light liquid sampler...section 1: first things to know about light liquid samplers page 1 yz -...

114
LightLiquidSampler S Y S T E M S U P P O R T M A N U A L

Upload: others

Post on 29-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • Light Liquid SamplerS Y S T E M S U P P O R T M A N U A L

  • LIGHT LIQUID SAMPLERINSTRUCTION & OPERATING

    MANUALVersion: 01012007

  • LLLLLIGHTIGHTIGHTIGHTIGHT L L L L LIQUIDIQUIDIQUIDIQUIDIQUID S S S S SAMPLERAMPLERAMPLERAMPLERAMPLER T T T T TABLEABLEABLEABLEABLE OFOFOFOFOF C C C C CONTENTSONTENTSONTENTSONTENTSONTENTS

    Page IYZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Light Liquid Sampler ver.01012007

    Table of Contents .............................................................................................................................. I

    Section 1: First Things To Know ....................................................................................................1How to Use this Manual .......................................................................................................................1Typographic Conventions ....................................................................................................................1Getting Help .........................................................................................................................................1Operation Specifications .....................................................................................................................2Theory of Operation ............................................................................................................................3System Accessories ...........................................................................................................................3

    Section 2: System Installation.........................................................................................................5Standard System Components

    Probe Mounted Pumps (PNR).......................................................................................................5Skid Mounted Pumps (LPR) ..........................................................................................................8

    System Flow SchematicPneumatic Actuated

    Probe Mounted (PNR-2P) ........................................................................................................12Skid Mounted (LPR-2P) ............................................................................................................13

    Hydraulic ActuatedProbe Mounted (PNR-2H) ........................................................................................................14Skid Mounted (LPR-2H) ............................................................................................................15

    Standard System MountingSkids ...........................................................................................................................................16Cabinets ......................................................................................................................................17

    Standard System ConnectionsPneumatic Actuated Skids

    Probe Mounted (PNR-2S-xP) ...................................................................................................18Skid Mounted (LPR-2S-xP) ......................................................................................................19

    Pneumatic Actuated CabinetsProbe Mounted (PNR-2C-xP) ...................................................................................................20Skid Mounted (LPR-2C-xP) ......................................................................................................22

    Hydraulic Actuated SkidsProbe Mounted (PNR-2S-xH) ...................................................................................................23Skid Mounted (LPR-2S-xH) ......................................................................................................25

    Hydraulic Actuated CabinetsProbe Mounted (PNR-2C-xH) ...................................................................................................27Skid Mounted (LPR-2C-xH) ......................................................................................................29

    Pump Sample Size ...........................................................................................................................31

    Section 3: Filling the Pre-Charge Vessel ....................................................................................33Filling the Vessel ................................................................................................................................33

  • LLLLLIGHTIGHTIGHTIGHTIGHT L L L L LIQUIDIQUIDIQUIDIQUIDIQUID S S S S SAMPLERAMPLERAMPLERAMPLERAMPLER T T T T TABLEABLEABLEABLEABLE OFOFOFOFOF C C C C CONTENTSONTENTSONTENTSONTENTSONTENTS

    YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Page II Light Liquid Sampler ver.01012007

    Table of Contents ............................................................................................................................. II

    Section 4: System Control & Electronics ....................................................................................35Overview ...........................................................................................................................................35Pneumatic Actuated Control Options

    “-0” Control By Customer ............................................................................................................36“-1A” 24 VDC Time Delay Relay ..................................................................................................37“-1B” 120 VAC Time Delay Relay ................................................................................................38“4A” 24 VDC / 4-20mA.................................................................................................................39“4B” 120 VAC / 4-20mA ...............................................................................................................40“6A” 12-24 VDC Timer/Counter (Z-65).........................................................................................41“6B” 120 VAC Timer/Counter (Z-65) ............................................................................................42“6M” 12-24 VDC Timer/Counter (Z-65 w/PIM Card) .....................................................................437B” 120 VAC 4 Digit Counter (ATC) .............................................................................................44

    Hydraulic Sctuated Control Options“1B” 120 VAC Time Delay Relay ..................................................................................................45“4B” 120 VAC / 4-20mA ...............................................................................................................46“7B” 120 VAC 4 Digit Counter (ATC) ...........................................................................................47

    Section 5: Programming for Proportional-to-Flow Operation ...................................................49Setting Operator Input Parameters ...................................................................................................49

    “-0” Control By Customer ............................................................................................................50“-1” Control Option.......................................................................................................................51“4” Control Option ........................................................................................................................53“6” Control Option ........................................................................................................................58“7” Control Option ........................................................................................................................61

    Section 6: Mechanical System ......................................................................................................63Sample Pumps and Balance Valves

    PNR-2P .......................................................................................................................................63LPR-2P .......................................................................................................................................64PNR-2H .......................................................................................................................................65LPR-2H .......................................................................................................................................66

    Accumulator Vessel ..........................................................................................................................675-Way Cross .....................................................................................................................................68Actuation/Mixing System (Pneu)........................................................................................................69Actuation/Mixing System (Hyd.) .........................................................................................................70

    Section 7: System Operation ........................................................................................................71Preparing The System for Operation ................................................................................................71Sample Pump Priming ......................................................................................................................71Product Line Test ..............................................................................................................................71Portable Sample Vessel Connection .................................................................................................71

  • LLLLLIGHTIGHTIGHTIGHTIGHT L L L L LIQUIDIQUIDIQUIDIQUIDIQUID S S S S SAMPLERAMPLERAMPLERAMPLERAMPLER T T T T TABLEABLEABLEABLEABLE OFOFOFOFOF C C C C CONTENTSONTENTSONTENTSONTENTSONTENTS

    Page IIIYZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Light Liquid Sampler ver.01012007

    Table of Contents ............................................................................................................................ III

    Section 8: System Maintenance ...................................................................................................75Preventative Maintenance Schedule .................................................................................................75

    Recommended Maintenance Schedule ......................................................................................75Monthly Inspection ....................................................................................................................75Annual Inspection .....................................................................................................................75Bi-Annual Inspection .................................................................................................................75

    Recommended Spare Parts List .................................................................................................75

    Section 9: System Troubleshooting .............................................................................................. 77Pneumatic Systems:

    How to Use This Section .............................................................................................................77For Additional Help .......................................................................................................................77Step-by-Step Resolution ..............................................................................................................77

    Actuation Gas Pressure ....................................................................................................................77Actuation Gas Pressure Troubleshooting Steps ..........................................................................77

    Electrical Power ................................................................................................................................78Electrical Power Troubleshooting Steps ......................................................................................78

    Sample Pulse ....................................................................................................................................79Sample Pulse Troubleshooting Steps .........................................................................................79

    Pump Performance ...........................................................................................................................79Pump Performance Troubleshooting Steps ................................................................................79

    Pre-Charge/Product Accumulator .....................................................................................................80Pre-Charge/Product Accumulator Troubleshooting Steps ...........................................................80

    Hydraulic Systems:How to Use This Section .............................................................................................................81For Additional Help .......................................................................................................................81Step-by-Step Resolution ..............................................................................................................81

    Electrical Power ................................................................................................................................81Electrical Power Troubleshooting Steps ......................................................................................82Sample Pulse Troubleshooting Steps .........................................................................................82

    Hydraulic Power ................................................................................................................................83Hydraulic Power Troubleshooting Steps ......................................................................................83

  • LLLLLIGHTIGHTIGHTIGHTIGHT L L L L LIQUIDIQUIDIQUIDIQUIDIQUID S S S S SAMPLERAMPLERAMPLERAMPLERAMPLER T T T T TABLEABLEABLEABLEABLE OFOFOFOFOF C C C C CONTENTSONTENTSONTENTSONTENTSONTENTS

    YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Page IV Light Liquid Sampler ver.01012007

    Table of Contents ........................................................................................................................... IV

    Appendix A: Illustrations ................................................................................................................87PNR-2P Sample Pump Assembled ..................................................................................................87LPR-2P Sample Pump Assembled ...................................................................................................88PNR-2H Sample Pump Assembled ..................................................................................................89LPR-2H Sample Pump Assembled ................................................................................................... 90Balance Valve Assembly, Exploded View ..........................................................................................915-Way Cross Assembly.....................................................................................................................92Pre-Charge System ..........................................................................................................................93Pneumatic Product Accumulator VesselProduct Accumulator Vessel .............................................................................................................94Mixing System-Accumulator ..............................................................................................................95Mixing System ...................................................................................................................................96Hydraulic Product Accumulator VesselProduct Accumulator Vessel .............................................................................................................97Mixing System-Accumulator ..............................................................................................................98Mixing System ...................................................................................................................................99Hydraulic Power Pack .....................................................................................................................100Hydraulic Power Pack/Test Switch ..................................................................................................101Electrical Wiring Hydraulic Power Pack/Test Switch.......................................................................102Z-65 Wiring Control Document .......................................................................................................103Z-200 Wiring Control Document...................................................................................................... 104

  • SSSSSECTIONECTIONECTIONECTIONECTION 1: 1: 1: 1: 1:FFFFFIRSTIRSTIRSTIRSTIRST T T T T THINGSHINGSHINGSHINGSHINGS T T T T TOOOOO K K K K KNOWNOWNOWNOWNOW A A A A ABOUTBOUTBOUTBOUTBOUT L L L L LIGHTIGHTIGHTIGHTIGHT L L L L LIQUIDIQUIDIQUIDIQUIDIQUID S S S S SAMPLERSAMPLERSAMPLERSAMPLERSAMPLERS

    Page 1YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Light Liquid Sampler ver.01012007

    How to Use this Manual

    The Light Liquid Sampler Operations Manual is astep-by-step guide containing the proceduresneeded to work with the Light Liquid SamplerSystem.

