as shown
in Figure 5.1.
Figure 5.1 Rapid Charging Unit at Lidl Broadway, Bexleyheath
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 25
5.4.4 The four active and passive rapid charging points would be provided within the standard
space parking provision, with their exact location yet to be determined, although anticipated
to be in close proximity to the building entrance.
5.4.5 Lidl have sourced rapid charging units that can fully charge a vehicle in 30 minutes;
equating to up to 48 vehicles being charged in any 24-hour period. In comparison, a trickle
charging point would need 8 hours to charge one vehicle and could only therefore charge
up to 3 vehicles in any 24-hour period.
5.4.6 On this basis, the chargers could theoretically charge 96 vehicles in one 24-hour period.
Whereas 10% active provision of trickle charging points, would result in 12 charging points,
effectively charging up to 36 vehicles in a 24-hour period.
5.5 Cycle Parking
5.5.1 Cycle parking standards applicable within LBBC are contained within current The London
Plan. The cycle parking standards within this document require new developments to
provide cycle parking for long stay (staff) and short stay (customer) purposes.
5.5.2 The relevant foodstore cycle parking standards within The London Plan, and the minimum
cycle parking standard for the development based on the proposed GIA of 2,211m2 are
confirmed in Table 5.1.
Table 5.1: Foodstore Minimum Cycle Parking Standards
Parking Type
Minimum Standards
Development Quantum
Minimum Cycle Parking
Standards Proposed Provision
Long Stay
1 space per 175m2 2,211m2 13 14
Short Stay
First 750m2: 1
space per 40m2
Thereafter 1 space
per 300m2
2,211m2 19 + 5 24
Total 2,211m2 37 spaces 38
5.5.3 Table 5.1 confirms that the development proposals will modestly exceed the minimum
cycle parking spaces, providing at least the minimum for both long stay and short stay. The
long stay spaces would be provided in a secure and sheltered bicycle store at the western
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 26
end of the car parking court. The short stay spaces would be provided by way of ‘Sheffield’
stands located near the site access, with clear visibility to customers.
5.6 Access Arrangements
5.6.1 Vehicle access will be retained onto the Madford Trading Park access road, which adjoins
Fraser Road as a priority junction (with ghost island arrangement). However, the existing
priority arrangement onto the trading park access will be relocated in closer proximity to
Fraser Road. This will provide a more direct access into the Lidl foodstore car parking
layout and for the Lidl servicing bay (discussed in detail in the subsequent section).
5.6.2 The relocated access arrangement will also provide for pedestrian and cycle access into
the proposed Lidl foodstore. Pedestrians will benefit from the provision of zebra style
crossings connecting footway provision on Fraser Road, across the site access and
through the car park to meet with the store entrance. Customers cycling to the site will be
able to park bicycles at the short stay ‘Sheffield’ stands located adjacent to the site access
before making use of the aforementioned pedestrian connections to the store.
5.7 Servicing Arrangements
5.7.1 Deliveries to the proposed foodstore will be from the regional distribution centre
approximately 2.1km to the north in Belvedere. All deliveries (including return removal of
waste) will take place to and from the regional distribution centre, which will be limited to 1-
2 daily deliveries. Routeing can therefore be expected to take place to and from Queens
Road (A2016) via the Erith Roundabout and the eastern length of Fraser Road. This will
mean left turns in and right turns out of the Madford Trading Park access road.
5.7.2 All servicing will take place via the single vehicle access onto the Madford Trading Park
access road. The existing service egress at the application site onto ‘Birch Walk’ will be
stopped up, removing existing HGV movements in this location.
5.7.3 The proposed car parking layout has been designed to provide a direct route between the
Madford Trading Park access and a servicing bay at the western end of the proposed Lidl
foodstore. This would accommodate the largest vehicle expected to service the site, which
is a 16.5m articulated HGV. Supporting swept path analysis is provided in Appendix E.
5.7.4 A Delivery and Servicing Plan (DSP) has been prepared to accompany the planning
application. The DSP accords with the delivery and servicing principles outlined above, and
assist with their implementation.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 27
6 Assessment Methodology and Scope 6.1 Objective
6.1.1 This chapter provides the assessment methodology and scope for consideration of net
development trips. This is the basis of the following Chapters 7 to 10, which deal with future
baseline traffic, application site traffic generation for the existing and proposed site uses,
as well as detailed modelling assessments at junctions on the local road network.
6.2 Assessment Methodology
6.2.1 Pre-application dialogue with LBB highways officers as well as knowledge drawn from
similar Lidl foodstore schemes in Greater London has developed a robust means for
assessing the development proposal's impact on the local road network.
6.2.2 The assessment methodology is summarised as follows:
a) Review the Erith Quarry Redevelopment [14/02155/OUT] Transport Assessment to
determine weekday peak hour baseline traffic flows in a 2022 future year, inclusive of
other committed development traffic on the network (Chapter 7);
b) Undertake 2017 traffic surveys on the local road network to sense check above
weekday traffic flows and to gather Saturday and Sunday data and confirm existing
traffic generation / distribution at the application site (Chapters 7 and 8);
c) Apply growth assumptions to the Saturday and Sunday 2017 traffic data during the Lidl
peaks to provide corresponding 2022 future year assessments for the weekend
(Chapter 7);
d) Review trip rate data for similar operational Lidl foodstores to determine the peak hour
net traffic generation of the development proposals on a Saturday and Sunday, plus
differentiate by new / transferred / linked trips (Chapter 8);
e) Distribute net traffic generation, accounting for transferred / diverted / linked trips as
appropriate to provide total traffic on the local road network post development
implementation in the 2022 assessment year (Chapter 9); and
f) Undertake detailed modelling assessments at junctions on the network comparing the
2022 future year baseline with the 2022 total traffic post development implementation
(Chapter 10).
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 28
6.3 Scope of Network and Time Periods
6.3.1 The assessment scope in terms of junctions and time periods is summarised in Table 6.1
and illustrated on Figure 6.1.
Table 6.1 Assessment Scope (Tabulated)
6.3.2 Junction
Weekday Traditional Peak Hours 6.3.3 Saturday Lidl
Peak Hour (12:00-13:00)
6.3.4 Sunday Lidl Peak Hour
(12:00-13:00) AM
(08:00-09:00) PM
(17:00-18:00)
Junction 1 Madford Trading
Park priority
junction with
Fraser Road
Junction 2 Fraser Road /
Bexley Road Mini-
roundabout
Junction 3 Prospective Erith
Quarry Access
Roundabout (onto
Fraser Road)
Figure 6.1 Assessment Scope
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 29
6.3.5 The inclusion of a Sunday assessment, is very much a sensitivity test of the Saturday Lidl
peak hour assessment. The background and development traffic is less during the Sunday
Lidl peak hour than for the weekday and Saturday peak hours. Whilst for robustness, a
modelling assessment has been undertaken for the Sunday Lidl peak hour at the Madford
Trading Park access, it has not been considered necessary to quantify baseline traffic and
development traffic at other junctions.
6.3.6 In addition to providing hourly flows as per Table 6.1, for the purpose of undertaking
detailed modelling assessments by 'DIRECT' input of turning matrices at 15 minute
intervals (discussed in detail in Chapter 10), traffic flows have been quantified within the
hourly time periods by 15 minute intervals. The methodology for deriving 15 minute flows
in instances where only hourly flows are available is confirmed in the following Chapter 7.
6.4 Summary
6.4.1 A methodology has been established for determining 2022 baseline traffic flows within a
defined scope of junctions and time periods. This provides the framework for quantifying
these flows from the Erith Quarry Redevelopment Transport Assessment and November
2017 traffic surveys commissioned by mode, as detailed in Chapter 7. Trip generation as
well as net traffic distribution and assignment is detailed in Chapters 8 and 9 before testing
the performance of junctions with detailed modelling assessments in Chapter 10.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 30
7 Baseline Traffic Flows 7.1 Objective
7.1.1 This chapter sets out how baseline traffic flows have been sourced from both the Erith
Quarry Transport Assessment and newly commissioned 2017 traffic surveys. The
calculations and assumptions made to derive ‘2022 Baseline’ 15-minute flows within the
scope of junctions and time periods defined in Table 6.1 of Chapter 6 are presented. These
are provided as appended matrices and turning movements on network diagrams.
7.2 Erith Quarry Transport Assessment Traffic Flows
7.2.1 Baseline traffic surveys were undertaken on the local road network in May 2014 for the
Erith Quarry Transport Assessment during AM (07:00-10:00) and PM (16:00-19:00) peak
periods, covering the AM (08:00-09:00) and PM (17:00-18:00) assessment hours
confirmed in Chapter 6. This included through movements at the proposed Erith Quarry
access roundabout location, as well as the Fraser Road / Bexley Road mini-roundabout.
7.2.2 The Erith Quarry Transport Assessment provided ‘2022 Total Traffic’ flows by applying a
TEMPro growth rate to the 2014 traffic surveys and adding the following additional
committed (now implemented) development schemes, plus the Erith Quarry development
traffic:
§ Residential redevelopment of the Bexley College Campus, Tower Road (reference
12/00334/FULM) for 192 residential dwellings; and
§ Relocation of Bexley College to Walnut Tree Road (reference 12/00333/FULM) with a
proposed floor area of 6,843m2.
7.2.3 The Erith Quarry development proposals are currently under construction. Through
dialogue with LBB highways officers, the Erith Quarry ‘2022 Total Traffic’ has been agreed
to be a representative source of baseline traffic data for the weekday assessments, subject
to new traffic data confirming no significant change in flows over and above the Erith Quarry
2014 traffic surveys. This is confirmed in Section 7.4.
7.3 2017 Traffic Surveys
Scope
7.3.1 The scope of traffic surveys was agreed with LBB highways officers prior to their
undertaking in November 2017. The agreed scope of the surveys undertaken is
summarised as follows:
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 31
a) Manual Classified Turning Count (MCTC) at the Madford Trading Park priority junction
with Fraser Road (including existing internal accesses) on:
i. Friday between 07:00 and 10:00;
ii. Saturday between 11:00 and 15:00; and
iii. Sunday between 11:00 and 15:00.
b) MCTCs at the Fraser Road / Bexley Road mini-roundabout on:
i. Friday between 07:00 and 10:00; and
ii. Saturday between 11:00 and 15:00.
c) MCTCs at the Alford Road / Fraser Road, De Luci Road / Fraser Road and Riverdale
Road / Fraser Road priority junctions on Saturday between 11:00 and 15:00.
d) A 24 hour x 7-day Automatic Traffic Count (ATC) on Fraser Road at the site frontage
undertaken to cover the above MCTC time periods.
7.3.2 Full survey data for the MCTCs and ATC is provided in Appendix F.
Implications of Committed Erith Quarry Off-site Highways Works
7.3.3 Physical restrictions will be introduced at the Alford Road / Fraser Road, De Luci Road /
Fraser Road and Riverdale Road / Fraser Road priority junctions as part of the Erith Quarry
off-site highways works package. This would prevent the following manoeuvres currently
available to road users:
§ Right turns onto Fraser Road (N) from Alford Road (and in doing so blocking
manoeuvres between Alford Road and opposing De Luci Road); and
§ Right turns into Riverdale Road from Fraser Road (N), although the majority of these
manoeuvres (unless accessing residential properties on Riverdale Road) are likely to
be transferred to De Luci Road,
7.3.4 As identified within the survey scope, MCTCs have been undertaken at the Alford Road /
Fraser Road, De Luci Road / Fraser Road and Riverdale Road / Fraser Road priority
junctions (prior to the implementation of the physical restrictions). Movements that will be
restricted in the future are assumed to instead re-route via the prospective Erith Quarry
access roundabout for the purpose of assessing this junction.
7.3.5 The above is with the exception of right turns into Riverdale Road from Fraser Road where
the majority of these can instead use De Luci Road. The modest number of movements
associated with access to residential properties on Riverdale Road are assumed to be off-
set by the potential for some of the blocked right turns out of Alford Road to head north to
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 32
Pembroke Road. Overall, the total of movements assumed to be U-turns at the prospective
Erith Quarry access roundabout is a robust allowance.
7.4 2022 Weekday Peak Hour
2017 versus 2014 traffic survey comparison
7.4.1 The 2017 traffic survey data has been compared with the Erith Quarry 2014 traffic survey
data to confirm that the Erith Quarry Transport Assessment ‘2022 Total Traffic’ flows are
representative for the weekday peak hour assessment, as per Section 7.2.
7.4.2 Turning movements at the Fraser Road / Bexley Road mini-roundabout have been
reviewed between 2014 and 2017. This junction is considered to provide the most
appropriate comparison on the following basis:
§ It provides entry and exit movements onto the Fraser Road link;
§ It is the most heavily trafficked junction of the 2017 survey junctions; and
§ It is in close proximity to the more strategic Queens Road (A2016).
7.4.3 The comparison between the 2014 and 2017 turning movements at the Fraser Road /
Bexley Road mini-roundabout is provided in Figure 7.1 in terms of entry and exit
movements at each of the mini-roundabout arms. The negligible number of U-turns have
been deselected for simplicity.
Figure 7.1: Fraser Road / Bexley Road Mini-Roundabout 2014 vs 2017
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 33
7.4.4 Figure 7.1 demonstrates that two-way traffic flows on all arms of the Fraser Road / Bexley
Road mini-roundabout are less in the 2017 traffic surveys than 2014. The 2014 traffic flows
are therefore considered sufficiently robust as a component of the ‘2022 Total Traffic flows’
and adopted 2022 baseline position of this Transport Assessment.
Junction 1 – Madford Trading Park Site Access
7.4.5 In absence of Erith Quarry Transport Assessment ‘2022 Total Traffic’ flows at the Madford
Trading Park access, the 2017 traffic data (Friday) at this junction has been adopted. The
following calculations and assumptions have been applied to this data to establish the ‘2022
Baseline’ 15-minute flows during the AM (08:00-09:00) and PM (17:00-18:00) peak hours:
§ 2017 through movements on Fraser Road (inclusive of the committed development
traffic allowed for in the Erith Quarry Transport Assessment now assumed to be on the
network) have been factored to 2022 using the TEMPRo database (detailed below);
§ Erith Quarry development traffic has been added to the above 2022 through
movements as per the ‘right-out’ and ‘left-in’ movements at the Erith Quarry access
arm of the prospective Erith Quarry roundabout (detailed in subsequent paragraphs);
and
§ 2017 turning movements in and out of the Madford Trading Park access road are
assumed to remain static – i.e. not anticipated to experience direct traffic growth by
2022.
7.4.6 The weekday peak hour TEMPRo growth factors have been calculated on the following
basis, as confirmed in Table 7.2:
§ TEMPRo Version 7.2 with NTM AF15 Dataset; and
§ An average of the ‘Bexley 004 (E0200068)’ and ‘Bexley 005 (E0200069)’ 2011 Census
super output areas (mid-layer).
Table 7.2 TEMPro growth factors (Weekday)
Assessment Period Growth Factor
Weekday AM Network Peak (08:00-09:00) 1.0610
Weekday PM Network Peak (17:00-18:00) 1.0587
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 34
Junction 2 – Fraser Road / Bexley Road Mini-Roundabout
7.4.7 The ‘2022 Baseline’ 15-minute flows during the AM (08:00-09:00) and PM (17:00-18:00)
peak hours at the Fraser Road / Bexley Road mini-roundabout have been sourced from
the Erith Quarry Transport Assessment. This is the sum of the following:
§ ‘2022 Background Flows’ from the ‘DIRECT’ 15-minute turning flow inputs to the
respective AM (08:00-09:00) and PM (17:00-18:00) ARCADY modelling assessments.
The proportion of heavy vehicles has been calculated as per the corresponding hourly
movement proportions (which is the only available source); and
§ ‘Committed Development Flows’ and ‘Development Flows’ from the ‘DIRECT’ 15-
minute turning flow inputs to the respective AM (08:00-09:00) and PM (17:00-18:00)
ARCADY modelling assessments. No heavy vehicles are anticipated in the Erith
Quarry Transport Assessment.
Junction 3 – Prospective Erith Quarry Access Roundabout
7.4.8 The ‘2022 Baseline’ 15-minute flows during the AM (08:00-09:00) peak hour at the
prospective Erith Quarry access roundabout have been sourced from the Erith Quarry
Transport Assessment. This is the sum of the following:
§ ‘2022 Background Flows’ from the ‘DIRECT’ 15-minute turning flow inputs to the AM
(08:00-09:00) ARCADY ‘sensitivity’ modelling assessment. The proportion of heavy
vehicles has been calculated as per the corresponding hourly movement proportions
(which is the only available source); and
§ ‘Committed Development Flows’ and ‘Development Flows’ the ‘DIRECT’ 15-minute
turning flow inputs to the AM (08:00-09:00) ARCADY ‘sensitivity’ modelling
assessment. No heavy vehicles are anticipated in the Erith Quarry Transport
Assessment.
7.4.9 The ‘2022 Baseline’ 15-minute flows during the PM (17:00-18:00) peak hour at the
prospective Erith Quarry access roundabout have been sourced from the Erith Quarry
Transport Assessment. This is the sum of the following:
§ In absence of ‘DIRECT’ 15-minute flows during the PM (17:00-18:00) weekday, the
available light / heavy vehicle ‘2022 Background’ hourly flows have been proportioned
into 15-minute intervals as per the hourly profile of total ‘2022 Background’ traffic
movements at the Fraser Road / Bexley Road mini-roundabout.
§ The committed development and proposed development traffic are demonstrated to
have a flat profile during the PM (17:00-18:00) in the Erith Quarry Transport
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 35
Assessment and therefore have been applied evenly over the PM (17:00-18:00) peak
hour.
7.4.10 U-turns at the prospective Erith Quarry roundabout as a result of the committed Erith
Quarry off-site highways works have been applied as per the assumptions stated earlier in
this chapter.
7.4.11 The 2017 traffic survey data (Saturday) at the Alford Road / Fraser Road, De Luci Road /
Fraser Road priority junctions has been utilised to quantify the U-turns on a Saturday and
converted to AM (08:00-09:00) and PM (17:00-18:00) weekday peak hours through
application of ATC data on Lesney Park Road.
7.4.12 This Lesney Park Road ATC data was submitted within a Transport Assessment
accompanying a planning application for the extension of Christchurch Church of England
Primary School [13/00299/FUL], circa 500m to the south of the Madford Trading Park.
7.4.13 The largely residential nature of Lesney Park Road is considered to provide a suitable
proxy ATC for relating the Saturday data at the Alford Road / Fraser Road, De Luci Road /
Fraser Road and Riverdale Road / Fraser Road priority junctions with a typical AM (08:00-
09:00) and PM (17:00-18:00) weekday peak hour. The ATC flows and relative factors are
summarised in Table 7.3.
Table 7.3 Lesney Park Road ATC
Time Period Two-way traffic flow
Relative to
Friday AM
(08:00-09:00)
Friday PM
(17:00-18:00)
Saturday (12:00-13:00)
Sunday (12:00-13:00)
Friday AM (08:00-
09:00) 123 100% 173% 337% 265%
Friday PM
(17:00-18:00) 71 58% 100% 195% 153%
Saturday (12:00-
13:00) 37 30% 51% 100% 78%
Sunday (12:00-
13:00) 47 38% 65% 127% 100%
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 36
7.5 2022 Saturday Lidl Peak Hour
Junction 1 – Madford Trading Park Site Access
7.5.1 The ‘2022 Baseline’ 15-minute flows during the Saturday Lidl (12:00-13:00) peak hour at
the Madford Trading Park site access has been derived by adopting the 2017 traffic survey
data (Saturday) with the following calculations and assumptions applied:
§ Through movements on Fraser Road (inclusive of the committed development traffic
allowed for in the Erith Quarry Transport Assessment now assumed to be on the
network) have been factored to 2022 using the TEMPRo database (detailed below);
§ Erith Quarry development traffic has been added to the above 2022 through
movements as per the ‘right-out’ and ‘left-in’ movements at the Erith Quarry access
arm of the prospective Erith Quarry roundabout (detailed in subsequent paragraphs);
and
§ 2017 turning movements in and out of the Madford Trading Park access road are
assumed to remain static – i.e. not anticipated to experience direct traffic growth by
2022.
7.5.2 The Saturday Lidl peak hour TEMPRo growth factor has been calculated with the same
assumptions as the weekday, as confirmed in Table 7.4.
Table 7.4 TEMPro growth factor (Saturday)
Assessment Period Growth Factor
Saturday Lidl Peak Hour (12:00-13:00) 1.0598
Junction 2 – Fraser Road / Bexley Road Mini-Roundabout
7.5.3 The ‘2022 Baseline’ 15-minute flows during the Saturday Lidl (12:00-13:00) peak hour at
the Fraser Road / Bexley Road mini-roundabout have been derived by adopting the 2017
traffic survey data (Saturday) with the following calculations and assumptions applied:
§ All turning movements (inclusive of the committed development traffic allowed for in
the Erith Quarry Transport Assessment now assumed to be on the network) have been
factored to 2022 using the TEMPRo growth factor (Saturday) in Table 7.4; and
§ ‘2022 Baseline’ The Erith Quarry development traffic 15-minute flows during the PM
(17:00-18:00) peak hour have been translated to a Saturday by the relative factor in
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 37
Table 7.3. The PM has been adopted on the basis that this may be less affected by
school traffic on the network than if adopting the AM (08:00-09:00) peak hour period.
Junction 3 – Prospective Erith Quarry Access Roundabout
7.5.4 The ‘2022 Baseline’ 15-minute flows during the Saturday Lidl (12:00-13:00) peak hour at
the Fraser Road / Bexley Road mini-roundabout have been derived by adopting the 2017
traffic survey data (Saturday) with the following calculations and assumptions applied:
§ The through movements as per the Alford Road / Fraser Road turning count, factored
to 2022 using the TEMPRo growth factor (Saturday) in Table 7.4; and
§ Erith Quarry access arm flows and U-turns as per the PM (17:00-18:00) peak hour,
translated to a Saturday by the relative factor in Table 7.3. The PM has been adopted
on the basis that this may be less affected by school traffic on the network than if
adopting the AM (08:00-09:00) peak hour period.
7.6 2022 Sunday Lidl Peak Hour
7.6.1 The ‘2022 Baseline Traffic’ for the Sunday Lidl (12:00-13:00) peak hour for the Madford
Trading Park access has been derived in the same manner as the Saturday and
corresponding calculations / assumptions applicable to this junction, albeit with the
following differences:
§ Adopting the Sunday 2017 traffic survey and applying a Sunday TEMPRo growth factor
to the through movements (detailed below); and
§ Sunday Erith Quarry development traffic has been derived by adopting the Sunday
relative factor in Table 7.4.
7.6.2 The Sunday Lidl peak hour TEMPRo growth factor has been calculated with the same
assumptions as the weekday and Saturday, as confirmed in Table 7.5.
Table 7.5 TEMPro growth factors
Assessment Period Growth Factor
Sunday Lidl Peak Hour (12:00-13:00) 1.0582
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 38
7.7 Matrices and Network Diagrams
7.7.1 The above adoption of data between the Erith Quarry Transport Assessment and 2017
traffic surveys comprises the ‘2022 Baseline Traffic’ for the each of the assessed time
periods.
7.7.2 Tabulated turning movements for light and heavy vehicles at the Madford Trading Park
access, Fraser Road / Bexley Road mini-roundabout and prospective Erith Quarry access
roundabout are provided in Appendix G. Turning movements are also presented on
network diagrams.
7.8 Summary
7.8.1 ‘2022 Baseline’ 15-minute traffic flows have been confirmed on the local road network at
the scope of junctions and time periods defined in Table 6.1. This has followed the principle
agreed with LBBC highways officers by adopting the ‘2022 Total Traffic’ in the Erith Quarry
Transport Assessment for the weekday peak hour assessment, whilst applying the 2017
traffic surveys where necessary.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 39
8 Trip Generation 8.1 Introduction
8.1.1 This section confirms the vehicle trip generation for the existing site use, proposed site use
and corresponding net change in vehicle trips anticipated as a result of development
implementation.
8.1.2 Vehicle trips have been quantified for the traditional weekday AM (08:00-09:00) and PM
(17:00-18:00) peak hour periods, as well as for the Saturday (12:00-13:00) and Sunday
(12:00-13:00) periods of peak trip generation at the proposed Lidl foodstore. These align
with the assessment time periods confirmed in Table 6.1 of Chapter 6.
8.2 Existing Site Use
8.2.1 The existing site use comprises five non-food retail units totalling 1,937m2 GIA. Trips
comprise a mix of staff, customers and servicing / deliveries. Customers generate the
greatest level of traffic activity and are a mix of ‘consumer-to-business’ and ‘business-to-
business’ customers (reflective of the current occupiers being predominantly building
supply retailers). The latter can include local tradesmen, accessing the site by van / goods
vehicle.
8.2.2 The MCTC data collected at the site access has quantified existing turning movements at
the existing access onto the Madford Trading Park access road, as well as the junction with
Fraser Road.
8.2.3 Existing traffic generation during the AM (08:00-09:00) and PM (17:00-18:00) peak hour
periods, as well as for the Saturday (12:00-13:00) and Sunday (12:00-13:00) periods of
peak trip generation at the proposed Lidl foodstore are provided in Table 8.1, as per the
MCTC data. Trips have been distinguished between ‘To / From Fraser Road’ and ‘To /
From Wickes’. The latter quantifies existing linked trips between Wickes and the existing
units on the application site. Additional HGVs are denoted with “()”.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 40
Table 8.1: Existing Traffic Generation During Assessment Periods
Assessment Period
To / From Fraser Road To / From Wickes
Arrive Depart Two-way Arrive Depart Two-
way
Weekday AM
Network Peak
(08:00-09:00)
40 (2) 25 (1) 65 (3) 2 0 2
Weekday PM
Network Peak
(17:00-18:00)
14 29 (1) 43 (1) 3 0 3
Saturday Lidl
Peak (12:00-
13:00)
50 (1) 45 (2) 95 (3) 13 6 19
Sunday Lidl Peak
(12:00-13:00) 45 55 100 6 5 11
8.2.4 Table 8.1 demonstrates that the following traffic movements are currently generated at the
application site:
§ 70 two-way vehicle trips during the weekday AM (08:00-09:00) peak hour, comprising
44 arrivals and 26 departures;
§ 47 two-way vehicle trips during the weekday PM (17:00-18:00) peak hour, comprising
17 arrivals and 30 departures;
§ 117 two-way vehicle trips during the Saturday Lidl (12:00-13:00) peak hour, comprising
64 arrivals and 53 departures; and
§ 111 two-way vehicle trips during the Sunday Lidl (12:00-13:00) peak hour, comprising
51 arrivals and 60 departures.
8.2.5 The above quantifies a reasonable level of traffic activity at the application site currently,
including a number of HGVs.
Proposed Site Use
8.2.6 The proposed site use comprises a Lidl foodstore with a 2,111m2 GIA with a 1,405m2 retail
floor area (RFA). Trips will comprise a mix of staff, customers and servicing / deliveries.
Customers generate the greatest level of traffic activity and will tend to visit the store
regularly from the local area.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 41
8.2.7 Lidl foodstores vary from site to site. This is both in terms of their layout, such as parking
provision and floor areas, as well as by location, such as surrounding demographic,
availability of other food retail in the local area and sustainable travel connections.
8.2.8 In order to quantify likely traffic activity at the proposed Lidl foodstore, existing Lidl (and
where applicable other discount foodstores) have been reviewed. Similar stores to the
proposed Lidl foodstore in terms of layout and location have been selected. Traffic
generation data for existing stores has been sourced from both Lidl’s privately held
database, as well as the TRICS database.
8.2.9 Traffic generation of existing stores has been quantified on the basis of trip rates per 100m2
RFA. The ratio between RFA and GIA can vary between stores, due to differences in
operational floor space not directly related to consumer demand – e.g. storage. Whilst it is
possible to quantify trip rates by GIA, RFA has been quantified on the basis that it is a more
reliable comparative measure of customer based trips from store-to-store.
Lidl Database
8.2.10 Lidl’s privately held database covers sites in Greater London. Two sites have been selected
that are considered to most closely share similar layout and location principles as the
development proposals / application site. The two selected sites are summarised in Table 8.2 in terms of location, RFA, parking provision and ratio to RFA, as well as PTAL.
Table 8.2: Selected Lidl Database Sites and Parameters
Location RFA Parking
PTAL Provision Ratio
Streatham Vale, Mitcham (SW16 5HX) 1,642m2 65 1 per 25m2 2
Abbey Wood, Greenwich (SE2 9RQ) 1,811m2 79 1 per 23m2 4
8.2.11 The two sites included in Table 8.2 are considered to provide a good comparison to the
development proposals / application site on the following basis:
§ They are situated in predominantly residential area, away from the centre of major
retail areas (where linked parking / trips may otherwise occur);
§ They are situated on distributor roads, which may experience similar degrees of pas-
by trips and peak at similar time periods (e.g. as part of a commuter trip);
§ Whilst the ratio of parking provision to RFA is lower than that proposed (1 space per
20m2) this may reflect available space on-plot rather than day-to-day demand;
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 42
§ They have similar provision of daytime bus services, which is the most prevalent public
transport mode used by Lidl customers. Whilst the Abbey Wood store has a PTAL
score of 4, this is largely factored by the proximity of Abbey Wood train station being
within the 960m walk of rail services necessary for inclusion in the PTAL score; and
§ The Abbey Wood store is less than 4km from the application site and likely shares a
similar demographic to the application site.
8.2.12 The average vehicle trip rates per 100m2 RFA for the two stores have been obtained from
the database. These exist as Friday and Saturday surveys of the car park / site access.
Friday has been adopted for the weekday peak hour assessments, whilst the profile over
the Saturday has been reviewed to determine the Lidl peak hour for a Saturday. In absence
of Sunday data, the Saturday peak hour trip rates have been adopted as a worst-case for
a Sunday, both of which are summarised as the weekend assessment for development trip
generation purposes.
8.2.13 The weekday and weekend vehicle trip rate per 100m2 RFA profiles at one-hour intervals
between 07:00 and 22:00 are confirmed in Figure 8.1. Full data for both sites is provided
in Appendix H.
Figure 8.1: Weekday and Weekend Trip Rate Profile (Lidl Database Sites)
8.2.14 Figure 8.1 demonstrates that the weekend peak hour period is 12:00-13:00. For the
weekday, trip rates peak at 16:00-17:00. However, they are very similar during 17:00-
18:00, therefore this time period remains the assessed weekday PM peak hour on the basis
of higher traffic flows on the network.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 43
8.2.15 The average vehicle trips rates per 100m2 RFA for the weekday and weekend assessment
peak periods are confirmed in Table 8.3, along with corresponding trip generation for the
proposed RFA of 1,405m2.
Table 8.3: Lidl Database Weekday and Weekend Vehicle Trip Rates and Generation
AM Peak (08:00-09:00) PM Peak (17:00-18:00) Weekend (12:00-13:00)
Arrive Depart Two-way Arrive Depart Two-
way Arrive Depart Two-way
Vehicle
trip rate /
100m2
4.99 3.22 8.32 7.59 6.99 14.58 8.23 7.63 15.86
Vehicle
trips
(1,405m2)
70 47 117 107 98 205 116 107 223
8.2.16 Table 8.3 demonstrates that, if adopting an average of the vehicle trip rates derived from
two comparable Greater London sites in the Lidl database, the following traffic movements
may be generated at the proposed Lidl foodstore:
§ 117 two-way vehicle trips during the weekday AM (08:00-09:00) peak hour, comprising
70 arrivals and 47 departures;
§ 205 two-way vehicle trips during the weekday PM (17:00-18:00) peak hour, comprising
107 arrivals and 98 departures; and
§ 223 two-way vehicle trips during the weekend (12:00-13:00) peak hour, comprising 116
arrivals and 107 departures.
TRICS Database
8.2.17 The TRICS database has also been interrogated for weekday and weekend vehicle trip
rates per 100m2 RFA. The database has been filtered for ‘discount foodstore’ survey sites
on the following basis:
§ Lidl and Aldi stores surveyed in the last 3 years. Both discount foodstores have a similar
model / customer-base and have experienced growth in customer demand prior to this
period;
§ Sites in England only (noting that the TRICS database does not have any Lidl or Aldi
survey sites in Greater London);
§ RFAs exceeding circa 800m2 (only one site has been excluded on this basis); and
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 44
§ No filtering by rationale of parking provision to RFA, on the basis that all but one of the
filtered sites has a parking ratio lower than the development proposals, therefore the
vehicle trip rates are likely to be more robust.
8.2.18 The above filtering of discount foodstore site surveys resulted in 8 survey sites considered
appropriate for further analysis. The survey sites are summarised in Table 8.4 in terms of
TRICS reference, store operator, area of England, RFA and parking.
Table 8.4: Filtered TRICS Site Surveys
Reference Store Area RFA Parking
Provision Ratio
DH-01-C-01 Aldi Durham 953m2 72 1 per 13m2
GM-01-C-10 Aldi Greater Manchester 1,550m2 64 1 per 24m2
NR-01-C-02 Lidl Northamptonshire 1,424m2 105 1 per 14m2
LN-01-C-01 Lidl Lincolnshire 1,424m2 106 1 per 13m2
WO-01-C-01 Lidl Worcestershire 1,424m2 91 1 per 16m2
NT-01-C-01 Lidl Nottinghamshire 1,424m2 164 1 per 9m2
WM-01-C-02 Lidl West Midlands 1,341m2 114 1 per 12m2
WM-01-C-01 Lidl West Midlands 1341m2 95 1 per 14m2
8.2.19 All survey sites have both a weekday and weekend survey, except for DH-01-C-01 and
GM-01-C-10, which have respective weekday and weekend surveys only. The combined
vehicle trip rates per 100m2 RFA for weekdays and weekends have been derived on this
basis. The corresponding trip rates at one-hour intervals between 06:00 and 23:00 are
confirmed in Figure 8.2. Full multimodal TRICS outputs are provided in Appendix I.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 45
Figure 8.2: Weekday and Weekend Trip Rate Profile (TRICS Database)
8.2.20 Figure 8.2 corroborates the weekend peak being at 12:00-13:00 as established from the
Lidl database trip rates. The weekday peak is again 16:00-17:00 but as per the Lidl
database commentary, 17:00-18:00 remains the assessed period. The ratio between
weekday / weekend trip rates is notably greater than with the Lidl database trip rates. This
may reflect the characteristics of when discount foodstores are visited outside of Greater
London, both in terms of time of day and what day of the week is chosen.
8.2.21 The average vehicle trips rates per 100m2 RFA for the weekday and weekend assessment
peak periods are confirmed in Table 8.5, along with corresponding trip generation for the
proposed RFA of 1,405m2.
Table 8.5: TRICS Weekday and Weekend Vehicle Trip Rates and Generation
AM Peak (08:00-09:00) PM Peak (17:00-18:00) Weekend (12:00-13:00)
Arrive Depart Two-way Arrive Depart Two-
way Arrive Depart Two-way
Vehicle
trip rate /
100m2
3.708 2.304 6.012 5.766 5.819 11.585 9.800 10.274 20.074
Vehicle
trips
(1,405m2)
52 32 84 81 82 163 138 144 282
8.2.22 Table 8.3 demonstrates that, if adopting the TRICS vehicle trip rates, the following traffic
movements may be generated at the proposed Lidl foodstore:
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 46
§ 84 two-way vehicle trips during the weekday AM (08:00-09:00) peak hour, comprising
52 arrivals and 32 departures;
§ 163 two-way vehicle trips during the weekday PM (17:00-18:00) peak hour, comprising
81 arrivals and 82 departures; and
§ 282 two-way vehicle trips during the weekend (12:00-13:00) peak hour, comprising 138
arrivals and 144 departures.
Forecast Traffic Generation
8.2.23 The forecast traffic generation of the proposed Lidl foodstore has been estimated as per
the Lidl database and TRICS database. For a weekday, the Lidl database provides a more
robust quantum of traffic movements, whilst for a weekend it is the TRICS database. The
weekday and weekend vehicle trip rates and generation have been adopted for the
assessment on this basis. This is confirmed in Table 8.6, as collated from Tables 8.3 and 8.5.
Table 8.6: Forecast Traffic Generation
AM Peak (08:00-09:00) PM Peak (17:00-18:00) Weekend (12:00-13:00)
Arrive Depart Two-way Arrive Depart Two-
way Arrive Depart Two-way
Vehicle trip
rate / 100m2 4.99 3.22 8.32 7.59 6.99 14.58 9.800
10.27
4
20.07
4
Vehicle trips
(1,405m2) 70 47 117 107 98 205 138 144 282
8.2.24 Table 8.6 demonstrates that the following traffic movements are forecast to be generated
at the proposed Lidl foodstore:
§ 117 two-way vehicle trips during the weekday AM (08:00-09:00) peak hour, comprising
70 arrivals and 47 departures;
§ 205 two-way vehicle trips during the weekday PM (17:00-18:00) peak hour, comprising
107 arrivals and 98 departures; and
§ 282 two-way vehicle trips during the weekend (12:00-13:00) peak hour, comprising 138
arrivals and 144 departures.
8.3 Net Traffic Generation
8.3.1 The net traffic generation at the application site following implementation of the proposed
Lidl foodstore has been quantified. This is the forecast traffic generation (Table 8.6) minus
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 47
the existing traffic generation (Table 8.1, summarised for total movements including
HGVs). This is confirmed for the weekday and weekend assessment periods in Tables 8.7 and 8.8.
Table 8.7: Net Traffic Generation (Weekday)
AM Peak (08:00-09:00) PM Peak (17:00-18:00)
Arrive Depart Two-way Arrive Depart Two-way
Existing 44 26 70 17 30 47
Forecast 70 47 117 107 98 205
Net 26 21 47 90 68 158
Table 8.8: Net Traffic Generation (Weekend)
Saturday Peak (12:00-13:00) Sunday Peak (12:00-13:00)
Arrive Depart Two-way Arrive Depart Two-way
Existing 64 53 117 51 60 111
Forecast 138 144 282 138 144 282
Net 74 91 165 87 84 171
8.3.2 Tables 8.7 and 8.8 demonstrate that the following net change in traffic movements is
expected as a result of the development proposals:
§ An additional 47 two-way vehicle trips during the weekday AM (08:00-09:00) peak hour,
comprising 26 arrivals and 21 departures;
§ An additional 158 two-way vehicle trips during the weekday PM (17:00-18:00) peak
hour, comprising 90 arrivals and 68 departures;
§ 165 two-way vehicle trips during the Saturday (12:00-13:00) peak hour, comprising 74
arrivals and 91 departures; and
§ 171 two-way vehicle trips during the Sunday (12:00-13:00) peak hour, comprising 74
arrivals and 91 departures.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 48
8.4 Development Trip Types
8.4.1 The above net traffic generation is an estimate of what change may be observed in and out
of the Lidl access adjoining the Madford Trading Park access road. However, these are
unlikely to all relate to new traffic movements on the local road network.
8.4.2 The types of trips generated by retail developments are traditionally classified into one of
the following categories:
§ Primary new trip – a single purpose trip that is new to the highway network during the
assessment period;
§ Primary transferred trip – a single purpose trip that was previously undertaken at an
alternative foodstore location and transferred to the proposed site;
§ Linked pass-by trip – a multi-purpose trip that passes the site frontage along Fraser
Road; and
§ Linked diverted trip – a multi-purpose trip that has made a diversion on the local
highway network to visit the site.
8.4.3 The proximity of the development site to major infrastructure will impact on the level of
transferred / pass-by / diverted trips, including railway stations and public transport
interchanges, schools, large residential areas, other commercial areas, existing stores,
competition stores, and major office / workplace areas.
8.4.4 The following observations / rationale are considered likely to influence the types of trips
generated at the proposed Lidl foodstore:
§ The application site is located on Fraser Road (A206), a local distributor road between
Bexley Road and Queens Road (A2016) and residential communities to the west, with
approximately 9,000 two-way traffic movements on an average weekday. This means
Fraser Road is likely to enable a number of existing users of the link to visit the store,
plus offer a reasonable diversion from other major links; and
§ As demonstrated on Figure 4.1 in Chapter 4, three Lidl stores already exist within a
5km radius in addition to a number of competition foodstores. It is likely that a high
proportion of future customers already shop at existing Lidl stores in the area, mainly
to the south and west. These customers are likely to transfer to the proposed Lidl,
should the journey be perceived to be an improvement upon their existing one. A similar
effect may be noticed by existing customers at competitor stores in the area.
8.4.5 On the above basis, a typical 60/40 primary/linked trip split has been applied to the
weekday peak hours and a 70/30 primary/linked trip split is applied to the weekend peak
hours, as per Table 8.8.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 49
Table 8.8: Trip Type Proportions
Trip Type Weekday Weekend
Primary new trip 10% 10%
Primary transferred trip 50% 60%
Linked pass-by trip 20% 15%
Linked diverted trip 20% 15%
Total 100% 100%
8.4.6 Whilst the above has focused on the proposed Lidl store, it is necessary to note that the
existing uses at the site may also have a degree of linking of trips with other trips in the
area. Other than at the site access, removing the existing uses may not simply remove any
linked trips from the network.
8.4.7 On the basis that the existing uses may share similar linked trip and distribution patterns
with the proposed Lidl foodstore, for the purpose of the assessment, only the net traffic
generation have been proportioned into the four trip types. This is confirmed for the
weekday and weekend assessment periods in respective Tables 8.9 and 8.10.
Table 8.9: Net Traffic Generation by Trip Types (Weekday)
AM Peak (08:00-09:00) PM Peak (17:00-18:00)
Arrive Depart Two-way Arrive Depart Two-way
Primary new trip 3 2 5 9 7 16
Primary transferred trip 13 11 24 45 34 79
Linked pass-by-trip 5 4 9 18 14 32
Linked diverted trip 5 4 9 18 14 32
Total 26 21 47 90 68 158
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 50
Table 8.10: Net Traffic Generation by Trip Types (Weekend)
Saturday Peak (12:00-13:00) Sunday Peak (12:00-13:00)
Arrive Depart Two-way Arrive Depart Two-way
Primary new trip 7 9 16 9 8 17
Primary transferred trip 44 55 99 52 50 102
Linked pass-by-trip 11 14 25 13 13 26
Linked diverted trip 11 14 25 13 13 26
Total 74 91 165 87 84 171
8.4.8 Tables 8.9 and 8.10 demonstrate that the development proposals are expected to result
in the following new, net traffic movements on the network, with the remainder already on
the network:
§ 5 two-way vehicle trips during the weekday AM (08:00-09:00) peak hour, comprising 3
arrivals and 2 departures;
§ 16 two-way vehicle trips during the weekday PM (17:00-18:00) peak hour, comprising
9 arrivals and 7 departures; and
§ 16 two-way vehicle trips during the Saturday (12:00-13:00) peak hour, comprising 7
arrivals and 9 departures; and
§ 17 two-way vehicle trips during the Sunday (12:00-13:00) peak hour, comprising 9
arrivals and 8 departures.
8.4.9 The above new trips on the network only represents a modest increase and, in the round,
are expected to have negligible impact on the operation of the network as a whole.
Nevertheless, in order to consider localised impacts as a result of the new trips and any
reassignment of turning movements within the junction assessment scope by way of
transfer / diversion and turning in and out of the site access, this change in turning
movements has been quantified. This is the focus of the following Chapter 9.
8.5 Mode Share
8.5.1 The TRICS site surveys applied for the weekday assessment also include multimodal trip
rates (none available for the selected Greater London sites from the Lidl database). It
should be recognised that these may underestimate the level of sustainable travel given all
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 51
sites are outside of Greater London. However, for illustrative purposes, the average of the
weekday and weekend mode shares from TRICS are illustrated on Figure 8.3.
Figure 8.3: Illustrative TRICS Mode Share
8.6 Summary
8.6.1 Trip generation for the existing and proposed land uses has been quantified in order to
establish net traffic generation expected on the local road network by different trip types.
An illustrative mode share has also been estimated. This has followed an empirical
approach of recording movements associated with the existing operations at the application
site, whilst predicting traffic movements at the proposed land use by analysing Lidl’s
privately held database of traffic activity as well as the TRICS database for robustness.
8.6.2 The net traffic generation by trip types provide the output for distributing and assigning on
the local road network within the scope defined in Chapter 6. This is detailed in Chapter 9, before testing the impact of this net change in traffic movements through provision of
detailed modelling assessments in Chapter 10.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 52
9 Net Traffic Distribution and Assignment 9.1 Objective
9.1.1 This chapter outlines the methodology and assumptions for the distribution and assignment
of net development traffic movements within the assessment scope, by detailing the
approach taken for each of the development trip types.
9.1.2 Net development traffic matrices and network diagrams are provided, which when added
to the corresponding ‘2022 Baseline Flows’ matrices and network diagrams, provide the
‘2022 Baseline + Net Development Flows’ matrices – all of which are the basis for the
junction capacity testing summarised in Chapter 10.
9.2 Distribution and Assignment by Trip Types
9.2.1 The net traffic movements have been distributed and assigned within the junction
assessment scope by the four trip types confirmed in Chapter 8. This has been undertaken
on the following basis:
Primary New Trips
9.2.2 Net primary new trips on the network have been assigned on the following basis, applied
as per data at the various time periods:
§ At the Madford Trading Park access road as per the 2017 traffic survey distribution
from the application site, east / west on Fraser Road;
§ Departures are assumed to return via the route as the arrival, where these would likely
otherwise be pass-by (or other variations of linked trips);
§ All movements to and from the west assigned at the prospective Erith Quarry access
roundabout as per the proportion of ‘2022 Baseline’ turning movements for the
respective time period (which recognises some demand from the committed Erith
Quarry development); and
§ All movements to and from the east assigned at the Fraser Road / Bexley Road mini-
roundabout as per the proportion of 2017 turning movements for the respective time
period.
Primary Transferred Trips
9.2.3 The majority of net primary transferred trips on the network have been assumed to be
redistributed from existing Lidl’s in the west and south, where these are the most closely
located Lidl stores to the application site. A modest number have also been assumed to be
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 53
redistributed from other foodstores, such as a Morrisons supermarket on James Watt Way
to the east.
9.2.4 Some of the existing trips to the above stores may already use Fraser Road and Bexley
Road. For the purpose of this assessment, this is assumed to be 20%. For the remaining
80%, these are assumed to be introduced onto Fraser Road in the following way:
§ 80% to and from the west recognising the majority of transfer from existing Lidl stores,
have all been applied as through movements at the prospective Erith Quarry access
roundabout (none transferred from the Erith Quarry development); and
§ 20% to and from the east, split at the Fraser Road / Bexley Road mini-roundabout as
per the proportion of 2017 turning movements; and
§ Departures are assumed to return via the route as the arrival, where these would likely
otherwise be pass-by (or other variations of linked trips).
Linked Pass-by Trips
9.2.5 Net linked pass-by trips are discounted given they are already exist in the baseline traffic.
However, they are reassigned into the Madford Trading Park access road where they will
change only at this point on the network and continue back along the direction they would
otherwise have been travelling on Fraser Road.
Linked Diverted Trips
9.2.6 Net linked diverted trips relate to where traffic movements will divert from their existing
route down Fraser Road to access the proposed Lidl foodstore. The diversion of trips has
been applied on the following basis:
§ The distribution between east and west on Fraser Road has been quantified as per the
distribution of the existing land uses on the application site from the 2017 traffic survey;
§ All movements to and from the west have been applied as through movements at the
new Erith Quarry access roundabout (none diverted from the Erith Quarry
development);
§ Movements to and from the east have been assumed to already be on Bexley Road.
These movements have been reassigned at the Fraser Road / Bexley Road mini-
roundabout as per the proportion of 2017 turning movements; and
§ For simplicity, departures are assumed to return via the same route as the arrival.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 54
9.3 Net Turning Movements on the Network
9.3.1 Each of the four trip types have been quantified as net development traffic turning
movements within matrices for each of the three assessment junctions, as well as on
network diagrams. These are provided within Appendix J, including a total of net
development traffic turning movements. The matrices provide the net turning movements
at 15-minute intervals on the basis of a flat profile over all time periods.
9.3.2 The total of net turning movements provides the basis for assessing the net development
traffic impact for the junction capacity testing in the following Chapter 10.
9.4 Summary
9.4.1 The net traffic generation has been distributed and assigned on the network as informed
by existing patterns quantified by the November 2017 traffic surveys as well as sensible
assumptions regarding the likely transfer / shift in retail activity in the local area as a result
of implementing a new Lidl foodstore at the application site.
9.4.2 Junction matrices and network diagrams of turning movements for each of the assessed
time periods (weekday peaks, Saturday peak and Sunday peak where applicable) have
been confirmed. These form the basis of the ‘2022 Baseline Flows + Net Development
Traffic’ scenario tested and compared with the ‘2022 Baseline Flows’ scenario in Chapter 10 as part of detailed modelling assessments.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 55
10 Junction Capacity Testing 10.1 Objective
10.1.1 This chapter provides the results of detailed modelling assessments undertaken as per the
assessment scope. This provides a measurement of the development proposals’ net traffic
impact on the local road network in the 2022 assessment year.
10.1.2 TRL’s Junctions 9 software package has been used to prepare a PICADY model of the
Madford Trading Park access. ARCADY models have been prepared for the Fraser Road
/ Bexley Road mini-roundabout and prospective Erith Quarry roundabout.
10.2 Assessment Scenarios
10.2.1 Detailed modelling assessments have been undertaken for the following assessment
scenarios at all junctions:
§ Scenario 1: 2022 Baseline Flows; and
§ Scenario 2: 2022 Baseline Flows + Net Development Traffic.
10.2.2 ‘DIRECT’ 15-minute turning flow matrices of the above scenarios have been inputted into
the corresponding PICADY and ARCADY models, as provided in Appendices F (2022 Baseline) and K (2022 Baseline + Net Development Traffic).
10.2.3 To be consistent with the approach taken within the Erith Quarry Transport Assessment,
an additional 15-minute period either side of the peak hour has been adopted. For
robustness, these are equal to the respective first and last quarter of the relevant peak
hour.
10.3 Assumed Infrastructure
10.3.1 The PICADY and ARCADY models have been prepared to simulate the geometries of the
junctions. The geometries have been measured on the following basis:
§ Unaltered Madford Trading Park access in all scenarios as per topographical survey
data, supplemented with OS mapping for visibility on Fraser Road;
§ Prospective Erith Quarry access roundabout as per detailed design drawings provided
by LBBC highways officers and observations of works implemented on-the-ground; and
§ Existing Fraser Road / Bexley Road mini-roundabout arrangement as per OS mapping.
A sensitivity test of improvement measures put forward in the Erith Quarry Transport
Assessment (measured from included design) has also been undertaken.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 56
10.3.2 Junction geometry drawings inclusive of measurements on the above basis are provided
in Appendix L. It should be noted that some variations are noted between measurements
inputted into models within the Erith Quarry Transport Assessment and this Transport
Assessment. In the majority of instances, the geometries adopted in this Transport
Assessment have greater theoretical delay and are therefore considered more robust.
10.4 Modelling Results
10.4.1 The modelling results of the PICADY and ARCADY models are summarised and appraised
in Tables 10.1 to 10.5 for each of the three assessed junctions. Full outputs are provided
in Appendix M.
Madford Trading Park Site Access
Table 10.1 Madford Trading Park Site Access (Weekday)
Approach AM Peak (08:00-09:00) PM Peak (17:00-18:00)
Queue Delay (s) RFC Queue Delay (s) RFC
2022 Baseline Flows
Left out of access 0.0 5.85 0.02 0.0 5.69 0.02
Right out of access 0.0 7.58 0.02 0.0 7.22 0.01
Right into access 0.0 6.03 0.02 0.0 5.77 0.01
2022 Baseline Flows + Net Development
Left out of access 0.0 5.83 0.02 0.0 5.81 0.04
Right out of access 0.0 6.89 0.02 0.0 7.06 0.02
Right into access 0.0 5.96 0.02 0.0 5.93 0.04
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 57
Table 10.2 Madford Trading Park Site Access (Weekend)
Approach Saturday (12:00-13:00) Sunday (12:00-13:00)
Queue Delay (s) RFC Queue Delay (s) RFC
2022 Baseline Flows
Left out of access 0.0 5.92 0.03 0.0 5.91 0.02
Right out of access 0.0 7.69 0.03 0.0 7.74 0.03
Right into access 0.0 5.89 0.02 0.0 5.88 0.02
2022 Baseline Flows + Net Development
Left out of access 0.1 5.97 0.05 0.0 5.97 0.05
Right out of access 0.0 6.95 0.04 0.0 6.99 0.04
Right into access 0.0 5.98 0.04 0.0 6.02 0.05
10.4.2 Tables 10.1 and 10.2 demonstrate that the Madford Trading Park junction with Fraser
Road is forecast to operate with zero queuing with or without development in the 2022
assessment year during any of the assessed time periods. RFCs are not expected to
exceed 0.04, with drivers limited to a maximum delay of up to 8 secs when completing any
movement.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 58
Fraser Road / Bexley Road Mini-Roundabout
Table 10.3 Fraser Road / Bexley Road Mini-Roundabout (Weekday Existing Arrangement)
Approach
AM Peak (08:00-09:00) PM Peak (17:00-18:00)
Queue Delay (s) RFC Queue Delay
(s) RFC
2022 Baseline Flows
Bexley Road (A206 east) 0.2 3.13 0.15 0.2 3.06 0.19
Bexley Road (A220 west) 0.3 5.52 0.21 0.2 5.33 0.16
Erith Road (A206) 0.2 3.95 0.14 0.1 3.80 0.13
2022 Baseline Flows + Net Development
Bexley Road (A206 east) 0.2 3.13 0.15 0.2 3.06 0.19
Bexley Road (A220 west) 0.3 5.52 0.21 0.2 5.33 0.16
Erith Road (A206) 0.2 3.95 0.14 0.1 3.81 0.13
Table 10.4 Fraser Road / Bexley Road Mini-Roundabout (Weekend Existing Arrangement)
Approach Saturday (12:00 -13:00)
Queue Delay (s) RFC
2022 Baseline Flows
Bexley Road (A206 east) 0.2 2.97 0.16
Bexley Road (A220 west) 0.2 5.10 0.16
Erith Road (A206) 0.1 3.78 0.13
2022 Baseline Flows + Net Development
Bexley Road (A206 east) 0.2 2.97 0.16
Bexley Road (A220 west) 0.2 5.11 0.16
Erith Road (A206) 0.2 3.78 0.13
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 59
10.4.3 Tables 10.3 and 10.4 demonstrate that the existing Fraser Road / Bexley Road mini-
roundabout arrangement is forecast to operate with negligible queuing with or without
development in the 2022 assessment year during any of the assessed time periods. RFCs
are not expected to exceed 0.16, with drivers limited to a maximum delay of up to 6 secs
when completing any movement.
Table 10.5 Fraser Road / Bexley Road Mini-Roundabout (Weekday Proposed Arrangement)
Approach AM Peak (08:00-09:00) PM Peak (17:00-18:00)
Queue Delay(s) RFC Queue Delay(s) RFC
2022 Baseline Flows
Bexley Road (A206 east) 0.2 2.73 0.14 0.2 2.64 0.17
Bexley Road (A220 west) 0.2 4.19 0.17 0.2 4.09 0.13
Erith Road (A206) 0.1 3.17 0.12 0.1 3.06 0.10
2022 Baseline Flows + Net Development
Bexley Road (A206 east) 0.2 2.73 0.14 0.2 2.65 0.17
Bexley Road (A220 west) 0.2 4.19 0.17 0.2 4.09 0.13
Erith Road (A206) 0.1 3.17 0.12 0.1 3.06 0.11
Table 10.6 Fraser Road / Bexley Road Mini-Roundabout (Weekend Proposed Arrangement)
Approach Saturday (12:00-13:00)
Queue Delay(s) RFC
2022 Baseline Flows
Bexley Road (A206 east) 0.2 2.59 0.14
Bexley Road (A220 west) 0.2 3.93 0.13
Erith Road (A206) 0.1 3.04 0.11
2022 Baseline Flows + Net Development
Bexley Road (A206 east) 0.2 2.59 0.14
Bexley Road (A220 west) 0.1 3.93 0.13
Erith Road (A206) 0.1 3.03 0.11
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 60
10.4.4 Tables 10.5 and 10.6 demonstrate that should the proposed works at the Fraser Road /
Bexley Road mini-roundabout be implemented as part of the Erith Quarry Redevelopment
planning consent, this is forecast to operate with negligible queuing with or without
development in the 2022 assessment year during any of the assessed time periods. RFCs
are not expected to exceed 0.14, with drivers limited to a maximum delay of up to 4 secs
when completing any movement. This is a measured improvement upon the existing
arrangement, although the detailed modelling assessment undertaken as part of this
Transport Assessment demonstrates that such works are not necessarily warranted on
capacity grounds.
Prospective Erith Quarry Access Roundabout
Table 10.7 Prospective Erith Quarry Access Roundabout (Weekday)
Approach AM Peak (08:00-09:00) PM Peak (17:00-18:00)
Queue Delay (s) RFC Queue Delay (s) RFC
2022 Baseline Flows
Fraser Road (A206) 0.1 2.80 0.10 0.1 2.92 0.13
Erith Quarry Site 0.2 3.34 0.16 0.0 3.00 0.03
Erith Road (A206) 0.1 2.98 0.13 0.1 2.83 0.10
2022 Baseline Flows + Net Development
Fraser Road (A206) 0.1 2.89 0.10 0.2 2.94 0.14
Erith Quarry Site 0.2 3.35 0.16 0.0 3.01 0.03
Erith Road (A206) 0.1 2.96 0.13 0.1 2.84 0.10
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 61
Table 10.8 Prospective Erith Quarry Access Roundabout (Weekend)
Approach Saturday (12:00-13:00)
Queue Delay (s) RFC
2022 Baseline Flows
Fraser Road (A206) 0.1 2.78 0.09
Erith Quarry Site 0.0 2.89 0.01
Erith Road (A206) 0.1 2.83 0.10
2022 Baseline Flows + Net Development
Fraser Road (A206) 0.1 2.79 0.10
Erith Quarry Site 0.0 2.90 0.01
Erith Road (A206) 0.1 2.86 0.11
10.4.5 Tables 10.7 and 10.8 demonstrate that the prospective Erith Quarry roundabout is forecast
to operate with negligible queuing with or without development in the 2022 assessment
year during any of the assessed time periods. RFCs are not expected to exceed 0.16, with
drivers limited to a maximum delay of up to 4 secs when completing any movement.
10.5 Summary
10.5.1 The detailed modelling assessments undertaken and outline in this chapter in terms of
methodology, scenarios and ARCADY / PICADY summary results demonstrate that the
forecast net traffic impact following development implementation is not expected to result
in any material worsening of capacity performance of the tested junctions in the 2022
assessment year. On this basis, the development proposals are considered to likely have
an immaterial on the operation of the local road network.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 62
11 Personal Injury Collision Analysis Objective
11.1.1 Personal Injury Collision (PIC) data has been obtained from LBB for the period between
August 2014 and September 2017. The full details of the PIC including the study area
(which extends from Pembroke Road to the north west along the extent of Fraser road to
the Bexley Mini roundabout to the east), along with the severity and location of the PICs
are as attached within Appendix N.
Review and Analysis
11.1.2 In summary, there have been a total of eight PICs during the search period, of which all
eight were classified as ‘slight’ in severity.
11.1.3 The eight PICs have been collated by severity, nearest junction and number of involved
sensitive road users (pedestrians and cyclists), as quantified in Table 11.1 and
subsequently summarised.
Table 11.1 Summary of PIA Data
Junction Severity Sensitive Users
Slight Serious Fatal Pedestrians
Cyclists
Fraser Road (A206) / Riverdale Road 1 0 0 0 0
Fraser Road (A206)/ Pembroke Road 1 0 0 0 0
Fraser Road (A206) / Bexley Road (A220) 1 0 0 0 0
Fraser Road (A206) / Alford Road
1 0 0 0 0
Fraser Road (A206) / Alford Road
1 0 0 0 0
Fraser Road (A206) / Horton Place
1 0 0 1 0
Fraser Road (A206) / Birch Walk
1 0 0 1 0
Fraser Road (A206) / Bexley Road (A220) 1 0 0 0 0
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 63
Fraser Road (A206) / Riverdale Road
11.1.4 A single PIC occurred at the Fraser Road (A206) / Riverdale Road junction, with accident
ref. 0115RY10088 (classified as slight). This occurred in March 2015 and involved a
collision with a slow-moving vehicle turning into Riverdale Road with a vehicle that was
deemed to be traveling too fast and failed to stop. The PIC was not attributable to the
geometry or layout of the existing highway network. There have been no recorded PICs
within this area since March 2015 and no mitigation measures would be warranted or
exacerbation of existing shortfalls by the development proposals be expected.
Fraser Road (A206) / Pembroke Road
11.1.5 A PIC occurred at the junction between Fraser Road (A206) / Pembroke Road, with
accident ref. 0116RY10257 (classified as slight). This occurred in July 2016 and involved
a rear end collision with a slow-moving vehicle on the approach to the junction with
Pembroke Road. The PIC was not attributable to the geometry or layout of the existing
highway network. There have been no recorded PICs within this area since July 2016 and
no mitigation works would be warranted or exacerbation of existing shortfalls by the
development proposals be expected.
Fraser Road (A206) / Bexley Road (A220)
11.1.6 A total of two PICs occurred at the A206/A220 roundabout junction, with accident ref.
0114RY10332 (classified as slight) and accident ref. 0114RY10325 (classified as slight).
11.1.7 PIC ref. 0114RY10325 occurred in August 2014 and involved a vehicle failing to give way
and hitting the side of another vehicle. Accident ref. 0114RY10332 occurred in August 2014
and involved a vehicle driving too fast, losing control and hitting a parked vehicle.
11.1.8 The causes of the two PICs were not attributable to the geometry or layout of the existing
highway network. There have been no recorded PICs within this area since July 2016 and
no mitigation works would be warranted or exacerbation of existing shortfalls by the
development proposals be expected.
Fraser Road (A206) / Alford Road
11.1.9 A total of two PICS occurred at the Fraser Road (A206) / Alford Road junction, with accident
ref. 0114RY10452 (classified as slight) and accident ref. 0115RY10375 (classified as
slight).
11.1.10 PIC ref. 0114RY10452 occurred in November 2014 and involved a learner driver losing
control and colliding with a shop front window. Accident ref. 0115RY10375 occurred in
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 64
September 2015 as a result of a vehicle performing an aggressive U-turn without looking
and colliding with an oncoming vehicle.
11.1.11 The causes of the two PICs were not attributable to the geometry or layout of the existing
highway network. There have been no recorded PICs within this area since November
2014 and no mitigation works would be warranted or exacerbation of existing shortfalls by
the development proposals be expected.
Fraser Road (A206) / Horton Place
11.1.12 A single PIC occurred at the Fraser Road (A206) / Horton Place junction, with accident ref.
0115RY10439 (classified as slight). This occurred in November 2015 and involved a
pedestrian walking into the road without looking and being struck by an oncoming vehicle.
The cause of the PIC was not attributable to the geometry or layout of the existing highway
network. There have been no recoded PICs within this area since September 2015 and
no mitigation works would be warranted or exacerbation of existing shortfalls by the
development proposals be expected.
Fraser Road (A206) / Birch Walk
11.1.13 A single PIC occurred at the Fraser Road (A206) / Birch Walk junction, with accident Ref.
01160023961 (classified as slight). This occurred in October 2016 and involved a
pedestrian crossing the road (not on a crossing) and being struck by an oncoming vehicle
which failed to see the pedestrian. The cause of the PIC was not attributable to the
geometry or layout of the existing highway network. There have been no recoded PICs
within this area since September 2015 and no mitigation works would be warranted or
exacerbation of existing shortfalls by the development proposals be expected.
Summary
11.1.14 The review and analysis of the PIC data on the local highway network indicates that there
no specific highway safety concern that would warrant mitigation as in response to the
measured transport impact of the development proposals. It should also be clarified that
there have been no recorded PICs in and around the Madford Trading Park junction with
Fraser Road for the duration of the search period, where some increased traffic and
pedestrian activity is expected following development implementation.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 65
12 Conclusions and Recommendation 12.1 Conclusions
12.1.1 This Transport Assessment has provided detail on the transport matters considered
necessary for consideration in association with the proposed redevelopment of retail land
uses at the application site with a Lidl foodstore. This report concludes the following:
§ There is already a reasonable level of traffic activity, including servicing operations at
the application site. The principle of the access arrangements would be retained, albeit
an existing servicing egress onto Birch Walk stopped up (which may benefit highway
safety);
§ The application site is well located in terms of access by sustainable travel connections
to serve the proposed food retail land use and associated site users. Whilst the PTAL
score is 2, this doesn’t necessarily reflect the available train services. In any event the
available bus services and ability to walk to the site from nearby residential areas are
of greater value and make it likely that customers and staff will have every opportunity
to travel sustainably to and from the proposed development, reducing reliance on the
private car;
§ The proposed site layout allows for access to the site by vehicles (including servicing),
walking and cycling. The proposed car and cycle parking provision reflects the current
London Plan standards and suitable provision will be made for electric vehicle charging
and accessible parking;
§ Trip generation for the existing and proposed land uses has been quantified through
application of empirical data derived from both traffic surveys of the existing operations,
as well as trip rate data from a privately held Lidl database and the TRICS database
for robustness. The net traffic generation has been quantified on this basis and
differentiated by trip type, before distributing and assigning on the local road network
by applying existing traffic pattern assumptions and sensible transfer / retail shift
assumptions.
§ The performance of local junctions has been tested through undertaking of detailed
modelling assessments using ARCADY and PICADY. This has demonstrated that with
or without development in the 2022 assessment year, no material impact is forecast in
terms of junction capacity.
§ Personal Injury Collision (PIC) data has been collected for the surrounding local road
network. No PIC trends have been identified that would warrant mitigation in light of
transport impacts expected following development implementation.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 66
12.2 Recommendation
12.2.1 In the round of the conclusions and no transport implications being identified as in
appropriate in a planning, highway capacity or safety context, this Transport Assessment
recommends that the planning application be considered acceptable by LBB and any
interested consultees / stakeholders.
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 67
Appendix A Site Layout Plan
PROJECT
4th Floor, Greyfriars HouseGreyfriars Road, Cardiff CF10 3AL
Tel: 029 2055 8900 Fax: 029 2039 9592www.boyesrees.co.uk
Registered office. As above RegNo. 295 1683 ( England & Wales )
ORIGIN. VOLUME LEVEL TYPE DISCIP. NUMBER
SUITABILITY: REVISION:
JOB NO:
DRAWN BY:
DATE:
SCALE:
DRAWING TITLE:
PROJECT TITLE:
IN CASE OF DOUBT OR DISCREPANCIES PLEASE REFER TO ARCHITECT FOR INSTRUCTIONS.DRAWING AND SUITABILITY NUMBERS IN ACCORDANCE WITH BS1192:2007.THIS DRAWING SHOULD NOT BE SCALED.THIS DRAWING IS COPYRIGHT.
SUITABILITY NUMBER KEY:WIP
S0 - Work in Progress*SHARED
S1 - Fit for co-ordination**S2 - Fit for informationS3 - Fit for internal review and commentS4 - Fit for construction approval
DOCUMENTATIOND1 - Fit for costingD2 - Fit for tenderD3 - Fit for contractor designD4 - Fit for manufacture/ procurement
DOCUMENTATION - SIGN-OFFA - Fit for constructionB - Fit for construction, with commentsC - Comprehensive revisions needed
ARCHIVEAB - As BuiltFC - Final Construction
* For internal pre-issue usage only.** For model file usage only.
DESCRIPTIONDATEREV BY
clients logo
Proposed Lidl store atAtlas Trade Park,Fraser RoadErithKent
Proposed Site PlanOption 2: 111 Car Parking Spaces
WW 1:500 @ A3
JUN 20175508
S0 18
012010ADR00V01BR5508
Land protected by TPOs indicated WW15.07.1511
KEY
Land protected by TPO's
Part of development sitewithin TPO area
Tree proposedto be removed
9 nos. proposedreplacement trees
Store layouts updated to latest specifications AW06.03.1712Amended to client's comments AW21.03.1713Amended to client's comments AW23.03.1714
1:5000 50m25m
Amended to client's comments AW23.05.1715Amended to client's comments RB02.06.1716Site area revised AW27.07.1717Ownership area information added AW28.07.1718
Possible re
locatio
n of
substa
tion if
require
d
9218
1015
0
LAND PROTECTED B
Y TPO'S
LAND PROTECTED
BY TPO'S
PLANT
AREA
Totem
Signage
8060
2500
8500
Total Exte
rnal P
arking
111 Space
s
16
29
1200 10
96
01
11
86
9293
95
17
9000
1200
6000
5000
5000
500025
00
2500
09
30
39
40
98
99
103
109
111
5000
5000
3600
3600
5000
2500
5000
2500
5000
6795
6210
7660
87
Lidl
Signage
Foods refrig
eratio
n dry
cooler m
ounted upon
plinth w
ith se
cure
d
enclosu
re.
Heat pump units
Approx s
ize:
1900x1000x2
300H
VRF outdoor unit
mounted upon
PLA-ROCK beare
rs
Approx s
ize:
1350x720x1
690
Lobby
���Pð
Cus.
WC
���Pð
Cash
Room
���Pð
Sales Are
a
�����P
ð
Chiller
���Pð
Freeze
r
���Pð
Ware
house
����Pð
Welfare
���Pð
Utilitie
s
���Pð
Prep B
akery
���Pð
Office
��Pð
64000
2135
0
Development site boundary
Site Owned by UK Power Networks
Land within ownership(Not suitable for development)
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 68
Appendix B TFL Bus Spider Diagram
Route finderBus route Towards Bus stops
99 Bexleyheath � � � �
Woolwich � � �
229 Sidcup � � �
Thamesmead � � � � �
428 Bluewater �
469 Woolwich Common � � �
B12 Joydens Wood � H&R1
Night busesBus route Towards Bus stops
N89 Trafalgar Square �
Route B12 operates as Hail and Ride on the sections of roads marked H&R1 on the map. Buses stop at any safe point along the road. There are no bus stops at these locations, but please indicate clearly to the driver when you wish to board or alight.
River Thames
South RoadLarner Road
Manor RoadAperfield Road
Manor RoadBilton Road
Northend RoadPeareswood Road
Northend RoadColyers Lane
Hazel RoadBridge RoadSlade Green Road
Slade GreenForest Road
Bridge RoadNorthend Road
Forest RoadBridge Road
Bridge RoadWhitehall Lane
(not N89)
Bridge Road0DVHÀHOG�&ORVH
Whitehall LaneDale View
Howbury LaneLincoln Road
Thames RoadPerry Street
Parkside AvenuePerry Street
Parkside AvenueEversley Cross
Parkside AvenueParkside Cross Thames Road
Shearwood Crescent
Thames RoadKennet Road
Slade GreenWhitehall Lane
Crayford Way
West Hill
CrayfordTown Hall
Dartford BluewaterShopping Centre
Darent ValleyHospital
Slade Green RoadManor Road
Slade Green RoadGrange Way
Northall RoadManor Way
BarnehurstNorthall Road
BexleyheathShopping Centre
Mayplace Road East
Bexley RoadLesney Park
Bexley RoadCarlton Road
Bexley RoadNorthumberland Park
NorthumberlandHeath
Erith RoadBrook Street
Erith RoadRydal Drive
BarnehurstErith Road
BexleyheathBus Garage
Gravel Hill
BexleyLibrary
Baldwyns Park
Joydens Wood
SummerhouseDrive
Leyton Cross
Bexley Park
Birchwood RoadBexleyHurst RoadSidcupSidcupPolice Station
SidcupQueen MaryOs Hospital
West StreetMaxim Road/The Ship
West StreetSt. Francis Road
Lower RoadChurch Manorway
Lower RoadMayfield Road
Lower RoadPoplar Mount
Lower RoadHalt Robin LaneThe Barge Pole
Abbey EstateSewell Road
Abbey EstateSt. PaulOs Academy
Woolwich CommonQueen Elizabeth Hospital
Belvedere
Abbey Road
Abbey Wood
ThamesmeadBoiler House
ThamesmeadCrossway
ThamesmeadTown Centre
Church Manor Way
PlumsteadHigh Street
Plumstead
Avenue RoadLesney Park
Colyers LaneColyers Walk
Colyers LaneNorthumberland Way
Colyers LaneHurst Road
Colyers LaneMrytle Road
Erith HospitalCarlton RoadSilver Spring Close
Parsonage Manorway
Bedonwell RoadHythe Avenue
Long LaneBelvedere Road
Welling Corner
Welling
continues toTrafalgar Squarefor Charing Cross Pickford Lane
Bexleyheath
Crook Log
Hail & Ride s
ectio
n
Hail & Ride s
ectio
n
Fraser RoadEuropa Trading Estate
Fraser RoadBirch Walk
Fraser RoadAlford Road
Erith RoadTrinity School
Erith RoadErith Fire Station
Erith RoadBrook Street
Erith RoadNuxley Road
Upper BelvedereEardley Arms
Bostall HeathPlumstead Corner
Bostall HillWoolwich
Road
Woolwich Town Centrefor Woolwich Arsenal
Hai
l & R
ide
sect
ion
WOOLWICH
ABBEY WOOD
THAMESMEAD
PLUMSTEAD
BEXLEYHEATH
SIDCUP
CRAYFORD
DARTFORD
SLADE GREEN
428
99
B12B12229
229
469
99
N89
The yellow tinted area includes everybus stop up to about one-and-a-half miles from Erith. Main stops are shownin the white area outside.
