List of Cases to be submitted before 11th Consent Appraisal Committee Meeting Scheduled on 5.3.2013 at 11.00 A.M. (Part-II) Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmitted Agenda 1 ISTA Hotel (A Unit of IHHR Hospitality Pvt. Ltd.), S. No. 206, A/1. 206B, 206C, 206D, 206E, 217/2, Plot No. 88, Sub Plot 04, Pune Nagar Road, Pune 204.28 Crs Operate AST 1 to 22 Fresh Agenda 1 Calcite Properties Developer Pvt. Ltd., S.No. 1452/2 & 2444, Village Nagaon, Tal - Alibaug, Dist - Raigad 448.5 Crs Establish AST 23 to 41 2 Seya Industries Ltd., Plot No. D-16, MIDC \ Tarapur, Tal - Palghar, Dist - Thane 124.81 Crs Establish PAMS 42 to 72 3 Topworth Urja & Metals Ltd., Mouza Ukkerwahi, Vill- Heti, Umred Road, Tal- Ured, Nagpur 278.65 Crs Establish JD(APC) 73 - 89 4 Jakraya Sugar Ltd., Gat No. 61/1/A. A/p Watwate, Tal- Mohol, Dist - Solapur 106.93 Crs Establish JD(WPC) 90 - 96 5 Thane Municipal Corporation, Thane 1.91 Crs Establish JD(WPC) 97 - 110 6 Shri Datta Sakhar Karkhana Ltd., (A Unit of Dalmia Bharat Sugar & Industries Ltd), Asurle-Porle, Tal - Panhala 150 Crs Establish (Expansion) JD(WPC) 111 - 118 7 Lodha Novel Build Farm Pvt. Ltd., Old Survey Nos. 197/1, 197/2, 197/9, 200/1, 200/2, 200/3A, 200/3B etc. Vill Bhayandarpada, Godbunder Road Thane 703 Crs Establish (Expansion) RO(HQ) 119 - 138 8 JCB India Ltd., Plot No. A & B, Talegaon Floriculture & Industrial Park, Vill- Ambi, Tal- Maval, Dist - Pune 622.35 Crs Establish (Expansion) JD(APC) 139 - 145 9 RSB Transmissions (I) Ltd., Gat No. 908, Nagar Road, Vill- 190.96 Crs Establish (Expansion) JD(APC) 146 - 152

Upload: others

Post on 06-Sep-2019

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

List of Cases to be submitted before 11th Consent Appraisal Committee Meeting Scheduled on 5.3.2013 at 11.00 A.M. (Part-II)

Sr. No. Name & Address Capital

Investment Applied For

Section Page No. Remarks

Resubmitted Agenda 1 ISTA Hotel (A Unit of IHHR

Hospitality Pvt. Ltd.), S. No. 206, A/1. 206B, 206C, 206D, 206E, 217/2, Plot No. 88, Sub Plot 04, Pune Nagar Road, Pune

204.28 Crs Operate AST 1 to 22

Fresh Agenda

1

Calcite Properties Developer Pvt. Ltd., S.No. 1452/2 & 2444, Village Nagaon, Tal - Alibaug, Dist - Raigad

448.5 Crs Establish AST 23 to 41

2 Seya Industries Ltd., Plot No. D-16, MIDC \ Tarapur, Tal - Palghar, Dist - Thane

124.81 Crs Establish PAMS 42 to 72

3 Topworth Urja & Metals Ltd., Mouza Ukkerwahi, Vill- Heti, Umred Road, Tal- Ured, Nagpur

278.65 Crs Establish JD(APC) 73 - 89

4 Jakraya Sugar Ltd., Gat No. 61/1/A. A/p Watwate, Tal- Mohol, Dist - Solapur

106.93 Crs Establish JD(WPC) 90 - 96

5 Thane Municipal Corporation, Thane 1.91 Crs Establish JD(WPC) 97 - 110

6

Shri Datta Sakhar Karkhana Ltd., (A Unit of Dalmia Bharat Sugar & Industries Ltd), Asurle-Porle, Tal - Panhala

150 Crs Establish (Expansion) JD(WPC) 111 - 118

7

Lodha Novel Build Farm Pvt. Ltd., Old Survey Nos. 197/1, 197/2, 197/9, 200/1, 200/2, 200/3A, 200/3B etc. Vill Bhayandarpada, Godbunder Road Thane

703 Crs Establish (Expansion) RO(HQ) 119 - 138

8

JCB India Ltd., Plot No. A & B, Talegaon Floriculture & Industrial Park, Vill- Ambi, Tal- Maval, Dist - Pune

