linac test area instrumentation update m. haney, d. errede, z. conway university of illinois at...
TRANSCRIPT
![Page 1: Linac Test Area Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 14 June 2002](https://reader036.vdocument.in/reader036/viewer/2022072011/56649e3a5503460f94b2c7a6/html5/thumbnails/1.jpg)
Linac Test AreaInstrumentation Update
M. Haney, D. Errede,Z. Conway
University of Illinois at Urbana-Champaign
14 June 2002
![Page 2: Linac Test Area Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 14 June 2002](https://reader036.vdocument.in/reader036/viewer/2022072011/56649e3a5503460f94b2c7a6/html5/thumbnails/2.jpg)
14 June 2002 m. haney, et al. 2
Instrumentation
• Need safe solution for instrumenting the LH2 absorber in the LTA
• Prudent to accommodate MICEand European safety considerations– i.e. do it right the first time…
![Page 3: Linac Test Area Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 14 June 2002](https://reader036.vdocument.in/reader036/viewer/2022072011/56649e3a5503460f94b2c7a6/html5/thumbnails/3.jpg)
14 June 2002 m. haney, et al. 3
Primary Objective - Safety
• Intrinsic safety, if possible– Less than 1 watt (per channel?)– Good idea for Fermi; required for Europe
• Gas-purged enclosure, if necessary– 19” rack, 40U tall
![Page 4: Linac Test Area Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 14 June 2002](https://reader036.vdocument.in/reader036/viewer/2022072011/56649e3a5503460f94b2c7a6/html5/thumbnails/4.jpg)
14 June 2002 m. haney, et al. 4
Signals inside (the cryostat)
• 12 (cryo) temperatures– readout via GPIB + LabView (PC)
• 25(ish) 4-wire bolometry strips• Multiple fibers
– FISO strain gages– Laser occlusion?– Simple spark detectors
• (light pipe to photodiode)
![Page 5: Linac Test Area Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 14 June 2002](https://reader036.vdocument.in/reader036/viewer/2022072011/56649e3a5503460f94b2c7a6/html5/thumbnails/5.jpg)
14 June 2002 m. haney, et al. 5
(more) Signals inside
• USB (4 wires, and shield) for CCD camera– via PC
• Piezo vibration sensor– via (16 chan/12 bit) ADC and LabView (PC)
• Local (64 chan/16 bit) IRM channels– via “LabView” (see last slide)
• MICE channels (?)– placeholder for the future…
![Page 6: Linac Test Area Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 14 June 2002](https://reader036.vdocument.in/reader036/viewer/2022072011/56649e3a5503460f94b2c7a6/html5/thumbnails/6.jpg)
14 June 2002 m. haney, et al. 6
Signals outside
• Many voltages, currents, temperatures, pressures– magnets, beam position monitors, etc.
• Most available from ACNET or local IRM– via “LabView” (see last slide)
• or Cyro-PLC– and Intellution
![Page 7: Linac Test Area Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 14 June 2002](https://reader036.vdocument.in/reader036/viewer/2022072011/56649e3a5503460f94b2c7a6/html5/thumbnails/7.jpg)
14 June 2002 m. haney, et al. 7
Two Possibilities (1)
• Intrinsically safe
UPS
PC w/32 chan ADC
FISO
Cryo(temp)
IRM
Barrier(s)
network
ACNET
Sealed Conduit(s)
Intrinsically safe signal conditionersand transmitters
power
Hazard Safe
![Page 8: Linac Test Area Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 14 June 2002](https://reader036.vdocument.in/reader036/viewer/2022072011/56649e3a5503460f94b2c7a6/html5/thumbnails/8.jpg)
14 June 2002 m. haney, et al. 8
Two Possibilities (2)
• Gas-purged box
UPS
PC w/32 chan ADC
FISO
Cryo(temp)
IRM
Barrier(s)
network
ACNET
Sealed Conduit(s)
power
Hazard Safe
![Page 9: Linac Test Area Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 14 June 2002](https://reader036.vdocument.in/reader036/viewer/2022072011/56649e3a5503460f94b2c7a6/html5/thumbnails/9.jpg)
14 June 2002 m. haney, et al. 9
(basic) Barrier
Power +Signal
Return
Ground
“safe circuit”
fuse
![Page 10: Linac Test Area Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 14 June 2002](https://reader036.vdocument.in/reader036/viewer/2022072011/56649e3a5503460f94b2c7a6/html5/thumbnails/10.jpg)
14 June 2002 m. haney, et al. 10
This Summer – Z. Conway
• LabView interface– GPIB– ADC– IRM
![Page 11: Linac Test Area Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 14 June 2002](https://reader036.vdocument.in/reader036/viewer/2022072011/56649e3a5503460f94b2c7a6/html5/thumbnails/11.jpg)
14 June 2002 m. haney, et al. 11
Open Issues
• Local signal condition vs Purged box– Common mode concerns (noise from magnets)
• Especially surge currents on start/stop
– Long wires!
• 2-wire vs 4-wire solutions– Shielding and noise sensitivity in general– Cable plant size concern
• (already 200+ wires, not including shielding)
![Page 12: Linac Test Area Instrumentation Update M. Haney, D. Errede, Z. Conway University of Illinois at Urbana-Champaign 14 June 2002](https://reader036.vdocument.in/reader036/viewer/2022072011/56649e3a5503460f94b2c7a6/html5/thumbnails/12.jpg)
14 June 2002 m. haney, et al. 12
Open Issues (2)
• LabView vs C – to read ACNET data
(mostly, IRMs outside of the experiment)
• Remote control of PC– Citrix ICA, PCAnyWhere, etc.– LabView web-remote instrumentation– KVM?