Between Dartford and Bluewater, routestops only at Darent Valley Hospital
Until about 1200, routeruns clockwise around the loop.After 1200, it runs anti clockwise
428
RIVER THAMESRiversideGardens
VICT
ORI
A R
OA
D
BEXLEY ROADFRASER ROAD
BEXLEY ROAD
MANOR ROAD
QUEEN’S ROAD
ERITH HIGH STREET
WEST ST
COLEBROOKSTREET
WA
LNU
T TR
EE R
OA
D
PARK CRESCENT
CROS
S ST
CLOSE
WHARFSIDE CLOSE
JAMES WATT
WAYERIT
HHI
GHST
REET
CRES
CENT ROAD
BRONZE AGE WAY
STONEWOOD
ROAD
CHRISTCHURCH AVENUE
GLEBE WAY
PARK CRESCENT
CRICKETERS CLOSEP IER ROAD
QUEEN STREE T
SALT
FORD
Erith
RiversideShopping Centre
PostOfÀce
Museum
Police Library
Superstore
Town Hall
H&R1
© Transport for London TFL 32034.12.16 (T) Information correct from August 2016
Buses from Erith
Hail &Ride
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 69
Appendix C PTAL Outputs
Copyright TfL 20171 / 2
Map key - PTAL
0 (W ors t) 1a 1b 2 3 4 5 6a 6b (Bes t)
Map layers
PTAL (cel l s ize: 100m)
DA8 1QJ
Fraser Rd, Erith DA8 1QJ, UK
Easting: 550845, Northing: 178028
Grid Cell: 68770
Report generated: 04/09/2017
Calculation Parameters
Day of Week M-F
Time Period AM Peak
Walk Speed 4.8 kph
Bus Node Max. Walk Access Time (mins) 8
Bus Reliability Factor 2.0
LU Station Max. Walk Access Time (mins) 12
LU Reliability Factor 0.75
National Rail Station Max. Walk Access Time (mins) 12
National Rail Reliability Factor 0.75
TRANSPORT
FOR LONDON
PTAL output for Base Year
3
Copyright TfL 20172 / 2
Calculation data
Mode Stop Route Distance (metres) Frequency (vph) Walk Time (mins) SWT (mins) TAT (mins) EDF Weight AI
Total Grid Cell AI: 11.67
Bus ERITH BEXLEY ROAD 428 617.94 4 7.72 9.5 17.22 1.74 0.5 0.87
Bus WALNUT TREE RD BEXLEY
RD
469 572.63 4 7.16 9.5 16.66 1.8 0.5 0.9
Bus BEXLEY ROAD FRASER ROAD 229 361 6 4.51 7 11.51 2.61 0.5 1.3
Bus FRASER ROAD GYM CENTRE 99 101.33 5 1.27 8 9.27 3.24 1 3.24
Bus VICTORIA ROAD BEXLEY RD B12 432.4 3 5.41 12 17.41 1.72 0.5 0.86
Rail Erith 'DARTFD-CANONST 2B07 ' 700.84 2.33 8.76 13.63 22.39 1.34 1 1.34
Rail Erith 'SLADEGN-CANONST 2B29' 700.84 0.33 8.76 91.66 100.42 0.3 0.5 0.15
Rail Erith 'CANONST-DARTFD 2E11 ' 700.84 2 8.76 15.75 24.51 1.22 0.5 0.61
Rail Erith 'CANONST-SLADEGN 2E25' 700.84 1.67 8.76 18.71 27.47 1.09 0.5 0.55
Rail Erith 'CANONST-BRNHRST 2E27' 700.84 0.33 8.76 91.66 100.42 0.3 0.5 0.15
Rail Erith 'CANONST-CANONST 2I13' 700.84 0.33 8.76 91.66 100.42 0.3 0.5 0.15
Rail Erith 'CANONST-CANONST 2I15' 700.84 1.33 8.76 23.31 32.07 0.94 0.5 0.47
Rail Erith 'CANONST-CANONST
2O19'
700.84 1.33 8.76 23.31 32.07 0.94 0.5 0.47
Rail Erith 'SLADEGN-CHRX 2B14 ' 700.84 2 8.76 15.75 24.51 1.22 0.5 0.61
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 70
Appendix D TIM Outputs
Copyright TfL 20171 / 2
Map key - Travel Time
< 15 mins 15 - 30 mins 30 - 45 mins 45 - 60 mins 60 - 75 mins 75 - 90 mins 90 - 105 mins 105 - 120 mins 120 - 135 mins 135 - 150 mins
Map layers
T ravel T imes
Scenario: Base Year Mode: All public transport modes, Time of day: PM peak, Direction: From location
DA8 1QJ
Fraser Rd, Erith DA8 1QJ, UK
Easting: 550845, Northing: 178028
Report generated: 04/09/2017
Population and employment: GLA forecas ts 2016
Tow n Centres : GLA 2016
Education: EduBase 2016
Health: NHS Direc t, CQC 2016
Code: NT087P05A
TRANSPORT
FOR LONDON
TIM output for Base Year
Copyright TfL 20172 / 2
Catchment data for your current selection
Population - Total: London 2011
Total: London (2011) 8,217,475
Employment - Jobs: London 2011
Jobs: London (2011) 4,895,753
Town centres - Metropolitan, major and district: London
Metropolitan, major and district: London - 191
Health services - GP Surgeries: London
GP Surgeries: London - 1,454
Education establishments - Primary schools: London
Primary schools: London - 2,663
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
6,937
72,932
303,240
639,949
1,714,622
3,964,237
6,239,363
7,871,689
8,215,829
8,216,235T
rave
l Tim
e (m
ins)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
3,509
25,424
91,201
414,276
1,834,722
3,170,363
4,079,220
4,688,576
4,883,608
4,895,013
Tra
vel T
ime
(min
s)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
1
2
7
21
46
101
156
190
191
191
Tra
vel T
ime
(min
s)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
2
12
45
105
291
703
1,108
1,400
1,453
1,453
Tra
vel T
ime
(min
s)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
3
37
127
238
585
1,295
2,012
2,509
2,663
2,663
Tra
vel T
ime
(min
s)
Copyright TfL 20171 / 2
Map key - Travel Time
< 15 mins 15 - 30 mins 30 - 45 mins 45 - 60 mins 60 - 75 mins 75 - 90 mins 90 - 105 mins 105 - 120 mins 120 - 135 mins 135 - 150 mins
Map layers
T ravel T imes
Scenario: Base Year Mode: All public transport modes, Time of day: Between peak times, Direction: From location
DA8 1QJ
Fraser Rd, Erith DA8 1QJ, UK
Easting: 550845, Northing: 178028
Report generated: 04/09/2017
Population and employment: GLA forecas ts 2016
Tow n Centres : GLA 2016
Education: EduBase 2016
Health: NHS Direc t, CQC 2016
Code: NT096I05A
TRANSPORT
FOR LONDON
TIM output for Base Year
Copyright TfL 20172 / 2
Catchment data for your current selection
Population - Total: London 2011
Total: London (2011) 8,217,475
Employment - Jobs: London 2011
Jobs: London (2011) 4,895,753
Town centres - Metropolitan, major and district: London
Metropolitan, major and district: London - 191
Health services - GP Surgeries: London
GP Surgeries: London - 1,454
Education establishments - Primary schools: London
Primary schools: London - 2,663
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
6,937
75,346
308,770
655,129
1,791,902
4,129,674
6,439,440
7,951,423
8,216,233
8,216,235T
rave
l Tim
e (m
ins)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
3,509
22,353
94,717
544,404
2,141,854
3,270,290
4,153,053
4,709,194
4,894,833
4,895,013
Tra
vel T
ime
(min
s)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
1
1
7
21
45
105
163
190
191
191
Tra
vel T
ime
(min
s)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
2
12
47
107
307
738
1,156
1,411
1,453
1,453
Tra
vel T
ime
(min
s)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
3
40
128
240
609
1,330
2,071
2,554
2,663
2,663
Tra
vel T
ime
(min
s)
Copyright TfL 20171 / 2
Map key - Travel Time
< 15 mins 15 - 30 mins 30 - 45 mins 45 - 60 mins 60 - 75 mins 75 - 90 mins 90 - 105 mins 105 - 120 mins 120 - 135 mins 135 - 150 mins
Map layers
T ravel T imes
Scenario: Base Year Mode: All public transport modes, Time of day: AM peak, Direction: From location
DA8 1QJ
Fraser Rd, Erith DA8 1QJ, UK
Easting: 550845, Northing: 178028
Report generated: 04/09/2017
Population and employment: GLA forecas ts 2016
Tow n Centres : GLA 2016
Education: EduBase 2016
Health: NHS Direc t, CQC 2016
Code: NT086A05A
TRANSPORT
FOR LONDON
TIM output for Base Year
Copyright TfL 20172 / 2
Catchment data for your current selection
Population - Total: London 2011
Total: London (2011) 8,217,475
Employment - Jobs: London 2011
Jobs: London (2011) 4,895,753
Town centres - Metropolitan, major and district: London
Metropolitan, major and district: London - 191
Health services - GP Surgeries: London
GP Surgeries: London - 1,454
Education establishments - Primary schools: London
Primary schools: London - 2,663
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
6,937
70,926
299,059
640,941
1,760,776
3,988,756
6,316,530
7,883,004
8,205,587
8,216,235T
rave
l Tim
e (m
ins)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
3,509
21,703
91,491
518,434
2,133,265
3,218,565
4,105,109
4,693,531
4,879,271
4,895,013
Tra
vel T
ime
(min
s)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
1
1
7
19
44
103
159
190
191
191
Tra
vel T
ime
(min
s)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
2
11
45
104
305
709
1,134
1,405
1,452
1,453
Tra
vel T
ime
(min
s)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
3
37
122
240
587
1,274
2,015
2,535
2,659
2,663
Tra
vel T
ime
(min
s)
Copyright TfL 20171 / 2
Map key - Travel Time
< 15 mins 15 - 30 mins 30 - 45 mins 45 - 60 mins 60 - 75 mins 75 - 90 mins 90 - 105 mins 105 - 120 mins 120 - 135 mins 135 - 150 mins
Map layers
T ravel T imes
Scenario: Base Year Mode: All public transport modes, Time of day: AM peak, Direction: To location
DA8 1QJ
Fraser Rd, Erith DA8 1QJ, UK
Easting: 550845, Northing: 178028
Report generated: 04/09/2017
Population and employment: GLA forecas ts 2016
Tow n Centres : GLA 2016
Education: EduBase 2016
Health: NHS Direc t, CQC 2016
Code: NT086A05A
TRANSPORT
FOR LONDON
TIM output for Base Year
Copyright TfL 20172 / 2
Catchment data for your current selection
Population - Total: London 2011
Total: London (2011) 8,217,475
Employment - Jobs: London 2011
Jobs: London (2011) 4,895,753
Town centres - Metropolitan, major and district: London
Metropolitan, major and district: London - 191
Health services - GP Surgeries: London
GP Surgeries: London - 1,454
Education establishments - Primary schools: London
Primary schools: London - 2,663
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
6,937
72,932
287,990
670,731
1,723,201
3,893,729
6,264,882
7,804,668
8,206,462
8,216,235T
rave
l Tim
e (m
ins)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
3,509
25,424
88,506
533,399
2,092,673
3,168,439
4,097,555
4,665,551
4,857,170
4,895,013
Tra
vel T
ime
(min
s)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
1
2
7
22
42
100
157
190
191
191
Tra
vel T
ime
(min
s)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
2
12
44
106
296
698
1,111
1,395
1,453
1,453
Tra
vel T
ime
(min
s)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
3
37
117
247
575
1,255
1,996
2,499
2,657
2,663
Tra
vel T
ime
(min
s)
Copyright TfL 20171 / 2
Map key - Travel Time
< 15 mins 15 - 30 mins 30 - 45 mins 45 - 60 mins 60 - 75 mins 75 - 90 mins 90 - 105 mins 105 - 120 mins 120 - 135 mins 135 - 150 mins
Map layers
T ravel T imes
Scenario: Base Year Mode: All public transport modes, Time of day: PM peak, Direction: To location
DA8 1QJ
Fraser Rd, Erith DA8 1QJ, UK
Easting: 550845, Northing: 178028
Report generated: 04/09/2017
Population and employment: GLA forecas ts 2016
Tow n Centres : GLA 2016
Education: EduBase 2016
Health: NHS Direc t, CQC 2016
Code: NT087P05A
TRANSPORT
FOR LONDON
TIM output for Base Year
Copyright TfL 20172 / 2
Catchment data for your current selection
Population - Total: London 2011
Total: London (2011) 8,217,475
Employment - Jobs: London 2011
Jobs: London (2011) 4,895,753
Town centres - Metropolitan, major and district: London
Metropolitan, major and district: London - 191
Health services - GP Surgeries: London
GP Surgeries: London - 1,454
Education establishments - Primary schools: London
Primary schools: London - 2,663
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
6,937
85,948
301,091
703,300
1,812,109
4,008,427
6,243,930
7,822,956
8,211,756
8,216,235T
rave
l Tim
e (m
ins)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
3,509
27,932
91,065
474,433
2,010,919
3,203,154
4,071,280
4,658,170
4,870,622
4,895,013
Tra
vel T
ime
(min
s)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
1
2
7
22
47
101
155
190
191
191
Tra
vel T
ime
(min
s)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
2
14
45
116
308
711
1,106
1,397
1,453
1,453
Tra
vel T
ime
(min
s)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
3
44
122
258
610
1,294
1,999
2,496
2,661
2,663
Tra
vel T
ime
(min
s)
Copyright TfL 20171 / 2
Map key - Travel Time
< 15 mins 15 - 30 mins 30 - 45 mins 45 - 60 mins 60 - 75 mins 75 - 90 mins 90 - 105 mins 105 - 120 mins 120 - 135 mins 135 - 150 mins
Map layers
T ravel T imes
Scenario: Base Year Mode: All public transport modes, Time of day: Between peak times, Direction: To location
DA8 1QJ
Fraser Rd, Erith DA8 1QJ, UK
Easting: 550845, Northing: 178028
Report generated: 04/09/2017
Population and employment: GLA forecas ts 2016
Tow n Centres : GLA 2016
Education: EduBase 2016
Health: NHS Direc t, CQC 2016
Code: NT096I05A
TRANSPORT
FOR LONDON
TIM output for Base Year
Copyright TfL 20172 / 2
Catchment data for your current selection
Population - Total: London 2011
Total: London (2011) 8,217,475
Employment - Jobs: London 2011
Jobs: London (2011) 4,895,753
Town centres - Metropolitan, major and district: London
Metropolitan, major and district: London - 191
Health services - GP Surgeries: London
GP Surgeries: London - 1,454
Education establishments - Primary schools: London
Primary schools: London - 2,663
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
6,937
100,357
328,913
741,566
2,001,982
4,321,509
6,553,047
7,901,418
8,215,954
8,216,235T
rave
l Tim
e (m
ins)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
3,509
31,150
100,891
697,079
2,324,835
3,354,893
4,204,749
4,705,083
4,872,659
4,895,013
Tra
vel T
ime
(min
s)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
1
3
7
22
46
116
165
191
191
191
Tra
vel T
ime
(min
s)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
2
17
45
119
346
776
1,184
1,406
1,453
1,453
Tra
vel T
ime
(min
s)
< 15
< 30
< 45
< 60
< 75
< 90
< 105
< 120
< 135
< 150
3
48
130
270
654
1,393
2,103
2,535
2,663
2,663
Tra
vel T
ime
(min
s)
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 71
Appendix E Swept Path Analysis Drawing
Possible relocation of
substation if required
LAND PROTECTED BY TPO'S
PLANTAREA
TotemSignage
Total External Parking
111 Spaces
16
29
10
96
01
11
86
92
93 95
17
09
30
39
40
98 99 103 109 111
87
LidlSignage
Foods refrigeration dry
cooler mounted upon
plinth with secured
enclosure.
Heat pump units
Approx size:
1900x1000x2300H
VRF outdoor unit
mounted upon
PLA-ROCK bearers
Approx size:
1350x720x1690
Lobby
22 m²Cus.
WC
11 m²
Cash
Room
10 m²
Sales Area
1405 m²
Chiller
58 m²Freezer
37 m²
Warehouse
437 m²Welfare
71 m²
Utilities
16 m²
Prep Bakery
74 m²
Office
9 m²
date remarks
This drawing has been produced by modetransport planning.No responsibility will be accepted for theuse of this drawing in any other project.DO NOT SCALE OFF THIS DRAWING.
rev
client
job title
drawing title
drawing no.
scale
drawn
checked
created
16.5m Articulated Servicing Vehicle Swept Path Analysis
LIDL UK GmbH
LIDL Erith
1:500@A3
MF
CH
Feb 18 J32-3173-PS-001
09-02-18A Issued
mode transport planning9 Greyfriars RoadReadingRG1 1NU
t 0118 206 2945e [email protected] www.modetransport.co.uk
modetransport planning F
ile
: C
:\U
se
rs\M
od
eT
\ap
pd
ata
\lo
ca
l\te
mp
\AcP
ub
lish
_1
62
92
\17
09
29
J3
2-3
17
3-0
01
.dw
g
13.6
6.53
Max° HorizMax° Vert
6.4 1.4 1.4 2.58
4.78
1.37 3 1.4
Refridgerated Articulated Vehicle (16.5m)Overall Length 16.560mOverall Width 2.600mOverall Body Height 3.681mMin Body Ground Clearance 0.411mMax Track Width 2.500mLock to lock time 6.00sKerb to Kerb Turning Radius 6.530m
Access
Possible relocation of
substation if required
LAND PROTECTED BY TPO'S
PLANTAREA
TotemSignage
Total External Parking
111 Spaces
16
29
10
96
01
11
86
92
93 95
17
09
30
39
40
98 99 103 109 111
87
LidlSignage
Foods refrigeration dry
cooler mounted upon
plinth with secured
enclosure.
Heat pump units
Approx size:
1900x1000x2300H
VRF outdoor unit
mounted upon
PLA-ROCK bearers
Approx size:
1350x720x1690
Lobby
22 m²Cus.
WC
11 m²
Cash
Room
10 m²
Sales Area
1405 m²
Chiller
58 m²Freezer
37 m²
Warehouse
437 m²Welfare
71 m²
Utilities
16 m²
Prep Bakery
74 m²
Office
9 m²
date remarks
This drawing has been produced by modetransport planning.No responsibility will be accepted for theuse of this drawing in any other project.DO NOT SCALE OFF THIS DRAWING.
rev
client
job title
drawing title
drawing no.
scale
drawn
checked
created
16.5m Articulated Servicing Vehicle Swept Path Analysis
LIDL UK GmbH
LIDL Erith
1:500@A3
MF
CH
Feb 18 J32-3173-PS-002
09-02-18A Issued
mode transport planning9 Greyfriars RoadReadingRG1 1NU
t 0118 206 2945e [email protected] www.modetransport.co.uk
modetransport planning F
ile
: C
:\U
se
rs\M
od
eT
\ap
pd
ata
\lo
ca
l\te
mp
\AcP
ub
lish
_2
44
0\1
70
92
9 J
32
-31
73
-00
1.d
wg
13.6
6.53
Max° HorizMax° Vert
6.4 1.4 1.4 2.58
4.78
1.37 3 1.4
Refridgerated Articulated Vehicle (16.5m)Overall Length 16.560mOverall Width 2.600mOverall Body Height 3.681mMin Body Ground Clearance 0.411mMax Track Width 2.500mLock to lock time 6.00sKerb to Kerb Turning Radius 6.530m
AccessEgress
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 72
Appendix F Full Traffic Survey Data (ATC+ MCC)
Bexley ATC, A206Produced by Road Data Services Ltd.
Channel 1 - Westbound
09/11/2017Hr Ending 1 2 3 4 5 6 7 8 9 10 11 12 13 TOTAL
1 24 0 0 0 0 0 0 0 0 0 0 0 0 242 14 0 0 0 0 0 0 0 2 0 1 0 0 173 13 0 0 0 0 0 0 0 0 0 0 0 0 134 10 0 0 0 0 0 0 0 0 0 0 0 0 105 25 0 0 0 0 0 0 0 0 0 0 0 0 256 64 2 0 0 0 0 0 0 1 1 0 2 0 707 83 4 0 1 0 0 0 0 0 0 0 1 0 898 179 8 0 1 0 0 0 0 1 0 2 6 0 1979 265 11 0 0 0 0 0 1 5 0 3 10 0 295
10 236 10 0 0 1 0 0 0 4 0 1 6 0 25811 195 6 0 0 0 0 0 0 0 0 4 2 0 20712 225 7 0 1 0 0 0 1 3 0 5 5 0 24713 260 7 0 0 0 0 0 2 1 0 1 3 0 27414 268 9 0 1 0 0 0 2 4 0 1 4 0 28915 287 6 0 1 1 0 0 4 2 0 2 2 0 30516 362 8 0 0 0 0 0 1 3 0 2 5 0 38117 392 9 0 0 1 0 0 2 3 0 2 3 0 41218 432 8 0 0 0 0 0 2 1 0 1 4 0 44819 320 5 0 0 0 0 0 2 1 0 0 1 0 32920 219 4 0 0 0 0 0 1 0 0 0 0 0 22421 221 4 0 0 0 0 0 0 3 0 1 1 0 23022 148 3 0 0 0 0 0 0 1 0 1 0 0 15323 72 2 0 0 0 0 0 0 6 0 0 0 0 8024 49 2 0 0 0 0 0 0 1 0 0 1 0 53
7-19 3421 94 0 4 3 0 0 17 28 0 24 51 0 36426-22 4092 109 0 5 3 0 0 18 32 0 26 53 0 43386-24 4213 113 0 5 3 0 0 18 39 0 26 54 0 44710-24 4363 115 0 5 3 0 0 18 42 1 27 56 0 4630
Channel 2 - Eastbound
09/11/2017Hr Ending 1 2 3 4 5 6 7 8 9 10 11 12 13 TOTAL
1 19 0 0 0 0 0 0 0 1 0 2 0 0 222 12 0 0 0 0 0 0 0 0 0 3 0 0 153 4 0 0 0 0 0 0 0 0 0 0 0 0 44 14 0 0 0 0 0 0 0 0 0 2 0 0 165 13 2 0 0 0 0 0 0 0 0 0 0 0 156 104 3 0 0 0 0 0 0 0 0 1 2 0 1107 159 5 0 1 0 0 0 1 0 0 0 1 0 1678 252 6 0 1 0 0 0 1 0 0 1 4 0 2659 284 6 0 0 0 0 0 0 2 0 2 8 0 302
10 273 5 0 0 0 0 0 1 3 0 2 2 0 28611 270 5 0 1 0 0 0 1 5 0 4 4 0 29012 260 5 0 2 0 0 0 0 5 0 3 4 0 27913 233 5 0 1 0 0 0 1 3 0 6 5 0 25414 251 5 0 0 0 0 0 0 4 0 3 10 0 27315 265 6 0 1 0 0 0 0 2 0 1 9 0 28416 290 7 0 1 0 0 0 0 2 0 2 6 0 30817 303 6 0 1 0 0 0 0 0 0 2 3 0 31518 286 6 0 1 0 0 0 0 0 0 1 0 0 29419 266 4 0 0 0 0 0 0 0 0 3 1 0 27420 162 2 0 0 0 0 0 0 2 0 3 0 0 16921 105 3 0 0 0 0 0 0 0 0 1 0 0 10922 78 2 0 0 0 0 0 0 0 0 0 0 0 8023 54 0 0 0 0 0 0 0 2 0 1 0 0 5724 29 0 0 0 0 0 0 0 1 0 2 0 0 32
7-19 3233 66 0 9 0 0 0 4 26 0 30 56 0 34246-22 3737 78 0 10 0 0 0 5 28 0 34 57 0 39496-24 3820 78 0 10 0 0 0 5 31 0 37 57 0 40380-24 3986 83 0 10 0 0 0 5 32 0 45 59 0 4220
Vehicle Classes
Vehicle Classes
Bexley ATC, A206Produced by Road Data Services Ltd.
Channel 1 - Westbound
09/11/2017Hr Ending 0-10 11-20 21-30 31-35 36-40 41-45 46-50 51-55 56-60 61-70 71-80 81+ TOTAL
1 0 1 10 9 3 1 0 0 0 0 0 0 242 0 2 7 7 0 1 0 0 0 0 0 0 173 0 0 2 9 1 1 0 0 0 0 0 0 134 0 0 1 6 2 1 0 0 0 0 0 0 105 0 0 4 6 7 3 3 2 0 0 0 0 256 0 4 30 15 6 12 3 0 0 0 0 0 707 0 6 19 42 14 7 0 1 0 0 0 0 898 0 21 92 56 25 3 0 0 0 0 0 0 1979 0 47 130 88 29 1 0 0 0 0 0 0 295
10 0 50 105 65 30 7 1 0 0 0 0 0 25811 0 23 99 57 27 1 0 0 0 0 0 0 20712 0 36 115 77 15 4 0 0 0 0 0 0 24713 0 28 127 101 13 5 0 0 0 0 0 0 27414 0 26 156 76 23 8 0 0 0 0 0 0 28915 1 38 117 111 32 6 0 0 0 0 0 0 30516 0 50 183 121 22 5 0 0 0 0 0 0 38117 3 90 216 88 13 2 0 0 0 0 0 0 41218 2 85 251 90 17 3 0 0 0 0 0 0 44819 0 48 181 78 19 3 0 0 0 0 0 0 32920 0 14 75 93 31 10 1 0 0 0 0 0 22421 0 23 92 94 14 5 2 0 0 0 0 0 23022 0 12 54 60 19 7 1 0 0 0 0 0 15323 0 6 21 28 10 12 3 0 0 0 0 0 8024 0 0 17 26 8 2 0 0 0 0 0 0 53
7-19 6 542 1772 1008 265 48 1 0 0 0 0 0 36426-22 6 597 2012 1297 343 77 5 1 0 0 0 0 43386-24 6 603 2050 1351 361 91 8 1 0 0 0 0 44710-24 6 610 2104 1403 380 110 14 3 0 0 0 0 4630
Channel 2 - Eastbound
09/11/2017Hr Ending 0-10 11-20 21-30 31-35 36-40 41-45 46-50 51-55 56-60 61-70 71-80 81+ TOTAL
1 0 2 6 7 6 1 0 0 0 0 0 0 222 0 0 9 5 1 0 0 0 0 0 0 0 153 0 0 1 2 1 0 0 0 0 0 0 0 44 0 0 5 7 4 0 0 0 0 0 0 0 165 0 1 3 2 7 2 0 0 0 0 0 0 156 0 3 30 41 32 4 0 0 0 0 0 0 1107 0 5 43 81 25 11 2 0 0 0 0 0 1678 0 10 119 103 29 4 0 0 0 0 0 0 2659 0 21 87 152 37 5 0 0 0 0 0 0 302
10 0 21 102 129 30 4 0 0 0 0 0 0 28611 0 21 121 122 21 5 0 0 0 0 0 0 29012 1 13 94 129 37 5 0 0 0 0 0 0 27913 0 13 101 100 35 5 0 0 0 0 0 0 25414 0 22 97 119 32 3 0 0 0 0 0 0 27315 0 15 107 109 49 3 1 0 0 0 0 0 28416 0 25 119 122 35 6 1 0 0 0 0 0 30817 0 39 149 109 17 1 0 0 0 0 0 0 31518 0 29 141 100 18 4 2 0 0 0 0 0 29419 0 26 124 100 19 4 1 0 0 0 0 0 27420 0 16 42 69 32 7 2 1 0 0 0 0 16921 0 11 27 47 19 4 1 0 0 0 0 0 10922 0 3 29 28 17 3 0 0 0 0 0 0 8023 0 2 11 29 10 3 2 0 0 0 0 0 5724 0 2 10 10 7 2 1 0 0 0 0 0 32
7-19 1 255 1361 1394 359 49 5 0 0 0 0 0 34246-22 1 290 1502 1619 452 74 10 1 0 0 0 0 39496-24 1 294 1523 1658 469 79 13 1 0 0 0 0 40380-24 1 300 1577 1722 520 86 13 1 0 0 0 0 4220
Vehicle Speeds (MPH)
Vehicle Speeds (MPH)
Bexley ATC, A206Produced by Road Data Services Ltd.
Channel 1 - Westbound
10/11/2017Hr Ending 1 2 3 4 5 6 7 8 9 10 11 12 13 TOTAL
1 19 0 0 0 0 0 0 0 2 0 0 0 0 212 19 0 0 0 0 0 0 0 0 0 1 1 0 213 11 0 0 0 0 0 0 0 0 0 1 0 0 124 14 0 0 0 0 0 0 0 0 0 0 0 0 145 19 0 0 0 0 0 0 0 0 0 2 2 0 236 78 2 0 0 0 0 0 0 1 0 3 2 0 867 82 3 0 2 0 0 0 0 2 0 1 3 0 938 179 9 0 0 0 0 0 0 0 0 7 4 0 1999 268 11 0 0 1 0 0 3 5 0 1 3 0 292
10 256 11 0 3 1 0 0 1 4 0 0 4 0 28011 231 8 0 0 0 0 0 1 4 1 2 2 0 24912 253 9 0 1 0 0 0 0 3 0 4 4 0 27413 293 8 0 3 0 0 0 3 5 0 0 2 0 31414 297 9 0 1 0 0 0 0 2 0 0 3 0 31215 279 8 0 0 0 0 0 1 3 0 1 2 0 29416 356 8 0 1 0 0 0 0 2 0 2 3 0 37217 405 9 0 0 1 0 0 0 3 0 0 4 0 42218 433 8 0 0 0 0 0 2 2 0 2 4 0 45119 329 5 0 0 0 0 0 0 4 0 2 2 0 34220 257 4 0 0 0 0 0 0 1 0 0 2 0 26421 185 4 0 0 0 0 0 0 3 0 0 1 0 19322 136 3 0 0 0 0 0 1 2 0 1 3 0 14623 107 3 0 0 0 0 0 0 3 0 0 0 0 11324 72 1 0 0 0 0 0 0 1 0 0 0 0 74
7-19 3579 103 0 9 3 0 0 11 37 1 21 37 0 38016-22 4239 117 0 11 3 0 0 12 45 1 23 46 0 44976-24 4418 121 0 11 3 0 0 12 49 1 23 46 0 46840-24 4578 123 0 11 3 0 0 12 52 1 30 51 0 4861
Channel 2 - Eastbound
10/11/2017Hr Ending 1 2 3 4 5 6 7 8 9 10 11 12 13 TOTAL
1 8 0 0 0 0 0 0 0 2 0 0 0 0 102 8 0 0 0 0 0 0 0 1 0 2 0 0 113 6 0 0 0 0 0 0 0 0 0 2 0 0 84 13 0 0 0 0 0 0 0 0 0 1 0 0 145 14 2 0 0 0 0 0 0 0 0 0 1 0 176 107 4 0 0 0 0 0 0 0 0 1 2 0 1147 141 4 0 1 0 0 0 0 2 0 0 4 0 1528 250 7 0 1 0 0 0 1 2 0 1 3 0 2659 278 5 0 0 0 0 0 0 3 0 1 2 0 289
10 279 4 0 0 0 0 0 1 2 0 2 2 0 29011 270 7 0 1 0 0 0 0 5 0 2 6 0 29112 303 6 0 0 0 0 0 0 2 0 4 5 0 32013 293 7 0 0 0 0 0 1 3 1 1 4 0 31014 264 7 0 1 1 0 0 1 1 0 1 3 0 27915 265 7 0 1 0 0 0 0 1 0 3 4 0 28116 303 7 0 0 0 0 0 0 3 1 1 2 0 31717 294 6 0 0 0 0 0 0 0 0 4 3 0 30718 301 4 0 0 0 0 0 0 0 0 2 4 0 31119 269 3 0 1 0 0 0 0 0 0 1 2 0 27620 152 3 0 0 0 0 0 0 0 0 3 4 0 16221 121 2 0 0 0 0 0 0 1 0 0 1 0 12522 80 0 0 0 0 0 0 0 1 0 2 3 0 8623 82 2 0 0 0 0 0 0 0 0 1 0 0 8524 48 0 0 0 0 0 0 0 1 0 1 0 0 50
7-19 3369 70 0 5 1 0 0 4 22 2 23 40 0 35366-22 3863 79 0 6 1 0 0 4 26 2 28 52 0 40616-24 3993 81 0 6 1 0 0 4 27 2 30 52 0 41960-24 4149 87 0 6 1 0 0 4 30 2 36 55 0 4370
Vehicle Classes
Vehicle Classes
Bexley ATC, A206Produced by Road Data Services Ltd.
Channel 1 - Westbound
10/11/2017Hr Ending 0-10 11-20 21-30 31-35 36-40 41-45 46-50 51-55 56-60 61-70 71-80 81+ TOTAL
1 0 1 3 12 4 0 1 0 0 0 0 0 212 0 4 6 4 2 3 2 0 0 0 0 0 213 0 0 2 4 1 4 1 0 0 0 0 0 124 0 0 3 5 3 2 1 0 0 0 0 0 145 0 2 6 7 3 3 2 0 0 0 0 0 236 0 10 26 29 14 5 2 0 0 0 0 0 867 0 1 26 40 15 7 4 0 0 0 0 0 938 0 17 72 74 27 8 1 0 0 0 0 0 1999 0 32 130 97 29 3 1 0 0 0 0 0 292
10 0 42 140 71 21 5 1 0 0 0 0 0 28011 0 26 126 78 14 5 0 0 0 0 0 0 24912 0 39 118 86 27 4 0 0 0 0 0 0 27413 0 38 128 108 32 7 1 0 0 0 0 0 31414 0 36 131 107 28 9 1 0 0 0 0 0 31215 0 35 138 99 21 0 1 0 0 0 0 0 29416 3 48 181 105 28 7 0 0 0 0 0 0 37217 1 67 233 98 19 4 0 0 0 0 0 0 42218 0 94 252 91 14 0 0 0 0 0 0 0 45119 0 51 168 95 22 6 0 0 0 0 0 0 34220 0 28 142 70 21 3 0 0 0 0 0 0 26421 0 19 78 71 19 4 2 0 0 0 0 0 19322 0 26 37 62 15 5 1 0 0 0 0 0 14623 0 13 37 45 14 4 0 0 0 0 0 0 11324 0 3 28 25 11 5 2 0 0 0 0 0 74
7-19 4 525 1817 1109 282 58 6 0 0 0 0 0 38016-22 4 599 2100 1352 352 77 13 0 0 0 0 0 44976-24 4 615 2165 1422 377 86 15 0 0 0 0 0 46840-24 4 632 2211 1483 404 103 24 0 0 0 0 0 4861
Channel 2 - Eastbound
10/11/2017Hr Ending 0-10 11-20 21-30 31-35 36-40 41-45 46-50 51-55 56-60 61-70 71-80 81+ TOTAL
1 0 0 2 3 3 2 0 0 0 0 0 0 102 0 1 2 7 1 0 0 0 0 0 0 0 113 0 0 5 0 2 1 0 0 0 0 0 0 84 0 0 3 3 5 2 1 0 0 0 0 0 145 0 0 3 9 3 1 1 0 0 0 0 0 176 0 2 26 43 33 9 1 0 0 0 0 0 1147 0 4 36 70 31 8 3 0 0 0 0 0 1528 0 15 89 118 39 4 0 0 0 0 0 0 2659 0 26 103 127 25 6 2 0 0 0 0 0 289
10 0 25 112 126 23 3 1 0 0 0 0 0 29011 0 25 131 104 28 3 0 0 0 0 0 0 29112 0 29 137 116 31 6 1 0 0 0 0 0 32013 0 28 101 136 40 5 0 0 0 0 0 0 31014 0 20 103 117 33 5 1 0 0 0 0 0 27915 0 20 108 115 31 5 1 1 0 0 0 0 28116 0 33 116 128 33 6 1 0 0 0 0 0 31717 0 20 126 129 29 3 0 0 0 0 0 0 30718 0 35 142 106 23 5 0 0 0 0 0 0 31119 0 24 126 99 23 3 1 0 0 0 0 0 27620 0 10 51 69 25 4 3 0 0 0 0 0 16221 0 6 44 51 17 6 1 0 0 0 0 0 12522 0 7 26 31 17 5 0 0 0 0 0 0 8623 0 4 24 38 14 5 0 0 0 0 0 0 8524 0 5 19 13 11 2 0 0 0 0 0 0 50
7-19 0 300 1394 1421 358 54 8 1 0 0 0 0 35366-22 0 327 1551 1642 448 77 15 1 0 0 0 0 40616-24 0 336 1594 1693 473 84 15 1 0 0 0 0 41960-24 0 339 1635 1758 520 99 18 1 0 0 0 0 4370
Vehicle Speeds (MPH)
Vehicle Speeds (MPH)
Bexley ATC, A206Produced by Road Data Services Ltd.
Channel 1 - Westbound
11/11/2017Hr Ending 1 2 3 4 5 6 7 8 9 10 11 12 13 TOTAL
1 45 1 0 0 0 0 0 0 1 0 1 0 0 482 33 1 0 0 0 0 0 0 0 0 0 1 0 353 20 0 0 0 0 0 0 0 0 0 0 0 0 204 19 1 0 0 0 0 0 0 0 0 0 1 0 215 16 0 0 0 0 0 0 0 0 0 0 1 0 176 41 0 0 0 0 0 0 0 1 0 0 2 0 447 31 1 0 0 0 0 0 0 1 1 0 0 0 348 59 3 0 1 0 0 0 0 1 0 1 3 0 689 126 6 0 0 0 0 0 1 2 0 0 3 0 138
10 192 5 0 0 0 0 0 0 1 0 0 2 0 20011 235 6 0 0 0 0 0 0 3 0 1 2 0 24712 283 5 0 1 0 0 0 0 0 0 0 0 0 28913 344 5 0 0 0 0 0 4 2 0 0 1 0 35614 369 6 0 0 0 0 0 4 1 0 0 1 0 38115 362 5 0 0 0 0 0 2 3 0 1 1 0 37416 347 4 0 0 0 0 0 0 3 0 0 1 0 35517 376 6 0 0 0 0 0 1 1 0 0 1 0 38518 318 4 0 0 0 0 0 1 0 0 1 1 0 32519 213 4 0 0 0 0 0 0 0 0 0 0 0 21720 179 1 0 0 0 0 0 0 1 0 0 1 0 18221 128 2 0 1 0 0 0 1 2 0 0 0 0 13422 93 1 0 0 0 0 0 1 2 0 1 0 0 9823 95 2 0 0 0 0 0 0 1 0 0 1 0 9924 80 1 0 0 0 0 0 0 0 0 0 0 0 81
7-19 3224 59 0 2 0 0 0 13 17 0 4 16 0 33356-22 3655 64 0 3 0 0 0 15 23 1 5 17 0 37836-24 3830 67 0 3 0 0 0 15 24 1 5 18 0 39630-24 4004 70 0 3 0 0 0 15 26 1 6 23 0 4148
Channel 2 - Eastbound
11/11/2017Hr Ending 1 2 3 4 5 6 7 8 9 10 11 12 13 TOTAL
1 25 0 0 0 0 0 0 0 1 0 0 0 0 262 20 0 0 0 0 0 0 0 0 0 1 0 0 213 10 0 0 0 0 0 0 0 0 0 0 0 0 104 15 0 0 0 0 0 0 0 0 0 0 0 0 155 18 0 0 0 0 0 0 0 0 0 2 1 0 216 72 2 0 0 0 0 0 0 0 0 4 1 0 797 66 2 0 0 0 0 0 0 0 0 1 0 0 698 103 4 0 0 0 0 0 1 0 0 0 1 0 1099 236 4 0 1 0 0 0 1 0 0 0 1 0 243
10 328 5 0 0 0 0 0 0 1 0 0 2 0 33611 339 4 0 0 0 0 0 0 0 0 2 1 0 34612 344 5 0 0 0 0 0 0 1 1 0 0 0 35113 409 5 0 0 0 0 0 0 0 0 1 3 0 41814 360 6 0 0 0 0 0 1 2 0 1 0 0 37015 352 5 0 1 0 0 0 0 2 0 4 1 0 36516 323 4 0 0 0 0 0 1 0 0 1 2 0 33117 269 4 0 1 0 0 0 0 0 0 3 1 0 27818 229 3 0 0 0 0 0 0 1 0 3 0 0 23619 197 2 0 0 0 0 0 0 0 0 0 0 0 19920 134 1 0 0 0 0 0 0 0 0 1 0 0 13621 95 1 0 0 0 0 0 0 1 0 0 0 0 9722 80 1 0 0 0 0 0 0 1 0 3 0 0 8523 73 0 0 0 0 0 0 0 0 0 0 0 0 7324 59 0 0 0 0 0 0 0 0 0 0 0 0 59
7-19 3489 51 0 3 0 0 0 4 7 1 15 12 0 35826-22 3864 56 0 3 0 0 0 4 9 1 20 12 0 39696-24 3996 56 0 3 0 0 0 4 9 1 20 12 0 41010-24 4156 58 0 3 0 0 0 4 10 1 27 14 0 4273
Vehicle Classes
Vehicle Classes
Bexley ATC, A206Produced by Road Data Services Ltd.
Channel 1 - Westbound
11/11/2017Hr Ending 0-10 11-20 21-30 31-35 36-40 41-45 46-50 51-55 56-60 61-70 71-80 81+ TOTAL
1 0 0 20 19 6 2 1 0 0 0 0 0 482 0 2 8 14 8 1 2 0 0 0 0 0 353 0 3 1 9 2 2 3 0 0 0 0 0 204 0 2 2 6 6 5 0 0 0 0 0 0 215 0 0 7 7 2 0 1 0 0 0 0 0 176 0 4 12 19 3 2 4 0 0 0 0 0 447 0 1 7 11 12 1 2 0 0 0 0 0 348 0 3 24 33 6 2 0 0 0 0 0 0 689 0 7 54 50 14 12 0 1 0 0 0 0 138
10 0 16 67 82 28 7 0 0 0 0 0 0 20011 1 27 97 90 26 6 0 0 0 0 0 0 24712 0 31 118 98 28 13 1 0 0 0 0 0 28913 0 45 131 123 45 12 0 0 0 0 0 0 35614 4 75 148 108 39 6 1 0 0 0 0 0 38115 0 48 166 120 31 8 1 0 0 0 0 0 37416 1 47 137 128 37 5 0 0 0 0 0 0 35517 0 43 186 124 30 2 0 0 0 0 0 0 38518 0 29 161 104 22 8 1 0 0 0 0 0 32519 0 16 82 82 32 4 1 0 0 0 0 0 21720 0 11 71 63 29 7 1 0 0 0 0 0 18221 0 16 46 47 20 5 0 0 0 0 0 0 13422 0 11 26 34 22 5 0 0 0 0 0 0 9823 0 3 34 47 11 3 1 0 0 0 0 0 9924 0 5 24 29 13 8 2 0 0 0 0 0 81
7-19 6 387 1371 1142 338 85 5 1 0 0 0 0 33356-22 6 426 1521 1297 421 103 8 1 0 0 0 0 37836-24 6 434 1579 1373 445 114 11 1 0 0 0 0 39630-24 6 445 1629 1447 472 126 22 1 0 0 0 0 4148
Channel 2 - Eastbound
11/11/2017Hr Ending 0-10 11-20 21-30 31-35 36-40 41-45 46-50 51-55 56-60 61-70 71-80 81+ TOTAL
1 0 0 9 8 7 1 1 0 0 0 0 0 262 0 0 12 5 2 2 0 0 0 0 0 0 213 0 0 5 2 3 0 0 0 0 0 0 0 104 0 0 2 8 4 1 0 0 0 0 0 0 155 0 3 1 9 6 2 0 0 0 0 0 0 216 0 2 26 32 14 4 1 0 0 0 0 0 797 0 5 25 24 13 2 0 0 0 0 0 0 698 0 11 32 47 17 2 0 0 0 0 0 0 1099 0 8 70 116 41 6 2 0 0 0 0 0 243
10 0 15 98 161 55 7 0 0 0 0 0 0 33611 0 29 119 151 44 3 0 0 0 0 0 0 34612 0 28 124 157 37 5 0 0 0 0 0 0 35113 0 22 138 200 49 9 0 0 0 0 0 0 41814 0 30 118 158 56 7 1 0 0 0 0 0 37015 0 27 139 141 46 10 2 0 0 0 0 0 36516 0 16 109 135 60 9 1 1 0 0 0 0 33117 0 21 97 122 36 2 0 0 0 0 0 0 27818 0 12 92 98 33 1 0 0 0 0 0 0 23619 0 12 65 82 33 7 0 0 0 0 0 0 19920 0 11 34 64 21 6 0 0 0 0 0 0 13621 0 4 34 34 17 7 1 0 0 0 0 0 9722 0 11 27 31 11 4 0 0 1 0 0 0 8523 0 6 18 32 14 1 2 0 0 0 0 0 7324 0 4 17 24 11 3 0 0 0 0 0 0 59
7-19 0 231 1201 1568 507 68 6 1 0 0 0 0 35826-22 0 262 1321 1721 569 87 7 1 1 0 0 0 39696-24 0 272 1356 1777 594 91 9 1 1 0 0 0 41010-24 0 277 1411 1841 630 101 11 1 1 0 0 0 4273
Vehicle Speeds (MPH)
Vehicle Speeds (MPH)
Bexley ATC, A206Produced by Road Data Services Ltd.
Channel 1 - Westbound
12/11/2017Hr Ending 1 2 3 4 5 6 7 8 9 10 11 12 13 TOTAL
1 50 1 0 0 0 0 0 0 1 0 0 0 0 522 39 1 0 0 0 0 0 0 2 0 0 0 0 423 24 0 0 0 0 0 0 0 0 0 0 0 0 244 22 0 0 0 0 0 0 0 0 0 0 0 0 225 19 0 0 0 0 0 0 0 0 0 0 0 0 196 38 1 0 0 0 0 0 0 0 0 0 1 0 407 23 0 0 0 0 0 0 0 0 0 0 0 0 238 39 1 0 0 0 0 0 0 0 0 2 0 0 429 101 4 0 0 0 0 0 0 1 0 0 0 0 106
10 145 5 0 1 0 0 0 0 2 0 0 0 0 15311 140 3 0 0 0 0 0 1 2 0 1 1 0 14812 291 6 0 0 0 0 0 1 1 0 0 0 0 29913 346 7 0 2 0 0 0 0 0 0 0 0 0 35514 349 4 0 0 0 0 0 3 5 0 1 1 0 36315 346 4 0 0 0 0 0 1 2 0 1 1 0 35516 343 4 0 0 0 0 0 0 1 0 0 1 0 34917 318 5 0 0 0 0 0 1 2 0 1 0 0 32718 235 3 0 0 0 0 0 2 1 0 1 1 0 24319 196 3 0 0 0 0 0 0 0 0 0 1 0 20020 141 2 0 0 0 0 0 0 2 0 0 0 0 14521 100 1 0 0 0 0 0 0 4 0 0 0 0 10522 83 0 0 0 0 0 0 0 1 0 0 0 0 8423 51 1 0 0 0 0 0 0 5 0 0 0 0 5724 43 0 0 0 0 0 0 1 0 0 1 0 0 45
7-19 2849 49 0 3 0 0 0 9 17 0 7 6 0 29406-22 3196 52 0 3 0 0 0 9 24 0 7 6 0 32976-24 3290 53 0 3 0 0 0 10 29 0 8 6 0 33990-24 3482 56 0 3 0 0 0 10 32 0 8 7 0 3598
Channel 2 - Eastbound
12/11/2017Hr Ending 1 2 3 4 5 6 7 8 9 10 11 12 13 TOTAL
1 40 0 0 0 0 0 0 0 0 0 1 0 0 412 37 1 0 0 0 0 0 0 0 0 2 0 0 403 24 0 0 0 0 0 0 0 0 0 0 0 0 244 19 0 0 0 0 0 0 0 0 0 0 0 0 195 15 0 0 0 0 0 0 0 0 0 0 0 0 156 54 0 0 0 0 0 0 0 1 0 0 1 0 567 41 1 0 0 0 0 0 0 0 0 0 0 0 428 55 1 0 1 0 0 0 1 0 0 1 0 0 599 87 1 0 0 0 0 0 0 0 0 1 0 0 89
10 207 2 0 0 0 0 0 0 0 0 3 2 0 21411 321 2 0 0 0 0 0 0 1 0 1 0 0 32512 337 4 0 0 0 0 0 0 0 0 2 1 0 34413 343 3 0 0 0 0 0 1 1 0 2 1 0 35114 295 3 0 0 0 0 0 0 0 0 1 2 0 30115 298 3 0 0 0 0 0 0 0 0 1 0 0 30216 286 5 0 0 0 0 0 0 2 0 1 0 0 29417 246 3 0 1 0 0 0 0 1 0 5 0 0 25618 258 2 0 2 0 0 0 0 0 0 2 0 0 26419 172 1 0 0 0 0 0 0 0 0 1 0 0 17420 128 1 0 0 0 0 0 0 1 0 1 0 0 13121 79 0 0 0 0 0 0 0 0 0 0 0 0 7922 58 0 0 0 0 0 0 0 0 0 2 0 0 6023 43 0 0 0 0 0 0 0 1 0 2 1 0 4724 29 0 0 0 0 0 0 0 1 0 1 0 0 31
7-19 2905 30 0 4 0 0 0 2 5 0 21 6 0 29736-22 3211 32 0 4 0 0 0 2 6 0 24 6 0 32856-24 3283 32 0 4 0 0 0 2 8 0 27 7 0 33630-24 3472 33 0 4 0 0 0 2 9 0 30 8 0 3558
Vehicle Classes
Vehicle Classes
Bexley ATC, A206Produced by Road Data Services Ltd.
Channel 1 - Westbound
12/11/2017Hr Ending 0-10 11-20 21-30 31-35 36-40 41-45 46-50 51-55 56-60 61-70 71-80 81+ TOTAL
1 0 2 18 22 5 4 1 0 0 0 0 0 522 0 1 10 15 12 4 0 0 0 0 0 0 423 0 0 9 7 1 5 2 0 0 0 0 0 244 0 0 6 5 7 2 1 0 1 0 0 0 225 0 1 7 4 4 2 1 0 0 0 0 0 196 0 3 15 12 7 3 0 0 0 0 0 0 407 0 1 7 9 5 1 0 0 0 0 0 0 238 0 6 15 12 8 1 0 0 0 0 0 0 429 0 3 37 40 18 5 3 0 0 0 0 0 106
10 0 7 53 55 34 4 0 0 0 0 0 0 15311 0 14 50 49 26 9 0 0 0 0 0 0 14812 0 19 129 103 37 10 1 0 0 0 0 0 29913 0 26 147 121 48 13 0 0 0 0 0 0 35514 6 73 114 122 40 7 1 0 0 0 0 0 36315 0 28 140 143 29 12 3 0 0 0 0 0 35516 0 35 139 126 43 5 1 0 0 0 0 0 34917 0 32 143 122 23 6 1 0 0 0 0 0 32718 0 19 83 95 38 5 2 1 0 0 0 0 24319 2 21 71 69 24 7 6 0 0 0 0 0 20020 0 12 48 56 22 5 2 0 0 0 0 0 14521 0 13 32 34 18 4 4 0 0 0 0 0 10522 0 1 27 36 12 7 1 0 0 0 0 0 8423 0 6 24 16 9 2 0 0 0 0 0 0 5724 0 2 12 18 9 2 1 1 0 0 0 0 45
7-19 8 283 1121 1057 368 84 18 1 0 0 0 0 29406-22 8 310 1235 1192 425 101 25 1 0 0 0 0 32976-24 8 318 1271 1226 443 105 26 2 0 0 0 0 33990-24 8 325 1336 1291 479 125 31 2 1 0 0 0 3598
Channel 2 - Eastbound
12/11/2017Hr Ending 0-10 11-20 21-30 31-35 36-40 41-45 46-50 51-55 56-60 61-70 71-80 81+ TOTAL
1 0 0 12 17 7 3 2 0 0 0 0 0 412 0 0 12 18 7 2 1 0 0 0 0 0 403 0 0 5 7 8 3 1 0 0 0 0 0 244 0 3 5 7 0 1 3 0 0 0 0 0 195 0 0 6 4 5 0 0 0 0 0 0 0 156 0 5 11 25 10 3 1 1 0 0 0 0 567 0 2 9 20 9 2 0 0 0 0 0 0 428 0 4 17 18 16 4 0 0 0 0 0 0 599 0 4 29 25 21 5 5 0 0 0 0 0 89
10 0 11 61 100 33 5 4 0 0 0 0 0 21411 0 24 102 149 46 3 1 0 0 0 0 0 32512 0 37 118 146 38 4 1 0 0 0 0 0 34413 0 23 122 151 49 5 1 0 0 0 0 0 35114 0 23 89 151 33 5 0 0 0 0 0 0 30115 0 22 92 129 48 9 2 0 0 0 0 0 30216 0 18 103 126 42 4 1 0 0 0 0 0 29417 0 24 106 89 31 4 2 0 0 0 0 0 25618 0 16 102 117 24 4 1 0 0 0 0 0 26419 0 7 55 76 32 3 1 0 0 0 0 0 17420 0 6 46 53 20 5 1 0 0 0 0 0 13121 0 5 18 37 14 4 1 0 0 0 0 0 7922 0 1 14 29 14 2 0 0 0 0 0 0 6023 0 2 12 17 10 5 1 0 0 0 0 0 4724 0 1 11 5 12 2 0 0 0 0 0 0 31
7-19 0 213 996 1277 413 55 19 0 0 0 0 0 29736-22 0 227 1083 1416 470 68 21 0 0 0 0 0 32856-24 0 230 1106 1438 492 75 22 0 0 0 0 0 33630-24 0 238 1157 1516 529 87 30 1 0 0 0 0 3558
Vehicle Speeds (MPH)
Vehicle Speeds (MPH)
Bexley ATC, A206Produced by Road Data Services Ltd.
Channel 1 - Westbound
13/11/2017Hr Ending 1 2 3 4 5 6 7 8 9 10 11 12 13 TOTAL
1 16 1 0 0 0 0 0 0 0 0 0 0 0 172 15 0 0 0 0 0 0 0 0 0 0 0 0 153 8 0 0 0 0 0 0 0 0 0 0 3 0 114 9 0 0 0 0 0 0 0 0 0 0 0 0 95 17 0 0 0 0 0 0 0 0 0 0 1 0 186 73 1 0 0 0 0 0 0 1 0 1 1 0 777 85 3 0 0 0 0 0 0 0 0 0 1 0 898 182 6 0 0 0 0 0 1 0 0 3 4 0 1969 249 11 1 1 1 0 0 3 4 0 0 9 0 279
10 255 10 0 0 0 0 0 3 1 0 0 7 0 27611 188 7 0 2 0 0 0 1 3 0 0 1 0 20212 265 6 0 1 0 0 0 0 4 0 1 5 0 28213 243 7 0 0 1 0 0 1 2 0 2 2 0 25814 260 6 0 0 0 0 0 2 1 0 2 2 0 27315 282 6 0 1 1 0 0 2 2 0 2 5 0 30116 326 8 0 1 1 0 0 0 4 0 2 7 0 34917 373 8 0 0 0 0 0 0 2 0 2 5 0 39018 445 5 0 0 0 0 0 1 0 0 1 3 0 45519 296 5 0 0 0 0 0 0 1 0 2 0 0 30420 182 3 0 0 0 0 0 0 1 0 1 0 0 18721 151 3 0 0 0 0 0 0 3 0 2 0 0 15922 111 1 0 0 0 0 0 0 2 0 2 0 0 11623 67 0 0 0 0 0 0 0 4 0 1 1 0 7324 39 0 0 0 0 0 0 0 0 0 0 0 0 39
7-19 3364 85 1 6 4 0 0 14 24 0 17 50 0 35656-22 3893 95 1 6 4 0 0 14 30 0 22 51 0 41166-24 3999 95 1 6 4 0 0 14 34 0 23 52 0 42280-24 4137 97 1 6 4 0 0 14 35 0 24 57 0 4375
Channel 2 - Eastbound
13/11/2017Hr Ending 1 2 3 4 5 6 7 8 9 10 11 12 13 TOTAL
1 10 0 0 0 0 0 0 0 0 0 1 0 0 112 3 0 0 0 0 0 0 0 0 0 1 1 0 53 5 0 0 0 0 0 0 0 0 0 1 0 0 64 14 1 0 0 0 0 0 0 1 0 0 0 0 165 24 1 0 0 0 0 0 0 2 0 2 1 0 306 126 3 0 0 0 0 0 0 0 0 0 3 0 1327 170 3 0 0 0 0 0 0 1 0 1 0 0 1758 241 6 1 0 0 0 0 1 0 0 1 3 0 2539 277 5 0 1 0 0 0 1 2 0 3 8 0 297
10 268 5 0 2 1 0 0 2 2 0 0 4 0 28411 273 5 0 0 0 0 0 1 3 0 2 4 0 28812 266 5 0 0 0 0 0 0 3 0 2 7 0 28313 252 6 0 0 0 0 0 1 1 0 1 5 0 26614 243 6 0 0 0 0 0 0 0 0 4 4 0 25715 242 5 0 0 0 0 0 0 2 0 2 12 0 26316 250 5 0 0 1 0 0 1 5 0 2 2 0 26617 267 5 0 1 0 0 0 0 1 0 4 3 0 28118 218 1 0 1 0 0 0 0 1 0 2 1 0 22419 245 3 0 0 0 0 0 0 1 0 1 0 0 25020 141 2 0 0 0 0 0 0 1 0 0 0 0 14421 86 1 0 0 0 0 0 0 1 0 1 2 0 9122 57 0 0 0 0 0 0 0 1 0 5 0 0 6323 44 0 0 0 0 0 0 0 0 0 2 0 0 4624 16 0 0 0 0 0 0 0 2 0 0 0 0 18
7-19 3042 57 1 5 2 0 0 7 21 0 24 53 0 32126-22 3496 63 1 5 2 0 0 7 25 0 31 55 0 36856-24 3556 63 1 5 2 0 0 7 27 0 33 55 0 37490-24 3738 68 1 5 2 0 0 7 30 0 38 60 0 3949
Vehicle Classes
Vehicle Classes
Bexley ATC, A206Produced by Road Data Services Ltd.
Channel 1 - Westbound
13/11/2017Hr Ending 0-10 11-20 21-30 31-35 36-40 41-45 46-50 51-55 56-60 61-70 71-80 81+ TOTAL
1 0 1 7 5 2 1 0 1 0 0 0 0 172 0 2 4 6 2 1 0 0 0 0 0 0 153 0 1 1 2 4 1 2 0 0 0 0 0 114 0 0 0 4 3 2 0 0 0 0 0 0 95 0 0 5 5 3 4 1 0 0 0 0 0 186 0 4 19 36 16 2 0 0 0 0 0 0 777 0 11 24 30 17 6 1 0 0 0 0 0 898 1 22 82 67 22 2 0 0 0 0 0 0 1969 0 52 122 76 23 6 0 0 0 0 0 0 279
10 0 24 136 93 20 3 0 0 0 0 0 0 27611 0 23 103 56 17 3 0 0 0 0 0 0 20212 0 47 132 81 15 5 2 0 0 0 0 0 28213 0 39 102 90 22 5 0 0 0 0 0 0 25814 0 36 119 92 24 2 0 0 0 0 0 0 27315 0 63 123 84 27 4 0 0 0 0 0 0 30116 0 55 162 106 26 0 0 0 0 0 0 0 34917 0 61 205 107 12 4 1 0 0 0 0 0 39018 45 263 102 38 7 0 0 0 0 0 0 0 45519 8 55 134 87 19 1 0 0 0 0 0 0 30420 0 11 57 78 34 6 1 0 0 0 0 0 18721 0 16 63 52 17 10 1 0 0 0 0 0 15922 0 8 39 36 19 11 3 0 0 0 0 0 11623 0 4 26 27 11 3 2 0 0 0 0 0 7324 0 0 13 12 9 4 1 0 0 0 0 0 39
7-19 54 740 1522 977 234 35 3 0 0 0 0 0 35656-22 54 786 1705 1173 321 68 9 0 0 0 0 0 41166-24 54 790 1744 1212 341 75 12 0 0 0 0 0 42280-24 54 798 1780 1270 371 86 15 1 0 0 0 0 4375
Channel 2 - Eastbound
13/11/2017Hr Ending 0-10 11-20 21-30 31-35 36-40 41-45 46-50 51-55 56-60 61-70 71-80 81+ TOTAL
1 0 2 3 5 1 0 0 0 0 0 0 0 112 0 1 0 4 0 0 0 0 0 0 0 0 53 0 3 0 3 0 0 0 0 0 0 0 0 64 0 1 4 3 7 1 0 0 0 0 0 0 165 0 1 7 9 9 4 0 0 0 0 0 0 306 0 11 34 53 28 6 0 0 0 0 0 0 1327 0 4 46 76 35 14 0 0 0 0 0 0 1758 0 13 88 119 29 3 1 0 0 0 0 0 2539 0 19 111 133 27 6 1 0 0 0 0 0 297
10 0 18 99 130 35 2 0 0 0 0 0 0 28411 0 20 116 124 24 4 0 0 0 0 0 0 28812 0 17 113 123 24 4 2 0 0 0 0 0 28313 0 27 81 120 33 4 1 0 0 0 0 0 26614 0 17 89 117 34 0 0 0 0 0 0 0 25715 0 24 100 111 27 1 0 0 0 0 0 0 26316 0 23 107 114 22 0 0 0 0 0 0 0 26617 0 19 117 113 27 4 1 0 0 0 0 0 28118 0 61 106 46 9 2 0 0 0 0 0 0 22419 0 30 119 80 15 5 1 0 0 0 0 0 25020 0 6 51 55 28 3 1 0 0 0 0 0 14421 0 2 23 46 16 3 1 0 0 0 0 0 9122 0 2 21 22 11 6 1 0 0 0 0 0 6323 0 2 13 16 8 7 0 0 0 0 0 0 4624 0 0 9 8 1 0 0 0 0 0 0 0 18
7-19 0 288 1246 1330 306 35 7 0 0 0 0 0 32126-22 0 302 1387 1529 396 61 10 0 0 0 0 0 36856-24 0 304 1409 1553 405 68 10 0 0 0 0 0 37490-24 0 323 1457 1630 450 79 10 0 0 0 0 0 3949
Vehicle Speeds (MPH)
Vehicle Speeds (MPH)
Bexley ATC, A206Produced by Road Data Services Ltd.
Channel 1 - Westbound
14/11/2017Hr Ending 1 2 3 4 5 6 7 8 9 10 11 12 13 TOTAL
1 15 0 0 0 0 0 0 0 1 0 1 1 0 182 15 0 0 0 0 0 0 0 0 0 0 0 0 153 12 0 0 0 0 0 0 0 1 0 0 0 0 134 11 0 0 0 0 0 0 0 0 0 0 0 0 115 23 0 0 0 0 0 0 0 0 0 1 0 0 246 77 1 0 0 0 0 0 0 1 0 1 1 0 817 83 3 0 1 0 0 0 0 1 0 3 1 0 928 171 6 0 0 0 0 0 1 3 0 2 7 0 1909 281 10 0 1 1 0 0 1 3 0 5 9 0 311
10 241 9 1 1 0 0 0 0 3 0 0 6 0 26111 197 7 0 1 0 0 0 3 8 0 1 3 0 22012 239 8 0 1 0 0 0 2 4 0 2 4 0 26013 245 6 0 1 0 0 0 2 2 0 2 3 0 26114 233 6 0 2 0 0 0 3 4 0 2 2 0 25215 301 6 0 0 1 0 0 2 5 0 1 4 0 32016 336 7 0 1 0 0 0 0 1 0 0 5 0 35017 393 8 0 0 0 0 0 2 3 0 0 2 0 40818 475 8 0 0 1 0 0 3 2 0 1 4 0 49419 318 5 0 0 0 0 0 1 1 0 2 1 0 32820 216 3 0 0 0 0 0 2 2 0 2 0 0 22521 191 3 0 0 0 0 0 1 3 0 1 0 0 19922 136 2 0 0 0 0 0 2 0 0 2 0 0 14223 74 0 0 0 0 0 0 0 2 0 1 0 0 7724 34 0 0 0 0 0 0 0 3 0 0 0 0 37
7-19 3430 86 1 8 3 0 0 20 39 0 18 50 0 36556-22 4056 97 1 9 3 0 0 25 45 0 26 51 0 43136-24 4164 97 1 9 3 0 0 25 50 0 27 51 0 44270-24 4317 98 1 9 3 0 0 25 53 0 30 53 0 4589
Channel 2 - Eastbound
14/11/2017Hr Ending 1 2 3 4 5 6 7 8 9 10 11 12 13 TOTAL
1 7 0 0 0 0 0 0 0 1 0 1 0 0 92 4 0 0 0 0 0 0 0 0 0 0 0 0 43 6 1 0 0 0 0 0 0 0 0 1 0 0 84 7 1 0 0 0 0 0 0 0 0 2 1 0 115 11 1 0 0 0 0 0 0 0 0 0 0 0 126 121 2 0 0 0 0 0 0 0 0 3 2 0 1287 177 3 0 1 0 0 0 0 1 0 0 0 0 1828 245 6 0 1 0 0 0 1 1 0 1 4 0 2599 306 4 0 0 0 0 0 0 2 0 3 7 0 322
10 263 4 0 1 0 0 0 1 0 0 2 3 0 27411 279 5 0 2 0 0 0 0 1 0 2 4 0 29312 261 5 0 0 0 0 0 1 1 0 4 4 0 27613 232 6 0 0 0 0 0 1 1 0 1 10 0 25114 233 6 0 0 0 0 0 0 5 0 3 8 0 25515 236 5 0 2 0 0 0 1 2 0 2 8 0 25616 309 6 0 2 0 0 0 0 1 0 4 2 0 32417 288 5 0 0 0 0 0 1 3 0 1 2 0 30018 277 3 0 1 0 0 0 0 1 0 1 0 0 28319 264 3 0 0 0 0 0 0 0 0 1 2 0 27020 166 1 0 0 0 0 0 0 0 0 1 0 0 16821 106 2 0 0 0 0 0 0 1 0 4 1 0 11422 60 1 0 0 0 0 0 0 1 0 3 0 0 6523 42 0 0 0 0 0 0 0 0 0 1 0 0 4324 21 0 0 0 0 0 0 0 0 0 2 0 0 23
7-19 3193 58 0 9 0 0 0 6 18 0 25 54 0 33636-22 3702 65 0 10 0 0 0 6 21 0 33 55 0 38926-24 3765 65 0 10 0 0 0 6 21 0 36 55 0 39580-24 3921 70 0 10 0 0 0 6 22 0 43 58 0 4130
Vehicle Classes
Vehicle Classes
Bexley ATC, A206Produced by Road Data Services Ltd.
Channel 1 - Westbound
14/11/2017Hr Ending 0-10 11-20 21-30 31-35 36-40 41-45 46-50 51-55 56-60 61-70 71-80 81+ TOTAL
1 0 1 4 7 4 2 0 0 0 0 0 0 182 0 1 3 4 7 0 0 0 0 0 0 0 153 0 1 4 3 4 1 0 0 0 0 0 0 134 0 1 1 4 2 2 1 0 0 0 0 0 115 0 1 7 8 3 2 2 0 1 0 0 0 246 0 9 32 25 12 3 0 0 0 0 0 0 817 0 6 32 29 18 5 2 0 0 0 0 0 928 0 23 86 56 24 1 0 0 0 0 0 0 1909 0 38 146 100 24 3 0 0 0 0 0 0 311
10 0 29 135 79 15 2 1 0 0 0 0 0 26111 0 33 109 66 11 1 0 0 0 0 0 0 22012 0 39 129 68 21 3 0 0 0 0 0 0 26013 0 36 122 78 21 4 0 0 0 0 0 0 26114 0 34 135 66 13 4 0 0 0 0 0 0 25215 0 48 174 82 13 3 0 0 0 0 0 0 32016 0 37 154 121 31 6 1 0 0 0 0 0 35017 0 74 211 101 16 3 2 1 0 0 0 0 40818 1 94 247 129 21 2 0 0 0 0 0 0 49419 0 41 169 93 23 2 0 0 0 0 0 0 32820 0 27 97 73 20 6 2 0 0 0 0 0 22521 0 24 71 68 25 9 2 0 0 0 0 0 19922 0 12 71 31 20 8 0 0 0 0 0 0 14223 0 5 20 28 15 7 2 0 0 0 0 0 7724 0 0 9 12 9 4 3 0 0 0 0 0 37
7-19 1 526 1817 1039 233 34 4 1 0 0 0 0 36556-22 1 595 2088 1240 316 62 10 1 0 0 0 0 43136-24 1 600 2117 1280 340 73 15 1 0 0 0 0 44270-24 1 614 2168 1331 372 83 18 1 1 0 0 0 4589
Channel 2 - Eastbound
14/11/2017Hr Ending 0-10 11-20 21-30 31-35 36-40 41-45 46-50 51-55 56-60 61-70 71-80 81+ TOTAL
1 0 0 3 4 2 0 0 0 0 0 0 0 92 0 0 1 3 0 0 0 0 0 0 0 0 43 0 0 3 3 2 0 0 0 0 0 0 0 84 0 0 3 7 1 0 0 0 0 0 0 0 115 0 0 5 4 3 0 0 0 0 0 0 0 126 0 5 39 62 17 4 1 0 0 0 0 0 1287 0 11 48 85 26 10 2 0 0 0 0 0 1828 0 18 86 125 26 3 1 0 0 0 0 0 2599 0 32 117 136 32 5 0 0 0 0 0 0 322
10 0 23 93 121 34 3 0 0 0 0 0 0 27411 0 33 122 110 27 1 0 0 0 0 0 0 29312 0 25 105 117 28 1 0 0 0 0 0 0 27613 0 21 87 110 29 3 1 0 0 0 0 0 25114 0 18 89 127 18 2 1 0 0 0 0 0 25515 0 24 126 83 20 3 0 0 0 0 0 0 25616 0 25 111 133 47 5 3 0 0 0 0 0 32417 0 28 124 124 22 2 0 0 0 0 0 0 30018 0 22 109 117 33 2 0 0 0 0 0 0 28319 0 16 111 110 27 5 1 0 0 0 0 0 27020 0 7 63 68 23 7 0 0 0 0 0 0 16821 0 10 27 45 22 7 3 0 0 0 0 0 11422 0 5 29 19 10 2 0 0 0 0 0 0 6523 0 3 9 15 10 5 1 0 0 0 0 0 4324 0 0 10 6 5 1 1 0 0 0 0 0 23
7-19 0 285 1280 1413 343 35 7 0 0 0 0 0 33636-22 0 318 1447 1630 424 61 12 0 0 0 0 0 38926-24 0 321 1466 1651 439 67 14 0 0 0 0 0 39580-24 0 326 1520 1734 464 71 15 0 0 0 0 0 4130
Vehicle Speeds (MPH)
Vehicle Speeds (MPH)
Bexley ATC, A206Produced by Road Data Services Ltd.
Channel 1 - Westbound
15/11/2017Hr Ending 1 2 3 4 5 6 7 8 9 10 11 12 13 TOTAL
1 22 0 0 0 0 0 0 0 2 0 1 0 0 252 15 0 0 0 0 0 0 0 1 0 0 0 0 163 9 0 0 0 0 0 0 0 1 0 2 1 0 134 13 0 0 0 0 0 0 0 0 0 0 0 0 135 22 0 0 0 0 0 0 0 1 0 1 0 0 246 71 1 0 0 0 0 0 1 0 0 0 2 0 757 78 2 0 0 0 0 0 0 3 0 1 1 0 858 181 8 0 2 0 0 0 0 1 0 6 5 0 2039 267 11 1 0 1 0 0 0 3 0 1 9 0 293
10 279 11 0 0 0 0 0 0 5 0 3 10 0 30811 213 8 0 0 0 0 0 0 2 0 1 3 0 22712 236 7 0 1 0 0 0 1 2 0 4 3 0 25413 260 7 1 0 0 0 0 1 0 0 2 6 0 27714 247 5 0 1 1 0 0 0 7 0 2 1 0 26415 309 5 0 1 0 0 0 1 2 0 1 4 0 32316 334 8 0 0 0 0 0 1 0 0 1 3 0 34717 395 7 0 0 0 0 0 3 1 0 1 3 0 41018 480 9 0 0 0 0 0 3 0 0 3 1 0 49619 311 5 0 0 0 0 0 0 0 0 0 0 0 31620 185 3 0 0 0 0 0 0 1 0 2 0 0 19121 174 2 0 0 0 0 0 0 2 0 2 1 0 18122 128 1 0 0 0 0 0 0 4 0 1 1 0 13523 95 0 0 0 0 0 0 0 2 0 2 0 0 9924 53 0 0 0 0 0 0 0 2 0 0 1 0 56
7-19 3512 91 2 5 2 0 0 10 23 0 25 48 0 37186-22 4077 99 2 5 2 0 0 10 33 0 31 51 0 43106-24 4225 99 2 5 2 0 0 10 37 0 33 52 0 44650-24 4377 100 2 5 2 0 0 11 42 0 37 55 0 4631
Channel 2 - Eastbound
15/11/2017Hr Ending 1 2 3 4 5 6 7 8 9 10 11 12 13 TOTAL
1 10 0 0 0 0 0 0 0 1 0 0 1 0 122 3 0 0 0 0 0 0 0 0 0 3 0 0 63 4 0 0 0 0 0 0 0 1 0 1 0 0 64 12 0 0 0 0 0 0 0 0 0 1 1 0 145 12 2 0 0 0 0 0 0 0 0 2 1 0 176 105 2 0 0 0 0 0 1 0 0 4 2 0 1147 155 3 0 0 0 0 0 0 1 0 1 0 0 1608 255 5 0 0 0 0 0 0 3 0 0 3 0 2669 266 5 0 1 0 0 0 2 1 0 1 9 0 285
10 271 4 0 0 0 0 0 0 3 0 1 6 0 28511 256 7 0 0 0 0 0 0 2 0 3 5 0 27312 271 5 0 0 0 0 0 0 1 1 1 3 0 28213 255 6 0 0 0 0 0 0 5 0 5 3 0 27414 256 5 0 0 1 0 0 0 1 0 1 7 0 27115 260 5 0 1 0 0 0 0 0 0 3 8 0 27716 294 6 0 0 0 0 0 0 1 0 4 4 0 30917 280 5 0 1 0 0 0 0 0 0 3 4 0 29318 293 2 0 0 0 0 0 2 1 1 2 2 0 30319 264 2 0 0 0 0 0 0 0 0 0 0 0 26620 184 1 0 0 0 0 0 0 1 0 1 0 0 18721 106 2 0 1 0 0 0 0 0 0 0 0 0 10922 99 1 0 0 0 0 0 0 2 0 2 0 0 10423 43 1 0 0 0 0 0 0 0 0 2 1 0 4724 30 0 0 0 0 0 0 0 0 0 1 0 0 31
7-19 3221 57 0 3 1 0 0 4 18 2 24 54 0 33846-22 3765 64 0 4 1 0 0 4 22 2 28 54 0 39446-24 3838 65 0 4 1 0 0 4 22 2 31 55 0 40220-24 3984 69 0 4 1 0 0 5 24 2 42 60 0 4191
Vehicle Classes
Vehicle Classes
Bexley ATC, A206Produced by Road Data Services Ltd.