    The Light Liquid Sampler Series of samplers imple-ment the most advanced technology available in theindustry. It is recommended that the techniciansworking with the Light Liquid Sampler Systemsstudy the manual prior to initiating work on thesystem for the first time.

    Typographic Conventions

    To aide in readability, this manual uses severaltypographic conventions. References to illustrations,photographs, and other related content will appear initalicized text along with the location of where to find theitem in the manual. Digital versions of the manual,available in Adobe Acrobat™ PDF format, will behighlighted further in blue italic text indicating the copyretains a hyperlink to the referenced item.

    Measurement units are listed in italic parenthesis textfollowing their US standard equivalent. As an example,for defining a distance, 15' (4.5 meters), is how the textwill appear throughout the manual.

    Items that require action, for example the pressing of a keyfor programming the controller, will feature the action item insentence case Bold Text followed in normal text by theitem such as, the Up Arrow key or Main Power switch.

    ™ Adobe Acrobat & Acrobat Reader are trademarks of Adobe Systems, Inc.

    Getting Help

    This manual provides solutions to typical questionsabout the Light Liquid Sampler system. If theanswer can not be found within this manual, contactYZ Systems at:

    T: 1.281.362.6500T: 1.800.653.9435F: 1.281.362.6513Em: [email protected]

    When calling, have this manual close at hand.Whether calling or writing, please include in yourcommunique the following information:

    • The serial number of the Light Liquid SamplerSystem and the version number of this manual.The serial number is located on the system skid orenclosure. The version number of this manual islocated at the bottom of each page.

    • A description of the problem and, if applicable theactions of the technical personnel when the problemoccurred.

  • SSSSSECTIONECTIONECTIONECTIONECTION 1: 1: 1: 1: 1:FFFFFIRSTIRSTIRSTIRSTIRST T T T T THINGSHINGSHINGSHINGSHINGS T T T T TOOOOO K K K K KNOWNOWNOWNOWNOW A A A A ABOUTBOUTBOUTBOUTBOUT L L L L LIGHTIGHTIGHTIGHTIGHT L L L L LIQUIDIQUIDIQUIDIQUIDIQUID S S S S SAMPLERSAMPLERSAMPLERSAMPLERSAMPLERS

    YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Page 2 Light Liquid Sampler ver.01012007

    Operation Specifications

    Maximum Output:Std. 3/8” Plunger 6.8 gallons/day

    (25.3 liters/day)Opt.1/2” Plunger 12.17 gallons/day

    (46.07 liters/day)Opt.5/8” Plunger 19.02 gallons/day

    (72.0 liters/day)Opt.1” Plunger 24.34 gallons/day

    (92.07 liters/day)

    Maximum Operating Pressure: 1,800 psig(124 Bar (g)

    Pump Displacement:Std. 3/8” Plunger .25 - 1.8 cc/StrokeOpt.1/2” Plunger 0.8 - 3.2 cc/StrokeOpt.5/8” Plunger 1.25 - 5.0cc/StrokeOpt.1” Plunger 1.6 - 12.8cc/Stroke

    Operating Temp Range: 0 to 140 degrees F.(-17°C to 60°C)

    Power Supply Options:Pneumatic 120 VAC @ 1 AMP

    VDCHydraulic 120 VAC @ 20 AMP

    Flow Signal: *Customer Supplied

    Actuation Gas; 100 psi InstrumentQuality Gas

    Note: at temperatures below 32º F (0º C), condition-ing of the actuation gas supply may be required.Where the actuation gas supply has a high watercontent and/or a low hydrocarbon dew point, addi-tional actuation gas filtration or heating of the actua-tion gas supply may be necessary. Bottled nitrogencan also be used during cold operating conditions toavoid condensation in the actuation gas supply line.In addition, operation at extreme temperatures mayaffect system performance. To enhance the perfor-mance of this system, adequate heat should beprovided to maintain an operating environmentabove 30° F (-1º C).

    * Refer to Manual Section 4, System Control Options

  • SSSSSECTIONECTIONECTIONECTIONECTION 1: 1: 1: 1: 1:FFFFFIRSTIRSTIRSTIRSTIRST T T T T THINGSHINGSHINGSHINGSHINGS T T T T TOOOOO K K K K KNOWNOWNOWNOWNOW A A A A ABOUTBOUTBOUTBOUTBOUT L L L L LIGHTIGHTIGHTIGHTIGHT L L L L LIQUIDIQUIDIQUIDIQUIDIQUID S S S S SAMPLERSAMPLERSAMPLERSAMPLERSAMPLERS

    Page 3YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Light Liquid Sampler ver.01012007

    Theory of Operation

    The Light Liquid sampling systems are designedto sample light liquid hydrocarbons. Thousandsof individual samples are captured and combinedto develop a representative, composite sample ofthe flowing pipeline.

    Operation of the sampling system centersaround the following primary components: theSample Pump, the Product Accumulator Vessel,the Precharge Gas Vessel, and the ElectronicControl System. All equipment, except probemounted Sample Pumps are mounted on asteel skid, or in a system enclosure. Thesecomponents are shown in the diagrams on thefollowing pages.

    The sampling system operates on a simpleconcept. When the system receives a properflow signal (by others), the electronic control unitenergizes either a solenoid valve, or a HydraulicPower Pack. Energizing the solenoid valve, orHydraulic Power Pack allows a pressurizedpulse into the actuation cylinder of the samplepump, which in turn causes the pump to stroke.When the pump strokes, a small sample isdisplaced into the product accumulator vessel.Once the solenoid valve, or Hydraulic PowerPack is de-energized, the sample pump plungerreturns to its normal position. This action allowsa new sample bite to be captured in the pump.

    The purpose of the YZ light liquid hydrocarbonsampling system is to capture and maintain arepresentative liquid sample of the pipelineproduct. The sampled product is maintained in aliquid phase by the product accumulator vessel’sfree floating piston and the precharge gas sys-tem. In order for the system to function properly,pipeline product must be single phase, liquidproduct.

    By properly adjusting both the sample size andthe sample frequency, the sample vessel will fillto 80% capacity at the end of the sample period.Once the sample period is complete, the productwithin the sample receiver is thoroughly mixedusing the power mixer. A representative samplecan then be removed from the product accumu-lator vessel using the YZ DuraSite, a DOTapproved constant pressure sample vessel, referto page 72-73.

    After removing the remainder of the product fromthe accumulator vessel, the system is then readyfor a new sample period.

    System Accessories• DuraSite, portable DOT approved constant pres-

    sure sample vessels. Available in 150, 300, 500,800, and 1000 cc sizes.

    • KK-1, KK-2, & KK-3: carrying cases for DuraSitesthat meet DOT requirements for transportingportable sample vessels.

    • 1/4" stainless steel tubing Dielectric Isolator Union.These should be installed in every tubing line thatattaches the sampler to the pipeline in anymanner. For example the supply gas, productconnection to the system, and differential pres-sure switch connections, (P/N A1-0182).

    A complete line of sampling accessories rangingfrom sample probes to sample vessels is availablethrough YZ - Milton Roy. Please contact your localrepresentative or YZ - Milton Roy toll free at800.344.5399. For technical support call800.653.9435.

  • SSSSSECTIONECTIONECTIONECTIONECTION 1: 1: 1: 1: 1:FFFFFIRSTIRSTIRSTIRSTIRST T T T T THINGSHINGSHINGSHINGSHINGS T T T T TOOOOO K K K K KNOWNOWNOWNOWNOW A A A A ABOUTBOUTBOUTBOUTBOUT L L L L LIGHTIGHTIGHTIGHTIGHT L L L L LIQUIDIQUIDIQUIDIQUIDIQUID S S S S SAMPLERSAMPLERSAMPLERSAMPLERSAMPLERS

    YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Page 4 Light Liquid Sampler ver.01012007

    Notes

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    Page 5YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Light Liquid Sampler ver.01012007

    Standard Probe Mounted Pump(PNR) System ComponentsStandard primary components of the ProbeMounted Pump System (PNR-2) include thefollowing:• Sample Pump/Balance Valve, figure 1.

    Pneumatically or Hydraulically actuated PNR-2probe mounted Sample Pump.

    • System Skid, figure 2 (Pneumatic), figure 3 (Hy-draulic), & figure 4 (Both). Houses theAccumulator Vessel, Pre-charge Vessel, andSystem Electronics Enclosure.

    • Product Accumulator Vessel, figure 2 (PneumaticSkid), figure 3 (Hydraulic Skid), figure 4 (Both), &figures 5 & 6 (Cabinet Type). 1.5 gallon (5.68 Liters),3 Gallon (11.36 Liters), 5 Gallon (18.93 Liters).