622.35 Crs Establish (Expansion) JD(APC) 139 - 145

9 RSB Transmissions (I) Ltd., Gat No. 908, Nagar Road, Vill-

190.96 Crs Establish (Expansion)

JD(APC) 146 - 152

Page 2: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

Sanaswadi, Tal- Shirur, Dist - Pune

10 Sulzer India Ltd., Gat No. 304, Kondhapuri, Tal- Shirur, Dist - Pune

107.08 Crs Establish (Expansion) JD(APC) 153 - 160

11 Solar Industries India Ltd., Vill- Chakdoh, Tal- Katol, Dist - Nagpur 136.86 Crs Establish

(Expansion) JD(APC) 161 - 168

12 Rashtriya Chemical and Fertilizers Ltd., Chembur, Mumbai 1496.26 Crs Establish

(Expansion) PAMS 169 - 178

13 Larsen Toubro Realty Ltd., CTS No. 117A, 117A/1, 117/B, Villagae Tungwa, Kurla, Mumbai

1605 Crs Establish (Expansion) RO(HQ) 179 - 193

14

Dr. Babasaheb Ambedkar S.S.K. Ltd., (Distillery Unit) (Expansion Unit), Arvidnagar, Psot- Keshegaon

132.41 Crs Establich (Expansion) JD(WPC) 194 - 205

15 Dinshaws Dairy Ltd., K - 41/42, MIDC Butibori, Dist - Nagpur 111.21 Crs Establich

(Expansion) JD(WPC) 206 - 211

16 Crompton Greaves Ltd., (Switchgear Complex, Plot No. A-3, MIDC Ambad, Tal- & Dist - Nashik

140.3 Crs Establish (Expansion) JD(APC) 212 - 221

17 Wockhardt Hospital Ltd., C.S. No. 1877, Dr. Anand Rao Nair Marg, Agripada, Byculla, Mumbai

208 Crs. 1st Operate AST 222 -240

18 Ashland India Pvt. Ltd., Plot No. G-3, MIDC Additional Ambernath, Dist- Thane.

129 Crs 1st Operate PAMS 241 - 264

19

Urjankur Shree Tatyasaheb Kore Warana Power Co. Ltd., Gat No. 630 A/p Waranagar, Tal - Panhala, Dist - Kolhapur

281 Crs 1st Operate JD(WPC) 265 - 278

20

Macrotech Construction Pvt. Ltd. Lodha Pavilion, Appolo Mills Compounds, N. M. Joshi marg, Mahalaxmi, Mumbai

6695.33 Crs 1st Operate RO(HQ) 279 - 294

21

Indiabulls Power Ltd., Amravati Thermal Power Project (Ph 1), Plot No. D-2 and D-2 ( Part), Addl. Industrial Area, Nandgaon Peth, Amravati

1697.58 Crs 1st Operate JD(APC) 295 - 304

22 Grace Industries Ltd., (25 MW 101.46 Crs 1st operate JD(APC) 305 - 312

Page 3: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

TPP), A-23, MIDC Tadali Growth Centre, Chandrapur

23

Sudarshan Jeans Pvt Ltd., (Expansion) Plot No. T-2, MIDC Kagal, Hatkanangale Industrial Area, Tal- Kagal, Kolhapur

150.10 Crs 1st Operate (Expansion) JD(WPC) 313 - 323

24 WCL Mungoli OCM, Po- Sakhara (Kolgaon), Mugoli Sub Area, Dist - Yavatmal

120.13 Crs Operate (Expansion) JD(APC) 324 - 332

25 Sanjivani (T) SSK Ltd., (Distilery Unit), Sahajanand, Tal - Kopargaon, Ahmednagar

114.14 Crs 1st Operate (Expansion)

JD(WPC) 333 - 340

26 Wardha Power Co. Pvt. Ltd., B-2, MIDC Warora, Warora Growth Centre, Chandrapur

2829.16 Crs Renewal (Amalgamation) JD(APC) 341 - 360

27 WCL Durgapur OCM, Durgapur, Chandrapur 196.35 Crs Renewal

(Amalgamation) JD(APC) 361 - 371

28

Pad Dr. V. V. Patil S. S. K. Ltd., (Distillery Division + Acetaldehyde Unit), A/p Pravaranagar, Tal Rhata, Dist - Ahmednagar

255.35 Crs Renewal (Amalagamation) JD(WPC) 372 - 380

29 Watson Pharm Pvt. Ltd. Plot No. N-15, MIDC Additional Ambernath, Dist - Thane

139.28 Crs Amendment PAMS 381 - 393

30 Ratnagiri Gas and Power Pvt. Ltd., A/p- Anjenvel, Tal- Guhagar, Dist - Ratnagiri

8644.74 Crs Renewal JD(APC) 394 - 402

31 Siemens Rolling Stock Pvt. Ltd., Plot No. 1/2, MIDC Shendra, Aurangabad

103.78 Crs Renewal JD(APC) 403 - 409

32

Kirloskar Ferros Industries Ltd., Gat No. 12 to 18/1 +2 and 25/1, Shivashai Solapur, Tal- North Solapur