Channel 1 - Westbound
15/11/2017Hr Ending 0-10 11-20 21-30 31-35 36-40 41-45 46-50 51-55 56-60 61-70 71-80 81+ TOTAL
1 0 0 10 7 4 3 1 0 0 0 0 0 252 0 2 5 8 0 1 0 0 0 0 0 0 163 0 2 3 7 1 0 0 0 0 0 0 0 134 0 0 4 4 3 1 1 0 0 0 0 0 135 0 2 6 5 3 5 3 0 0 0 0 0 246 0 7 22 21 13 9 3 0 0 0 0 0 757 0 4 20 33 16 8 4 0 0 0 0 0 858 0 23 108 53 18 1 0 0 0 0 0 0 2039 0 28 135 100 26 4 0 0 0 0 0 0 293
10 0 28 150 91 31 6 2 0 0 0 0 0 30811 2 42 92 70 20 1 0 0 0 0 0 0 22712 0 37 98 94 19 5 1 0 0 0 0 0 25413 0 33 116 103 19 6 0 0 0 0 0 0 27714 0 39 123 83 16 3 0 0 0 0 0 0 26415 0 33 166 94 24 4 2 0 0 0 0 0 32316 0 38 174 107 26 1 1 0 0 0 0 0 34717 1 67 215 112 12 3 0 0 0 0 0 0 41018 1 97 249 121 26 2 0 0 0 0 0 0 49619 0 40 156 93 22 4 1 0 0 0 0 0 31620 0 14 71 73 29 4 0 0 0 0 0 0 19121 0 17 67 65 22 9 1 0 0 0 0 0 18122 0 13 47 53 13 9 0 0 0 0 0 0 13523 0 9 30 38 12 6 3 1 0 0 0 0 9924 0 3 18 23 11 1 0 0 0 0 0 0 56
7-19 4 505 1782 1121 259 40 7 0 0 0 0 0 37186-22 4 553 1987 1345 339 70 12 0 0 0 0 0 43106-24 4 565 2035 1406 362 77 15 1 0 0 0 0 44650-24 4 578 2085 1458 386 96 23 1 0 0 0 0 4631
Channel 2 - Eastbound
15/11/2017Hr Ending 0-10 11-20 21-30 31-35 36-40 41-45 46-50 51-55 56-60 61-70 71-80 81+ TOTAL
1 0 1 1 8 1 1 0 0 0 0 0 0 122 0 0 1 3 1 1 0 0 0 0 0 0 63 0 1 2 2 1 0 0 0 0 0 0 0 64 0 2 1 10 1 0 0 0 0 0 0 0 145 0 0 4 8 3 2 0 0 0 0 0 0 176 0 5 28 45 27 5 4 0 0 0 0 0 1147 0 6 37 77 34 4 1 1 0 0 0 0 1608 0 12 96 116 37 3 2 0 0 0 0 0 2669 0 17 100 116 46 6 0 0 0 0 0 0 285
10 0 13 102 134 28 7 1 0 0 0 0 0 28511 0 23 100 129 18 2 1 0 0 0 0 0 27312 0 29 113 105 28 7 0 0 0 0 0 0 28213 0 21 113 108 27 3 1 1 0 0 0 0 27414 0 26 124 100 19 2 0 0 0 0 0 0 27115 0 17 129 99 28 4 0 0 0 0 0 0 27716 0 20 120 135 30 4 0 0 0 0 0 0 30917 0 23 137 106 25 2 0 0 0 0 0 0 29318 0 26 134 113 26 3 1 0 0 0 0 0 30319 0 19 91 126 25 5 0 0 0 0 0 0 26620 0 9 54 85 35 4 0 0 0 0 0 0 18721 0 4 28 49 22 4 2 0 0 0 0 0 10922 0 10 37 46 8 2 0 1 0 0 0 0 10423 0 2 14 19 9 1 2 0 0 0 0 0 4724 0 0 6 15 6 1 3 0 0 0 0 0 31
7-19 0 246 1359 1387 337 48 6 1 0 0 0 0 33846-22 0 275 1515 1644 436 62 9 3 0 0 0 0 39446-24 0 277 1535 1678 451 64 14 3 0 0 0 0 40220-24 0 286 1572 1754 485 73 18 3 0 0 0 0 4191
Vehicle Speeds (MPH)
Vehicle Speeds (MPH)
Bexley ATC, A206Produced by Road Data Services Ltd.
Channel 1 - Westbound Vehicle Flow Week 1
09/11/2017 10/11/2017 11/11/2017 12/11/2017 13/11/2017 14/11/2017 15/11/2017Hr Ending Thursday Friday Saturday Sunday Monday Tuesday Wednesday 5 Day Ave 7 Day Ave
1 24 21 48 52 17 18 25 21 292 17 21 35 42 15 15 16 17 233 13 12 20 24 11 13 13 12 154 10 14 21 22 9 11 13 11 145 25 23 17 19 18 24 24 23 216 70 86 44 40 77 81 75 78 687 89 93 34 23 89 92 85 90 728 197 199 68 42 196 190 203 197 1569 295 292 138 106 279 311 293 294 245
10 258 280 200 153 276 261 308 277 24811 207 249 247 148 202 220 227 221 21412 247 274 289 299 282 260 254 263 27213 274 314 356 355 258 261 277 277 29914 289 312 381 363 273 252 264 278 30515 305 294 374 355 301 320 323 309 32516 381 372 355 349 349 350 347 360 35817 412 422 385 327 390 408 410 408 39318 448 451 325 243 455 494 496 469 41619 329 342 217 200 304 328 316 324 29120 224 264 182 145 187 225 191 218 20321 230 193 134 105 159 199 181 192 17222 153 146 98 84 116 142 135 138 12523 80 113 99 57 73 77 99 88 8524 53 74 81 45 39 37 56 52 55
7-19 3642 3801 3335 2940 3565 3655 3718 3676 35226-22 4338 4497 3783 3297 4116 4313 4310 4315 40936-24 4471 4684 3963 3399 4228 4427 4465 4455 42340-24 4630 4861 4148 3598 4375 4589 4631 4617 4405
7-196-22
6-240-24
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
09/11/201710/11/201711/11/201712/11/201713/11/201714/11/201715/11/2017
Num
ber o
f Veh
icle
s
Date
Vehicle Flow (Channel 1)
7-19 6-22 6-24 0-24
Bexley ATC, A206Produced by Road Data Services Ltd.
Channel 1 - Westbound Average Speed Week 1
09/11/2017 10/11/2017 11/11/2017 12/11/2017 13/11/2017 14/11/2017 15/11/2017Hr Ending Thursday Friday Saturday Sunday Monday Tuesday Wednesday
1 30.2 33.0 30.3 30.8 31.7 33.3 32.22 28.1 30.9 31.4 32.2 29.5 31.7 28.83 32.8 36.6 33.2 33.2 35.2 32.0 28.94 33.4 34.5 34.4 34.8 36.5 35.5 34.05 36.8 32.7 30.7 31.6 35.1 33.7 35.36 31.5 30.2 32.2 30.0 31.6 29.0 31.97 31.6 32.7 33.0 31.5 30.8 30.8 32.48 28.4 30.1 30.3 27.9 27.9 28.2 27.09 27.1 28.4 30.6 31.4 27.1 27.9 28.5
10 27.4 27.2 29.9 30.8 28.0 27.9 28.211 27.8 27.9 28.7 29.9 27.7 26.8 27.512 27.4 28.2 28.9 29.3 27.3 27.0 28.413 28.1 28.6 29.0 29.4 27.9 27.3 28.414 27.7 28.8 27.2 27.4 27.6 27.0 27.615 28.7 27.8 28.0 29.3 26.9 26.9 28.016 27.6 27.5 28.1 28.9 27.2 28.3 27.917 25.4 26.3 28.0 28.5 26.6 26.8 26.518 25.8 25.1 28.3 29.8 19.3 26.5 26.219 26.7 26.9 29.5 29.6 26.0 27.3 27.520 30.3 27.6 30.2 30.3 30.7 28.5 29.821 28.4 29.0 29.4 30.1 29.5 29.4 29.522 30.0 28.8 30.3 31.7 31.0 28.8 29.423 32.3 29.2 30.4 29.0 30.5 32.2 30.424 31.4 31.1 31.2 32.6 33.4 34.2 31.0
10-12 27.6 28.1 28.8 29.5 27.5 26.9 27.914-16 28.1 27.6 28.0 29.1 27.0 27.6 28.00-24 27.9 28.0 29.0 29.5 27.1 27.8 28.1
Average 28.1
Channel 1 - Westbound 85th Percentile
09/11/2017 10/11/2017 11/11/2017 12/11/2017 13/11/2017 14/11/2017 15/11/2017Hr Ending Thursday Friday Saturday Sunday Monday Tuesday Wednesday
1 35.1 36.5 35.8 38.9 38.6 41.0 40.22 33.2 41.6 37.3 38.1 37.2 37.3 33.13 36.2 43.5 43.4 41.5 45.1 37.8 34.44 37.2 42.0 41.1 39.4 41.2 42.8 39.35 44.3 41.7 35.3 39.6 44.3 42.6 45.76 41.3 37.9 39.3 35.7 37.3 36.4 40.47 38.0 39.3 38.3 37.6 37.9 37.8 38.78 35.5 36.5 35.6 36.7 34.5 35.2 34.09 34.2 34.3 37.2 38.6 34.5 34.1 34.9
10 35.6 33.6 36.5 37.4 33.9 34.2 34.411 35.2 33.9 35.7 37.1 34.3 32.9 34.312 33.6 35.1 35.5 35.6 33.7 33.5 34.613 33.7 35.1 36.2 35.9 34.9 33.9 34.414 34.1 34.8 34.7 34.9 34.1 32.9 33.615 35.1 34.4 34.5 34.9 33.4 33.7 33.716 33.7 34.2 34.9 35.5 33.6 34.9 34.517 32.4 32.6 33.8 34.6 32.7 33.4 33.018 32.4 32.3 34.4 36.4 28.6 33.1 32.919 33.6 33.5 35.9 36.9 33.7 33.3 33.820 36.6 33.6 36.5 36.9 37.1 35.3 35.921 34.4 34.5 36.8 38.4 36.1 36.6 36.122 37.8 35.8 37.5 38.5 38.9 36.8 35.823 41.2 35.7 35.2 36.3 37.4 39.2 38.524 37.7 37.8 37.7 39.2 40.1 42.4 36.8
10-12 34.1 34.5 35.6 36.2 33.8 33.2 34.514-16 34.4 34.2 34.7 35.3 33.5 34.4 34.30-24 34.6 34.5 35.8 36.3 34.4 34.5 34.6
85th %ile 34.9
Bexley ATC, A206Produced by Road Data Services Ltd.
Channel 2 - Eastbound Vehicle Flow Week 1
09/11/2017 10/11/2017 11/11/2017 12/11/2017 13/11/2017 14/11/2017 15/11/2017Hr Ending Thursday Friday Saturday Sunday Monday Tuesday Wednesday 5 Day Ave 7 Day Ave
1 22 10 26 41 11 9 12 13 192 15 11 21 40 5 4 6 8 153 4 8 10 24 6 8 6 6 94 16 14 15 19 16 11 14 14 155 15 17 21 15 30 12 17 18 186 110 114 79 56 132 128 114 120 1057 167 152 69 42 175 182 160 167 1358 265 265 109 59 253 259 266 262 2119 302 289 243 89 297 322 285 299 261
10 286 290 336 214 284 274 285 284 28111 290 291 346 325 288 293 273 287 30112 279 320 351 344 283 276 282 288 30513 254 310 418 351 266 251 274 271 30314 273 279 370 301 257 255 271 267 28715 284 281 365 302 263 256 277 272 29016 308 317 331 294 266 324 309 305 30717 315 307 278 256 281 300 293 299 29018 294 311 236 264 224 283 303 283 27419 274 276 199 174 250 270 266 267 24420 169 162 136 131 144 168 187 166 15721 109 125 97 79 91 114 109 110 10322 80 86 85 60 63 65 104 80 7823 57 85 73 47 46 43 47 56 5724 32 50 59 31 18 23 31 31 35
7-19 3424 3536 3582 2973 3212 3363 3384 3384 33536-22 3949 4061 3969 3285 3685 3892 3944 3906 38266-24 4038 4196 4101 3363 3749 3958 4022 3993 39180-24 4220 4370 4273 3558 3949 4130 4191 4172 4099
7-196-22
6-240-24
0
500
1000
1500
2000
2500
3000
3500
4000
4500
09/11/201710/11/201711/11/201712/11/201713/11/201714/11/201715/11/2017
Num
ber o
f Veh
icle
s
Date
Vehicle Flow (Channel 2)
7-19 6-22 6-24 0-24
Bexley ATC, A206Produced by Road Data Services Ltd.
Channel 2 - Eastbound Average Speed Week 1
09/11/2017 10/11/2017 11/11/2017 12/11/2017 13/11/2017 14/11/2017 15/11/2017Hr Ending Thursday Friday Saturday Sunday Monday Tuesday Wednesday
1 31.6 34.8 32.6 32.2 29.2 30.8 32.72 31.2 31.3 31.5 32.8 29.8 32.3 34.33 30.7 30.9 30.9 35.5 25.3 33.0 27.74 31.1 36.2 33.3 31.3 34.1 31.5 29.15 33.9 33.9 32.9 32.0 32.5 32.4 32.56 32.6 33.4 32.0 32.5 31.3 31.6 32.67 32.3 32.6 30.3 32.2 32.9 31.8 32.58 30.2 30.7 29.8 32.0 30.7 30.3 30.69 30.7 29.6 31.9 32.5 30.0 29.6 30.7
10 30.1 29.4 31.2 31.6 30.3 30.4 30.711 29.7 29.3 30.1 30.6 29.8 28.8 29.612 30.8 29.2 30.1 29.5 30.0 29.5 29.313 30.6 29.9 30.6 30.4 30.1 29.9 29.914 30.1 30.2 30.5 30.7 30.3 30.0 29.215 30.8 30.0 30.6 30.9 29.5 28.4 29.316 29.8 29.6 31.2 30.4 29.3 30.1 30.017 28.0 29.9 30.4 29.7 29.9 29.3 28.718 28.9 28.7 30.2 30.1 25.7 29.7 28.919 29.2 28.9 31.0 31.3 28.5 30.2 30.120 31.4 31.4 31.4 31.2 30.9 31.0 31.121 30.9 31.5 31.7 32.1 32.7 32.0 32.422 31.5 30.9 29.8 32.4 31.9 30.2 29.523 32.9 31.5 31.6 32.4 32.2 32.7 32.324 32.2 30.2 31.8 32.5 30.3 31.7 33.8
10-12 30.2 29.3 30.1 30.0 29.9 29.1 29.414-16 30.3 29.8 30.9 30.7 29.4 29.3 29.70-24 30.3 30.1 30.8 30.8 30.0 30.0 30.1
Average 30.3
Channel 2 - Eastbound 85th Percentile
09/11/2017 10/11/2017 11/11/2017 12/11/2017 13/11/2017 14/11/2017 15/11/2017Hr Ending Thursday Friday Saturday Sunday Monday Tuesday Wednesday
1 37.6 39.4 40.1 37.5 32.9 37.1 35.82 37.9 34.4 36.7 39.6 34.1 36.3 37.63 34.4 39.1 38.4 41.5 34.6 39.7 34.54 36.0 43.9 37.8 43.7 38.7 34.9 33.85 39.9 37.9 39.5 37.1 38.8 37.1 38.56 37.6 38.9 38.1 37.3 38.0 36.9 39.17 38.7 38.2 36.7 37.6 39.4 37.5 37.98 35.4 36.4 35.6 38.6 35.5 35.5 35.99 35.7 35.2 37.1 38.3 35.0 35.6 36.4
10 35.3 35.0 36.3 37.1 35.5 35.8 35.811 35.2 35.5 35.7 36.1 35.1 34.6 34.712 36.0 35.1 35.4 35.3 35.3 35.2 35.413 36.0 35.8 36.1 35.8 36.1 35.7 35.614 35.6 35.7 36.3 35.7 35.8 35.2 34.515 36.5 35.4 36.2 36.3 35.5 34.4 35.116 35.7 35.4 37.0 35.8 34.9 35.8 35.617 33.5 34.9 35.5 35.9 35.3 35.1 34.318 34.8 35.2 35.7 35.6 33.2 35.5 34.919 34.8 35.0 36.5 36.7 34.6 35.4 35.420 37.3 36.7 36.7 38.2 36.6 36.5 36.221 37.5 36.5 38.3 38.4 36.5 38.5 38.122 36.9 37.3 36.9 37.5 38.8 36.5 34.623 39.0 37.6 37.2 38.1 40.3 38.7 39.024 38.0 37.0 38.3 38.2 34.0 38.4 38.4
10-12 35.4 35.4 35.5 35.5 35.2 34.7 35.214-16 36.1 35.4 36.5 36.2 35.3 34.9 35.50-24 35.8 35.8 36.4 36.5 35.7 35.7 35.7
85th %ile 35.9
Bexley ATC, A206Produced by Road Data Services Ltd.
Channel 1 - Westbound Speed Summary Week 1
09/11/2017 10/11/2017 11/11/2017 12/11/2017 13/11/2017 14/11/2017 15/11/2017Speed (MPH) Thursday Friday Saturday Sunday Monday Tuesday Wednesday
0-30 2720 2847 2080 1669 2632 2783 266731-45 1893 1990 2045 1895 1727 1786 194046-60 17 24 23 34 16 20 24
61- 0 0 0 0 0 0 0
TOTAL 4630 4861 4148 3598 4375 4589 4631
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
09/11/2017 10/11/2017 11/11/2017 12/11/2017 13/11/2017 14/11/2017 15/11/2017
Date
Speed Summary (MPH)
0-30 31-45 46-60 61-
Bexley ATC, A206Produced by Road Data Services Ltd.
Channel 1 - Westbound Vehicle Class Week 1
Classes Car / LGV / OGV1 / Bus OGV2 TOTALDay / Time Caravan - 1 - 2,3,5,6,7,12 - 4,8,9,10,11,13 - 1-13
09/11/20177-19 3421 148 73 36426-22 4092 165 81 43386-24 4213 170 88 44710-24 4363 174 93 4630
10/11/20177-19 3579 143 79 38016-22 4239 166 92 44976-24 4418 170 96 46840-24 4578 177 106 4861
11/11/20177-19 3224 75 36 33356-22 3655 81 47 37836-24 3830 85 48 39630-24 4004 93 51 4148
12/11/20177-19 2849 55 36 29406-22 3196 58 43 32976-24 3290 59 50 33990-24 3482 63 53 3598
13/11/20177-19 3364 140 61 35656-22 3893 151 72 41166-24 3999 152 77 42280-24 4137 159 79 4375
14/11/20177-19 3430 140 85 36556-22 4056 152 105 43136-24 4164 152 111 44270-24 4317 155 117 4589
15/11/20177-19 3512 143 63 37186-22 4077 154 79 43106-24 4225 155 85 44650-24 4377 159 95 4631
Average7-19 3340 121 62 35226-22 3887 132 74 40936-24 4020 135 79 42340-24 4180 140 85 4405
95%
3%2%
Total Vehicle Class Distribution
Bexley ATC, A206Produced by Road Data Services Ltd.
Channel 2 - Eastbound Speed Summary Week 1
09/11/2017 10/11/2017 11/11/2017 12/11/2017 13/11/2017 14/11/2017 15/11/2017Speed (MPH) Thursday Friday Saturday Sunday Monday Tuesday Wednesday
0-30 1878 1974 1688 1395 1780 1846 185831-45 2328 2377 2572 2132 2159 2269 231246-60 14 19 13 31 10 15 21
61- 0 0 0 0 0 0 0
TOTAL 4220 4370 4273 3558 3949 4130 4191
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
09/11/2017 10/11/2017 11/11/2017 12/11/2017 13/11/2017 14/11/2017 15/11/2017
Date
Speed Summary (MPH)
0-30 31-45 46-60 61-
Bexley ATC, A206Produced by Road Data Services Ltd.
Channel 2 - Eastbound Vehicle Class Week 1
Classes Car / LGV / OGV1 / Bus OGV2 TOTALDay / Time Caravan - 1 - 2,3,5,6,7,12 - 4,8,9,10,11,13 - 1-13
09/11/20177-19 3233 122 69 34246-22 3737 135 77 39496-24 3820 135 83 40380-24 3986 142 92 4220
10/11/20177-19 3369 111 56 35366-22 3863 132 66 40616-24 3993 134 69 41960-24 4149 143 78 4370
11/11/20177-19 3489 63 30 35826-22 3864 68 37 39696-24 3996 68 37 41010-24 4156 72 45 4273
12/11/20177-19 2905 36 32 29736-22 3211 38 36 32856-24 3283 39 41 33630-24 3472 41 45 3558
13/11/20177-19 3042 113 57 32126-22 3496 121 68 36856-24 3556 121 72 37490-24 3738 131 80 3949
14/11/20177-19 3193 112 58 33636-22 3702 120 70 38926-24 3765 120 73 39580-24 3921 128 81 4130
15/11/20177-19 3221 112 51 33846-22 3765 119 60 39446-24 3838 121 63 40220-24 3984 130 77 4191
Average7-19 3207 96 50 33536-22 3663 105 59 38266-24 3750 105 63 39180-24 3915 112 71 4099
95%
3%
2%
Total Vehicle Class Distribution
Bexley - Manual Traffic Survey, Friday 10th November 2017
Junction: (1) A206 / Wickes / Screwfix
Approach: A206 (West)
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL0700 - 0715 45 5 50 0 0 0 0 0 00715 - 0730 59 2 61 5 0 5 1 0 10730 - 0745 61 2 63 4 0 4 1 0 10745 - 0800 74 3 77 3 0 3 1 0 1Hourly Total 239 12 251 12 0 12 3 0 30800 - 0815 73 6 79 1 0 1 0 0 00815 - 0830 57 4 61 4 0 4 9 0 90830 - 0845 65 3 68 1 0 1 5 1 60845 - 0900 65 5 70 4 0 4 3 0 3Hourly Total 260 18 278 10 0 10 17 1 180900 - 0915 71 5 76 7 0 7 4 0 40915 - 0930 55 2 57 6 0 6 2 0 20930 - 0945 63 7 70 1 0 1 5 0 50945 - 1000 54 6 60 9 0 9 4 0 4Hourly Total 243 20 263 23 0 23 15 0 15
Session Total 742 50 792 45 0 45 35 1 36
1430 - 1445 59 8 67 4 0 4 6 0 61445 - 1500 72 9 81 2 0 2 3 1 4Hourly Total 131 17 148 6 0 6 9 1 101500 - 1515 62 5 67 4 0 4 6 0 61515 - 1530 56 4 60 5 0 5 7 1 81530 - 1545 87 6 93 4 0 4 4 0 41545 - 1600 69 2 71 0 0 0 3 0 3Hourly Total 274 17 291 13 0 13 20 1 211600 - 1615 82 3 85 0 0 0 13 0 131615 - 1630 73 5 78 0 0 0 4 0 41630 - 1645 64 5 69 0 0 0 4 0 41645 - 1700 53 1 54 2 0 2 1 0 1Hourly Total 272 14 286 2 0 2 22 0 221700 - 1715 61 3 64 5 0 5 2 0 21715 - 1730 61 2 63 4 0 4 3 0 31730 - 1745 96 3 99 4 0 4 4 0 41745 - 1800 69 2 71 2 0 2 0 0 0Hourly Total 287 10 297 15 0 15 9 0 91800 - 1815 68 1 69 4 0 4 4 0 41815 - 1830 54 5 59 1 0 1 0 0 01830 - 1845 70 1 71 1 0 1 2 0 21845 - 1900 63 5 68 4 0 4 0 0 0Hourly Total 255 12 267 10 0 10 6 0 6
Session Total 1219 70 1289 46 0 46 66 2 68
Ahead to A206 (East) To Wickes To Screwfix
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Saturday 11th November 2017
Junction: (1) A206 / Wickes / Screwfix
Approach: Wickes
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL1100 - 1115 3 0 3 12 0 12 7 0 71115 - 1130 2 0 2 11 0 11 2 0 21130 - 1145 2 0 2 6 0 6 3 1 41145 - 1200 1 0 1 7 0 7 4 0 4Hourly Total 8 0 8 36 0 36 16 1 171200 - 1215 5 0 5 8 0 8 5 0 51215 - 1230 3 0 3 7 0 7 5 0 51230 - 1245 3 0 3 4 0 4 8 0 81245 - 1300 2 0 2 9 1 10 9 0 9Hourly Total 13 0 13 28 1 29 27 0 271300 - 1315 0 0 0 13 0 13 5 0 51315 - 1330 0 0 0 11 0 11 4 0 41330 - 1345 2 0 2 12 0 12 5 0 51345 - 1400 0 0 0 7 0 7 9 0 9Hourly Total 2 0 2 43 0 43 23 0 231400 - 1415 0 0 0 10 0 10 9 1 101415 - 1430 1 0 1 8 0 8 10 0 101430 - 1445 2 0 2 4 0 4 15 0 151445 - 1500 0 0 0 0 1 1 12 0 12Hourly Total 3 0 3 22 1 23 46 1 47
TOTAL 26 0 26 129 2 131 112 2 114
To Screwfix To A206 (West) To A206 (East)
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Friday 10th November 2017
Junction: (1) A206 / Wickes / Screwfix
Approach: A206 (East)
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL0700 - 0715 7 0 7 2 0 2 36 7 430715 - 0730 3 0 3 1 0 1 32 4 360730 - 0745 0 0 0 3 0 3 40 7 470745 - 0800 0 1 1 2 0 2 48 10 58Hourly Total 10 1 11 8 0 8 156 28 1840800 - 0815 4 1 5 3 0 3 63 6 690815 - 0830 6 0 6 0 0 0 68 12 800830 - 0845 3 0 3 5 0 5 51 6 570845 - 0900 4 0 4 5 1 6 53 5 58Hourly Total 17 1 18 13 1 14 235 29 2640900 - 0915 0 1 1 2 0 2 38 8 460915 - 0930 5 0 5 5 0 5 52 6 580930 - 0945 4 0 4 2 0 2 56 16 720945 - 1000 5 0 5 5 0 5 66 11 77Hourly Total 14 1 15 14 0 14 212 41 253
Session Total 41 3 44 35 1 36 603 98 701
1430 - 1445 4 0 4 4 1 5 70 9 791445 - 1500 1 0 1 6 0 6 60 9 69Hourly Total 5 0 5 10 1 11 130 18 1481500 - 1515 0 0 0 0 0 0 75 7 821515 - 1530 3 0 3 2 0 2 82 5 871530 - 1545 0 0 0 3 1 4 98 5 1031545 - 1600 2 0 2 2 1 3 86 3 89Hourly Total 5 0 5 7 2 9 341 20 3611600 - 1615 0 0 0 0 0 0 91 7 981615 - 1630 0 0 0 7 0 7 73 5 781630 - 1645 6 0 6 3 0 3 116 2 1181645 - 1700 2 0 2 6 0 6 105 5 110Hourly Total 8 0 8 16 0 16 385 19 4041700 - 1715 0 0 0 0 0 0 109 5 1141715 - 1730 1 0 1 2 0 2 110 2 1121730 - 1745 2 0 2 1 0 1 101 4 1051745 - 1800 4 0 4 2 0 2 110 3 113Hourly Total 7 0 7 5 0 5 430 14 4441800 - 1815 0 0 0 0 0 0 88 3 911815 - 1830 0 0 0 0 0 0 83 3 861830 - 1845 1 0 1 0 0 0 81 2 831845 - 1900 2 0 2 0 0 0 80 4 84Hourly Total 3 0 3 0 0 0 332 12 344
Session Total 28 0 28 38 3 41 1618 83 1701
To Wickes To Screwfix Ahead to A206 (West)
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Saturday 11th November 2017
Junction: (1) A206 / Wickes / Screwfix
Approach: Screwfix
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL1100 - 1115 3 0 3 7 0 7 0 0 01115 - 1130 6 0 6 8 0 8 1 0 11130 - 1145 6 0 6 8 0 8 1 0 11145 - 1200 3 0 3 10 0 10 3 0 3Hourly Total 18 0 18 33 0 33 5 0 51200 - 1215 7 0 7 6 1 7 2 0 21215 - 1230 6 1 7 5 0 5 2 0 21230 - 1245 8 0 8 6 0 6 2 0 21245 - 1300 6 0 6 1 0 1 0 0 0Hourly Total 27 1 28 18 1 19 6 0 61300 - 1315 10 0 10 5 0 5 2 0 21315 - 1330 5 0 5 8 0 8 1 0 11330 - 1345 6 0 6 6 0 6 3 0 31345 - 1400 4 0 4 6 0 6 1 0 1Hourly Total 25 0 25 25 0 25 7 0 71400 - 1415 2 0 2 10 0 10 2 0 21415 - 1430 6 0 6 7 0 7 2 0 21430 - 1445 6 0 6 5 0 5 1 0 11445 - 1500 14 0 14 8 0 8 4 0 4Hourly Total 28 0 28 30 0 30 9 0 9
TOTAL 98 1 99 106 1 107 27 0 27
To A206 (West) To A206 (East) To Wickes
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Friday 10th November 2017
Junction: (1) A206 / Wickes / Screwfix
Approach: Wickes
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL0700 - 0715 0 0 0 1 2 3 0 0 00715 - 0730 1 0 1 4 0 4 3 0 30730 - 0745 1 0 1 5 0 5 2 0 20745 - 0800 2 0 2 2 0 2 1 1 2Hourly Total 4 0 4 12 2 14 6 1 70800 - 0815 0 0 0 0 0 0 1 0 10815 - 0830 1 0 1 2 0 2 1 0 10830 - 0845 1 0 1 5 0 5 0 0 00845 - 0900 0 0 0 2 0 2 6 0 6Hourly Total 2 0 2 9 0 9 8 0 80900 - 0915 2 0 2 3 1 4 7 0 70915 - 0930 1 0 1 4 0 4 2 0 20930 - 0945 0 0 0 6 0 6 5 1 60945 - 1000 1 0 1 5 0 5 2 0 2Hourly Total 4 0 4 18 1 19 16 1 17
Session Total 10 0 10 39 3 42 30 2 32
1430 - 1445 0 0 0 4 0 4 0 0 01445 - 1500 0 0 0 1 0 1 1 2 3Hourly Total 0 0 0 5 0 5 1 2 31500 - 1515 1 0 1 2 0 2 2 0 21515 - 1530 1 0 1 2 0 2 6 0 61530 - 1545 1 0 1 4 0 4 3 0 31545 - 1600 1 0 1 4 0 4 0 0 0Hourly Total 4 0 4 12 0 12 11 0 111600 - 1615 0 0 0 1 0 1 0 0 01615 - 1630 0 0 0 4 0 4 1 0 11630 - 1645 0 0 0 0 0 0 4 0 41645 - 1700 1 0 1 4 0 4 2 0 2Hourly Total 1 0 1 9 0 9 7 0 71700 - 1715 0 0 0 3 0 3 3 0 31715 - 1730 1 0 1 3 0 3 1 0 11730 - 1745 2 0 2 1 0 1 2 0 21745 - 1800 0 0 0 5 0 5 0 0 0Hourly Total 3 0 3 12 0 12 6 0 61800 - 1815 1 0 1 5 0 5 2 0 21815 - 1830 0 0 0 2 0 2 0 0 01830 - 1845 0 0 0 2 0 2 2 0 21845 - 1900 0 0 0 0 0 0 1 0 1Hourly Total 1 0 1 9 0 9 5 0 5
Session Total 9 0 9 47 0 47 30 2 32
To Screwfix To A206 (West) To A206 (East)
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Saturday 11th November 2017
Junction: (4) A206 / Riverdale Road
Approach: A206 (South)
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL1100 - 1115 11 0 11 57 2 591115 - 1130 8 0 8 61 2 631130 - 1145 6 0 6 63 3 661145 - 1200 4 0 4 65 3 68Hourly Total 29 0 29 246 10 2561200 - 1215 9 0 9 74 2 761215 - 1230 11 0 11 73 4 771230 - 1245 9 1 10 60 2 621245 - 1300 12 0 12 78 5 83Hourly Total 41 1 42 285 13 2981300 - 1315 14 0 14 85 3 881315 - 1330 17 0 17 79 1 801330 - 1345 9 0 9 68 3 711345 - 1400 7 0 7 78 3 81Hourly Total 47 0 47 310 10 3201400 - 1415 3 1 4 87 3 901415 - 1430 13 0 13 76 2 781430 - 1445 4 0 4 77 1 781445 - 1500 11 0 11 61 3 64Hourly Total 31 1 32 301 9 310
TOTAL 148 2 150 1142 42 1184
Left to Riverdale Road N/B to A206 (North)
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Saturday 11th November 2017
Junction: (1) A206 / Wickes / Screwfix
Approach: A206 (East)
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL1100 - 1115 7 0 7 8 0 8 62 4 661115 - 1130 5 0 5 10 0 10 54 2 561130 - 1145 0 0 0 7 0 7 58 2 601145 - 1200 5 1 6 5 0 5 60 2 62Hourly Total 17 1 18 30 0 30 234 10 2441200 - 1215 3 0 3 13 1 14 78 3 811215 - 1230 5 0 5 6 0 6 78 3 811230 - 1245 7 0 7 5 0 5 57 2 591245 - 1300 9 0 9 10 0 10 84 4 88Hourly Total 24 0 24 34 1 35 297 12 3091300 - 1315 9 0 9 2 0 2 86 2 881315 - 1330 7 0 7 4 0 4 92 1 931330 - 1345 6 0 6 7 0 7 66 4 701345 - 1400 6 1 7 9 0 9 78 3 81Hourly Total 28 1 29 22 0 22 322 10 3321400 - 1415 7 0 7 8 0 8 89 5 941415 - 1430 10 0 10 6 0 6 79 3 821430 - 1445 7 0 7 7 0 7 79 1 801445 - 1500 5 0 5 1 0 1 68 3 71Hourly Total 29 0 29 22 0 22 315 12 327
TOTAL 98 2 100 108 1 109 1168 44 1212
To Wickes To Screwfix Ahead to A206 (West)
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Saturday 11th November 2017
Junction: (4) A206 / Riverdale Road
Approach: A206 (North)
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL1100 - 1115 97 4 101 4 0 41115 - 1130 87 5 92 11 0 111130 - 1145 71 6 77 8 0 81145 - 1200 109 6 115 10 0 10Hourly Total 364 21 385 33 0 331200 - 1215 112 2 114 8 0 81215 - 1230 117 8 125 12 0 121230 - 1245 91 4 95 13 0 131245 - 1300 99 5 104 7 0 7Hourly Total 419 19 438 40 0 401300 - 1315 125 2 127 6 0 61315 - 1330 90 4 94 13 0 131330 - 1345 111 4 115 7 1 81345 - 1400 94 2 96 7 0 7Hourly Total 420 12 432 33 1 341400 - 1415 92 4 96 5 0 51415 - 1430 96 4 100 8 1 91430 - 1445 75 2 77 13 0 131445 - 1500 85 3 88 6 0 6Hourly Total 348 13 361 32 1 33
TOTAL 1551 65 1616 138 2 140
S/B to A206 (South) Right to Riverdale Road
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Friday 10th November 2017
Junction: (1) A206 / Wickes / Screwfix
Approach: Screwfix
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL0700 - 0715 2 0 2 1 0 1 1 0 10715 - 0730 1 0 1 1 0 1 0 0 00730 - 0745 0 0 0 2 0 2 0 0 00745 - 0800 1 0 1 1 0 1 0 0 0Hourly Total 4 0 4 5 0 5 1 0 10800 - 0815 7 0 7 1 0 1 0 0 00815 - 0830 1 0 1 0 0 0 0 0 00830 - 0845 5 1 6 2 0 2 0 0 00845 - 0900 6 0 6 3 0 3 0 0 0Hourly Total 19 1 20 6 0 6 0 0 00900 - 0915 4 1 5 2 0 2 0 0 00915 - 0930 4 0 4 2 0 2 0 0 00930 - 0945 3 0 3 2 0 2 2 0 20945 - 1000 1 0 1 4 0 4 0 0 0Hourly Total 12 1 13 10 0 10 2 0 2
Session Total 35 2 37 21 0 21 3 0 3
1430 - 1445 1 0 1 5 0 5 0 0 01445 - 1500 3 0 3 3 0 3 0 0 0Hourly Total 4 0 4 8 0 8 0 0 01500 - 1515 8 1 9 4 0 4 0 0 01515 - 1530 6 0 6 3 0 3 1 0 11530 - 1545 6 0 6 4 1 5 0 0 01545 - 1600 6 0 6 3 1 4 0 0 0Hourly Total 26 1 27 14 2 16 1 0 11600 - 1615 5 0 5 2 0 2 0 0 01615 - 1630 4 0 4 4 0 4 0 0 01630 - 1645 4 0 4 6 0 6 0 0 01645 - 1700 5 0 5 4 0 4 0 0 0Hourly Total 18 0 18 16 0 16 0 0 01700 - 1715 6 0 6 3 0 3 0 0 01715 - 1730 4 0 4 1 0 1 0 0 01730 - 1745 6 0 6 2 1 3 0 0 01745 - 1800 5 0 5 2 0 2 0 0 0Hourly Total 21 0 21 8 1 9 0 0 01800 - 1815 1 0 1 3 0 3 0 0 01815 - 1830 0 0 0 3 0 3 1 0 11830 - 1845 2 0 2 1 0 1 0 0 01845 - 1900 0 0 0 1 0 1 0 0 0Hourly Total 3 0 3 8 0 8 1 0 1
Session Total 72 1 73 54 3 57 2 0 2
To A206 (West) To A206 (East) To Wickes
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Saturday 11th November 2017
Junction: (1) A206 / Wickes / Screwfix
Approach: A206 (West)
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL
1100 - 1115 82 5 87 7 0 7 8 0 8
1115 - 1130 75 5 80 9 0 9 4 0 4
1130 - 1145 51 5 56 5 0 5 5 0 5
1145 - 1200 77 5 82 10 0 10 4 1 5
Hourly Total 285 20 305 31 0 31 21 1 22
1200 - 1215 103 2 105 10 0 10 4 0 4
1215 - 1230 97 8 105 9 0 9 3 0 3
1230 - 1245 84 2 86 7 1 8 4 0 4
1245 - 1300 75 3 78 9 0 9 5 0 5
Hourly Total 359 15 374 35 1 36 16 0 16
1300 - 1315 98 3 101 6 0 6 10 0 10
1315 - 1330 75 3 78 8 0 8 7 0 7
1330 - 1345 82 3 85 12 0 12 8 0 8
1345 - 1400 65 3 68 9 0 9 7 0 7
Hourly Total 320 12 332 35 0 35 32 0 32
1400 - 1415 70 4 74 11 0 11 4 0 4
1415 - 1430 86 4 90 7 0 7 4 0 4
1430 - 1445 54 2 56 8 0 8 5 0 5
1445 - 1500 71 3 74 10 0 10 2 0 2
Hourly Total 281 13 294 36 0 36 15 0 15
TOTAL 1245 60 1305 137 1 138 84 1 85
Ahead to A206 (East) To Wickes To Screwfix
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Saturday 11th November 2017
Junction: (3) A206 / Alford Road / De Luci Road
Approach: A206 (North)
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL1100 - 1115 6 0 6 90 4 94 1 0 11115 - 1130 8 0 8 79 5 84 0 0 01130 - 1145 14 0 14 57 6 63 0 0 01145 - 1200 13 1 14 96 5 101 0 0 0Hourly Total 41 1 42 322 20 342 1 0 11200 - 1215 11 0 11 101 2 103 0 0 01215 - 1230 10 1 11 107 7 114 0 0 01230 - 1245 7 1 8 84 3 87 0 0 01245 - 1300 17 1 18 82 4 86 0 0 0Hourly Total 45 3 48 374 16 390 0 0 01300 - 1315 16 0 16 109 2 111 0 0 01315 - 1330 9 0 9 81 4 85 0 0 01330 - 1345 7 0 7 104 4 108 0 0 01345 - 1400 13 0 13 81 2 83 0 0 0Hourly Total 45 0 45 375 12 387 0 0 01400 - 1415 13 0 13 79 4 83 0 0 01415 - 1430 11 0 11 85 4 89 0 0 01430 - 1445 10 0 10 65 2 67 0 0 01445 - 1500 6 0 6 79 3 82 0 0 0Hourly Total 40 0 40 308 13 321 0 0 0
TOTAL 171 4 175 1379 61 1440 1 0 1
Left to Alford Road S/B to A206 (South) Right to De Luci Road
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Sunday 12th November 2017
Junction: (1) A206 / Wickes / Screwfix
Approach: A206 (West)
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL
1100 - 1115 68 1 69 10 0 10 4 0 4
1115 - 1130 74 2 76 9 0 9 7 0 7
1130 - 1145 73 2 75 11 0 11 8 0 8
1145 - 1200 63 5 68 12 0 12 9 0 9
Hourly Total 278 10 288 42 0 42 28 0 28
1200 - 1215 74 2 76 7 0 7 6 0 6
1215 - 1230 75 3 78 16 0 16 7 0 7
1230 - 1245 77 4 81 8 0 8 3 0 3
1245 - 1300 64 1 65 2 0 2 7 0 7
Hourly Total 290 10 300 33 0 33 23 0 23
1300 - 1315 49 1 50 9 0 9 4 0 4
1315 - 1330 71 0 71 5 0 5 5 0 5
1330 - 1345 67 2 69 6 0 6 5 0 5
1345 - 1400 70 1 71 6 0 6 5 0 5
Hourly Total 257 4 261 26 0 26 19 0 19
1400 - 1415 72 1 73 5 0 5 4 0 4
1415 - 1430 57 5 62 6 0 6 6 0 6
1430 - 1445 57 1 58 7 0 7 8 0 8
1445 - 1500 54 1 55 6 0 6 0 0 0
Hourly Total 240 8 248 24 0 24 18 0 18
TOTAL 1065 32 1097 125 0 125 88 0 88
Ahead to A206 (East) To Wickes To Screwfix
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Sunday 12th November 2017
Junction: (1) A206 / Wickes / Screwfix
Approach: A206 (East)
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL1100 - 1115 8 0 8 8 0 8 66 4 701115 - 1130 8 0 8 6 0 6 61 3 641130 - 1145 11 1 12 6 1 7 59 2 611145 - 1200 6 0 6 9 0 9 46 1 47Hourly Total 33 1 34 29 1 30 232 10 2421200 - 1215 11 0 11 4 0 4 75 2 771215 - 1230 1 0 1 6 0 6 65 2 671230 - 1245 5 0 5 8 0 8 71 2 731245 - 1300 8 1 9 4 0 4 91 2 93Hourly Total 25 1 26 22 0 22 302 8 3101300 - 1315 10 0 10 6 0 6 71 2 731315 - 1330 10 0 10 6 0 6 77 2 791330 - 1345 3 1 4 12 0 12 69 0 691345 - 1400 11 0 11 6 0 6 77 2 79Hourly Total 34 1 35 30 0 30 294 6 3001400 - 1415 6 0 6 7 0 7 75 3 781415 - 1430 6 0 6 5 0 5 65 1 661430 - 1445 14 0 14 0 0 0 85 3 881445 - 1500 8 0 8 5 0 5 73 2 75Hourly Total 34 0 34 17 0 17 298 9 307
TOTAL 126 3 129 98 1 99 1126 33 1159
To Wickes To Screwfix Ahead to A206 (West)
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Sunday 12th November 2017
Junction: (1) A206 / Wickes / Screwfix
Approach: Wickes
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL
1100 - 1115 1 0 1 4 0 4 7 0 7
1115 - 1130 1 0 1 9 0 9 11 0 11
1130 - 1145 1 0 1 13 0 13 5 0 5
1145 - 1200 3 0 3 1 0 1 1 0 1
Hourly Total 6 0 6 27 0 27 24 0 24
1200 - 1215 1 0 1 13 0 13 4 0 4
1215 - 1230 1 0 1 9 0 9 4 0 4
1230 - 1245 2 0 2 10 0 10 8 0 8
1245 - 1300 2 0 2 8 0 8 4 0 4
Hourly Total 6 0 6 40 0 40 20 0 20
1300 - 1315 1 0 1 3 1 4 5 0 5
1315 - 1330 2 0 2 11 0 11 7 0 7
1330 - 1345 1 0 1 9 0 9 5 1 6
1345 - 1400 0 0 0 11 0 11 4 0 4
Hourly Total 4 0 4 34 1 35 21 1 22
1400 - 1415 0 0 0 8 0 8 9 0 9
1415 - 1430 3 0 3 3 0 3 6 0 6
1430 - 1445 0 0 0 10 0 10 6 0 6
1445 - 1500 3 0 3 4 0 4 8 0 8
Hourly Total 6 0 6 25 0 25 29 0 29
TOTAL 22 0 22 126 1 127 94 1 95
To Screwfix To A206 (West) To A206 (East)
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Saturday 11th November 2017
Junction: (2) A206 / A220
Approach: A206 (East)
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL1100 - 1115 80 5 85 61 2 631115 - 1130 76 6 82 63 3 661130 - 1145 89 5 94 45 2 471145 - 1200 96 4 100 60 3 63Hourly Total 341 20 361 229 10 2391200 - 1215 92 7 99 83 4 871215 - 1230 116 5 121 79 3 821230 - 1245 99 4 103 61 3 641245 - 1300 110 3 113 87 2 89Hourly Total 417 19 436 310 12 3221300 - 1315 100 7 107 77 2 791315 - 1330 100 4 104 86 3 891330 - 1345 99 5 104 71 5 761345 - 1400 111 9 120 82 3 85Hourly Total 410 25 435 316 13 3291400 - 1415 107 3 110 85 3 881415 - 1430 93 6 99 93 2 951430 - 1445 92 4 96 86 1 871445 - 1500 83 3 86 62 3 65Hourly Total 375 16 391 326 9 335
TOTAL 1543 80 1623 1181 44 1225
W/B to A220 Right to A206 (North)
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Sunday 12th November 2017
Junction: (1) A206 / Wickes / Screwfix
Approach: Screwfix
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL1100 - 1115 6 0 6 8 0 8 2 0 21115 - 1130 8 0 8 6 0 6 1 0 11130 - 1145 5 0 5 10 0 10 1 0 11145 - 1200 19 1 20 8 1 9 2 0 2Hourly Total 38 1 39 32 1 33 6 0 61200 - 1215 3 0 3 10 0 10 2 0 21215 - 1230 6 0 6 11 0 11 1 0 11230 - 1245 8 0 8 6 0 6 2 0 21245 - 1300 7 0 7 4 0 4 0 0 0Hourly Total 24 0 24 31 0 31 5 0 51300 - 1315 11 0 11 6 0 6 2 0 21315 - 1330 7 0 7 3 0 3 1 0 11330 - 1345 0 0 0 10 0 10 4 0 41345 - 1400 1 0 1 4 0 4 1 0 1Hourly Total 19 0 19 23 0 23 8 0 81400 - 1415 5 0 5 4 0 4 0 0 01415 - 1430 2 0 2 7 0 7 1 0 11430 - 1445 2 0 2 9 0 9 0 0 01445 - 1500 6 0 6 5 0 5 1 0 1Hourly Total 15 0 15 25 0 25 2 0 2
TOTAL 96 1 97 111 1 112 21 0 21
To A206 (West) To A206 (East) To Wickes
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Friday 10th November 2017
Junction: (2) A206 / A220
Approach: A206 (North)
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL0700 - 0715 40 4 44 6 1 70715 - 0730 55 3 58 7 0 70730 - 0745 52 2 54 7 1 80745 - 0800 67 1 68 7 3 10Hourly Total 214 10 224 27 5 320800 - 0815 66 2 68 8 5 130815 - 0830 64 4 68 6 1 70830 - 0845 52 2 54 4 0 40845 - 0900 56 4 60 9 2 11Hourly Total 238 12 250 27 8 350900 - 0915 70 3 73 9 2 110915 - 0930 47 2 49 15 0 150930 - 0945 58 5 63 8 2 100945 - 1000 61 6 67 5 2 7Hourly Total 236 16 252 37 6 43
Session Total 688 38 726 91 19 110
1430 - 1445 59 7 66 12 0 121445 - 1500 64 9 73 11 0 11Hourly Total 123 16 139 23 0 231500 - 1515 60 4 64 9 1 101515 - 1530 55 4 59 16 1 171530 - 1545 77 5 82 8 0 81545 - 1600 68 4 72 12 0 12Hourly Total 260 17 277 45 2 471600 - 1615 66 3 69 17 0 171615 - 1630 67 6 73 14 0 141630 - 1645 62 4 66 14 0 141645 - 1700 45 2 47 14 1 15Hourly Total 240 15 255 59 1 601700 - 1715 50 3 53 16 0 161715 - 1730 45 2 47 19 1 201730 - 1745 72 4 76 23 0 231745 - 1800 63 2 65 16 0 16Hourly Total 230 11 241 74 1 751800 - 1815 64 1 65 16 0 161815 - 1830 58 5 63 5 0 51830 - 1845 64 2 66 9 0 91845 - 1900 56 4 60 4 0 4Hourly Total 242 12 254 34 0 34
Session Total 1095 71 1166 235 4 239
Left to A206 (East) Right to A220
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Saturday 11th November 2017
Junction: (2) A206 / A220
Approach: A206 (North)
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL1100 - 1115 72 6 78 21 0 211115 - 1130 67 4 71 18 1 191130 - 1145 55 5 60 12 2 141145 - 1200 79 4 83 9 0 9Hourly Total 273 19 292 60 3 631200 - 1215 99 2 101 14 0 141215 - 1230 86 7 93 22 0 221230 - 1245 73 1 74 17 0 171245 - 1300 66 5 71 21 0 21Hourly Total 324 15 339 74 0 741300 - 1315 85 3 88 20 0 201315 - 1330 77 4 81 10 0 101330 - 1345 70 3 73 25 0 251345 - 1400 67 3 70 12 0 12Hourly Total 299 13 312 67 0 671400 - 1415 78 5 83 10 1 111415 - 1430 90 3 93 14 0 141430 - 1445 63 3 66 10 0 101445 - 1500 80 2 82 10 1 11Hourly Total 311 13 324 44 2 46
TOTAL 1207 60 1267 245 5 250
Left to A206 (East) Right to A220
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Friday 10th November 2017
Junction: (2) A206 / A220
Approach: A206 (East)
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL0700 - 0715 41 8 49 21 6 270715 - 0730 42 11 53 22 5 270730 - 0745 46 12 58 34 6 400745 - 0800 61 10 71 44 11 55Hourly Total 190 41 231 121 28 1490800 - 0815 68 12 80 57 6 630815 - 0830 88 11 99 58 10 680830 - 0845 98 9 107 57 5 620845 - 0900 72 9 81 55 4 59Hourly Total 326 41 367 227 25 2520900 - 0915 52 6 58 41 9 500915 - 0930 65 9 74 50 5 550930 - 0945 63 7 70 44 12 560945 - 1000 71 8 79 65 11 76Hourly Total 251 30 281 200 37 237
Session Total 767 112 879 548 90 638
1430 - 1445 102 12 114 73 7 801445 - 1500 86 11 97 55 8 63Hourly Total 188 23 211 128 15 1431500 - 1515 133 6 139 72 10 821515 - 1530 133 11 144 75 5 801530 - 1545 86 7 93 84 5 891545 - 1600 85 3 88 84 3 87Hourly Total 437 27 464 315 23 3381600 - 1615 119 6 125 85 7 921615 - 1630 100 5 105 73 4 771630 - 1645 92 4 96 101 4 1051645 - 1700 96 6 102 96 5 101Hourly Total 407 21 428 355 20 3751700 - 1715 105 2 107 99 6 1051715 - 1730 127 3 130 91 0 911730 - 1745 97 8 105 96 3 991745 - 1800 79 8 87 107 3 110Hourly Total 408 21 429 393 12 4051800 - 1815 82 9 91 80 3 831815 - 1830 82 7 89 85 3 881830 - 1845 96 7 103 67 2 691845 - 1900 97 1 98 74 4 78Hourly Total 357 24 381 306 12 318
Session Total 1797 116 1913 1497 82 1579
W/B to A220 Right to A206 (North)
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Friday 10th November 2017
Junction: (2) A206 / A220
Approach: A220
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL0700 - 0715 19 0 19 121 3 1240715 - 0730 10 1 11 95 6 1010730 - 0745 9 0 9 90 4 940745 - 0800 10 0 10 86 6 92Hourly Total 48 1 49 392 19 4110800 - 0815 16 1 17 77 7 840815 - 0830 22 0 22 95 6 1010830 - 0845 11 0 11 90 6 960845 - 0900 5 1 6 76 5 81Hourly Total 54 2 56 338 24 3620900 - 0915 8 1 9 71 10 810915 - 0930 9 1 10 80 7 870930 - 0945 18 2 20 85 9 940945 - 1000 16 0 16 86 6 92Hourly Total 51 4 55 322 32 354
Session Total 153 7 160 1052 75 1127
1430 - 1445 11 2 13 67 14 811445 - 1500 11 0 11 76 9 85Hourly Total 22 2 24 143 23 1661500 - 1515 8 0 8 64 10 741515 - 1530 8 0 8 58 11 691530 - 1545 12 0 12 76 5 811545 - 1600 4 2 6 68 9 77Hourly Total 32 2 34 266 35 3011600 - 1615 6 1 7 86 8 941615 - 1630 8 0 8 93 9 1021630 - 1645 17 0 17 65 8 731645 - 1700 8 0 8 89 6 95Hourly Total 39 1 40 333 31 3641700 - 1715 10 0 10 84 4 881715 - 1730 11 1 12 69 7 761730 - 1745 12 2 14 75 8 831745 - 1800 10 0 10 88 5 93Hourly Total 43 3 46 316 24 3401800 - 1815 13 0 13 104 9 1131815 - 1830 2 0 2 85 2 871830 - 1845 8 0 8 84 7 911845 - 1900 9 0 9 87 3 90Hourly Total 32 0 32 360 21 381
Session Total 168 8 176 1418 134 1552
Left to A206 (North) E/B to A206 (East)
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Saturday 11th November 2017
Junction: (2) A206 / A220
Approach: A220
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL1100 - 1115 15 1 16 95 6 1011115 - 1130 5 0 5 113 6 1191130 - 1145 22 0 22 86 6 921145 - 1200 10 0 10 114 3 117Hourly Total 52 1 53 408 21 4291200 - 1215 15 1 16 79 5 841215 - 1230 16 0 16 92 4 961230 - 1245 14 0 14 83 6 891245 - 1300 14 0 14 96 3 99Hourly Total 59 1 60 350 18 3681300 - 1315 17 0 17 86 2 881315 - 1330 12 0 12 89 7 961330 - 1345 9 0 9 97 4 1011345 - 1400 9 0 9 96 3 99Hourly Total 47 0 47 368 16 3841400 - 1415 13 0 13 104 5 1091415 - 1430 7 1 8 86 5 911430 - 1445 5 0 5 96 6 1021445 - 1500 13 0 13 85 3 88Hourly Total 38 1 39 371 19 390
TOTAL 196 3 199 1497 74 1571
Left to A206 (North) E/B to A206 (East)
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Saturday 11th November 2017
Junction: (3) A206 / Alford Road / De Luci Road
Approach: Alford Road
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL1100 - 1115 6 0 6 0 0 0 1 0 11115 - 1130 3 0 3 0 0 0 2 0 21130 - 1145 6 0 6 0 0 0 4 0 41145 - 1200 4 0 4 0 0 0 2 0 2Hourly Total 19 0 19 0 0 0 9 0 91200 - 1215 8 0 8 0 0 0 4 0 41215 - 1230 5 0 5 0 0 0 6 0 61230 - 1245 3 0 3 1 0 1 2 0 21245 - 1300 6 0 6 0 0 0 0 0 0Hourly Total 22 0 22 1 0 1 12 0 121300 - 1315 4 0 4 0 0 0 1 1 21315 - 1330 6 0 6 0 0 0 5 0 51330 - 1345 6 0 6 0 0 0 2 0 21345 - 1400 3 0 3 0 0 0 3 0 3Hourly Total 19 0 19 0 0 0 11 1 121400 - 1415 7 0 7 0 0 0 2 0 21415 - 1430 3 0 3 0 0 0 2 0 21430 - 1445 2 0 2 0 0 0 2 0 21445 - 1500 4 0 4 0 0 0 4 0 4Hourly Total 16 0 16 0 0 0 10 0 10
TOTAL 76 0 76 1 0 1 42 1 43
Left to A206 (South) W/B to De Luci Road Right to A206 (North)
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Saturday 11th November 2017
Junction: (3) A206 / Alford Road / De Luci Road
Approach: A206 (South)
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL1100 - 1115 1 0 1 67 2 69 6 0 61115 - 1130 1 0 1 67 2 69 7 0 71130 - 1145 0 0 0 65 3 68 8 0 81145 - 1200 0 0 0 67 3 70 9 0 9Hourly Total 2 0 2 266 10 276 30 0 301200 - 1215 1 0 1 78 2 80 13 0 131215 - 1230 1 0 1 78 4 82 9 0 91230 - 1245 0 0 0 66 3 69 7 0 71245 - 1300 0 0 0 90 5 95 10 0 10Hourly Total 2 0 2 312 14 326 39 0 391300 - 1315 1 0 1 98 2 100 11 0 111315 - 1330 0 0 0 90 1 91 15 0 151330 - 1345 0 0 0 74 3 77 7 0 71345 - 1400 1 0 1 81 3 84 9 0 9Hourly Total 2 0 2 343 9 352 42 0 421400 - 1415 0 0 0 88 4 92 7 1 81415 - 1430 4 0 4 85 2 87 9 1 101430 - 1445 1 0 1 79 1 80 14 0 141445 - 1500 0 0 0 68 3 71 12 0 12Hourly Total 5 0 5 320 10 330 42 2 44
TOTAL 11 0 11 1241 43 1284 153 2 155
Left to De Luci Road N/B to A206 (North) Right to Alford Road
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Saturday 11th November 2017
Junction: (3) A206 / Alford Road / De Luci Road
Approach: De Luci Road
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL1100 - 1115 0 0 0 1 0 1 2 0 21115 - 1130 0 0 0 0 0 0 1 0 11130 - 1145 0 0 0 0 0 0 0 0 01145 - 1200 0 0 0 1 0 1 0 0 0Hourly Total 0 0 0 2 0 2 3 0 31200 - 1215 1 0 1 0 0 0 0 0 01215 - 1230 0 0 0 1 0 1 0 0 01230 - 1245 1 0 1 0 0 0 0 0 01245 - 1300 0 0 0 0 0 0 0 0 0Hourly Total 2 0 2 1 0 1 0 0 01300 - 1315 0 0 0 0 0 0 1 0 11315 - 1330 1 0 1 0 0 0 0 0 01330 - 1345 1 0 1 0 0 0 0 0 01345 - 1400 1 0 1 0 0 0 1 0 1Hourly Total 3 0 3 0 0 0 2 0 21400 - 1415 0 0 0 0 0 0 0 0 01415 - 1430 2 0 2 0 0 0 2 0 21430 - 1445 0 0 0 0 0 0 0 0 01445 - 1500 0 0 0 0 0 0 0 0 0Hourly Total 2 0 2 0 0 0 2 0 2
TOTAL 7 0 7 3 0 3 7 0 7
Left to A206 (North) E/B to Alford Road Right to A206 (South)
Produced by Road Data Services Ltd
Bexley - Manual Traffic Survey, Saturday 11th November 2017
Junction: (4) A206 / Riverdale Road
Approach: Riverdale Road
TIME LIGHT HEAVY TOTAL LIGHT HEAVY TOTAL1100 - 1115 0 0 0 0 0 01115 - 1130 0 0 0 0 0 01130 - 1145 0 0 0 0 0 01145 - 1200 0 0 0 0 0 0Hourly Total 0 0 0 0 0 01200 - 1215 0 0 0 0 0 01215 - 1230 0 0 0 0 0 01230 - 1245 0 0 0 0 0 01245 - 1300 0 0 0 0 0 0Hourly Total 0 0 0 0 0 01300 - 1315 0 0 0 0 0 01315 - 1330 0 0 0 0 0 01330 - 1345 0 0 0 0 0 01345 - 1400 0 0 0 0 0 0Hourly Total 0 0 0 0 0 01400 - 1415 0 0 0 0 0 01415 - 1430 0 0 0 0 0 01430 - 1445 0 0 0 0 0 01445 - 1500 0 0 0 0 0 0Hourly Total 0 0 0 0 0 0
TOTAL 0 0 0 0 0 0
Left to A206 (North) Right to A206 (South)
Produced by Road Data Services Ltd
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 73
Appendix G 2022 Baseline Data
Junction 1: Site AccessPeak Hour: AM (08:00-09:00) Through traffic growth factor = 1.061
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 0 0 0 1 0 1 102 6 109 7 0 7 0 0 0 2 0 2 88 6 94 7 1 8 0 0 00815-0830 0 0 0 13 0 13 87 4 92 3 0 3 0 0 0 1 0 1 106 13 119 6 0 6 0 0 00830-0845 0 0 0 6 1 7 108 3 111 10 1 11 0 0 0 2 0 2 124 6 130 8 0 8 0 0 00845-0900 0 0 0 7 0 7 143 5 148 8 0 8 0 0 0 9 0 9 79 5 85 9 1 10 0 0 0TOTAL 0 0 0 27 1 28 441 19 460 28 1 29 0 0 0 14 0 14 397 31 428 30 2 32 0 0 0
HV = 0% HV = 4% HV = 4% HV = 3% HV = 0% HV = 0% HV = 7% HV = 6% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 7 1 70815-0830 7 0 8 0830-0845 8 1 90845-0900 10 1 6
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C A B C
A 0 28 460 A 0 1 19 A 0.0% 3.6% 4.2% A 0.0% 6.3% 7.2%B 29 0 14 B 1 0 0 B 3.4% 0.0% 0.0% B 0.0% 0.0% 3.4%C 428 32 0 C 31 2 0 C 7.2% 6.3% 0.0% C 4.2% 3.6% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 1 109 A 0 13 92 A 0 7 111 A 0 7 148B 7 0 2 B 3 0 1 B 11 0 2 B 8 0 9C 94 8 0 C 119 6 0 C 130 8 0 C 85 10 0
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 8 94 A 0 6 119 A 0 8 130 A 0 10 85B 2 0 7 B 1 0 3 B 2 0 11 B 9 0 8C 109 1 0 C 92 13 0 C 111 7 0 C 148 7 0
TIME PERIOD
Junction 1: Site AccessPeak Hour: PM (17:00-18:00) Through traffic growth factor = 1.061
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1700-1715 0 0 0 7 0 7 81 3 84 9 0 9 0 0 0 6 0 6 142 5 147 0 0 0 0 0 01715-1730 0 0 0 7 0 7 81 2 83 7 0 7 0 0 0 2 0 2 143 2 145 3 0 3 0 0 01730-1745 0 0 0 8 0 8 118 3 121 7 0 7 0 0 0 4 1 5 133 4 137 3 0 3 0 0 01745-1800 0 0 0 2 0 2 89 2 91 10 0 10 0 0 0 2 0 2 143 3 146 6 0 6 0 0 0TOTAL 0 0 0 24 0 24 369 11 379 33 0 33 0 0 0 14 1 15 560 15 575 12 0 12 0 0 0
HV = 0% HV = 0% HV = 3% HV = 0% HV = 0% HV = 7% HV = 3% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 6 1 101715-1730 6 1 10 1730-1745 9 1 91745-1800 6 1 10
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C A B C
A 0 24 379 A 0 0 11 A 0.0% 0.0% 2.8% A 0.0% 0.0% 2.6%B 33 0 15 B 0 0 1 B 0.0% 0.0% 6.7% B 6.7% 0.0% 0.0%C 575 12 0 C 15 0 0 C 2.6% 0.0% 0.0% C 2.8% 0.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0 7 84 A 0 7 83 A 0 8 121 A 0 2 91B 9 0 6 B 7 0 2 B 7 0 5 B 10 0 2C 147 0 0 C 145 3 0 C 137 3 0 C 146 6 0
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0 0 147 A 0 3 145 A 0 3 137 A 0 6 146B 6 0 9 B 2 0 7 B 5 0 7 B 2 0 10C 84 7 0 C 83 7 0 C 121 8 0 C 91 2 0
TIME PERIOD
Junction 1: Site AccessPeak Hour: Saturday (12:00-13:00) Through traffic growth factor = 1.0598
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1200-1215 0 0 0 14 0 14 117 2 120 15 0 15 0 0 0 11 1 12 96 3 99 16 1 17 0 0 01215-1230 0 0 0 12 0 12 111 8 120 13 1 14 0 0 0 10 0 10 96 3 99 11 0 11 0 0 01230-1245 0 0 0 11 1 12 97 2 99 12 0 12 0 0 0 14 0 14 74 2 76 12 0 12 0 0 01245-1300 0 0 0 14 0 14 88 3 91 15 1 16 0 0 0 10 0 10 102 4 107 19 0 19 0 0 0TOTAL 0 0 0 51 1 52 413 16 429 55 2 57 0 0 0 45 1 46 368 13 381 58 1 59 0 0 0
HV = 0% HV = 2% HV = 4% HV = 4% HV = 0% HV = 2% HV = 3% HV = 2% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 9 2 81215-1230 9 2 7 1230-1245 7 2 61245-1300 7 2 8
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C A B C
A 0 52 429 A 0 1 16 A 0.0% 1.9% 3.7% A 0.0% 1.7% 3.3%B 57 0 46 B 2 0 1 B 3.5% 0.0% 2.2% B 2.2% 0.0% 3.5%C 381 59 0 C 13 1 0 C 3.3% 1.7% 0.0% C 3.7% 1.9% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 14 120 A 0 12 120 A 0 12 99 A 0 14 91B 15 0 12 B 14 0 10 B 12 0 14 B 16 0 10C 99 17 0 C 99 11 0 C 76 12 0 C 107 19 0
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 17 99 A 0 11 99 A 0 12 76 A 0 19 107B 12 0 15 B 10 0 14 B 14 0 12 B 10 0 16C 120 14 0 C 120 12 0 C 99 12 0 C 91 14 0
TIME PERIOD
Junction 1: Site AccessPeak Hour: Sunday (12:00-13:00) Through traffic growth factor = 1.0582
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1200-1215 0 0 0 14 0 14 125 2 127 15 0 15 0 0 0 11 1 12 100 3 103 16 1 17 0 0 01215-1230 0 0 0 12 0 12 120 8 129 13 1 14 0 0 0 10 0 10 100 3 103 11 0 11 0 0 01230-1245 0 0 0 11 1 12 114 2 117 12 0 12 0 0 0 14 0 14 77 2 79 12 0 12 0 0 01245-1300 0 0 0 14 0 14 128 3 131 15 1 16 0 0 0 10 0 10 106 4 110 19 0 19 0 0 0TOTAL 0 0 0 51 1 52 488 16 504 55 2 57 0 0 0 45 1 46 382 13 395 58 1 59 0 0 0
HV = 0% HV = 2% HV = 3% HV = 4% HV = 0% HV = 2% HV = 3% HV = 2% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 9 2 81215-1230 9 2 8 1230-1245 9 2 61245-1300 10 2 9
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C A B C
A 0 52 504 A 0 1 16 A 0.0% 1.9% 3.2% A 0.0% 1.7% 3.2%B 57 0 46 B 2 0 1 B 3.5% 0.0% 2.2% B 2.2% 0.0% 3.5%C 395 59 0 C 13 1 0 C 3.2% 1.7% 0.0% C 3.2% 1.9% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 14 127 A 0 12 129 A 0 12 117 A 0 14 131B 15 0 12 B 14 0 10 B 12 0 14 B 16 0 10C 103 17 0 C 103 11 0 C 79 12 0 C 110 19 0
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 17 103 A 0 11 103 A 0 12 79 A 0 19 110B 12 0 15 B 10 0 14 B 14 0 12 B 10 0 16C 127 14 0 C 129 12 0 C 117 12 0 C 131 14 0
TIME PERIOD
Junction 2: Bexley Road Mini-RoundaboutPeak Hour: PM (17:00-18:00) Committed Development
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1700-1715 0 0 0 0 0 0 -1 0 -1 0 0 0 0 0 0 1 0 1 12 0 12 0 0 0 0 0 01715-1730 0 0 0 0 0 0 -1 0 -1 0 0 0 0 0 0 1 0 1 12 0 12 0 0 0 0 0 01730-1745 0 0 0 0 0 0 -1 0 -1 0 0 0 0 0 0 1 0 1 12 0 12 0 0 0 0 0 01745-1800 0 0 0 0 0 0 -1 0 -1 0 0 0 0 0 0 1 0 1 12 0 12 0 0 0 0 0 0TOTAL 0 0 0 0 0 0 -4 0 -4 0 0 0 0 0 0 4 0 4 48 0 48 0 0 0 0 0 0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 -0.07 0.07 0.801715-1730 -0.07 0.07 0.80 1730-1745 -0.07 0.07 0.801745-1800 -0.07 0.07 0.80
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 0 -4 A 0 0 0 A 0.0% 0.0% 0.0%B 0 0 4 B 0 0 0 B 0.0% 0.0% 0.0%C 48 0 0 C 0 0 0 C 0.0% 0.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0 0 -1 A 0 0 -1 A 0 0 -1 A 0 0 -1B 0 0 1 B 0 0 1 B 0 0 1 B 0 0 1C 12 0 0 C 12 0 0 C 12 0 0 C 12 0 0
TIME PERIOD
Junction 2: Bexley Road Mini-RoundaboutPeak Hour: PM (17:00-18:00) 2022 Background
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1700-1715 0 0 0 22 2 23 85 4 89 14 0 14 0 0 0 97 9 106 87 5 91 146 4 150 0 0 01715-1730 0 0 0 19 1 20 80 4 84 14 0 14 0 0 0 80 7 87 101 5 106 145 4 149 0 0 01730-1745 0 0 0 22 2 23 93 5 98 18 0 18 0 0 0 86 8 94 107 6 112 136 4 140 0 0 01745-1800 0 0 0 20 1 21 86 4 90 12 0 12 0 0 0 89 8 97 105 6 110 123 4 126 0 0 0TOTAL 0 0 0 82 6 87 344 18 361 57 0 58 0 0 0 353 32 384 400 21 419 550 16 565 0 0 0
HV = 0% HV = 7% HV = 5% HV = 0% HV = 0% HV = 8% HV = 5% HV = 3% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 7.47 8.00 16.071715-1730 6.93 6.73 17.00 1730-1745 8.07 7.47 16.801745-1800 7.40 7.27 15.73
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 87 361 A 0 6 18 A 0.0% 6.9% 5.0%B 58 0 384 B 0 0 32 B 0.0% 0.0% 8.3%C 419 565 0 C 21 16 0 C 5.0% 2.8% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0 23 89 A 0 20 84 A 0 23 98 A 0 21 90B 14 0 106 B 14 0 87 B 18 0 94 B 12 0 97C 91 150 0 C 106 149 0 C 112 140 0 C 110 126 0
TIME PERIOD
Junction 2: Bexley Road Mini-RoundaboutPeak Hour: AM (08:00-09:00) 2022 Background
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 0 0 0 13 1 14 64 6 69 21 0 21 0 0 0 102 7 108 74 10 84 56 6 62 0 0 00815-0830 0 0 0 15 1 16 63 6 68 14 0 14 0 0 0 122 8 130 91 12 103 97 11 108 0 0 00830-0845 0 0 0 12 1 13 80 7 86 16 0 16 0 0 0 99 7 105 76 10 86 104 12 116 0 0 00845-0900 0 0 0 12 1 13 69 6 74 8 0 8 0 0 0 99 7 105 79 10 89 72 8 80 0 0 0TOTAL 0 0 0 53 3 56 275 25 297 58 1 59 0 0 0 422 28 448 321 42 362 328 38 366 0 0 0
HV = 0% HV = 5% HV = 8% HV = 2% HV = 0% HV = 6% HV = 12% HV = 10% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 5.53 8.60 9.730815-0830 5.60 9.60 14.07 0830-0845 6.60 8.07 13.470845-0900 5.80 7.53 11.27
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 56 297 A 0 3 25 A 0.0% 5.4% 8.4%B 59 0 448 B 1 0 28 B 1.7% 0.0% 6.3%C 362 366 0 C 42 38 0 C 11.6% 10.4% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 14 69 A 0 16 68 A 0 13 86 A 0 13 74B 21 0 108 B 14 0 130 B 16 0 105 B 8 0 105C 84 62 0 C 103 108 0 C 86 116 0 C 89 80 0
TIME PERIOD
Junction 2: Bexley Road Mini-RoundaboutPeak Hour: AM (08:00-09:00) Committed Development
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 0 0 0 0 0 0 12 0 12 0 0 0 0 0 0 13 0 13 -5 0 -20 0 0 0 0 0 00815-0830 0 0 0 0 0 0 12 0 12 0 0 0 0 0 0 13 0 13 -5 0 -20 0 0 0 0 0 00830-0845 0 0 0 0 0 0 12 0 12 0 0 0 0 0 0 13 0 13 -5 0 -20 0 0 0 0 0 00845-0900 0 0 0 0 0 0 12 0 12 0 0 0 0 0 0 13 0 13 -5 0 -20 0 0 0 0 0 0TOTAL 0 0 0 0 0 0 48 0 48 0 0 0 0 0 0 52 0 52 -20 0 -80 0 0 0 0 0 0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 0.80 0.87 -1.330815-0830 0.80 0.87 -1.33 0830-0845 0.80 0.87 -1.330845-0900 0.80 0.87 -1.33
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 0 48 A 0 0 0 A 0.0% 0.0% 0.0%B 0 0 52 B 0 0 0 B 0.0% 0.0% 0.0%C -80 0 0 C 0 0 0 C 0.0% 0.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 0 12 A 0 0 12 A 0 0 12 A 0 0 12B 0 0 13 B 0 0 13 B 0 0 13 B 0 0 13C -20 0 0 C -20 0 0 C -20 0 0 C -20 0 0
TIME PERIOD
Junction 2: Bexley Road Mini-RoundaboutPeak Hour: PM (17:00-18:00) 2022 Total
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1700-1715 0 0 0 30 2 31 92 4 96 27 0 27 0 0 0 98 9 107 112 5 116 146 4 150 0 0 01715-1730 0 0 0 27 1 28 87 4 91 27 0 27 0 0 0 81 7 88 126 5 131 145 4 149 0 0 01730-1745 0 0 0 30 2 31 100 5 105 31 0 31 0 0 0 87 8 95 132 6 137 136 4 140 0 0 01745-1800 0 0 0 28 1 29 93 4 97 25 0 25 0 0 0 90 8 98 130 6 135 123 4 126 0 0 0TOTAL 0 0 0 114 6 119 372 18 389 109 0 110 0 0 0 357 32 388 500 21 519 550 16 565 0 0 0
HV = 0% HV = 5% HV = 5% HV = 0% HV = 0% HV = 8% HV = 4% HV = 3% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 8.47 8.93 17.731715-1730 7.93 7.67 18.67 1730-1745 9.07 8.40 18.471745-1800 8.40 8.20 17.40
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 119 389 A 0 6 18 A 0.0% 5.0% 4.6%B 110 0 388 B 0 0 32 B 0.0% 0.0% 8.2%C 519 565 0 C 21 16 0 C 4.0% 2.8% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0 31 96 A 0 28 91 A 0 31 105 A 0 29 97B 27 0 107 B 27 0 88 B 31 0 95 B 25 0 98C 116 150 0 C 131 149 0 C 137 140 0 C 135 126 0
TIME PERIOD
Junction 2: Bexley Road Mini-RoundaboutPeak Hour: AM (08:00-09:00) Erith Quarry Development
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 0 0 0 19 0 19 19 0 19 21 0 21 0 0 0 0 0 0 0 0 16 0 0 0 0 0 00815-0830 0 0 0 19 0 19 19 0 19 21 0 21 0 0 0 0 0 0 0 0 16 0 0 0 0 0 00830-0845 0 0 0 19 0 19 19 0 19 21 0 21 0 0 0 0 0 0 0 0 16 0 0 0 0 0 00845-0900 0 0 0 19 0 19 19 0 19 21 0 21 0 0 0 0 0 0 0 0 16 0 0 0 0 0 0TOTAL 0 0 0 76 0 76 76 0 76 84 0 84 0 0 0 0 0 0 0 0 64 0 0 0 0 0 0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 2.53 1.40 1.070815-0830 2.53 1.40 1.07 0830-0845 2.53 1.40 1.070845-0900 2.53 1.40 1.07
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 76 76 A 0 0 0 A 0.0% 0.0% 0.0%B 84 0 0 B 0 0 0 B 0.0% 0.0% 0.0%C 64 0 0 C 0 0 0 C 0.0% 0.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 19 19 A 0 19 19 A 0 19 19 A 0 19 19B 21 0 0 B 21 0 0 B 21 0 0 B 21 0 0C 16 0 0 C 16 0 0 C 16 0 0 C 16 0 0
TIME PERIOD
Junction 2: Bexley Road Mini-RoundaboutPeak Hour: PM (17:00-18:00) Erith Quarry Development
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1700-1715 0 0 0 8 0 8 8 0 8 13 0 13 0 0 0 0 0 0 13 0 13 0 0 0 0 0 01715-1730 0 0 0 8 0 8 8 0 8 13 0 13 0 0 0 0 0 0 13 0 13 0 0 0 0 0 01730-1745 0 0 0 8 0 8 8 0 8 13 0 13 0 0 0 0 0 0 13 0 13 0 0 0 0 0 01745-1800 0 0 0 8 0 8 8 0 8 13 0 13 0 0 0 0 0 0 13 0 13 0 0 0 0 0 0TOTAL 0 0 0 32 0 32 32 0 32 52 0 52 0 0 0 0 0 0 52 0 52 0 0 0 0 0 0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 1.07 0.87 0.871715-1730 1.07 0.87 0.87 1730-1745 1.07 0.87 0.871745-1800 1.07 0.87 0.87
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 32 32 A 0 0 0 A 0.0% 0.0% 0.0%B 52 0 0 B 0 0 0 B 0.0% 0.0% 0.0%C 52 0 0 C 0 0 0 C 0.0% 0.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0 8 8 A 0 8 8 A 0 8 8 A 0 8 8B 13 0 0 B 13 0 0 B 13 0 0 B 13 0 0C 13 0 0 C 13 0 0 C 13 0 0 C 13 0 0
TIME PERIOD
Junction 2: Bexley Road Mini-RoundaboutPeak Hour: AM (08:00-09:00) 2022 Total
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 0 0 0 32 1 33 95 6 100 42 0 42 0 0 0 115 7 121 69 10 80 56 6 62 0 0 00815-0830 0 0 0 34 1 35 94 6 99 35 0 35 0 0 0 135 8 143 86 12 99 97 11 108 0 0 00830-0845 0 0 0 31 1 32 111 7 117 37 0 37 0 0 0 112 7 118 71 10 82 104 12 116 0 0 00845-0900 0 0 0 31 1 32 100 6 105 29 0 29 0 0 0 112 7 118 74 10 85 72 8 80 0 0 0TOTAL 0 0 0 129 3 132 399 25 421 142 1 143 0 0 0 474 28 500 301 42 346 328 38 366 0 0 0
HV = 0% HV = 2% HV = 6% HV = 1% HV = 0% HV = 6% HV = 12% HV = 10% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 8.87 10.87 9.470815-0830 8.93 11.87 13.80 0830-0845 9.93 10.33 13.200845-0900 9.13 9.80 11.00
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 132 421 A 0 3 25 A 0.0% 2.3% 5.9%B 143 0 500 B 1 0 28 B 0.7% 0.0% 5.6%C 346 366 0 C 42 38 0 C 12.1% 10.4% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 33 100 A 0 35 99 A 0 32 117 A 0 32 105B 42 0 121 B 35 0 143 B 37 0 118 B 29 0 118C 80 62 0 C 99 108 0 C 82 116 0 C 85 80 0
TIME PERIOD
Junction 2: Bexley Road Mini-RoundaboutPeak Hour: AM (08:00-09:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 0 0 0 32 1 33 95 6 100 42 0 42 0 0 0 115 7 121 69 10 80 56 6 62 0 0 00815-0830 0 0 0 34 1 35 94 6 99 35 0 35 0 0 0 135 8 143 86 12 99 97 11 108 0 0 00830-0845 0 0 0 31 1 32 111 7 117 37 0 37 0 0 0 112 7 118 71 10 82 104 12 116 0 0 00845-0900 0 0 0 31 1 32 100 6 105 29 0 29 0 0 0 112 7 118 74 10 85 72 8 80 0 0 0TOTAL 0 0 0 129 3 132 399 25 421 142 1 143 0 0 0 474 28 500 301 42 346 328 38 366 0 0 0
HV = 0% HV = 2% HV = 6% HV = 1% HV = 0% HV = 6% HV = 12% HV = 10% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 9 11 90815-0830 9 12 14 0830-0845 10 10 130845-0900 9 10 11
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C A B C
A 0 132 421 A 0 3 25 A 0.0% 2.3% 5.9% A 0.0% 10.4% 12.1%B 143 0 500 B 1 0 28 B 0.7% 0.0% 5.6% B 5.6% 0.0% 0.7%C 346 366 0 C 42 38 0 C 12.1% 10.4% 0.0% C 5.9% 2.3% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 33 100 A 0 35 99 A 0 32 117 A 0 32 105B 42 0 121 B 35 0 143 B 37 0 118 B 29 0 118C 80 62 0 C 99 108 0 C 82 116 0 C 85 80 0
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 62 80 A 0 108 99 A 0 116 82 A 0 80 85B 121 0 42 B 143 0 35 B 118 0 37 B 118 0 29C 100 33 0 C 99 35 0 C 117 32 0 C 105 32 0
TIME PERIOD
Junction 2: Bexley Road Mini-RoundaboutPeak Hour: PM (17:00-18:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1700-1715 0 0 0 30 2 31 92 4 96 27 0 27 0 0 0 98 9 107 112 5 116 146 4 150 0 0 01715-1730 0 0 0 27 1 28 87 4 91 27 0 27 0 0 0 81 7 88 126 5 131 145 4 149 0 0 01730-1745 0 0 0 30 2 31 100 5 105 31 0 31 0 0 0 87 8 95 132 6 137 136 4 140 0 0 01745-1800 0 0 0 28 1 29 93 4 97 25 0 25 0 0 0 90 8 98 130 6 135 123 4 126 0 0 0TOTAL 0 0 0 114 6 119 372 18 389 109 0 110 0 0 0 357 32 388 500 21 519 550 16 565 0 0 0
HV = 0% HV = 5% HV = 5% HV = 0% HV = 0% HV = 8% HV = 4% HV = 3% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 8 9 181715-1730 8 8 19 1730-1745 9 8 181745-1800 8 8 17
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C A B C
A 0 119 389 A 0 6 18 A 0.0% 5.0% 4.6% A 0.0% 2.8% 4.0%B 110 0 388 B 0 0 32 B 0.0% 0.0% 8.2% B 8.2% 0.0% 0.0%C 519 565 0 C 21 16 0 C 4.0% 2.8% 0.0% C 4.6% 5.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0 31 96 A 0 28 91 A 0 31 105 A 0 29 97B 27 0 107 B 27 0 88 B 31 0 95 B 25 0 98C 116 150 0 C 131 149 0 C 137 140 0 C 135 126 0
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0 150 116 A 0 149 131 A 0 140 137 A 0 126 135B 107 0 27 B 88 0 27 B 95 0 31 B 98 0 25C 96 31 0 C 91 28 0 C 105 31 0 C 97 29 0
TIME PERIOD
Junction 2: Bexley Road Mini-RoundaboutPeak Hour: Saturday (12:00-13:00) Through traffic growth factor = 1.0598
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1200-1215 0 0 0 33 0 33 105 2 107 26 1 27 0 0 0 92 5 97 88 4 92 111 7 118 0 0 01215-1230 0 0 0 42 0 42 91 7 99 27 0 27 0 0 0 106 4 110 84 3 87 136 5 142 0 0 01230-1245 0 0 0 36 0 36 77 1 78 25 0 25 0 0 0 96 6 103 65 3 68 118 4 123 0 0 01245-1300 0 0 0 41 0 41 70 5 75 25 0 25 0 0 0 110 3 113 92 2 94 130 3 133 0 0 0TOTAL 0 0 0 151 0 151 343 16 359 104 1 105 0 0 0 404 19 423 329 13 341 495 20 516 0 0 0
HV = 0% HV = 0% HV = 4% HV = 1% HV = 0% HV = 5% HV = 4% HV = 4% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 9 8 141215-1230 9 9 15 1230-1245 8 9 131245-1300 8 9 15
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C A B C
A 0 151 359 A 0 0 16 A 0.0% 0.0% 4.4% A 0.0% 3.9% 3.7%B 105 0 423 B 1 0 19 B 1.0% 0.0% 4.5% B 4.5% 0.0% 1.0%C 341 516 0 C 13 20 0 C 3.7% 3.9% 0.0% C 4.4% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 33 107 A 0 42 99 A 0 36 78 A 0 41 75B 27 0 97 B 27 0 110 B 25 0 103 B 25 0 113C 92 118 0 C 87 142 0 C 68 123 0 C 94 133 0
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 118 92 A 0 142 87 A 0 123 68 A 0 133 94B 97 0 27 B 110 0 27 B 103 0 25 B 113 0 25C 107 33 0 C 99 42 0 C 78 36 0 C 75 41 0
TIME PERIOD
Junction 3: Erith Quarry RoundaboutPeak Hour: AM (08:00-09:00) 2022 Total
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 0 0 0 25 0 25 94 3 97 132 0 132 0 0 0 25 0 25 61 5 66 21 0 21 0 0 00815-0830 0 0 0 27 0 27 111 4 115 36 0 36 0 0 0 27 0 27 90 7 98 34 0 34 0 0 00830-0845 0 0 0 39 0 39 103 4 106 61 0 61 0 0 0 39 0 39 68 6 74 70 0 70 0 0 00845-0900 0 0 0 74 0 74 99 4 102 133 0 133 0 0 0 74 0 74 70 6 76 23 0 23 0 0 0TOTAL 0 0 0 165 0 165 406 15 420 362 0 362 0 0 0 165 0 165 289 24 314 148 0 148 0 0 0
HV = 0% HV = 0% HV = 4% HV = 0% HV = 0% HV = 0% HV = 8% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 8.13 10.47 5.800815-0830 9.47 4.20 8.80 0830-0845 9.67 6.67 9.600845-0900 11.73 13.80 6.60
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 165 420 A 0 0 15 A 0.0% 0.0% 3.6%B 362 0 165 B 0 0 0 B 0.0% 0.0% 0.0%C 314 148 0 C 24 0 0 C 7.6% 0.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 25 97 A 0 27 115 A 0 39 106 A 0 74 102B 132 0 25 B 36 0 27 B 61 0 39 B 133 0 74C 66 21 0 C 98 34 0 C 74 70 0 C 76 23 0
TIME PERIOD
Junction 3: Erith Quarry RoundaboutPeak Hour: AM (08:00-09:00) 2022 Background
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 0 0 0 0 0 0 86 3 89 0 0 0 0 0 0 0 0 0 64 5 69 0 0 0 0 0 00815-0830 0 0 0 0 0 0 101 4 105 0 0 0 0 0 0 0 0 0 94 7 102 0 0 0 0 0 00830-0845 0 0 0 0 0 0 93 4 96 0 0 0 0 0 0 0 0 0 72 6 78 0 0 0 0 0 00845-0900 0 0 0 0 0 0 91 4 94 0 0 0 0 0 0 0 0 0 74 6 80 0 0 0 0 0 0TOTAL 0 0 0 0 0 0 370 15 384 0 0 0 0 0 0 0 0 0 304 24 329 0 0 0 0 0 0
HV = 0% HV = 0% HV = 4% HV = 0% HV = 0% HV = 0% HV = 7% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 5.93 0.00 4.600815-0830 7.00 0.00 6.80 0830-0845 6.40 0.00 5.200845-0900 6.27 0.00 5.33
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 0 384 A 0 0 15 A 0.0% 0.0% 3.9%B 0 0 0 B 0 0 0 B 0.0% 0.0% 0.0%C 329 0 0 C 24 0 0 C 7.3% 0.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 0 89 A 0 0 105 A 0 0 96 A 0 0 94B 0 0 0 B 0 0 0 B 0 0 0 B 0 0 0C 69 0 0 C 102 0 0 C 78 0 0 C 80 0 0
TIME PERIOD
Junction 3: Erith Quarry RoundaboutPeak Hour: AM (08:00-09:00) Committed Development
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 0 0 0 0 0 0 8 0 8 0 0 0 0 0 0 0 0 0 -3 0 -3 0 0 0 0 0 00815-0830 0 0 0 0 0 0 10 0 10 0 0 0 0 0 0 0 0 0 -4 0 -4 0 0 0 0 0 00830-0845 0 0 0 0 0 0 10 0 10 0 0 0 0 0 0 0 0 0 -4 0 -4 0 0 0 0 0 00845-0900 0 0 0 0 0 0 8 0 8 0 0 0 0 0 0 0 0 0 -4 0 -4 0 0 0 0 0 0TOTAL 0 0 0 0 0 0 36 0 36 0 0 0 0 0 0 0 0 0 -15 0 -15 0 0 0 0 0 0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 0.53 0.00 -0.200815-0830 0.67 0.00 -0.27 0830-0845 0.67 0.00 -0.270845-0900 0.53 0.00 -0.27
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 0 36 A 0 0 0 A 0.0% 0.0% 0.0%B 0 0 0 B 0 0 0 B 0.0% 0.0% 0.0%C -15 0 0 C 0 0 0 C 0.0% 0.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 0 8 A 0 0 10 A 0 0 10 A 0 0 8B 0 0 0 B 0 0 0 B 0 0 0 B 0 0 0C -3 0 0 C -4 0 0 C -4 0 0 C -4 0 0
TIME PERIOD
Junction 3: Erith Quarry RoundaboutPeak Hour: AM (08:00-09:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 7 0 7 25 0 25 94 3 97 132 0 132 0 0 0 25 0 25 61 5 66 21 0 21 0 0 00815-0830 11 0 11 27 0 27 111 4 115 36 0 36 0 0 0 27 0 27 90 7 98 34 0 34 0 0 00830-0845 4 0 4 39 0 39 103 4 106 61 0 61 0 0 0 39 0 39 68 6 74 70 0 70 0 0 00845-0900 0 0 0 74 0 74 99 4 102 133 0 133 0 0 0 74 0 74 70 6 76 23 0 23 0 0 0TOTAL 22 0 22 165 0 165 406 15 420 362 0 362 0 0 0 165 0 165 289 24 314 148 0 148 0 0 0
HV = 0% HV = 0% HV = 4% HV = 0% HV = 0% HV = 0% HV = 8% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 9 10 60815-0830 10 4 9 0830-0845 10 7 100845-0900 12 14 7
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 22 165 420 A 0 0 15 A 0.0% 0.0% 3.6%B 362 0 165 B 0 0 0 B 0.0% 0.0% 0.0%C 314 148 0 C 24 0 0 C 7.6% 0.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 7 25 97 A 11 27 115 A 4 39 106 A 0 74 102B 132 0 25 B 36 0 27 B 61 0 39 B 133 0 74C 66 21 0 C 98 34 0 C 74 70 0 C 76 23 0
TIME PERIOD
Junction 3: Erith Quarry RoundaboutPeak Hour: AM (08:00-09:00) Erith Quarry Development
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 0 0 0 25 0 25 0 0 0 132 0 132 0 0 0 25 0 25 0 0 0 21 0 21 0 0 00815-0830 0 0 0 27 0 27 0 0 0 36 0 36 0 0 0 27 0 27 0 0 0 34 0 34 0 0 00830-0845 0 0 0 39 0 39 0 0 0 61 0 61 0 0 0 39 0 39 0 0 0 70 0 70 0 0 00845-0900 0 0 0 74 0 74 0 0 0 133 0 133 0 0 0 74 0 74 0 0 0 23 0 23 0 0 0
TOTAL 0 0 0 165 0 165 0 0 0 362 0 362 0 0 0 165 0 165 0 0 0 148 0 148 0 0 0HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
B-A is greater when sourced from 15 minute flows than hourl (could be the result of the school sensitivity test)Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 1.67 10.47 1.400815-0830 1.80 4.20 2.27 0830-0845 2.60 6.67 4.670845-0900 4.93 13.80 1.53
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 165 0 A 0 0 0 A 0.0% 0.0% 0.0%B 362 0 165 B 0 0 0 B 0.0% 0.0% 0.0%C 0 148 0 C 0 0 0 C 0.0% 0.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 25 0 A 0 27 0 A 0 39 0 A 0 74 0B 132 0 25 B 36 0 27 B 61 0 39 B 133 0 74C 0 21 0 C 0 34 0 C 0 70 0 C 0 23 0
TIME PERIOD
Junction 3: Erith Quarry Roundabout
Peak Hour: PM (17:00-18:00) 2022 Total
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1700-1715 0 0 0 36 0 35.5 85 5 90 20 0 20 0 0 0 16 0 16 126 4 130 26 0 26 0 0 0
1715-1730 0 0 0 36 0 35.5 79 4 83 20 0 20 0 0 0 16 0 16 143 5 147 26 0 26 0 0 0
1730-1745 0 0 0 36 0 35.5 92 5 97 20 0 20 0 0 0 16 0 16 154 5 159 26 0 26 0 0 0
1745-1800 0 0 0 36 0 35.5 84 4 89 20 0 20 0 0 0 16 0 16 145 5 150 26 0 26 0 0 0
TOTAL 0 0 0 142 0 142 341 18 359 80 0 80 0 0 0 64 0 64 567 19 586 104 0 104 0 0 0HV = 0% HV = 0% HV = 5% HV = 0% HV = 0% HV = 0% HV = 3% HV = 0% HV = 0%
Vehicles per Minute
TIME FROM A FROM B FROM C
1700-1715 8.35 2.40 10.43
1715-1730 7.92 2.40 11.56
1730-1745 8.84 2.40 12.31
1745-1800 8.30 2.40 11.71
Total Vehicles Number of HGV's Proportion of HGV's for Hour
A B C A B C A B C
A 0 142 359 A 0 0 18 A 0.0% 0.0% 5.0%
B 80 0 64 B 0 0 0 B 0.0% 0.0% 0.0%
C 586 104 0 C 19 0 0 C 3.2% 0.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800
A B C A B C A B C A B C
A 0 35.5 89.7574 A 0 35.5 83.26669 A 0 35.5 97.03946 A 0 35.5 88.93644
B 20 0 16 B 20 0 16 B 20 0 16 B 20 0 16
C 130.4111 26 0 C 147.3539 26 0 C 158.5953 26 0 C 149.6397 26 0
TIME
PERIOD
Junction 3: Erith Quarry RoundaboutPeak Hour: PM (17:00-18:00) 2022 Background
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1700-1715 0 0 0 0 0 0 86 5 91 0 0 0 0 0 0 0 0 0 114 4 118 0 0 0 0 0 01715-1730 0 0 0 0 0 0 80 4 84 0 0 0 0 0 0 0 0 0 131 5 135 0 0 0 0 0 01730-1745 0 0 0 0 0 0 93 5 98 0 0 0 0 0 0 0 0 0 142 5 147 0 0 0 0 0 01745-1800 0 0 0 0 0 0 85 4 90 0 0 0 0 0 0 0 0 0 133 5 138 0 0 0 0 0 0
TOTAL 0 0 0 0 0 0 345 18 363 0 0 0 0 0 0 0 0 0 519 19 538 0 0 0 0 0 0HV = 0% HV = 0% HV = 5% HV = 0% HV = 0% HV = 0% HV = 4% HV = 0% HV = 0%
Value half hidden in appendix, assumed worst-case 19 (on the basis of the number 1 being visible and it being a 2 digit no.)