    • Pre-Charge Vessel, figure 2 (Pneumatic Skid),figure 3 (Hydraulic Skid), figure 4 (Both), &figures 5 & 6 (Cabinet Type). Sized to matchProduct Accumulator volume.

    figure 1

    figure 3

    IS O LA T IO N V ALV E

    F LO W

    SU P P LY P R O B E

    (FR O M SK ID )P N E U M A TIC S U P PLY

    (TO S K ID )P R O D U C T O U T

    Actuation Supply(From Skid or Cabinet)

    (To Skid or Cabinet)

    24VDC SIGNAL IN(BY CUSTOMER)3/4" FNPT PROVIDED

    PNEUMATIC SUPPLY(TO PUMP) 1/4" TUBINGCONNECTION PROVIDED

    3 WAY SOLENOID VALVE

    FILTER/REGULATOR

    PNEUMATICSUPPLY IN(BY CUSTOMER)1/4" FNPTPROVIDED

    MIXING VALVE

    86" 56"

    40" 1

    120VAC IN(BY CUSTOMER)3/4" FNPTPROVIDED

    LIFTINGHOOK

    PNEUMATICPOWER MIXER

    figure 2

    Flow SIGNALPOWER IN

    40" (1.5 Gal.) 56" (3 Gal.) 86" (5 Gal.)

    23 3/4"

    Pack

    120 VAC

    m Pump

    movallve

    duct

    duct

    sselcumulator

    Hydraulic

    Switch

    Power

    Test/Mixing

    ModeSwitch

    gnetic Level Monitor

    lume Scale

    lumeicator

    's)

    ElectronicTo Customer4-20mA

    37 1/4" (1.5 Gal.) 53 1/4" (3 Gal.) 83 1/4" (5 Gal.)

    HydraulicPneumatic

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Page 6 Light Liquid Sampler ver.01012007

    1000

    1500500

    2000p si

    PRECHARGESUPPLY IN(BY CUSTOMER)1/4" FNPTPROVIDED

    MAGNETICVOLUMEINDICATOR

    VOLUMESCALE (cc's)

    PRODUCTREMOVALVALVE

    RELIEFVALVE

    PRODUCTACCUMULATORCYLINDER

    PRECHARGEVESSEL

    PRODUCT IN (FROM PUMP)1/4" TUBING CONNECTIONPROVIDED

    500

    2000psi

    1500

    1000

    • Five-Way Cross, figure 4 (Skid) & figures 5 & 6(Cabinets) mounts the Pressure Gage, Relief Valve,Product Isolation, and Product Removal Valves.

    figure 4

    Standard Probe Mounted Pump(PNR) System Components

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    Page 7YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Light Liquid Sampler ver.01012007

    • System Cabinet, figure 5 (Pneumatic) & figure 6(Hydraulic). Houses the Accumulator Vessel, Pre-charge Vessel, Five-Way Cross, and System Elec-tronics Enclosure.

    figure 5

    PRODUCTACCUMULATORVESSEL

    5-WAY CROSS

    MIXING VALVE

    PRESSUREREGULATOR

    SOLENOID VALVE

    SYSTEM CONTROL

    ENCLOSURE(XP BOX)

    FRONT

    1500

    1000

    500

    2000psi

    500

    2000psi

    1500

    1000

    PRE-CHARGEVESSEL

    J

    O

    N

    L

    M

    K

    I

    H

    G

    E

    FRONT VIEWENCLOSURE DOOR SHOWN REMOVED FOR DRAWING CLARITY.

    2000

    15001000

    500

    psi

    15005001000

    2000psi

    40"

    K

    M

    G

    H

    Standard Probe Mounted Pump(PNR) System Components

    figure 6Pneumatic Hydraulic

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Page 8 Light Liquid Sampler ver.01012007

    Standard Skid Mounted Pump(LPR) System ComponentsStandard primary components of the Skid MountedPump System (LPR-2) include the following:

    • System Skid/Cabinet, figure 7, figure 8, figure 9,figure 10, figure 11, and figure 12. Houses theSample Pump, Accumulator Vessel, Pre-chargeVessel, Five-Way Cross, and System Electronics.

    • Sample Pump/Balance Valve, figure 7, figure 9,figure 11, and figure 12. The LPR-2 slip streamSample Pump is mounted either; on the front ofthe sampler skid, or inside the cabinet.

    • Product Accumulator Vessel, figure 7, figure 8,figure 9, figure 10, figure 11, and figure 12,1.5 gallon (5.68 Liters), 3 Gallon (11.36 Liters),5 Gallon (18.93 Liters).

    • Pre-Charge Vessel, figure 7, figure 8, figure 9,figure 10, figure 11, and figure 12. Sized to matchProduct Accumulator volume.

    • Five-Way Cross, figure 7, figure 9, figure 11, andfigure 12. mounts the Pressure Gage, ReliefValve, Product Isolation, and Product RemovalValves.

    • Pneumatic System, figure 8, and figure 11.Provides power for the Sample Pump actuation,and the Mixing system for the Product Accumula-tor Vessel.

    figure 7

    Pneumatic PowerMixer

    Product AccumulatorVessel

    Product RemovalValve

    Precharge Supply

    Product Loop Return

    LPR-2 Pump0-1.8 cc/stroke

    psi2000

    1500

    1000

    500

    Volume Scale(cc's)

    Magnetic VolumeIndicator

    Balance Valve

    Precharge Vessel

    Product Loop Supply

    Relief Valve

    500 15001000

    psi2000

    24"

    86" 5 Gallon56" 3 Gallon

    40" 1.5 Gallon

    Signal

    sel

    ply

    lator

    30”

    30”

    24VDC SIGNAL IN(BY CUSTOMER)3/4" FNPT PROVIDED

    PNEUMATIC SUPPLY(TO PUMP) 1/4" TUBINGCONNECTION PROVIDED

    3 WAY SOLENOID VALVE

    FILTER/REGULATOR

    PNEUMATICSUPPLY IN(BY CUSTOMER)1/4" FNPTPROVIDED

    MIXING VALVE

    86" 5 G56" 3 G

    40" 1.5 G

    120VAC IN(BY CUSTOMER)3/4" FNPTPROVIDED

    LIFTINGHOOK

    PNEUMATICPOWER MIXER

    figure 8

    Supply Power

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    Page 9YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Light Liquid Sampler ver.01012007

    • Hydraulic PowerPak, figure 10 & figure 12. Pro-vides hydraulic power for the Sample Pumpactuation, and the Mixing system for the ProductAccumulator Vessel.

    24"

    ReliefValve

    Product LoopReturn

    Product LoopSupply

    PrechargeVessel

    ProductRemovalValve

    1000500

    psi

    1500

    2000

    5 GallonProductAccumulatorVessel

    BalanceValve

    1500

    2000

    PrechargeSupply

    psi

    5001000

    LiftingHook

    LPR-2Pump

    MagneticVolumeIndicator

    figure 9

    ProductAccumulatorVessel

    Five-Way Cross

    86" 56"

    40" 1

    BACK VIEW

    XP ENCLOSURE

    TEST/MIXINGSWITCH

    MODE SWITCH

    120VAC IN(BY CUSTOMER)1/2" FNPTPROVIDED

    HYDRAULIC POWER MIXER

    DRY CONTACTCLOSURE IN(BY CUSTOMER)1/2" FNPTPROVIDED

    DIVERTERVALVE

    HYDRAULICPOWER PACK

    LIFTINGHOOK

    figure10

    30”

    Supply Power

    FlowSignal

    Standard Skid Mounted Pump(LPR) System Components

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Page 10 Light Liquid Sampler ver.01012007

    Standard Cabinet Mounted Pump(LPR) System Components

    figure 11

    Magnetic Volume Indicator

    Lifting Eye

    Electrical Enclosure

    Five Way Cross

    Regulator

    LPR Pump

    Mixing Valve

    Product In

    Product Loop

    Volume Scale (cc’s)

    Precharge Vessel

    Product Accumulator Cylinder

    Product Mixing Assy.

    Pneumatic

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    Page 11YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Light Liquid Sampler ver.01012007

    Standard Cabinet Mounted Pump(LPR) System Components

    figure 12

    44"

    40"

    Lifting Eye

    1000

    500

    psi

    1500

    2000

    SAMPLE VESSEL

    PRECHARGE VESSEL

    HYDRAULICMIXING ASSEMBLY

    10001500

    psi2000

    500

    HYDRAULICPOWER PACK

    DIVERTER VALVE

    TEST/MIXMODE SWITCH

    TDR

    LPR-2HPUMP

    Hydraulic

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Page 12 Light Liquid Sampler ver.01012007

    System Pneumatic Actuated Flow SchematicProbe Mounted (PNR-2P)

    figure 13

    VESSEL

    ELECTRICAL

    PRECHARGE

    PRESSURE REGULATOR w/GAUGE

    BALANCE VALVE

    RELIEF VALVE

    NORMALLY CLOSED VALVE

    PRESSURE GAUGE

    NORMALLY OPEN VALVE

    PNEUMATIC

    PRODUCT

    L E G E N D

    METERED CONTACTS

    120 VAC

    SUPPLY PROBE

    SYSTEM SCHEMATIC

    ISOLATION VALVE

    FLOW

    PRODUCT REMOVALVALVE

    ISOLATION VALVESAMPLE VESSEL

    PNEUMATIC SUPPLY(FROM SKID)

    w/ATCCOUNTER

    ENCLOSURECONTROLSYSTEM

    S

    VESSEL

    5 GALLONSAMPLE

    (BY CUSTOMER)

    INSTRUMENT

    100 PSIAIR

    PRECHARGE

    PI

    VALVEMIXING

    ACCUMULATORVESSEL

    ISOLATION VALVE

    SUPPLY PROBE

    SYSTEMCONTROL

    ENCLOSURE

    Supply Powerand

    Flow Signal(By Customer)

