Karl W. Berger, P.E.DCM, Inc.
Centreville, VA
IEEE/ASME National Capital Land Transportation CommitteeDecember 8, 2009
![Page 2: Light Rail Braking & Automatic Train Protection](https://reader031.vdocument.in/reader031/viewer/2022020110/55a4710c1a28aba1568b45d0/html5/thumbnails/2.jpg)
Long term inadequate inspection allowed
fleet-wide wheel defects.
Investigation revealed underlying problem
caused by poor integration of car braking
systems with Automatic Train Protection
(ATP).
A temporary fix completely eliminated
wheel damage.
2
![Page 3: Light Rail Braking & Automatic Train Protection](https://reader031.vdocument.in/reader031/viewer/2022020110/55a4710c1a28aba1568b45d0/html5/thumbnails/3.jpg)
Opened in 1992 as a single-track line.
Central Line + 2 branches = 30 miles.
Serves 33,600 passengers per day.
53 large LRVs by ABB (Bombardier).
Originally equipped with Automatic Block
Signals (ABS) and magnetic Trip Stops.
Several collisions revealed deficiencies
with Trip Stops.
3
![Page 4: Light Rail Braking & Automatic Train Protection](https://reader031.vdocument.in/reader031/viewer/2022020110/55a4710c1a28aba1568b45d0/html5/thumbnails/4.jpg)
Progressively upgraded Central Line
between 2004 and 2006.
Replaced ABS with Cab Signaling with
Automatic Train Protection.
Removed wayside signals and trip stops.
Reduced headways from 17 minutes to 8
minutes.
Improved service reliability.
4
![Page 5: Light Rail Braking & Automatic Train Protection](https://reader031.vdocument.in/reader031/viewer/2022020110/55a4710c1a28aba1568b45d0/html5/thumbnails/5.jpg)
Wayside signal system impresses each track block with a speed codes.
Speed code inductively coupled to lead vehicle in train.
Operator normally controls train below received speed code.
Audible alert if operator exceeds speed. Automatic Train Protection applies brakes
if operator or vehicle fails to respond.
5
![Page 6: Light Rail Braking & Automatic Train Protection](https://reader031.vdocument.in/reader031/viewer/2022020110/55a4710c1a28aba1568b45d0/html5/thumbnails/6.jpg)
Guaranteed Emergency Brake Rate
(GEBR) of 1.5mphps (0.67 m/s2)
implemented with vital systems.
GEBR achieved with single-point failures
in braking systems.
Signal block lengths designed to include
adjustment for grade and curvature.
6
![Page 7: Light Rail Braking & Automatic Train Protection](https://reader031.vdocument.in/reader031/viewer/2022020110/55a4710c1a28aba1568b45d0/html5/thumbnails/7.jpg)
Condition Cab Signal Command LRV Response
Speed <
Speed Code – 1.5 mph
Normal Operate Normally
Speed =
Speed Code – 1.5 mph
Propulsion Disable Inhibit Propulsion
Speed >
Speed Code + 0.5 mph
Penalty 1 (Overspeed) Apply Full Service
Braking
Penalty 1 Active
AND
Decel < 1.5 mphps
for > 3 seconds
Penalty 2
(Brake Assurance)
Apply Emergency
Brakes (vital)
7
![Page 8: Light Rail Braking & Automatic Train Protection](https://reader031.vdocument.in/reader031/viewer/2022020110/55a4710c1a28aba1568b45d0/html5/thumbnails/8.jpg)
APPROACH8 – Used at interlockings.
Immediate Penalty 2 Emergency Brake on
Loss of Speed Code or Overspeed.
8
![Page 9: Light Rail Braking & Automatic Train Protection](https://reader031.vdocument.in/reader031/viewer/2022020110/55a4710c1a28aba1568b45d0/html5/thumbnails/9.jpg)
Constraints due to nearly obsolete car
control computer.
Added redundancy to remove single-point
failures in friction and track brake systems.
Added two emergency magnet valves for
ATP Emergency Brake applications.
9
![Page 10: Light Rail Braking & Automatic Train Protection](https://reader031.vdocument.in/reader031/viewer/2022020110/55a4710c1a28aba1568b45d0/html5/thumbnails/10.jpg)
April 2008 – broken wheel found on LRV
prior to entering service.
Fleet inspection found many wheels with
excessive damage and flats.
Investigation started.
10
![Page 11: Light Rail Braking & Automatic Train Protection](https://reader031.vdocument.in/reader031/viewer/2022020110/55a4710c1a28aba1568b45d0/html5/thumbnails/11.jpg)
The fall leaf season intensified the
problem.