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 6.05 0.00 7.891715-1730 5.62 0.00 9.02 1730-1745 6.54 0.00 9.771745-1800 6.00 0.00 9.18
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 0 363 A 0 0 18 A 0.0% 0.0% 5.0%B 0 0 0 B 0 0 0 B 0.0% 0.0% 0.0%C 538 0 0 C 19 0 0 C 3.5% 0.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0 0 90.7574 A 0 0 84.26669 A 0 0 98.03946 A 0 0 89.93644B 0 0 0 B 0 0 0 B 0 0 0 B 0 0 0C 118.4111 0 0 C 135.3539 0 0 C 146.5953 0 0 C 137.6397 0 0
TIME PERIOD
Junction 3: Erith Quarry RoundaboutPeak Hour: PM (17:00-18:00) Committed Development
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1700-1715 0 0 0 0 0 0 -1 0 -1 0 0 0 0 0 0 0 0 0 12 0 12 0 0 0 0 0 01715-1730 0 0 0 0 0 0 -1 0 -1 0 0 0 0 0 0 0 0 0 12 0 12 0 0 0 0 0 01730-1745 0 0 0 0 0 0 -1 0 -1 0 0 0 0 0 0 0 0 0 12 0 12 0 0 0 0 0 01745-1800 0 0 0 0 0 0 -1 0 -1 0 0 0 0 0 0 0 0 0 12 0 12 0 0 0 0 0 0TOTAL 0 0 0 0 0 0 -4 0 -4 0 0 0 0 0 0 0 0 0 48 0 48 0 0 0 0 0 0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 -0.07 0.00 0.801715-1730 -0.07 0.00 0.80 1730-1745 -0.07 0.00 0.801745-1800 -0.07 0.00 0.80
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 0 -4 A 0 0 0 A 0.0% 0.0% 0.0%B 0 0 0 B 0 0 0 B 0.0% 0.0% 0.0%C 48 0 0 C 0 0 0 C 0.0% 0.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0 0 -1 A 0 0 -1 A 0 0 -1 A 0 0 -1B 0 0 0 B 0 0 0 B 0 0 0 B 0 0 0C 12 0 0 C 12 0 0 C 12 0 0 C 12 0 0
TIME PERIOD
Junction 3: Erith Quarry RoundaboutPeak Hour: PM (17:00-18:00) Erith Quarry Development
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1700-1715 0 0 0 36 0 36 0 0 0 20 0 20 0 0 0 16 0 16 0 0 0 26 0 26 0 0 01715-1730 0 0 0 36 0 36 0 0 0 20 0 20 0 0 0 16 0 16 0 0 0 26 0 26 0 0 01730-1745 0 0 0 36 0 36 0 0 0 20 0 20 0 0 0 16 0 16 0 0 0 26 0 26 0 0 01745-1800 0 0 0 36 0 36 0 0 0 20 0 20 0 0 0 16 0 16 0 0 0 26 0 26 0 0 0TOTAL 0 0 0 142 0 142 0 0 0 80 0 80 0 0 0 64 0 64 0 0 0 104 0 104 0 0 0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
NotesVehicles per Minute 1. Movements to and from the east as per Bexley Mini-roundabout TIME FROM A FROM B FROM C 2. Movements to and from the west as per Appendix 8T hourly and rounded evenly over the hour (given flat profile for 15 minute flows)1700-1715 2.37 2.40 1.731715-1730 2.37 2.40 1.73 1730-1745 2.37 2.40 1.731745-1800 2.37 2.40 1.73
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 142 0 A 0 0 0 A 0.0% 0.0% 0.0%B 80 0 64 B 0 0 0 B 0.0% 0.0% 0.0%C 0 104 0 C 0 0 0 C 0.0% 0.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0 35.5 0 A 0 35.5 0 A 0 35.5 0 A 0 35.5 0B 20 0 16 B 20 0 16 B 20 0 16 B 20 0 16C 0 26 0 C 0 26 0 C 0 26 0 C 0 26 0
TIME PERIOD
Junction 3: Erith Quarry RoundaboutPeak Hour: PM (17:00-18:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1700-1715 4 0 4 36 0 36 85 5 90 20 0 20 0 0 0 16 0 16 126 4 130 26 0 26 0 0 01715-1730 6 0 6 36 0 36 79 4 83 20 0 20 0 0 0 16 0 16 143 5 147 26 0 26 0 0 01730-1745 2 0 2 36 0 36 92 5 97 20 0 20 0 0 0 16 0 16 154 5 159 26 0 26 0 0 01745-1800 0 0 0 36 0 36 84 4 89 20 0 20 0 0 0 16 0 16 145 5 150 26 0 26 0 0 0TOTAL 13 0 13 142 0 142 341 18 359 80 0 80 0 0 0 64 0 64 567 19 586 104 0 104 0 0 0
HV = 0% HV = 0% HV = 5% HV = 0% HV = 0% HV = 0% HV = 3% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 9 2 101715-1730 8 2 12 1730-1745 9 2 121745-1800 8 2 12
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 13 142 359 A 0 0 18 A 0.0% 0.0% 5.0%B 80 0 64 B 0 0 0 B 0.0% 0.0% 0.0%C 586 104 0 C 19 0 0 C 3.2% 0.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 4 36 90 A 6 36 83 A 2 36 97 A 0 36 89B 20 0 16 B 20 0 16 B 20 0 16 B 20 0 16C 130 26 0 C 147 26 0 C 159 26 0 C 150 26 0
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0 26 130 A 0 26 147 A 0 26 159 A 0 26 150B 16 0 20 B 16 0 20 B 16 0 20 B 16 0 20C 90 36 4 C 83 36 6 C 97 36 2 C 89 36 0
1700-1715 1715-1730 1730-1745 1745-1800C B A A B C A B C A B C
C 12 0 0 A 12 0 0 A 12 0 0 A 0 0 0B 0 0 0 B 0 0 0 B 0 0 0 B 0 0 0A 0 0 0 C 0 0 0 C 0 0 0 C 0 0 0
TIME PERIOD
Junction 3: Erith Quarry RoundaboutPeak Hour: Saturday (12:00-13:00) Through traffic growth factor = 1.0598
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1200-1215 2 0 2 18 0 18 116 2 118 10 0 10 0 0 0 8 0 8 98 2 100 13 0 13 0 0 01215-1230 3 0 3 18 0 18 119 7 126 10 0 10 0 0 0 8 0 8 93 4 98 13 0 13 0 0 01230-1245 1 0 1 18 0 18 92 3 95 10 0 10 0 0 0 8 0 8 77 3 81 13 0 13 0 0 01245-1300 0 0 0 18 0 18 93 4 98 10 0 10 0 0 0 8 0 8 106 5 111 13 0 13 0 0 0TOTAL 7 0 7 73 0 73 420 17 437 41 0 41 0 0 0 33 0 33 374 15 389 53 0 53 0 0 0
HV = 0% HV = 0% HV = 4% HV = 0% HV = 0% HV = 0% HV = 4% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 9 1 81215-1230 10 1 7 1230-1245 8 1 61245-1300 8 1 8
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 7 73 437 A 0 0 17 A 0.0% 0.0% 3.9%B 41 0 33 B 0 0 0 B 0.0% 0.0% 0.0%C 389 53 0 C 15 0 0 C 3.8% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 2 18 118 A 3 18 126 A 1 18 95 A 0 18 98B 10 0 8 B 10 0 8 B 10 0 8 B 10 0 8C 100 13 0 C 98 13 0 C 81 13 0 C 111 13 0
TIME PERIOD
Legend Job Title: Job No. Drawn:
Total Vehicles
Total HGV
% HGV Figure Title: Figure No. Date:
12/02/2018
Notes
Data sourced from application 14/002155/OUTM
Stomar TA, as well as additional traffic surveys
commissioned by mode in November 2017
Proposed Lidl Foodstore,
Fraser Road, Erith, Bexley J323173 SKJ
G1
0
0
%
2022 Baseline
Weekday AM Peak Hour (08:00-09:00)
0% 0% 3% 0% 1% 6%0 32 2 6% 1 28
5000 0 148 0 0% 1
3 132
362 165 314 24 8% 29 14 428 31 7% 143
6% 25 4210% 0 22 4% 1 28 2%0% 0 165 4% 19 460
12% 10%42 38
4% 15 420 346 366
Bexley Road (A206 east)
Erith Quarry Site Site Access Bexley Road (A220 west)
Erith Road (A206) Fraser Road (A206)
Legend Job Title: Job No. Drawn:
Total Vehicles
Total HGV
% HGV Figure Title: Figure No. Date:
07/02/2018
Notes
Data sourced from application 14/002155/OUTM
Stomar TA, as well as additional traffic surveys
commissioned by mode in November 2017
Proposed Lidl Foodstore,
Fraser Road, Erith, Bexley J323173 SKJ
G2
0
0
%
2022 Baseline
Weekday PM Peak Hour (17:00-18:00)
0% 0% 0% 7% 0% 8%1 12 0 0% 0 32
3880 0 104 0 0% 0
6 119
80 64 586 19 3% 33 15 575 15 3% 110
5% 18 3890% 0 13 0% 0 24 5%0% 0 142 3% 11 379
4% 3%21 16
5% 18 359 519 565
Bexley Road (A206 east)
Erith Quarry Site Site Access Bexley Road (A220 west)
Erith Road (A206) Fraser Road (A206)
Legend Job Title: Job No. Drawn:
Total Vehicles
Total HGV
% HGV Figure Title: Figure No. Date:
07/02/2018
Notes
Data sourced from application 14/002155/OUTM
Stomar TA, as well as additional traffic surveys
commissioned by mode in November 2017
Proposed Lidl Foodstore,
Fraser Road, Erith, Bexley J323173 SKJ
G3
0
0
%
2022 Baseline
Saturday Peak Hour (12:00-13:00)
0% 0% 4% 2% 1% 5%1 59 1 2% 1 19
4230 0 53 0 0% 2
0 151
41 33 389 15 4% 57 46 381 13 3% 105
4% 16 3590% 0 7 2% 1 52 0%0% 0 73 4% 16 429
4% 4%13 20
4% 17 437 341 516
Bexley Road (A206 east)
Erith Quarry Site Site Access Bexley Road (A220 west)
Erith Road (A206) Fraser Road (A206)
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 74
Appendix H Lidl Operational Data
Lidl - Abbey Wood 1C Eynsham Dr, London SE2 9RQ (2015)
Lidl Erith - Traffic Flow Calculations V1.6.xlsx/8.2 Abbey Wood (2015) 12/02/2018
Factor 100 sqmFriday Daily Profile - Observed RFA 1811 sqm
AccumVeh Trip Trips Veh Trip Trips Veh Trip Trips
Time Range Rate Rate Rate 400:00-01:00 401:00-02:00 402:00-03:00 403:00-04:00 404:00-05:00 405:00-06:00 406:00-07:00 407:00-08:00 408:00-09:00 4.14 75 2.32 42 6.46 117 3709:00-10:00 5.85 106 5.85 106 11.71 212 3710:00-11:00 5.02 91 5.30 96 10.33 187 3211:00-12:00 5.36 97 4.58 83 9.94 180 4612:00-13:00 5.91 107 5.47 99 11.37 206 5413:00-14:00 5.36 97 6.52 118 11.87 215 3314:00-15:00 5.30 96 5.36 97 10.66 193 3215:00-16:00 6.02 109 5.58 101 11.60 210 4016:00-17:00 6.02 109 6.41 116 12.42 225 3317:00-18:00 5.85 106 5.58 101 11.43 207 3818:00-19:00 5.30 96 5.47 99 10.77 195 3519:00-20:00 4.80 87 5.30 96 10.10 183 2620:00-21:00 3.15 57 3.75 68 6.90 125 1521:00-22:00 2.209 40 2.60 47 4.80 87 822:00-23:00 823:00-24:00 8Daily: 70.29 1,273 70.07 1,269 140.36 2,542
Saturday
Mode of travel by group - from survey, adjusted for sample & observed carsWalk Bus Cycle Car Car (disp) Train Tube Other Total
No%
Factor 100 sqmSaturday Daily Profile - Observed RFA 1811 sqm
AccumVeh Trip Trips Veh Trip Trips Veh Trip Trips
Time Range Rate Rate Rate 300:00-01:00 301:00-02:00 302:00-03:00 303:00-04:00 304:00-05:00 305:00-06:00 306:00-07:00 307:00-08:00 308:00-09:00 3.59 65 2.82 51 6.41 116 1709:00-10:00 5.80 105 5.25 95 11.04 200 2710:00-11:00 7.40 134 5.91 107 13.31 241 5411:00-12:00 6.68 121 7.45 135 14.14 256 4012:00-13:00 8.12 147 7.40 134 15.52 281 5313:00-14:00 6.96 126 6.63 120 13.58 246 5914:00-15:00 6.63 120 6.79 123 13.42 243 5615:00-16:00 6.74 122 7.45 135 14.19 257 4316:00-17:00 5.80 105 6.13 111 11.93 216 3717:00-18:00 5.85 106 6.46 117 12.31 223 2618:00-19:00 4.97 90 4.91 89 9.88 179 2719:00-20:00 4.86 88 5.85 106 10.71 194 920:00-21:00 3.37 61 3.31 60 6.68 121 1021:00-22:00 1.933 35 2.60 47 4.53 82 -222:00-23:00 -223:00-24:00 -2Daily: 78.69 1,425 78.96 1,430 157.65 2,855
Arrivals Departures Totals
No multi-modal survey available
Arrivals Departures Totals
Lidl - Micham 9-17 Western Rd, Mitcham CR4 3ED (2016)
Lidl Erith - Traffic Flow Calculations V1.6.xlsx/8.3 Mitcham (2016) 12/02/2018
Factor 100 sqmFriday Daily Profile - Observed RFA 1642 sqm
AccumVeh Trip Trips Veh Trip Trips Veh Trip Trips
Time Range Rate Rate Rate 400:00-01:00 401:00-02:00 402:00-03:00 403:00-04:00 404:00-05:00 405:00-06:00 406:00-07:00 407:00-08:00 0.79 13 0.37 6 1.16 19 1108:00-09:00 5.85 96 4.32 71 10.17 167 3609:00-10:00 5.91 97 6.09 100 12.00 197 3310:00-11:00 6.03 99 5.91 97 11.94 196 3511:00-12:00 7.13 117 6.46 106 13.58 223 4612:00-13:00 7.67 126 7.55 124 15.23 250 4813:00-14:00 7.61 125 6.58 108 14.19 233 6514:00-15:00 6.94 114 7.49 123 14.43 237 5615:00-16:00 7.49 123 6.33 104 13.82 227 7516:00-17:00 8.71 143 8.77 144 17.48 287 7417:00-18:00 9.32 153 8.40 138 17.72 291 8918:00-19:00 7.19 118 8.77 144 15.96 262 6319:00-20:00 5.97 98 6.64 109 12.61 207 5220:00-21:00 5.85 96 6.39 105 12.24 201 4321:00-22:00 3.532 58 4.08 67 7.61 125 3422:00-23:00 3423:00-24:00 34Daily: 95.98 1,576 94.15 1,546 190.13 3,122
Saturday
Mode of travel by group - from survey, adjusted for sample & observed carsWalk Bus Cycle Car Car (disp) Train Tube Other Total
No%
Factor 100 sqmSaturday Daily Profile - Observed RFA 1642 sqm
AccumVeh Trip Trips Veh Trip Trips Veh Trip Trips
Time Range Rate Rate Rate 300:00-01:00 301:00-02:00 302:00-03:00 303:00-04:00 304:00-05:00 305:00-06:00 306:00-07:00 307:00-08:00 0.79 13 0.18 3 0.97 16 1308:00-09:00 2.56 42 3.53 58 6.09 100 -309:00-10:00 6.52 107 6.27 103 12.79 210 110:00-11:00 6.82 112 6.88 113 13.70 225 011:00-12:00 8.40 138 7.73 127 16.14 265 1112:00-13:00 8.34 137 7.86 129 16.20 266 1913:00-14:00 7.73 127 8.10 133 15.83 260 1314:00-15:00 6.82 112 6.94 114 13.76 226 1115:00-16:00 8.04 132 7.86 129 15.90 261 1416:00-17:00 8.59 141 9.20 151 17.78 292 417:00-18:00 8.04 132 7.55 124 15.59 256 1218:00-19:00 6.94 114 7.37 121 14.31 235 519:00-20:00 6.09 100 7.00 115 13.09 215 -1020:00-21:00 4.26 70 4.63 76 8.89 146 -1621:00-22:00 3.471 57 4.20 69 7.67 126 -2822:00-23:00 -2823:00-24:00 -28Daily: 93.42 1,534 95.31 1,565 188.73 3,099
Arrivals Departures Totals
No multi-modal survey available
Arrivals Departures Totals
Lidl - Average of Abbey Wood (2015) Micham (2016)
Lidl Erith - Traffic Flow Calculations V1.6.xlsx/8.4 Average of AW&M 12/02/2018
Factor 100 sqmFriday Daily Profile - Average RFA 1405 sqm
AccumVeh Trip Trips Veh Trip Trips Veh Trip Trips
Time Range Rate Rate Rate 400:00-01:00 401:00-02:00 402:00-03:00 403:00-04:00 404:00-05:00 405:00-06:00 406:00-07:00 407:00-08:00 0.79 11 0.37 5 1.16 16 1008:00-09:00 4.99 70 3.32 47 8.32 117 3309:00-10:00 5.88 83 5.97 84 11.85 167 3210:00-11:00 5.53 78 5.60 79 11.13 156 3111:00-12:00 6.24 88 5.52 78 11.76 165 4112:00-13:00 6.79 95 6.51 91 13.30 187 4513:00-14:00 6.48 91 6.55 92 13.03 183 4414:00-15:00 6.12 86 6.42 90 12.55 176 4015:00-16:00 6.75 95 5.96 84 12.71 179 5116:00-17:00 7.36 103 7.59 107 14.95 210 4817:00-18:00 7.59 107 6.99 98 14.58 205 5718:00-19:00 6.24 88 7.12 100 13.36 188 4419:00-20:00 5.39 76 5.97 84 11.36 160 3620:00-21:00 4.50 63 5.07 71 9.57 134 2821:00-22:00 2.87 40 3.34 47 6.21 87 2122:00-23:00 2123:00-24:00 21Daily: 83.53 1,174 82.30 1,156 165.83 2,330
Saturday
Mode of travel by group - from survey, adjusted for sample & observed cars
Walk Bus Cycle Car Car (disp) Train Tube Other TotalNo%
Factor 100 sqmSaturday Daily Profile - Average RFA 1405 sqm
AccumVeh Trip Trips Veh Trip Trips Veh Trip Trips
Time Range Rate Rate Rate 300:00-01:00 301:00-02:00 302:00-03:00 303:00-04:00 304:00-05:00 305:00-06:00 306:00-07:00 307:00-08:00 0.79 11 0.18 3 0.97 14 1208:00-09:00 3.07 43 3.17 45 6.25 88 1009:00-10:00 6.16 87 5.76 81 11.92 167 1610:00-11:00 7.11 100 6.40 90 13.51 190 2611:00-12:00 7.54 106 7.59 107 15.14 213 2512:00-13:00 8.23 116 7.63 107 15.86 223 3413:00-14:00 7.35 103 7.36 103 14.71 207 3314:00-15:00 6.72 94 6.87 96 13.59 191 3115:00-16:00 7.39 104 7.66 108 15.04 211 2816:00-17:00 7.19 101 7.66 108 14.86 209 2117:00-18:00 6.95 98 7.01 98 13.95 196 2018:00-19:00 5.96 84 6.14 86 12.10 170 1719:00-20:00 5.47 77 6.43 90 11.90 167 420:00-21:00 3.82 54 3.97 56 7.79 109 221:00-22:00 2.70 38 3.40 48 6.10 86 -822:00-23:00 -823:00-24:00 -8Daily: 86.45 1,215 87.23 1,226 173.68 2,440
Arrivals Departures Totals
No multi-modal survey available
Arrivals Departures Totals
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 75
Appendix I TRICS Outputs
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 1mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
Calculation Reference: AUDIT-754101-171213-1246TRIP RATE CALCULATION SELECTION PARAMETERS:
Land Use : 01 - RETAILCategory : C - DISCOUNT FOOD STORESMULTI-MODAL VEHICLES
Selected regions and areas:05 EAST MIDLANDS
LN LINCOLNSHIRE 1 daysNR NORTHAMPTONSHIRE 1 daysNT NOTTINGHAMSHIRE 1 days
06 WEST MIDLANDSWM WEST MIDLANDS 2 daysWO WORCESTERSHIRE 1 days
09 NORTHDH DURHAM 1 days
This section displays the number of survey days per TRICS® sub-region in the selected set
Secondary Filtering selection:
This data displays the chosen trip rate parameter and its selected range. Only sites that fall within the parameter rangeare included in the trip rate calculation.
Parameter: Retail floor areaActual Range: 953 to 1550 (units: sqm)Range Selected by User: 953 to 1550 (units: sqm)
Public Transport Provision:Selection by: Include all surveys
Date Range: 01/01/09 to 06/04/17
This data displays the range of survey dates selected. Only surveys that were conducted within this date range areincluded in the trip rate calculation.
Selected survey days:Tuesday 4 daysWednesday 1 daysThursday 1 daysFriday 1 days
This data displays the number of selected surveys by day of the week.
Selected survey types:Manual count 7 daysDirectional ATC Count 0 days
This data displays the number of manual classified surveys and the number of unclassified ATC surveys, the total addingup to the overall number of surveys in the selected set. Manual surveys are undertaken using staff, whilst ATC surveysare undertaking using machines.
Selected Locations:Edge of Town Centre 2Edge of Town 3Neighbourhood Centre (PPS6 Local Centre) 2
This data displays the number of surveys per main location category within the selected set. The main location categoriesconsist of Free Standing, Edge of Town, Suburban Area, Neighbourhood Centre, Edge of Town Centre, Town Centre andNot Known.
Selected Location Sub Categories:Industrial Zone 1Residential Zone 1Retail Zone 2Built-Up Zone 1High Street 1No Sub Category 1
This data displays the number of surveys per location sub-category within the selected set. The location sub-categoriesconsist of Commercial Zone, Industrial Zone, Development Zone, Residential Zone, Retail Zone, Built-Up Zone, Village,Out of Town, High Street and No Sub Category.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 2mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
Secondary Filtering selection:
Use Class: A 1 7 days
This data displays the number of surveys per Use Class classification within the selected set. The Use Classes Order 2005has been used for this purpose, which can be found within the Library module of TRICS®.
Population within 1 mile:5,001 to 10,000 2 days10,001 to 15,000 2 days20,001 to 25,000 1 days25,001 to 50,000 1 days50,001 to 100,000 1 days
This data displays the number of selected surveys within stated 1-mile radii of population.
Population within 5 miles:25,001 to 50,000 1 days50,001 to 75,000 1 days75,001 to 100,000 2 days250,001 to 500,000 1 days500,001 or More 2 days
This data displays the number of selected surveys within stated 5-mile radii of population.
Car ownership within 5 miles:0.6 to 1.0 3 days1.1 to 1.5 4 days
This data displays the number of selected surveys within stated ranges of average cars owned per residential dwelling,within a radius of 5-miles of selected survey sites.
Petrol filling station:Included in the survey count 0 daysExcluded from count or no filling station 7 days
This data displays the number of surveys within the selected set that include petrol filling station activity, and thenumber of surveys that do not.
Travel Plan:Yes 1 daysNo 6 days
This data displays the number of surveys within the selected set that were undertaken at sites with Travel Plans in place,and the number of surveys that were undertaken at sites without Travel Plans.
PTAL Rating:No PTAL Present 7 days
This data displays the number of selected surveys with PTAL Ratings.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 3mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
LIST OF SITES relevant to selection parameters
The 'browse and select' feature in TRICS was used to choose the sites to be included in this selected set. The TRICS userbrowsed the full list of sites for this land use category and selected directly from this list.
1 DH-01-C-01 ALDI DURHAMWATLING ROAD
BISHOP AUCKLANDEdge of TownRetail ZoneTotal Retail floor area: 9 5 3 sqm
Survey date: THURSDAY 06/04/17 Survey Type: MANUAL2 LN-01-C-01 LIDL LINCOLNSHIRE
RICHMOND DRIVE
SKEGNESSEdge of Town CentreBuilt-Up ZoneTotal Retail floor area: 1 4 2 4 sqm
Survey date: TUESDAY 19/07/16 Survey Type: MANUAL3 NR-01-C-02 LIDL NORTHAMPTONSHIRE
NEWTON ROAD
RUSHDENEdge of Town CentreResidential ZoneTotal Retail floor area: 1 4 2 4 sqm
Survey date: TUESDAY 19/07/16 Survey Type: MANUAL4 NT-01-C-01 LIDL NOTTINGHAMSHIRE
CHAPEL LANE
BINGHAMEdge of TownIndustrial ZoneTotal Retail floor area: 1 4 2 4 sqm
Survey date: FRIDAY 15/07/16 Survey Type: MANUAL5 WM-01-C-01 LIDL WEST MIDLANDS
MACKADOWN LANEKITT'S GREENBIRMINGHAMNeighbourhood Centre (PPS6 Local Centre)No Sub CategoryTotal Retail floor area: 1 3 4 1 sqm
Survey date: TUESDAY 12/07/16 Survey Type: MANUAL6 WM-01-C-02 LIDL WEST MIDLANDS
HIGH STREETGUNS VILLAGEWEST BROMWICHNeighbourhood Centre (PPS6 Local Centre)High StreetTotal Retail floor area: 1 3 4 1 sqm
Survey date: TUESDAY 12/07/16 Survey Type: MANUAL7 WO-01-C-01 LIDL WORCESTERSHIRE
BLACKPOLE ROADBRICKFIELDSWORCESTEREdge of TownRetail ZoneTotal Retail floor area: 1 4 2 4 sqm
Survey date: WEDNESDAY 13/07/16 Survey Type: MANUAL
This section provides a list of all survey sites and days in the selected set. For each individual survey site, it displays aunique site reference code and site address, the selected trip rate calculation parameter and its value, the day of theweek and date of each survey, and whether the survey was a manual classified count or an ATC count.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 4mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL VEHICLESCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.281 2 1424 0.070 2 1424 0.35106:00 - 07:007 1333 0.439 7 1333 0.139 7 1333 0.57807:00 - 08:007 1333 3.719 7 1333 2.315 7 1333 6.03408:00 - 09:007 1333 4.908 7 1333 4.094 7 1333 9.00209:00 - 10:007 1333 5.026 7 1333 4.394 7 1333 9.42010:00 - 11:007 1333 5.584 7 1333 5.091 7 1333 10.67511:00 - 12:007 1333 5.455 7 1333 5.337 7 1333 10.79212:00 - 13:007 1333 5.712 7 1333 6.548 7 1333 12.26013:00 - 14:007 1333 6.323 7 1333 5.884 7 1333 12.20714:00 - 15:007 1333 6.323 7 1333 6.184 7 1333 12.50715:00 - 16:007 1333 5.991 7 1333 6.580 7 1333 12.57116:00 - 17:007 1333 5.905 7 1333 5.937 7 1333 11.84217:00 - 18:007 1333 5.262 7 1333 5.712 7 1333 10.97418:00 - 19:007 1333 4.062 7 1333 4.694 7 1333 8.75619:00 - 20:007 1333 2.829 7 1333 3.719 7 1333 6.54820:00 - 21:007 1333 0.975 7 1333 1.725 7 1333 2.70021:00 - 22:007 1333 0.021 7 1333 0.439 7 1333 0.46022:00 - 23:00
23:00 - 24:00Total Rates: 6 8.815 6 8.862 137.677
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 5mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 3Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 6mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL TAXISCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.000 2 1424 0.000 2 1424 0.00006:00 - 07:007 1333 0.000 7 1333 0.000 7 1333 0.00007:00 - 08:007 1333 0.000 7 1333 0.000 7 1333 0.00008:00 - 09:007 1333 0.032 7 1333 0.032 7 1333 0.06409:00 - 10:007 1333 0.043 7 1333 0.032 7 1333 0.07510:00 - 11:007 1333 0.032 7 1333 0.043 7 1333 0.07511:00 - 12:007 1333 0.043 7 1333 0.054 7 1333 0.09712:00 - 13:007 1333 0.054 7 1333 0.043 7 1333 0.09713:00 - 14:007 1333 0.054 7 1333 0.064 7 1333 0.11814:00 - 15:007 1333 0.054 7 1333 0.021 7 1333 0.07515:00 - 16:007 1333 0.043 7 1333 0.021 7 1333 0.06416:00 - 17:007 1333 0.075 7 1333 0.075 7 1333 0.15017:00 - 18:007 1333 0.043 7 1333 0.075 7 1333 0.11818:00 - 19:007 1333 0.011 7 1333 0.021 7 1333 0.03219:00 - 20:007 1333 0.021 7 1333 0.011 7 1333 0.03220:00 - 21:007 1333 0.021 7 1333 0.021 7 1333 0.04221:00 - 22:007 1333 0.000 7 1333 0.000 7 1333 0.00022:00 - 23:00
23:00 - 24:00Total Rates: 0.526 0.513 1.039
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 7mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 3Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 8mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL OGVSCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.035 2 1424 0.000 2 1424 0.03506:00 - 07:007 1333 0.011 7 1333 0.000 7 1333 0.01107:00 - 08:007 1333 0.000 7 1333 0.000 7 1333 0.00008:00 - 09:007 1333 0.075 7 1333 0.032 7 1333 0.10709:00 - 10:007 1333 0.021 7 1333 0.054 7 1333 0.07510:00 - 11:007 1333 0.043 7 1333 0.021 7 1333 0.06411:00 - 12:007 1333 0.011 7 1333 0.021 7 1333 0.03212:00 - 13:007 1333 0.032 7 1333 0.054 7 1333 0.08613:00 - 14:007 1333 0.011 7 1333 0.021 7 1333 0.03214:00 - 15:007 1333 0.011 7 1333 0.000 7 1333 0.01115:00 - 16:007 1333 0.011 7 1333 0.021 7 1333 0.03216:00 - 17:007 1333 0.043 7 1333 0.011 7 1333 0.05417:00 - 18:007 1333 0.021 7 1333 0.021 7 1333 0.04218:00 - 19:007 1333 0.032 7 1333 0.032 7 1333 0.06419:00 - 20:007 1333 0.000 7 1333 0.011 7 1333 0.01120:00 - 21:007 1333 0.000 7 1333 0.011 7 1333 0.01121:00 - 22:007 1333 0.000 7 1333 0.011 7 1333 0.01122:00 - 23:00
23:00 - 24:00Total Rates: 0.357 0.321 0.678
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 9mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 3Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 10mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL PSVSCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.000 2 1424 0.000 2 1424 0.00006:00 - 07:007 1333 0.011 7 1333 0.000 7 1333 0.01107:00 - 08:007 1333 0.000 7 1333 0.011 7 1333 0.01108:00 - 09:007 1333 0.011 7 1333 0.000 7 1333 0.01109:00 - 10:007 1333 0.000 7 1333 0.000 7 1333 0.00010:00 - 11:007 1333 0.000 7 1333 0.000 7 1333 0.00011:00 - 12:007 1333 0.000 7 1333 0.000 7 1333 0.00012:00 - 13:007 1333 0.000 7 1333 0.000 7 1333 0.00013:00 - 14:007 1333 0.011 7 1333 0.021 7 1333 0.03214:00 - 15:007 1333 0.000 7 1333 0.000 7 1333 0.00015:00 - 16:007 1333 0.000 7 1333 0.000 7 1333 0.00016:00 - 17:007 1333 0.000 7 1333 0.000 7 1333 0.00017:00 - 18:007 1333 0.000 7 1333 0.000 7 1333 0.00018:00 - 19:007 1333 0.000 7 1333 0.000 7 1333 0.00019:00 - 20:007 1333 0.000 7 1333 0.000 7 1333 0.00020:00 - 21:007 1333 0.000 7 1333 0.000 7 1333 0.00021:00 - 22:007 1333 0.000 7 1333 0.000 7 1333 0.00022:00 - 23:00
23:00 - 24:00Total Rates: 0.033 0.032 0.065
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 11mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 3Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 12mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL CYCLISTSCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.035 2 1424 0.000 2 1424 0.03506:00 - 07:007 1333 0.000 7 1333 0.011 7 1333 0.01107:00 - 08:007 1333 0.171 7 1333 0.096 7 1333 0.26708:00 - 09:007 1333 0.096 7 1333 0.043 7 1333 0.13909:00 - 10:007 1333 0.118 7 1333 0.107 7 1333 0.22510:00 - 11:007 1333 0.021 7 1333 0.129 7 1333 0.15011:00 - 12:007 1333 0.075 7 1333 0.075 7 1333 0.15012:00 - 13:007 1333 0.054 7 1333 0.021 7 1333 0.07513:00 - 14:007 1333 0.043 7 1333 0.054 7 1333 0.09714:00 - 15:007 1333 0.139 7 1333 0.086 7 1333 0.22515:00 - 16:007 1333 0.064 7 1333 0.075 7 1333 0.13916:00 - 17:007 1333 0.043 7 1333 0.043 7 1333 0.08617:00 - 18:007 1333 0.043 7 1333 0.032 7 1333 0.07518:00 - 19:007 1333 0.064 7 1333 0.096 7 1333 0.16019:00 - 20:007 1333 0.043 7 1333 0.064 7 1333 0.10720:00 - 21:007 1333 0.000 7 1333 0.043 7 1333 0.04321:00 - 22:007 1333 0.000 7 1333 0.011 7 1333 0.01122:00 - 23:00
23:00 - 24:00Total Rates: 1.009 0.986 1.995
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 13mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 3Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 14mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL VEHICLE OCCUPANTSCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.281 2 1424 0.070 2 1424 0.35106:00 - 07:007 1333 0.600 7 1333 0.161 7 1333 0.76107:00 - 08:007 1333 5.016 7 1333 3.194 7 1333 8.21008:00 - 09:007 1333 6.912 7 1333 5.498 7 1333 12.41009:00 - 10:007 1333 7.084 7 1333 6.184 7 1333 13.26810:00 - 11:007 1333 7.641 7 1333 6.998 7 1333 14.63911:00 - 12:007 1333 7.856 7 1333 7.845 7 1333 15.70112:00 - 13:007 1333 8.370 7 1333 9.377 7 1333 17.74713:00 - 14:007 1333 8.981 7 1333 8.541 7 1333 17.52214:00 - 15:007 1333 9.442 7 1333 8.852 7 1333 18.29415:00 - 16:007 1333 8.831 7 1333 9.720 7 1333 18.55116:00 - 17:007 1333 8.606 7 1333 9.174 7 1333 17.78017:00 - 18:007 1333 7.813 7 1333 8.327 7 1333 16.14018:00 - 19:007 1333 6.162 7 1333 7.202 7 1333 13.36419:00 - 20:007 1333 4.222 7 1333 5.401 7 1333 9.62320:00 - 21:007 1333 1.554 7 1333 2.572 7 1333 4.12621:00 - 22:007 1333 0.043 7 1333 0.793 7 1333 0.83622:00 - 23:00
23:00 - 24:00Total Rates: 9 9.414 9 9.909 199.323
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 15mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 3Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 16mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL PEDESTRIANSCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.386 2 1424 0.035 2 1424 0.42106:00 - 07:007 1333 0.386 7 1333 0.032 7 1333 0.41807:00 - 08:007 1333 1.468 7 1333 1.029 7 1333 2.49708:00 - 09:007 1333 1.575 7 1333 1.275 7 1333 2.85009:00 - 10:007 1333 2.079 7 1333 2.068 7 1333 4.14710:00 - 11:007 1333 2.079 7 1333 2.443 7 1333 4.52211:00 - 12:007 1333 2.326 7 1333 2.272 7 1333 4.59812:00 - 13:007 1333 2.004 7 1333 2.390 7 1333 4.39413:00 - 14:007 1333 2.561 7 1333 2.111 7 1333 4.67214:00 - 15:007 1333 1.950 7 1333 2.604 7 1333 4.55415:00 - 16:007 1333 2.754 7 1333 2.218 7 1333 4.97216:00 - 17:007 1333 2.861 7 1333 2.143 7 1333 5.00417:00 - 18:007 1333 2.079 7 1333 2.004 7 1333 4.08318:00 - 19:007 1333 1.072 7 1333 1.479 7 1333 2.55119:00 - 20:007 1333 0.900 7 1333 1.286 7 1333 2.18620:00 - 21:007 1333 0.375 7 1333 0.750 7 1333 1.12521:00 - 22:007 1333 0.000 7 1333 0.246 7 1333 0.24622:00 - 23:00
23:00 - 24:00Total Rates: 2 6.855 2 6.385 5 3.240
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 17mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 3Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 18mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL BUS/TRAM PASSENGERSCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.176 2 1424 0.000 2 1424 0.17606:00 - 07:007 1333 0.107 7 1333 0.064 7 1333 0.17107:00 - 08:007 1333 0.375 7 1333 0.268 7 1333 0.64308:00 - 09:007 1333 0.525 7 1333 0.450 7 1333 0.97509:00 - 10:007 1333 0.450 7 1333 0.450 7 1333 0.90010:00 - 11:007 1333 0.386 7 1333 0.397 7 1333 0.78311:00 - 12:007 1333 0.386 7 1333 0.311 7 1333 0.69712:00 - 13:007 1333 0.407 7 1333 0.450 7 1333 0.85713:00 - 14:007 1333 0.450 7 1333 0.407 7 1333 0.85714:00 - 15:007 1333 0.472 7 1333 0.386 7 1333 0.85815:00 - 16:007 1333 0.311 7 1333 0.386 7 1333 0.69716:00 - 17:007 1333 0.257 7 1333 0.397 7 1333 0.65417:00 - 18:007 1333 0.279 7 1333 0.375 7 1333 0.65418:00 - 19:007 1333 0.193 7 1333 0.236 7 1333 0.42919:00 - 20:007 1333 0.150 7 1333 0.214 7 1333 0.36420:00 - 21:007 1333 0.086 7 1333 0.150 7 1333 0.23621:00 - 22:007 1333 0.000 7 1333 0.054 7 1333 0.05422:00 - 23:00
23:00 - 24:00Total Rates: 5.010 4.995 1 0.005
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 19mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 3Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 20mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL TOTAL RAIL PASSENGERSCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.000 2 1424 0.000 2 1424 0.00006:00 - 07:007 1333 0.000 7 1333 0.000 7 1333 0.00007:00 - 08:007 1333 0.043 7 1333 0.021 7 1333 0.06408:00 - 09:007 1333 0.043 7 1333 0.043 7 1333 0.08609:00 - 10:007 1333 0.021 7 1333 0.021 7 1333 0.04210:00 - 11:007 1333 0.043 7 1333 0.021 7 1333 0.06411:00 - 12:007 1333 0.011 7 1333 0.032 7 1333 0.04312:00 - 13:007 1333 0.032 7 1333 0.021 7 1333 0.05313:00 - 14:007 1333 0.011 7 1333 0.011 7 1333 0.02214:00 - 15:007 1333 0.021 7 1333 0.021 7 1333 0.04215:00 - 16:007 1333 0.032 7 1333 0.011 7 1333 0.04316:00 - 17:007 1333 0.054 7 1333 0.021 7 1333 0.07517:00 - 18:007 1333 0.043 7 1333 0.075 7 1333 0.11818:00 - 19:007 1333 0.021 7 1333 0.043 7 1333 0.06419:00 - 20:007 1333 0.011 7 1333 0.021 7 1333 0.03220:00 - 21:007 1333 0.000 7 1333 0.021 7 1333 0.02121:00 - 22:007 1333 0.000 7 1333 0.000 7 1333 0.00022:00 - 23:00
23:00 - 24:00Total Rates: 0.386 0.383 0.769
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 21mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 3Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 22mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL TOTAL PEOPLECalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.878 2 1424 0.105 2 1424 0.98306:00 - 07:007 1333 1.093 7 1333 0.268 7 1333 1.36107:00 - 08:007 1333 7.073 7 1333 4.608 7 1333 11.68108:00 - 09:007 1333 9.152 7 1333 7.309 7 1333 16.46109:00 - 10:007 1333 9.752 7 1333 8.831 7 1333 18.58310:00 - 11:007 1333 10.170 7 1333 9.988 7 1333 20.15811:00 - 12:007 1333 10.653 7 1333 10.535 7 1333 21.18812:00 - 13:007 1333 10.867 7 1333 12.260 7 1333 23.12713:00 - 14:007 1333 12.046 7 1333 11.124 7 1333 23.17014:00 - 15:007 1333 12.024 7 1333 11.949 7 1333 23.97315:00 - 16:007 1333 11.992 7 1333 12.410 7 1333 24.40216:00 - 17:007 1333 11.821 7 1333 11.778 7 1333 23.59917:00 - 18:007 1333 10.256 7 1333 10.813 7 1333 21.06918:00 - 19:007 1333 7.513 7 1333 9.056 7 1333 16.56919:00 - 20:007 1333 5.326 7 1333 6.987 7 1333 12.31320:00 - 21:007 1333 2.015 7 1333 3.537 7 1333 5.55221:00 - 22:007 1333 0.043 7 1333 1.104 7 1333 1.14722:00 - 23:00
23:00 - 24:00Total Rates: 132.674 132.662 265.336
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 23mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 3Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 24mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL CARSCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.246 2 1424 0.035 2 1424 0.28106:00 - 07:007 1333 0.407 7 1333 0.129 7 1333 0.53607:00 - 08:007 1333 3.462 7 1333 2.165 7 1333 5.62708:00 - 09:007 1333 4.469 7 1333 3.794 7 1333 8.26309:00 - 10:007 1333 4.780 7 1333 4.115 7 1333 8.89510:00 - 11:007 1333 5.337 7 1333 4.844 7 1333 10.18111:00 - 12:007 1333 5.187 7 1333 5.037 7 1333 10.22412:00 - 13:007 1333 5.326 7 1333 6.184 7 1333 11.51013:00 - 14:007 1333 6.077 7 1333 5.541 7 1333 11.61814:00 - 15:007 1333 6.023 7 1333 5.905 7 1333 11.92815:00 - 16:007 1333 5.659 7 1333 6.237 7 1333 11.89616:00 - 17:007 1333 5.562 7 1333 5.626 7 1333 11.18817:00 - 18:007 1333 4.930 7 1333 5.294 7 1333 10.22418:00 - 19:007 1333 3.751 7 1333 4.362 7 1333 8.11319:00 - 20:007 1333 2.669 7 1333 3.483 7 1333 6.15220:00 - 21:007 1333 0.900 7 1333 1.575 7 1333 2.47521:00 - 22:007 1333 0.021 7 1333 0.407 7 1333 0.42822:00 - 23:00
23:00 - 24:00Total Rates: 6 4.806 6 4.733 129.539
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 25mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 3Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 26mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL LGVSCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.000 2 1424 0.035 2 1424 0.03506:00 - 07:007 1333 0.011 7 1333 0.000 7 1333 0.01107:00 - 08:007 1333 0.246 7 1333 0.139 7 1333 0.38508:00 - 09:007 1333 0.322 7 1333 0.236 7 1333 0.55809:00 - 10:007 1333 0.182 7 1333 0.193 7 1333 0.37510:00 - 11:007 1333 0.150 7 1333 0.171 7 1333 0.32111:00 - 12:007 1333 0.182 7 1333 0.193 7 1333 0.37512:00 - 13:007 1333 0.289 7 1333 0.257 7 1333 0.54613:00 - 14:007 1333 0.161 7 1333 0.214 7 1333 0.37514:00 - 15:007 1333 0.225 7 1333 0.236 7 1333 0.46115:00 - 16:007 1333 0.257 7 1333 0.289 7 1333 0.54616:00 - 17:007 1333 0.204 7 1333 0.193 7 1333 0.39717:00 - 18:007 1333 0.246 7 1333 0.311 7 1333 0.55718:00 - 19:007 1333 0.257 7 1333 0.257 7 1333 0.51419:00 - 20:007 1333 0.129 7 1333 0.193 7 1333 0.32220:00 - 21:007 1333 0.054 7 1333 0.118 7 1333 0.17221:00 - 22:007 1333 0.000 7 1333 0.021 7 1333 0.02122:00 - 23:00
23:00 - 24:00Total Rates: 2.915 3.056 5.971
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 27mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 3Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 28mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL MOTOR CYCLESCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.000 2 1424 0.000 2 1424 0.00006:00 - 07:007 1333 0.000 7 1333 0.011 7 1333 0.01107:00 - 08:007 1333 0.011 7 1333 0.000 7 1333 0.01108:00 - 09:007 1333 0.000 7 1333 0.000 7 1333 0.00009:00 - 10:007 1333 0.000 7 1333 0.000 7 1333 0.00010:00 - 11:007 1333 0.021 7 1333 0.011 7 1333 0.03211:00 - 12:007 1333 0.032 7 1333 0.032 7 1333 0.06412:00 - 13:007 1333 0.011 7 1333 0.011 7 1333 0.02213:00 - 14:007 1333 0.021 7 1333 0.021 7 1333 0.04214:00 - 15:007 1333 0.011 7 1333 0.021 7 1333 0.03215:00 - 16:007 1333 0.021 7 1333 0.011 7 1333 0.03216:00 - 17:007 1333 0.021 7 1333 0.032 7 1333 0.05317:00 - 18:007 1333 0.021 7 1333 0.011 7 1333 0.03218:00 - 19:007 1333 0.011 7 1333 0.021 7 1333 0.03219:00 - 20:007 1333 0.011 7 1333 0.021 7 1333 0.03220:00 - 21:007 1333 0.000 7 1333 0.000 7 1333 0.00021:00 - 22:007 1333 0.000 7 1333 0.000 7 1333 0.00022:00 - 23:00
23:00 - 24:00Total Rates: 0.192 0.203 0.395
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 29mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 3Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekday Page 1mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
Time Range/Peak Period SelectionDirection: Totals / Use All Times
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 1mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
Calculation Reference: AUDIT-754101-171213-1249TRIP RATE CALCULATION SELECTION PARAMETERS:
Land Use : 01 - RETAILCategory : C - DISCOUNT FOOD STORESMULTI-MODAL VEHICLES
Selected regions and areas:05 EAST MIDLANDS
LN LINCOLNSHIRE 1 daysNR NORTHAMPTONSHIRE 1 daysNT NOTTINGHAMSHIRE 1 days
06 WEST MIDLANDSWM WEST MIDLANDS 2 daysWO WORCESTERSHIRE 1 days
08 NORTH WESTGM GREATER MANCHESTER 1 days
This section displays the number of survey days per TRICS® sub-region in the selected set
Secondary Filtering selection:
This data displays the chosen trip rate parameter and its selected range. Only sites that fall within the parameter rangeare included in the trip rate calculation.
Parameter: Retail floor areaActual Range: 953 to 1550 (units: sqm)Range Selected by User: 953 to 1550 (units: sqm)
Public Transport Provision:Selection by: Include all surveys
Date Range: 01/01/09 to 06/04/17
This data displays the range of survey dates selected. Only surveys that were conducted within this date range areincluded in the trip rate calculation.
Selected survey days:Saturday 6 daysSunday 1 days
This data displays the number of selected surveys by day of the week.
Selected survey types:Manual count 7 daysDirectional ATC Count 0 days
This data displays the number of manual classified surveys and the number of unclassified ATC surveys, the total addingup to the overall number of surveys in the selected set. Manual surveys are undertaken using staff, whilst ATC surveysare undertaking using machines.
Selected Locations:Edge of Town Centre 3Edge of Town 2Neighbourhood Centre (PPS6 Local Centre) 2
This data displays the number of surveys per main location category within the selected set. The main location categoriesconsist of Free Standing, Edge of Town, Suburban Area, Neighbourhood Centre, Edge of Town Centre, Town Centre andNot Known.
Selected Location Sub Categories:Industrial Zone 1Residential Zone 1Retail Zone 2Built-Up Zone 1High Street 1No Sub Category 1
This data displays the number of surveys per location sub-category within the selected set. The location sub-categoriesconsist of Commercial Zone, Industrial Zone, Development Zone, Residential Zone, Retail Zone, Built-Up Zone, Village,Out of Town, High Street and No Sub Category.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 2mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
Secondary Filtering selection:
Use Class: A 1 7 days
This data displays the number of surveys per Use Class classification within the selected set. The Use Classes Order 2005has been used for this purpose, which can be found within the Library module of TRICS®.
Population within 1 mile:5,001 to 10,000 1 days10,001 to 15,000 2 days20,001 to 25,000 1 days25,001 to 50,000 2 days50,001 to 100,000 1 days
This data displays the number of selected surveys within stated 1-mile radii of population.
Population within 5 miles:25,001 to 50,000 1 days50,001 to 75,000 1 days75,001 to 100,000 1 days250,001 to 500,000 1 days500,001 or More 3 days
This data displays the number of selected surveys within stated 5-mile radii of population.
Car ownership within 5 miles:0.6 to 1.0 3 days1.1 to 1.5 4 days
This data displays the number of selected surveys within stated ranges of average cars owned per residential dwelling,within a radius of 5-miles of selected survey sites.
Petrol filling station:Included in the survey count 0 daysExcluded from count or no filling station 7 days
This data displays the number of surveys within the selected set that include petrol filling station activity, and thenumber of surveys that do not.
Travel Plan:Yes 1 daysNo 6 days
This data displays the number of surveys within the selected set that were undertaken at sites with Travel Plans in place,and the number of surveys that were undertaken at sites without Travel Plans.
PTAL Rating:No PTAL Present 7 days
This data displays the number of selected surveys with PTAL Ratings.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 3mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
LIST OF SITES relevant to selection parameters
The 'browse and select' feature in TRICS was used to choose the sites to be included in this selected set. The TRICS userbrowsed the full list of sites for this land use category and selected directly from this list.