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    Page 13YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Light Liquid Sampler ver.01012007

    System Pneumatic Actuated Flow SchematicSkid Mounted (LPR-2P)

    figure 14

    L E G E N D

    RETURNPRODUCT

    PUMPSAMPLINGLPR-2

    BALANCE VALVE

    PRODUCT

    PRECHARGE

    ELECTRICAL

    PNEUMATIC

    NORMALLY OPEN VALVE

    NORMALLY CLOSED VALVE

    PRESSURE GAUGE

    RELIEF VALVE

    PRESSURE REGULATOR w/GAUGE

    PRODUCT REMOVALPRODUCTINLET VALVE

    ISOLATION VALVESAMPLE VESSEL

    METERED CONTACTS w/ATCCOUNTER

    120 VACENCLOSURE

    CONTROLSYSTEM

    (BY CUSTOMER)100 PSI

    AIRINSTRUMENT

    VESSELSAMPLE

    S

    VESSELPRECHARGE

    VALVEMIXING

    PI

    SYSTEM SCHEMATIC

    3 GALLON

    Supply Powerand

    Flow Signal(By Customer)

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Page 14 Light Liquid Sampler ver.01012007

    System Hydraulic Actuated Flow SchematicProbe Mounted (PNR-2H)

    figure 15

    PNR-2

    PUMPSAMPLING

    ENCLOSURE

    SYSTEMCONTROL

    SAMPLEVESSEL

    ISOLATION VALVESAMPLE VESSEL

    PRODUCT REMOVALVALVE

    PRECHARGEVESSEL

    PIPELINE

    FLOW

    L E G E N D

    PRECHARGE

    PRODUCT

    ELECTRICAL

    NORMALLY OPEN VALVE

    HYDRAULIC

    RELIEF VALVE

    THREE WAY VALVE

    PRESSURE GAUGE

    NORMALLY CLOSED VALVE

    HydraulicPower Pack

    Supply Powerand

    Flow Signal(By Customer)

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    Page 15YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Light Liquid Sampler ver.01012007

    System Hydraulic Actuated Flow SchematicSkid/Cabinet Mounted (LPR-2H)figure 16

    L E G E N D

    NORMALLY OPEN VALVE

    ELECTRICAL

    PRODUCT

    PRECHARGE

    HYDRAULIC

    RELIEF VALVE

    THREE WAY VALVE

    PRODUCTINLET

    DIVERTOR

    RETURNPRODUCT

    LPR-2PUMP

    VALVE

    HYDRAULICPOWER PACK

    DRY CONTACT INPUT(BY CUSTOMER)

    (BY CUSTOMER)120 VAC

    TEST/MIXING &MODE SWITCH

    TIME DELAYRELAY

    SYSTEMCONTROL

    VESSELPRECHARGE

    VALVEPRODUCT REMOVAL

    SAMPLE VESSELISOLATION VALVE

    VESSELSAMPLE

    PI

    PRESSURE GAUGE

    SYSTEMCONTROL

    ENCLOSURE

    Flow Input(BY CUSTOMER)

    Power Supply(BY CUSTOMER)

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Page 16 Light Liquid Sampler ver.01012007

    Standard Skid Mounting

    1. Bolt down the system skid to a concrete slabusing the mounting holes (5/8") provided in thebottom of the skid. Recommended bolt/studsizes for mounting the skid is 1/2", figure 17.

    2. Connect a ground wire from the grounding luglocated on the skid to a properly installed groundrod, located adjacent to the system skid,figure 17.

    figure 17

    30"28"

    28"

    30"

    Ø5/8 MOUNTING HOLES (4 PLACES)

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    Page 17YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Light Liquid Sampler ver.01012007

    43"

    18"

    TOP VIEW

    (4 PLACES)ANCHOR HOLESØ5/8" THROUGH

    Standard Cabinet Mounting

    1. Bolt down the system enclosure to a concreteslab using the mounting holes (5/8") provided inthe bottom of each leg of the enclosure. Recom-mended bolt/stud sizes for mounting the enclo-sure is 1/2" figure 18.

    2. Connect a ground wire from the grounding luglocated on the enclosure leg to a properlyinstalled ground rod, located adjacent to thesystem enclosure, figure 18.

    figure 18

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Page 18 Light Liquid Sampler ver.01012007

    Standard Probe MountedPneumatic Actuated Skid System(PNR-2S-xP) Connections

    Pump InstallationThe PNR-2 sample pump is designed to bemounted directly to a threaded connection on thepipeline, figure 19. The probe tubing should be cutsuch that the tip of the probe will be located in thecenter 1/3 of the pipeline after installation. After thepipeline has been depressurized, the threads onthe probe body should be taped and doped and thepump installed into the pipeline connection.

    Skid InstallationThe skid should be located as close as possibleto the pipeline. 1/4" stainless steel tubing shouldbe field routed from the probe mounted SamplePump/Balance Valve, ”product out” connectionto the skid mounted 5-Way Cross, port tagged“product in”. Likewise, 1/4" stainless steel tubingshould be field routed from the pump porttagged “pneumatic supply” back to the Pneu-matic Solenoid on the skid. These tubing linesshould both incorporate a dielectric isolationfitting between the sample skid and the probemounted Sample Pump. Care should be taken inrouting this tubing to prevent traps, long runs, etc.

    CACACACACAUTION:UTION:UTION:UTION:UTION:Excessive tubing lengths should be avoided. Installationof the sample system enclosure should be as close tothe point of sample removal and the sample pump aspossible. If longer tubing lengths are required consultYZ Systems Technical Services at; 800.653.9435 or1.281.362.6500.

    Electrical ConnectionsA customer supplied power supply must beconnected to control the system via the sideopening of the skid electrical enclosure labled forit. The wiring for the flow signal should beconnected to the control the system via the sideopening of the skid electrical enclosure labled forsignal in. All electrical connections are typicallydesigned for ½” NPT conduit connections, referto Section 4, Electrical Wiring for connectiondetails.

    ISOLATION VALVE

    FLOW

    SUPPLY PROBE

    (FROM SKID)PNEUMATIC SUPPLY

    (TO SKID)PRODUCT OUT

    10 00

    150 050 0

    200 0ps i

    PRECHARGESUPPLY IN(BY CUSTOM ER)1/4" FNPTPROVIDED

    M AG NETICVOLUMEINDICATOR

    VO LUM ESCALE (cc's)

    PRODUCTREM OVALVALVE

    RELIEFVALVE

    PRODUCTACCUM ULATORCYLINDER

    PRECHARGEVESSEL

    PRODUCT IN (FRO M PUM P)1/4" TUBING CONNECTIONPROVIDED

    500

    2 000ps i

    15 00

    1 000

    figure 20

    Solenoid

    Signal InSupplyPower

    figure 19

    figure 21

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    Page 19YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Light Liquid Sampler ver.01012007

    Standard Skid MountedPneumatic Actuated System(LPR-2S-xP) Connections

    Skid InstallationThe skid should be located as close as possibleto the pipeline. 1/4" stainless steel tubing shouldbe field routed from the pipeline sample probe tothe pump Product Loop Supply port tagged“product in”. Likewise, 1/4" stainless steel tubingshould be field routed from the pump ProductLoop Return port tagged “product loop” back to adownstream port in the pipeline with adequatedifferential pressure to create a continual flowingsample loop. These tubing lines should bothincorporate a dielectric isolation fitting betweenthe sample skid and the pipeline. Care should betaken in routing this tubing to prevent traps, longruns, etc.

    CACACACACAUTION:UTION:UTION:UTION:UTION:Excessive tubing lengths should be avoided.Installation of the sample system enclosure shouldbe as close to the point of sample removal and thesample pump as possible. If longer tubing lengthsare required consult YZ Systems Technical Servicesat; 800.653.9435 or 1.281.362.6500.

    Electrical Connections

    A customer supplied power supply must beconnected to control the system via the sideopening of the skid electrical enclosure labled forit. The wiring for the flow signal should beconnected to the control the system via the sideopening of the skid electrical enclosure labled forsignal in. All electrical connections are typicallydesigned for ½” NPT conduit connections, referto Section 4, Electrical Wiring for connectiondetails.

    figure 23

    120 VAC

    Solenoid

    Signal InSupplyPower

    24"

    Pneumatic PowerMixer

    Volume Scale(cc's)

    Magnetic VolumeIndicator

    Product AccumulatorVessel

    Product RemovalValve

    Balance Valve

    Precharge Supply

    Product Loop Supply

    Product Loop Return

    LPR-2 Pump0-1.8 cc/stroke

    Precharge Vessel

    Relief Valve

    Product AccumulatorVessel

    Instrument Air

    psi2000

    500 15001000

    1000

    1500

    psi2000

    500

    Explosion-ProofEnclosure

    3-Way SolenoidValve

    figure 22

    30”

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Page 20 Light Liquid Sampler ver.01012007

    Standard Probe Mounted PneumaticActuated Cabinet System (PNR-2C-xP)Connections

    Standard System Connections

    Pump InstallationThe PNR-2 sample pump is designed to bemounted directly to a threaded connection on thepipeline, figure 24. The probe tubing should be cutsuch that the tip of the probe will be located in thecenter 1/3 of the pipeline after installation. After thepipeline has been depressurized, the threads onthe probe body should be taped and doped and thepump installed into the pipeline connection.

