lima ebus intro to electric buses · 2020. 9. 9. · • fleet of six proterra ecoride 35ft ebuses...
TRANSCRIPT
![Page 1: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/1.jpg)
Lima eBus Intro to Electric Buses
Any reproduction or distribution is expressly prohibited.
![Page 2: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/2.jpg)
Workshop Agenda
1. Anatomy of the Transit Bus & Evolution
2. Technology Comparison (eBus vs. diesel)
3. Going Electric Global eBus Outlook
4. Benefits & Challenges of eBus Adoption
5. eBus Lessons Learned
6. Session Wrap & Questions
Session 1Intro to Electric Buses10:30am to 12:30pm
![Page 3: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/3.jpg)
Transit Bus Technology Evolution
![Page 4: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/4.jpg)
Transit Bus Anatomy - Subsystems
Proprietary classification algorithm
10 Major Subsystems* (Articulating Joint, 18m only)
• Subsystems used to classify Work Order Maintenance
• Identify cost drivers according to subsystem
![Page 5: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/5.jpg)
Diesel Engine Generations - EPA Impact
![Page 6: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/6.jpg)
Diesel Engine Generations - EPA Impact
![Page 7: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/7.jpg)
Propulsion System Focus
![Page 8: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/8.jpg)
Transit Bus AnatomyDiesel vs. Electric
![Page 9: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/9.jpg)
eBus Anatomy – Functional Overview
Drive Cycle• Power electronics system manages energy
distribution throughout drivetrain
• On-board battery pack powers traction motor
• Traction motor powers drive axle and wheels
• Electrical energy transformed to mechanical
Regenerative Braking• Traction motor run in reverse to recapture
mechanical energy from braking
• Regenerative braking used to recharge vehicle battery
• Managed through power electronics controller
https://www.youtube.com/watch?v=H7XGaGc0qek
![Page 10: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/10.jpg)
eBus Anatomy - Subsystems
![Page 11: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/11.jpg)
eBus Anatomy – Charging Methods
Plug-in Depot Charge
• Plug-in charger with vehicle charging port
• Slow charging at depot
Overhead Pantograph Charge
• Pantograph (on Bus or station) lowers high voltage charger to conductive rails
• Fast charging on-route or at depot
Inductive Charging
• Wireless charging using inductive current charges battery pack
![Page 12: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/12.jpg)
Subsystem Comparison
![Page 13: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/13.jpg)
Subsystem Comparison
![Page 14: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/14.jpg)
Subsystem Comparison
System Diesel Bus Change to BEB Major Changes
Brakes, Pneumatic & ABS SensorsFriction Braking System
with Caliper Brakes
Regenerative Braking System,
Partially Recharges Battery
During Deceleration
Yes
Wheels, Axles, Suspension & Differential
Pneumatic Suspension Front
& Rear, Rear Differential,
Standard Wheel & Tire Size
Rear Axle to be Compatible with
Regenerative Braking, Higher
Axle & Suspension Rating to
Support Battery Weight
Yes
HVAC Diesel Powered Heater
Diesel Heater or Electric Heater
(to reach Zero Tailpipe
Emissions)
Yes
Farebox & ITS
Fare Payment Equipment,
Communications and
Destination Signs
Fare Payment Equipment,
Communications and Destination
Signs
No
Doors & Ramps
Bifold Doors Front & Rear,
Manual or Powered Ramp
Deployment
Bifold Doors Front & Rear,
Manual or Powered Ramp
Deployment
No
Interior
Passenger Seating,
Stanchions, Stop Request,
Signals, etc.
Optimize weight of Interior
components to compensate for
additional battery weight (i.e.
plastic seats, plastic stanchions)
Yes
![Page 15: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/15.jpg)
Global eBus Outlook
![Page 16: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/16.jpg)
Global Electric Bus Growth Forecast
![Page 17: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/17.jpg)
Global Electric Bus Orders
City / Transit Agency No. of eBuses Ordered
Los Angeles County Metropolitan Transportation Authority 2,200*
Medellin, Colombia 64
Santiago, Chile 100
RATP, Paris 4,500*
New York MTA, USA 500*
Bangalore Metropolitan Transport Corporation, Bengaluru, India
150*
* Planned / Approved
![Page 18: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/18.jpg)
LA Metro ZEB ProgramLos Angeles, California, USA
• Zero Emission Bus (ZEB) Program Master Plan currently underway
• Largest e-Bus study in North America to have fully electric fleet by 2030
• Phased implementation by Division
• Optimization Plan for:• Depot vs. On-route Charging• On-site Power Demand at Facilities• Facility Upgrades• Percentage of Route Network Complete
• Initial eBus pilot of BYD K9 in 2015• Challenges on vehicle maintenance• Retrofits and modifications• Range Expectations (155 miles vs. 133 miles actual)• Power Requirements (Gradeability)• Termination of Pilot after 4 months
![Page 19: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/19.jpg)
BYD eBus FleetShenzhen, China
• Largest eBus fleet in the world with 16,000 buses
• Shenzhen headquarters for BYD largest global EV manufacturer
• Benefits of improved air quality and traffic noise reduction
• China’s Electrification Goal 20% of all vehicles by 2025
• Shenzhen Bus Company Fleet• GHG emissions reduced 440,000 tonnes/year• Fleet fuel cost 50% reduction• 180 depots with over 40,000 charging stations
installed• Overnight charge (~2 hours) • eBus range 200 km
![Page 20: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/20.jpg)
TTC eBus ProgramToronto, Canada
• City of Toronto TransformTO climate change action plan 80% GHG reduction by 2050
• Public Transit Infrastructure Fund (PTIF) $140 million Government of Canada and City of Toronto
• 60 eBuses set to be in operation by 2020
• Rotational pilot set for three (3) divisions• New Flyer Xclesior Charge (454 kWh)• BYD K9 (500 kWh)• Proterra E2 Catalyst (440 kWh)
• All eBuses depot charged
• Ongoing Audit for eBus OEMs
• Microgrid Energy Storage
![Page 21: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/21.jpg)
Going ElectricBenefits & Challenges
![Page 22: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/22.jpg)
Challenges to Transit Agencies
Requirements for transit agencies to reduce GHG emissions of their fleet.