1 GM-01-C-10 ALDI GREATER MANCHESTERGREAT ANCOATS STREETURBAN EXCHANGEMANCHESTEREdge of Town CentreRetail ZoneTotal Retail floor area: 1 5 5 0 sqm
Survey date: SUNDAY 25/09/16 Survey Type: MANUAL2 LN-01-C-01 LIDL LINCOLNSHIRE
RICHMOND DRIVE
SKEGNESSEdge of Town CentreBuilt-Up ZoneTotal Retail floor area: 1 4 2 4 sqm
Survey date: SATURDAY 16/07/16 Survey Type: MANUAL3 NR-01-C-02 LIDL NORTHAMPTONSHIRE
NEWTON ROAD
RUSHDENEdge of Town CentreResidential ZoneTotal Retail floor area: 1 4 2 4 sqm
Survey date: SATURDAY 16/07/16 Survey Type: MANUAL4 NT-01-C-01 LIDL NOTTINGHAMSHIRE
CHAPEL LANE
BINGHAMEdge of TownIndustrial ZoneTotal Retail floor area: 1 4 2 4 sqm
Survey date: SATURDAY 16/07/16 Survey Type: MANUAL5 WM-01-C-01 LIDL WEST MIDLANDS
MACKADOWN LANEKITT'S GREENBIRMINGHAMNeighbourhood Centre (PPS6 Local Centre)No Sub CategoryTotal Retail floor area: 1 3 4 1 sqm
Survey date: SATURDAY 09/07/16 Survey Type: MANUAL6 WM-01-C-02 LIDL WEST MIDLANDS
HIGH STREETGUNS VILLAGEWEST BROMWICHNeighbourhood Centre (PPS6 Local Centre)High StreetTotal Retail floor area: 1 3 4 1 sqm
Survey date: SATURDAY 09/07/16 Survey Type: MANUAL7 WO-01-C-01 LIDL WORCESTERSHIRE
BLACKPOLE ROADBRICKFIELDSWORCESTEREdge of TownRetail ZoneTotal Retail floor area: 1 4 2 4 sqm
Survey date: SATURDAY 16/07/16 Survey Type: MANUAL
This section provides a list of all survey sites and days in the selected set. For each individual survey site, it displays aunique site reference code and site address, the selected trip rate calculation parameter and its value, the day of theweek and date of each survey, and whether the survey was a manual classified count or an ATC count.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 4mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL VEHICLESCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.386 2 1424 0.140 2 1424 0.52606:00 - 07:006 1396 0.752 6 1396 0.179 6 1396 0.93107:00 - 08:006 1396 4.595 6 1396 3.032 6 1396 7.62708:00 - 09:006 1396 6.063 6 1396 5.682 6 1396 11.74509:00 - 10:006 1396 9.298 6 1396 8.152 6 1396 17.45010:00 - 11:007 1418 10.274 7 1418 9.519 7 1418 19.79311:00 - 12:007 1418 9.921 7 1418 10.415 7 1418 20.33612:00 - 13:007 1418 10.133 7 1418 9.186 7 1418 19.31913:00 - 14:007 1418 8.894 7 1418 8.844 7 1418 17.73814:00 - 15:007 1418 9.317 7 1418 10.153 7 1418 19.47015:00 - 16:007 1418 8.592 7 1418 9.337 7 1418 17.92916:00 - 17:006 1396 7.329 6 1396 7.126 6 1396 14.45517:00 - 18:006 1396 5.443 6 1396 6.672 6 1396 12.11518:00 - 19:006 1396 3.533 6 1396 4.524 6 1396 8.05719:00 - 20:006 1396 2.483 6 1396 2.841 6 1396 5.32420:00 - 21:006 1396 1.158 6 1396 1.743 6 1396 2.90121:00 - 22:006 1396 0.107 6 1396 0.501 6 1396 0.60822:00 - 23:00
23:00 - 24:00Total Rates: 9 8.278 9 8.046 196.324
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 5mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 5Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 6mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL TAXISCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.000 2 1424 0.000 2 1424 0.00006:00 - 07:006 1396 0.012 6 1396 0.012 6 1396 0.02407:00 - 08:006 1396 0.036 6 1396 0.036 6 1396 0.07208:00 - 09:006 1396 0.036 6 1396 0.024 6 1396 0.06009:00 - 10:006 1396 0.072 6 1396 0.048 6 1396 0.12010:00 - 11:007 1418 0.131 7 1418 0.101 7 1418 0.23211:00 - 12:007 1418 0.111 7 1418 0.131 7 1418 0.24212:00 - 13:007 1418 0.151 7 1418 0.131 7 1418 0.28213:00 - 14:007 1418 0.141 7 1418 0.131 7 1418 0.27214:00 - 15:007 1418 0.091 7 1418 0.121 7 1418 0.21215:00 - 16:007 1418 0.141 7 1418 0.131 7 1418 0.27216:00 - 17:006 1396 0.119 6 1396 0.143 6 1396 0.26217:00 - 18:006 1396 0.119 6 1396 0.131 6 1396 0.25018:00 - 19:006 1396 0.036 6 1396 0.048 6 1396 0.08419:00 - 20:006 1396 0.095 6 1396 0.095 6 1396 0.19020:00 - 21:006 1396 0.000 6 1396 0.012 6 1396 0.01221:00 - 22:006 1396 0.000 6 1396 0.000 6 1396 0.00022:00 - 23:00
23:00 - 24:00Total Rates: 1.291 1.295 2.586
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 7mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 5Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 8mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL OGVSCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.035 2 1424 0.035 2 1424 0.07006:00 - 07:006 1396 0.012 6 1396 0.000 6 1396 0.01207:00 - 08:006 1396 0.024 6 1396 0.024 6 1396 0.04808:00 - 09:006 1396 0.012 6 1396 0.012 6 1396 0.02409:00 - 10:006 1396 0.012 6 1396 0.012 6 1396 0.02410:00 - 11:007 1418 0.000 7 1418 0.010 7 1418 0.01011:00 - 12:007 1418 0.000 7 1418 0.000 7 1418 0.00012:00 - 13:007 1418 0.010 7 1418 0.000 7 1418 0.01013:00 - 14:007 1418 0.020 7 1418 0.010 7 1418 0.03014:00 - 15:007 1418 0.030 7 1418 0.040 7 1418 0.07015:00 - 16:007 1418 0.010 7 1418 0.010 7 1418 0.02016:00 - 17:006 1396 0.000 6 1396 0.012 6 1396 0.01217:00 - 18:006 1396 0.000 6 1396 0.000 6 1396 0.00018:00 - 19:006 1396 0.024 6 1396 0.012 6 1396 0.03619:00 - 20:006 1396 0.000 6 1396 0.012 6 1396 0.01220:00 - 21:006 1396 0.000 6 1396 0.000 6 1396 0.00021:00 - 22:006 1396 0.000 6 1396 0.000 6 1396 0.00022:00 - 23:00
23:00 - 24:00Total Rates: 0.189 0.189 0.378
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 9mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 5Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 10mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL PSVSCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.000 2 1424 0.000 2 1424 0.00006:00 - 07:006 1396 0.000 6 1396 0.000 6 1396 0.00007:00 - 08:006 1396 0.000 6 1396 0.000 6 1396 0.00008:00 - 09:006 1396 0.000 6 1396 0.000 6 1396 0.00009:00 - 10:006 1396 0.000 6 1396 0.000 6 1396 0.00010:00 - 11:007 1418 0.000 7 1418 0.000 7 1418 0.00011:00 - 12:007 1418 0.000 7 1418 0.000 7 1418 0.00012:00 - 13:007 1418 0.000 7 1418 0.000 7 1418 0.00013:00 - 14:007 1418 0.000 7 1418 0.000 7 1418 0.00014:00 - 15:007 1418 0.000 7 1418 0.000 7 1418 0.00015:00 - 16:007 1418 0.000 7 1418 0.000 7 1418 0.00016:00 - 17:006 1396 0.000 6 1396 0.000 6 1396 0.00017:00 - 18:006 1396 0.000 6 1396 0.000 6 1396 0.00018:00 - 19:006 1396 0.000 6 1396 0.000 6 1396 0.00019:00 - 20:006 1396 0.000 6 1396 0.000 6 1396 0.00020:00 - 21:006 1396 0.000 6 1396 0.000 6 1396 0.00021:00 - 22:006 1396 0.000 6 1396 0.000 6 1396 0.00022:00 - 23:00
23:00 - 24:00Total Rates: 0.000 0.000 0.000
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 11mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 5Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 12mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL CYCLISTSCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.035 2 1424 0.000 2 1424 0.03506:00 - 07:006 1396 0.048 6 1396 0.012 6 1396 0.06007:00 - 08:006 1396 0.084 6 1396 0.048 6 1396 0.13208:00 - 09:006 1396 0.024 6 1396 0.048 6 1396 0.07209:00 - 10:006 1396 0.095 6 1396 0.036 6 1396 0.13110:00 - 11:007 1418 0.091 7 1418 0.060 7 1418 0.15111:00 - 12:007 1418 0.081 7 1418 0.081 7 1418 0.16212:00 - 13:007 1418 0.141 7 1418 0.081 7 1418 0.22213:00 - 14:007 1418 0.081 7 1418 0.141 7 1418 0.22214:00 - 15:007 1418 0.101 7 1418 0.081 7 1418 0.18215:00 - 16:007 1418 0.101 7 1418 0.151 7 1418 0.25216:00 - 17:006 1396 0.119 6 1396 0.191 6 1396 0.31017:00 - 18:006 1396 0.131 6 1396 0.131 6 1396 0.26218:00 - 19:006 1396 0.084 6 1396 0.060 6 1396 0.14419:00 - 20:006 1396 0.060 6 1396 0.084 6 1396 0.14420:00 - 21:006 1396 0.024 6 1396 0.060 6 1396 0.08421:00 - 22:006 1396 0.000 6 1396 0.000 6 1396 0.00022:00 - 23:00
23:00 - 24:00Total Rates: 1.300 1.265 2.565
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 13mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 5Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 14mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL VEHICLE OCCUPANTSCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.386 2 1424 0.140 2 1424 0.52606:00 - 07:006 1396 1.086 6 1396 0.239 6 1396 1.32507:00 - 08:006 1396 6.398 6 1396 4.237 6 1396 10.63508:00 - 09:006 1396 8.857 6 1396 8.116 6 1396 16.97309:00 - 10:006 1396 13.679 6 1396 12.079 6 1396 25.75810:00 - 11:007 1418 15.411 7 1418 13.870 7 1418 29.28111:00 - 12:007 1418 14.988 7 1418 16.015 7 1418 31.00312:00 - 13:007 1418 16.841 7 1418 14.917 7 1418 31.75813:00 - 14:007 1418 14.373 7 1418 14.132 7 1418 28.50514:00 - 15:007 1418 15.079 7 1418 16.166 7 1418 31.24515:00 - 16:007 1418 13.830 7 1418 14.756 7 1418 28.58616:00 - 17:006 1396 11.578 6 1396 11.864 6 1396 23.44217:00 - 18:006 1396 8.534 6 1396 10.444 6 1396 18.97818:00 - 19:006 1396 5.908 6 1396 7.460 6 1396 13.36819:00 - 20:006 1396 3.808 6 1396 4.679 6 1396 8.48720:00 - 21:006 1396 1.874 6 1396 2.590 6 1396 4.46421:00 - 22:006 1396 0.107 6 1396 0.633 6 1396 0.74022:00 - 23:00
23:00 - 24:00Total Rates: 152.737 152.337 305.074
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 15mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 5Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 16mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL PEDESTRIANSCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.562 2 1424 0.000 2 1424 0.56206:00 - 07:006 1396 0.346 6 1396 0.072 6 1396 0.41807:00 - 08:006 1396 0.716 6 1396 0.824 6 1396 1.54008:00 - 09:006 1396 0.836 6 1396 1.050 6 1396 1.88609:00 - 10:006 1396 1.587 6 1396 1.516 6 1396 3.10310:00 - 11:007 1418 2.478 7 1418 3.002 7 1418 5.48011:00 - 12:007 1418 3.505 7 1418 3.425 7 1418 6.93012:00 - 13:007 1418 3.666 7 1418 3.344 7 1418 7.01013:00 - 14:007 1418 3.576 7 1418 3.465 7 1418 7.04114:00 - 15:007 1418 3.717 7 1418 4.170 7 1418 7.88715:00 - 16:007 1418 4.744 7 1418 4.271 7 1418 9.01516:00 - 17:006 1396 3.629 6 1396 3.044 6 1396 6.67317:00 - 18:006 1396 3.629 6 1396 2.650 6 1396 6.27918:00 - 19:006 1396 1.611 6 1396 2.292 6 1396 3.90319:00 - 20:006 1396 1.874 6 1396 2.220 6 1396 4.09420:00 - 21:006 1396 0.752 6 1396 0.943 6 1396 1.69521:00 - 22:006 1396 0.012 6 1396 0.310 6 1396 0.32222:00 - 23:00
23:00 - 24:00Total Rates: 3 7.240 3 6.598 7 3.838
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 17mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 5Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 18mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL BUS/TRAM PASSENGERSCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.105 2 1424 0.035 2 1424 0.14006:00 - 07:006 1396 0.095 6 1396 0.084 6 1396 0.17907:00 - 08:006 1396 0.322 6 1396 0.191 6 1396 0.51308:00 - 09:006 1396 0.394 6 1396 0.346 6 1396 0.74009:00 - 10:006 1396 0.406 6 1396 0.251 6 1396 0.65710:00 - 11:007 1418 0.624 7 1418 0.443 7 1418 1.06711:00 - 12:007 1418 0.564 7 1418 0.453 7 1418 1.01712:00 - 13:007 1418 0.574 7 1418 0.403 7 1418 0.97713:00 - 14:007 1418 0.604 7 1418 0.463 7 1418 1.06714:00 - 15:007 1418 0.413 7 1418 0.524 7 1418 0.93715:00 - 16:007 1418 0.282 7 1418 0.564 7 1418 0.84616:00 - 17:006 1396 0.251 6 1396 0.406 6 1396 0.65717:00 - 18:006 1396 0.334 6 1396 0.370 6 1396 0.70418:00 - 19:006 1396 0.191 6 1396 0.382 6 1396 0.57319:00 - 20:006 1396 0.131 6 1396 0.215 6 1396 0.34620:00 - 21:006 1396 0.060 6 1396 0.107 6 1396 0.16721:00 - 22:006 1396 0.012 6 1396 0.060 6 1396 0.07222:00 - 23:00
23:00 - 24:00Total Rates: 5.362 5.297 1 0.659
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 19mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 5Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 20mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL TOTAL RAIL PASSENGERSCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.000 2 1424 0.000 2 1424 0.00006:00 - 07:006 1396 0.024 6 1396 0.012 6 1396 0.03607:00 - 08:006 1396 0.048 6 1396 0.036 6 1396 0.08408:00 - 09:006 1396 0.060 6 1396 0.060 6 1396 0.12009:00 - 10:006 1396 0.024 6 1396 0.036 6 1396 0.06010:00 - 11:007 1418 0.040 7 1418 0.030 7 1418 0.07011:00 - 12:007 1418 0.020 7 1418 0.030 7 1418 0.05012:00 - 13:007 1418 0.030 7 1418 0.000 7 1418 0.03013:00 - 14:007 1418 0.010 7 1418 0.030 7 1418 0.04014:00 - 15:007 1418 0.020 7 1418 0.010 7 1418 0.03015:00 - 16:007 1418 0.050 7 1418 0.030 7 1418 0.08016:00 - 17:006 1396 0.012 6 1396 0.048 6 1396 0.06017:00 - 18:006 1396 0.060 6 1396 0.036 6 1396 0.09618:00 - 19:006 1396 0.024 6 1396 0.036 6 1396 0.06019:00 - 20:006 1396 0.024 6 1396 0.060 6 1396 0.08420:00 - 21:006 1396 0.024 6 1396 0.024 6 1396 0.04821:00 - 22:006 1396 0.000 6 1396 0.000 6 1396 0.00022:00 - 23:00
23:00 - 24:00Total Rates: 0.470 0.478 0.948
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 21mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 5Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 22mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL TOTAL PEOPLECalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 1.088 2 1424 0.176 2 1424 1.26406:00 - 07:006 1396 1.599 6 1396 0.418 6 1396 2.01707:00 - 08:006 1396 7.567 6 1396 5.335 6 1396 12.90208:00 - 09:006 1396 10.169 6 1396 9.620 6 1396 19.78909:00 - 10:006 1396 15.791 6 1396 13.917 6 1396 29.70810:00 - 11:007 1418 18.644 7 1418 17.405 7 1418 36.04911:00 - 12:007 1418 19.158 7 1418 20.004 7 1418 39.16212:00 - 13:007 1418 21.253 7 1418 18.745 7 1418 39.99813:00 - 14:007 1418 18.644 7 1418 18.231 7 1418 36.87514:00 - 15:007 1418 19.329 7 1418 20.951 7 1418 40.28015:00 - 16:007 1418 19.007 7 1418 19.772 7 1418 38.77916:00 - 17:006 1396 15.588 6 1396 15.553 6 1396 31.14117:00 - 18:006 1396 12.688 6 1396 13.631 6 1396 26.31918:00 - 19:006 1396 7.818 6 1396 10.229 6 1396 18.04719:00 - 20:006 1396 5.896 6 1396 7.257 6 1396 13.15320:00 - 21:006 1396 2.733 6 1396 3.724 6 1396 6.45721:00 - 22:006 1396 0.131 6 1396 1.003 6 1396 1.13422:00 - 23:00
23:00 - 24:00Total Rates: 197.103 195.971 393.074
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 23mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 5Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 24mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL CARSCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.351 2 1424 0.105 2 1424 0.45606:00 - 07:006 1396 0.597 6 1396 0.131 6 1396 0.72807:00 - 08:006 1396 4.297 6 1396 2.757 6 1396 7.05408:00 - 09:006 1396 5.705 6 1396 5.407 6 1396 11.11209:00 - 10:006 1396 8.928 6 1396 7.842 6 1396 16.77010:00 - 11:007 1418 9.871 7 1418 9.126 7 1418 18.99711:00 - 12:007 1418 9.579 7 1418 10.042 7 1418 19.62112:00 - 13:007 1418 9.539 7 1418 8.753 7 1418 18.29213:00 - 14:007 1418 8.310 7 1418 8.310 7 1418 16.62014:00 - 15:007 1418 8.944 7 1418 9.690 7 1418 18.63415:00 - 16:007 1418 8.270 7 1418 9.015 7 1418 17.28516:00 - 17:006 1396 6.995 6 1396 6.732 6 1396 13.72717:00 - 18:006 1396 5.144 6 1396 6.338 6 1396 11.48218:00 - 19:006 1396 3.354 6 1396 4.237 6 1396 7.59119:00 - 20:006 1396 2.220 6 1396 2.554 6 1396 4.77420:00 - 21:006 1396 1.062 6 1396 1.611 6 1396 2.67321:00 - 22:006 1396 0.095 6 1396 0.489 6 1396 0.58422:00 - 23:00
23:00 - 24:00Total Rates: 9 3.261 9 3.139 186.400
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 25mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 5Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 26mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL LGVSCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.000 2 1424 0.000 2 1424 0.00006:00 - 07:006 1396 0.119 6 1396 0.036 6 1396 0.15507:00 - 08:006 1396 0.239 6 1396 0.203 6 1396 0.44208:00 - 09:006 1396 0.286 6 1396 0.227 6 1396 0.51309:00 - 10:006 1396 0.286 6 1396 0.239 6 1396 0.52510:00 - 11:007 1418 0.242 7 1418 0.262 7 1418 0.50411:00 - 12:007 1418 0.222 7 1418 0.232 7 1418 0.45412:00 - 13:007 1418 0.403 7 1418 0.272 7 1418 0.67513:00 - 14:007 1418 0.393 7 1418 0.373 7 1418 0.76614:00 - 15:007 1418 0.232 7 1418 0.272 7 1418 0.50415:00 - 16:007 1418 0.171 7 1418 0.181 7 1418 0.35216:00 - 17:006 1396 0.215 6 1396 0.227 6 1396 0.44217:00 - 18:006 1396 0.167 6 1396 0.191 6 1396 0.35818:00 - 19:006 1396 0.119 6 1396 0.227 6 1396 0.34619:00 - 20:006 1396 0.131 6 1396 0.167 6 1396 0.29820:00 - 21:006 1396 0.095 6 1396 0.095 6 1396 0.19021:00 - 22:006 1396 0.012 6 1396 0.012 6 1396 0.02422:00 - 23:00
23:00 - 24:00Total Rates: 3.332 3.216 6.548
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 27mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 5Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 28mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
TRIP RATE for Land Use 01 - RETAIL/C - DISCOUNT FOOD STORESMULTI-MODAL MOTOR CYCLESCalculation factor: 100 sqmBOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days RFA Rate Days RFA Rate Days RFA Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:00
2 1424 0.000 2 1424 0.000 2 1424 0.00006:00 - 07:006 1396 0.012 6 1396 0.000 6 1396 0.01207:00 - 08:006 1396 0.000 6 1396 0.012 6 1396 0.01208:00 - 09:006 1396 0.024 6 1396 0.012 6 1396 0.03609:00 - 10:006 1396 0.000 6 1396 0.012 6 1396 0.01210:00 - 11:007 1418 0.030 7 1418 0.020 7 1418 0.05011:00 - 12:007 1418 0.010 7 1418 0.010 7 1418 0.02012:00 - 13:007 1418 0.030 7 1418 0.030 7 1418 0.06013:00 - 14:007 1418 0.030 7 1418 0.020 7 1418 0.05014:00 - 15:007 1418 0.020 7 1418 0.050 7 1418 0.07015:00 - 16:007 1418 0.000 7 1418 0.000 7 1418 0.00016:00 - 17:006 1396 0.000 6 1396 0.012 6 1396 0.01217:00 - 18:006 1396 0.012 6 1396 0.012 6 1396 0.02418:00 - 19:006 1396 0.000 6 1396 0.000 6 1396 0.00019:00 - 20:006 1396 0.036 6 1396 0.012 6 1396 0.04820:00 - 21:006 1396 0.000 6 1396 0.024 6 1396 0.02421:00 - 22:006 1396 0.000 6 1396 0.000 6 1396 0.00022:00 - 23:00
23:00 - 24:00Total Rates: 0.204 0.226 0.430
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown justabove the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivalsplus departures). Within each of these main columns are three sub-columns. These display the number of survey dayswhere count data is included (per time period), the average value of the selected trip rate calculation parameter (pertime period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at thefoot of the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey daysthat have count data available for the stated time period. The average (mean) number of arrivals, departures or totals(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the statedtime period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the statedcalculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Triprates are then rounded to 3 decimal places.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 29mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
The survey data, graphs and all associated supporting information, contained within the TRICS Database are publishedby TRICS Consortium Limited ("the Company") and the Company claims copyright and database rights in this publishedwork. The Company authorises those who possess a current TRICS licence to access the TRICS Database and copy thedata contained within the TRICS Database for the licence holders' use only. Any resulting copy must retain all copyrightsand other proprietary notices, and any disclaimer contained thereon.
The Company accepts no responsibility for loss which may arise from reliance on data contained in the TRICS Database.[No warranty of any kind, express or implied, is made as to the data contained in the TRICS Database.]
Parameter summary
Trip rate parameter range selected: 953 - 1550 (units: sqm)Survey date date range: 01/01/09 - 06/04/17Number of weekdays (Monday-Friday): 7Number of Saturdays: 6Number of Sundays: 1Surveys automatically removed from selection: 5Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip ratecalculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximumsurvey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set ofsurveys are show. Finally, the number of survey days that have been manually removed from the selected set outside ofthe standard filtering procedure are displayed.
TRICS 7.4.3 301017 B18.05 Database right of TRICS Consortium Limited, 2017. All rights reserved Wednesday 13/12/17 Discount Foodstore Weekend Page 1mode transport limited Lombard House, 145 Great Charles Street Birmimgham, B3 3LP Licence No: 754101
Time Range/Peak Period SelectionDirection: Totals / Use All Times
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 76
Appendix J Net Development Traffic
Junction 1: Site AccessPeak Hour: AM (08:00-09:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT0800-0815 0.0 0.0 0.0 0.8 0.0 0.8 0.0 0.0 0.0 0.7 0.0 0.7 0.0 0.0 0.0 0.3 0.0 0.3 0.0 0.0 0.0 0.4 0.0 0.4 0.0 0.0 0.00815-0830 0.0 0.0 0.0 0.8 0.0 0.8 0.0 0.0 0.0 0.7 0.0 0.7 0.0 0.0 0.0 0.3 0.0 0.3 0.0 0.0 0.0 0.4 0.0 0.4 0.0 0.0 0.00830-0845 0.0 0.0 0.0 0.8 0.0 0.8 0.0 0.0 0.0 0.7 0.0 0.7 0.0 0.0 0.0 0.3 0.0 0.3 0.0 0.0 0.0 0.4 0.0 0.4 0.0 0.0 0.00845-0900 0.0 0.0 0.0 0.8 0.0 0.8 0.0 0.0 0.0 0.7 0.0 0.7 0.0 0.0 0.0 0.3 0.0 0.3 0.0 0.0 0.0 0.4 0.0 0.4 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 3.3 0.0 3.3 0.0 0.0 0.0 2.6 0.0 2.6 0.0 0.0 0.0 1.4 0.0 1.4 0.0 0.0 0.0 1.7 0.0 1.7 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 0.05 0.07 0.030815-0830 0.05 0.07 0.03 0830-0845 0.05 0.07 0.030845-0900 0.05 0.07 0.03
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 3.3 0.0 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 2.6 0.0 1.4 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 0.0 1.7 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0.0 0.8 0.0 A 0.0 0.8 0.0 A 0.0 0.8 0.0 A 0.0 0.8 0.0B 0.7 0.0 0.3 B 0.7 0.0 0.3 B 0.7 0.0 0.3 B 0.7 0.0 0.3C 0.0 0.4 0.0 C 0.0 0.4 0.0 C 0.0 0.4 0.0 C 0.0 0.4 0.0
TIME PERIOD
Junction 1: Site AccessPeak Hour: AM (08:00-09:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT0800-0815 0.0 0.0 0.0 2.6 0.0 2.6 -0.5 0.0 -0.5 2.2 0.0 2.2 0.0 0.0 0.0 0.6 0.0 0.6 -0.1 0.0 -0.1 0.7 0.0 0.7 0.0 0.0 0.00815-0830 0.0 0.0 0.0 2.6 0.0 2.6 -0.5 0.0 -0.5 2.2 0.0 2.2 0.0 0.0 0.0 0.6 0.0 0.6 -0.1 0.0 -0.1 0.7 0.0 0.7 0.0 0.0 0.00830-0845 0.0 0.0 0.0 2.6 0.0 2.6 -0.5 0.0 -0.5 2.2 0.0 2.2 0.0 0.0 0.0 0.6 0.0 0.6 -0.1 0.0 -0.1 0.7 0.0 0.7 0.0 0.0 0.00845-0900 0.0 0.0 0.0 2.6 0.0 2.6 -0.5 0.0 -0.5 2.2 0.0 2.2 0.0 0.0 0.0 0.6 0.0 0.6 -0.1 0.0 -0.1 0.7 0.0 0.7 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 10.4 0.0 10.4 -2.1 0.0 -2.1 8.8 0.0 8.8 0.0 0.0 0.0 2.2 0.0 2.2 -0.5 0.0 -0.5 2.6 0.0 2.6 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 0.14 0.18 0.030815-0830 0.14 0.18 0.03 0830-0845 0.14 0.18 0.030845-0900 0.14 0.18 0.03
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 10.4 -2.1 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 8.8 0.0 2.2 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C -0.5 2.6 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0.0 2.6 -0.5 A 0.0 2.6 -0.5 A 0.0 2.6 -0.5 A 0.0 2.6 -0.5B 2.2 0.0 0.6 B 2.2 0.0 0.6 B 2.2 0.0 0.6 B 2.2 0.0 0.6C -0.1 0.7 0.0 C -0.1 0.7 0.0 C -0.1 0.7 0.0 C -0.1 0.7 0.0
TIME PERIOD
Junction 1: Site AccessPeak Hour: AM (08:00-09:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT0800-0815 0.0 0.0 0.0 0.5 0.0 0.5 0.0 0.0 0.0 0.3 0.0 0.3 0.0 0.0 0.0 0.2 0.0 0.2 0.0 0.0 0.0 0.3 0.0 0.3 0.0 0.0 0.00815-0830 0.0 0.0 0.0 0.5 0.0 0.5 0.0 0.0 0.0 0.3 0.0 0.3 0.0 0.0 0.0 0.2 0.0 0.2 0.0 0.0 0.0 0.3 0.0 0.3 0.0 0.0 0.00830-0845 0.0 0.0 0.0 0.5 0.0 0.5 0.0 0.0 0.0 0.3 0.0 0.3 0.0 0.0 0.0 0.2 0.0 0.2 0.0 0.0 0.0 0.3 0.0 0.3 0.0 0.0 0.00845-0900 0.0 0.0 0.0 0.5 0.0 0.5 0.0 0.0 0.0 0.3 0.0 0.3 0.0 0.0 0.0 0.2 0.0 0.2 0.0 0.0 0.0 0.3 0.0 0.3 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 2.0 0.0 2.0 0.0 0.0 0.0 1.3 0.0 1.3 0.0 0.0 0.0 0.7 0.0 0.7 0.0 0.0 0.0 1.0 0.0 1.0 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 0.03 0.03 0.020815-0830 0.03 0.03 0.02 0830-0845 0.03 0.03 0.020845-0900 0.03 0.03 0.02
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 2.0 0.0 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 1.3 0.0 0.7 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 0.0 1.0 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0.0 0.5 0.0 A 0.0 0.5 0.0 A 0.0 0.5 0.0 A 0.0 0.5 0.0B 0.3 0.0 0.2 B 0.3 0.0 0.2 B 0.3 0.0 0.2 B 0.3 0.0 0.2C 0.0 0.3 0.0 C 0.0 0.3 0.0 C 0.0 0.3 0.0 C 0.0 0.3 0.0
TIME PERIOD
Junction 1: Site AccessPeak Hour: AM (08:00-09:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 0 0 0 5 0 5 -1 0 -1 4 0 4 0 0 0 2 0 2 -1 0 -1 2 0 2 0 0 00815-0830 0 0 0 5 0 5 -1 0 -1 4 0 4 0 0 0 2 0 2 -1 0 -1 2 0 2 0 0 00830-0845 0 0 0 5 0 5 -1 0 -1 4 0 4 0 0 0 2 0 2 -1 0 -1 2 0 2 0 0 00845-0900 0 0 0 5 0 5 -1 0 -1 4 0 4 0 0 0 2 0 2 -1 0 -1 2 0 2 0 0 0TOTAL 0 0 0 18 0 18 -5 0 -5 15 0 15 0 0 0 6 0 6 -3 0 -3 8 0 8 0 0 0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 0.23 0.35 0.080815-0830 0.23 0.35 0.08 0830-0845 0.23 0.35 0.080845-0900 0.23 0.35 0.08
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 18.26263 -4.70626 A 0 0 0 A 0.0% 0.0% 0.0%B 14.62626 0 6.373737 B 0 0 0 B 0.0% 0.0% 0.0%C -2.89374 7.737374 0 C 0 0 0 C 0.0% 0.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 4.565657 -1.17657 A 0 4.565657 -1.17657 A 0 4.565657 -1.17657 A 0 4.565657 -1.17657B 3.656566 0 1.593434 B 3.656566 0 1.593434 B 3.656566 0 1.593434 B 3.656566 0 1.593434C -0.72343 1.934343 0 C -0.72343 1.934343 0 C -0.72343 1.934343 0 C -0.72343 1.934343 0
TIME PERIOD
Junction 1: Site AccessPeak Hour: AM (17:00-18:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1700-1715 0.0 0.0 0.0 9.0 0.0 9.0 -9.0 0.0 -9.0 6.8 0.0 6.8 0.0 0.0 0.0 1.7 0.0 1.7 -2.3 0.0 -2.3 2.3 0.0 2.3 0.0 0.0 0.01715-1730 0.0 0.0 0.0 9.0 0.0 9.0 -9.0 0.0 -9.0 6.8 0.0 6.8 0.0 0.0 0.0 1.7 0.0 1.7 -2.3 0.0 -2.3 2.3 0.0 2.3 0.0 0.0 0.01730-1745 0.0 0.0 0.0 9.0 0.0 9.0 -9.0 0.0 -9.0 6.8 0.0 6.8 0.0 0.0 0.0 1.7 0.0 1.7 -2.3 0.0 -2.3 2.3 0.0 2.3 0.0 0.0 0.01745-1800 0.0 0.0 0.0 9.0 0.0 9.0 -9.0 0.0 -9.0 6.8 0.0 6.8 0.0 0.0 0.0 1.7 0.0 1.7 -2.3 0.0 -2.3 2.3 0.0 2.3 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 36.0 0.0 36.0 -36.0 0.0 -36.0 27.2 0.0 27.2 0.0 0.0 0.0 6.8 0.0 6.8 -9.0 0.0 -9.0 9.0 0.0 9.0 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 0.00 0.57 0.001715-1730 0.00 0.57 0.00 1730-1745 0.00 0.57 0.001745-1800 0.00 0.57 0.00
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 36.0 -36.0 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 27.2 0.0 6.8 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C -9.0 9.0 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0.0 9.0 -9.0 A 0.0 9.0 -9.0 A 0.0 9.0 -9.0 A 0.0 9.0 -9.0B 6.8 0.0 1.7 B 6.8 0.0 1.7 B 6.8 0.0 1.7 B 6.8 0.0 1.7C -2.3 2.3 0.0 C -2.3 2.3 0.0 C -2.3 2.3 0.0 C -2.3 2.3 0.0
TIME PERIOD
Junction 1: Site AccessPeak Hour: AM (08:00-09:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT0800-0815 0% 0% 0% 65% 65% 65% 0% 0% 0% 65% 65% 65% 0% 0% 0% 35% 35% 35% 0% 0% 0% 35% 35% 35% 0% 0% 0%0815-0830 0% 0% 0% 65% 65% 65% 0% 0% 0% 65% 65% 65% 0% 0% 0% 35% 35% 35% 0% 0% 0% 35% 35% 35% 0% 0% 0%0830-0845 0% 0% 0% 65% 65% 65% 0% 0% 0% 65% 65% 65% 0% 0% 0% 35% 35% 35% 0% 0% 0% 35% 35% 35% 0% 0% 0%0845-0900 0% 0% 0% 65% 65% 65% 0% 0% 0% 65% 65% 65% 0% 0% 0% 35% 35% 35% 0% 0% 0% 35% 35% 35% 0% 0% 0%TOTAL 0% 0% 0% 65% 65% 65% 0% 0% 0% 65% 65% 65% 0% 0% 0% 35% 35% 35% 0% 0% 0% 35% 35% 35% 0% 0% 0%
HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 0.04 0.07 0.020815-0830 0.04 0.07 0.02 0830-0845 0.04 0.07 0.020845-0900 0.04 0.07 0.02
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 2.618182 0 A 0 0.654545 0 A 0.0% 25.0% 0.0%B 2.618182 0 1.381818 B 0.654545 0 0.345455 B 25.0% 0.0% 25.0%C 0 1.381818 0 C 0 0.345455 0 C 0.0% 25.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 0.654545 0 A 0 0.654545 0 A 0 0.654545 0 A 0 0.654545 0B 0.654545 0 0.345455 B 0.654545 0 0.345455 B 0.654545 0 0.345455 B 0.654545 0 0.345455C 0 0.345455 0 C 0 0.345455 0 C 0 0.345455 0 C 0 0.345455 0
TIME PERIOD
Junction 1: Site AccessPeak Hour: AM (08:00-09:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT0800-0815 0.0 0.0 0.0 0.7 0.0 0.7 -0.7 0.0 -0.7 0.5 0.0 0.5 0.0 0.0 0.0 0.5 0.0 0.5 -0.6 0.0 -0.6 0.6 0.0 0.6 0.0 0.0 0.00815-0830 0.0 0.0 0.0 0.7 0.0 0.7 -0.7 0.0 -0.7 0.5 0.0 0.5 0.0 0.0 0.0 0.5 0.0 0.5 -0.6 0.0 -0.6 0.6 0.0 0.6 0.0 0.0 0.00830-0845 0.0 0.0 0.0 0.7 0.0 0.7 -0.7 0.0 -0.7 0.5 0.0 0.5 0.0 0.0 0.0 0.5 0.0 0.5 -0.6 0.0 -0.6 0.6 0.0 0.6 0.0 0.0 0.00845-0900 0.0 0.0 0.0 0.7 0.0 0.7 -0.7 0.0 -0.7 0.5 0.0 0.5 0.0 0.0 0.0 0.5 0.0 0.5 -0.6 0.0 -0.6 0.6 0.0 0.6 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 2.6 0.0 2.6 -2.6 0.0 -2.6 1.9 0.0 1.9 0.0 0.0 0.0 2.1 0.0 2.1 -2.4 0.0 -2.4 2.4 0.0 2.4 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 0.00 0.07 0.000815-0830 0.00 0.07 0.00 0830-0845 0.00 0.07 0.000845-0900 0.00 0.07 0.00
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 2.6 -2.6 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 1.9 0.0 2.1 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C -2.4 2.4 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0.0 0.7 -0.7 A 0.0 0.7 -0.7 A 0.0 0.7 -0.7 A 0.0 0.7 -0.7B 0.5 0.0 0.5 B 0.5 0.0 0.5 B 0.5 0.0 0.5 B 0.5 0.0 0.5C -0.6 0.6 0.0 C -0.6 0.6 0.0 C -0.6 0.6 0.0 C -0.6 0.6 0.0
TIME PERIOD
Junction 1: Site AccessPeak Hour: PM (17:00-18:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1700-1715 0% 0% 0% 40% 40% 40% 0% 0% 0% 60% 60% 60% 0% 0% 0% 40% 40% 40% 0% 0% 0% 60% 60% 60% 0% 0% 0%1715-1730 0% 0% 0% 40% 40% 40% 0% 0% 0% 60% 60% 60% 0% 0% 0% 40% 40% 40% 0% 0% 0% 60% 60% 60% 0% 0% 0%1730-1745 0% 0% 0% 40% 40% 40% 0% 0% 0% 60% 60% 60% 0% 0% 0% 40% 40% 40% 0% 0% 0% 60% 60% 60% 0% 0% 0%1745-1800 0% 0% 0% 40% 40% 40% 0% 0% 0% 60% 60% 60% 0% 0% 0% 40% 40% 40% 0% 0% 0% 60% 60% 60% 0% 0% 0%TOTAL 0% 0% 0% 40% 40% 40% 0% 0% 0% 60% 60% 60% 0% 0% 0% 40% 40% 40% 0% 0% 0% 60% 60% 60% 0% 0% 0%
HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 0.03 0.07 0.041715-1730 0.03 0.07 0.04 1730-1745 0.03 0.07 0.041745-1800 0.03 0.07 0.04
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 1.601116 0 A 0 0.400279 0 A 0.0% 25.0% 0.0%B 2.398884 0 1.601116 B 0.599721 0 0.400279 B 25.0% 0.0% 25.0%C 0 2.398884 0 C 0 0.599721 0 C 0.0% 25.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0 0.400279 0 A 0 0.400279 0 A 0 0.400279 0 A 0 0.400279 0B 0.599721 0 0.400279 B 0.599721 0 0.400279 B 0.599721 0 0.400279 B 0.599721 0 0.400279C 0 0.599721 0 C 0 0.599721 0 C 0 0.599721 0 C 0 0.599721 0
TIME PERIOD
Junction 1: Site AccessPeak Hour: PM (17:00-18:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1700-1715 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 1.2 0.0 1.2 0.0 0.0 0.0 0.5 0.0 0.5 0.0 0.0 0.0 0.7 0.0 0.7 0.0 0.0 0.01715-1730 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 1.2 0.0 1.2 0.0 0.0 0.0 0.5 0.0 0.5 0.0 0.0 0.0 0.7 0.0 0.7 0.0 0.0 0.00730-0745 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 1.2 0.0 1.2 0.0 0.0 0.0 0.5 0.0 0.5 0.0 0.0 0.0 0.7 0.0 0.7 0.0 0.0 0.00745-1800 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 1.2 0.0 1.2 0.0 0.0 0.0 0.5 0.0 0.5 0.0 0.0 0.0 0.7 0.0 0.7 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 6.3 0.0 6.3 0.0 0.0 0.0 4.9 0.0 4.9 0.0 0.0 0.0 2.1 0.0 2.1 0.0 0.0 0.0 2.7 0.0 2.7 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 0.10 0.12 0.051715-1730 0.10 0.12 0.05 0730-0745 0.10 0.12 0.050745-1800 0.10 0.12 0.05
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 6.3 0.0 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 4.9 0.0 2.1 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 0.0 2.7 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1700-1715 1715-1730 0730-0745 0745-1800A B C A B C A B C A B C
A 0.0 1.6 0.0 A 0.0 1.6 0.0 A 0.0 1.6 0.0 A 0.0 1.6 0.0B 1.2 0.0 0.5 B 1.2 0.0 0.5 B 1.2 0.0 0.5 B 1.2 0.0 0.5C 0.0 0.7 0.0 C 0.0 0.7 0.0 C 0.0 0.7 0.0 C 0.0 0.7 0.0
TIME PERIOD
Junction 1: Site AccessPeak Hour: AM (08:00-09:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT0800-0815 0% 0% 0% 53% 53% 53% 0% 0% 0% 47% 47% 47% 0% 0% 0% 53% 53% 53% 0% 0% 0% 47% 47% 47% 0% 0% 0%0815-0830 0% 0% 0% 53% 53% 53% 0% 0% 0% 47% 47% 47% 0% 0% 0% 53% 53% 53% 0% 0% 0% 47% 47% 47% 0% 0% 0%0830-0845 0% 0% 0% 53% 53% 53% 0% 0% 0% 47% 47% 47% 0% 0% 0% 53% 53% 53% 0% 0% 0% 47% 47% 47% 0% 0% 0%0845-0900 0% 0% 0% 53% 53% 53% 0% 0% 0% 47% 47% 47% 0% 0% 0% 53% 53% 53% 0% 0% 0% 47% 47% 47% 0% 0% 0%TOTAL 0% 0% 0% 53% 53% 53% 0% 0% 0% 47% 47% 47% 0% 0% 0% 53% 53% 53% 0% 0% 0% 47% 47% 47% 0% 0% 0%
HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 0.04 0.07 0.030815-0830 0.04 0.07 0.03 0830-0845 0.04 0.07 0.030845-0900 0.04 0.07 0.03
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 2.10101 0 A 0 0.525253 0 A 0.0% 25.0% 0.0%B 1.89899 0 2.10101 B 0.474747 0 0.525253 B 25.0% 0.0% 25.0%C 0 1.89899 0 C 0 0.474747 0 C 0.0% 25.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 0.525253 0 A 0 0.525253 0 A 0 0.525253 0 A 0 0.525253 0B 0.474747 0 0.525253 B 0.474747 0 0.525253 B 0.474747 0 0.525253 B 0.474747 0 0.525253C 0 0.474747 0 C 0 0.474747 0 C 0 0.474747 0 C 0 0.474747 0
TIME PERIOD
Junction 1: Site AccessPeak Hour: Sat (12:00-13:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1200-1215 0.0 0.0 0.0 0.8 0.0 0.8 0.0 0.0 0.0 1.0 0.0 1.0 0.0 0.0 0.0 1.2 0.0 1.2 0.0 0.0 0.0 1.0 0.0 1.0 0.0 0.0 0.01215-1230 0.0 0.0 0.0 0.8 0.0 0.8 0.0 0.0 0.0 1.0 0.0 1.0 0.0 0.0 0.0 1.2 0.0 1.2 0.0 0.0 0.0 1.0 0.0 1.0 0.0 0.0 0.01230-1245 0.0 0.0 0.0 0.8 0.0 0.8 0.0 0.0 0.0 1.0 0.0 1.0 0.0 0.0 0.0 1.2 0.0 1.2 0.0 0.0 0.0 1.0 0.0 1.0 0.0 0.0 0.01245-1300 0.0 0.0 0.0 0.8 0.0 0.8 0.0 0.0 0.0 1.0 0.0 1.0 0.0 0.0 0.0 1.2 0.0 1.2 0.0 0.0 0.0 1.0 0.0 1.0 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 3.2 0.0 3.2 0.0 0.0 0.0 4.1 0.0 4.1 0.0 0.0 0.0 4.9 0.0 4.9 0.0 0.0 0.0 3.8 0.0 3.8 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.05 0.15 0.061215-1230 0.05 0.15 0.06 1230-1245 0.05 0.15 0.061245-1300 0.05 0.15 0.06
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 3.2 0.0 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 4.1 0.0 4.9 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 0.0 3.8 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0.0 0.8 0.0 A 0.0 0.8 0.0 A 0.0 0.8 0.0 A 0.0 0.8 0.0B 1.0 0.0 1.2 B 1.0 0.0 1.2 B 1.0 0.0 1.2 B 1.0 0.0 1.2C 0.0 1.0 0.0 C 0.0 1.0 0.0 C 0.0 1.0 0.0 C 0.0 1.0 0.0
TIME PERIOD
Junction 1: Site AccessPeak Hour: Sat (12:00-13:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1200-1215 0% 0% 0% 55% 55% 55% 0% 0% 0% 45% 45% 45% 0% 0% 0% 55% 55% 55% 0% 0% 0% 45% 45% 45% 0% 0% 0%1215-1230 0% 0% 0% 55% 55% 55% 0% 0% 0% 45% 45% 45% 0% 0% 0% 55% 55% 55% 0% 0% 0% 45% 45% 45% 0% 0% 0%1230-1245 0% 0% 0% 55% 55% 55% 0% 0% 0% 45% 45% 45% 0% 0% 0% 55% 55% 55% 0% 0% 0% 45% 45% 45% 0% 0% 0%1245-1300 0% 0% 0% 55% 55% 55% 0% 0% 0% 45% 45% 45% 0% 0% 0% 55% 55% 55% 0% 0% 0% 45% 45% 45% 0% 0% 0%TOTAL 0% 0% 0% 55% 55% 55% 0% 0% 0% 45% 45% 45% 0% 0% 0% 55% 55% 55% 0% 0% 0% 45% 45% 45% 0% 0% 0%
HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.04 0.07 0.031215-1230 0.04 0.07 0.03 1230-1245 0.04 0.07 0.031245-1300 0.04 0.07 0.03
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 2.189024 0 A 0 0.547256 0 A 0.0% 25.0% 0.0%B 1.810976 0 2.189024 B 0.452744 0 0.547256 B 25.0% 0.0% 25.0%C 0 1.810976 0 C 0 0.452744 0 C 0.0% 25.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 0.547256 0 A 0 0.547256 0 A 0 0.547256 0 A 0 0.547256 0B 0.452744 0 0.547256 B 0.452744 0 0.547256 B 0.452744 0 0.547256 B 0.452744 0 0.547256C 0 0.452744 0 C 0 0.452744 0 C 0 0.452744 0 C 0 0.452744 0
TIME PERIOD
Junction 1: Site AccessPeak Hour: AM (08:00-09:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT0800-0815 0% 0% 0% 65% 65% 65% 0% 0% 0% 65% 65% 65% 0% 0% 0% 35% 35% 35% 0% 0% 0% 35% 35% 35% 0% 0% 0%0815-0830 0% 0% 0% 65% 65% 65% 0% 0% 0% 65% 65% 65% 0% 0% 0% 35% 35% 35% 0% 0% 0% 35% 35% 35% 0% 0% 0%0830-0845 0% 0% 0% 65% 65% 65% 0% 0% 0% 65% 65% 65% 0% 0% 0% 35% 35% 35% 0% 0% 0% 35% 35% 35% 0% 0% 0%0845-0900 0% 0% 0% 65% 65% 65% 0% 0% 0% 65% 65% 65% 0% 0% 0% 35% 35% 35% 0% 0% 0% 35% 35% 35% 0% 0% 0%TOTAL 0% 0% 0% 65% 65% 65% 0% 0% 0% 65% 65% 65% 0% 0% 0% 35% 35% 35% 0% 0% 0% 35% 35% 35% 0% 0% 0%
HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 0.04 0.07 0.020815-0830 0.04 0.07 0.02 0830-0845 0.04 0.07 0.020845-0900 0.04 0.07 0.02
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 2.618182 0 A 0 0.654545 0 A 0.0% 25.0% 0.0%B 2.618182 0 1.381818 B 0.654545 0 0.345455 B 25.0% 0.0% 25.0%C 0 1.381818 0 C 0 0.345455 0 C 0.0% 25.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 0.654545 0 A 0 0.654545 0 A 0 0.654545 0 A 0 0.654545 0B 0.654545 0 0.345455 B 0.654545 0 0.345455 B 0.654545 0 0.345455 B 0.654545 0 0.345455C 0 0.345455 0 C 0 0.345455 0 C 0 0.345455 0 C 0 0.345455 0
TIME PERIOD
Junction 1: Site AccessPeak Hour: PM (17:00-18:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1700-1715 0% 0% 0% 70% 70% 70% 0% 0% 0% 70% 70% 70% 0% 0% 0% 30% 30% 30% 0% 0% 0% 30% 30% 30% 0% 0% 0%1715-1730 0% 0% 0% 70% 70% 70% 0% 0% 0% 70% 70% 70% 0% 0% 0% 30% 30% 30% 0% 0% 0% 30% 30% 30% 0% 0% 0%0730-0745 0% 0% 0% 70% 70% 70% 0% 0% 0% 70% 70% 70% 0% 0% 0% 30% 30% 30% 0% 0% 0% 30% 30% 30% 0% 0% 0%0745-1800 0% 0% 0% 70% 70% 70% 0% 0% 0% 70% 70% 70% 0% 0% 0% 30% 30% 30% 0% 0% 0% 30% 30% 30% 0% 0% 0%TOTAL 0% 0% 0% 70% 70% 70% 0% 0% 0% 70% 70% 70% 0% 0% 0% 30% 30% 30% 0% 0% 0% 30% 30% 30% 0% 0% 0%
HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 0.05 0.07 0.021715-1730 0.05 0.07 0.02 0730-0745 0.05 0.07 0.020745-1800 0.05 0.07 0.02
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 2.790698 0 A 0 0.697674 0 A 0.0% 25.0% 0.0%B 2.790698 0 1.209302 B 0.697674 0 0.302326 B 25.0% 0.0% 25.0%C 0 1.209302 0 C 0 0.302326 0 C 0.0% 25.0% 0.0%
1700-1715 1715-1730 0730-0745 0745-1800A B C A B C A B C A B C
A 0 0.697674 0 A 0 0.697674 0 A 0 0.697674 0 A 0 0.697674 0B 0.697674 0 0.302326 B 0.697674 0 0.302326 B 0.697674 0 0.302326 B 0.697674 0 0.302326C 0 0.302326 0 C 0 0.302326 0 C 0 0.302326 0 C 0 0.302326 0
TIME PERIOD
Junction 1: Site AccessPeak Hour: PM (17:00-18:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1700-1715 0.0 0.0 0.0 1.8 0.0 1.8 -1.8 0.0 -1.8 2.1 0.0 2.1 0.0 0.0 0.0 1.4 0.0 1.4 -2.7 0.0 -2.7 2.7 0.0 2.7 0.0 0.0 0.01715-1730 0.0 0.0 0.0 1.8 0.0 1.8 -1.8 0.0 -1.8 2.1 0.0 2.1 0.0 0.0 0.0 1.4 0.0 1.4 -2.7 0.0 -2.7 2.7 0.0 2.7 0.0 0.0 0.01730-1745 0.0 0.0 0.0 1.8 0.0 1.8 -1.8 0.0 -1.8 2.1 0.0 2.1 0.0 0.0 0.0 1.4 0.0 1.4 -2.7 0.0 -2.7 2.7 0.0 2.7 0.0 0.0 0.01745-1800 0.0 0.0 0.0 1.8 0.0 1.8 -1.8 0.0 -1.8 2.1 0.0 2.1 0.0 0.0 0.0 1.4 0.0 1.4 -2.7 0.0 -2.7 2.7 0.0 2.7 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 7.2 0.0 7.2 -7.2 0.0 -7.2 8.4 0.0 8.4 0.0 0.0 0.0 5.6 0.0 5.6 -10.8 0.0 -10.8 10.8 0.0 10.8 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 0.00 0.23 0.001715-1730 0.00 0.23 0.00 1730-1745 0.00 0.23 0.001745-1800 0.00 0.23 0.00
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 7.2 -7.2 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 8.4 0.0 5.6 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C -10.8 10.8 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0.0 1.8 -1.8 A 0.0 1.8 -1.8 A 0.0 1.8 -1.8 A 0.0 1.8 -1.8B 2.1 0.0 1.4 B 2.1 0.0 1.4 B 2.1 0.0 1.4 B 2.1 0.0 1.4C -2.7 2.7 0.0 C -2.7 2.7 0.0 C -2.7 2.7 0.0 C -2.7 2.7 0.0
TIME PERIOD
Junction 1: Site AccessPeak Hour: PM (17:00-18:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1700-1715 0.0 0.0 0.0 3.1 0.0 3.1 0.0 0.0 0.0 2.4 0.0 2.4 0.0 0.0 0.0 1.1 0.0 1.1 0.0 0.0 0.0 1.4 0.0 1.4 0.0 0.0 0.01715-1730 0.0 0.0 0.0 3.1 0.0 3.1 0.0 0.0 0.0 2.4 0.0 2.4 0.0 0.0 0.0 1.1 0.0 1.1 0.0 0.0 0.0 1.4 0.0 1.4 0.0 0.0 0.01730-1745 0.0 0.0 0.0 3.1 0.0 3.1 0.0 0.0 0.0 2.4 0.0 2.4 0.0 0.0 0.0 1.1 0.0 1.1 0.0 0.0 0.0 1.4 0.0 1.4 0.0 0.0 0.01745-1800 0.0 0.0 0.0 3.1 0.0 3.1 0.0 0.0 0.0 2.4 0.0 2.4 0.0 0.0 0.0 1.1 0.0 1.1 0.0 0.0 0.0 1.4 0.0 1.4 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 12.6 0.0 12.6 0.0 0.0 0.0 9.8 0.0 9.8 0.0 0.0 0.0 4.2 0.0 4.2 0.0 0.0 0.0 5.4 0.0 5.4 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 0.21 0.23 0.091715-1730 0.21 0.23 0.09 1730-1745 0.21 0.23 0.091745-1800 0.21 0.23 0.09
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 12.6 0.0 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 9.8 0.0 4.2 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 0.0 5.4 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0.0 3.1 0.0 A 0.0 3.1 0.0 A 0.0 3.1 0.0 A 0.0 3.1 0.0B 2.4 0.0 1.1 B 2.4 0.0 1.1 B 2.4 0.0 1.1 B 2.4 0.0 1.1C 0.0 1.4 0.0 C 0.0 1.4 0.0 C 0.0 1.4 0.0 C 0.0 1.4 0.0
TIME PERIOD
Junction 1: Site AccessPeak Hour: PM (17:00-18:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1700-1715 0% 0% 0% 70% 70% 70% 0% 0% 0% 70% 70% 70% 0% 0% 0% 30% 30% 30% 0% 0% 0% 30% 30% 30% 0% 0% 0%1715-1730 0% 0% 0% 70% 70% 70% 0% 0% 0% 70% 70% 70% 0% 0% 0% 30% 30% 30% 0% 0% 0% 30% 30% 30% 0% 0% 0%1730-1745 0% 0% 0% 70% 70% 70% 0% 0% 0% 70% 70% 70% 0% 0% 0% 30% 30% 30% 0% 0% 0% 30% 30% 30% 0% 0% 0%1745-1800 0% 0% 0% 70% 70% 70% 0% 0% 0% 70% 70% 70% 0% 0% 0% 30% 30% 30% 0% 0% 0% 30% 30% 30% 0% 0% 0%TOTAL 0% 0% 0% 70% 70% 70% 0% 0% 0% 70% 70% 70% 0% 0% 0% 30% 30% 30% 0% 0% 0% 30% 30% 30% 0% 0% 0%
HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 0.05 0.07 0.021715-1730 0.05 0.07 0.02 1730-1745 0.05 0.07 0.021745-1800 0.05 0.07 0.02
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 2.790698 0 A 0 0.697674 0 A 0.0% 25.0% 0.0%B 2.790698 0 1.209302 B 0.697674 0 0.302326 B 25.0% 0.0% 25.0%C 0 1.209302 0 C 0 0.302326 0 C 0.0% 25.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0 0.697674 0 A 0 0.697674 0 A 0 0.697674 0 A 0 0.697674 0B 0.697674 0 0.302326 B 0.697674 0 0.302326 B 0.697674 0 0.302326 B 0.697674 0 0.302326C 0 0.302326 0 C 0 0.302326 0 C 0 0.302326 0 C 0 0.302326 0
TIME PERIOD
Junction 1: Site AccessPeak Hour: PM (17:00-18:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1700-1715 0 0 0 16 0 16 -11 0 -11 13 0 13 0 0 0 5 0 5 -5 0 -5 7 0 7 0 0 01715-1730 0 0 0 16 0 16 -11 0 -11 13 0 13 0 0 0 5 0 5 -5 0 -5 7 0 7 0 0 01730-1745 0 0 0 16 0 16 -11 0 -11 13 0 13 0 0 0 5 0 5 -5 0 -5 7 0 7 0 0 01745-1800 0 0 0 16 0 16 -11 0 -11 13 0 13 0 0 0 5 0 5 -5 0 -5 7 0 7 0 0 0TOTAL 0 0 0 62 0 62 -43 0 -43 50 0 50 0 0 0 19 0 19 -20 0 -20 28 0 28 0 0 0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 0.31 1.15 0.141715-1730 0.31 1.15 0.14 1730-1745 0.31 1.15 0.141745-1800 0.31 1.15 0.14
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 62.04223 -43.205 A 0 0 0 A 0.0% 0.0% 0.0%B 50.24726 0 18.75274 B 0 0 0 B 0.0% 0.0% 0.0%C -19.795 27.95777 0 C 0 0 0 C 0.0% 0.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0 15.51056 -10.8013 A 0 15.51056 -10.8013 A 0 15.51056 -10.8013 A 0 15.51056 -10.8013B 12.56181 0 4.688186 B 12.56181 0 4.688186 B 12.56181 0 4.688186 B 12.56181 0 4.688186C -4.94874 6.989442 0 C -4.94874 6.989442 0 C -4.94874 6.989442 0 C -4.94874 6.989442 0
TIME PERIOD
Junction 1: Site AccessPeak Hour: Sat (12:00-13:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1200-1215 0% 0% 0% 45% 45% 45% 0% 0% 0% 45% 45% 45% 0% 0% 0% 55% 55% 55% 0% 0% 0% 55% 55% 55% 0% 0% 0%1215-1230 0% 0% 0% 45% 45% 45% 0% 0% 0% 45% 45% 45% 0% 0% 0% 55% 55% 55% 0% 0% 0% 55% 55% 55% 0% 0% 0%1230-1245 0% 0% 0% 45% 45% 45% 0% 0% 0% 45% 45% 45% 0% 0% 0% 55% 55% 55% 0% 0% 0% 55% 55% 55% 0% 0% 0%1245-1300 0% 0% 0% 45% 45% 45% 0% 0% 0% 45% 45% 45% 0% 0% 0% 55% 55% 55% 0% 0% 0% 55% 55% 55% 0% 0% 0%TOTAL 0% 0% 0% 45% 45% 45% 0% 0% 0% 45% 45% 45% 0% 0% 0% 55% 55% 55% 0% 0% 0% 55% 55% 55% 0% 0% 0%
HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.03 0.07 0.041215-1230 0.03 0.07 0.04 1230-1245 0.03 0.07 0.041245-1300 0.03 0.07 0.04
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 1.810526 0 A 0 0.452632 0 A 0.0% 25.0% 0.0%B 1.810526 0 2.189474 B 0.452632 0 0.547368 B 25.0% 0.0% 25.0%C 0 2.189474 0 C 0 0.547368 0 C 0.0% 25.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 0.452632 0 A 0 0.452632 0 A 0 0.452632 0 A 0 0.452632 0B 0.452632 0 0.547368 B 0.452632 0 0.547368 B 0.452632 0 0.547368 B 0.452632 0 0.547368C 0 0.547368 0 C 0 0.547368 0 C 0 0.547368 0 C 0 0.547368 0
TIME PERIOD
Junction 1: Site AccessPeak Hour: Sat (12:00-13:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1200-1215 0 0 0 12 0 12 -10 0 -10 15 0 15 0 0 0 7 0 7 -3 0 -3 6 0 6 0 0 01215-1230 0 0 0 12 0 12 -10 0 -10 15 0 15 0 0 0 7 0 7 -3 0 -3 6 0 6 0 0 01230-1245 0 0 0 12 0 12 -10 0 -10 15 0 15 0 0 0 7 0 7 -3 0 -3 6 0 6 0 0 01245-1300 0 0 0 12 0 12 -10 0 -10 15 0 15 0 0 0 7 0 7 -3 0 -3 6 0 6 0 0 0TOTAL 0 0 0 49 0 49 -41 0 -41 61 0 61 0 0 0 27 0 27 -14 0 -14 24 0 24 0 0 0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.14 1.46 0.161215-1230 0.14 1.46 0.16 1230-1245 0.14 1.46 0.161245-1300 0.14 1.46 0.16
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 49.36719 -41.2198 A 0 0 0 A 0.0% 0.0% 0.0%B 60.74894 0 27.05106 B 0 0 0 B 0.0% 0.0% 0.0%C -13.7802 23.63281 0 C 0 0 0 C 0.0% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 12.3418 -10.305 A 0 12.3418 -10.305 A 0 12.3418 -10.305 A 0 12.3418 -10.305B 15.18724 0 6.762765 B 15.18724 0 6.762765 B 15.18724 0 6.762765 B 15.18724 0 6.762765C -3.44505 5.908204 0 C -3.44505 5.908204 0 C -3.44505 5.908204 0 C -3.44505 5.908204 0
TIME PERIOD
Junction 1: Site AccessPeak Hour: SAT (12:00-13:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1200-1215 0.0 0.0 0.0 8.8 0.0 8.8 -8.8 0.0 -8.8 11.0 0.0 11.0 0.0 0.0 0.0 1.7 0.0 1.7 -2.2 0.0 -2.2 2.2 0.0 2.2 0.0 0.0 0.01215-1230 0.0 0.0 0.0 8.8 0.0 8.8 -8.8 0.0 -8.8 11.0 0.0 11.0 0.0 0.0 0.0 1.7 0.0 1.7 -2.2 0.0 -2.2 2.2 0.0 2.2 0.0 0.0 0.01230-1245 0.0 0.0 0.0 8.8 0.0 8.8 -8.8 0.0 -8.8 11.0 0.0 11.0 0.0 0.0 0.0 1.7 0.0 1.7 -2.2 0.0 -2.2 2.2 0.0 2.2 0.0 0.0 0.01245-1300 0.0 0.0 0.0 8.8 0.0 8.8 -8.8 0.0 -8.8 11.0 0.0 11.0 0.0 0.0 0.0 1.7 0.0 1.7 -2.2 0.0 -2.2 2.2 0.0 2.2 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 35.2 0.0 35.2 -35.2 0.0 -35.2 44.0 0.0 44.0 0.0 0.0 0.0 6.8 0.0 6.8 -8.8 0.0 -8.8 8.8 0.0 8.8 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.00 0.85 0.001215-1230 0.00 0.85 0.00 1230-1245 0.00 0.85 0.001245-1300 0.00 0.85 0.00
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 35.2 -35.2 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 44.0 0.0 6.8 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C -8.8 8.8 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0.0 8.8 -8.8 A 0.0 8.8 -8.8 A 0.0 8.8 -8.8 A 0.0 8.8 -8.8B 11.0 0.0 1.7 B 11.0 0.0 1.7 B 11.0 0.0 1.7 B 11.0 0.0 1.7C -2.2 2.2 0.0 C -2.2 2.2 0.0 C -2.2 2.2 0.0 C -2.2 2.2 0.0
TIME PERIOD
Junction 1: Site AccessPeak Hour: SAT (12:00-13:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1200-1215 0.0 0.0 0.0 1.5 0.0 1.5 -1.5 0.0 -1.5 1.6 0.0 1.6 0.0 0.0 0.0 1.9 0.0 1.9 -1.2 0.0 -1.2 1.2 0.0 1.2 0.0 0.0 0.01215-1230 0.0 0.0 0.0 1.5 0.0 1.5 -1.5 0.0 -1.5 1.6 0.0 1.6 0.0 0.0 0.0 1.9 0.0 1.9 -1.2 0.0 -1.2 1.2 0.0 1.2 0.0 0.0 0.01230-1245 0.0 0.0 0.0 1.5 0.0 1.5 -1.5 0.0 -1.5 1.6 0.0 1.6 0.0 0.0 0.0 1.9 0.0 1.9 -1.2 0.0 -1.2 1.2 0.0 1.2 0.0 0.0 0.01245-1300 0.0 0.0 0.0 1.5 0.0 1.5 -1.5 0.0 -1.5 1.6 0.0 1.6 0.0 0.0 0.0 1.9 0.0 1.9 -1.2 0.0 -1.2 1.2 0.0 1.2 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 6.0 0.0 6.0 -6.0 0.0 -6.0 6.3 0.0 6.3 0.0 0.0 0.0 7.7 0.0 7.7 -5.0 0.0 -5.0 5.0 0.0 5.0 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.00 0.23 0.001215-1230 0.00 0.23 0.00 1230-1245 0.00 0.23 0.001245-1300 0.00 0.23 0.00
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 6.0 -6.0 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 6.3 0.0 7.7 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C -5.0 5.0 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0.0 1.5 -1.5 A 0.0 1.5 -1.5 A 0.0 1.5 -1.5 A 0.0 1.5 -1.5B 1.6 0.0 1.9 B 1.6 0.0 1.9 B 1.6 0.0 1.9 B 1.6 0.0 1.9C -1.2 1.2 0.0 C -1.2 1.2 0.0 C -1.2 1.2 0.0 C -1.2 1.2 0.0
TIME PERIOD
Junction 1: Site AccessPeak Hour: Sat (12:00-13:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1200-1215 0.0 0.0 0.0 1.2 0.0 1.2 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 1.9 0.0 1.9 0.0 0.0 0.0 1.5 0.0 1.5 0.0 0.0 0.01215-1230 0.0 0.0 0.0 1.2 0.0 1.2 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 1.9 0.0 1.9 0.0 0.0 0.0 1.5 0.0 1.5 0.0 0.0 0.01230-1245 0.0 0.0 0.0 1.2 0.0 1.2 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 1.9 0.0 1.9 0.0 0.0 0.0 1.5 0.0 1.5 0.0 0.0 0.01245-1300 0.0 0.0 0.0 1.2 0.0 1.2 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 1.9 0.0 1.9 0.0 0.0 0.0 1.5 0.0 1.5 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 5.0 0.0 5.0 0.0 0.0 0.0 6.3 0.0 6.3 0.0 0.0 0.0 7.7 0.0 7.7 0.0 0.0 0.0 6.0 0.0 6.0 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.08 0.23 0.101215-1230 0.08 0.23 0.10 1230-1245 0.08 0.23 0.101245-1300 0.08 0.23 0.10
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 5.0 0.0 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 6.3 0.0 7.7 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 0.0 6.0 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0.0 1.2 0.0 A 0.0 1.2 0.0 A 0.0 1.2 0.0 A 0.0 1.2 0.0B 1.6 0.0 1.9 B 1.6 0.0 1.9 B 1.6 0.0 1.9 B 1.6 0.0 1.9C 0.0 1.5 0.0 C 0.0 1.5 0.0 C 0.0 1.5 0.0 C 0.0 1.5 0.0
TIME PERIOD
Junction 1: Site AccessPeak Hour: Sat (12:00-13:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1200-1215 0% 0% 0% 45% 45% 45% 0% 0% 0% 45% 45% 45% 0% 0% 0% 55% 55% 55% 0% 0% 0% 55% 55% 55% 0% 0% 0%1215-1230 0% 0% 0% 45% 45% 45% 0% 0% 0% 45% 45% 45% 0% 0% 0% 55% 55% 55% 0% 0% 0% 55% 55% 55% 0% 0% 0%1230-1245 0% 0% 0% 45% 45% 45% 0% 0% 0% 45% 45% 45% 0% 0% 0% 55% 55% 55% 0% 0% 0% 55% 55% 55% 0% 0% 0%1245-1300 0% 0% 0% 45% 45% 45% 0% 0% 0% 45% 45% 45% 0% 0% 0% 55% 55% 55% 0% 0% 0% 55% 55% 55% 0% 0% 0%TOTAL 0% 0% 0% 45% 45% 45% 0% 0% 0% 45% 45% 45% 0% 0% 0% 55% 55% 55% 0% 0% 0% 55% 55% 55% 0% 0% 0%
HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.03 0.07 0.041215-1230 0.03 0.07 0.04 1230-1245 0.03 0.07 0.041245-1300 0.03 0.07 0.04
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 1.810526 0 A 0 0.452632 0 A 0.0% 25.0% 0.0%B 1.810526 0 2.189474 B 0.452632 0 0.547368 B 25.0% 0.0% 25.0%C 0 2.189474 0 C 0 0.547368 0 C 0.0% 25.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 0.452632 0 A 0 0.452632 0 A 0 0.452632 0 A 0 0.452632 0B 0.452632 0 0.547368 B 0.452632 0 0.547368 B 0.452632 0 0.547368 B 0.452632 0 0.547368C 0 0.547368 0 C 0 0.547368 0 C 0 0.547368 0 C 0 0.547368 0
TIME PERIOD
Junction 1: Site AccessPeak Hour: SUM (12:00-13:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1200-1215 0.0 0.0 0.0 1.1 0.0 1.1 0.0 0.0 0.0 1.0 0.0 1.0 0.0 0.0 0.0 1.0 0.0 1.0 0.0 0.0 0.0 1.1 0.0 1.1 0.0 0.0 0.01215-1230 0.0 0.0 0.0 1.1 0.0 1.1 0.0 0.0 0.0 1.0 0.0 1.0 0.0 0.0 0.0 1.0 0.0 1.0 0.0 0.0 0.0 1.1 0.0 1.1 0.0 0.0 0.01230-1245 0.0 0.0 0.0 1.1 0.0 1.1 0.0 0.0 0.0 1.0 0.0 1.0 0.0 0.0 0.0 1.0 0.0 1.0 0.0 0.0 0.0 1.1 0.0 1.1 0.0 0.0 0.01245-1300 0.0 0.0 0.0 1.1 0.0 1.1 0.0 0.0 0.0 1.0 0.0 1.0 0.0 0.0 0.0 1.0 0.0 1.0 0.0 0.0 0.0 1.1 0.0 1.1 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 4.5 0.0 4.5 0.0 0.0 0.0 4.0 0.0 4.0 0.0 0.0 0.0 4.0 0.0 4.0 0.0 0.0 0.0 4.5 0.0 4.5 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.08 0.13 0.071215-1230 0.08 0.13 0.07 1230-1245 0.08 0.13 0.071245-1300 0.08 0.13 0.07
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 4.5 0.0 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 4.0 0.0 4.0 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 0.0 4.5 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0.0 1.1 0.0 A 0.0 1.1 0.0 A 0.0 1.1 0.0 A 0.0 1.1 0.0B 1.0 0.0 1.0 B 1.0 0.0 1.0 B 1.0 0.0 1.0 B 1.0 0.0 1.0C 0.0 1.1 0.0 C 0.0 1.1 0.0 C 0.0 1.1 0.0 C 0.0 1.1 0.0
TIME PERIOD
Junction 1: Site AccessPeak Hour: Sun (12:00-13:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1200-1215 0% 0% 0% 51% 51% 51% 0% 0% 0% 51% 51% 51% 0% 0% 0% 49% 49% 49% 0% 0% 0% 49% 49% 49% 0% 0% 0%1215-1230 0% 0% 0% 51% 51% 51% 0% 0% 0% 51% 51% 51% 0% 0% 0% 49% 49% 49% 0% 0% 0% 49% 49% 49% 0% 0% 0%1230-1245 0% 0% 0% 51% 51% 51% 0% 0% 0% 51% 51% 51% 0% 0% 0% 49% 49% 49% 0% 0% 0% 49% 49% 49% 0% 0% 0%1245-1300 0% 0% 0% 51% 51% 51% 0% 0% 0% 51% 51% 51% 0% 0% 0% 49% 49% 49% 0% 0% 0% 49% 49% 49% 0% 0% 0%TOTAL 0% 0% 0% 51% 51% 51% 0% 0% 0% 51% 51% 51% 0% 0% 0% 49% 49% 49% 0% 0% 0% 49% 49% 49% 0% 0% 0%
HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.03 0.07 0.031215-1230 0.03 0.07 0.03 1230-1245 0.03 0.07 0.031245-1300 0.03 0.07 0.03
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 2.021505 0 A 0 0.505376 0 A 0.0% 25.0% 0.0%B 2.021505 0 1.978495 B 0.505376 0 0.494624 B 25.0% 0.0% 25.0%C 0 1.978495 0 C 0 0.494624 0 C 0.0% 25.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 0.505376 0 A 0 0.505376 0 A 0 0.505376 0 A 0 0.505376 0B 0.505376 0 0.494624 B 0.505376 0 0.494624 B 0.505376 0 0.494624 B 0.505376 0 0.494624C 0 0.494624 0 C 0 0.494624 0 C 0 0.494624 0 C 0 0.494624 0
TIME PERIOD
Junction 1: Site AccessPeak Hour: SUN (12:00-13:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1200-1215 0.0 0.0 0.0 10.4 0.0 10.4 -10.4 0.0 -10.4 10.0 0.0 10.0 0.0 0.0 0.0 2.5 0.0 2.5 -2.6 0.0 -2.6 2.6 0.0 2.6 0.0 0.0 0.01215-1230 0.0 0.0 0.0 10.4 0.0 10.4 -10.4 0.0 -10.4 10.0 0.0 10.0 0.0 0.0 0.0 2.5 0.0 2.5 -2.6 0.0 -2.6 2.6 0.0 2.6 0.0 0.0 0.01230-1245 0.0 0.0 0.0 10.4 0.0 10.4 -10.4 0.0 -10.4 10.0 0.0 10.0 0.0 0.0 0.0 2.5 0.0 2.5 -2.6 0.0 -2.6 2.6 0.0 2.6 0.0 0.0 0.01245-1300 0.0 0.0 0.0 10.4 0.0 10.4 -10.4 0.0 -10.4 10.0 0.0 10.0 0.0 0.0 0.0 2.5 0.0 2.5 -2.6 0.0 -2.6 2.6 0.0 2.6 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 41.6 0.0 41.6 -41.6 0.0 -41.6 40.0 0.0 40.0 0.0 0.0 0.0 10.0 0.0 10.0 -10.4 0.0 -10.4 10.4 0.0 10.4 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.00 0.83 0.001215-1230 0.00 0.83 0.00 1230-1245 0.00 0.83 0.001245-1300 0.00 0.83 0.00
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 41.6 -41.6 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 40.0 0.0 10.0 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C -10.4 10.4 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0.0 10.4 -10.4 A 0.0 10.4 -10.4 A 0.0 10.4 -10.4 A 0.0 10.4 -10.4B 10.0 0.0 2.5 B 10.0 0.0 2.5 B 10.0 0.0 2.5 B 10.0 0.0 2.5C -2.6 2.6 0.0 C -2.6 2.6 0.0 C -2.6 2.6 0.0 C -2.6 2.6 0.0
TIME PERIOD
Junction 1: Site AccessPeak Hour: SUN (12:00-13:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1200-1215 0.0 0.0 0.0 1.8 0.0 1.8 -1.8 0.0 -1.8 1.5 0.0 1.5 0.0 0.0 0.0 1.8 0.0 1.8 -1.5 0.0 -1.5 1.5 0.0 1.5 0.0 0.0 0.01215-1230 0.0 0.0 0.0 1.8 0.0 1.8 -1.8 0.0 -1.8 1.5 0.0 1.5 0.0 0.0 0.0 1.8 0.0 1.8 -1.5 0.0 -1.5 1.5 0.0 1.5 0.0 0.0 0.01230-1245 0.0 0.0 0.0 1.8 0.0 1.8 -1.8 0.0 -1.8 1.5 0.0 1.5 0.0 0.0 0.0 1.8 0.0 1.8 -1.5 0.0 -1.5 1.5 0.0 1.5 0.0 0.0 0.01245-1300 0.0 0.0 0.0 1.8 0.0 1.8 -1.8 0.0 -1.8 1.5 0.0 1.5 0.0 0.0 0.0 1.8 0.0 1.8 -1.5 0.0 -1.5 1.5 0.0 1.5 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 7.1 0.0 7.1 -7.1 0.0 -7.1 5.9 0.0 5.9 0.0 0.0 0.0 7.1 0.0 7.1 -5.9 0.0 -5.9 5.9 0.0 5.9 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.00 0.22 0.001215-1230 0.00 0.22 0.00 1230-1245 0.00 0.22 0.001245-1300 0.00 0.22 0.00
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 7.1 -7.1 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 5.9 0.0 7.1 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C -5.9 5.9 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0.0 1.8 -1.8 A 0.0 1.8 -1.8 A 0.0 1.8 -1.8 A 0.0 1.8 -1.8B 1.5 0.0 1.8 B 1.5 0.0 1.8 B 1.5 0.0 1.8 B 1.5 0.0 1.8C -1.5 1.5 0.0 C -1.5 1.5 0.0 C -1.5 1.5 0.0 C -1.5 1.5 0.0
TIME PERIOD
Junction 1: Site AccessPeak Hour: SUN (12:00-13:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1200-1215 0% 0% 0% 55% 55% 55% 0% 0% 0% 45% 45% 45% 0% 0% 0% 55% 55% 55% 0% 0% 0% 45% 45% 45% 0% 0% 0%1215-1230 0% 0% 0% 55% 55% 55% 0% 0% 0% 45% 45% 45% 0% 0% 0% 55% 55% 55% 0% 0% 0% 45% 45% 45% 0% 0% 0%1230-1245 0% 0% 0% 55% 55% 55% 0% 0% 0% 45% 45% 45% 0% 0% 0% 55% 55% 55% 0% 0% 0% 45% 45% 45% 0% 0% 0%1245-1300 0% 0% 0% 55% 55% 55% 0% 0% 0% 45% 45% 45% 0% 0% 0% 55% 55% 55% 0% 0% 0% 45% 45% 45% 0% 0% 0%TOTAL 0% 0% 0% 55% 55% 55% 0% 0% 0% 45% 45% 45% 0% 0% 0% 55% 55% 55% 0% 0% 0% 45% 45% 45% 0% 0% 0%
HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.04 0.07 0.031215-1230 0.04 0.07 0.03 1230-1245 0.04 0.07 0.031245-1300 0.04 0.07 0.03
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 2.189024 0 A 0 0.547256 0 A 0.0% 25.0% 0.0%B 1.810976 0 2.189024 B 0.452744 0 0.547256 B 25.0% 0.0% 25.0%C 0 1.810976 0 C 0 0.452744 0 C 0.0% 25.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 0.547256 0 A 0 0.547256 0 A 0 0.547256 0 A 0 0.547256 0B 0.452744 0 0.547256 B 0.452744 0 0.547256 B 0.452744 0 0.547256 B 0.452744 0 0.547256C 0 0.452744 0 C 0 0.452744 0 C 0 0.452744 0 C 0 0.452744 0
TIME PERIOD
Junction 1: Site AccessPeak Hour: AM (08:00-09:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1200-1215 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.01215-1230 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.01230-1245 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.01245-1300 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 6.6 0.0 6.6 0.0 0.0 0.0 6.6 0.0 6.6 0.0 0.0 0.0 6.4 0.0 6.4 0.0 0.0 0.0 6.4 0.0 6.4 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.11 0.22 0.111215-1230 0.11 0.22 0.11 1230-1245 0.11 0.22 0.111245-1300 0.11 0.22 0.11
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 6.6 0.0 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 6.6 0.0 6.4 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 0.0 6.4 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0.0 1.6 0.0 A 0.0 1.6 0.0 A 0.0 1.6 0.0 A 0.0 1.6 0.0B 1.6 0.0 1.6 B 1.6 0.0 1.6 B 1.6 0.0 1.6 B 1.6 0.0 1.6C 0.0 1.6 0.0 C 0.0 1.6 0.0 C 0.0 1.6 0.0 C 0.0 1.6 0.0
TIME PERIOD
Junction 1: Site AccessPeak Hour: Sun (12:00-13:00)