    Cabinet InstallationThe system enclosure portion of the samplershould be located as close as possible to thesample pump. 1/4" stainless steel tubing shouldbe field routed from the Sample Pump/BalanceValve discharge (product out), figure 24, to theFive-Way Cross connection (product in),figure 25 on the enclosure. Care should be takenin routing tubing to prevent traps, long runs, etc.

    1/4" stainless steel tubing should also be fieldrouted from the connection on the Sample Pumplabeled pneumatic supply, figure 24, to the sole-noid valve connection on the system enclosure(pneumatic supply to sample pump), figure 25.

    CACACACACAUTION:UTION:UTION:UTION:UTION:Excessive tubing lengths should be avoided.Installation of the sample system enclosure shouldbe as close to the point of sample removal and thesample pump as possible. If longer tubing lengthsare required consult YZ Systems Technical Servicesat; 800.653.9435 or 1.936.788.5593.

    figure 24

    ISOLATION VALVE

    FLOW

    SUPPLY PROBE

    (FROM SKID)PNEUMATIC SUPPLY

    (TO SKID)PRODUCT OUT

    POWER INBY CUSTOMER

    (1/2" FNPT)

    PNEUMATIC SUPPLYTO SAMPLE PUMP

    (1/4" FNPT)

    PNEUMATIC SUPPLYBY CUSTOMER

    (1/4" FNPT)

    PRODUCT INFROM SAMPLE

    PUMP(1/4" FNPT)

    LEFT SIDE

    DRY CONTACT PULSE INBY CUSTOMER

    (1/2" FNPT)

    FLOW SIGNAL IN

    figure 25

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    Page 21YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Light Liquid Sampler ver.01012007

    Standard Probe Mounted PneumaticActuated Cabinet System (PNR-2C-xP)Connections

    Pneumatic SupplyA 1/4” connection is provided on the systemenclosure for a continuous pneumatic supply(80-100 psi by customer) to the regulator, figure 26.The necessary regulator, solenoid valve, etc. isprovided within the sampling system.

    Electrical ConnectionsPower Supply, and the flow signal should beconnected to the left side opening for the electri-cal enclosure figure 26.

    Pump Sample SizeThe sample size of the PNR-2 is adjustable. Thesample grab size of the pump is adjusted byloosening the lock/seal nut on top of the pumpand turning the volume adjustment screw in todecrease the sample volume or out to increasethe sample volume. Once the new sample sizehas been set, the lock/seal nut should be retight-ened, refer to Section 2, page 31 .

    POWER INBY CUSTOMER

    (1/2" FNPT)

    PNEUMATIC SUPPLYTO SAMPLE PUMP

    (1/4" FNPT)

    PNEUMATIC SUPPLYBY CUSTOMER

    (1/4" FNPT)

    PRODUCT INFROM SAMPLE

    PUMP(1/4" FNPT)

    LEFT SIDE

    DRY CONTACT PULSE INBY CUSTOMER

    (1/2" FNPT)

    FLOW SIGNAL IN

    figure 26

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Page 22 Light Liquid Sampler ver.01012007

    Standard Cabinet MountedPneumatic Actuated System(LPR-2C-xP) Connections

    Standard System Connections

    System InstallationThe System Enclosure should be located asclose as possible to the pipeline. 1/4" stainlesssteel tubing should be field routed from thepipeline sample probe to the pump port tagged“product in”. Likewise, 1/4" stainless steeltubing should be field routed from the pump porttagged “product loop” back to a downstream portin the pipeline with adequate differential pressureto create a continual flowing sample loop. Thesetubing lines should both incorporate a dielectricisolation fitting between the sample enclosureand the pipeline. Care should be taken in routingthis tubing to prevent traps, long runs, etc.

    CACACACACAUTION:UTION:UTION:UTION:UTION:Excessive tubing lengths should be avoided.Installation of the sample system enclosure shouldbe as close to the point of sample removal and thesample pump as possible. If longer tubing lengthsare required consult YZ Systems Technical Servicesat; 800.653.9435 or 1.281.362.6500.

    Electrical ConnectionsPower Supply, and the flow signal should beconnected to the left side opening for the electri-cal enclosure.

    figure 27

    7"8"

    PRODUCT IN(FROM PIPELINE 1/4"NPT)

    BACK VIEW

    PRODUCT LOOP(TO PIPELINE 1/4"NPT)

    SUPPLY AIR 100 psi1/4" TUBING

    (BY CUSTOMER)

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    Page 23YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Light Liquid Sampler ver.01012007

    Standard Probe MountedHydraulic Actuated Skid System(PNR-2S-xH) Connections

    Pump InstallationThe PNR-2 sample pump is designed to bemounted directly to a threaded connection on thepipeline, figure 28. The probe tubing should be cutsuch that the tip of the probe will be located in thecenter 1/3 of the pipeline after installation. After thepipeline has been depressurized, the threads onthe probe body should be taped and doped and thepump installed into the pipeline connection.

    System Skid InstallationThe system skid portion of the sampler shouldbe located as close as possible to the samplepump. 1/4" stainless steel tubing should be fieldrouted from the Sample Pump discharge check(product out), figure 28, to the Five-Way Crossconnection (product in), figure 29 (front) on theSkid. Care should be taken in routing tubing toprevent traps, long runs, etc.

    1/4” - 3/8" stainless steel tubing should also befield routed from the connection on the SamplePump labeled hydraulic supply (from skid), figure28, to the hydraulic supply to pump connectionon the system Skid, figure 30 (rear). Additionally1/4” - 3/8" stainless steel tubing should also befield routed from the connection on the SamplePump labeled hydraulic return (from skid), figure28, to the hydraulic return from pump connectionon the system skid, figure 30 (rear).See also Appendix A, Hydraulic Power Pack,page 100.

    CACACACACAUTION:UTION:UTION:UTION:UTION:Excessive tubing lengths should be avoided.Installation of the sample system Skid should be asclose to the point of sample removal and thesample pump as possible. If longer tubing lengthsare required consult YZ Systems Technical Servicesat; 800.653.9435 or 1.281.362.6500.

    13 1/4"

    PrechargeVessel 2000

    1500

    psi

    1000500

    PrechargeSupply

    2000psi

    1000500 1500

    HookLifting

    40" (1.5 Ga 86" (

    From Pump

    RemovalValve

    Product

    Product

    VesselAccumulator

    Magnetic

    Volume Scale

    VolumeIndicator

    (cc's)

    40" (1.5 Gal.) 56" (3 Gal.) 86" (5 Gal.)

    23 3/4"

    Pack

    120 VAC

    m Pump

    ovalve

    duct

    duct

    selumulator

    Hydraulic

    Switch

    Power

    Test/Mixing

    ModeSwitch

    gnetic Level Monitor

    ume Scale

    umeicator

    's)

    ElectronicTo Customer4-20mA

    37 1/4" (1.5 Gal.) 53 1/4" (3 Gal.) 83 1/4" (5 Gal.)

    figure 30(rear)

    figure 29(front)

    ISOLATION VALVE

    FLOW

    HYDRAULIC SUPPLY

    SUPPLY PROBE

    PRODUCT OUTHYDRAULIC RETURN

    (FROM SKID)

    (TO SKID)(FROM SKID)

    figure 28

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Page 24 Light Liquid Sampler ver.01012007

    Standard Probe MountedHydraulic Actuated Skid System(PNR-2S-xH) Connections

    Electrical Connections120 VAC, 60 Hz electrical power, and the flowsignal should be connected to the left sideopening for the electrical Skid figure 30 (rear).

    Pump Sample SizeThe sample size of the PNR-2 is adjustable. Thesample grab size of the pump is adjusted byloosening the lock/seal nut on top of the pumpand turning the volume adjustment screw in todecrease the sample volume or out to increasethe sample volume. Once the new sample sizehas been set, the lock/seal nut should be retight-ened, refer to Section 2, page 31 .

    Hydraulic Power Pack BreatherRemove the 3/8" NPT plug located in the top ofthe power pack reservoir. Install the breatherprovided with the skid.

    Hydraulic Pump Line PurgingDuring this process, check the fluid level in thehydraulic oil reservoir frequently to assure thatyou do not run low on fluid. Slightly loosen thereturn connection tubing connection on theSystem Skid. When the Hydraulic Power Pack isactuated in this mode air will escape at thisconnection. Verify that the electrical Mode Switchis in the Mix Mode, and the manual DiverterValve is set to Sample. Now use the electricalTest Switch to actuate the Hydraulic PowerPack. Hold in the Test position until you gethydraulic fluid at the hydraulic return connection.As soon as you get fluid at this connection,release the Test switch, and tighten the connec-tion.

    Vent

    figure 31

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    Page 25YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Light Liquid Sampler ver.01012007

    Standard Skid MountedHydraulic Actuated System(LPR-2S-xH) Connections

    Skid InstallationThe skid should be located as close as possibleto the pipeline. 1/4" stainless steel tubing shouldalso be field routed from the pipeline sampleprobe to the pump port tagged “product in”, orproduct loop supply. Likewise, 1/4" stainlesssteel tubing should be field routed from the pumpport tagged “product loop” return back to adownstream port in the pipeline with adequatedifferential pressure to create a continual flowingsample loop. Care should be taken in routingthis tubing to prevent traps, long runs, etc.