Northern half of system shut down in early
November 2008.
Only 7 cars operational by mid-November.
Intensified research into problem and
solutions.
11
![Page 12: Light Rail Braking & Automatic Train Protection](https://reader031.vdocument.in/reader031/viewer/2022020110/55a4710c1a28aba1568b45d0/html5/thumbnails/12.jpg)
12
![Page 13: Light Rail Braking & Automatic Train Protection](https://reader031.vdocument.in/reader031/viewer/2022020110/55a4710c1a28aba1568b45d0/html5/thumbnails/13.jpg)
Causes: • Inadequate slide control in service braking
• No slide control in Emergency Braking
• Problems induced by other defects.
Distribution:• Brake Assurance – General 36%
• Brake Assurance – Greasy Rail 22%
• APPROACH8 anomaly 21%
• Unknown/Unaccounted 14%
• Operator commanded 7%
13
![Page 14: Light Rail Braking & Automatic Train Protection](https://reader031.vdocument.in/reader031/viewer/2022020110/55a4710c1a28aba1568b45d0/html5/thumbnails/14.jpg)
Component failures in signal cabins
caused momentary loss of speed code at
interlockings. (APPROCH8 Anomaly)
Excessive grease on curves reduced
adhesions.
Accounted for 43% of Emergency Brake
flats.
14
![Page 15: Light Rail Braking & Automatic Train Protection](https://reader031.vdocument.in/reader031/viewer/2022020110/55a4710c1a28aba1568b45d0/html5/thumbnails/15.jpg)
Inadequate slide control in service braking
– typically 0.8 to 1.2 mphps during slide.
No slide control in Emergency Braking.
Higher adhesion demand on unpowered
center trucks.
Maintenance was not refilling sand boxes.
15
![Page 16: Light Rail Braking & Automatic Train Protection](https://reader031.vdocument.in/reader031/viewer/2022020110/55a4710c1a28aba1568b45d0/html5/thumbnails/16.jpg)
16
![Page 17: Light Rail Braking & Automatic Train Protection](https://reader031.vdocument.in/reader031/viewer/2022020110/55a4710c1a28aba1568b45d0/html5/thumbnails/17.jpg)
LRVs equipped with six electromagnetic
track brakes (one pair per truck) .
Each pair provides ≈ 0.8 mphps.
Sliding wheels + Track Brakes > 1.5mphps
Not fail safe – power required for
actuation.
Cannot be used to meet GEBR.
17
![Page 18: Light Rail Braking & Automatic Train Protection](https://reader031.vdocument.in/reader031/viewer/2022020110/55a4710c1a28aba1568b45d0/html5/thumbnails/18.jpg)
18
![Page 19: Light Rail Braking & Automatic Train Protection](https://reader031.vdocument.in/reader031/viewer/2022020110/55a4710c1a28aba1568b45d0/html5/thumbnails/19.jpg)
Energize one pair of track brakes on ATP
overspeed (Penalty 1).
Track brakes add ≈0.8 mphps to full
service brakes. GEBR satisfied with sliding
wheels.
Vitality provided by existing Emergency
Brake response.
19
![Page 20: Light Rail Braking & Automatic Train Protection](https://reader031.vdocument.in/reader031/viewer/2022020110/55a4710c1a28aba1568b45d0/html5/thumbnails/20.jpg)
Added two diodes and an On/Off switch.
Effectiveness verified by test.
Vitality of ATP confirmed by Failure Mode
Effects and Criticality Analysis.
Entire fleet retrofitted and tested in one
week.
Full service over entire system restored by
the end of November 2008.
20
![Page 21: Light Rail Braking & Automatic Train Protection](https://reader031.vdocument.in/reader031/viewer/2022020110/55a4710c1a28aba1568b45d0/html5/thumbnails/21.jpg)
21
![Page 22: Light Rail Braking & Automatic Train Protection](https://reader031.vdocument.in/reader031/viewer/2022020110/55a4710c1a28aba1568b45d0/html5/thumbnails/22.jpg)
Wheel flatting eliminated.
Center Truck track brakes shoe life
reduced to 3 months.
ATP software modification added
discrimination and restored acceptable
shoe life.
22
![Page 23: Light Rail Braking & Automatic Train Protection](https://reader031.vdocument.in/reader031/viewer/2022020110/55a4710c1a28aba1568b45d0/html5/thumbnails/23.jpg)
Improve dynamic brake slide control.
Improve friction brake slide control.
Replace car control computer.
Improve ATP integration.