    LINE BALANCING

    P.VIDYUT CHANDRA

  • 8/2/2019 linebalancing-120323122041-phpapp01

    2/10

    INTRODUCTION

    Line balancing means balancing production

    line or an assembly line.

  • 8/2/2019 linebalancing-120323122041-phpapp01

    3/10

    Why Line balancing

    So that there is an even flow of production

    units from one work station to the next

  • 8/2/2019 linebalancing-120323122041-phpapp01

    4/10

    Why this Problem Raise

    This problem is particularly important in plant

    layouts ..

    The finished product is the result of many

    sequential operations.

    The production capacity of each machine

    /workstation in sequence is not identical .

  • 8/2/2019 linebalancing-120323122041-phpapp01

    5/10

    OBJECTIVE OF LINE BALANCING

    To distribute the task evenly over workstations

    , so that idle time of man and machines is

    minimized.

  • 8/2/2019 linebalancing-120323122041-phpapp01

    6/10

    FABRICATION UNITS

    Machines operations are difficult to split in to

    small work elements for re grouping.

    Some operations are inter-related with each

    otherand have fixed sequence

    Example tapping after drilling

    Machine tools emplyed cannot be used forvariety of jobs ..without expensive changes in

    setup and tools ..

  • 8/2/2019 linebalancing-120323122041-phpapp01

    7/10

    How to handle the LB problem

    By sub contracting

    By diverting extra parts to another machine

    not in line.

    Having more than one machine at slow work

    station. Or changing the speed of machine .

    Motivating and improving performance ofworker or assigning job to efficient worker.

    Providing a buffer stock of semi finished parts

  • 8/2/2019 linebalancing-120323122041-phpapp01

    8/10

  • 8/2/2019 linebalancing-120323122041-phpapp01

    9/10

    Objective questions

    Work element is a part of total job content.

    Work station iscombination of few work

    elements are performed on part/component.

    Station time is the time required to perform

    the designated amount of work at a given

    station.

    Total work content is algebraic sum of all the

    work elements on the line.

  • 8/2/2019 linebalancing-120323122041-phpapp01

    10/10

    Cycle Time is time required to complete onejob

    Delay or idle time of ith station = cycle time

    (work content of ith station / cycle time) -station time.

    Or it is difference between the cycle time and

    station time Balance delay is the measure of line

    efficiency.