    CACACACACAUTION:UTION:UTION:UTION:UTION:Excessive tubing lengths should be avoided.Installation of the sample system enclosure shouldbe as close to the point of sample removal and thesample pump as possible. If longer tubing lengthsare required consult YZ Systems Technical Servicesat; 800.653.9435 or 1.281.362.6500.

    Electrical Connections120 VAC, 60 Hz, electrical power should beconnected to the left side opening of the skidelectrical enclosure. The power wiring should beconnected to the wires tagged “120 VAC”. Thehot wire should be connected to the black sys-tem wire. The neutral wire should be connectedto the white system wire.

    The flow signal to control the system should beconnected to the right side opening of the skidelectrical enclosure. The wiring for the flowsignal should be connected to the wires whichare tagged for that purpose, refer to Section 4,Electrical Wiring.

    86"56"

    40" 1

    BACK VIEW

    XP ENCLOSURE

    TEST/MIXINGSWITCH

    MODE SWITCH

    120VAC IN(BY CUSTOMER)1/2" FNPTPROVIDED

    HYDRAULIC POWER MIXER

    DRY CONTACTCLOSURE IN(BY CUSTOMER)1/2" FNPTPROVIDED

    DIVERTERVALVE

    HYDRAULICPOWER PACK

    LIFTINGHOOK

    figure 33

    F l o wS i g n a l

    FRONT VIEW

    PRECHARGEVESSEL

    PRODUCT LOOPSUPPLY(BY CUSTOMER)1/4" FNPTPROVIDED

    RELIEFVALVE

    PRODUCT LOOPRETURN(BY CUSTOMER)1/4" FNPTPROVIDED

    PRECHARGESUPPLY IN(BY CUSTOMER)1/4" FNPTPROVIDED

    1500

    2000psi

    1000

    500

    PRODUCTREMOVALVALVE

    PRODUCTACCUMULATORCYLINDER

    500

    2000psi

    1500

    1000

    MAGNETICVOLUMEINDICATOR

    VOLUMESCALE (cc's)

    figure 32

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Page 26 Light Liquid Sampler ver.01012007

    Pump Sample SizeThe sample size of the PNR-2 is adjustable. Thesample grab size of the pump is adjusted byloosening the lock/seal nut on top of the pumpand turning the volume adjustment screw in todecrease the sample volume or out to increasethe sample volume. Once the new sample sizehas been set, the lock/seal nut should be retight-ened, refer to Section 2, page 31 .

    Hydraulic Power Pack BreatherRemove the 3/8" NPT plug located in the top ofthe power pack reservoir. Install the breatherprovided with the skid.

    Hydraulic Pump Line PurgingDuring this process, check the fluid level in thehydraulic oil reservoir frequently to assure thatyou do not run low on fluid. Slightly loosen thereturn connection tubing connection on theSystem Skid. When the Hydraulic Power Pack isactuated in this mode air will escape at thisconnection. Verify that the electrical Mode Switchis in the Mix Mode, and the manual DiverterValve is set to Sample. Now use the electricalTest Switch to actuate the Hydraulic PowerPack. Hold in the Test position until you gethydraulic fluid at the hydraulic return connection.As soon as you get fluid at this connection,release the Test switch, and tighten the connec-tion.

    Breather

    figure 34

    Standard Skid MountedHydraulic Actuated System(LPR-2S-xH) Connections

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    Page 27YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Light Liquid Sampler ver.01012007

    Standard Probe Mounted HydraulicActuated Cabinet System (PNR-2C-xH)Connections

    Pump InstallationThe PNR-2 sample pump is designed to bemounted directly to a threaded connection on thepipeline. The probe tubing should be cut suchthat the tip of the probe will be located in thecenter 1/3 of the pipeline after installation. Afterthe pipeline has been depressurized, the threadson the probe body should be taped and dopedand the pump installed into the pipeline connec-tion.

    Electrical Connections120 VAC, 60 Hz electrical power should beconnected to the left side opening of the cabinetelectrical enclosure. The power wiring should beconnected to the wires tagged “120 Volt AC”.The hot wire should be connected to the blacksystem wire. The neutral wire should be con-nected to the white system wire. The flow signalshould be connected at this time

    Cabinet InstallationThe cabinet should be located as close aspossible to the pipeline. Care should be taken inrouting tubing between the pump and cabinet, toprevent traps, long runs, etc. 1/4" stainlesssteel tubing should be field routed from thebalance valve discharge to the product in con-nection for the five-way cross.

    1/4" - 3/8” stainless steel tubing should also befield routed from the sample pump hydraulicsupply and return ports to the cabinet connec-tions. These lines will have to be purged of air,and filled with hydraulic fluid before and pumpactuation can begin.

    ISOLATION VALVE

    FLOW

    (FROM CABINET)HYDRAULIC SUPPLY

    SUPPLY PROBE

    PRODUCT OUT(TO CABINET)

    (FROM CABINET)HYDRAULIC RETURN

    Product Out To CabinetConnection "C"

    Hydraulic Supply ToCabinet Connection "D"

    Hydraulic Return ToCabinet Connection "P"

    A

    B

    20"24"

    9"

    57"

    LEFT SIDE VIEW

    15"

    20"

    P

    C

    D

    figure 35

    figure 36

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Page 28 Light Liquid Sampler ver.01012007

    Standard Probe Mounted HydraulicActuated Cabinet System (PNR-2C-xH)Connections

    Precharge Gas InstallationConnect the precharge gas source (normallynitrogen) to the isolation valve 1/4" NPT connec-tion located on top of the precharge vessel.Open the isolation valve. Fill the prechargevessel with gas until the pressure in the vessel is100 to 150 psi above the vapor pressure of theproduct to be sampled. Once the vessel is filled,close the isolation valve and remove theprecharge gas source. Leak test all connectionsbetween the precharge vessel and the productaccumulator vessel.

    Hydraulic Power Pack BreatherRemove the 1/4" NPT plug located in the top ofthe power pack reservoir. Install the breatherprovided with the skid.

    Hydraulic Pump Line PurgingDurring this process, check the fluid level in thehydraulic oil reservoir frequently to assure thatyou do not run low on fluid. Slightly loosen thetubing connection "P" on the side of the cabinet.When the Hydraulic Power Pack is actuated inthis mode air will escape at this connection.Verify that theelectrical Mode Switch, and the manual DiverterValve are both set to Sample. Now use theelectrical Test Switch to actuate the HydraulicPower Pack. Hold in the Test position until youget hydraulic fluid at connection "P" on thecabinet. As soon as you get fluid at connection"P" on the cabinet, tighten the connection, andrelaese the Test switch.

    figure 37

    Vent

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    Page 29YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Light Liquid Sampler ver.01012007

    Standard Cabinet MountedHydraulic Actuated System(LPR-2C-xH) Connections

    Sample Probe InstallationThe sample probe assembly is designed to bemounted directly to a threaded connection onthe pipeline. The probe should be cut such thatthe tip of the probe will be located in the center1/3 of the pipeline after installation. After thepipeline has been depressurized, the threads onthe probe body should be taped and doped andthe pump installed into the pipeline connection.Location of the probe in the pipeline should be inaccordance with approved sampling standards.It is essential that the probe be located in anarea of the pipeline where the product will behomogeneously mixed. The probe should beinserted to extract the product from the center 1/3of the pipeline. It should then be connected tothe Sample Pump product connection andreturn ports in a manner to assure adequateflow through the connection lines.

    Cabinet InstallationThe cabinet should be located as close aspossible to the pipeline. 1/4" stainless steeltubing should also be field routed from thesample probe discharge to the port tagged"product in" on the enclosure, which connects tothe product inlet of the Sample Pump. 1/4"stainless steel tubing should also be field routedfrom the return connection on the cabinet to thelow pressure return port of the pipeline. Careshould be taken in routing this tubing to preventtraps, long runs, etc.

    7"8"

    PRODUCT IN(FROM PIPELINE 1/4"NPT)

    BACK VIEW

    PRODUCT LOOP(TO PIPELINE 1/4"NPT)

    SUPPLY AIR 100 psi1/4" TUBING

    (BY CUSTOMER)

    figure 38

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Page 30 Light Liquid Sampler ver.01012007

    Standard Cabinet MountedHydraulic Actuated System(LPR-2C-xH) Connections

    Electrical Connections120 VAC, 60 Hz electrical power, and the flowsignal should be connected to the left sideopening for the electrical Skid figure 26 (rear).

    Pump Sample SizeThe sample size of the PNR-2 is adjustable. Thesample grab size of the pump is adjusted byloosening the lock/seal nut on top of the pumpand turning the volume adjustment screw in todecrease the sample volume or out to increasethe sample volume. Once the new sample sizehas been set, the lock/seal nut should be retight-ened, refer to Section 2, page 31 .

    Hydraulic Power Pack BreatherRemove the 3/8" NPT plug located in the top ofthe power pack reservoir. Install the breatherprovided with the skid.

    Hydraulic Pump Line PurgingDuring this process, check the fluid level in thehydraulic oil reservoir frequently to assure thatyou do not run low on fluid. Slightly loosen thereturn connection tubing connection on theSystem Skid. When the Hydraulic Power Pack isactuated in this mode air will escape at thisconnection. Verify that the electrical Mode Switchis in the Mix Mode, and the manual DiverterValve is set to Sample. Now use the electricalTest Switch to actuate the Hydraulic PowerPack. Hold in the Test position until you gethydraulic fluid at the hydraulic return connection.As soon as you get fluid at this connection,release the Test switch, and tighten the connec-tion.