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1200-1215 0% 0% 0% 51% 51% 51% 0% 0% 0% 51% 51% 51% 0% 0% 0% 49% 49% 49% 0% 0% 0% 49% 49% 49% 0% 0% 0%1215-1230 0% 0% 0% 51% 51% 51% 0% 0% 0% 51% 51% 51% 0% 0% 0% 49% 49% 49% 0% 0% 0% 49% 49% 49% 0% 0% 0%1230-1245 0% 0% 0% 51% 51% 51% 0% 0% 0% 51% 51% 51% 0% 0% 0% 49% 49% 49% 0% 0% 0% 49% 49% 49% 0% 0% 0%1245-1300 0% 0% 0% 51% 51% 51% 0% 0% 0% 51% 51% 51% 0% 0% 0% 49% 49% 49% 0% 0% 0% 49% 49% 49% 0% 0% 0%TOTAL 0% 0% 0% 51% 51% 51% 0% 0% 0% 51% 51% 51% 0% 0% 0% 49% 49% 49% 0% 0% 0% 49% 49% 49% 0% 0% 0%
HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.03 0.07 0.031215-1230 0.03 0.07 0.03 1230-1245 0.03 0.07 0.031245-1300 0.03 0.07 0.03
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 2.021505 0 A 0 0.505376 0 A 0.0% 25.0% 0.0%B 2.021505 0 1.978495 B 0.505376 0 0.494624 B 25.0% 0.0% 25.0%C 0 1.978495 0 C 0 0.494624 0 C 0.0% 25.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 0.505376 0 A 0 0.505376 0 A 0 0.505376 0 A 0 0.505376 0B 0.505376 0 0.494624 B 0.505376 0 0.494624 B 0.505376 0 0.494624 B 0.505376 0 0.494624C 0 0.494624 0 C 0 0.494624 0 C 0 0.494624 0 C 0 0.494624 0
TIME PERIOD
Junction 1: Site AccessPeak Hour: Sun (12:00-13:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1200-1215 0 0 0 15 0 15 -12 0 -12 14 0 14 0 0 0 7 0 7 -4 0 -4 7 0 7 0 0 01215-1230 0 0 0 15 0 15 -12 0 -12 14 0 14 0 0 0 7 0 7 -4 0 -4 7 0 7 0 0 01230-1245 0 0 0 15 0 15 -12 0 -12 14 0 14 0 0 0 7 0 7 -4 0 -4 7 0 7 0 0 01245-1300 0 0 0 15 0 15 -12 0 -12 14 0 14 0 0 0 7 0 7 -4 0 -4 7 0 7 0 0 0TOTAL 0 0 0 60 0 60 -49 0 -49 56 0 56 0 0 0 28 0 28 -16 0 -16 27 0 27 0 0 0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.19 1.40 0.181215-1230 0.19 1.40 0.18 1230-1245 0.19 1.40 0.181245-1300 0.19 1.40 0.18
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 59.83261 -48.7143 A 0 0 0 A 0.0% 0.0% 0.0%B 56.49857 0 27.50143 B 0 0 0 B 0.0% 0.0% 0.0%C -16.2857 27.16739 0 C 0 0 0 C 0.0% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 14.95815 -12.1786 A 0 14.95815 -12.1786 A 0 14.95815 -12.1786 A 0 14.95815 -12.1786B 14.12464 0 6.875357 B 14.12464 0 6.875357 B 14.12464 0 6.875357 B 14.12464 0 6.875357C -4.07142 6.791848 0 C -4.07142 6.791848 0 C -4.07142 6.791848 0 C -4.07142 6.791848 0
TIME PERIOD
Junction 1: Site AccessPeak Hour: ALL
Arrival Departure Departure ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT00-15 0% 0% 0% 80% 80% 80% 0% 0% 0% 80% 80% 80% 0% 0% 0% 20% 20% 20% 0% 0% 0% 20% 20% 20% 0% 0% 0%15-30 0% 0% 0% 80% 80% 80% 0% 0% 0% 80% 80% 80% 0% 0% 0% 20% 20% 20% 0% 0% 0% 20% 20% 20% 0% 0% 0%30-45 0% 0% 0% 80% 80% 80% 0% 0% 0% 80% 80% 80% 0% 0% 0% 20% 20% 20% 0% 0% 0% 20% 20% 20% 0% 0% 0%45-00 0% 0% 0% 80% 80% 80% 0% 0% 0% 80% 80% 80% 0% 0% 0% 20% 20% 20% 0% 0% 0% 20% 20% 20% 0% 0% 0%TOTAL 0% 0% 0% 80% 80% 80% 0% 0% 0% 80% 80% 80% 0% 0% 0% 20% 20% 20% 0% 0% 0% 20% 20% 20% 0% 0% 0%
HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0% HV = 50% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C
00-15 0.05 0.07 0.0115-30 0.05 0.07 0.01 30-45 0.05 0.07 0.0145-00 0.05 0.07 0.01
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 3.2 0 A 0 0.8 0 A 0.0% 25.0% 0.0%B 3.2 0 0.8 B 0.8 0 0.2 B 25.0% 0.0% 25.0%C 0 0.8 0 C 0 0.2 0 C 0.0% 25.0% 0.0%
00-15 15-30 30-45 45-00A B C A B C A B C A B C
A 0 0.8 0 A 0 0.8 0 A 0 0.8 0 A 0 0.8 0B 0.8 0 0.2 B 0.8 0 0.2 B 0.8 0 0.2 B 0.8 0 0.2C 0 0.2 0 C 0 0.2 0 C 0 0.2 0 C 0 0.2 0
TIME PERIOD
Junction 2: Bexley MiniPeak Hour: PM (17:00-18:00)
Departure Departure Arrival ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1700-1715 0% 0% 0% 5% 5% 5% 25% 25% 25% 5% 5% 5% 0% 0% 0% 0% 0% 0% 25% 25% 25% 0% 0% 0% 0% 0% 0%1715-1730 0% 0% 0% 5% 5% 5% 25% 25% 25% 5% 5% 5% 0% 0% 0% 0% 0% 0% 25% 25% 25% 0% 0% 0% 0% 0% 0%0730-0745 0% 0% 0% 5% 5% 5% 25% 25% 25% 5% 5% 5% 0% 0% 0% 0% 0% 0% 25% 25% 25% 0% 0% 0% 0% 0% 0%0745-1800 0% 0% 0% 5% 5% 5% 25% 25% 25% 5% 5% 5% 0% 0% 0% 0% 0% 0% 25% 25% 25% 0% 0% 0% 0% 0% 0%TOTAL 0% 0% 0% 5% 5% 5% 25% 25% 25% 5% 5% 5% 0% 0% 0% 0% 0% 0% 25% 25% 25% 0% 0% 0% 0% 0% 0%
HV = 0% HV = 50% HV = 50% HV = 50% HV = 0% HV = 0% HV = 50% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 0.02 0.00 0.021715-1730 0.02 0.00 0.02 0730-0745 0.02 0.00 0.020745-1800 0.02 0.00 0.02
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 0.191201 1.018102 A 0 0.0478 0.254525 A 0.0% 25.0% 25.0%B 0.191201 0 0 B 0.0478 0 0 B 25.0% 0.0% 0.0%C 1.018102 0 0 C 0.254525 0 0 C 25.0% 0.0% 0.0%
1700-1715 1715-1730 0730-0745 0745-1800A B C A B C A B C A B C
A 0 0.0478 0.254525 A 0 0.0478 0.254525 A 0 0.0478 0.254525 A 0 0.0478 0.254525B 0.0478 0 0 B 0.0478 0 0 B 0.0478 0 0 B 0.0478 0 0C 0.254525 0 0 C 0.254525 0 0 C 0.254525 0 0 C 0.254525 0 0
TIME PERIOD
Junction 2: Bexley MiniPeak Hour: AM (08:00-09:00)
Departure Departure Arrival ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0
0815-0830 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0
0830-0845 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.00845-0900 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL 0.0 0.0 0.0 0.1 0.0 0.1 0.6 0.0 0.6 0.2 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.9 0.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per Minute
TIME FROM A FROM B FROM C
0800-0815 0.01 0.00 0.01
0815-0830 0.01 0.00 0.01
0830-0845 0.01 0.00 0.010845-0900 0.01 0.00 0.01
Total Vehicles Number of HGV's Proportion of HGV's for Hour
A B C A B C A B C
A 0.0 0.1 0.6 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%
B 0.2 0.0 0.0 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 0.9 0.0 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900
A B C A B C A B C A B C
A 0.0 0.0 0.1 A 0.0 0.0 0.1 A 0.0 0.0 0.1 A 0.0 0.0 0.1
B 0.0 0.0 0.0 B 0.0 0.0 0.0 B 0.0 0.0 0.0 B 0.0 0.0 0.0C 0.2 0.0 0.0 C 0.2 0.0 0.0 C 0.2 0.0 0.0 C 0.2 0.0 0.0
TIME PERIOD
Junction 2: Bexley MiniPeak Hour: AM (08:00-09:00)
Departure Departure Arrival ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT0800-0815 0% 0% 0% 5% 5% 5% 29% 29% 29% 5% 5% 5% 0% 0% 0% 0% 0% 0% 29% 29% 29% 0% 0% 0% 0% 0% 0%0815-0830 0% 0% 0% 5% 5% 5% 29% 29% 29% 5% 5% 5% 0% 0% 0% 0% 0% 0% 29% 29% 29% 0% 0% 0% 0% 0% 0%0830-0845 0% 0% 0% 5% 5% 5% 29% 29% 29% 5% 5% 5% 0% 0% 0% 0% 0% 0% 29% 29% 29% 0% 0% 0% 0% 0% 0%0845-0900 0% 0% 0% 5% 5% 5% 29% 29% 29% 5% 5% 5% 0% 0% 0% 0% 0% 0% 29% 29% 29% 0% 0% 0% 0% 0% 0%TOTAL 0% 0% 0% 5% 5% 5% 29% 29% 29% 5% 5% 5% 0% 0% 0% 0% 0% 0% 29% 29% 29% 0% 0% 0% 0% 0% 0%
HV = 0% HV = 50% HV = 50% HV = 50% HV = 0% HV = 0% HV = 50% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 0.02 0.00 0.020815-0830 0.02 0.00 0.02 0830-0845 0.02 0.00 0.020845-0900 0.02 0.00 0.02
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 0.204995 1.176823 A 0 0.051249 0.294206 A 0.0% 25.0% 25.0%B 0.204995 0 0 B 0.051249 0 0 B 25.0% 0.0% 0.0%C 1.176823 0 0 C 0.294206 0 0 C 25.0% 0.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 0.051249 0.294206 A 0 0.051249 0.294206 A 0 0.051249 0.294206 A 0 0.051249 0.294206B 0.051249 0 0 B 0.051249 0 0 B 0.051249 0 0 B 0.051249 0 0C 0.294206 0 0 C 0.294206 0 0 C 0.294206 0 0 C 0.294206 0 0
TIME PERIOD
Junction 2: Bexley MiniPeak Hour: AM (08:00-09:00)
Departure Departure Arrival ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 0.0 0.0 0.0 0.1 0.0 0.1 0.4 0.0 0.4 0.1 0.0 0.1 0.0 0.0 0.0 -0.1 0.0 -0.1 0.4 0.0 0.4 -0.1 0.0 -0.1 0.0 0.0 0.0
0815-0830 0.0 0.0 0.0 0.1 0.0 0.1 0.4 0.0 0.4 0.1 0.0 0.1 0.0 0.0 0.0 -0.1 0.0 -0.1 0.4 0.0 0.4 -0.1 0.0 -0.1 0.0 0.0 0.0
0830-0845 0.0 0.0 0.0 0.1 0.0 0.1 0.4 0.0 0.4 0.1 0.0 0.1 0.0 0.0 0.0 -0.1 0.0 -0.1 0.4 0.0 0.4 -0.1 0.0 -0.1 0.0 0.0 0.00845-0900 0.0 0.0 0.0 0.1 0.0 0.1 0.4 0.0 0.4 0.1 0.0 0.1 0.0 0.0 0.0 -0.1 0.0 -0.1 0.4 0.0 0.4 -0.1 0.0 -0.1 0.0 0.0 0.0
TOTAL 0.0 0.0 0.0 0.3 0.0 0.3 1.5 0.0 1.5 0.3 0.0 0.3 0.0 0.0 0.0 -0.5 0.0 -0.5 1.8 0.0 1.8 -0.5 0.0 -0.5 0.0 0.0 0.0HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per Minute
TIME FROM A FROM B FROM C
0800-0815 0.03 0.00 0.02
0815-0830 0.03 0.00 0.02
0830-0845 0.03 0.00 0.020845-0900 0.03 0.00 0.02
Total Vehicles Number of HGV's Proportion of HGV's for Hour
A B C A B C A B C
A 0.0 0.3 1.5 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%
B 0.3 0.0 -0.5 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 1.8 -0.5 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900
A B C A B C A B C A B C
A 0.0 0.1 0.4 A 0.0 0.1 0.4 A 0.0 0.1 0.4 A 0.0 0.1 0.4
B 0.1 0.0 -0.1 B 0.1 0.0 -0.1 B 0.1 0.0 -0.1 B 0.1 0.0 -0.1C 0.4 -0.1 0.0 C 0.4 -0.1 0.0 C 0.4 -0.1 0.0 C 0.4 -0.1 0.0
TIME PERIOD
Junction 2: Bexley MiniPeak Hour: AM (08:00-09:00)
Departure Departure Arrival ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 0.0 0.0 0.0 0.2 0.0 0.2 0.2 0.0 0.2 0.2 0.0 0.2 0.0 0.0 0.0 -0.4 0.0 -0.4 0.2 0.0 0.2 -0.4 0.0 -0.4 0.0 0.0 0.0
0815-0830 0.0 0.0 0.0 0.2 0.0 0.2 0.2 0.0 0.2 0.2 0.0 0.2 0.0 0.0 0.0 -0.4 0.0 -0.4 0.2 0.0 0.2 -0.4 0.0 -0.4 0.0 0.0 0.0
0830-0845 0.0 0.0 0.0 0.2 0.0 0.2 0.2 0.0 0.2 0.2 0.0 0.2 0.0 0.0 0.0 -0.4 0.0 -0.4 0.2 0.0 0.2 -0.4 0.0 -0.4 0.0 0.0 0.00845-0900 0.0 0.0 0.0 0.2 0.0 0.2 0.2 0.0 0.2 0.2 0.0 0.2 0.0 0.0 0.0 -0.4 0.0 -0.4 0.2 0.0 0.2 -0.4 0.0 -0.4 0.0 0.0 0.0
TOTAL 0.0 0.0 0.0 0.7 0.0 0.7 0.7 0.0 0.7 0.8 0.0 0.8 0.0 0.0 0.0 -1.6 0.0 -1.6 0.9 0.0 0.9 -1.6 0.0 -1.6 0.0 0.0 0.0HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per Minute
TIME FROM A FROM B FROM C
0800-0815 0.02 -0.01 -0.01
0815-0830 0.02 -0.01 -0.01
0830-0845 0.02 -0.01 -0.010845-0900 0.02 -0.01 -0.01
Total Vehicles Number of HGV's Proportion of HGV's for Hour
A B C A B C A B C
A 0.0 0.7 0.7 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%
B 0.8 0.0 -1.6 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 0.9 -1.6 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900
A B C A B C A B C A B C
A 0.0 0.2 0.2 A 0.0 0.2 0.2 A 0.0 0.2 0.2 A 0.0 0.2 0.2
B 0.2 0.0 -0.4 B 0.2 0.0 -0.4 B 0.2 0.0 -0.4 B 0.2 0.0 -0.4C 0.2 -0.4 0.0 C 0.2 -0.4 0.0 C 0.2 -0.4 0.0 C 0.2 -0.4 0.0
TIME PERIOD
Junction 2: Bexley Mini
Peak Hour: AM (08:00-09:00)
Departure Departure Arrival ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 0% 0% 0% 3% 3% 3% 17% 17% 17% 3% 3% 3% 0% 0% 0% -20% -20% -20% 17% 17% 17% -20% -20% -20% 0% 0% 0%
0815-0830 0% 0% 0% 3% 3% 3% 17% 17% 17% 3% 3% 3% 0% 0% 0% -20% -20% -20% 17% 17% 17% -20% -20% -20% 0% 0% 0%
0830-0845 0% 0% 0% 3% 3% 3% 17% 17% 17% 3% 3% 3% 0% 0% 0% -20% -20% -20% 17% 17% 17% -20% -20% -20% 0% 0% 0%
0845-0900 0% 0% 0% 3% 3% 3% 17% 17% 17% 3% 3% 3% 0% 0% 0% -20% -20% -20% 17% 17% 17% -20% -20% -20% 0% 0% 0%
TOTAL 0% 0% 0% 3% 3% 3% 17% 17% 17% 3% 3% 3% 0% 0% 0% -20% -20% -20% 17% 17% 17% -20% -20% -20% 0% 0% 0%HV = 0% HV = 50% HV = 50% HV = 50% HV = 0% HV = 50% HV = 50% HV = 50% HV = 0%
Vehicles per Minute
TIME FROM A FROM B FROM C
0800-0815 0.01 -0.01 0.00
0815-0830 0.01 -0.01 0.00
0830-0845 0.01 -0.01 0.00
0845-0900 0.01 -0.01 0.00
Total Vehicles Number of HGV's Proportion of HGV's for Hour
A B C A B C A B C
A 0 0.118681 0.681319 A 0 0.02967 0.17033 A 0.0% 25.0% 25.0%
B 0.118681 0 -0.8 B 0.02967 0 -0.2 B 25.0% 0.0% 25.0%
C 0.681319 -0.8 0 C 0.17033 -0.2 0 C 25.0% 25.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900
A B C A B C A B C A B C
A 0 0.02967 0.17033 A 0 0.02967 0.17033 A 0 0.02967 0.17033 A 0 0.02967 0.17033
B 0.02967 0 -0.2 B 0.02967 0 -0.2 B 0.02967 0 -0.2 B 0.02967 0 -0.2
C 0.17033 -0.2 0 C 0.17033 -0.2 0 C 0.17033 -0.2 0 C 0.17033 -0.2 0
TIME
PERIOD
Junction 2: Bexley MiniPeak Hour: PM (17:00-18:00)
Departure Departure Arrival ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1700-1715 0.0 0.0 0.0 0.1 0.0 0.1 0.4 0.0 0.4 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.01715-1730 0.0 0.0 0.0 0.1 0.0 0.1 0.4 0.0 0.4 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.00730-0745 0.0 0.0 0.0 0.1 0.0 0.1 0.4 0.0 0.4 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.00745-1800 0.0 0.0 0.0 0.1 0.0 0.1 0.4 0.0 0.4 0.1 0.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.6 0.0 0.0 0.0 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 0.3 0.0 0.3 1.8 0.0 1.8 0.4 0.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 2.3 0.0 2.3 0.0 0.0 0.0 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 0.04 0.01 0.041715-1730 0.04 0.01 0.04 0730-0745 0.04 0.01 0.040745-1800 0.04 0.01 0.04
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 0.3 1.8 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 0.4 0.0 0.0 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 2.3 0.0 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1700-1715 1715-1730 0730-0745 0745-1800A B C A B C A B C A B C
A 0.0 0.1 0.4 A 0.0 0.1 0.4 A 0.0 0.1 0.4 A 0.0 0.1 0.4B 0.1 0.0 0.0 B 0.1 0.0 0.0 B 0.1 0.0 0.0 B 0.1 0.0 0.0C 0.6 0.0 0.0 C 0.6 0.0 0.0 C 0.6 0.0 0.0 C 0.6 0.0 0.0
TIME PERIOD
Junction 2: Bexley Mini
Peak Hour: AM (08:00-09:00)
Departure Departure Arrival ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 0% 0% 0% 17% 17% 17% 18% 18% 18% 17% 17% 17% 0% 0% 0% 0% 0% 0% 18% 18% 18% 0% 0% 0% 0% 0% 0%
0815-0830 0% 0% 0% 17% 17% 17% 18% 18% 18% 17% 17% 17% 0% 0% 0% 0% 0% 0% 18% 18% 18% 0% 0% 0% 0% 0% 0%
0830-0845 0% 0% 0% 17% 17% 17% 18% 18% 18% 17% 17% 17% 0% 0% 0% 0% 0% 0% 18% 18% 18% 0% 0% 0% 0% 0% 0%
0845-0900 0% 0% 0% 17% 17% 17% 18% 18% 18% 17% 17% 17% 0% 0% 0% 0% 0% 0% 18% 18% 18% 0% 0% 0% 0% 0% 0%
TOTAL 0% 0% 0% 17% 17% 17% 18% 18% 18% 17% 17% 17% 0% 0% 0% 0% 0% 0% 18% 18% 18% 0% 0% 0% 0% 0% 0%HV = 0% HV = 50% HV = 50% HV = 50% HV = 0% HV = 0% HV = 50% HV = 0% HV = 0%
Vehicles per Minute
TIME FROM A FROM B FROM C
0800-0815 0.02 0.01 0.01
0815-0830 0.02 0.01 0.01
0830-0845 0.02 0.01 0.01
0845-0900 0.02 0.01 0.01
Total Vehicles Number of HGV's Proportion of HGV's for Hour
A B C A B C A B C
A 0 0.678423 0.703395 A 0 0.169606 0.175849 A 0.0% 25.0% 25.0%
B 0.678423 0 0 B 0.169606 0 0 B 25.0% 0.0% 0.0%
C 0.703395 0 0 C 0.175849 0 0 C 25.0% 0.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900
A B C A B C A B C A B C
A 0 0.169606 0.175849 A 0 0.169606 0.175849 A 0 0.169606 0.175849 A 0 0.169606 0.175849
B 0.169606 0 0 B 0.169606 0 0 B 0.169606 0 0 B 0.169606 0 0
C 0.175849 0 0 C 0.175849 0 0 C 0.175849 0 0 C 0.175849 0 0
TIME
PERIOD
Junction 2: Bexley MiniPeak Hour: AM (08:00-09:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 -1 0 -1 1 0 1 -1 0 -1 0 0 00815-0830 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 -1 0 -1 1 0 1 -1 0 -1 0 0 00830-0845 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 -1 0 -1 1 0 1 -1 0 -1 0 0 00845-0900 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 -1 0 -1 1 0 1 -1 0 -1 0 0 0TOTAL 0 0 0 1 0 1 3 0 3 1 0 1 0 0 0 -2 0 -2 4 0 4 -2 0 -2 0 0 0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 0.06 -0.01 0.020815-0830 0.06 -0.01 0.02 0830-0845 0.06 -0.01 0.020845-0900 0.06 -0.01 0.02
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 1.042019 2.790708 A 0 0 0 A 0.0% 0.0% 0.0%B 1.310346 0 -2.00329 B 0 0 0 B 0.0% 0.0% 0.0%C 3.53329 -2.0658 0 C 0 0 0 C 0.0% 0.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 0.260505 0.697677 A 0 0.260505 0.697677 A 0 0.260505 0.697677 A 0 0.260505 0.697677B 0.327587 0 -0.50082 B 0.327587 0 -0.50082 B 0.327587 0 -0.50082 B 0.327587 0 -0.50082C 0.883323 -0.51645 0 C 0.883323 -0.51645 0 C 0.883323 -0.51645 0 C 0.883323 -0.51645 0
TIME PERIOD
Junction 2: Bexley MiniPeak Hour: PM (17:00-18:00)
Departure Departure Arrival ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1700-1715 0.0 0.0 0.0 0.2 0.0 0.2 1.1 0.0 1.1 0.3 0.0 0.3 0.0 0.0 0.0 -0.4 0.0 -0.4 1.5 0.0 1.5 -0.4 0.0 -0.4 0.0 0.0 0.01715-1730 0.0 0.0 0.0 0.2 0.0 0.2 1.1 0.0 1.1 0.3 0.0 0.3 0.0 0.0 0.0 -0.4 0.0 -0.4 1.5 0.0 1.5 -0.4 0.0 -0.4 0.0 0.0 0.01730-1745 0.0 0.0 0.0 0.2 0.0 0.2 1.1 0.0 1.1 0.3 0.0 0.3 0.0 0.0 0.0 -0.4 0.0 -0.4 1.5 0.0 1.5 -0.4 0.0 -0.4 0.0 0.0 0.01745-1800 0.0 0.0 0.0 0.2 0.0 0.2 1.1 0.0 1.1 0.3 0.0 0.3 0.0 0.0 0.0 -0.4 0.0 -0.4 1.5 0.0 1.5 -0.4 0.0 -0.4 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 0.9 0.0 0.9 4.6 0.0 4.6 1.1 0.0 1.1 0.0 0.0 0.0 -1.4 0.0 -1.4 6.1 0.0 6.1 -1.7 0.0 -1.7 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 0.09 0.00 0.071715-1730 0.09 0.00 0.07 1730-1745 0.09 0.00 0.071745-1800 0.09 0.00 0.07
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 0.9 4.6 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 1.1 0.0 -1.4 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 6.1 -1.7 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0.0 0.2 1.1 A 0.0 0.2 1.1 A 0.0 0.2 1.1 A 0.0 0.2 1.1B 0.3 0.0 -0.4 B 0.3 0.0 -0.4 B 0.3 0.0 -0.4 B 0.3 0.0 -0.4C 1.5 -0.4 0.0 C 1.5 -0.4 0.0 C 1.5 -0.4 0.0 C 1.5 -0.4 0.0
TIME PERIOD
Junction 2: Bexley MiniPeak Hour: PM (17:00-18:00)
Departure Departure Arrival ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1700-1715 0% 0% 0% 3% 3% 3% 17% 17% 17% 3% 3% 3% 0% 0% 0% -20% -20% -20% 17% 17% 17% -20% -20% -20% 0% 0% 0%1715-1730 0% 0% 0% 3% 3% 3% 17% 17% 17% 3% 3% 3% 0% 0% 0% -20% -20% -20% 17% 17% 17% -20% -20% -20% 0% 0% 0%1730-1745 0% 0% 0% 3% 3% 3% 17% 17% 17% 3% 3% 3% 0% 0% 0% -20% -20% -20% 17% 17% 17% -20% -20% -20% 0% 0% 0%1745-1800 0% 0% 0% 3% 3% 3% 17% 17% 17% 3% 3% 3% 0% 0% 0% -20% -20% -20% 17% 17% 17% -20% -20% -20% 0% 0% 0%TOTAL 0% 0% 0% 3% 3% 3% 17% 17% 17% 3% 3% 3% 0% 0% 0% -20% -20% -20% 17% 17% 17% -20% -20% -20% 0% 0% 0%
HV = 0% HV = 50% HV = 50% HV = 50% HV = 0% HV = 50% HV = 50% HV = 50% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 0.01 -0.01 0.001715-1730 0.01 -0.01 0.00 1730-1745 0.01 -0.01 0.001745-1800 0.01 -0.01 0.00
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 0.126486 0.673514 A 0 0.031622 0.168378 A 0.0% 25.0% 25.0%B 0.126486 0 -0.8 B 0.031622 0 -0.2 B 25.0% 0.0% 25.0%C 0.673514 -0.8 0 C 0.168378 -0.2 0 C 25.0% 25.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0 0.031622 0.168378 A 0 0.031622 0.168378 A 0 0.031622 0.168378 A 0 0.031622 0.168378B 0.031622 0 -0.2 B 0.031622 0 -0.2 B 0.031622 0 -0.2 B 0.031622 0 -0.2C 0.168378 -0.2 0 C 0.168378 -0.2 0 C 0.168378 -0.2 0 C 0.168378 -0.2 0
TIME PERIOD
Junction 2: Bexley MiniPeak Hour: PM (17:00-18:00)
Departure Departure Arrival ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1700-1715 0.0 0.0 0.0 0.6 0.0 0.6 0.5 0.0 0.5 0.8 0.0 0.8 0.0 0.0 0.0 -1.2 0.0 -1.2 0.6 0.0 0.6 -1.2 0.0 -1.2 0.0 0.0 0.01715-1730 0.0 0.0 0.0 0.6 0.0 0.6 0.5 0.0 0.5 0.8 0.0 0.8 0.0 0.0 0.0 -1.2 0.0 -1.2 0.6 0.0 0.6 -1.2 0.0 -1.2 0.0 0.0 0.01730-1745 0.0 0.0 0.0 0.6 0.0 0.6 0.5 0.0 0.5 0.8 0.0 0.8 0.0 0.0 0.0 -1.2 0.0 -1.2 0.6 0.0 0.6 -1.2 0.0 -1.2 0.0 0.0 0.01745-1800 0.0 0.0 0.0 0.6 0.0 0.6 0.5 0.0 0.5 0.8 0.0 0.8 0.0 0.0 0.0 -1.2 0.0 -1.2 0.6 0.0 0.6 -1.2 0.0 -1.2 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 2.4 0.0 2.4 1.8 0.0 1.8 3.1 0.0 3.1 0.0 0.0 0.0 -4.9 0.0 -4.9 2.4 0.0 2.4 -4.9 0.0 -4.9 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 0.07 -0.03 -0.041715-1730 0.07 -0.03 -0.04 1730-1745 0.07 -0.03 -0.041745-1800 0.07 -0.03 -0.04
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 2.4 1.8 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 3.1 0.0 -4.9 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 2.4 -4.9 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0.0 0.6 0.5 A 0.0 0.6 0.5 A 0.0 0.6 0.5 A 0.0 0.6 0.5B 0.8 0.0 -1.2 B 0.8 0.0 -1.2 B 0.8 0.0 -1.2 B 0.8 0.0 -1.2C 0.6 -1.2 0.0 C 0.6 -1.2 0.0 C 0.6 -1.2 0.0 C 0.6 -1.2 0.0
TIME PERIOD
Junction 2: Bexley MiniPeak Hour: PM (17:00-18:00)
Departure Departure Arrival ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1700-1715 0% 0% 0% 17% 17% 17% 13% 13% 13% 17% 17% 17% 0% 0% 0% 0% 0% 0% 13% 13% 13% 0% 0% 0% 0% 0% 0%1715-1730 0% 0% 0% 17% 17% 17% 13% 13% 13% 17% 17% 17% 0% 0% 0% 0% 0% 0% 13% 13% 13% 0% 0% 0% 0% 0% 0%1730-1745 0% 0% 0% 17% 17% 17% 13% 13% 13% 17% 17% 17% 0% 0% 0% 0% 0% 0% 13% 13% 13% 0% 0% 0% 0% 0% 0%1745-1800 0% 0% 0% 17% 17% 17% 13% 13% 13% 17% 17% 17% 0% 0% 0% 0% 0% 0% 13% 13% 13% 0% 0% 0% 0% 0% 0%TOTAL 0% 0% 0% 17% 17% 17% 13% 13% 13% 17% 17% 17% 0% 0% 0% 0% 0% 0% 13% 13% 13% 0% 0% 0% 0% 0% 0%
HV = 0% HV = 50% HV = 50% HV = 50% HV = 0% HV = 0% HV = 50% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 0.02 0.01 0.011715-1730 0.02 0.01 0.01 1730-1745 0.02 0.01 0.011745-1800 0.02 0.01 0.01
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 0.681485 0.527817 A 0 0.170371 0.131954 A 0.0% 25.0% 25.0%B 0.681485 0 0 B 0.170371 0 0 B 25.0% 0.0% 0.0%C 0.527817 0 0 C 0.131954 0 0 C 25.0% 0.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0 0.170371 0.131954 A 0 0.170371 0.131954 A 0 0.170371 0.131954 A 0 0.170371 0.131954B 0.170371 0 0 B 0.170371 0 0 B 0.170371 0 0 B 0.170371 0 0C 0.131954 0 0 C 0.131954 0 0 C 0.131954 0 0 C 0.131954 0 0
TIME PERIOD
Junction 2: Bexley MiniPeak Hour: PM (17:00-18:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1700-1715 0 0 0 1 0 1 2 0 2 1 0 1 0 0 0 -2 0 -2 3 0 3 -2 0 -2 0 0 01715-1730 0 0 0 1 0 1 2 0 2 1 0 1 0 0 0 -2 0 -2 3 0 3 -2 0 -2 0 0 01730-1745 0 0 0 1 0 1 2 0 2 1 0 1 0 0 0 -2 0 -2 3 0 3 -2 0 -2 0 0 01745-1800 0 0 0 1 0 1 2 0 2 1 0 1 0 0 0 -2 0 -2 3 0 3 -2 0 -2 0 0 0TOTAL 0 0 0 4 0 4 8 0 8 5 0 5 0 0 0 -6 0 -6 11 0 11 -7 0 -7 0 0 0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 0.20 -0.03 0.071715-1730 0.20 -0.03 0.07 1730-1745 0.20 -0.03 0.071745-1800 0.20 -0.03 0.07
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 3.579907 8.20893 A 0 0 0 A 0.0% 0.0% 0.0%B 4.635263 0 -6.34361 B 0 0 0 B 0.0% 0.0% 0.0%C 10.72753 -6.64448 0 C 0 0 0 C 0.0% 0.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0 0.894977 2.052232 A 0 0.894977 2.052232 A 0 0.894977 2.052232 A 0 0.894977 2.052232B 1.158816 0 -1.5859 B 1.158816 0 -1.5859 B 1.158816 0 -1.5859 B 1.158816 0 -1.5859C 2.681882 -1.66112 0 C 2.681882 -1.66112 0 C 2.681882 -1.66112 0 C 2.681882 -1.66112 0
TIME PERIOD
Junction 2: Bexley MiniPeak Hour: Sat (12:00-13:00)
Departure Departure Arrival ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1200-1215 0.0 0.0 0.0 0.4 0.0 0.4 1.8 0.0 1.8 0.3 0.0 0.3 0.0 0.0 0.0 -0.5 0.0 -0.5 1.5 0.0 1.5 -0.5 0.0 -0.5 0.0 0.0 0.01215-1230 0.0 0.0 0.0 0.4 0.0 0.4 1.8 0.0 1.8 0.3 0.0 0.3 0.0 0.0 0.0 -0.5 0.0 -0.5 1.5 0.0 1.5 -0.5 0.0 -0.5 0.0 0.0 0.01230-1245 0.0 0.0 0.0 0.4 0.0 0.4 1.8 0.0 1.8 0.3 0.0 0.3 0.0 0.0 0.0 -0.5 0.0 -0.5 1.5 0.0 1.5 -0.5 0.0 -0.5 0.0 0.0 0.01245-1300 0.0 0.0 0.0 0.4 0.0 0.4 1.8 0.0 1.8 0.3 0.0 0.3 0.0 0.0 0.0 -0.5 0.0 -0.5 1.5 0.0 1.5 -0.5 0.0 -0.5 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 1.5 0.0 1.5 7.3 0.0 7.3 1.2 0.0 1.2 0.0 0.0 0.0 -2.1 0.0 -2.1 5.8 0.0 5.8 -1.8 0.0 -1.8 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C §1200-1215 0.15 -0.02 0.071215-1230 0.15 -0.02 0.07 1230-1245 0.15 -0.02 0.071245-1300 0.15 -0.02 0.07
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 1.5 7.3 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 1.2 0.0 -2.1 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 5.8 -1.8 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0.0 0.4 1.8 A 0.0 0.4 1.8 A 0.0 0.4 1.8 A 0.0 0.4 1.8B 0.3 0.0 -0.5 B 0.3 0.0 -0.5 B 0.3 0.0 -0.5 B 0.3 0.0 -0.5C 1.5 -0.5 0.0 C 1.5 -0.5 0.0 C 1.5 -0.5 0.0 C 1.5 -0.5 0.0
TIME PERIOD
Junction 2: Bexley MiniPeak Hour: SAT (12:00-13:00)
Departure Departure Arrival ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1200-1215 0.0 0.0 0.0 0.2 0.0 0.2 1.0 0.0 1.0 0.2 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0
1215-1230 0.0 0.0 0.0 0.2 0.0 0.2 1.0 0.0 1.0 0.2 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0
1230-1245 0.0 0.0 0.0 0.2 0.0 0.2 1.0 0.0 1.0 0.2 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.01245-1300 0.0 0.0 0.0 0.2 0.0 0.2 1.0 0.0 1.0 0.2 0.0 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL 0.0 0.0 0.0 0.9 0.0 0.9 4.1 0.0 4.1 0.7 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 3.2 0.0 3.2 0.0 0.0 0.0 0.0 0.0 0.0HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per Minute
TIME FROM A FROM B FROM C
1200-1215 0.08 0.01 0.05
1215-1230 0.08 0.01 0.05
1230-1245 0.08 0.01 0.051245-1300 0.08 0.01 0.05
Total Vehicles Number of HGV's Proportion of HGV's for Hour
A B C A B C A B C
A 0.0 0.9 4.1 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%
B 0.7 0.0 0.0 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 3.2 0.0 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300
A B C A B C A B C A B C
A 0.0 0.2 1.0 A 0.0 0.2 1.0 A 0.0 0.2 1.0 A 0.0 0.2 1.0
B 0.2 0.0 0.0 B 0.2 0.0 0.0 B 0.2 0.0 0.0 B 0.2 0.0 0.0C 0.8 0.0 0.0 C 0.8 0.0 0.0 C 0.8 0.0 0.0 C 0.8 0.0 0.0
TIME PERIOD
Junction 2: Bexley MiniPeak Hour: Sat (12:00-13:00)
Departure Arrival ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1200-1215 0% 0% 0% 9% 9% 9% 45% 45% 45% 9% 9% 9% 0% 0% 0% 0% 0% 0% 45% 45% 45% 0% 0% 0% 0% 0% 0%1215-1230 0% 0% 0% 9% 9% 9% 45% 45% 45% 9% 9% 9% 0% 0% 0% 0% 0% 0% 45% 45% 45% 0% 0% 0% 0% 0% 0%1230-1245 0% 0% 0% 9% 9% 9% 45% 45% 45% 9% 9% 9% 0% 0% 0% 0% 0% 0% 45% 45% 45% 0% 0% 0% 0% 0% 0%1245-1300 0% 0% 0% 9% 9% 9% 45% 45% 45% 9% 9% 9% 0% 0% 0% 0% 0% 0% 45% 45% 45% 0% 0% 0% 0% 0% 0%TOTAL 0% 0% 0% 9% 9% 9% 45% 45% 45% 9% 9% 9% 0% 0% 0% 0% 0% 0% 45% 45% 45% 0% 0% 0% 0% 0% 0%
HV = 0% HV = 50% HV = 50% HV = 50% HV = 0% HV = 0% HV = 50% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.04 0.01 0.031215-1230 0.04 0.01 0.03 1230-1245 0.04 0.01 0.031245-1300 0.04 0.01 0.03
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 0.379661 1.809813 A 0 0.094915 0.452453 A 0.0% 25.0% 25.0%B 0.379661 0 0 B 0.094915 0 0 B 25.0% 0.0% 0.0%C 1.809813 0 0 C 0.452453 0 0 C 25.0% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 0.094915 0.452453 A 0 0.094915 0.452453 A 0 0.094915 0.452453 A 0 0.094915 0.452453B 0.094915 0 0 B 0.094915 0 0 B 0.094915 0 0 B 0.094915 0 0C 0.452453 0 0 C 0.452453 0 0 C 0.452453 0 0 C 0.452453 0 0
TIME PERIOD
Junction 2: Bexley MiniPeak Hour: SAT (12:00-13:00)
Departure Departure Arrival ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1200-1215 0% 0% 0% 3% 3% 3% 17% 17% 17% 3% 3% 3% 0% 0% 0% -20% -20% -20% 17% 17% 17% -20% -20% -20% 0% 0% 0%1215-1230 0% 0% 0% 3% 3% 3% 17% 17% 17% 3% 3% 3% 0% 0% 0% -20% -20% -20% 17% 17% 17% -20% -20% -20% 0% 0% 0%1230-1245 0% 0% 0% 3% 3% 3% 17% 17% 17% 3% 3% 3% 0% 0% 0% -20% -20% -20% 17% 17% 17% -20% -20% -20% 0% 0% 0%1245-1300 0% 0% 0% 3% 3% 3% 17% 17% 17% 3% 3% 3% 0% 0% 0% -20% -20% -20% 17% 17% 17% -20% -20% -20% 0% 0% 0%TOTAL 0% 0% 0% 3% 3% 3% 17% 17% 17% 3% 3% 3% 0% 0% 0% -20% -20% -20% 17% 17% 17% -20% -20% -20% 0% 0% 0%
HV = 0% HV = 50% HV = 50% HV = 50% HV = 0% HV = 50% HV = 50% HV = 50% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.01 -0.01 0.001215-1230 0.01 -0.01 0.00 1230-1245 0.01 -0.01 0.001245-1300 0.01 -0.01 0.00
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 0.138722 0.661278 A 0 0.034681 0.165319 A 0.0% 25.0% 25.0%B 0.138722 0 -0.8 B 0.034681 0 -0.2 B 25.0% 0.0% 25.0%C 0.661278 -0.8 0 C 0.165319 -0.2 0 C 25.0% 25.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 0.034681 0.165319 A 0 0.034681 0.165319 A 0 0.034681 0.165319 A 0 0.034681 0.165319B 0.034681 0 -0.2 B 0.034681 0 -0.2 B 0.034681 0 -0.2 B 0.034681 0 -0.2C 0.165319 -0.2 0 C 0.165319 -0.2 0 C 0.165319 -0.2 0 C 0.165319 -0.2 0
TIME PERIOD
Junction 2: Bexley MiniPeak Hour: SAT (12:00-13:00)
Departure Departure Arrival ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1200-1215 0.0 0.0 0.0 1.0 0.0 1.0 0.9 0.0 0.9 0.8 0.0 0.8 0.0 0.0 0.0 -1.7 0.0 -1.7 0.7 0.0 0.7 -1.7 0.0 -1.7 0.0 0.0 0.01215-1230 0.0 0.0 0.0 1.0 0.0 1.0 0.9 0.0 0.9 0.8 0.0 0.8 0.0 0.0 0.0 -1.7 0.0 -1.7 0.7 0.0 0.7 -1.7 0.0 -1.7 0.0 0.0 0.01230-1245 0.0 0.0 0.0 1.0 0.0 1.0 0.9 0.0 0.9 0.8 0.0 0.8 0.0 0.0 0.0 -1.7 0.0 -1.7 0.7 0.0 0.7 -1.7 0.0 -1.7 0.0 0.0 0.01245-1300 0.0 0.0 0.0 1.0 0.0 1.0 0.9 0.0 0.9 0.8 0.0 0.8 0.0 0.0 0.0 -1.7 0.0 -1.7 0.7 0.0 0.7 -1.7 0.0 -1.7 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 4.2 0.0 4.2 3.5 0.0 3.5 3.3 0.0 3.3 0.0 0.0 0.0 -6.8 0.0 -6.8 2.7 0.0 2.7 -6.8 0.0 -6.8 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.13 -0.06 -0.071215-1230 0.13 -0.06 -0.07 1230-1245 0.13 -0.06 -0.071245-1300 0.13 -0.06 -0.07
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 4.2 3.5 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 3.3 0.0 -6.8 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 2.7 -6.8 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0.0 1.0 0.9 A 0.0 1.0 0.9 A 0.0 1.0 0.9 A 0.0 1.0 0.9B 0.8 0.0 -1.7 B 0.8 0.0 -1.7 B 0.8 0.0 -1.7 B 0.8 0.0 -1.7C 0.7 -1.7 0.0 C 0.7 -1.7 0.0 C 0.7 -1.7 0.0 C 0.7 -1.7 0.0
TIME PERIOD
Junction 2: Bexley MiniPeak Hour: SAT (12:00-13:00)
Departure Departure Arrival ArrivalA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1200-1215 0% 0% 0% 30% 30% 30% 25% 25% 25% 30% 30% 30% 0% 0% 0% 0% 0% 0% 25% 25% 25% 0% 0% 0% 0% 0% 0%1215-1230 0% 0% 0% 30% 30% 30% 25% 25% 25% 30% 30% 30% 0% 0% 0% 0% 0% 0% 25% 25% 25% 0% 0% 0% 0% 0% 0%1230-1245 0% 0% 0% 30% 30% 30% 25% 25% 25% 30% 30% 30% 0% 0% 0% 0% 0% 0% 25% 25% 25% 0% 0% 0% 0% 0% 0%1245-1300 0% 0% 0% 30% 30% 30% 25% 25% 25% 30% 30% 30% 0% 0% 0% 0% 0% 0% 25% 25% 25% 0% 0% 0% 0% 0% 0%TOTAL 0% 0% 0% 30% 30% 30% 25% 25% 25% 30% 30% 30% 0% 0% 0% 0% 0% 0% 25% 25% 25% 0% 0% 0% 0% 0% 0%
HV = 0% HV = 50% HV = 50% HV = 50% HV = 0% HV = 0% HV = 50% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.04 0.02 0.021215-1230 0.04 0.02 0.02 1230-1245 0.04 0.02 0.021245-1300 0.04 0.02 0.02
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 1.190366 0.999108 A 0 0.297591 0.249777 A 0.0% 25.0% 25.0%B 1.190366 0 0 B 0.297591 0 0 B 25.0% 0.0% 0.0%C 0.999108 0 0 C 0.249777 0 0 C 25.0% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 0.297591 0.249777 A 0 0.297591 0.249777 A 0 0.297591 0.249777 A 0 0.297591 0.249777B 0.297591 0 0 B 0.297591 0 0 B 0.297591 0 0 B 0.297591 0 0C 0.249777 0 0 C 0.249777 0 0 C 0.249777 0 0 C 0.249777 0 0
TIME PERIOD
Junction 2: Bexley MiniPeak Hour: Sat (12:00-13:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1200-1215 0 0 0 2 0 2 4 0 4 1 0 1 0 0 0 -2 0 -2 3 0 3 -2 0 -2 0 0 01215-1230 0 0 0 2 0 2 4 0 4 1 0 1 0 0 0 -2 0 -2 3 0 3 -2 0 -2 0 0 01230-1245 0 0 0 2 0 2 4 0 4 1 0 1 0 0 0 -2 0 -2 3 0 3 -2 0 -2 0 0 01245-1300 0 0 0 2 0 2 4 0 4 1 0 1 0 0 0 -2 0 -2 3 0 3 -2 0 -2 0 0 0TOTAL 0 0 0 7 0 7 15 0 15 5 0 5 0 0 0 -9 0 -9 12 0 12 -9 0 -9 0 0 0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.36 -0.06 0.051215-1230 0.36 -0.06 0.05 1230-1245 0.36 -0.06 0.051245-1300 0.36 -0.06 0.05
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 6.546463 14.84301 A 0 0 0 A 0.0% 0.0% 0.0%B 5.158669 0 -8.89409 B 0 0 0 B 0.0% 0.0% 0.0%C 11.73396 -8.60668 0 C 0 0 0 C 0.0% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 1.636616 3.710753 A 0 1.636616 3.710753 A 0 1.636616 3.710753 A 0 1.636616 3.710753B 1.289667 0 -2.22352 B 1.289667 0 -2.22352 B 1.289667 0 -2.22352 B 1.289667 0 -2.22352C 2.933491 -2.15167 0 C 2.933491 -2.15167 0 C 2.933491 -2.15167 0 C 2.933491 -2.15167 0
TIME PERIOD
Junction 1: Erith RoundaboutPeak Hour: AM (08:00-09:00)
Arrival Arrival Departure DepartureA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.2 0.2 0.0 0.2 0.1 0.0 0.1 0.0 0.0 0.0
0815-0830 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.2 0.2 0.0 0.2 0.1 0.0 0.1 0.0 0.0 0.0
0830-0845 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.2 0.2 0.0 0.2 0.1 0.0 0.1 0.0 0.0 0.0
0845-0900 0.0 0.0 0.0 0.0 0.0 0.0 0.3 0.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.2 0.2 0.0 0.2 0.1 0.0 0.1 0.0 0.0 0.0
TOTAL 0.0 0.0 0.0 0.0 0.0 0.0 1.4 0.0 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.6 0.0 0.6 0.9 0.0 0.9 0.4 0.0 0.4 0.0 0.0 0.0HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per Minute
TIME FROM A FROM B FROM C
0800-0815 0.02 0.01 0.02
0815-0830 0.02 0.01 0.02
0830-0845 0.02 0.01 0.020845-0900 0.02 0.01 0.02
Total Vehicles Number of HGV's Proportion of HGV's for Hour
A B C A B C A B C
A 0.0 0.0 1.4 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%
B 0.0 0.0 0.6 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 0.9 0.4 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900
A B C A B C A B C A B C
A 0.0 0.0 0.3 A 0.0 0.0 0.3 A 0.0 0.0 0.3 A 0.0 0.0 0.3
B 0.0 0.0 0.2 B 0.0 0.0 0.2 B 0.0 0.0 0.2 B 0.0 0.0 0.2C 0.2 0.1 0.0 C 0.2 0.1 0.0 C 0.2 0.1 0.0 C 0.2 0.1 0.0
TIME PERIOD
Junction 1: Erith RoundaboutPeak Hour: AM (08:00-09:00)
Arrival Arrival Departure DepartureA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT0800-0815 0% 0% 0% 0% 0% 0% 45% 45% 45% 0% 0% 0% 0% 0% 0% 20% 20% 20% 45% 45% 45% 20% 20% 20% 0% 0% 0%0815-0830 0% 0% 0% 0% 0% 0% 45% 45% 45% 0% 0% 0% 0% 0% 0% 20% 20% 20% 45% 45% 45% 20% 20% 20% 0% 0% 0%0830-0845 0% 0% 0% 0% 0% 0% 45% 45% 45% 0% 0% 0% 0% 0% 0% 20% 20% 20% 45% 45% 45% 20% 20% 20% 0% 0% 0%0845-0900 0% 0% 0% 0% 0% 0% 45% 45% 45% 0% 0% 0% 0% 0% 0% 20% 20% 20% 45% 45% 45% 20% 20% 20% 0% 0% 0%TOTAL 0% 0% 0% 0% 0% 0% 45% 45% 45% 0% 0% 0% 0% 0% 0% 20% 20% 20% 45% 45% 45% 20% 20% 20% 0% 0% 0%
HV = 0% HV = 0% HV = 50% HV = 0% HV = 0% HV = 50% HV = 50% HV = 50% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 0.03 0.01 0.040815-0830 0.03 0.01 0.04 0830-0845 0.03 0.01 0.040845-0900 0.03 0.01 0.04
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 0 1.805195 A 0 0 0.451299 A 0.0% 0.0% 25.0%B 0 0 0.812987 B 0 0 0.203247 B 0.0% 0.0% 25.0%C 1.805195 0.812987 0 C 0.451299 0.203247 0 C 25.0% 25.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 0 0.451299 A 0 0 0.451299 A 0 0 0.451299 A 0 0 0.451299B 0 0 0.203247 B 0 0 0.203247 B 0 0 0.203247 B 0 0 0.203247C 0.451299 0.203247 0 C 0.451299 0.203247 0 C 0.451299 0.203247 0 C 0.451299 0.203247 0
TIME PERIOD
Junction 3: Erith RoundaboutPeak Hour: SAT (12:00-13:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1200-1215 0 0 0 0 0 0 10 0 10 0 0 0 0 0 0 0 0 0 11 0 11 0 0 0 0 0 01215-1230 0 0 0 0 0 0 10 0 10 0 0 0 0 0 0 0 0 0 11 0 11 0 0 0 0 0 01230-1245 0 0 0 0 0 0 10 0 10 0 0 0 0 0 0 0 0 0 11 0 11 0 0 0 0 0 01245-1300 0 0 0 0 0 0 10 0 10 0 0 0 0 0 0 0 0 0 11 0 11 0 0 0 0 0 0TOTAL 0 0 0 0 0 0 38 0 38 0 0 0 0 0 0 1 0 1 46 0 46 1 0 1 0 0 0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.64 0.02 0.771215-1230 0.64 0.02 0.77 1230-1245 0.64 0.02 0.771245-1300 0.64 0.02 0.77
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 0 38.43764 A 0 0 0 A 0.0% 0.0% 0.0%B 0 0 0.980375 B 0 0 0 B 0.0% 0.0% 0.0%C 45.65805 0.762514 0 C 0 0 0 C 0.0% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 0 9.60941 A 0 0 9.60941 A 0 0 9.60941 A 0 0 9.60941B 0 0 0.245094 B 0 0 0.245094 B 0 0 0.245094 B 0 0 0.245094C 11.41451 0.190629 0 C 11.41451 0.190629 0 C 11.41451 0.190629 0 C 11.41451 0.190629 0
TIME PERIOD
Junction 3: Erith RoundaboutPeak Hour: AM (08:00-09:00)
Arrival DepartureA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0
0815-0830 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0
0830-0845 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0
0845-0900 0.0 0.0 0.0 0.0 0.0 0.0 0.8 0.0 0.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.7 0.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL 0.0 0.0 0.0 0.0 0.0 0.0 3.3 0.0 3.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.6 0.0 2.6 0.0 0.0 0.0 0.0 0.0 0.0HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per Minute
TIME FROM A FROM B FROM C
0800-0815 0.05 0.00 0.04
0815-0830 0.05 0.00 0.04
0830-0845 0.05 0.00 0.040845-0900 0.05 0.00 0.04
Total Vehicles Number of HGV's Proportion of HGV's for Hour
A B C A B C A B C
A 0.0 0.0 3.3 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%
B 0.0 0.0 0.0 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 2.6 0.0 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900
A B C A B C A B C A B C
A 0.0 0.0 0.8 A 0.0 0.0 0.8 A 0.0 0.0 0.8 A 0.0 0.0 0.8
B 0.0 0.0 0.0 B 0.0 0.0 0.0 B 0.0 0.0 0.0 B 0.0 0.0 0.0C 0.7 0.0 0.0 C 0.7 0.0 0.0 C 0.7 0.0 0.0 C 0.7 0.0 0.0
TIME PERIOD
Junction 3: Erith RoundaboutPeak Hour: AM (08:00-09:00)
Arrival DepartureA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.8 0.0 1.8 0.0 0.0 0.0 0.0 0.0 0.0
0815-0830 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.8 0.0 1.8 0.0 0.0 0.0 0.0 0.0 0.0
0830-0845 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.8 0.0 1.8 0.0 0.0 0.0 0.0 0.0 0.0
0845-0900 0.0 0.0 0.0 0.0 0.0 0.0 2.1 0.0 2.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.8 0.0 1.8 0.0 0.0 0.0 0.0 0.0 0.0
TOTAL 0.0 0.0 0.0 0.0 0.0 0.0 8.3 0.0 8.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.0 0.0 7.0 0.0 0.0 0.0 0.0 0.0 0.0HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per Minute
TIME FROM A FROM B FROM C
0800-0815 0.14 0.00 0.12
0815-0830 0.14 0.00 0.12
0830-0845 0.14 0.00 0.120845-0900 0.14 0.00 0.12
Total Vehicles Number of HGV's Proportion of HGV's for Hour
A B C A B C A B C
A 0.0 0.0 8.3 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%
B 0.0 0.0 0.0 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 7.0 0.0 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900
A B C A B C A B C A B C
A 0.0 0.0 2.1 A 0.0 0.0 2.1 A 0.0 0.0 2.1 A 0.0 0.0 2.1
B 0.0 0.0 0.0 B 0.0 0.0 0.0 B 0.0 0.0 0.0 B 0.0 0.0 0.0C 1.8 0.0 0.0 C 1.8 0.0 0.0 C 1.8 0.0 0.0 C 1.8 0.0 0.0
TIME PERIOD
Junction 3: Erith RoundaboutPeak Hour: PM (17:00-18:00)
Arrival DepartureA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1700-1715 0.0 0.0 0.0 0.0 0.0 0.0 7.2 0.0 7.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.4 0.0 5.4 0.0 0.0 0.0 0.0 0.0 0.01715-1730 0.0 0.0 0.0 0.0 0.0 0.0 7.2 0.0 7.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.4 0.0 5.4 0.0 0.0 0.0 0.0 0.0 0.01730-1745 0.0 0.0 0.0 0.0 0.0 0.0 7.2 0.0 7.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.4 0.0 5.4 0.0 0.0 0.0 0.0 0.0 0.01745-1800 0.0 0.0 0.0 0.0 0.0 0.0 7.2 0.0 7.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.4 0.0 5.4 0.0 0.0 0.0 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 0.0 0.0 0.0 28.8 0.0 28.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 21.8 0.0 21.8 0.0 0.0 0.0 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 0.48 0.00 0.361715-1730 0.48 0.00 0.36 1730-1745 0.48 0.00 0.361745-1800 0.48 0.00 0.36
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 0.0 28.8 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 0.0 0.0 0.0 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 21.8 0.0 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0.0 0.0 7.2 A 0.0 0.0 7.2 A 0.0 0.0 7.2 A 0.0 0.0 7.2B 0.0 0.0 0.0 B 0.0 0.0 0.0 B 0.0 0.0 0.0 B 0.0 0.0 0.0C 5.4 0.0 0.0 C 5.4 0.0 0.0 C 5.4 0.0 0.0 C 5.4 0.0 0.0
TIME PERIOD
Junction 3: Erith RoundaboutPeak Hour: AM (08:00-09:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 0 0 0 0 0 0 3 0 3 0 0 0 0 0 0 0 0 0 3 0 3 0 0 0 0 0 00815-0830 0 0 0 0 0 0 3 0 3 0 0 0 0 0 0 0 0 0 3 0 3 0 0 0 0 0 00830-0845 0 0 0 0 0 0 3 0 3 0 0 0 0 0 0 0 0 0 3 0 3 0 0 0 0 0 00845-0900 0 0 0 0 0 0 3 0 3 0 0 0 0 0 0 0 0 0 3 0 3 0 0 0 0 0 0TOTAL 0 0 0 0 0 0 13 0 13 0 0 0 0 0 0 1 0 1 11 0 11 0 0 0 0 0 0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 0.22 0.01 0.180815-0830 0.22 0.01 0.18 0830-0845 0.22 0.01 0.180845-0900 0.22 0.01 0.18
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 0 12.94662 A 0 0 0 A 0.0% 0.0% 0.0%B 0 0 0.60974 B 0 0 0 B 0.0% 0.0% 0.0%C 10.56078 0.406494 0 C 0 0 0 C 0.0% 0.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 0 3.236656 A 0 0 3.236656 A 0 0 3.236656 A 0 0 3.236656B 0 0 0.152435 B 0 0 0.152435 B 0 0 0.152435 B 0 0 0.152435C 2.640195 0.101623 0 C 2.640195 0.101623 0 C 2.640195 0.101623 0 C 2.640195 0.101623 0
TIME PERIOD
Junction 1: Erith RoundaboutPeak Hour: SAT (12:00-13:00)
Arrival Arrival Departure DepartureA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1200-1215 0% 0% 0% 0% 0% 0% 41% 41% 41% 0% 0% 0% 0% 0% 0% 4% 4% 4% 41% 41% 41% 4% 4% 4% 0% 0% 0%1215-1230 0% 0% 0% 0% 0% 0% 41% 41% 41% 0% 0% 0% 0% 0% 0% 4% 4% 4% 41% 41% 41% 4% 4% 4% 0% 0% 0%1230-1245 0% 0% 0% 0% 0% 0% 41% 41% 41% 0% 0% 0% 0% 0% 0% 4% 4% 4% 41% 41% 41% 4% 4% 4% 0% 0% 0%1245-1300 0% 0% 0% 0% 0% 0% 41% 41% 41% 0% 0% 0% 0% 0% 0% 4% 4% 4% 41% 41% 41% 4% 4% 4% 0% 0% 0%TOTAL 0% 0% 0% 0% 0% 0% 41% 41% 41% 0% 0% 0% 0% 0% 0% 4% 4% 4% 41% 41% 41% 4% 4% 4% 0% 0% 0%
HV = 0% HV = 0% HV = 50% HV = 0% HV = 0% HV = 50% HV = 50% HV = 50% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.03 0.00 0.031215-1230 0.03 0.00 0.03 1230-1245 0.03 0.00 0.031245-1300 0.03 0.00 0.03
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 0 1.632867 A 0 0 0.408217 A 0.0% 0.0% 25.0%B 0 0 0.17766 B 0 0 0.044415 B 0.0% 0.0% 25.0%C 1.632867 0.17766 0 C 0.408217 0.044415 0 C 25.0% 25.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 0 0.408217 A 0 0 0.408217 A 0 0 0.408217 A 0 0 0.408217B 0 0 0.044415 B 0 0 0.044415 B 0 0 0.044415 B 0 0 0.044415C 0.408217 0.044415 0 C 0.408217 0.044415 0 C 0.408217 0.044415 0 C 0.408217 0.044415 0
TIME PERIOD
Junction 1: Erith RoundaboutPeak Hour: PM (17:00-18:00)
Arrival Arrival Departure DepartureA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1700-1715 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.2 1.0 0.0 1.0 0.2 0.0 0.2 0.0 0.0 0.01715-1730 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.2 1.0 0.0 1.0 0.2 0.0 0.2 0.0 0.0 0.00730-0745 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.2 1.0 0.0 1.0 0.2 0.0 0.2 0.0 0.0 0.00745-1800 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.2 1.0 0.0 1.0 0.2 0.0 0.2 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 0.0 0.0 0.0 5.3 0.0 5.3 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 1.0 4.1 0.0 4.1 0.8 0.0 0.8 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 0.09 0.02 0.081715-1730 0.09 0.02 0.08 0730-0745 0.09 0.02 0.080745-1800 0.09 0.02 0.08
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 0.0 5.3 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 0.0 0.0 1.0 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 4.1 0.8 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1700-1715 1715-1730 0730-0745 0745-1800A B C A B C A B C A B C
A 0.0 0.0 1.3 A 0.0 0.0 1.3 A 0.0 0.0 1.3 A 0.0 0.0 1.3B 0.0 0.0 0.2 B 0.0 0.0 0.2 B 0.0 0.0 0.2 B 0.0 0.0 0.2C 1.0 0.2 0.0 C 1.0 0.2 0.0 C 1.0 0.2 0.0 C 1.0 0.2 0.0
TIME PERIOD
Junction 1: Erith RoundaboutPeak Hour: PM (17:00-18:00)
Arrival Arrival Departure DepartureA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1700-1715 0% 0% 0% 0% 0% 0% 59% 59% 59% 0% 0% 0% 0% 0% 0% 11% 11% 11% 59% 59% 59% 11% 11% 11% 0% 0% 0%1715-1730 0% 0% 0% 0% 0% 0% 59% 59% 59% 0% 0% 0% 0% 0% 0% 11% 11% 11% 59% 59% 59% 11% 11% 11% 0% 0% 0%0730-0745 0% 0% 0% 0% 0% 0% 59% 59% 59% 0% 0% 0% 0% 0% 0% 11% 11% 11% 59% 59% 59% 11% 11% 11% 0% 0% 0%0745-1800 0% 0% 0% 0% 0% 0% 59% 59% 59% 0% 0% 0% 0% 0% 0% 11% 11% 11% 59% 59% 59% 11% 11% 11% 0% 0% 0%TOTAL 0% 0% 0% 0% 0% 0% 59% 59% 59% 0% 0% 0% 0% 0% 0% 11% 11% 11% 59% 59% 59% 11% 11% 11% 0% 0% 0%
HV = 0% HV = 0% HV = 50% HV = 0% HV = 0% HV = 50% HV = 50% HV = 50% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 0.04 0.01 0.051715-1730 0.04 0.01 0.05 0730-0745 0.04 0.01 0.050745-1800 0.04 0.01 0.05
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 0 2.354975 A 0 0 0.588744 A 0.0% 0.0% 25.0%B 0 0 0.435722 B 0 0 0.108931 B 0.0% 0.0% 25.0%C 2.354975 0.435722 0 C 0.588744 0.108931 0 C 25.0% 25.0% 0.0%
1700-1715 1715-1730 0730-0745 0745-1800A B C A B C A B C A B C
A 0 0 0.588744 A 0 0 0.588744 A 0 0 0.588744 A 0 0 0.588744B 0 0 0.108931 B 0 0 0.108931 B 0 0 0.108931 B 0 0 0.108931C 0.588744 0.108931 0 C 0.588744 0.108931 0 C 0.588744 0.108931 0 C 0.588744 0.108931 0
TIME PERIOD
Junction 3: Erith RoundaboutPeak Hour: PM (17:00-18:00)
Arrival DepartureA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1700-1715 0.0 0.0 0.0 0.0 0.0 0.0 3.1 0.0 3.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.4 0.0 2.4 0.0 0.0 0.0 0.0 0.0 0.01715-1730 0.0 0.0 0.0 0.0 0.0 0.0 3.1 0.0 3.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.4 0.0 2.4 0.0 0.0 0.0 0.0 0.0 0.01730-1745 0.0 0.0 0.0 0.0 0.0 0.0 3.1 0.0 3.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.4 0.0 2.4 0.0 0.0 0.0 0.0 0.0 0.01745-1800 0.0 0.0 0.0 0.0 0.0 0.0 3.1 0.0 3.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.4 0.0 2.4 0.0 0.0 0.0 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 0.0 0.0 0.0 12.6 0.0 12.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9.8 0.0 9.8 0.0 0.0 0.0 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 0.21 0.00 0.161715-1730 0.21 0.00 0.16 1730-1745 0.21 0.00 0.161745-1800 0.21 0.00 0.16
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 0.0 12.6 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 0.0 0.0 0.0 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 9.8 0.0 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0.0 0.0 3.1 A 0.0 0.0 3.1 A 0.0 0.0 3.1 A 0.0 0.0 3.1B 0.0 0.0 0.0 B 0.0 0.0 0.0 B 0.0 0.0 0.0 B 0.0 0.0 0.0C 2.4 0.0 0.0 C 2.4 0.0 0.0 C 2.4 0.0 0.0 C 2.4 0.0 0.0
TIME PERIOD
Junction 3: Erith RoundaboutPeak Hour: PM (17:00-18:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1700-1715 0 0 0 0 0 0 12 0 12 0 0 0 0 0 0 0 0 0 9 0 9 0 0 0 0 0 01715-1730 0 0 0 0 0 0 12 0 12 0 0 0 0 0 0 0 0 0 9 0 9 0 0 0 0 0 01730-1745 0 0 0 0 0 0 12 0 12 0 0 0 0 0 0 0 0 0 9 0 9 0 0 0 0 0 01745-1800 0 0 0 0 0 0 12 0 12 0 0 0 0 0 0 0 0 0 9 0 9 0 0 0 0 0 0TOTAL 0 0 0 0 0 0 47 0 47 0 0 0 0 0 0 1 0 1 36 0 36 1 0 1 0 0 0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 0.78 0.02 0.611715-1730 0.78 0.02 0.61 1730-1745 0.78 0.02 0.611745-1800 0.78 0.02 0.61
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0 0 46.65683 A 0 0 0 A 0.0% 0.0% 0.0%B 0 0 0.980375 B 0 0 0 B 0.0% 0.0% 0.0%C 35.64865 0.762514 0 C 0 0 0 C 0.0% 0.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0 0 11.66421 A 0 0 11.66421 A 0 0 11.66421 A 0 0 11.66421B 0 0 0.245094 B 0 0 0.245094 B 0 0 0.245094 B 0 0 0.245094C 8.912162 0.190629 0 C 8.912162 0.190629 0 C 8.912162 0.190629 0 C 8.912162 0.190629 0
TIME PERIOD
Junction 1: Erith RoundaboutPeak Hour: SAT (12:00-13:00)
Arrival Arrival Departure DepartureA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1200-1215 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.2 1.0 0.0 1.0 0.2 0.0 0.2 0.0 0.0 0.01215-1230 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.2 1.0 0.0 1.0 0.2 0.0 0.2 0.0 0.0 0.01230-1245 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.2 1.0 0.0 1.0 0.2 0.0 0.2 0.0 0.0 0.01245-1300 0.0 0.0 0.0 0.0 0.0 0.0 1.3 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.0 0.2 1.0 0.0 1.0 0.2 0.0 0.2 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 0.0 0.0 0.0 5.3 0.0 5.3 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 1.0 4.1 0.0 4.1 0.8 0.0 0.8 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.09 0.02 0.081215-1230 0.09 0.02 0.08 1230-1245 0.09 0.02 0.081245-1300 0.09 0.02 0.08
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 0.0 5.3 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 0.0 0.0 1.0 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 4.1 0.8 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0.0 0.0 1.3 A 0.0 0.0 1.3 A 0.0 0.0 1.3 A 0.0 0.0 1.3B 0.0 0.0 0.2 B 0.0 0.0 0.2 B 0.0 0.0 0.2 B 0.0 0.0 0.2C 1.0 0.2 0.0 C 1.0 0.2 0.0 C 1.0 0.2 0.0 C 1.0 0.2 0.0
TIME PERIOD
Junction 3: Erith RoundaboutPeak Hour: Sat (12:00-13:00)
Arrival DepartureA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1200-1215 0.0 0.0 0.0 0.0 0.0 0.0 7.0 0.0 7.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.8 0.0 8.8 0.0 0.0 0.0 0.0 0.0 0.01215-1230 0.0 0.0 0.0 0.0 0.0 0.0 7.0 0.0 7.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.8 0.0 8.8 0.0 0.0 0.0 0.0 0.0 0.01230-1245 0.0 0.0 0.0 0.0 0.0 0.0 7.0 0.0 7.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.8 0.0 8.8 0.0 0.0 0.0 0.0 0.0 0.01245-1300 0.0 0.0 0.0 0.0 0.0 0.0 7.0 0.0 7.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.8 0.0 8.8 0.0 0.0 0.0 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 0.0 0.0 0.0 28.2 0.0 28.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 35.2 0.0 35.2 0.0 0.0 0.0 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.47 0.00 0.591215-1230 0.47 0.00 0.59 1230-1245 0.47 0.00 0.591245-1300 0.47 0.00 0.59
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 0.0 28.2 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 0.0 0.0 0.0 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 35.2 0.0 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0.0 0.0 7.0 A 0.0 0.0 7.0 A 0.0 0.0 7.0 A 0.0 0.0 7.0B 0.0 0.0 0.0 B 0.0 0.0 0.0 B 0.0 0.0 0.0 B 0.0 0.0 0.0C 8.8 0.0 0.0 C 8.8 0.0 0.0 C 8.8 0.0 0.0 C 8.8 0.0 0.0
TIME PERIOD
Junction 3: Erith RoundaboutPeak Hour: SAT (12:00-13:00)
Arrival DepartureA-A A-B A-C B-A B-B B-C C-A C-B C-C
LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT1200-1215 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 0.0 0.0 0.01215-1230 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 0.0 0.0 0.01230-1245 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 0.0 0.0 0.01245-1300 0.0 0.0 0.0 0.0 0.0 0.0 1.2 0.0 1.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 0.0 1.6 0.0 0.0 0.0 0.0 0.0 0.0TOTAL 0.0 0.0 0.0 0.0 0.0 0.0 5.0 0.0 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6.3 0.0 6.3 0.0 0.0 0.0 0.0 0.0 0.0
HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 0.08 0.00 0.111215-1230 0.08 0.00 0.11 1230-1245 0.08 0.00 0.111245-1300 0.08 0.00 0.11
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 0.0 0.0 5.0 A 0.0 0.0 0.0 A 0.0% 0.0% 0.0%B 0.0 0.0 0.0 B 0.0 0.0 0.0 B 0.0% 0.0% 0.0%C 6.3 0.0 0.0 C 0.0 0.0 0.0 C 0.0% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0.0 0.0 1.2 A 0.0 0.0 1.2 A 0.0 0.0 1.2 A 0.0 0.0 1.2B 0.0 0.0 0.0 B 0.0 0.0 0.0 B 0.0 0.0 0.0 B 0.0 0.0 0.0C 1.6 0.0 0.0 C 1.6 0.0 0.0 C 1.6 0.0 0.0 C 1.6 0.0 0.0
TIME PERIOD
Arrive Depart Two-way Arrive Depart Two-way Arrive Depart Two-way Arrive Depart Two-wayPrimary
transferred trip 100% 13 11 24 45 34 79 44 55 99 52 50 102
Already on Fraser Road 20% 3 2 5 9 7 16 9 11 20 10 10 20
Residual new movements 80% 10 9 19 36 27 63 35 44 79 42 40 82
East WestDistribution 20% 80%
AM Peak (08:00-09:00) PM Peak (17:00-18:00) Saturday (12:00-13:00) Sunday (12:00-13:00)
Legend Job Title: Job No. Drawn:
Total Vehicles
Total HGV
% HGV Figure Title: Figure No. Date:
08/02/2018
Notes
Data sourced from application 14/002155/OUTM
Stomar TA, as well as additional traffic surveys
commissioned by mode in November 2017
Proposed Lidl Foodstore,
Fraser Road, Erith, Bexley J323173 SKJ
J1
0
0
%
Net Development Traffic
Weekday AM Peak Hour (08:00-09:00)
0% 0% 0% 0% 0% 0%0 8 0 0% 0 0
-20 0 0 0 0% 0
0 1
0 1 11 0 0% 15 6 -3 0 0% 1
0% 0 30% 0 0 0% 0 18 0%0% 0 0 0% 0 -5
0% 0%0 0
0% 0 13 4 -2
Bexley Road (A206 east)
Erith Quarry Site Site Access Bexley Road (A220 west)
Erith Road (A206) Fraser Road (A206)
Legend Job Title: Job No. Drawn:
Total Vehicles
Total HGV
% HGV Figure Title: Figure No. Date:
08/02/2018
Notes
Data sourced from application 14/002155/OUTM
Stomar TA, as well as additional traffic surveys
commissioned by mode in November 2017
Proposed Lidl Foodstore,
Fraser Road, Erith, Bexley J323173 SKJ
J2
0
0
%
Net Development Traffic
Weekday PM Peak Hour (17:00-18:00)
0% 0% 0% 0% 0% 0%0 28 0 0% 0 0
-60 0 1 0 0% 0
0 4
0 1 36 0 0% 50 19 -20 0 0% 5
0% 0 80% 0 0 0% 0 62 0%0% 0 0 0% 0 -43
0% 0%0 0
0% 0 47 11 -7
Bexley Road (A206 east)
Erith Quarry Site Site Access Bexley Road (A220 west)
Erith Road (A206) Fraser Road (A206)
Legend Job Title: Job No. Drawn:
Total Vehicles
Total HGV
% HGV Figure Title: Figure No. Date:
08/02/2018
Notes
Data sourced from application 14/002155/OUTM
Stomar TA, as well as additional traffic surveys
commissioned by mode in November 2017
Proposed Lidl Foodstore,
Fraser Road, Erith, Bexley J323173 SKJ
J3
0
0
%
Net Development Traffic
Saturday Peak Hour (12:00-13:00)
0% 0% 0% 0% 0% 0%0 24 0 0% 0 0
-90 0 1 0 0% 0
0 7
0 1 46 0 0% 61 27 -14 0 0% 5
0% 0 150% 0 0 0% 0 49 0%0% 0 0 0% 0 -41
0% 0%0 0
0% 0 38 12 -9
Bexley Road (A206 east)
Erith Quarry Site Site Access Bexley Road (A220 west)
Erith Road (A206) Fraser Road (A206)
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 77
Appendix K Total Traffic
Junction 1: Site AccessPeak Hour: AM (08:00-09:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 0 0 0 6 0 6 101 6 108 11 0 11 0 0 0 4 0 4 87 6 93 9 1 10 0 0 00815-0830 0 0 0 18 0 18 86 4 91 7 0 7 0 0 0 3 0 3 105 13 118 8 0 8 0 0 00830-0845 0 0 0 11 1 12 107 3 110 14 1 15 0 0 0 4 0 4 123 6 130 10 0 10 0 0 00845-0900 0 0 0 12 0 12 142 5 147 12 0 12 0 0 0 11 0 11 79 5 84 11 1 12 0 0 0TOTAL 0 0 0 45 1 46 436 19 455 43 1 44 0 0 0 20 0 20 394 31 425 38 2 40 0 0 0
HV = 0% HV = 2% HV = 4% HV = 2% HV = 0% HV = 0% HV = 7% HV = 5% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 8 1 70815-0830 7 1 8 0830-0845 8 1 90845-0900 11 1 6
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C A B C
A 0 46 455 A 0 1 19 A 0.0% 2.2% 4.2% A 0.0% 5.0% 7.2%B 44 0 20 B 1 0 0 B 2.3% 0.0% 0.0% B 0.0% 0.0% 2.3%C 425 40 0 C 31 2 0 C 7.2% 5.0% 0.0% C 4.2% 2.2% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 6 108 A 0 18 91 A 0 12 110 A 0 12 147B 11 0 4 B 7 0 3 B 15 0 4 B 12 0 11C 93 10 0 C 118 8 0 C 130 10 0 C 84 12 0
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 10 93 A 0 8 118 A 0 10 130 A 0 12 84B 4 0 11 B 3 0 7 B 4 0 15 B 11 0 12C 108 6 0 C 91 18 0 C 110 12 0 C 147 12 0
TIME PERIOD
Junction 1: Site AccessPeak Hour: PM (17:00-18:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1700-1715 0 0 0 23 0 23 70 3 73 22 0 22 0 0 0 11 0 11 137 5 142 7 0 7 0 0 01715-1730 0 0 0 23 0 23 70 2 72 20 0 20 0 0 0 7 0 7 138 2 140 10 0 10 0 0 01730-1745 0 0 0 24 0 24 107 3 110 20 0 20 0 0 0 9 1 10 128 4 132 10 0 10 0 0 01745-1800 0 0 0 18 0 18 78 2 81 23 0 23 0 0 0 7 0 7 138 3 141 13 0 13 0 0 0TOTAL 0 0 0 86 0 86 325 11 336 83 0 83 0 0 0 33 1 34 540 15 555 40 0 40 0 0 0
HV = 0% HV = 0% HV = 3% HV = 0% HV = 0% HV = 3% HV = 3% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 6 2 101715-1730 6 2 10 1730-1745 9 2 91745-1800 7 2 10
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C A B C
A 0 86 336 A 0 0 11 A 0.0% 0.0% 3.2% A 0.0% 0.0% 2.7%B 83 0 34 B 0 0 1 B 0.0% 0.0% 3.0% B 3.0% 0.0% 0.0%C 555 40 0 C 15 0 0 C 2.7% 0.0% 0.0% C 3.2% 0.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0 23 73 A 0 23 72 A 0 24 110 A 0 18 81B 22 0 11 B 20 0 7 B 20 0 10 B 23 0 7C 142 7 0 C 140 10 0 C 132 10 0 C 141 13 0
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0 7 142 A 0 10 140 A 0 10 132 A 0 13 141B 11 0 22 B 7 0 20 B 10 0 20 B 7 0 23C 73 23 0 C 72 23 0 C 110 24 0 C 81 18 0
TIME PERIOD
Junction 1: Site AccessPeak Hour: Sat (12:00-13:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1200-1215 0 0 0 26 0 26 107 2 109 30 0 30 0 0 0 18 1 19 93 3 96 22 1 23 0 0 01215-1230 0 0 0 24 0 24 101 8 109 28 1 29 0 0 0 17 0 17 93 3 96 17 0 17 0 0 01230-1245 0 0 0 23 1 24 87 2 89 27 0 27 0 0 0 21 0 21 70 2 72 18 0 18 0 0 01245-1300 0 0 0 26 0 26 77 3 81 30 1 31 0 0 0 17 0 17 99 4 103 25 0 25 0 0 0TOTAL 0 0 0 100 1 101 372 16 388 116 2 118 0 0 0 72 1 73 354 13 367 82 1 83 0 0 0
HV = 0% HV = 1% HV = 4% HV = 2% HV = 0% HV = 1% HV = 3% HV = 1% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 9 3 81215-1230 9 3 8 1230-1245 8 3 61245-1300 7 3 9
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C A B C
A 0 101 388 A 0 1 16 A 0.0% 1.0% 4.1% A 0.0% 1.2% 3.5%B 118 0 73 B 2 0 1 B 1.7% 0.0% 1.4% B 1.4% 0.0% 1.7%C 367 83 0 C 13 1 0 C 3.5% 1.2% 0.0% C 4.1% 1.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 26 109 A 0 24 109 A 0 24 89 A 0 26 81B 30 0 19 B 29 0 17 B 27 0 21 B 31 0 17C 96 23 0 C 96 17 0 C 72 18 0 C 103 25 0
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 23 96 A 0 17 96 A 0 18 72 A 0 25 103B 19 0 30 B 17 0 29 B 21 0 27 B 17 0 31C 109 26 0 C 109 24 0 C 89 24 0 C 81 26 0
TIME PERIOD
Junction 1: Site AccessPeak Hour: Sun (12:00-13:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1200-1215 0 0 0 29 0 29 113 2 115 29 0 29 0 0 0 18 1 19 95 3 99 23 1 24 0 0 01215-1230 0 0 0 27 0 27 108 8 117 27 1 28 0 0 0 17 0 17 95 3 99 18 0 18 0 0 01230-1245 0 0 0 26 1 27 102 2 104 26 0 26 0 0 0 21 0 21 73 2 75 19 0 19 0 0 01245-1300 0 0 0 29 0 29 116 3 119 29 1 30 0 0 0 17 0 17 102 4 106 26 0 26 0 0 0TOTAL 0 0 0 111 1 112 439 16 455 111 2 113 0 0 0 73 1 74 366 13 379 85 1 86 0 0 0
HV = 0% HV = 1% HV = 3% HV = 2% HV = 0% HV = 1% HV = 3% HV = 1% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 10 3 81215-1230 10 3 8 1230-1245 9 3 61245-1300 10 3 9
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C A B C
A 0 112 455 A 0 1 16 A 0.0% 0.9% 3.5% A 0.0% 1.2% 3.4%B 113 0 74 B 2 0 1 B 1.8% 0.0% 1.4% B 1.4% 0.0% 1.8%C 379 86 0 C 13 1 0 C 3.4% 1.2% 0.0% C 3.5% 0.9% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 29 115 A 0 27 117 A 0 27 104 A 0 29 119B 29 0 19 B 28 0 17 B 26 0 21 B 30 0 17C 99 24 0 C 99 18 0 C 75 19 0 C 106 26 0
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 24 99 A 0 18 99 A 0 19 75 A 0 26 106B 19 0 29 B 17 0 28 B 21 0 26 B 17 0 30C 115 29 0 C 117 27 0 C 104 27 0 C 119 29 0
TIME PERIOD
Junction 2: Bexley MiniPeak Hour: AM (08:00-09:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 0 0 0 33 1 33 96 6 101 42 0 42 0 0 0 114 7 120 70 10 81 55 6 61 0 0 00815-0830 0 0 0 34 1 35 95 6 100 35 0 35 0 0 0 135 8 142 87 12 100 96 11 107 0 0 00830-0845 0 0 0 32 1 32 111 7 118 37 0 37 0 0 0 111 7 117 72 10 83 103 12 115 0 0 00845-0900 0 0 0 32 1 32 100 6 106 29 0 29 0 0 0 111 7 117 75 10 86 71 8 79 0 0 0TOTAL 0 0 0 130 3 133 402 25 424 143 1 144 0 0 0 472 28 498 305 42 350 326 38 364 0 0 0
HV = 0% HV = 2% HV = 6% HV = 1% HV = 0% HV = 6% HV = 12% HV = 10% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 9 11 90815-0830 9 12 14 0830-0845 10 10 130845-0900 9 10 11