138.58 Crs Renewal JD(APC) 410 - 418

33 Asahi India Glass Ltd., T-7, MIDC Taloja, Dist - Raigad

478.0 Crs Renewal JD(APC) 419 - 433

34 Balaji Infra Projects Ltd., (Port Activities at Dighi), Tal- Shirvardhan, Dist - Raigad

720.61 Crs Renewal JD(APC) 434 - 454

35 Thyssemkrupp Electric Steel India Pvt. Ltd., A/p- Gonde, Vill- Wadivarhe, Tal- Igatpuri, Dist-

474.13 Crs Renewal JD(APC) 455 - 464

Page 4: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

Nashik

36 Shree Sidhbali Ispat Ltd., MIDC Tadali Growth Centre, Chandrapur

231.75 Crs Renewal JD(APC) 465 - 477

37 Shree Dnyaneshwar SSK Ltd., (Distillery Division), Bhende BK, Newasa

205.46 Crs Renewal JD(WPC) 478 - 495

38

Kisanveer SSK Ltd., (Distillery Division) At- Bhuinj, Post- Kisanveernagar, Tal - Wai, Dist- Satara

264.99 Crs Renewal JD(WPC) 496 - 502

39 Apar Sacks Ltd., Unti Ashti, Tal - Charmoshi, Dist - Chandrapur 371.71 Crs Renewal JD(WPC) 503 - 514

40 Sanjivani (T) SSK Ltd., (Sugar + Co-generation)- Kopargaon, Ahmednagar

223.35 Crs Renewal JD(WPC) 515 - 527

41 Jubilant Life Science Ltd., Villagar Nimbut-Nira, Tal - Baramati, Dist- Pune

307.80 Crs Renewal PAMS 528 - 540

42 National Chemical Laboratory, Pashan Road, Shivaji Nagar, Pune 236.66 Crs Renewal PAMS 541 - 552

Page 5: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

Resubmitted Agenda CAC Item No.01 Name of the Industry: ISTA Hotel (A Unit of IHHR Hospitality Pvt. Ltd.),

S. No. 206, A/1. 206B, 206C, 206D, 206E, 217/2, Plot No. 88, Sub Plot 04, Pune Nagar Road, Pune

HOD Remarks :- 1. Application for grant of renewal of Consent to Operate of Hotel (209 rooms) received at

R.O. (Pune) on 29/08/2012. 2. R.O.(Pune) forwarded application to A.S.(T) on 11/12/12. 3. Earlier Board had granted Consent to Operate vide Consent No.

MPCBHQ/ROPune/AST/CAC-430 dtd. 18/05/2012 for Hotel activity (209 rooms) having total BUA of 12,809.43 sq. mtrs.

4. Firm has provided primary treatment to treat laundry effluent. After treatment, it is mixed with sewage for further treatment in the STP consisting of primary, secondary & tertiary treatment. After treatment, treated sewage/effluent is utilized upto maximum extent for flushing, cooling purpose, gardening and rest is discharged into Municipal sewer. JVS result dtd. 28/11/2012 is observed within Consented limits.

5. Application was discussed in CAC meeting held on 8/01/2013 and it was decided to keep the case in abeyance and resubmit in meeting dtd. 22/01/13 after getting the details on area statement.

6. R.O.(Pune) on 4/02/13 forwarded area statement submitted by the Hotel Authority on 3/02/13 which shows total construction BUA of 13,229.46 sq. mtrs. for 120 Nos. of rooms. whereas Board had granted Consent for Hotel with 209 rooms on BUA 12,809.43 sq. mtrs.

7. R.O. (Pune) has recommended grant of renewal of Consent to Operate upto 31/08/2013.

8. Firm has paid total Consent to Operate fees of Rs. 4,15,567/- (Excess Amount of Rs. 2,44,000/- paid earlier is taken into account) for period of 1 year. 9. Renewal of Consent to Operate may be granted for 120 Nos. of rooms. over total

construction BUA of 13,229.46 sq. mtrs. upto 31/08/2013 subject to condition of submission of Company’s Board Resolution for not violating Consent conditions in future and B.G. of Rs. 2.0 Lakhs. towards compliance of the same.

Asst. Secretary (Tech.)

 

Page 6: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

Fresh Agenda CAC Item No.01 Name of industry : - Calcite Properties Developer Pvt. Ltd.,

S.No. 1452/2 & 2444, Village Nagaon, Tal - Alibaug, Dist – Raigad.