    Vent

    figure 39

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    Page 31YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Light Liquid Sampler ver.01012007

    Pump Sample Size

    The sample size of the PNR-2 Pump is adjust-able. Sample grab size of the pump is adjustedby loosening the 5/16 jam nut on top of the pumpand turning the volume adjustment screw acornnut in to decrease the sample volume or out toincrease the sample volume. Once the newsample size has been set, the jam nut should beretightened, refer to Section 6, pages 63-66, andAppendix, pages 87-90 .

    Pump Displacement:Std. 3/8” Plunger .25 - 1.8 cc/StrokeOpt.1/2” Plunger 0.8 - 3.2 cc/StrokeOpt.5/8” Plunger 1.25 - 5.0cc/StrokeOpt.1” Plunger 1.6 - 12.8cc/StrokeThe

    figure 40

    STROKE SCALE, 3/8" PD PUMP

    PNR-2 ACTUATOR CYLINDER

    PNR-2 STROKE SCREW ASSY

    PNR-2 STROKE SCALE IND

    B2-1003

    ACTUATION SUPPLY

    5/16 FLAT WASHER, SS

    MCONN, 1/4T 1/8P, SS

    5/16-18 x 5/8" HHCS SS

    A1-0003

    B2-1007

    C0-0017

    C0-0098

    B2-1002

    D5-0020

    PD PUMP PACKING

    5/16-24 JAM NUT SS

    PNR-2 PACKING GLAND NUT

    PNR-2 ACORN NUT

    A6-0035

    B2-1006

    C0-0108

    B2-1001

  • SSSSSECTIONECTIONECTIONECTIONECTION 2: 2: 2: 2: 2: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM I I I I INSTNSTNSTNSTNSTALLAALLAALLAALLAALLATIONTIONTIONTIONTION

    YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Page 32 Light Liquid Sampler ver.01012007

    Notes

  • SSSSSECTIONECTIONECTIONECTIONECTION 3: F 3: F 3: F 3: F 3: FILLINGILLINGILLINGILLINGILLING THETHETHETHETHE P P P P PRERERERERE-C-C-C-C-CHARGEHARGEHARGEHARGEHARGE V V V V VESSELESSELESSELESSELESSEL

    Page 33YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Light Liquid Sampler ver.01012007

    The purpose of the precharge system is to keepthe sampled product in a liquid phase. This isaccomplished by maintaining a prechargepressure on top of the accumulator vesselpiston. The precharge vessel provides additionalvolume to the precharge system, which mini-mizes the pressure increase within the productaccumulator as it fills.

    Prior to placing the sampler into service, it isnecessary that the precharge system becharged to a pressure at least 100 psi greaterthan the product vapor pressure. For example, ifa product with a vapor pressure of 300 psi isbeing sampled, a precharge pressure of 400 psiwould be required. Servicing the prechargevessel is done using the isolation valve locatedon top of the precharge vessel. Please note thatthe valve isolates the precharge system from theatmosphere, and does not separate theprecharge vessel from the accumulator vessel.Also, the precharge vessel is shipped with 10 psiof blanket pressure. Normally this Pre-Chargevessel should only need to be filled one time atthe installation of the sampler system, as the gasis not consumed in the sampling process.

    CACACACACAUTION:UTION:UTION:UTION:UTION:Take necessary precautions when working withNitrogen Vessels, as the high pressure containedwithin is dangerous Additionally, all personnelshould wear protective clothing, and use equipmentas recommended by the manufacturer during thistime. If you are uncertain about any aspect of theNitrogen Vessel itself, you should contact themanufacturer of your Vessel prior to proceeding.

    Filling the Vessel1. Connect the precharge gas source (normally

    nitrogen) to the isolation valve 1/4" NPT connection located on top of the precharge vessel, refer to page 93.

    2. Open the isolation valve.

    3. Fill the precharge vessel with gas until the pressure in the vessel is 100 to 150 psi above the vapor pressure of the product to be sampled.

    4. Once the vessel is filled, close the isolation valve and remove the precharge gas source.

    5. Leak test all connections between the precharge vessel and the product accumu- lator vessel.

    6. Continue through the remaining procedures inthis manual.

  • SSSSSECTIONECTIONECTIONECTIONECTION 3: F 3: F 3: F 3: F 3: FILLINGILLINGILLINGILLINGILLING THETHETHETHETHE P P P P PRERERERERE-C-C-C-C-CHARGEHARGEHARGEHARGEHARGE V V V V VESSELESSELESSELESSELESSEL

    YZ - Milton Roy • 201 Ivyland Road • Ivyland, Pa. • USA • 18974 • P: 281.362.6500 • F: 281.362.6513Page 34 Light Liquid Sampler ver.01012007

    Notes

  • YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720Page 35PNR-2S-(1.5,3,5)P-3B ver.08292005

    SSSSSECTIONECTIONECTIONECTIONECTION 4: 4: 4: 4: 4: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM C C C C CONTRONTRONTRONTRONTROLOLOLOLOL & E & E & E & E & ELECTRLECTRLECTRLECTRLECTRONICSONICSONICSONICSONICSSSSSSECTIONECTIONECTIONECTIONECTION 4: 4: 4: 4: 4: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM C C C C CONTRONTRONTRONTRONTROLOLOLOLOL & E & E & E & E & ELECTRLECTRLECTRLECTRLECTRONICSONICSONICSONICSONICS

    Overview

    The electronic control package provided withyour sampling system may consist of a simplesolenoid which interfaces with an outside controlsystem to operate, or it may be a self containedcontroller, or anything in between. The controlsystem must send a mimimum 3 second actua-tion pulse to the sample pump. This 3 secondduration allows sufficient time to stroke thesample pump and retrieve a single sample.

    SAFETY NOSAFETY NOSAFETY NOSAFETY NOSAFETY NOTESTESTESTESTES• Always use extreme care when performing mainte-

    nance on Sampling Systems. Always takenecessary measures to assure that electricalclassification in the area is considered, before,and during all repairs, and that necessary stepsare taken to maintain proper electrical proceduresfor the classification of the area.

    All electronics are housed in explosion proofenclosures and are rated for use in Class I,Division 1, Groups C and D hazardous locations,or are Intrinsically Safe for installation in Class I,Division 1, Groups C and D hazardous locations.

    By properly adjusting both the sample size andthe sample frequency, the sample vessel will fillto 80% capacity at the end of the sample period.

    Refer to apropriate control option wiring informa-tion on the following pages, and to Section 5 forProgramming for Operation details.

  • YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720Page 36 PNR-2S-(1.5,3,5)P-3B ver.08292005

    SSSSSECTIONECTIONECTIONECTIONECTION 4: 4: 4: 4: 4: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM C C C C CONTRONTRONTRONTRONTROLOLOLOLOL & E & E & E & E & ELECTRLECTRLECTRLECTRLECTRONICSONICSONICSONICSONICS

    Pneumatic Actuated “- 0” Control Option

    The electronic control package provided thissampling system consist of a simple solenoidwhich interfaces with an outside customersupplied power supply and control system tooperate it. The control system must send amimimum 3 second actuation pulse to thesolenoid. This 3 second duration allows sufficienttime for the solenoid to actuate the sample pumpand retrieve a single sample.

    Proper programing of the customer suppliedcontrol unit should allow the sample vessel to fillto 80% capacity at the end of the sample period.

    CUSTOMER SUPPLIED

    SWITCHED VOLTAGE

    -0A = 24 VDC

    -0B = 120 VAC

    (SEE NOTE #1)

    1. VOLTAGE SIGNAL MUST HAVE A

    MINIMUM DWELL OF 3 SECONDS.

    figure 41

  • YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720Page 37PNR-2S-(1.5,3,5)P-3B ver.08292005

    SSSSSECTIONECTIONECTIONECTIONECTION 4: 4: 4: 4: 4: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM C C C C CONTRONTRONTRONTRONTROLOLOLOLOL & E & E & E & E & ELECTRLECTRLECTRLECTRLECTRONICSONICSONICSONICSONICS

    Pneumatic Actuated “- 1A” (24 VDC) Control Option

    The electronic control package provided with this sampling system consists of a solid state TimeDelay Relay (TDR), and a solenoid. The TDR converts a continuous voltage signal into a 3 secondvoltage output to the solenoid, everytime a contact closure occurs. This 3 second duration allowssufficient time to actuate the sample pump and retrieve a single sample.

    SAFETY NOSAFETY NOSAFETY NOSAFETY NOSAFETY NOTESTESTESTESTES• Always use extreme care when performing maintenance on Sampling Systems. Always take necessary

    measures to assure that electrical classification in the area is considered, before, and during all repairs,and that necessary steps are taken to maintain proper electrical procedures for the classification of thearea.

    The control package requires the user to provide 24 VDC at terminals 2 and 3. You are also re-quired to provide dry contacts at terminals 2 and 6, each time the pump should be actuated. Allelectronics in this package are housed in explosion proof enclosures and are rated for use in ClassI, Division 1, Groups C and D hazardous locations.

    figure 42

    PARTS LIST

    LOCATION QTY PART NUMBER DESCRIPTION

    K1 1 E0-6007 TIME DELAY RELAY

    RI 1 G1-0112 RESISTOR SSEMBLY

    D1 1 E0-2003 DIODE

  • YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720Page 38 PNR-2S-(1.5,3,5)P-3B ver.08292005

    SSSSSECTIONECTIONECTIONECTIONECTION 4: 4: 4: 4: 4: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM C C C C CONTRONTRONTRONTRONTROLOLOLOLOL & E & E & E & E & ELECTRLECTRLECTRLECTRLECTRONICSONICSONICSONICSONICS

    Pneumatic Actuated “- 1B” (120 VAC) Control Option

    The electronic control package provided with this sampling system consists of a solid state TimeDelay Relay (TDR), and a solenoid. The TDR converts a continuous voltage signal into a 3 secondvoltage output to the solenoid, everytime a contact closure occurs. This 3 second duration allowssufficient time to actuate the sample pump and retrieve a single sample.