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C A B C
A 0 133 424 A 0 3 25 A 0.0% 2.3% 5.9% A 0.0% 10.4% 12.0%B 144 0 498 B 1 0 28 B 0.7% 0.0% 5.6% B 5.6% 0.0% 0.7%C 350 364 0 C 42 38 0 C 12.0% 10.4% 0.0% C 5.9% 2.3% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 33 101 A 0 35 100 A 0 32 118 A 0 32 106B 42 0 120 B 35 0 142 B 37 0 117 B 29 0 117C 81 61 0 C 100 107 0 C 83 115 0 C 86 79 0
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 0 61 81 A 0 107 100 A 0 115 83 A 0 79 86B 120 0 42 B 142 0 35 B 117 0 37 B 117 0 29C 101 33 0 C 100 35 0 C 118 32 0 C 106 32 0
TIME PERIOD
Junction 2: Bexley MiniPeak Hour: PM (17:00-18:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1700-1715 0 0 0 31 2 32 94 4 98 28 0 28 0 0 0 97 9 105 115 5 119 144 4 148 0 0 01715-1730 0 0 0 28 1 29 89 4 93 28 0 28 0 0 0 79 7 86 129 5 134 143 4 147 0 0 01730-1745 0 0 0 31 2 32 102 5 107 32 0 32 0 0 0 86 8 93 135 6 140 135 4 138 0 0 01745-1800 0 0 0 29 1 30 95 4 99 26 0 26 0 0 0 89 8 96 133 6 138 121 4 124 0 0 0TOTAL 0 0 0 118 6 123 380 18 397 114 0 115 0 0 0 351 32 382 511 21 530 543 16 558 0 0 0
HV = 0% HV = 5% HV = 5% HV = 0% HV = 0% HV = 8% HV = 4% HV = 3% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 9 9 181715-1730 8 8 19 1730-1745 9 8 191745-1800 9 8 17
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C A B C
A 0 123 397 A 0 6 18 A 0.0% 4.9% 4.5% A 0.0% 2.9% 4.0%B 115 0 382 B 0 0 32 B 0.0% 0.0% 8.4% B 8.4% 0.0% 0.0%C 530 558 0 C 21 16 0 C 4.0% 2.9% 0.0% C 4.5% 4.9% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0 32 98 A 0 29 93 A 0 32 107 A 0 30 99B 28 0 105 B 28 0 86 B 32 0 93 B 26 0 96C 119 148 0 C 134 147 0 C 140 138 0 C 138 124 0
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 0 148 119 A 0 147 134 A 0 138 140 A 0 124 138B 105 0 28 B 86 0 28 B 93 0 32 B 96 0 26C 98 32 0 C 93 29 0 C 107 32 0 C 99 30 0
TIME PERIOD
Junction 2: Bexley MiniPeak Hour: Sat (12:00-13:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1200-1215 0 0 0 35 0 35 109 2 111 27 1 29 0 0 0 90 5 95 91 4 95 109 7 116 0 0 01215-1230 0 0 0 43 0 43 95 7 102 29 0 29 0 0 0 104 4 108 87 3 90 134 5 139 0 0 01230-1245 0 0 0 38 0 38 81 1 82 26 0 26 0 0 0 94 6 100 68 3 71 116 4 120 0 0 01245-1300 0 0 0 42 0 42 74 5 79 26 0 26 0 0 0 108 3 111 95 2 97 128 3 131 0 0 0TOTAL 0 0 0 158 0 158 358 16 374 109 1 110 0 0 0 395 19 414 340 13 353 487 20 507 0 0 0
HV = 0% HV = 0% HV = 4% HV = 1% HV = 0% HV = 5% HV = 4% HV = 4% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 10 8 141215-1230 10 9 15 1230-1245 8 8 131245-1300 8 9 15
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C A B C
A 0 158 374 A 0 0 16 A 0.0% 0.0% 4.2% A 0.0% 4.0% 3.6%B 110 0 414 B 1 0 19 B 1.0% 0.0% 4.6% B 4.6% 0.0% 1.0%C 353 507 0 C 13 20 0 C 3.6% 4.0% 0.0% C 4.2% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 35 111 A 0 43 102 A 0 38 82 A 0 42 79B 29 0 95 B 29 0 108 B 26 0 100 B 26 0 111C 95 116 0 C 90 139 0 C 71 120 0 C 97 131 0
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 0 116 95 A 0 139 90 A 0 120 71 A 0 131 97B 95 0 29 B 108 0 29 B 100 0 26 B 111 0 26C 111 35 0 C 102 43 0 C 82 38 0 C 79 42 0
TIME PERIOD
Junction 3: Erith RoundaboutPeak Hour: AM (08:00-09:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
0800-0815 7 0 7 25 0 25 97 3 100 132 0 132 0 0 0 25 0 25 63 5 69 21 0 21 0 0 00815-0830 11 0 11 27 0 27 114 4 118 36 0 36 0 0 0 27 0 27 93 7 101 34 0 34 0 0 00830-0845 4 0 4 39 0 39 106 4 109 61 0 61 0 0 0 39 0 39 71 6 77 70 0 70 0 0 00845-0900 0 0 0 74 0 74 102 4 105 133 0 133 0 0 0 74 0 74 73 6 79 23 0 23 0 0 0TOTAL 22 0 22 165 0 165 419 15 433 362 0 362 0 0 0 166 0 166 300 24 325 148 0 148 0 0 0
HV = 0% HV = 0% HV = 3% HV = 0% HV = 0% HV = 0% HV = 7% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C0800-0815 9 10 60815-0830 10 4 9 0830-0845 10 7 100845-0900 12 14 7
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 22 165 433 A 0 0 15 A 0.0% 0.0% 3.5%B 362 0 166 B 0 0 0 B 0.0% 0.0% 0.0%C 325 148 0 C 24 0 0 C 7.4% 0.0% 0.0%
0800-0815 0815-0830 0830-0845 0845-0900A B C A B C A B C A B C
A 7 25 100 A 11 27 118 A 4 39 109 A 0 74 105B 132 0 25 B 36 0 27 B 61 0 39 B 133 0 74C 69 21 0 C 101 34 0 C 77 70 0 C 79 23 0
TIME PERIOD
Junction 3: Erith RoundaboutPeak Hour: PM (17:00-18:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1700-1715 4 0 4 36 0 36 97 5 101 20 0 20 0 0 0 16 0 16 135 4 139 26 0 26 0 0 01715-1730 6 0 6 36 0 36 91 4 95 20 0 20 0 0 0 16 0 16 151 5 156 26 0 26 0 0 01730-1745 2 0 2 36 0 36 104 5 109 20 0 20 0 0 0 16 0 16 162 5 168 26 0 26 0 0 01745-1800 0 0 0 36 0 36 96 4 101 20 0 20 0 0 0 16 0 16 154 5 159 26 0 26 0 0 0TOTAL 13 0 13 142 0 142 388 18 406 80 0 80 0 0 0 65 0 65 603 19 622 105 0 105 0 0 0
HV = 0% HV = 0% HV = 4% HV = 0% HV = 0% HV = 0% HV = 3% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1700-1715 9 2 111715-1730 9 2 12 1730-1745 10 2 131745-1800 9 2 12
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 13 142 406 A 0 0 18 A 0.0% 0.0% 4.4%B 80 0 65 B 0 0 0 B 0.0% 0.0% 0.0%C 622 105 0 C 19 0 0 C 3.1% 0.0% 0.0%
1700-1715 1715-1730 1730-1745 1745-1800A B C A B C A B C A B C
A 4 36 101 A 6 36 95 A 2 36 109 A 0 36 101B 20 0 16 B 20 0 16 B 20 0 16 B 20 0 16C 139 26 0 C 156 26 0 C 168 26 0 C 159 26 0
TIME PERIOD
Junction 3: Erith RoundaboutPeak Hour: Sat (12:00-13:00)
A-A A-B A-C B-A B-B B-C C-A C-B C-CLV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT LV HV TOT
1200-1215 2 0 2 18 0 18 125 2 127 10 0 10 0 0 0 8 0 8 109 2 111 14 0 14 0 0 01215-1230 3 0 3 18 0 18 128 7 136 10 0 10 0 0 0 8 0 8 105 4 109 14 0 14 0 0 01230-1245 1 0 1 18 0 18 102 3 105 10 0 10 0 0 0 8 0 8 89 3 92 14 0 14 0 0 01245-1300 0 0 0 18 0 18 103 4 107 10 0 10 0 0 0 8 0 8 117 5 123 14 0 14 0 0 0TOTAL 7 0 7 73 0 73 458 17 475 41 0 41 0 0 0 34 0 34 420 15 435 54 0 54 0 0 0
HV = 0% HV = 0% HV = 4% HV = 0% HV = 0% HV = 0% HV = 3% HV = 0% HV = 0%
Vehicles per MinuteTIME FROM A FROM B FROM C1200-1215 10 1 81215-1230 10 1 8 1230-1245 8 1 71245-1300 8 1 9
Total Vehicles Number of HGV's Proportion of HGV's for HourA B C A B C A B C
A 7 73 475 A 0 0 17 A 0.0% 0.0% 3.6%B 41 0 34 B 0 0 0 B 0.0% 0.0% 0.0%C 435 54 0 C 15 0 0 C 3.4% 0.0% 0.0%
1200-1215 1215-1230 1230-1245 1245-1300A B C A B C A B C A B C
A 2 18 127 A 3 18 136 A 1 18 105 A 0 18 107B 10 0 8 B 10 0 8 B 10 0 8 B 10 0 8C 111 14 0 C 109 14 0 C 92 14 0 C 123 14 0
TIME PERIOD
Legend Job Title: Job No. Drawn:
Total Vehicles
Total HGV
% HGV Figure Title: Figure No. Date:
12% 10%42 38
3% 15 433 350 3646% 25 424
0% 0 22 2% 1 46 2%0% 0 165 4% 19 455
3 133
362 166 325 24 7% 44 20 425 31 7% 144 4980 0 148 0 0% 1
6%0 40 2 5% 1 28
0% 0% 2% 0% 1%
0
0
%
Total Traffic
Weekday AM Peak Hour (08:00-09:00)09/02/2018
Notes
Data sourced from application 14/002155/OUTM
Stomar TA, as well as additional traffic surveys
commissioned by mode in November 2017
Proposed Lidl Foodstore,
Fraser Road, Erith, Bexley J323173 SKJ
K1
Bexley Road (A206 east)
Erith Quarry Site Site Access Bexley Road (A220 west)
Erith Road (A206) Fraser Road (A206)
Legend Job Title: Job No. Drawn:
Total Vehicles
Total HGV
% HGV Figure Title: Figure No. Date:
4% 3%21 16
4% 18 406 530 5585% 18 397
0% 0 13 0% 0 86 5%0% 0 142 3% 11 336
6 123
80 65 622 19 3% 83 34 555 15 3% 115 3820 0 105 0 0% 0
8%1 40 0 0% 0 32
0% 0% 0% 3% 0%
0
0
%
Total Traffic
Weekday PM Peak Hour (17:00-18:00)09/02/2018
Notes
Data sourced from application 14/002155/OUTM
Stomar TA, as well as additional traffic surveys
commissioned by mode in November 2017
Proposed Lidl Foodstore,
Fraser Road, Erith, Bexley J323173 SKJ
K2
Bexley Road (A206 east)
Erith Quarry Site Site Access Bexley Road (A220 west)
Erith Road (A206) Fraser Road (A206)
Legend Job Title: Job No. Drawn:
Total Vehicles
Total HGV
% HGV Figure Title: Figure No. Date:
4% 4%13 20
4% 17 475 353 5074% 16 374
0% 0 7 1% 1 101 0%0% 0 73 4% 16 388
0 158
41 34 435 15 3% 118 73 367 13 3% 110 4140 0 54 0 0% 2
5%1 83 1 1% 1 19
0% 0% 2% 1% 1%
0
0
%
Total Traffic
Saturday Peak Hour (12:00-13:00)09/02/2018
Notes
Data sourced from application 14/002155/OUTM
Stomar TA, as well as additional traffic surveys
commissioned by mode in November 2017
Proposed Lidl Foodstore,
Fraser Road, Erith, Bexley J323173 SKJ
K3
Bexley Road (A206 east)
Erith Quarry Site Site Access Bexley Road (A220 west)
Erith Road (A206) Fraser Road (A206)
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 78
Appendix L Junctions Geometries
Job Title Erith LidlJob Number J323173Location Erith LidlDate 08/02/2018
Junction 1 Fraser Road/Bexley mini-roundaboutCurrent Layout
Bexeley Road (A206) EFraser Road (A206)
Bexley Road (A220) W
Sensitvity (Stomor Scheme)
Bexeley Road (A206) EFraser Road (A206)
Bexley Road (A220) W
Junction 2 Roundabout access for Erith Quarry proposals
Erith Road (A206)Erith Quarry Site Access
Fraser Road (A206)
Junction 3 Madford Trading Park/Fraser Road ghost island priority junction
AverageMajor 8.86Minor 4.78
VisibilityMajor Arm 134
Minor Arm (to the left) 126 2.36Minor Arm (to the right) 21 16.1
W5
21.53.36
Entry corner kerb line distance radius24.61.14
18.21
21
Entry Angle (PHI)
Entry corner kerb line distance 32.81.3227.6
6.1 8.6 10.4 28 21.5
0m 5m 10m 15m 20m10.7 4.2 3 3 34.27 4.53 4.37 4.55 -W1 W2 W3 W4
Approach Half-Width Minimum Apprpach Width Width Entry Width Effective Flare Length Distance to next arm
4.03 22.5 28
Approach Half-Width (v) Entry Width (e ) Effective Flare Length (l ) Entry Radius (r ) Inscribed Circle Diamter (ICD)
Width of Carriageway (v)
4.824.2
5.34
7.35.066.08
0.842.94
2
4.16 6.18
17.91.1420.8
4.824.2
5.34
4.76 6.07 2.2 16.8 28
Ghost Right Turn Lanewidth of ghost right turn
length of ghost right turn lane
3.1 3.1 6.06 17.65 20.96.3 6.3 6.5 0.15 9.44 4 6.8 2.98 28.8
Approach Half-Width Minimum Apprpach Width Width Entry Width Effective Flare Length Distance to next arm
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 79
Appendix M Arcady and Picady Outputs
Filename: 180205_Erith Quarry Roundabout.j9 Path: C:\Users\Mode\Dropbox (mode)\Project\Reading\1. Projects\J323173 Lidl Erith\4. Data\Junction Models\February 2018 Report generation date: 05/02/2018 14:54:56
»2022 Base, AM »2022 Base, PM »2022 Base, SAT »2022 Base + Dev, AM »2022 Base + Dev, PM »2022 Base + Dev, SAT
Summary of junction performance
Junctions 9ARCADY 9 - Roundabout Module
Version: 9.0.2.5947 © Copyright TRL Limited, 2017
For sales and distribution information, program advice and maintenance, contact TRL: +44 (0)1344 770558 [email protected] www.trlsoftware.co.uk
The users of this computer program for the solution of an engineering problem are in no way relieved of their responsibility for the correctness of the solution
AM PM SAT Queue (Veh) Delay (s) RFC LOS Queue (Veh) Delay (s) RFC LOS Queue (Veh) Delay (s) RFC LOS
2022 BaseA - Fraser Road (A206) 0.1 2.80 0.10 A 0.1 2.92 0.13 A 0.1 2.78 0.09 A
B - Erith Quarry Site 0.2 3.34 0.16 A 0.0 3.00 0.03 A 0.0 2.89 0.01 A
C - Erith Road (A206) 0.1 2.98 0.13 A 0.1 2.83 0.10 A 0.1 2.83 0.10 A
2022 Base + DevA - Fraser Road (A206) 0.1 2.89 0.10 A 0.2 2.94 0.14 A 0.1 2.79 0.10 A
B - Erith Quarry Site 0.2 3.35 0.16 A 0.0 3.01 0.03 A 0.0 2.90 0.01 A
C - Erith Road (A206) 0.1 2.96 0.13 A 0.1 2.84 0.10 A 0.1 2.86 0.11 A
Values shown are the highest values encountered over all time segments. Delay is the maximum value of average delay per arriving vehicle.
File summary
File Description Title (untitled)
Location
Site number
Date 22/01/2018
Version
Status (new file)
Identifier
Client
Jobnumber
Enumerator DESKTOP-499K8KJ\Mode
Description
Generated on 05/02/2018 14:55:03 using Junctions 9 (9.0.2.5947)
1
Units
Analysis Options
Demand Set Summary
Analysis Set Details
Distance units Speed units Traffic units input Traffic units results Flow units Average delay units Total delay units Rate of delay unitsm kph Veh Veh perHour s -Min perMin
Calculate Queue Percentiles Calculate residual capacity RFC Threshold Average Delay threshold (s) Queue threshold (PCU) 0.85 36.00 20.00
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D1 2022 Base AM DIRECT 07:45 09:15 90 15
D2 2022 Base PM DIRECT 16:45 18:15 90 15
D3 2022 Base SAT DIRECT 11:45 13:15 90 15
D4 2022 Base + Dev AM DIRECT 07:45 09:15 90 15
D5 2022 Base + Dev PM DIRECT 16:45 18:15 90 15
D6 2022 Base + Dev SAT DIRECT 11:45 13:15 90 15
ID Network flow scaling factor (%)
A1 100.000
Generated on 05/02/2018 14:55:03 using Junctions 9 (9.0.2.5947)
2
2022 Base, AM Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Arms
Arms
Roundabout Geometry
Slope / Intercept / Capacity
Roundabout Slope and Intercept used in model
The slope and intercept shown above include any corrections and adjustments.
Traffic Demand
Demand Set Details
Junction Name Junction Type Arm order Junction Delay (s) Junction LOS
1 Erith Quarry R'bt Standard Roundabout A, B, C 3.06 A
Driving side LightingLeft Normal/unknown
Arm Name Description
A Fraser Road (A206)
B Erith Quarry Site
C Erith Road (A206)
Arm V - Approach road half-width (m)
E - Entry width (m)
l' - Effective flare length (m)
R - Entry radius (m)
D - Inscribed circle diameter (m)
PHI - Conflict (entry) angle (deg)
Exit only
A - Fraser Road (A206) 4.80 6.00 1.5 18.6 28.0 43.0
B - Erith Quarry Site 3.30 6.00 11.0 10.5 28.0 43.0
C - Erith Road (A206) 3.60 5.60 6.8 29.8 28.0 21.0
Arm Final slope Final intercept (PCU/hr)
A - Fraser Road (A206) 0.600 1481
B - Erith Quarry Site 0.556 1328
C - Erith Road (A206) 0.627 1469
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D1 2022 Base AM DIRECT 07:45 09:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Generated on 05/02/2018 14:55:03 using Junctions 9 (9.0.2.5947)
3
Demand overview (Traffic)
Origin-Destination Data
Vehicle Mix
Arm Linked arm Use O-D data Scaling Factor (%)
A - Fraser Road (A206) ü 100.000
B - Erith Quarry Site ü 100.000
C - Erith Road (A206) ü 100.000
07:45 - 08:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 21 66
B - Erith Quarry Site 25 0 132
C - Erith Road (A206) 97 25 7
08:00 - 08:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 21 66
B - Erith Quarry Site 25 0 132
C - Erith Road (A206) 97 25 7
08:15 - 08:30
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 34 98
B - Erith Quarry Site 27 0 36
C - Erith Road (A206) 115 27 11
08:30 - 08:45
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 70 74
B - Erith Quarry Site 39 0 61
C - Erith Road (A206) 106 39 4
08:45 - 09:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 23 76
B - Erith Quarry Site 74 0 133
C - Erith Road (A206) 102 74 0
09:00 - 09:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 23 76
B - Erith Quarry Site 74 0 133
C - Erith Road (A206) 102 74 0
Heavy Vehicle Percentages To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 0 3
B - Erith Quarry Site 0 0 0
C - Erith Road (A206) 5 0 0
Generated on 05/02/2018 14:55:03 using Junctions 9 (9.0.2.5947)
4
Results
Results Summary for whole modelled period
Main Results for each time segment
07:45 - 08:00
08:00 - 08:15
08:15 - 08:30
08:30 - 08:45
08:45 - 09:00
09:00 - 09:15
Arm Max RFC Max delay (s) Max Queue (Veh) Max LOS
A - Fraser Road (A206) 0.10 2.80 0.1 A
B - Erith Quarry Site 0.16 3.34 0.2 A
C - Erith Road (A206) 0.13 2.98 0.1 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 87 32 1427 0.061 87 0.1 2.686 A
B - Erith Quarry Site 157 73 1286 0.122 156 0.1 3.184 A
C - Erith Road (A206) 129 25 1401 0.092 129 0.1 2.829 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 87 32 1427 0.061 87 0.1 2.686 A
B - Erith Quarry Site 157 73 1286 0.122 157 0.1 3.187 A
C - Erith Road (A206) 129 25 1401 0.092 129 0.1 2.829 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 132 38 1424 0.093 132 0.1 2.785 A
B - Erith Quarry Site 63 109 1266 0.050 63 0.1 2.996 A
C - Erith Road (A206) 153 27 1400 0.109 153 0.1 2.886 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 144 43 1431 0.101 144 0.1 2.796 A
B - Erith Quarry Site 100 78 1283 0.078 100 0.1 3.042 A
C - Erith Road (A206) 149 39 1395 0.107 149 0.1 2.888 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 99 74 1402 0.071 99 0.1 2.763 A
B - Erith Quarry Site 207 76 1284 0.161 207 0.2 3.338 A
C - Erith Road (A206) 176 74 1383 0.127 176 0.1 2.982 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 99 74 1402 0.071 99 0.1 2.762 A
B - Erith Quarry Site 207 76 1284 0.161 207 0.2 3.341 A
C - Erith Road (A206) 176 74 1383 0.127 176 0.1 2.982 A
Generated on 05/02/2018 14:55:03 using Junctions 9 (9.0.2.5947)
5
2022 Base, PM Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
Junction Name Junction Type Arm order Junction Delay (s) Junction LOS
1 Erith Quarry R'bt Standard Roundabout A, B, C 2.89 A
Driving side LightingLeft Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D2 2022 Base PM DIRECT 16:45 18:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Arm Linked arm Use O-D data Scaling Factor (%)
A - Fraser Road (A206) ü 100.000
B - Erith Quarry Site ü 100.000
C - Erith Road (A206) ü 100.000
16:45 - 17:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 26 130
B - Erith Quarry Site 16 0 20
C - Erith Road (A206) 90 36 4
17:00 - 17:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 26 130
B - Erith Quarry Site 16 0 20
C - Erith Road (A206) 90 36 4
17:15 - 17:30
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 26 147
B - Erith Quarry Site 16 0 20
C - Erith Road (A206) 83 36 6
Generated on 05/02/2018 14:55:03 using Junctions 9 (9.0.2.5947)
6
Vehicle Mix
Results
Results Summary for whole modelled period
Main Results for each time segment
16:45 - 17:00
17:30 - 17:45
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 26 159
B - Erith Quarry Site 16 0 20
C - Erith Road (A206) 97 36 2
17:45 - 18:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 26 150
B - Erith Quarry Site 16 0 20
C - Erith Road (A206) 89 36 0
18:00 - 18:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 26 150
B - Erith Quarry Site 16 0 20
C - Erith Road (A206) 89 36 0
Heavy Vehicle Percentages To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 0 3
B - Erith Quarry Site 0 0 0
C - Erith Road (A206) 5 0 0
Arm Max RFC Max delay (s) Max Queue (Veh) Max LOS
A - Fraser Road (A206) 0.13 2.92 0.1 A
B - Erith Quarry Site 0.03 3.00 0.0 A
C - Erith Road (A206) 0.10 2.83 0.1 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 156 40 1419 0.110 156 0.1 2.850 A
B - Erith Quarry Site 36 134 1251 0.029 36 0.0 2.961 A
C - Erith Road (A206) 130 16 1411 0.092 130 0.1 2.810 A
Generated on 05/02/2018 14:55:03 using Junctions 9 (9.0.2.5947)
7
17:00 - 17:15
17:15 - 17:30
17:30 - 17:45
17:45 - 18:00
18:00 - 18:15
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 156 40 1419 0.110 156 0.1 2.850 A
B - Erith Quarry Site 36 134 1251 0.029 36 0.0 2.962 A
C - Erith Road (A206) 130 16 1410 0.092 130 0.1 2.810 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 173 42 1417 0.122 173 0.1 2.893 A
B - Erith Quarry Site 36 153 1240 0.029 36 0.0 2.988 A
C - Erith Road (A206) 125 16 1412 0.089 125 0.1 2.795 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 185 38 1419 0.130 185 0.1 2.917 A
B - Erith Quarry Site 36 161 1236 0.029 36 0.0 3.000 A
C - Erith Road (A206) 135 16 1409 0.096 135 0.1 2.825 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 176 36 1420 0.124 176 0.1 2.895 A
B - Erith Quarry Site 36 150 1242 0.029 36 0.0 2.984 A
C - Erith Road (A206) 125 16 1409 0.089 125 0.1 2.805 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 176 36 1420 0.124 176 0.1 2.894 A
B - Erith Quarry Site 36 150 1242 0.029 36 0.0 2.987 A
C - Erith Road (A206) 125 16 1409 0.089 125 0.1 2.804 A
Generated on 05/02/2018 14:55:03 using Junctions 9 (9.0.2.5947)
8
2022 Base, SAT Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
Junction Name Junction Type Arm order Junction Delay (s) Junction LOS
1 Erith Quarry R'bt Standard Roundabout A, B, C 2.81 A
Driving side LightingLeft Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D3 2022 Base SAT DIRECT 11:45 13:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Arm Linked arm Use O-D data Scaling Factor (%)
A - Fraser Road (A206) ü 100.000
B - Erith Quarry Site ü 100.000
C - Erith Road (A206) ü 100.000
11:45 - 12:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 13 100
B - Erith Quarry Site 8 0 10
C - Erith Road (A206) 118 18 2
12:00 - 12:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 13 100
B - Erith Quarry Site 8 0 10
C - Erith Road (A206) 118 18 2
12:15 - 12:30
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 13 98
B - Erith Quarry Site 8 0 10
C - Erith Road (A206) 126 18 3
Demand (Veh/hr)
Generated on 05/02/2018 14:55:03 using Junctions 9 (9.0.2.5947)
9
Vehicle Mix
Results
Results Summary for whole modelled period
Main Results for each time segment
11:45 - 12:00
12:30 - 12:45
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 13 81
B - Erith Quarry Site 8 0 10
C - Erith Road (A206) 95 18 1
12:45 - 13:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 13 111
B - Erith Quarry Site 8 0 10
C - Erith Road (A206) 98 18 0
13:00 - 13:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 13 111
B - Erith Quarry Site 8 0 10
C - Erith Road (A206) 98 18 0
Heavy Vehicle Percentages To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 0 4
B - Erith Quarry Site 0 0 0
C - Erith Road (A206) 4 0 0
Arm Max RFC Max delay (s) Max Queue (Veh) Max LOS
A - Fraser Road (A206) 0.09 2.78 0.1 A
B - Erith Quarry Site 0.01 2.89 0.0 A
C - Erith Road (A206) 0.10 2.83 0.1 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 113 20 1418 0.080 113 0.1 2.757 A
B - Erith Quarry Site 18 102 1269 0.014 18 0.0 2.876 A
C - Erith Road (A206) 138 8 1417 0.097 138 0.1 2.813 A
Generated on 05/02/2018 14:55:03 using Junctions 9 (9.0.2.5947)
10
12:00 - 12:15
12:15 - 12:30
12:30 - 12:45
12:45 - 13:00
13:00 - 13:15
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 113 20 1418 0.080 113 0.1 2.757 A
B - Erith Quarry Site 18 102 1269 0.014 18 0.0 2.877 A
C - Erith Road (A206) 138 8 1417 0.097 138 0.1 2.813 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 111 21 1418 0.078 111 0.1 2.756 A
B - Erith Quarry Site 18 101 1270 0.014 18 0.0 2.875 A
C - Erith Road (A206) 147 8 1417 0.104 147 0.1 2.834 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 94 19 1420 0.066 94 0.1 2.716 A
B - Erith Quarry Site 18 82 1280 0.014 18 0.0 2.853 A
C - Erith Road (A206) 114 8 1418 0.080 114 0.1 2.760 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 124 18 1419 0.087 124 0.1 2.779 A
B - Erith Quarry Site 18 111 1264 0.014 18 0.0 2.889 A
C - Erith Road (A206) 116 8 1418 0.082 116 0.1 2.765 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 124 18 1419 0.087 124 0.1 2.779 A
B - Erith Quarry Site 18 111 1264 0.014 18 0.0 2.889 A
C - Erith Road (A206) 116 8 1418 0.082 116 0.1 2.765 A
Generated on 05/02/2018 14:55:03 using Junctions 9 (9.0.2.5947)
11
2022 Base + Dev, AM Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
Junction Name Junction Type Arm order Junction Delay (s) Junction LOS
1 Erith Quarry R'bt Standard Roundabout A, B, C 3.08 A
Driving side LightingLeft Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D4 2022 Base + Dev AM DIRECT 07:45 09:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Arm Linked arm Use O-D data Scaling Factor (%)
A - Fraser Road (A206) ü 100.000
B - Erith Quarry Site ü 100.000
C - Erith Road (A206) ü 100.000
07:45 - 08:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 21 69
B - Erith Quarry Site 25 0 132
C - Erith Road (A206) 100 25 7
08:00 - 08:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 21 69
B - Erith Quarry Site 25 0 132
C - Erith Road (A206) 100 25 7
08:15 - 08:30
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 34 101
B - Erith Quarry Site 27 0 36
C - Erith Road (A206) 118 27 11
Generated on 05/02/2018 14:55:03 using Junctions 9 (9.0.2.5947)
12
Vehicle Mix
Results
Results Summary for whole modelled period
Main Results for each time segment
07:45 - 08:00
08:30 - 08:45
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 70 77
B - Erith Quarry Site 39 0 61
C - Erith Road (A206) 109 39 4
08:45 - 09:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 23 79
B - Erith Quarry Site 74 0 133
C - Erith Road (A206) 105 74 0
09:00 - 09:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 23 79
B - Erith Quarry Site 74 0 133
C - Erith Road (A206) 105 74 0
Heavy Vehicle Percentages To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 0 7
B - Erith Quarry Site 0 0 0
C - Erith Road (A206) 4 0 0
Arm Max RFC Max delay (s) Max Queue (Veh) Max LOS
A - Fraser Road (A206) 0.10 2.89 0.1 A
B - Erith Quarry Site 0.16 3.35 0.2 A
C - Erith Road (A206) 0.13 2.96 0.1 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 90 32 1383 0.065 90 0.1 2.783 A
B - Erith Quarry Site 157 76 1283 0.122 156 0.1 3.194 A
C - Erith Road (A206) 132 25 1416 0.093 132 0.1 2.802 A
Generated on 05/02/2018 14:55:03 using Junctions 9 (9.0.2.5947)
13
08:00 - 08:15
08:15 - 08:30
08:30 - 08:45
08:45 - 09:00
09:00 - 09:15
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 90 32 1383 0.065 90 0.1 2.783 A
B - Erith Quarry Site 157 76 1283 0.122 157 0.1 3.197 A
C - Erith Road (A206) 132 25 1416 0.093 132 0.1 2.802 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 135 38 1381 0.098 135 0.1 2.887 A
B - Erith Quarry Site 63 112 1262 0.050 63 0.1 3.007 A
C - Erith Road (A206) 156 27 1415 0.110 156 0.1 2.858 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 147 43 1400 0.105 147 0.1 2.871 A
B - Erith Quarry Site 100 81 1280 0.078 100 0.1 3.051 A
C - Erith Road (A206) 152 39 1410 0.108 152 0.1 2.864 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 102 74 1359 0.075 102 0.1 2.867 A
B - Erith Quarry Site 207 79 1281 0.162 207 0.2 3.349 A
C - Erith Road (A206) 179 74 1394 0.128 179 0.1 2.961 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 102 74 1358 0.075 102 0.1 2.867 A
B - Erith Quarry Site 207 79 1281 0.162 207 0.2 3.352 A
C - Erith Road (A206) 179 74 1394 0.128 179 0.1 2.961 A
Generated on 05/02/2018 14:55:03 using Junctions 9 (9.0.2.5947)
14
2022 Base + Dev, PM Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
Junction Name Junction Type Arm order Junction Delay (s) Junction LOS
1 Erith Quarry R'bt Standard Roundabout A, B, C 2.91 A
Driving side LightingLeft Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D5 2022 Base + Dev PM DIRECT 16:45 18:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Arm Linked arm Use O-D data Scaling Factor (%)
A - Fraser Road (A206) ü 100.000
B - Erith Quarry Site ü 100.000
C - Erith Road (A206) ü 100.000
16:45 - 17:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 26 139
B - Erith Quarry Site 16 0 20
C - Erith Road (A206) 101 36 4
17:00 - 17:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 26 139
B - Erith Quarry Site 16 0 20
C - Erith Road (A206) 101 36 4
17:15 - 17:30
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 26 156
B - Erith Quarry Site 16 0 20
C - Erith Road (A206) 95 36 6
Generated on 05/02/2018 14:55:03 using Junctions 9 (9.0.2.5947)
15
Vehicle Mix
Results
Results Summary for whole modelled period
Main Results for each time segment
16:45 - 17:00
17:30 - 17:45
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 26 168
B - Erith Quarry Site 16 0 20
C - Erith Road (A206) 109 36 2
17:45 - 18:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 26 159
B - Erith Quarry Site 16 0 20
C - Erith Road (A206) 101 36 0
18:00 - 18:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 26 159
B - Erith Quarry Site 16 0 20
C - Erith Road (A206) 101 36 0
Heavy Vehicle Percentages To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 0 3
B - Erith Quarry Site 0 0 0
C - Erith Road (A206) 4 0 0
Arm Max RFC Max delay (s) Max Queue (Veh) Max LOS
A - Fraser Road (A206) 0.14 2.94 0.2 A
B - Erith Quarry Site 0.03 3.01 0.0 A
C - Erith Road (A206) 0.10 2.84 0.1 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 165 40 1418 0.116 164 0.1 2.869 A
B - Erith Quarry Site 36 143 1246 0.029 36 0.0 2.974 A
C - Erith Road (A206) 141 16 1415 0.100 141 0.1 2.825 A
Generated on 05/02/2018 14:55:03 using Junctions 9 (9.0.2.5947)
16
17:00 - 17:15
17:15 - 17:30
17:30 - 17:45
17:45 - 18:00
18:00 - 18:15
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 165 40 1418 0.116 165 0.1 2.871 A
B - Erith Quarry Site 36 143 1246 0.029 36 0.0 2.974 A
C - Erith Road (A206) 141 16 1415 0.100 141 0.1 2.825 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 182 42 1417 0.128 182 0.1 2.915 A
B - Erith Quarry Site 36 162 1235 0.029 36 0.0 3.001 A
C - Erith Road (A206) 137 16 1416 0.097 137 0.1 2.813 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 194 38 1418 0.137 194 0.2 2.939 A
B - Erith Quarry Site 36 170 1230 0.029 36 0.0 3.013 A
C - Erith Road (A206) 147 16 1413 0.104 147 0.1 2.842 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 185 36 1420 0.130 185 0.2 2.916 A
B - Erith Quarry Site 36 159 1237 0.029 36 0.0 2.997 A
C - Erith Road (A206) 137 16 1413 0.097 137 0.1 2.819 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 185 36 1420 0.130 185 0.2 2.914 A
B - Erith Quarry Site 36 159 1237 0.029 36 0.0 2.997 A
C - Erith Road (A206) 137 16 1413 0.097 137 0.1 2.821 A
Generated on 05/02/2018 14:55:03 using Junctions 9 (9.0.2.5947)
17
2022 Base + Dev, SAT Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
Junction Name Junction Type Arm order Junction Delay (s) Junction LOS
1 Erith Quarry R'bt Standard Roundabout A, B, C 2.83 A
Driving side LightingLeft Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D6 2022 Base + Dev SAT DIRECT 11:45 13:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Arm Linked arm Use O-D data Scaling Factor (%)
A - Fraser Road (A206) ü 100.000
B - Erith Quarry Site ü 100.000
C - Erith Road (A206) ü 100.000
11:45 - 12:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 14 111
B - Erith Quarry Site 8 0 10
C - Erith Road (A206) 127 18 2
12:00 - 12:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 14 111
B - Erith Quarry Site 8 0 10
C - Erith Road (A206) 127 18 2
12:15 - 12:30
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 14 109
B - Erith Quarry Site 8 0 10
C - Erith Road (A206) 136 18 3
Generated on 05/02/2018 14:55:03 using Junctions 9 (9.0.2.5947)
18
Vehicle Mix
Results
Results Summary for whole modelled period
Main Results for each time segment
11:45 - 12:00
12:30 - 12:45
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 14 92
B - Erith Quarry Site 8 0 10
C - Erith Road (A206) 105 18 1
12:45 - 13:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 14 123
B - Erith Quarry Site 8 0 10
C - Erith Road (A206) 107 18 0
13:00 - 13:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 14 123
B - Erith Quarry Site 8 0 10
C - Erith Road (A206) 107 18 0
Heavy Vehicle Percentages To
From
A - Fraser Road (A206) B - Erith Quarry Site C - Erith Road (A206)
A - Fraser Road (A206) 0 0 3
B - Erith Quarry Site 0 0 0
C - Erith Road (A206) 4 0 0
Arm Max RFC Max delay (s) Max Queue (Veh) Max LOS
A - Fraser Road (A206) 0.10 2.79 0.1 A
B - Erith Quarry Site 0.01 2.90 0.0 A
C - Erith Road (A206) 0.11 2.86 0.1 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 125 20 1426 0.088 125 0.1 2.767 A
B - Erith Quarry Site 18 113 1263 0.014 18 0.0 2.890 A
C - Erith Road (A206) 147 8 1417 0.104 147 0.1 2.834 A
Generated on 05/02/2018 14:55:03 using Junctions 9 (9.0.2.5947)
19
12:00 - 12:15
12:15 - 12:30
12:30 - 12:45
12:45 - 13:00
13:00 - 13:15
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 125 20 1426 0.088 125 0.1 2.767 A
B - Erith Quarry Site 18 113 1263 0.014 18 0.0 2.891 A
C - Erith Road (A206) 147 8 1417 0.104 147 0.1 2.834 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 123 21 1425 0.086 123 0.1 2.766 A
B - Erith Quarry Site 18 112 1264 0.014 18 0.0 2.891 A
C - Erith Road (A206) 157 8 1416 0.111 157 0.1 2.857 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 106 19 1427 0.074 106 0.1 2.724 A
B - Erith Quarry Site 18 93 1274 0.014 18 0.0 2.864 A
C - Erith Road (A206) 124 8 1418 0.087 124 0.1 2.782 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 137 18 1426 0.096 137 0.1 2.791 A
B - Erith Quarry Site 18 123 1257 0.014 18 0.0 2.904 A
C - Erith Road (A206) 125 8 1417 0.088 125 0.1 2.785 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Fraser Road (A206) 137 18 1426 0.096 137 0.1 2.791 A
B - Erith Quarry Site 18 123 1257 0.014 18 0.0 2.904 A
C - Erith Road (A206) 125 8 1417 0.088 125 0.1 2.785 A
Generated on 05/02/2018 14:55:03 using Junctions 9 (9.0.2.5947)
20
Filename: 180205_Fraser Road Bexley Road Mini Roundabout.j9 Path: C:\Users\Mode\Dropbox (mode)\Project\Reading\1. Projects\J323173 Lidl Erith\4. Data\Junction Models\February 2018 Report generation date: 05/02/2018 15:02:57
»2022 Base, AM »2022 Base, PM »2022 Base, SAT »2022 Base + Dev, AM »2022 Base + Dev, PM »2022 Base + Dev, SAT
Summary of junction performance
Junctions 9ARCADY 9 - Roundabout Module
Version: 9.0.2.5947 © Copyright TRL Limited, 2017
For sales and distribution information, program advice and maintenance, contact TRL: +44 (0)1344 770558 [email protected] www.trlsoftware.co.uk
The users of this computer program for the solution of an engineering problem are in no way relieved of their responsibility for the correctness of the solution
AM PM SAT Queue (Veh) Delay (s) RFC LOS Queue (Veh) Delay (s) RFC LOS Queue (Veh) Delay (s) RFC LOS
2022 BaseA - Bexley Road (A206 east) 0.2 3.13 0.15 A 0.2 3.06 0.19 A 0.2 2.97 0.16 A
B - Bexley Road (A220 west) 0.3 5.52 0.21 A 0.2 5.33 0.16 A 0.2 5.10 0.16 A
C - Erith Road (A206) 0.2 3.95 0.14 A 0.1 3.80 0.13 A 0.1 3.78 0.13 A
2022 Base + DevA - Bexley Road (A206 east) 0.2 3.13 0.15 A 0.2 3.06 0.19 A 0.2 2.97 0.16 A
B - Bexley Road (A220 west) 0.3 5.52 0.21 A 0.2 5.33 0.16 A 0.2 5.11 0.16 A
C - Erith Road (A206) 0.2 3.95 0.14 A 0.1 3.81 0.13 A 0.2 3.78 0.13 A
Values shown are the highest values encountered over all time segments. Delay is the maximum value of average delay per arriving vehicle.
File summary
File Description Title (untitled)
Location
Site number
Date 23/01/2018
Version
Status (new file)
Identifier
Client
Jobnumber
Enumerator DESKTOP-499K8KJ\Mode
Description
Generated on 05/02/2018 15:03:06 using Junctions 9 (9.0.2.5947)
1
Units
Analysis Options
Demand Set Summary
Analysis Set Details
Distance units Speed units Traffic units input Traffic units results Flow units Average delay units Total delay units Rate of delay unitsm kph Veh Veh perHour s -Min perMin
Mini-roundabout model Calculate Queue Percentiles Calculate residual capacity RFC Threshold Average Delay threshold (s) Queue threshold (PCU)JUNCTIONS 9 0.85 36.00 20.00
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D1 2022 Base AM DIRECT 07:45 09:15 90 15
D2 2022 Base PM DIRECT 16:45 18:15 90 15
D3 2022 Base SAT DIRECT 11:45 13:15 90 15
D4 2022 Base + Dev AM DIRECT 07:45 09:15 90 15
D5 2022 Base + Dev PM DIRECT 16:45 18:15 90 15
D6 2022 Base + Dev SAT DIRECT 11:45 13:15 90 15
ID Network flow scaling factor (%)
A1 100.000
Generated on 05/02/2018 15:03:06 using Junctions 9 (9.0.2.5947)
2
2022 Base, AM Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Arms
Arms
Mini Roundabout Geometry
Slope / Intercept / Capacity
Roundabout Slope and Intercept used in model
The slope and intercept shown above include any corrections and adjustments.
Traffic Demand
Demand Set Details
Junction Name Junction Type Arm order Junction Delay (s) Junction LOS
1 Bexley Road Mini-Rbt (Existing) Mini-roundabout A, B, C 4.17 A
Driving side Lighting Road surface In LondonLeft Normal/unknown Normal/unknown
Arm Name Description
A Bexley Road (A206 east)
B Bexley Road (A220 west)
C Erith Road (A206)
Arm Approach road half-width (m)
Minimum approach road half-width (m)
Entry width (m)
Effective flare length (m)
Distance to next arm (m)
Entry corner kerb line distance (m)
Gradient over 50m (%)
Kerbed central island
A - Bexley Road (A206 east) 3.70 3.70 6.00 6.4 20.00 19.30 0.0
B - Bexley Road (A220 west) 4.20 4.20 4.90 5.2 10.00 2.00 0.0
C - Erith Road (A206) 4.30 4.30 6.60 2.4 17.90 18.90 0.0
Arm Final slope Final intercept (PCU/hr)
A - Bexley Road (A206 east) 0.871 1535
B - Bexley Road (A220 west) 0.654 943
C - Erith Road (A206) 0.836 1223
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D1 2022 Base AM DIRECT 07:45 09:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Generated on 05/02/2018 15:03:06 using Junctions 9 (9.0.2.5947)
3
Demand overview (Traffic)
Origin-Destination Data
Vehicle Mix
Arm Linked arm Use O-D data Scaling Factor (%)
A - Bexley Road (A206 east) ü 100.000
B - Bexley Road (A220 west) ü 100.000
C - Erith Road (A206) ü 100.000
07:45 - 08:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 62 80
B - Bexley Road (A220 west) 121 0 42
C - Erith Road (A206) 100 33 0
08:00 - 08:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 62 80
B - Bexley Road (A220 west) 121 0 42
C - Erith Road (A206) 100 33 0
08:15 - 08:30
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 108 99
B - Bexley Road (A220 west) 143 0 35
C - Erith Road (A206) 99 35 0
08:30 - 08:45
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 116 82
B - Bexley Road (A220 west) 118 0 37
C - Erith Road (A206) 117 32 0
08:45 - 09:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 80 85
B - Bexley Road (A220 west) 118 0 29
C - Erith Road (A206) 105 32 0
09:00 - 09:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 80 85
B - Bexley Road (A220 west) 118 0 29
C - Erith Road (A206) 105 32 0
Heavy Vehicle Percentages To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 10 12
B - Bexley Road (A220 west) 6 0 1
C - Erith Road (A206) 6 2 0
Generated on 05/02/2018 15:03:06 using Junctions 9 (9.0.2.5947)
4
Results
Results Summary for whole modelled period
Main Results for each time segment
07:45 - 08:00
08:00 - 08:15
08:15 - 08:30
08:30 - 08:45
08:45 - 09:00
09:00 - 09:15
Arm Max RFC Max delay (s) Max Queue (Veh) Max LOS
A - Bexley Road (A206 east) 0.15 3.13 0.2 A
B - Bexley Road (A220 west) 0.21 5.52 0.3 A
C - Erith Road (A206) 0.14 3.95 0.2 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 142 33 1355 0.105 142 0.1 2.967 A
B - Bexley Road (A220 west) 163 80 845 0.193 162 0.2 5.263 A
C - Erith Road (A206) 133 120 1063 0.125 132 0.1 3.864 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 142 33 1355 0.105 142 0.1 2.967 A
B - Bexley Road (A220 west) 163 80 845 0.193 163 0.2 5.279 A
C - Erith Road (A206) 133 121 1063 0.125 133 0.1 3.871 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 207 35 1355 0.153 207 0.2 3.134 A
B - Bexley Road (A220 west) 178 99 829 0.215 178 0.3 5.525 A
C - Erith Road (A206) 134 143 1045 0.128 134 0.1 3.951 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 198 32 1359 0.146 198 0.2 3.102 A
B - Bexley Road (A220 west) 155 82 843 0.184 155 0.2 5.237 A
C - Erith Road (A206) 149 118 1064 0.140 149 0.2 3.934 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 165 32 1357 0.122 165 0.1 3.020 A
B - Bexley Road (A220 west) 147 85 839 0.175 147 0.2 5.202 A
C - Erith Road (A206) 137 118 1065 0.129 137 0.1 3.881 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 165 32 1357 0.122 165 0.1 3.019 A
B - Bexley Road (A220 west) 147 85 839 0.175 147 0.2 5.204 A
C - Erith Road (A206) 137 118 1065 0.129 137 0.1 3.881 A
Generated on 05/02/2018 15:03:06 using Junctions 9 (9.0.2.5947)
5
2022 Base, PM Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
Junction Name Junction Type Arm order Junction Delay (s) Junction LOS
1 Bexley Road Mini-Rbt (Existing) Mini-roundabout A, B, C 3.80 A
Driving side Lighting Road surface In LondonLeft Normal/unknown Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D2 2022 Base PM DIRECT 16:45 18:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Arm Linked arm Use O-D data Scaling Factor (%)
A - Bexley Road (A206 east) ü 100.000
B - Bexley Road (A220 west) ü 100.000
C - Erith Road (A206) ü 100.000
16:45 - 17:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 150 116
B - Bexley Road (A220 west) 107 0 27
C - Erith Road (A206) 96 31 0
17:00 - 17:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 150 116
B - Bexley Road (A220 west) 107 0 27
C - Erith Road (A206) 96 31 0
17:15 - 17:30
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 149 131
B - Bexley Road (A220 west) 88 0 27
C - Erith Road (A206) 91 28 0
Generated on 05/02/2018 15:03:06 using Junctions 9 (9.0.2.5947)
6
Vehicle Mix
Results
Results Summary for whole modelled period
Main Results for each time segment
16:45 - 17:00
17:30 - 17:45
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 140 137
B - Bexley Road (A220 west) 95 0 31
C - Erith Road (A206) 105 31 0
17:45 - 18:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 126 135
B - Bexley Road (A220 west) 98 0 25
C - Erith Road (A206) 97 29 0
18:00 - 18:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 126 135
B - Bexley Road (A220 west) 98 0 25
C - Erith Road (A206) 97 29 0
Heavy Vehicle Percentages To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 3 4
B - Bexley Road (A220 west) 8 0 0
C - Erith Road (A206) 5 5 0
Arm Max RFC Max delay (s) Max Queue (Veh) Max LOS
A - Bexley Road (A206 east) 0.19 3.06 0.2 A
B - Bexley Road (A220 west) 0.16 5.33 0.2 A
C - Erith Road (A206) 0.13 3.80 0.1 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 266 31 1457 0.183 265 0.2 3.020 A
B - Bexley Road (A220 west) 134 116 813 0.165 133 0.2 5.293 A
C - Erith Road (A206) 127 106 1074 0.118 126 0.1 3.799 A
Generated on 05/02/2018 15:03:06 using Junctions 9 (9.0.2.5947)
7
17:00 - 17:15
17:15 - 17:30
17:30 - 17:45
17:45 - 18:00
18:00 - 18:15
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 266 31 1456 0.183 266 0.2 3.023 A
B - Bexley Road (A220 west) 134 116 812 0.165 134 0.2 5.305 A
C - Erith Road (A206) 127 107 1073 0.118 127 0.1 3.804 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 280 28 1459 0.192 280 0.2 3.053 A
B - Bexley Road (A220 west) 115 131 805 0.143 115 0.2 5.219 A
C - Erith Road (A206) 119 88 1089 0.109 119 0.1 3.709 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 277 31 1456 0.190 277 0.2 3.055 A
B - Bexley Road (A220 west) 126 137 802 0.157 126 0.2 5.327 A
C - Erith Road (A206) 136 95 1083 0.126 136 0.1 3.798 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 261 29 1457 0.179 261 0.2 3.009 A
B - Bexley Road (A220 west) 123 135 800 0.154 123 0.2 5.313 A
C - Erith Road (A206) 126 98 1081 0.117 126 0.1 3.769 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 261 29 1457 0.179 261 0.2 3.011 A
B - Bexley Road (A220 west) 123 135 800 0.154 123 0.2 5.313 A
C - Erith Road (A206) 126 98 1081 0.117 126 0.1 3.772 A
Generated on 05/02/2018 15:03:06 using Junctions 9 (9.0.2.5947)
8
2022 Base, SAT Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
Junction Name Junction Type Arm order Junction Delay (s) Junction LOS
1 Bexley Road Mini-Rbt (Existing) Mini-roundabout A, B, C 3.78 A
Driving side Lighting Road surface In LondonLeft Normal/unknown Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D3 2022 Base SAT DIRECT 11:45 13:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Arm Linked arm Use O-D data Scaling Factor (%)
A - Bexley Road (A206 east) ü 100.000
B - Bexley Road (A220 west) ü 100.000
C - Erith Road (A206) ü 100.000
11:45 - 12:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 118 92
B - Bexley Road (A220 west) 97 0 27
C - Erith Road (A206) 107 33 0
12:00 - 12:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 118 92
B - Bexley Road (A220 west) 97 0 27
C - Erith Road (A206) 107 33 0
12:15 - 12:30
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 142 87
B - Bexley Road (A220 west) 110 0 27
C - Erith Road (A206) 99 42 0
Generated on 05/02/2018 15:03:06 using Junctions 9 (9.0.2.5947)
9
Vehicle Mix
Results
Results Summary for whole modelled period
Main Results for each time segment
11:45 - 12:00
12:30 - 12:45
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 123 68
B - Bexley Road (A220 west) 103 0 25
C - Erith Road (A206) 78 36 0
12:45 - 13:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 133 94
B - Bexley Road (A220 west) 113 0 25
C - Erith Road (A206) 75 41 0
13:00 - 13:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 133 94
B - Bexley Road (A220 west) 113 0 25
C - Erith Road (A206) 75 41 0
Heavy Vehicle Percentages To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 4 4
B - Bexley Road (A220 west) 5 0 1
C - Erith Road (A206) 4 0 0
Arm Max RFC Max delay (s) Max Queue (Veh) Max LOS
A - Bexley Road (A206 east) 0.16 2.97 0.2 A
B - Bexley Road (A220 west) 0.16 5.10 0.2 A
C - Erith Road (A206) 0.13 3.78 0.1 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 210 33 1448 0.145 209 0.2 2.904 A
B - Bexley Road (A220 west) 124 92 846 0.147 123 0.2 4.978 A
C - Erith Road (A206) 140 96 1102 0.127 139 0.1 3.739 A
Generated on 05/02/2018 15:03:06 using Junctions 9 (9.0.2.5947)
10
12:00 - 12:15
12:15 - 12:30
12:30 - 12:45
12:45 - 13:00
13:00 - 13:15
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 210 33 1448 0.145 210 0.2 2.906 A
B - Bexley Road (A220 west) 124 92 846 0.147 124 0.2 4.987 A
C - Erith Road (A206) 140 97 1101 0.127 140 0.1 3.744 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 229 42 1441 0.159 229 0.2 2.970 A
B - Bexley Road (A220 west) 137 87 848 0.161 137 0.2 5.060 A
C - Erith Road (A206) 141 110 1093 0.129 141 0.1 3.780 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 191 36 1446 0.132 191 0.2 2.871 A
B - Bexley Road (A220 west) 128 68 861 0.149 128 0.2 4.915 A
C - Erith Road (A206) 114 103 1100 0.104 114 0.1 3.652 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 227 41 1442 0.157 227 0.2 2.963 A
B - Bexley Road (A220 west) 138 94 843 0.164 138 0.2 5.103 A
C - Erith Road (A206) 116 113 1093 0.106 116 0.1 3.683 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 227 41 1442 0.157 227 0.2 2.963 A
B - Bexley Road (A220 west) 138 94 843 0.164 138 0.2 5.103 A
C - Erith Road (A206) 116 113 1093 0.106 116 0.1 3.683 A
Generated on 05/02/2018 15:03:06 using Junctions 9 (9.0.2.5947)
11
2022 Base + Dev, AM Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
Junction Name Junction Type Arm order Junction Delay (s) Junction LOS
1 Bexley Road Mini-Rbt (Existing) Mini-roundabout A, B, C 4.16 A
Driving side Lighting Road surface In LondonLeft Normal/unknown Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D4 2022 Base + Dev AM DIRECT 07:45 09:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Arm Linked arm Use O-D data Scaling Factor (%)
A - Bexley Road (A206 east) ü 100.000
B - Bexley Road (A220 west) ü 100.000
C - Erith Road (A206) ü 100.000
07:45 - 08:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 61 81
B - Bexley Road (A220 west) 120 0 42
C - Erith Road (A206) 101 33 0
08:00 - 08:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 61 81
B - Bexley Road (A220 west) 120 0 42
C - Erith Road (A206) 101 33 0
08:15 - 08:30
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 107 100
B - Bexley Road (A220 west) 142 0 35
C - Erith Road (A206) 100 35 0
Generated on 05/02/2018 15:03:06 using Junctions 9 (9.0.2.5947)
12
Vehicle Mix
Results
Results Summary for whole modelled period
Main Results for each time segment
07:45 - 08:00
08:30 - 08:45
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 115 83
B - Bexley Road (A220 west) 117 0 37
C - Erith Road (A206) 118 32 0
08:45 - 09:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 79 86
B - Bexley Road (A220 west) 117 0 29
C - Erith Road (A206) 106 32 0
09:00 - 09:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 79 86
B - Bexley Road (A220 west) 117 0 29
C - Erith Road (A206) 106 32 0
Heavy Vehicle Percentages To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 10 12
B - Bexley Road (A220 west) 6 0 1
C - Erith Road (A206) 6 2 0
Arm Max RFC Max delay (s) Max Queue (Veh) Max LOS
A - Bexley Road (A206 east) 0.15 3.13 0.2 A
B - Bexley Road (A220 west) 0.21 5.52 0.3 A
C - Erith Road (A206) 0.14 3.95 0.2 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 142 33 1355 0.105 142 0.1 2.967 A
B - Bexley Road (A220 west) 162 81 844 0.192 161 0.2 5.260 A
C - Erith Road (A206) 134 119 1064 0.126 133 0.1 3.865 A
Generated on 05/02/2018 15:03:06 using Junctions 9 (9.0.2.5947)
13
08:00 - 08:15
08:15 - 08:30
08:30 - 08:45
08:45 - 09:00
09:00 - 09:15
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 142 33 1355 0.105 142 0.1 2.968 A
B - Bexley Road (A220 west) 162 81 844 0.192 162 0.2 5.276 A
C - Erith Road (A206) 134 120 1064 0.126 134 0.1 3.872 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 207 35 1355 0.153 207 0.2 3.134 A
B - Bexley Road (A220 west) 177 100 829 0.214 177 0.3 5.522 A
C - Erith Road (A206) 135 142 1046 0.129 135 0.1 3.952 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 198 32 1359 0.146 198 0.2 3.102 A
B - Bexley Road (A220 west) 154 83 842 0.183 154 0.2 5.234 A
C - Erith Road (A206) 150 117 1065 0.141 150 0.2 3.935 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 165 32 1357 0.122 165 0.1 3.020 A
B - Bexley Road (A220 west) 146 86 838 0.174 146 0.2 5.200 A
C - Erith Road (A206) 138 117 1066 0.130 138 0.1 3.881 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 165 32 1357 0.122 165 0.1 3.020 A
B - Bexley Road (A220 west) 146 86 838 0.174 146 0.2 5.201 A
C - Erith Road (A206) 138 117 1066 0.130 138 0.1 3.880 A
Generated on 05/02/2018 15:03:06 using Junctions 9 (9.0.2.5947)
14
2022 Base + Dev, PM Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
Junction Name Junction Type Arm order Junction Delay (s) Junction LOS
1 Bexley Road Mini-Rbt (Existing) Mini-roundabout A, B, C 3.80 A
Driving side Lighting Road surface In LondonLeft Normal/unknown Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D5 2022 Base + Dev PM DIRECT 16:45 18:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Arm Linked arm Use O-D data Scaling Factor (%)
A - Bexley Road (A206 east) ü 100.000
B - Bexley Road (A220 west) ü 100.000
C - Erith Road (A206) ü 100.000
16:45 - 17:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 148 119
B - Bexley Road (A220 west) 105 0 28
C - Erith Road (A206) 98 32 0
17:00 - 17:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 148 119
B - Bexley Road (A220 west) 105 0 28
C - Erith Road (A206) 98 32 0
17:15 - 17:30
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 147 134
B - Bexley Road (A220 west) 86 0 28
C - Erith Road (A206) 93 29 0
Generated on 05/02/2018 15:03:06 using Junctions 9 (9.0.2.5947)
15
Vehicle Mix
Results
Results Summary for whole modelled period
Main Results for each time segment
16:45 - 17:00
17:30 - 17:45
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 138 140
B - Bexley Road (A220 west) 93 0 32
C - Erith Road (A206) 107 32 0
17:45 - 18:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 124 138
B - Bexley Road (A220 west) 96 0 26
C - Erith Road (A206) 99 30 0
18:00 - 18:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 124 138
B - Bexley Road (A220 west) 96 0 26
C - Erith Road (A206) 99 30 0
Heavy Vehicle Percentages To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 3 4
B - Bexley Road (A220 west) 8 0 0
C - Erith Road (A206) 5 5 0
Arm Max RFC Max delay (s) Max Queue (Veh) Max LOS
A - Bexley Road (A206 east) 0.19 3.06 0.2 A
B - Bexley Road (A220 west) 0.16 5.33 0.2 A
C - Erith Road (A206) 0.13 3.81 0.1 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 267 32 1456 0.183 266 0.2 3.025 A
B - Bexley Road (A220 west) 133 119 811 0.164 132 0.2 5.296 A
C - Erith Road (A206) 130 104 1075 0.121 129 0.1 3.804 A
Generated on 05/02/2018 15:03:06 using Junctions 9 (9.0.2.5947)
16
17:00 - 17:15
17:15 - 17:30
17:30 - 17:45
17:45 - 18:00
18:00 - 18:15
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 267 32 1455 0.183 267 0.2 3.028 A
B - Bexley Road (A220 west) 133 119 811 0.164 133 0.2 5.308 A
C - Erith Road (A206) 130 105 1075 0.121 130 0.1 3.809 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 281 29 1458 0.193 281 0.2 3.058 A
B - Bexley Road (A220 west) 114 134 804 0.142 114 0.2 5.221 A
C - Erith Road (A206) 122 86 1091 0.112 122 0.1 3.714 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 278 32 1455 0.191 278 0.2 3.061 A
B - Bexley Road (A220 west) 125 140 800 0.156 125 0.2 5.329 A
C - Erith Road (A206) 139 93 1085 0.128 139 0.1 3.804 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 262 30 1456 0.180 262 0.2 3.014 A
B - Bexley Road (A220 west) 122 138 799 0.153 122 0.2 5.316 A
C - Erith Road (A206) 129 96 1083 0.119 129 0.1 3.774 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 262 30 1456 0.180 262 0.2 3.014 A
B - Bexley Road (A220 west) 122 138 799 0.153 122 0.2 5.318 A
C - Erith Road (A206) 129 96 1083 0.119 129 0.1 3.777 A
Generated on 05/02/2018 15:03:06 using Junctions 9 (9.0.2.5947)
17
2022 Base + Dev, SAT Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
Junction Name Junction Type Arm order Junction Delay (s) Junction LOS
1 Bexley Road Mini-Rbt (Existing) Mini-roundabout A, B, C 3.78 A
Driving side Lighting Road surface In LondonLeft Normal/unknown Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D6 2022 Base + Dev SAT DIRECT 11:45 13:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Arm Linked arm Use O-D data Scaling Factor (%)
A - Bexley Road (A206 east) ü 100.000
B - Bexley Road (A220 west) ü 100.000
C - Erith Road (A206) ü 100.000
11:45 - 12:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 116 95
B - Bexley Road (A220 west) 95 0 29
C - Erith Road (A206) 111 35 0
12:00 - 12:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 116 95
B - Bexley Road (A220 west) 95 0 29
C - Erith Road (A206) 111 35 0
12:15 - 12:30
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 139 90
B - Bexley Road (A220 west) 108 0 29
C - Erith Road (A206) 102 43 0
Generated on 05/02/2018 15:03:06 using Junctions 9 (9.0.2.5947)
18
Vehicle Mix
Results
Results Summary for whole modelled period
Main Results for each time segment
11:45 - 12:00
12:30 - 12:45
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 120 71
B - Bexley Road (A220 west) 100 0 26
C - Erith Road (A206) 82 38 0
12:45 - 13:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 131 97
B - Bexley Road (A220 west) 111 0 26
C - Erith Road (A206) 79 42 0
13:00 - 13:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 131 97
B - Bexley Road (A220 west) 111 0 26
C - Erith Road (A206) 79 42 0
Heavy Vehicle Percentages To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 4 4
B - Bexley Road (A220 west) 5 0 1
C - Erith Road (A206) 4 0 0
Arm Max RFC Max delay (s) Max Queue (Veh) Max LOS
A - Bexley Road (A206 east) 0.16 2.97 0.2 A
B - Bexley Road (A220 west) 0.16 5.11 0.2 A
C - Erith Road (A206) 0.13 3.78 0.2 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 211 35 1447 0.146 210 0.2 2.910 A
B - Bexley Road (A220 west) 124 95 845 0.147 123 0.2 4.988 A
C - Erith Road (A206) 146 94 1107 0.132 145 0.2 3.743 A
Generated on 05/02/2018 15:03:06 using Junctions 9 (9.0.2.5947)
19
12:00 - 12:15
12:15 - 12:30
12:30 - 12:45
12:45 - 13:00
13:00 - 13:15
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 211 35 1447 0.146 211 0.2 2.913 A
B - Bexley Road (A220 west) 124 95 844 0.147 124 0.2 4.997 A
C - Erith Road (A206) 146 95 1106 0.132 146 0.2 3.747 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 229 43 1440 0.159 229 0.2 2.972 A
B - Bexley Road (A220 west) 137 90 847 0.162 137 0.2 5.070 A
C - Erith Road (A206) 145 108 1098 0.132 145 0.2 3.777 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 191 38 1444 0.132 191 0.2 2.873 A
B - Bexley Road (A220 west) 126 71 859 0.147 126 0.2 4.911 A
C - Erith Road (A206) 120 100 1105 0.109 120 0.1 3.653 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 228 42 1441 0.158 228 0.2 2.967 A
B - Bexley Road (A220 west) 137 97 842 0.163 137 0.2 5.108 A
C - Erith Road (A206) 121 111 1097 0.110 121 0.1 3.686 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 228 42 1441 0.158 228 0.2 2.967 A
B - Bexley Road (A220 west) 137 97 842 0.163 137 0.2 5.108 A
C - Erith Road (A206) 121 111 1097 0.110 121 0.1 3.686 A
Generated on 05/02/2018 15:03:06 using Junctions 9 (9.0.2.5947)
20
Filename: 180205_Fraser Road Bexley Road Mini Roundabout - Stomor Mitigation.j9 Path: C:\Users\Mode\Dropbox (mode)\Project\Reading\1. Projects\J323173 Lidl Erith\4. Data\Junction Models\February 2018 Report generation date: 05/02/2018 15:12:40
»2022 Base, AM »2022 Base, PM »2022 Base, SAT »2022 Base + Dev, AM »2022 Base + Dev, PM »2022 Base + Dev, SAT
Summary of junction performance
Junctions 9ARCADY 9 - Roundabout Module
Version: 9.0.2.5947 © Copyright TRL Limited, 2017
For sales and distribution information, program advice and maintenance, contact TRL: +44 (0)1344 770558 [email protected] www.trlsoftware.co.uk
The users of this computer program for the solution of an engineering problem are in no way relieved of their responsibility for the correctness of the solution
AM PM SAT Queue (Veh) Delay (s) RFC LOS Queue (Veh) Delay (s) RFC LOS Queue (Veh) Delay (s) RFC LOS
2022 BaseA - Bexley Road (A206 east) 0.2 2.73 0.14 A 0.2 2.64 0.17 A 0.2 2.59 0.14 A
B - Bexley Road (A220 west) 0.2 4.19 0.17 A 0.2 4.09 0.13 A 0.2 3.93 0.13 A
C - Erith Road (A206) 0.1 3.17 0.12 A 0.1 3.06 0.10 A 0.1 3.04 0.11 A
2022 Base + DevA - Bexley Road (A206 east) 0.2 2.73 0.14 A 0.2 2.65 0.17 A 0.2 2.59 0.14 A
B - Bexley Road (A220 west) 0.2 4.19 0.17 A 0.2 4.09 0.13 A 0.1 3.93 0.13 A
C - Erith Road (A206) 0.1 3.17 0.12 A 0.1 3.06 0.11 A 0.1 3.03 0.11 A
Values shown are the highest values encountered over all time segments. Delay is the maximum value of average delay per arriving vehicle.