HOD Remarks:

1. Application for grant of Consent to Establish for constructions of Hotel (4 Star) & Restaurant buildings received at R.O. (Raigad) on 22/01/2013.

2. Firm has obtained Environmental & CRZ Clearance from MoEF for Eco-Tourism-Vasahat & Beach Resort at Village Nagaon, Tal. Alibag, Dist. Raigad-402 204 vide letter F. No. 11-62/2010-IA-III dtd. 26/12/12.

3. Firm has obtained NOC from Local Grampanchayat Nagaon vide letter No. 1229 dtd. 18/10/11.

4. Firm has obtained NOC from MTDC for Tourism Development vide letter dtd. 15/09/11. 5. Firm has obtained 30 years lease of 74.64 Ha land from MTDC for Tourism

Development vide letter No. MTDC/PER./2009 dtd. 23/09/2009. 6. Firm has proposed to provide full fledged STP of Capacity 910 CMD for the treatment of

905 CMD sewage. 7. SRO(Raigad-II) / RO(Raigad) have recommended that grant of Consent to Establish. 8. Firm has paid Consent to Establish fees of Rs. 8,97,000/- vide DD No. 249055 dtd.

7/01/13 drawn on Vijaya Bank. 9. Consent to Establish may be granted subject to condition of compliance of EC/CRZ

conditions & submission of B.G. of Rs. 10 Lakhs towards compliance of Consent conditions.

Asst. Secretary (Tech.)

Page 7: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.02 Name of industry :- Seya Industries Ltd., Plot No. D-16, MIDC \ Tarapur,

Tal - Palghar, Dist – Thane.

HOD Remarks - Applied for Consent to establish. - Application received at SRO On 16.11.2012 and at HQ it received on

03.01.2012.

- CI is Rs. 124.81/- Crs. proposed unit.

- Cess assessment done up to - NA - Envt. Statement submitted for the year -NA.

- Industry has proposed to provide APC/WPC systems. - Proposed to provide Primary, Secondory, Tertiary, R.O and MEE to

achieve Zero Discharge, • Industry is proposed in MIDC area, considering location of industry near to salwad village and no buffer zone in between MIDC and Village, Regional Officer Thane has expressed apprehension about mishap in case of accidental leakages of chlorine gas or incidence of fire.

We may consider the case for consent to establish subject to EC , zero discharge & by imposing condition as follow.- For gaseous emissions limit of Chlorine from hypo tower- 15 mg/m3 and HCL-35 mg/m3., Chlorine alarm system adjusted to 1 ppm,

Page 8: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

 CAC Item No.03 Name of industry: Topworth Urja & Metals Ltd.,

Mouza Ukkerwahi, Vill- Heti, Umred Road, Tal- Ured, Nagpur.

HOD Remarks Applied for Consent to Establish for Proposed Fly Ash Plant & Consent to Renewal for

Existing Power, Sponge Iron, Billet Plant combined Consent.

Renewal of consent with Amalgamation and they will utilize fly as generated from the

power plant (as non hazardous solid waste) to utilize in the brick plant. (utility services). No

need for getting separate Consent to Establish/Operate. The analysis results of stack /

ambient are exceeding. C.A.A.Q.M.S. under installation. Directions issued by R.O. for Non-

compliance. Total C.I. 278.65 Crores. Total B.G. available with the Board is Rs. 25/- Lakhs

taken for various plants (details enclosed).

In view of above we may grant renewal with amalgamation up to 31.05.2015 with part

forfeiting of the B.G. as results are exceeding /or we may issue SCN for refusal due to non

compliance.

Joint Director (APC)

Page 9: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.04 Name of industry :- Jakraya Sugar Ltd.,

Gat No. 61/1/A. A/p Watwate, Tal- Mohol, Dist – Solapur  HOD Remarks

• Applied for C to E, proposed 30 KLPD Distillery unit. • Application received at SRO on dt.15.10.2012 and at HQ on dt.18.12.2012. • C.I of the proposed unit is Rs.31.74 Crs • Proposed at 5 KM from Bhima river (A-II) Class, which satisfies the RRZ. • As per the corrected water budget submitted by industry the quantity of I.E is 316.80

CMD. • Industry has proposed following: a) Biomethanation followed by composting. b) 5 Days and 30 Days pacca storage tank. c) Compost yard of 10 Acres. • Industry vide letter dt.27.11.2012 has reported that steam will be used form the

exiting boiler of Sugar unit. • Wet Scrubber is provided as an APC System. • Attracts Environmental Clearance as per EIA Notification 2006 and amendments

thereof. • