LIGHTNING PROTECTION SYSTEMS FRANCEBP 80055 - France -33460 MARGAUX
Analysis - Prevention - Protection – Lightning
INSTRUCTIONSPROTECTION AGAINST LIGHTNING STUDY APPLICATION
(DPF01+DPF01-A)
Before its implementation, a protection against lightning system must be the object of an in-depth study.
The information requested in this form will enable us to answer you at your earliest convenience and to propose you a quoted study matching your expectations, while meeting these standards.
By calling on LPS France, you are certain that this study will be carried out according to the standards the references of which follow :
- NF - C 17100- NF - C 17102- IEC 62305- UTE 15 – 443
For an optimal security and the preservation of your warranties, this system must also be installed and its follow-up ensured in accordance with the already mentioned standards as well as the manufacturer's instructions.
In the interest of the preservation of your security and your warranties, it is highly recommanded to have the installation, the checkings and maintenance of your system done by a LPS France licensed company.
Therefore, please take the time to fill it at best. Do not hesitate to enclose all types of documents, sketches or plans that would enable us to detail your request.
(1) : The title and reference of the project are assigned at the time of creation of the herein study and risk assessment file and must be mentioned in the layout and carrying out files, as well as in all the follow-up documents of the Outside Protection against Lightning (O.P.L.I.) of the site.
(3) : Rewrite the references of the different buildings and structures on the plan on the following page, in order to be able to locate them relative to each other.
(4) : Examples of purposes : workshop, office, equipment room, locker-room, etc...
(5) : These documents allow the carried out study to be more precise. Whatever the enclosed documents, draw the plan of the site remains essential.
(2) : The DPF01 form concerns the site in general, each building and structure shall be the objet of a detailed DPF01-A form.
(6) : The plan must imperatively include the following elements :- The représentation of each building/structure respecting their location relative to each other, the reference of each building/structure assigned on page 1 must be rewritten on them.- The separation distance between each building/structure,- The network paths (gas, water, electricity, phone, etc...)
(7) : Examples : elevator shaft, trap door, etc...
(8) : Examples : T.V., Radio, beep, etc...
(9) : Example : zinc gutter, etc...
(10) : Examples : electrical grounding, vat, etc...
(11) : Examples : buried, column, etc...
Notes of the form :
LIGHTNING PROTECTION SYSTEMS FRANCE
BP 80055 - France -33460 MARGAUX
Analysis - Prevention - Protection – Lightning
Protection against lightning study application
Site to protect(1) :
Buildings and/or structures of the site to protect :
Situation
Name of the site :
Reference of the project :
Company :
Address 1 :
Address 2 :
ZIP code :
Town :
Country :
Contact
Name :
Position :
Phone :
Email :
DPF01
File
Application dispatch date :Reception date : (do not fill)Date of response: (do not fill)
List of buildings and/or structures
Total number of buildings and structures the site consists of (2) :
Reference (3) Purpose (4)ABCDEFGH
I
J
Company
Company name :
LPS France licence number:
Address 1 :
Address 2 :
ZIP code :
Town :
Country :
LPS France representative:
Contact
Name :
Position :
Phone :
Email :
Page 1/2
}
LIGHTNING PROTECTION SYSTEMS FRANCE
BP 80055 - France -33460 MARGAUX
Analysis - Prevention - Protection – Lightning
Page 2/2
Layout of site:
DPF01
Documents enclosed with study (5)
Block plan : Else :
Wiring diagram : Specify :
Picture :
Plan of the site (6)Caption :
A, B, C...
Buildings/structures and their references
Separation distance
between each element of the plan in meter
(xm) Buried network (water, gas,
electricity, phone, etc...)
Scale of the plan (1cm = … m)D, E...
LIGHTNING PROTECTION SYSTEMS FRANCE
BP 80055 - France -33460 MARGAUX
Analysis - Prevention - Protection – Lightning
Protection against lightning study application
Building/structure reference :...... N°...../.....
DPF01-A
h1
h2
h3
L5
L1L2
L6 L4
L3
Measures in meters
h1
h2
h3
L1
L2
L3
L4
L5
L6
Dimensions of the building :
Elements and materials
Purpose (4) :
Access to the roof : Yes No Type (7) :
Aerial on the roof (8) : Yes No Hauteur :
Metallic elements :
On roof : Yes No Nature (9):
On the ground : Yes No Nature (10):
Overhead power supply cable : Yes No Remarks
Buried power supply cable : Yes No Remarks
Belting at the bottom of excavation : Yes No Remarks
Overhead phone cables : Yes No Remarks
Buried phone cable : Yes No Remarks
Gas networks : Yes No Type (11) :
Main Low Voltage Board
Number of poles : Protected poles :
Un :
Electrical grounding at ... in meters :
IΔn :
Characteristics of the building :
LIGHTNING PROTECTION SYSTEMS FRANCE
BP 80055 - France -33460 MARGAUX
Analysis - Prevention - Protection – Lightning
Protection against lightning study application
Building/structure reference :...... N°...../.....
DPF01-A
Building
Surrounded by higher trees or structures : Yes No
Surrounded by lower trees or structures : Yes No
Surrounded by strutures farther than 3 H : Yes No
Remarks :
The building and its environment :
Roof
Metallic Common Flammable
Remarks :
Structure
Metallic Current Flammable
Remarks :
Content
Of no value and non-flammable
Of current value or normally flammable
Of high value or particularly flammable
Of exceptional value, irreplaceable or explosive
Remarks :
Occupation
Unoccupied Normallyt occupied Difficult evacuation or risks of panic
Remarks :
Consequences
No continuity of service necessity
Continuity of service necessity
Consequences for the environment
Remarks :
Frame
Metallic American Traditional
Else :
Roofing
Slate Tile Everite
Else :
Nature of the soil on surface
Tarred Cobbled Limestone
Else :
Nature of the subsurface soil
Soil Clay Limy
Else :
Distance from the wall in meters: