100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016
Renewable Energies
REGIONS OFCLIMATE ACTION
Summary
Mandating Authority :
Expected project CAPEX :
Location and population
Project Type :
Main stakeholders
Social and environmental impact
Linking renewable energy with community tourism in northern protected areas of the province of Pichincha
Creation of jobs; decreased energy con-sumption without affecting user comfort. A switch to clean energy will also reduce dependence on fossil fuels, which are more expensive and difficult to access in remote rural areas and are used mainly for small motorized boats and motorcycles.
The project aims at providing renewable energy to three new tourism installations run by community enterprises which are located in rural poor areas of the province of Pichincha; the idea is to strengthen the concept of eco-tourism by reducing carbon emissions in protected areas. At the same time the project would contribute to guaranteeing jobs of indegenous and peasant initiatives. This is identified as an innovative pilot project in the province’s environmental policy framework.
Provincial government of Pichincha
300’000 €
Main stakeholders (involved in the project)Public Entities- Provincial government of Pichincha- Municipal government of Pedro Moncayo- Municipal government of CayambeCommunity tourism enterprises:- Santa Mónica; Cochasquí (Pedro Moncayo)- Paquiestancia (Cayambe)
Municipalities of Cayambe and Pedro Moncayo, Ecuador.65 000 inh.
Solar
100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016
Building permits signed :
STAGE 4 : Permitting / Financing / Contracts
Land concession signed :
Environmental impact study :
Grid Connection :
Power Purchase Agreement
Off-Taker :
Tenor : Price of electricity :
Identified sources of fundings
Comments
Engineering, Procurement and Construction Contractor :
Operation and Maintenance Contractor :
STAGE 5 : Engineering / Construction / Commercial Operation
STAGE 1 : Concept Development, Site identification
Site identified :
Site access :
Expected installed capacity :
Adequate road Rail access Port facilities
Project maturity ( IFC / World Bank Categories )
STAGE 3 : Feasibility Studies
STAGE 2 : Pre-Feasibility Studies
Pre-feasibility study :
Feasibility study :
Expected type of contract :
Technology :
Energy resource data
✓
STAGE 1 : Concept Development, Site identification
STAGE 2 : Pre-Feasibility Studies
STAGE 3 : Feasibility Studies
STAGE 4 : Permitting / Financing / Contracts
STAGE 5 : Engineering/Construction/Commercial Operation
Yes
Apart from the reduction of carbon emissions in eco-tourism of protected areas, motivations for implementing the project come from the fact that in Ecuador solar energy is until now underused, despite high solar irradiation. Therefore, the project has been in-serted as a high priority within the political framework of provincial and municipal entities.
Examples:- Solar energySOLAR PANEL 250W 24V PANASONIC VB HN250AE02- Boat transportAqua watt green racing electric propulsion comparable to 20 HPgasoline energy- MotorcyclesZERO MMX ZF6.5
Yes
Yes
Yes
Contact has already been established with local enterprises RENO-VAENERGIA S.A based in Pedro Moncayo. Contact with international providers will be established if required.
RENOVAENERGIA S.A based in Pedro Moncayo
Yes
Yes
Yes
Empresa Eléctrica Regional Norte S.A. (Emelnorte)
10 Years 0,077EUR/Kwh
Not specified
0,003 Mw (for solar panels)
Data available for January 2013- January 2015
BOOT
Yes