File summary
File Description Title (untitled)
Location
Site number
Date 23/01/2018
Version
Status (new file)
Identifier
Client
Jobnumber
Enumerator DESKTOP-499K8KJ\Mode
Description
Generated on 05/02/2018 15:12:50 using Junctions 9 (9.0.2.5947)
1
Units
Analysis Options
Demand Set Summary
Analysis Set Details
Distance units Speed units Traffic units input Traffic units results Flow units Average delay units Total delay units Rate of delay unitsm kph Veh Veh perHour s -Min perMin
Mini-roundabout model Calculate Queue Percentiles Calculate residual capacity RFC Threshold Average Delay threshold (s) Queue threshold (PCU)JUNCTIONS 9 0.85 36.00 20.00
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D1 2022 Base AM DIRECT 07:45 09:15 90 15
D2 2022 Base PM DIRECT 16:45 18:15 90 15
D3 2022 Base SAT DIRECT 11:45 13:15 90 15
D4 2022 Base + Dev AM DIRECT 07:45 09:15 90 15
D5 2022 Base + Dev PM DIRECT 16:45 18:15 90 15
D6 2022 Base + Dev SAT DIRECT 11:45 13:15 90 15
ID Network flow scaling factor (%)
A1 100.000
Generated on 05/02/2018 15:12:50 using Junctions 9 (9.0.2.5947)
2
2022 Base, AM Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Arms
Arms
Mini Roundabout Geometry
Slope / Intercept / Capacity
Roundabout Slope and Intercept used in model
The slope and intercept shown above include any corrections and adjustments.
Traffic Demand
Demand Set Details
Junction Name Junction Type Arm order Junction Delay (s) Junction LOS
1 Bexley Road Mini-Rbt (Stomor Mit.) Mini-roundabout A, B, C 3.34 A
Driving side Lighting Road surface In LondonLeft Normal/unknown Normal/unknown
Arm Name Description
A Bexley Road (A206 east)
B Bexley Road (A220 west)
C Erith Road (A206)
Arm Approach road half-width (m)
Minimum approach road half-width (m)
Entry width (m)
Effective flare length (m)
Distance to next arm (m)
Entry corner kerb line distance (m)
Gradient over 50m (%)
Kerbed central island
A - Bexley Road (A206 east) 3.10 3.10 6.00 11.5 20.00 20.00 0.0
B - Bexley Road (A220 west) 4.20 4.20 6.60 29.7 9.40 2.00 0.0
C - Erith Road (A206) 4.20 4.20 5.90 5.1 20.00 20.00 0.0
Arm Final slope Final intercept (PCU/hr)
A - Bexley Road (A206 east) 0.959 1726
B - Bexley Road (A220 west) 0.708 1168
C - Erith Road (A206) 0.971 1480
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D1 2022 Base AM DIRECT 07:45 09:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Generated on 05/02/2018 15:12:50 using Junctions 9 (9.0.2.5947)
3
Demand overview (Traffic)
Origin-Destination Data
Vehicle Mix
Arm Linked arm Use O-D data Scaling Factor (%)
A - Bexley Road (A206 east) ü 100.000
B - Bexley Road (A220 west) ü 100.000
C - Erith Road (A206) ü 100.000
07:45 - 08:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 62 80
B - Bexley Road (A220 west) 121 0 42
C - Erith Road (A206) 100 33 0
08:00 - 08:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 62 80
B - Bexley Road (A220 west) 121 0 42
C - Erith Road (A206) 100 33 0
08:15 - 08:30
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 108 99
B - Bexley Road (A220 west) 143 0 35
C - Erith Road (A206) 99 35 0
08:30 - 08:45
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 116 82
B - Bexley Road (A220 west) 118 0 37
C - Erith Road (A206) 117 32 0
08:45 - 09:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 80 85
B - Bexley Road (A220 west) 118 0 29
C - Erith Road (A206) 105 32 0
09:00 - 09:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 80 85
B - Bexley Road (A220 west) 118 0 29
C - Erith Road (A206) 105 32 0
Heavy Vehicle Percentages To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 10 12
B - Bexley Road (A220 west) 6 0 1
C - Erith Road (A206) 6 2 0
Generated on 05/02/2018 15:12:50 using Junctions 9 (9.0.2.5947)
4
Results
Results Summary for whole modelled period
Main Results for each time segment
07:45 - 08:00
08:00 - 08:15
08:15 - 08:30
08:30 - 08:45
08:45 - 09:00
09:00 - 09:15
Arm Max RFC Max delay (s) Max Queue (Veh) Max LOS
A - Bexley Road (A206 east) 0.14 2.73 0.2 A
B - Bexley Road (A220 west) 0.17 4.19 0.2 A
C - Erith Road (A206) 0.12 3.17 0.1 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 142 33 1524 0.093 142 0.1 2.603 A
B - Bexley Road (A220 west) 163 80 1055 0.155 162 0.2 4.029 A
C - Erith Road (A206) 133 120 1291 0.103 133 0.1 3.105 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 142 33 1524 0.093 142 0.1 2.603 A
B - Bexley Road (A220 west) 163 80 1055 0.155 163 0.2 4.037 A
C - Erith Road (A206) 133 121 1290 0.103 133 0.1 3.109 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 207 35 1525 0.136 207 0.2 2.731 A
B - Bexley Road (A220 west) 178 99 1037 0.172 178 0.2 4.189 A
C - Erith Road (A206) 134 143 1270 0.106 134 0.1 3.169 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 198 32 1529 0.129 198 0.1 2.705 A
B - Bexley Road (A220 west) 155 82 1052 0.147 155 0.2 4.015 A
C - Erith Road (A206) 149 118 1292 0.115 149 0.1 3.150 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 165 32 1527 0.108 165 0.1 2.644 A
B - Bexley Road (A220 west) 147 85 1048 0.140 147 0.2 3.996 A
C - Erith Road (A206) 137 118 1293 0.106 137 0.1 3.114 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 165 32 1527 0.108 165 0.1 2.643 A
B - Bexley Road (A220 west) 147 85 1048 0.140 147 0.2 3.997 A
C - Erith Road (A206) 137 118 1293 0.106 137 0.1 3.116 A
Generated on 05/02/2018 15:12:50 using Junctions 9 (9.0.2.5947)
5
2022 Base, PM Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
Junction Name Junction Type Arm order Junction Delay (s) Junction LOS
1 Bexley Road Mini-Rbt (Stomor Mit.) Mini-roundabout A, B, C 3.10 A
Driving side Lighting Road surface In LondonLeft Normal/unknown Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D2 2022 Base PM DIRECT 16:45 18:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Arm Linked arm Use O-D data Scaling Factor (%)
A - Bexley Road (A206 east) ü 100.000
B - Bexley Road (A220 west) ü 100.000
C - Erith Road (A206) ü 100.000
16:45 - 17:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 150 116
B - Bexley Road (A220 west) 107 0 27
C - Erith Road (A206) 96 31 0
17:00 - 17:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 150 116
B - Bexley Road (A220 west) 107 0 27
C - Erith Road (A206) 96 31 0
17:15 - 17:30
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 149 131
B - Bexley Road (A220 west) 88 0 27
C - Erith Road (A206) 91 28 0
Generated on 05/02/2018 15:12:50 using Junctions 9 (9.0.2.5947)
6
Vehicle Mix
Results
Results Summary for whole modelled period
Main Results for each time segment
16:45 - 17:00
17:30 - 17:45
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 140 137
B - Bexley Road (A220 west) 95 0 31
C - Erith Road (A206) 105 31 0
17:45 - 18:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 126 135
B - Bexley Road (A220 west) 98 0 25
C - Erith Road (A206) 97 29 0
18:00 - 18:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 126 135
B - Bexley Road (A220 west) 98 0 25
C - Erith Road (A206) 97 29 0
Heavy Vehicle Percentages To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 3 4
B - Bexley Road (A220 west) 8 0 0
C - Erith Road (A206) 5 5 0
Arm Max RFC Max delay (s) Max Queue (Veh) Max LOS
A - Bexley Road (A206 east) 0.17 2.64 0.2 A
B - Bexley Road (A220 west) 0.13 4.09 0.2 A
C - Erith Road (A206) 0.10 3.06 0.1 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 266 31 1639 0.162 265 0.2 2.619 A
B - Bexley Road (A220 west) 134 116 1018 0.132 133 0.2 4.069 A
C - Erith Road (A206) 127 107 1303 0.097 127 0.1 3.061 A
Generated on 05/02/2018 15:12:50 using Junctions 9 (9.0.2.5947)
7
17:00 - 17:15
17:15 - 17:30
17:30 - 17:45
17:45 - 18:00
18:00 - 18:15
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 266 31 1639 0.162 266 0.2 2.622 A
B - Bexley Road (A220 west) 134 116 1017 0.132 134 0.2 4.074 A
C - Erith Road (A206) 127 107 1302 0.098 127 0.1 3.062 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 280 28 1641 0.171 280 0.2 2.644 A
B - Bexley Road (A220 west) 115 131 1010 0.114 115 0.1 4.026 A
C - Erith Road (A206) 119 88 1321 0.090 119 0.1 2.996 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 277 31 1638 0.169 277 0.2 2.645 A
B - Bexley Road (A220 west) 126 137 1006 0.125 126 0.1 4.089 A
C - Erith Road (A206) 136 95 1314 0.103 136 0.1 3.054 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 261 29 1639 0.159 261 0.2 2.611 A
B - Bexley Road (A220 west) 123 135 1004 0.122 123 0.1 4.084 A
C - Erith Road (A206) 126 98 1311 0.096 126 0.1 3.039 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 261 29 1639 0.159 261 0.2 2.613 A
B - Bexley Road (A220 west) 123 135 1004 0.122 123 0.1 4.084 A
C - Erith Road (A206) 126 98 1311 0.096 126 0.1 3.039 A
Generated on 05/02/2018 15:12:50 using Junctions 9 (9.0.2.5947)
8
2022 Base, SAT Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
Junction Name Junction Type Arm order Junction Delay (s) Junction LOS
1 Bexley Road Mini-Rbt (Stomor Mit.) Mini-roundabout A, B, C 3.08 A
Driving side Lighting Road surface In LondonLeft Normal/unknown Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D3 2022 Base SAT DIRECT 11:45 13:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Arm Linked arm Use O-D data Scaling Factor (%)
A - Bexley Road (A206 east) ü 100.000
B - Bexley Road (A220 west) ü 100.000
C - Erith Road (A206) ü 100.000
11:45 - 12:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 118 92
B - Bexley Road (A220 west) 97 0 27
C - Erith Road (A206) 107 33 0
12:00 - 12:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 118 92
B - Bexley Road (A220 west) 97 0 27
C - Erith Road (A206) 107 33 0
12:15 - 12:30
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 142 87
B - Bexley Road (A220 west) 110 0 27
C - Erith Road (A206) 99 42 0
Generated on 05/02/2018 15:12:50 using Junctions 9 (9.0.2.5947)
9
Vehicle Mix
Results
Results Summary for whole modelled period
Main Results for each time segment
11:45 - 12:00
12:30 - 12:45
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 123 68
B - Bexley Road (A220 west) 103 0 25
C - Erith Road (A206) 78 36 0
12:45 - 13:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 133 94
B - Bexley Road (A220 west) 113 0 25
C - Erith Road (A206) 75 41 0
13:00 - 13:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 133 94
B - Bexley Road (A220 west) 113 0 25
C - Erith Road (A206) 75 41 0
Heavy Vehicle Percentages To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 4 4
B - Bexley Road (A220 west) 5 0 1
C - Erith Road (A206) 4 0 0
Arm Max RFC Max delay (s) Max Queue (Veh) Max LOS
A - Bexley Road (A206 east) 0.14 2.59 0.2 A
B - Bexley Road (A220 west) 0.13 3.93 0.2 A
C - Erith Road (A206) 0.11 3.04 0.1 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 210 33 1629 0.129 209 0.1 2.533 A
B - Bexley Road (A220 west) 124 92 1057 0.117 123 0.1 3.856 A
C - Erith Road (A206) 140 97 1336 0.105 140 0.1 3.008 A
Generated on 05/02/2018 15:12:50 using Junctions 9 (9.0.2.5947)
10
12:00 - 12:15
12:15 - 12:30
12:30 - 12:45
12:45 - 13:00
13:00 - 13:15
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 210 33 1629 0.129 210 0.1 2.535 A
B - Bexley Road (A220 west) 124 92 1056 0.117 124 0.1 3.860 A
C - Erith Road (A206) 140 97 1336 0.105 140 0.1 3.009 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 229 42 1621 0.141 229 0.2 2.585 A
B - Bexley Road (A220 west) 137 87 1059 0.129 137 0.1 3.903 A
C - Erith Road (A206) 141 110 1326 0.106 141 0.1 3.036 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 191 36 1627 0.117 191 0.1 2.507 A
B - Bexley Road (A220 west) 128 68 1072 0.119 128 0.1 3.811 A
C - Erith Road (A206) 114 103 1334 0.085 114 0.1 2.949 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 227 41 1622 0.140 227 0.2 2.580 A
B - Bexley Road (A220 west) 138 94 1054 0.131 138 0.2 3.931 A
C - Erith Road (A206) 116 113 1327 0.087 116 0.1 2.972 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 227 41 1622 0.140 227 0.2 2.580 A
B - Bexley Road (A220 west) 138 94 1054 0.131 138 0.2 3.931 A
C - Erith Road (A206) 116 113 1327 0.087 116 0.1 2.973 A
Generated on 05/02/2018 15:12:50 using Junctions 9 (9.0.2.5947)
11
2022 Base + Dev, AM Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
Junction Name Junction Type Arm order Junction Delay (s) Junction LOS
1 Bexley Road Mini-Rbt (Stomor Mit.) Mini-roundabout A, B, C 3.34 A
Driving side Lighting Road surface In LondonLeft Normal/unknown Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D4 2022 Base + Dev AM DIRECT 07:45 09:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Arm Linked arm Use O-D data Scaling Factor (%)
A - Bexley Road (A206 east) ü 100.000
B - Bexley Road (A220 west) ü 100.000
C - Erith Road (A206) ü 100.000
07:45 - 08:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 61 81
B - Bexley Road (A220 west) 120 0 42
C - Erith Road (A206) 101 33 0
08:00 - 08:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 61 81
B - Bexley Road (A220 west) 120 0 42
C - Erith Road (A206) 101 33 0
08:15 - 08:30
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 107 100
B - Bexley Road (A220 west) 142 0 35
C - Erith Road (A206) 100 35 0
Generated on 05/02/2018 15:12:50 using Junctions 9 (9.0.2.5947)
12
Vehicle Mix
Results
Results Summary for whole modelled period
Main Results for each time segment
07:45 - 08:00
08:30 - 08:45
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 115 83
B - Bexley Road (A220 west) 117 0 37
C - Erith Road (A206) 118 32 0
08:45 - 09:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 79 86
B - Bexley Road (A220 west) 117 0 29
C - Erith Road (A206) 106 32 0
09:00 - 09:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 79 86
B - Bexley Road (A220 west) 117 0 29
C - Erith Road (A206) 106 32 0
Heavy Vehicle Percentages To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 10 12
B - Bexley Road (A220 west) 6 0 1
C - Erith Road (A206) 6 2 0
Arm Max RFC Max delay (s) Max Queue (Veh) Max LOS
A - Bexley Road (A206 east) 0.14 2.73 0.2 A
B - Bexley Road (A220 west) 0.17 4.19 0.2 A
C - Erith Road (A206) 0.12 3.17 0.1 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 142 33 1524 0.093 142 0.1 2.604 A
B - Bexley Road (A220 west) 162 81 1054 0.154 161 0.2 4.028 A
C - Erith Road (A206) 134 119 1292 0.104 134 0.1 3.106 A
Generated on 05/02/2018 15:12:50 using Junctions 9 (9.0.2.5947)
13
08:00 - 08:15
08:15 - 08:30
08:30 - 08:45
08:45 - 09:00
09:00 - 09:15
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 142 33 1524 0.093 142 0.1 2.604 A
B - Bexley Road (A220 west) 162 81 1054 0.154 162 0.2 4.035 A
C - Erith Road (A206) 134 120 1291 0.104 134 0.1 3.109 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 207 35 1525 0.136 207 0.2 2.731 A
B - Bexley Road (A220 west) 177 100 1037 0.171 177 0.2 4.187 A
C - Erith Road (A206) 135 142 1270 0.106 135 0.1 3.169 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 198 32 1529 0.129 198 0.1 2.704 A
B - Bexley Road (A220 west) 154 83 1051 0.146 154 0.2 4.013 A
C - Erith Road (A206) 150 117 1293 0.116 150 0.1 3.150 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 165 32 1526 0.108 165 0.1 2.644 A
B - Bexley Road (A220 west) 146 86 1047 0.139 146 0.2 3.996 A
C - Erith Road (A206) 138 117 1294 0.107 138 0.1 3.117 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 165 32 1526 0.108 165 0.1 2.643 A
B - Bexley Road (A220 west) 146 86 1047 0.139 146 0.2 3.996 A
C - Erith Road (A206) 138 117 1294 0.107 138 0.1 3.117 A
Generated on 05/02/2018 15:12:50 using Junctions 9 (9.0.2.5947)
14
2022 Base + Dev, PM Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
Junction Name Junction Type Arm order Junction Delay (s) Junction LOS
1 Bexley Road Mini-Rbt (Stomor Mit.) Mini-roundabout A, B, C 3.10 A
Driving side Lighting Road surface In LondonLeft Normal/unknown Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D5 2022 Base + Dev PM DIRECT 16:45 18:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Arm Linked arm Use O-D data Scaling Factor (%)
A - Bexley Road (A206 east) ü 100.000
B - Bexley Road (A220 west) ü 100.000
C - Erith Road (A206) ü 100.000
16:45 - 17:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 148 119
B - Bexley Road (A220 west) 105 0 28
C - Erith Road (A206) 98 32 0
17:00 - 17:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 148 119
B - Bexley Road (A220 west) 105 0 28
C - Erith Road (A206) 98 32 0
17:15 - 17:30
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 147 134
B - Bexley Road (A220 west) 86 0 28
C - Erith Road (A206) 93 29 0
Generated on 05/02/2018 15:12:50 using Junctions 9 (9.0.2.5947)
15
Vehicle Mix
Results
Results Summary for whole modelled period
Main Results for each time segment
16:45 - 17:00
17:30 - 17:45
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 138 140
B - Bexley Road (A220 west) 93 0 32
C - Erith Road (A206) 107 32 0
17:45 - 18:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 124 138
B - Bexley Road (A220 west) 96 0 26
C - Erith Road (A206) 99 30 0
18:00 - 18:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 124 138
B - Bexley Road (A220 west) 96 0 26
C - Erith Road (A206) 99 30 0
Heavy Vehicle Percentages To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 3 4
B - Bexley Road (A220 west) 8 0 0
C - Erith Road (A206) 5 5 0
Arm Max RFC Max delay (s) Max Queue (Veh) Max LOS
A - Bexley Road (A206 east) 0.17 2.65 0.2 A
B - Bexley Road (A220 west) 0.13 4.09 0.2 A
C - Erith Road (A206) 0.11 3.06 0.1 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 267 32 1638 0.163 266 0.2 2.623 A
B - Bexley Road (A220 west) 133 119 1016 0.131 132 0.1 4.070 A
C - Erith Road (A206) 130 105 1305 0.100 130 0.1 3.063 A
Generated on 05/02/2018 15:12:50 using Junctions 9 (9.0.2.5947)
16
17:00 - 17:15
17:15 - 17:30
17:30 - 17:45
17:45 - 18:00
18:00 - 18:15
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 267 32 1638 0.163 267 0.2 2.626 A
B - Bexley Road (A220 west) 133 119 1016 0.131 133 0.2 4.076 A
C - Erith Road (A206) 130 105 1304 0.100 130 0.1 3.065 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 281 29 1640 0.171 281 0.2 2.648 A
B - Bexley Road (A220 west) 114 134 1008 0.113 114 0.1 4.027 A
C - Erith Road (A206) 122 86 1323 0.092 122 0.1 2.996 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 278 32 1637 0.170 278 0.2 2.649 A
B - Bexley Road (A220 west) 125 140 1005 0.124 125 0.1 4.091 A
C - Erith Road (A206) 139 93 1316 0.106 139 0.1 3.057 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 262 30 1638 0.160 262 0.2 2.617 A
B - Bexley Road (A220 west) 122 138 1003 0.122 122 0.1 4.085 A
C - Erith Road (A206) 129 96 1313 0.098 129 0.1 3.039 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 262 30 1638 0.160 262 0.2 2.615 A
B - Bexley Road (A220 west) 122 138 1003 0.122 122 0.1 4.085 A
C - Erith Road (A206) 129 96 1313 0.098 129 0.1 3.039 A
Generated on 05/02/2018 15:12:50 using Junctions 9 (9.0.2.5947)
17
2022 Base + Dev, SAT Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
Junction Name Junction Type Arm order Junction Delay (s) Junction LOS
1 Bexley Road Mini-Rbt (Stomor Mit.) Mini-roundabout A, B, C 3.08 A
Driving side Lighting Road surface In LondonLeft Normal/unknown Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D6 2022 Base + Dev SAT DIRECT 11:45 13:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Arm Linked arm Use O-D data Scaling Factor (%)
A - Bexley Road (A206 east) ü 100.000
B - Bexley Road (A220 west) ü 100.000
C - Erith Road (A206) ü 100.000
11:45 - 12:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 116 95
B - Bexley Road (A220 west) 95 0 29
C - Erith Road (A206) 111 35 0
12:00 - 12:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 116 95
B - Bexley Road (A220 west) 95 0 29
C - Erith Road (A206) 111 35 0
12:15 - 12:30
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 139 90
B - Bexley Road (A220 west) 108 0 29
C - Erith Road (A206) 102 43 0
Generated on 05/02/2018 15:12:50 using Junctions 9 (9.0.2.5947)
18
Vehicle Mix
Results
Results Summary for whole modelled period
Main Results for each time segment
11:45 - 12:00
12:30 - 12:45
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 120 71
B - Bexley Road (A220 west) 100 0 26
C - Erith Road (A206) 82 38 0
12:45 - 13:00
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 131 97
B - Bexley Road (A220 west) 111 0 26
C - Erith Road (A206) 79 42 0
13:00 - 13:15
Demand (Veh/hr) To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 131 97
B - Bexley Road (A220 west) 111 0 26
C - Erith Road (A206) 79 42 0
Heavy Vehicle Percentages To
From
A - Bexley Road (A206 east) B - Bexley Road (A220 west) C - Erith Road (A206)
A - Bexley Road (A206 east) 0 4 4
B - Bexley Road (A220 west) 5 0 1
C - Erith Road (A206) 4 0 0
Arm Max RFC Max delay (s) Max Queue (Veh) Max LOS
A - Bexley Road (A206 east) 0.14 2.59 0.2 A
B - Bexley Road (A220 west) 0.13 3.93 0.1 A
C - Erith Road (A206) 0.11 3.03 0.1 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 211 35 1628 0.130 210 0.1 2.538 A
B - Bexley Road (A220 west) 124 95 1055 0.118 123 0.1 3.862 A
C - Erith Road (A206) 146 95 1342 0.109 146 0.1 3.006 A
Generated on 05/02/2018 15:12:50 using Junctions 9 (9.0.2.5947)
19
12:00 - 12:15
12:15 - 12:30
12:30 - 12:45
12:45 - 13:00
13:00 - 13:15
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 211 35 1628 0.130 211 0.1 2.540 A
B - Bexley Road (A220 west) 124 95 1055 0.118 124 0.1 3.866 A
C - Erith Road (A206) 146 95 1342 0.109 146 0.1 3.009 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 229 43 1620 0.141 229 0.2 2.587 A
B - Bexley Road (A220 west) 137 90 1058 0.130 137 0.1 3.910 A
C - Erith Road (A206) 145 108 1332 0.109 145 0.1 3.032 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 191 38 1625 0.118 191 0.1 2.512 A
B - Bexley Road (A220 west) 126 71 1071 0.118 126 0.1 3.809 A
C - Erith Road (A206) 120 100 1341 0.089 120 0.1 2.948 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 228 42 1621 0.141 228 0.2 2.583 A
B - Bexley Road (A220 west) 137 97 1052 0.130 137 0.1 3.934 A
C - Erith Road (A206) 121 111 1332 0.091 121 0.1 2.972 A
Arm Total Demand (Veh/hr)
Circulating flow (Veh/hr)
Capacity (Veh/hr) RFC Throughput
(Veh/hr)End queue
(Veh) Delay (s) LOS
A - Bexley Road (A206 east) 228 42 1621 0.141 228 0.2 2.583 A
B - Bexley Road (A220 west) 137 97 1052 0.130 137 0.1 3.935 A
C - Erith Road (A206) 121 111 1332 0.091 121 0.1 2.973 A
Generated on 05/02/2018 15:12:50 using Junctions 9 (9.0.2.5947)
20
Filename: 180205_Madford Trading Park Priority Junction.j9 Path: C:\Users\Mode\Dropbox (mode)\Project\Reading\1. Projects\J323173 Lidl Erith\4. Data\Junction Models\February 2018 Report generation date: 05/02/2018 15:41:34
»2022 Base, AM »2022 Base, PM »2022 Base, SAT »2022 Base, SUN »2022 Base + Dev, AM »2022 Base + Dev, PM »2022 Base + Dev, SAT »2022 Base + Dev, SUN
Summary of junction performance
Junctions 9PICADY 9 - Priority Intersection Module
Version: 9.0.2.5947 © Copyright TRL Limited, 2017
For sales and distribution information, program advice and maintenance, contact TRL: +44 (0)1344 770558 [email protected] www.trlsoftware.co.uk
The users of this computer program for the solution of an engineering problem are in no way relieved of their responsibility for the correctness of the solution
AM PM SAT SUN
Queue (Veh)
Delay (s) RFC LOS Queue
(Veh)Delay
(s) RFC LOS Queue (Veh)
Delay (s) RFC LOS Queue
(Veh)Delay
(s) RFC LOS
2022 BaseStream B-C 0.0 5.85 0.02 A 0.0 5.69 0.02 A 0.0 5.92 0.03 A 0.0 5.91 0.02 A
Stream B-A 0.0 7.58 0.02 A 0.0 7.22 0.01 A 0.0 7.69 0.03 A 0.0 7.74 0.03 A
Stream C-AB 0.0 6.03 0.02 A 0.0 5.77 0.01 A 0.0 5.89 0.02 A 0.0 5.88 0.02 A
2022 Base + DevStream B-C 0.0 5.83 0.02 A 0.0 5.81 0.04 A 0.1 5.97 0.05 A 0.0 5.97 0.05 A
Stream B-A 0.0 6.89 0.02 A 0.0 7.06 0.02 A 0.0 6.95 0.04 A 0.0 6.99 0.04 A
Stream C-AB 0.0 5.96 0.03 A 0.0 5.93 0.04 A 0.0 5.98 0.04 A 0.0 6.02 0.05 A
Values shown are the highest values encountered over all time segments. Delay is the maximum value of average delay per arriving vehicle.
File summary
File Description Title (untitled)
Location
Site number
Date 22/01/2018
Version
Status (new file)
Identifier
Client
Jobnumber
Enumerator DESKTOP-499K8KJ\Mode
Description
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
1
Units
Analysis Options
Demand Set Summary
Analysis Set Details
Distance units Speed units Traffic units input Traffic units results Flow units Average delay units Total delay units Rate of delay unitsm kph Veh Veh perHour s -Min perMin
Calculate Queue Percentiles Calculate residual capacity RFC Threshold Average Delay threshold (s) Queue threshold (PCU) 0.85 36.00 20.00
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D1 2022 Base AM DIRECT 07:45 09:15 90 15
D2 2022 Base PM DIRECT 16:45 18:15 90 15
D3 2022 Base SAT DIRECT 11:45 13:15 90 15
D4 2022 Base SUN DIRECT 11:45 13:15 90 15
D5 2022 Base + Dev AM DIRECT 07:45 09:15 90 15
D6 2022 Base + Dev PM DIRECT 16:45 18:15 90 15
D7 2022 Base + Dev SAT DIRECT 11:45 13:15 90 15
D8 2022 Base + Dev SUN DIRECT 11:45 13:15 90 15
ID Network flow scaling factor (%)
A1 100.000
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
2
2022 Base, AM Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Arms
Arms
Major Arm Geometry
Geometries for Arm C are measured opposite Arm B. Geometries for Arm A (if relevant) are measured opposite Arm D.
Minor Arm Geometry
Slope / Intercept / Capacity
Priority Intersection Slopes and Intercepts
The slopes and intercepts shown above do NOT include any corrections or adjustments. Streams may be combined, in which case capacity will be adjusted. Values are shown for the first time segment only; they may differ for subsequent time segments.
Junction Name Junction Type Major road direction Junction Delay (s) Junction LOS
1 Madford Trading Park Priority Junction T-Junction Two-way 0.44 A
Driving side LightingLeft Normal/unknown
Arm Name Description Arm type
A Fraser Road (A206) Major
B Site Access Minor
C Fraser Road (A206) Major
Arm Width of carriageway (m)
Has kerbed central reserve
Has right turn bay
Width for right turn (m)
Visibility for right turn (m) Blocks? Blocking queue
(PCU)
C - Fraser Road (A206) 8.90 ü 2.40 132.2 ü 2.00
Arm Minor arm type
Width at give-way (m)
Width at 5m (m)
Width at 10m (m)
Width at 15m (m)
Width at 20m (m)
Estimate flare length
Flare length (PCU)
Visibility to left (m)
Visibility to right (m)
B - Site AccessOne lane plus flare
10.00 4.20 3.00 3.00 3.00 1.00 21 22
Junction Stream Intercept(Veh/hr)
Slopefor A-B
Slopefor A-C
Slopefor C-A
Slopefor C-B
1 B-A 594 0.095 0.239 0.150 0.342
1 B-C 679 0.091 0.230 - -
1 C-B 665 0.225 0.225 - -
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
3
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D1 2022 Base AM DIRECT 07:45 09:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Arm Linked arm Use O-D data Scaling Factor (%)
A - Fraser Road (A206) ü 100.000
B - Site Access ü 100.000
C - Fraser Road (A206) ü 100.000
07:45 - 08:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 8 94
B - Site Access 2 0 7
C - Fraser Road (A206) 109 1 0
08:00 - 08:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 8 94
B - Site Access 2 0 7
C - Fraser Road (A206) 109 1 0
08:15 - 08:30
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 6 119
B - Site Access 1 0 3
C - Fraser Road (A206) 92 13 0
08:30 - 08:45
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 8 130
B - Site Access 2 0 11
C - Fraser Road (A206) 111 7 0
08:45 - 09:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 10 85
B - Site Access 9 0 8
C - Fraser Road (A206) 148 7 0
09:00 - 09:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 10 85
B - Site Access 9 0 8
C - Fraser Road (A206) 148 7 0
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
4
Vehicle Mix
Results
Results Summary for whole modelled period
Main Results for each time segment
07:45 - 08:00
08:00 - 08:15
08:15 - 08:30
Heavy Vehicle Percentages To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 6 7
B - Site Access 0 0 3
C - Fraser Road (A206) 4 4 0
Stream Max RFC Max delay (s) Max Queue (Veh) Max LOS
B-C 0.02 5.85 0.0 A
B-A 0.02 7.58 0.0 A
C-AB 0.02 6.03 0.0 A
C-A
A-B
A-C
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 7 635 0.011 7 0.0 5.730 A
B-A 2 552 0.004 2 0.0 6.544 A
C-AB 1 616 0.002 1 0.0 5.857 A
C-A 109 109
A-B 8 8
A-C 94 94
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 7 635 0.011 7 0.0 5.730 A
B-A 2 552 0.004 2 0.0 6.544 A
C-AB 1 616 0.002 1 0.0 5.857 A
C-A 109 109
A-B 8 8
A-C 94 94
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 3 630 0.005 3 0.0 5.744 A
B-A 1 544 0.002 1 0.0 6.626 A
C-AB 13 610 0.021 13 0.0 6.027 A
C-A 92 92
A-B 6 6
A-C 119 119
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
5
08:30 - 08:45
08:45 - 09:00
09:00 - 09:15
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 11 627 0.018 11 0.0 5.847 A
B-A 2 540 0.004 2 0.0 6.686 A
C-AB 7 607 0.012 7 0.0 5.998 A
C-A 111 111
A-B 8 8
A-C 130 130
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 8 716 0.011 8 0.0 5.086 A
B-A 9 484 0.019 9 0.0 7.579 A
C-AB 7 617 0.011 7 0.0 5.901 A
C-A 148 148
A-B 10 10
A-C 85 85
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 8 716 0.011 8 0.0 5.086 A
B-A 9 484 0.019 9 0.0 7.579 A
C-AB 7 617 0.011 7 0.0 5.899 A
C-A 148 148
A-B 10 10
A-C 85 85
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
6
2022 Base, PM Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
Junction Name Junction Type Major road direction Junction Delay (s) Junction LOS
1 Madford Trading Park Priority Junction T-Junction Two-way 0.42 A
Driving side LightingLeft Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D2 2022 Base PM DIRECT 16:45 18:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Arm Linked arm Use O-D data Scaling Factor (%)
A - Fraser Road (A206) ü 100.000
B - Site Access ü 100.000
C - Fraser Road (A206) ü 100.000
16:45 - 17:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 0 147
B - Site Access 6 0 9
C - Fraser Road (A206) 84 7 0
17:00 - 17:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 0 147
B - Site Access 6 0 9
C - Fraser Road (A206) 84 7 0
17:15 - 17:30
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 3 145
B - Site Access 2 0 7
C - Fraser Road (A206) 83 7 0
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
7
Vehicle Mix
Results
Results Summary for whole modelled period
Main Results for each time segment
16:45 - 17:00
17:30 - 17:45
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 3 137
B - Site Access 5 0 7
C - Fraser Road (A206) 121 8 0
17:45 - 18:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 6 146
B - Site Access 2 0 10
C - Fraser Road (A206) 91 2 0
18:00 - 18:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 6 146
B - Site Access 2 0 10
C - Fraser Road (A206) 91 2 0
Heavy Vehicle Percentages To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 0 3
B - Site Access 7 0 0
C - Fraser Road (A206) 3 0 0
Stream Max RFC Max delay (s) Max Queue (Veh) Max LOS
B-C 0.02 5.69 0.0 A
B-A 0.01 7.22 0.0 A
C-AB 0.01 5.77 0.0 A
C-A
A-B
A-C
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 9 642 0.014 9 0.0 5.686 A
B-A 6 507 0.012 6 0.0 7.182 A
C-AB 7 631 0.011 7 0.0 5.772 A
C-A 84 84
A-B 0 0
A-C 147 147
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
8
17:00 - 17:15
17:15 - 17:30
17:30 - 17:45
17:45 - 18:00
18:00 - 18:15
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 9 642 0.014 9 0.0 5.686 A
B-A 6 507 0.012 6 0.0 7.182 A
C-AB 7 631 0.011 7 0.0 5.772 A
C-A 84 84
A-B 0 0
A-C 147 147
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 7 643 0.011 7 0.0 5.655 A
B-A 2 507 0.004 2 0.0 7.124 A
C-AB 7 630 0.011 7 0.0 5.774 A
C-A 83 83
A-B 3 3
A-C 145 145
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 7 644 0.011 7 0.0 5.649 A
B-A 5 503 0.010 5 0.0 7.220 A
C-AB 8 632 0.013 8 0.0 5.766 A
C-A 121 121
A-B 3 3
A-C 137 137
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 10 643 0.016 10 0.0 5.686 A
B-A 2 507 0.004 2 0.0 7.122 A
C-AB 2 629 0.003 2 0.0 5.739 A
C-A 91 91
A-B 6 6
A-C 146 146
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 10 643 0.016 10 0.0 5.686 A
B-A 2 507 0.004 2 0.0 7.121 A
C-AB 2 629 0.003 2 0.0 5.738 A
C-A 91 91
A-B 6 6
A-C 146 146
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
9
2022 Base, SAT Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
Junction Name Junction Type Major road direction Junction Delay (s) Junction LOS
1 Madford Trading Park Priority Junction T-Junction Two-way 0.97 A
Driving side LightingLeft Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D3 2022 Base SAT DIRECT 11:45 13:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Arm Linked arm Use O-D data Scaling Factor (%)
A - Fraser Road (A206) ü 100.000
B - Site Access ü 100.000
C - Fraser Road (A206) ü 100.000
11:45 - 12:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 17 99
B - Site Access 12 0 15
C - Fraser Road (A206) 120 14 0
12:00 - 12:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 17 99
B - Site Access 12 0 15
C - Fraser Road (A206) 120 14 0
12:15 - 12:30
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 11 99
B - Site Access 10 0 14
C - Fraser Road (A206) 120 12 0
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
10
Vehicle Mix
Results
Results Summary for whole modelled period
Main Results for each time segment
11:45 - 12:00
12:30 - 12:45
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 12 76
B - Site Access 14 0 12
C - Fraser Road (A206) 99 12 0
12:45 - 13:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 19 107
B - Site Access 10 0 16
C - Fraser Road (A206) 91 14 0
13:00 - 13:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 19 107
B - Site Access 10 0 16
C - Fraser Road (A206) 91 14 0
Heavy Vehicle Percentages To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 2 3
B - Site Access 2 0 4
C - Fraser Road (A206) 4 2 0
Stream Max RFC Max delay (s) Max Queue (Veh) Max LOS
B-C 0.03 5.92 0.0 A
B-A 0.03 7.69 0.0 A
C-AB 0.02 5.89 0.0 A
C-A
A-B
A-C
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 15 625 0.024 15 0.0 5.900 A
B-A 12 534 0.022 12 0.0 6.896 A
C-AB 14 627 0.022 14 0.0 5.869 A
C-A 120 120
A-B 17 17
A-C 99 99
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
11
12:00 - 12:15
12:15 - 12:30
12:30 - 12:45
12:45 - 13:00
13:00 - 13:15
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 15 625 0.024 15 0.0 5.900 A
B-A 12 534 0.022 12 0.0 6.897 A
C-AB 14 627 0.022 14 0.0 5.869 A
C-A 120 120
A-B 17 17
A-C 99 99
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 14 626 0.022 14 0.0 5.882 A
B-A 10 535 0.019 10 0.0 6.854 A
C-AB 12 629 0.019 12 0.0 5.840 A
C-A 120 120
A-B 11 11
A-C 99 99
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 12 710 0.017 12 0.0 5.158 A
B-A 14 482 0.029 14 0.0 7.690 A
C-AB 12 634 0.019 12 0.0 5.791 A
C-A 99 99
A-B 12 12
A-C 76 76
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 16 624 0.026 16 0.0 5.924 A
B-A 10 536 0.019 10 0.0 6.841 A
C-AB 14 625 0.022 14 0.0 5.891 A
C-A 91 91
A-B 19 19
A-C 107 107
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 16 624 0.026 16 0.0 5.924 A
B-A 10 536 0.019 10 0.0 6.843 A
C-AB 14 625 0.022 14 0.0 5.891 A
C-A 91 91
A-B 19 19
A-C 107 107
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
12
2022 Base, SUN Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
Junction Name Junction Type Major road direction Junction Delay (s) Junction LOS
1 Madford Trading Park Priority Junction T-Junction Two-way 0.94 A
Driving side LightingLeft Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D4 2022 Base SUN DIRECT 11:45 13:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Arm Linked arm Use O-D data Scaling Factor (%)
A - Fraser Road (A206) ü 100.000
B - Site Access ü 100.000
C - Fraser Road (A206) ü 100.000
11:45 - 12:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 17 103
B - Site Access 12 0 15
C - Fraser Road (A206) 127 14 0
12:00 - 12:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 17 103
B - Site Access 12 0 15
C - Fraser Road (A206) 127 14 0
12:15 - 12:30
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 11 103
B - Site Access 10 0 14
C - Fraser Road (A206) 129 12 0
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
13
Vehicle Mix
Results
Results Summary for whole modelled period
Main Results for each time segment
11:45 - 12:00
12:30 - 12:45
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 12 79
B - Site Access 14 0 12
C - Fraser Road (A206) 117 12 0
12:45 - 13:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 12 79
B - Site Access 14 0 12
C - Fraser Road (A206) 117 12 0
13:00 - 13:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 12 79
B - Site Access 14 0 12
C - Fraser Road (A206) 117 12 0
Heavy Vehicle Percentages To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 2 3
B - Site Access 2 0 4
C - Fraser Road (A206) 3 2 0
Stream Max RFC Max delay (s) Max Queue (Veh) Max LOS
B-C 0.02 5.91 0.0 A
B-A 0.03 7.74 0.0 A
C-AB 0.02 5.88 0.0 A
C-A
A-B
A-C
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 15 624 0.024 15 0.0 5.910 A
B-A 12 532 0.023 12 0.0 6.922 A
C-AB 14 626 0.022 14 0.0 5.878 A
C-A 127 127
A-B 17 17
A-C 103 103
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
14
12:00 - 12:15
12:15 - 12:30
12:30 - 12:45
12:45 - 13:00
13:00 - 13:15
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 15 624 0.024 15 0.0 5.910 A
B-A 12 532 0.023 12 0.0 6.922 A
C-AB 14 626 0.022 14 0.0 5.878 A
C-A 127 127
A-B 17 17
A-C 103 103
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 14 625 0.022 14 0.0 5.889 A
B-A 10 533 0.019 10 0.0 6.884 A
C-AB 12 628 0.019 12 0.0 5.849 A
C-A 129 129
A-B 11 11
A-C 103 103
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 12 709 0.017 12 0.0 5.162 A
B-A 14 479 0.029 14 0.0 7.739 A
C-AB 12 633 0.019 12 0.0 5.799 A
C-A 117 117
A-B 12 12
A-C 79 79
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 12 709 0.017 12 0.0 5.162 A
B-A 14 479 0.029 14 0.0 7.739 A
C-AB 12 633 0.019 12 0.0 5.799 A
C-A 117 117
A-B 12 12
A-C 79 79
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 12 709 0.017 12 0.0 5.162 A
B-A 14 479 0.029 14 0.0 7.739 A
C-AB 12 633 0.019 12 0.0 5.797 A
C-A 117 117
A-B 12 12
A-C 79 79
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
15
2022 Base + Dev, AM Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
Junction Name Junction Type Major road direction Junction Delay (s) Junction LOS
1 Madford Trading Park Priority Junction T-Junction Two-way 0.66 A
Driving side LightingLeft Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D5 2022 Base + Dev AM DIRECT 07:45 09:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Arm Linked arm Use O-D data Scaling Factor (%)
A - Fraser Road (A206) ü 100.000
B - Site Access ü 100.000
C - Fraser Road (A206) ü 100.000
07:45 - 08:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 10 93
B - Site Access 4 0 11
C - Fraser Road (A206) 108 6 0
08:00 - 08:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 10 93
B - Site Access 4 0 11
C - Fraser Road (A206) 108 6 0
08:15 - 08:30
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 8 118
B - Site Access 3 0 7
C - Fraser Road (A206) 91 18 0
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
16
Vehicle Mix
Results
Results Summary for whole modelled period
Main Results for each time segment
07:45 - 08:00
08:30 - 08:45
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 10 130
B - Site Access 4 0 15
C - Fraser Road (A206) 110 12 0
08:45 - 09:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 12 84
B - Site Access 11 0 12
C - Fraser Road (A206) 147 12 0
09:00 - 09:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 12 84
B - Site Access 11 0 12
C - Fraser Road (A206) 147 12 0
Heavy Vehicle Percentages To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 5 7
B - Site Access 2 0 2
C - Fraser Road (A206) 4 2 0
Stream Max RFC Max delay (s) Max Queue (Veh) Max LOS
B-C 0.02 5.83 0.0 A
B-A 0.02 6.89 0.0 A
C-AB 0.03 5.96 0.0 A
C-A
A-B
A-C
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 11 641 0.017 11 0.0 5.714 A
B-A 4 540 0.007 4 0.0 6.719 A
C-AB 6 627 0.010 6 0.0 5.792 A
C-A 108 108
A-B 10 10
A-C 93 93
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
17
08:00 - 08:15
08:15 - 08:30
08:30 - 08:45
08:45 - 09:00
09:00 - 09:15
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 11 641 0.017 11 0.0 5.714 A
B-A 4 540 0.007 4 0.0 6.719 A
C-AB 6 627 0.010 6 0.0 5.792 A
C-A 108 108
A-B 10 10
A-C 93 93
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 7 635 0.011 7 0.0 5.731 A
B-A 3 532 0.006 3 0.0 6.803 A
C-AB 18 622 0.029 18 0.0 5.959 A
C-A 91 91
A-B 8 8
A-C 118 118
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 15 632 0.024 15 0.0 5.834 A
B-A 4 528 0.008 4 0.0 6.869 A
C-AB 12 619 0.019 12 0.0 5.933 A
C-A 110 110
A-B 10 10
A-C 130 130
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 12 641 0.019 12 0.0 5.728 A
B-A 11 534 0.021 11 0.0 6.886 A
C-AB 12 629 0.019 12 0.0 5.835 A
C-A 147 147
A-B 12 12
A-C 84 84
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 12 641 0.019 12 0.0 5.725 A
B-A 11 534 0.021 11 0.0 6.886 A
C-AB 12 629 0.019 12 0.0 5.833 A
C-A 147 147
A-B 12 12
A-C 84 84
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
18
2022 Base + Dev, PM Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
Junction Name Junction Type Major road direction Junction Delay (s) Junction LOS
1 Madford Trading Park Priority Junction T-Junction Two-way 1.10 A
Driving side LightingLeft Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D6 2022 Base + Dev PM DIRECT 16:45 18:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Arm Linked arm Use O-D data Scaling Factor (%)
A - Fraser Road (A206) ü 100.000
B - Site Access ü 100.000
C - Fraser Road (A206) ü 100.000
16:45 - 17:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 7 142
B - Site Access 11 0 22
C - Fraser Road (A206) 73 23 0
17:00 - 17:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 7 142
B - Site Access 11 0 22
C - Fraser Road (A206) 73 23 0
17:15 - 17:30
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 10 140
B - Site Access 7 0 20
C - Fraser Road (A206) 72 23 0
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
19
Vehicle Mix
Results
Results Summary for whole modelled period
Main Results for each time segment
16:45 - 17:00
17:30 - 17:45
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 10 132
B - Site Access 10 0 20
C - Fraser Road (A206) 110 24 0
17:45 - 18:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 13 141
B - Site Access 7 0 23
C - Fraser Road (A206) 81 18 0
18:00 - 18:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 13 141
B - Site Access 7 0 23
C - Fraser Road (A206) 81 18 0
Heavy Vehicle Percentages To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 0 3
B - Site Access 3 0 0
C - Fraser Road (A206) 3 0 0
Stream Max RFC Max delay (s) Max Queue (Veh) Max LOS
B-C 0.04 5.81 0.0 A
B-A 0.02 7.06 0.0 A
C-AB 0.04 5.93 0.0 A
C-A
A-B
A-C
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 22 641 0.034 22 0.0 5.812 A
B-A 11 524 0.021 11 0.0 7.019 A
C-AB 23 630 0.037 23 0.0 5.925 A
C-A 73 73
A-B 7 7
A-C 142 142
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
20
17:00 - 17:15
17:15 - 17:30
17:30 - 17:45
17:45 - 18:00
18:00 - 18:15
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 22 641 0.034 22 0.0 5.814 A
B-A 11 524 0.021 11 0.0 7.020 A
C-AB 23 630 0.037 23 0.0 5.927 A
C-A 73 73
A-B 7 7
A-C 142 142
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 20 642 0.031 20 0.0 5.785 A
B-A 7 524 0.013 7 0.0 6.965 A
C-AB 23 630 0.037 23 0.0 5.929 A
C-A 72 72
A-B 10 10
A-C 140 140
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 20 643 0.031 20 0.0 5.773 A
B-A 10 520 0.019 10 0.0 7.058 A
C-AB 24 632 0.038 24 0.0 5.920 A
C-A 110 110
A-B 10 10
A-C 132 132
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 23 642 0.036 23 0.0 5.815 A
B-A 7 524 0.013 7 0.0 6.965 A
C-AB 18 629 0.029 18 0.0 5.890 A
C-A 81 81
A-B 13 13
A-C 141 141
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 23 642 0.036 23 0.0 5.815 A
B-A 7 524 0.013 7 0.0 6.964 A
C-AB 18 629 0.029 18 0.0 5.892 A
C-A 81 81
A-B 13 13
A-C 141 141
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
21
2022 Base + Dev, SAT Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
Junction Name Junction Type Major road direction Junction Delay (s) Junction LOS
1 Madford Trading Park Priority Junction T-Junction Two-way 1.57 A
Driving side LightingLeft Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D7 2022 Base + Dev SAT DIRECT 11:45 13:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Arm Linked arm Use O-D data Scaling Factor (%)
A - Fraser Road (A206) ü 100.000
B - Site Access ü 100.000
C - Fraser Road (A206) ü 100.000
11:45 - 12:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 23 96
B - Site Access 19 0 30
C - Fraser Road (A206) 109 26 0
12:00 - 12:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 23 96
B - Site Access 19 0 30
C - Fraser Road (A206) 109 26 0
12:15 - 12:30
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 17 96
B - Site Access 17 0 29
C - Fraser Road (A206) 109 24 0
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
22
Vehicle Mix
Results
Results Summary for whole modelled period
Main Results for each time segment
11:45 - 12:00
12:30 - 12:45
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 18 72
B - Site Access 21 0 27
C - Fraser Road (A206) 89 24 0
12:45 - 13:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 25 103
B - Site Access 17 0 31
C - Fraser Road (A206) 81 26 0
13:00 - 13:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 25 103
B - Site Access 17 0 31
C - Fraser Road (A206) 81 26 0
Heavy Vehicle Percentages To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 1 4
B - Site Access 1 0 2
C - Fraser Road (A206) 4 1 0
Stream Max RFC Max delay (s) Max Queue (Veh) Max LOS
B-C 0.05 5.97 0.1 A
B-A 0.04 6.95 0.0 A
C-AB 0.04 5.98 0.0 A
C-A
A-B
A-C
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 30 635 0.047 30 0.0 5.946 A
B-A 19 537 0.035 19 0.0 6.949 A
C-AB 26 630 0.041 26 0.0 5.961 A
C-A 109 109
A-B 23 23
A-C 96 96
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
23
12:00 - 12:15
12:15 - 12:30
12:30 - 12:45
12:45 - 13:00
13:00 - 13:15
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 30 635 0.047 30 0.0 5.949 A
B-A 19 537 0.035 19 0.0 6.952 A
C-AB 26 630 0.041 26 0.0 5.963 A
C-A 109 109
A-B 23 23
A-C 96 96
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 29 636 0.046 29 0.0 5.930 A
B-A 17 538 0.032 17 0.0 6.912 A
C-AB 24 631 0.038 24 0.0 5.931 A
C-A 109 109
A-B 17 17
A-C 96 96
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 27 641 0.042 27 0.0 5.866 A
B-A 21 547 0.038 21 0.0 6.844 A
C-AB 24 636 0.038 24 0.0 5.881 A
C-A 89 89
A-B 18 18
A-C 72 72
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 31 634 0.049 31 0.1 5.970 A
B-A 17 539 0.032 17 0.0 6.894 A
C-AB 26 627 0.041 26 0.0 5.984 A
C-A 81 81
A-B 25 25
A-C 103 103
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 31 634 0.049 31 0.1 5.970 A
B-A 17 539 0.032 17 0.0 6.896 A
C-AB 26 627 0.041 26 0.0 5.984 A
C-A 81 81
A-B 25 25
A-C 103 103
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
24
2022 Base + Dev, SUN Data Errors and Warnings No errors or warnings
Junction Network
Junctions
Junction Network Options
Traffic Demand
Demand Set Details
Demand overview (Traffic)
Origin-Destination Data
Junction Name Junction Type Major road direction Junction Delay (s) Junction LOS
1 Madford Trading Park Priority Junction T-Junction Two-way 1.50 A
Driving side LightingLeft Normal/unknown
ID Scenario name Time Period name Traffic profile type Start time (HH:mm) Finish time (HH:mm) Time period length (min) Time segment length (min)
D8 2022 Base + Dev SUN DIRECT 11:45 13:15 90 15
Vehicle mix source PCU Factor for a HV (PCU) O-D data varies over timeHV Percentages 2.00 ü
Arm Linked arm Use O-D data Scaling Factor (%)
A - Fraser Road (A206) ü 100.000
B - Site Access ü 100.000
C - Fraser Road (A206) ü 100.000
11:45 - 12:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 24 99
B - Site Access 19 0 29
C - Fraser Road (A206) 115 29 0
12:00 - 12:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 24 99
B - Site Access 19 0 29
C - Fraser Road (A206) 115 29 0
12:15 - 12:30
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 18 99
B - Site Access 17 0 28
C - Fraser Road (A206) 117 27 0
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
25
Vehicle Mix
Results
Results Summary for whole modelled period
Main Results for each time segment
11:45 - 12:00
12:30 - 12:45
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 19 75
B - Site Access 21 0 26
C - Fraser Road (A206) 104 27 0
12:45 - 13:00
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 26 106
B - Site Access 17 0 30
C - Fraser Road (A206) 119 29 0
13:00 - 13:15
Demand (Veh/hr) To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 26 106
B - Site Access 17 0 30
C - Fraser Road (A206) 119 29 0
Heavy Vehicle Percentages To
From
A - Fraser Road (A206) B - Site Access C - Fraser Road (A206)
A - Fraser Road (A206) 0 1 3
B - Site Access 1 0 2
C - Fraser Road (A206) 4 1 0
Stream Max RFC Max delay (s) Max Queue (Veh) Max LOS
B-C 0.05 5.97 0.0 A
B-A 0.04 6.99 0.0 A
C-AB 0.05 6.02 0.0 A
C-A
A-B
A-C
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 29 635 0.046 29 0.0 5.942 A
B-A 19 534 0.036 19 0.0 6.983 A
C-AB 29 629 0.046 29 0.0 5.997 A
C-A 115 115
A-B 24 24
A-C 99 99
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
26
12:00 - 12:15
12:15 - 12:30
12:30 - 12:45
12:45 - 13:00
13:00 - 13:15
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 29 635 0.046 29 0.0 5.944 A
B-A 19 534 0.036 19 0.0 6.986 A
C-AB 29 629 0.046 29 0.0 5.999 A
C-A 115 115
A-B 24 24
A-C 99 99
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 28 636 0.044 28 0.0 5.926 A
B-A 17 535 0.032 17 0.0 6.947 A
C-AB 27 630 0.043 27 0.0 5.969 A
C-A 117 117
A-B 18 18
A-C 99 99
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 26 640 0.041 26 0.0 5.863 A
B-A 21 543 0.039 21 0.0 6.896 A
C-AB 27 636 0.043 27 0.0 5.915 A
C-A 104 104
A-B 19 19
A-C 75 75
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 30 633 0.047 30 0.0 5.966 A
B-A 17 532 0.032 17 0.0 6.994 A
C-AB 29 627 0.046 29 0.0 6.019 A
C-A 119 119
A-B 26 26
A-C 106 106
Stream Total Demand (Veh/hr) Capacity (Veh/hr) RFC Throughput
(Veh/hr) End queue (Veh) Delay (s) LOS
B-C 30 633 0.047 30 0.0 5.966 A
B-A 17 532 0.032 17 0.0 6.993 A
C-AB 29 627 0.046 29 0.0 6.019 A
C-A 119 119
A-B 26 26
A-C 106 106
Generated on 05/02/2018 15:41:43 using Junctions 9 (9.0.2.5947)
27
Proposed Lidl Foodstore, Fraser Road, Erith
Transport Assessment | 180209 323173 ta v1.5.docx 80
Appendix N PIC Data
Fraser Rd - personal injury collisions - 36 months to 31 Dec 2016
11 SEP 2017 12:21Date:
Page:
Interpreted Listing
RACCM28INTLVAUGHANMR LAAU - Accident Analysis System
1 of 1 (summary)
Summary of Accidents Selected
251
FRASER RD.001 NODE 187 (ERITH ROAD/PEMBROOK ROAD)FRASER RD.002 LINK 172-187 (FRASER ROAD)FRASER RD.003 NODE 172 (BEXLEY ROAD/FRASER ROAD)
Site Reference and Description (zero accident counts shown in bold) Accidents
36 MTS TO DEC-2016 36 MTS TO DEC-2016 36 MTS TO DEC-2016
Date Period
The description of how the accident occurred and the contributory factors are the reporting officer's opinion at the time of reporting and may not be the result of extensive investigation
Fraser Rd - personal injury collisions - 36 months to 31 Dec 2016
RACCM28INTLVAUGHANMR
11 SEP 2017 12:21Date:
Page:
LAAU - Accident Analysis System
Interpreted Listing
1 of 4
1
2
0115RY10088
0116RY10257
MON 09/03/15 10:10
THU 14/07/16 09:10
ROAD-DRY
ROAD-DRY
LIGHT
LIGHT
WEATHER-FINE
WEATHER-FINE
FRASER ROAD J/W RIVERDALE ROAD
FRASER ROAD J/W PEMBROKE ROAD
SINGLE CWY
SINGLE CWY
T/STAG JUN
T/STAG JUN
GIVE WAY/UNCONT
GIVE WAY/UNCONT
NO XING FACILITY IN 50M
ZEBRA
18
18
NODE 187
NODE 187
550390
550390
178370
178380
V1 WAS DRIVING TOO FAST AND HIT TURNING V2
V1 MOVED OFF TOO QUICK AND HIT V2
/
/
/
/
POLICE - AT SCENE
POLICE - AT SCENE
001
001
001
002
001
002
CASUALTY
CASUALTY
(001)
(002)
(19 Yrs - M DA7 )
(53 Yrs - M ME5 )
VEHICLE
VEHICLE
VEHICLE
VEHICLE
(002)
(001)
(002)
(001)
BT - NOT REQUESTED
BT - NOT REQUESTED
BT - NEGATIVE
BT - NOT REQUESTED
M/C 50-125CC
CAR
CAR
M/C 50-125CC
SLIGHT
SLIGHT
DRIVER/RIDER
DRIVER/RIDER
(19 Yrs - M DA7 )
(34 Yrs - M DE56)
(21 Yrs - M DA16)
(53 Yrs - M ME5 )
GOING AHEAD OTHER
TURNING RIGHT
MOVING OFF
GOING AHEAD HELD UP
NW TO SE
NW TO SW
SE TO NW
SE TO NW
JCT MID
JCT MID
JCT MID
JCT MID
FRONT HIT FIRST
O/S HIT FIRST
FRONT HIT FIRST
BACK HIT FIRST
x
x
FRASER RD.001 NODE 187 (ERITH ROAD/PEMBROOK ROAD) 36 MTS TO DEC-2016 SORTED BY DATE
307 (TRAVELLING TOO FAST FOR CONDITIONS) 405 (FAILED TO LOOK PROPERLY)
405 (FAILED TO LOOK PROPERLY) 602 (CARELESS/RECKLESS/IN A HURRY)
End of Accidents for
V001 V001
V001 V001
A A
A A
FRASER RD.001 NODE 187 (ERITH ROAD/PEMBROOK ROAD)
Fraser Rd - personal injury collisions - 36 months to 31 Dec 2016
RACCM28INTLVAUGHANMR
11 SEP 2017 12:21Date:
Page:
LAAU - Accident Analysis System
Interpreted Listing
2 of 4
1
2
3
0114RY10332
0114RY10452
0115RY10375
SAT 09/08/14 19:30
SAT 01/11/14 16:17
MON 28/09/15 16:00
ROAD-DRY
ROAD-DRY
ROAD-DRY
LIGHT
LIGHT
LIGHT
WEATHER-FINE
WEATHER-FINE
WEATHER-FINE
NFL FRASER ROAD 100 M NW J/W BEXLEY ROAD
ALFORD ROAD J/W FRASER ROAD
FRASER ROAD 55 M SE J/W ALFORD ROAD
SINGLE CWY
SINGLE CWY
SINGLE CWY
NO JUN IN 20M
T/STAG JUN
NO JUN IN 20M
GIVE WAY/UNCONT
NO XING FACILITY IN 50M
NO XING FACILITY IN 50M
NO XING FACILITY IN 50M
18
18
18
LINK 172-187
LINK 172-187
LINK 172-187
551070
550420
550440
178010
178340
178300
V1 WAS DRIVING TO FAST, SWERVED, LOST CONTROL AND HIT PARKED V2
V1 SWERVED LOST CONTROL AND HIT A SHOP WINDOW
V2 U TURNED WITHOUT LOOKING AND HIT ON COMING V1
/
/
/
/
/
/
POLICE - AT SCENE
POLICE - AT SCENE
POLICE - AT SCENE
001
001
001
001
002
001
001
002
CASUALTY
CASUALTY
CASUALTY
(001)
(001)
(001)
(21 Yrs - M DA16)
(30 Yrs - F RM9 )
(19 Yrs - F TN14)
VEHICLE
VEHICLE
VEHICLE
VEHICLE
VEHICLE
(002)
(001)
(000)
(002)
(001)
BT - NOT REQUESTED
BT - NOT REQUESTED
BT - NEGATIVE
BT - DRV NOT CONTACTED
BT - DRV NOT CONTACTED
LEFT CWY NEARSIDE
CAR
CAR
CAR
CAR
CAR
SLIGHT
SLIGHT
SLIGHT
DRIVER/RIDER
DRIVER/RIDER
DRIVER/RIDER
(21 Yrs - M DA16)
(28 Yrs - M DA8 )
(30 Yrs - F RM9 )
(19 Yrs - F TN14)
(? Yrs - M )
GOING AHEAD OTHER
PARKED
GOING AHEAD OTHER
GOING AHEAD OTHER
U-TURNING
NW TO SE
P TO P
SW TO NE
NW TO SE
NW TO NW
JCT MID
FRONT HIT FIRST
BACK HIT FIRST
FRONT HIT FIRST
FRONT HIT FIRST
O/S HIT FIRST
HIT PARKED VEH
HIT KERB HIT OTH OBJECT
x
x
x
FRASER RD.002 LINK 172-187 (FRASER ROAD) 36 MTS TO DEC-2016 SORTED BY DATE
307 (TRAVELLING TOO FAST FOR CONDITIONS) 405 (FAILED TO LOOK PROPERLY)601 (AGGRESSIVE DRIVING)
405 (FAILED TO LOOK PROPERLY) 410 (LOSS OF CONTROL)605 (INEXPERIENCED OR LEARNER DRIVER/RIDER)
403 (POOR TURN OR MANOEUVRE) 405 (FAILED TO LOOK PROPERLY)601 (AGGRESSIVE DRIVING)
V001 V001V001
V001 V001V001
V002 V002V002
A AA
A AA
A AA
Fraser Rd - personal injury collisions - 36 months to 31 Dec 2016
RACCM28INTLVAUGHANMR
11 SEP 2017 12:21Date:
Page:
LAAU - Accident Analysis System
Interpreted Listing
3 of 4
4
5
0115RY10439
01160023961
WED 18/11/15 17:10
THU 13/10/16 05:30
ROAD-DRY
ROAD-WET
LIGHT
DARK
WEATHER-FINE
RAINING
FRASER ROAD J/W HAWTON PLACE
FRASER ROAD J/W BIRCH WALK
SINGLE CWY
SINGLE CWY
T/STAG JUN
T/STAG JUN
GIVE WAY/UNCONT
GIVE WAY/UNCONT
NO XING FACILITY IN 50M
NO XING FACILITY IN 50M
18
18
LINK 172-187
LINK 172-187
550480
550540
178250
178200
PED WALKED INTO THE ROAD NOT LOOKING AND WAS HIT BY V1
PED WAS IN THE ROAD CROSSING, V1 DRIVER DIDN'T SEE PED AND HIT PED
/
/
/
/
POLICE - AT SCENE
POLICE - AT SCENE
001
001
001
001
CASUALTY
CASUALTY
(001)
(001)
(48 Yrs - F DA7 )
(23 Yrs - M DA17)
VEHICLE
VEHICLE
(000)
(000)
BT - NEGATIVE
BT - NOT REQUESTED
CAR
CAR
SLIGHT
SLIGHT
PEDESTRIAN
PEDESTRIAN
CROSSING ROAD (NOT ON XING)
CROSSING ROAD (NOT ON XING)
SW BOUND
SE BOUND
FROM DRIVERS O/SIDE
FROM DRIVERS O/SIDE
(28 Yrs - M RM14)
(54 Yrs - M DA5 )
GOING AHEAD OTHER
GOING AHEAD OTHER
SE TO NW
SE TO NW
JCT MID
JCT MID
O/S HIT FIRST
N/S HIT FIRST
x
x
FRASER RD.002 LINK 172-187 (FRASER ROAD) 36 MTS TO DEC-2016 SORTED BY DATE
802 (FAILED TO LOOK PROPERLY) 808 (CARELESS/RECKLESS/IN A HURRY)
405 (FAILED TO LOOK PROPERLY) 602 (CARELESS/RECKLESS/IN A HURRY)
End of Accidents for
C001 C001
V001 V001
A A
A A
FRASER RD.002 LINK 172-187 (FRASER ROAD)
Fraser Rd - personal injury collisions - 36 months to 31 Dec 2016
RACCM28INTLVAUGHANMR
11 SEP 2017 12:21Date:
Page:
LAAU - Accident Analysis System
Interpreted Listing
4 of 4
1 0114RY10325 FRI 01/08/14 09:25ROAD-DRY
LIGHTWEATHER-FINE
BEXLEY ROAD J/W FRASER ROADROUNDABOUT ROUNDABOUT GIVE WAY/UNCONT NO XING FACILITY IN 50M
18 NODE 172 551160 177970
V2 DIDN'T GIVEWAY AND HIT THE SIDE OF V1
/ /POLICE - AT SCENE
001
001
002
CASUALTY (001) (40 Yrs - F SE18)
VEHICLE
VEHICLE
(002)
(001)
BT - NEGATIVE
BT - NEGATIVE
CAR
CAR
SLIGHT DRIVER/RIDER
(40 Yrs - F SE18)
(70 Yrs - F DA17)
TURNING RIGHT
GOING AHEAD OTHER
NW TO W
W TO E
JCT MID
JCT MID
N/S HIT FIRST
FRONT HIT FIRST
x
End of Report
FRASER RD.003 NODE 172 (BEXLEY ROAD/FRASER ROAD) 36 MTS TO DEC-2016 SORTED BY DATE
302 (DISOBEYED GIVE WAY OR STOP SIGN OR MARKINGS) 405 (FAILED TO LOOK PROPERLY)
End of Accidents for
V002 V002A A
FRASER RD.003 NODE 172 (BEXLEY ROAD/FRASER ROAD)
Fraser Rd - personal injury collisions - 36 months to 31 Dec 2016
11 SEP 2017 12:21Date:
Page:
Stick Diagram
RACCM28STICKVAUGHANMR LAAU - Accident Analysis System
1 of 1 (summary)
251
FRASER RD.001 NODE 187 (ERITH ROAD/PEMBROOK ROAD)FRASER RD.002 LINK 172-187 (FRASER ROAD)FRASER RD.003 NODE 172 (BEXLEY ROAD/FRASER ROAD)
Summary of Accidents SelectedSite Reference and Description (zero accident counts shown in bold) Accidents
36 MTS TO DEC-2016 36 MTS TO DEC-2016 36 MTS TO DEC-2016
Date Period
The description of how the accident occurred and the contributory factors are the reporting officer's opinion at the time of reporting and may not be the result of extensive investigation
Fraser Rd - personal injury collisions - 36 months to 31 Dec 2016
RACCM28STICKVAUGHANMR
11 SEP 2017 12:21Date:
Page:
LAAU - Accident Analysis System
Stick Diagram
1 of 3
1 20115RY10088 0116RY10257Accident ReferenceMONDAY THURSDAY Day09/03/2015 14/07/2016Date10:10 09:10TimeLIGHT LIGHTLight ConditionsDRY DRYRoad SurfaceSLIGHT SLIGHTSeverity
Pedestrian Location
550390 550390Easting/Northing 178370 178380
Conflict
Site Diagram
N
FRASER RD.001 NODE 187 (ERITH ROAD/PEMBROOK ROAD)
Pedestrian
Wet
Dark
0
0
0
36 MTS TO DEC-2016 SORTED BY DATE
0 %
0 %
0 %
12 12/2014 12 12/2015 12 12/2016
0 0 0
0 0 0
0 1 1
Severity / Months To
Fatal
Serious
Slight
Total 0 1 1
Pct
Total Pct
0
20
2
100.0 % 0.0 % 0.0 %
0.0 % 50.0 % 50.0 %
ContributoryFactors(* denotes pre 2005)
307405
405602
V001V001
V001V001
AA
AA
Fraser Rd - personal injury collisions - 36 months to 31 Dec 2016
RACCM28STICKVAUGHANMR
11 SEP 2017 12:21Date:
Page:
LAAU - Accident Analysis System
Stick Diagram
2 of 3
1 2 3 4 50114RY10332 0114RY10452 0115RY10375 0115RY10439 01160023961Accident ReferenceSATURDAY SATURDAY MONDAY WEDNESDAY THURSDAY Day09/08/2014 01/11/2014 28/09/2015 18/11/2015 13/10/2016Date19:30 16:17 16:00 17:10 05:30TimeLIGHT LIGHT LIGHT LIGHT DARKLight ConditionsDRY DRY DRY DRY WETRoad SurfaceSLIGHT SLIGHT SLIGHT SLIGHT SLIGHTSeverity
0 0Pedestrian Location
551070 550420 550440 550480 550540Easting/Northing 178010 178340 178300 178250 178200
Conflict
Site Diagram
N
FRASER RD.002 LINK 172-187 (FRASER ROAD)
Pedestrian
Wet
Dark
2
1
1
36 MTS TO DEC-2016 SORTED BY DATE
40 %
20 %
20 %
12 12/2014 12 12/2015 12 12/2016
0 0 0
0 0 0
2 2 1
Severity / Months To
Fatal
Serious
Slight
Total 2 2 1
Pct
Total Pct
0
50
5
100.0 % 0.0 % 0.0 %
40.0 % 40.0 % 20.0 %
ContributoryFactors(* denotes pre 2005)
307405601
405410605
403405601
802808
405602
V001V001V001
V001V001V001
V002V002V002
C001C001
V001V001
AAA
AAA
AAA
AA
AA
Fraser Rd - personal injury collisions - 36 months to 31 Dec 2016
RACCM28STICKVAUGHANMR
11 SEP 2017 12:21Date:
Page:
LAAU - Accident Analysis System
Stick Diagram
3 of 3
10114RY10325Accident ReferenceFRIDAY Day01/08/2014Date09:25TimeLIGHTLight ConditionsDRYRoad SurfaceSLIGHTSeverity
Pedestrian Location
551160Easting/Northing 177970
Conflict
Site Diagram
N
FRASER RD.003 NODE 172 (BEXLEY ROAD/FRASER ROAD)
Pedestrian
Wet
Dark
0
0
0
36 MTS TO DEC-2016 SORTED BY DATE
0 %
0 %
0 %
12 12/2014 12 12/2015 12 12/2016
0 0 0
0 0 0
1 0 0
Severity / Months To
Fatal
Serious
Slight
Total 1 0 0
Pct
Total Pct
0
10
1
100.0 % 0.0 % 0.0 %
100.0 % 0.0 % 0.0 %
ContributoryFactors(* denotes pre 2005)
302405
V002V002
AA