Electric buses are a main GHG mitigation initiative supported by government funded programs and policies.
The electric bus market is experiencing considerable growth with much interest and investment in electric bus technology and advancements in battery innovation.
Why are transit agencies going electric?
How much will an electric bus and supporting infrastructure cost me?
How will my current operations and facilities be disrupted by introducing electric buses?
What kind of training will be required for drivers and personnel working with high voltage electrical infrastructure and batteries?
Main questions transit agencies have for electric bus adoption:
![Page 23: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/23.jpg)
6,000 houses together consume approx. 6 MW energy1 house area = 1,050 sq. ft
6,000 Houses – 145 acres
200 eBuses – 25 acres
200 electric buses in a bus garage consume approx. 6 MW energy for charging
Electric Bus Energy Consumption Comparison
![Page 24: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/24.jpg)
Electric Bus Noise Comparison
• Volvo (Sweden) study on socio-economic cost of traffic noise
• Socio-economic benefits from low noise eBuses• Health effects (i.e. stress, hearing damage. Blood pressure)• Lower impact on health care system• Higher quality of living in major transit corridors
• Considerations for visually impaired due to low noise level
![Page 25: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/25.jpg)
eBus Lessons LearnedWinnipeg Transit, MB, CAN
• eBus pilot for Airport Route in partnership with New Flyer 200 kWh battery pack
• Initial operations without revenue service to test subsystem functionality
• On-route pantograph fast charger installed
• Four seasons energy consumption (kWh/km) recorded:• Spring/Fall = 1.25 kWh/km (No A/C)• Summer = 1.85 kWh/km (Full A/C)• Winter = 3.10 kWh/km (Full Heat)
• Auxiliary diesel heating system used in HVAC to lessen demand on battery draw, improve cold weather operation
![Page 26: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/26.jpg)
eBus Lessons LearnedWorcester (WRTA), MA, USA
• Second largest Regional Transit Authority (RTA) in Massachusetts, fleet size 52 buses
• Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013
• End point on-route charging used• Challenges with charging infrastructure maintenance
(eBuses out 10 weeks)• Range limitation ~30 miles (small battery pack)• High charging cost due to power transmission
(considering off grid natural gas generators)
• Supply chain issues for parts availability to support repairs
![Page 27: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/27.jpg)
eBus Lessons LearnedFoothill Transit, CA, USA
• Collaboration with California Air Resources Board (CARB) and National Renewable Energy Laboratory (NREL)
• Twelve (12) Proterra 35ft fast charge eBuses (88 kWh)
• Two (2) Proterra 40ft fast charge (106 kWh)
• eBus purchase cost $880,000 to $905,000 USD
• eBus operations on 16 mile route loop with on-route end point charging
• On-route charger reliability 98% up time
• Majority of eBus fleet downtime related to general bus maintenance issues (not electric powertrain)
Energy Consumption:• 35ft eBus = 2.18 kWh/mile• 40FT eBus = 2.22 kWh/mile• HVAC major factor
![Page 28: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/28.jpg)
Electric Bus Barriers to Adoption
Technological• Infrastructure planning
• High voltage, power distribution• Grid demand management
• Range limitations• Local skillset for fleet & infrastructure maintenance
Financial• Higher vehicle purchase/capital cost• Capital investment for supporting infrastructure• Risk of unproven technology and lifecycle cost savings
Institutional • Lack of favourable policies, grants and/or incentives• Land acquisition for charging infrastructure
![Page 29: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/29.jpg)
Roadmap to Electric
![Page 30: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/30.jpg)
Road Map (Stages)
Stage 1: Understanding • User group and vehicle needs (operations)• GHG Reduction Targets
Stage 2: Exploratory • Market research on alt. propulsion technologies• Impact of green tech on GHG reduction• Grants and funding opportunities • Utility Partnerships (Grid impact, pricing)
![Page 31: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/31.jpg)
Road Map (Stages)
Stage 3: Implementation • Change management plan• Maintenance & facility modifications • Buy-in from stakeholders & senior management
Stage 4: Execution & Monitoring• Pilot vehicle program • Review of pilot data & user feedback
![Page 32: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/32.jpg)
eBus Global Deployment
![Page 33: Lima eBus Intro to Electric Buses · 2020. 9. 9. · • Fleet of six Proterra EcoRide 35ft eBuses operation started in 2013 • End point on-route charging used • Challenges with](https://reader035.vdocument.in/reader035/viewer/2022071417/6114c06cff3fb255ef6d18ef/html5/thumbnails/33.jpg)
Any reproduction or distribution is expressly prohibited.