    SAFETY NOSAFETY NOSAFETY NOSAFETY NOSAFETY NOTESTESTESTESTES• Always use extreme care when performing maintenance on Sampling Systems. Always take necessary

    measures to assure that electrical classification in the area is considered, before, and during all repairs,and that necessary steps are taken to maintain proper electrical procedures for the classification of thearea.

    The control package requires you to provide 120 VAC at terminals 2 and 3. You are also required toprovide dry contacts at terminals 2 and 6, in order to stroke the pump. All electronics are housed inexplosion proof enclosures and are rated for use in Class I, Division 1, Groups C and D hazardouslocations. Refer to Section 5 for programming information.

    figure 43

  • YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720Page 39PNR-2S-(1.5,3,5)P-3B ver.08292005

    SSSSSECTIONECTIONECTIONECTIONECTION 4: 4: 4: 4: 4: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM C C C C CONTRONTRONTRONTRONTROLOLOLOLOL & E & E & E & E & ELECTRLECTRLECTRLECTRLECTRONICSONICSONICSONICSONICS

    Pneumatic Actuated “- 4A” (24VDC / 4-20 mA) Control Option

    The electronic control package provided with this sampling system consists of a solid state Z-200controller, opto relay, and time delay relay, to fire a solenoid. The Z-200 utilizes customer pro-grammed parameters and the customer supplied 4-20mA flow control signal to converts a continu-ous voltage signal into a 3 second voltage output to the solenoid, everytime a sample is required ofthe system. This 3 second duration allows sufficient time to stroke the sample pump and retrieve asingle sample.

    SAFETY NOSAFETY NOSAFETY NOSAFETY NOSAFETY NOTESTESTESTESTES• Always use extreme care when performing maintenance on Sampling Systems. Always take necessary

    measures to assure that electrical classification in the area is considered, before, and during all repairs,and that necessary steps are taken to maintain proper electrical procedures for the classification of thearea.

    This control package requires you to provide 24 VDC at TS1 terminals 1 and 2(Z-200 terminal #7 &#8). You are also required to provide a 4-20 mA flow control signal at TS1 terminals 5 and 6 (N-200terminal #4 & #5), in order to stroke the pump. All electronics are rated for use in Class I, Division 1,Groups C and D hazardous locations. Refer to Section 5 for programming information, andAppendix A for Wiring Control Document.

    figure 44

  • YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720Page 40 PNR-2S-(1.5,3,5)P-3B ver.08292005

    SSSSSECTIONECTIONECTIONECTIONECTION 4: 4: 4: 4: 4: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM C C C C CONTRONTRONTRONTRONTROLOLOLOLOL & E & E & E & E & ELECTRLECTRLECTRLECTRLECTRONICSONICSONICSONICSONICS

    Pneumatic Actuated “- 4B” (120VAC / 4-20 mA) Control Option

    The electronic control package provided with this sampling system consists of a solid state Z-200controller, opto relay, and time delay relay, to fire a solenoid. The Z-200 utilizes customer pro-grammed parameters and the customer supplied 4-20mA flow control signal to converts a continu-ous voltage signal into a 3 second voltage output to the solenoid, everytime a sample is required ofthe system. This 3 second duration allows sufficient time to stroke the sample pump and retrieve asingle sample.

    SAFETY NOSAFETY NOSAFETY NOSAFETY NOSAFETY NOTESTESTESTESTES• Always use extreme care when performing maintenance on Sampling Systems. Always take necessary

    measures to assure that electrical classification in the area is considered, before, and during all repairs,and that necessary steps are taken to maintain proper electrical procedures for the classification of thearea.

    This control package requires you to provide 120 VAC at TS1 terminals 1, 2, and 3(Z-200 terminal #7 &#8). You are also required to provide a 4-20 mA flow control signal at TS1 terminals 8 and 9 (N-200terminal #4 & #5), in order to stroke the pump. All electronics are rated for use in Class I, Division 1,Groups C and D hazardous locations. Refer to Section 5 for programming information, andAppendix A for Wiring Control Document.

    figure 45

  • YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720Page 41PNR-2S-(1.5,3,5)P-3B ver.08292005

    SSSSSECTIONECTIONECTIONECTIONECTION 4: 4: 4: 4: 4: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM C C C C CONTRONTRONTRONTRONTROLOLOLOLOL & E & E & E & E & ELECTRLECTRLECTRLECTRLECTRONICSONICSONICSONICSONICS

    Pneumatic Actuated “- 6A” (12-24 VDC / Z-65 Timer/Counter) Control Option

    The electronic control package provided with this sampling system consists of a solid state Z-65 timer/counter controller, to fire a solenoid. The Z-65 utilizes customer programmed parameters and thecustomer supplied metered contact pulses to convert a continuous voltage signal into a 3 secondvoltage output to the solenoid, everytime a sample is required of the system. This 3 second durationallows sufficient time to actuate the sample pump and retrieve a single sample.

    SAFETY NOSAFETY NOSAFETY NOSAFETY NOSAFETY NOTESTESTESTESTES• Always use extreme care when performing maintenance on Sampling Systems. Always take necessary

    measures to assure that electrical classification in the area is considered, before, and during all repairs,and that necessary steps are taken to maintain proper electrical procedures for the classification of thearea.

    This control package requires you to provide 12-24 VDC at Z-65 terminal #5 & #6. You also may needto provide a metered contact pulse control signal at Z-65 terminal #3 & #5 (for counter mode), in orderto stroke the pump. All electronics are rated for use in Class I, Division 1, Groups C and D hazard-ous locations. Refer to Section 5 for programming information, and Appendix A for Wiring ControlDocument.

    figure 46

    OPTIONAL

    OPTIONAL

    OPTIONALCOUNT INPUT

  • YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720Page 42 PNR-2S-(1.5,3,5)P-3B ver.08292005

    SSSSSECTIONECTIONECTIONECTIONECTION 4: 4: 4: 4: 4: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM C C C C CONTRONTRONTRONTRONTROLOLOLOLOL & E & E & E & E & ELECTRLECTRLECTRLECTRLECTRONICSONICSONICSONICSONICS

    Pneumatic Actuated “- 6B” (120VAC / Z-65 Timer/Counter) Control Option

    The electronic control package provided with this sampling system consists of a solid state Z-65 timer/counter controller, to fire a solenoid. The Z-65 utilizes customer programmed parameters and thecustomer supplied metered contact pulses to convert a continuous voltage signal into a 3 secondvoltage output to the solenoid, everytime a sample is required of the system. This 3 second durationallows sufficient time to actuate the sample pump and retrieve a single sample.

    SAFETY NOSAFETY NOSAFETY NOSAFETY NOSAFETY NOTESTESTESTESTES• Always use extreme care when performing maintenance on Sampling Systems. Always take necessary

    measures to assure that electrical classification in the area is considered, before, and during all repairs,and that necessary steps are taken to maintain proper electrical procedures for the classification of thearea.

    This control package requires you to provide 120 VAC at TS1 terminals 1, 2, and 3. You also may needto provide customer supplied metered contact pulses at Z-65 terminal #3 & #5 (counter mode), inorder to stroke the pump. All electronics are rated for use in Class I, Division 1, Groups C and Dhazardous locations. Refer to Section 5 for programming information, and Appendix A for WiringControl Document.

    figure 47

  • YZ Systems, Inc. • 3101 Pollok Drive • Conroe, Texas • USA • 77303 • P: 936.788.5593 • F: 936.788.5720Page 43PNR-2S-(1.5,3,5)P-3B ver.08292005

    SSSSSECTIONECTIONECTIONECTIONECTION 4: 4: 4: 4: 4: S S S S SYYYYYSTEMSTEMSTEMSTEMSTEM C C C C CONTRONTRONTRONTRONTROLOLOLOLOL & E & E & E & E & ELECTRLECTRLECTRLECTRLECTRONICSONICSONICSONICSONICS

    Pneumatic Actuated “- 6M (12-24 VDC / Z-65 Timer/Counter w/PIM Card)Control Option

    The electronic control package provided with this sampling system consists of a solid state Z-65timer/counter controller, to fire a solenoid. The Z-65 utilizes customer programmed parameters andthe customer supplied metered contact pulses to convert a continuous voltage signal into a 3 sec-ond voltage output to the solenoid, everytime a sample is required of the system. This 3 secondduration allows sufficient time to actuate the sample pump and retrieve a single sample.

    SAFETY NOSAFETY NOSAFETY NOSAFETY NOSAFETY NOTESTESTESTESTES• Always use extreme care when performing maintenance on Sampling Systems. Always take necessary

    measures to assure that electrical classification in the area is considered, before, and during all repairs,and that necessary steps are taken to maintain proper electrical procedures for the classification of thearea.

    This control package requires you to provide 12-24 VDC at Z-65 terminal #5 &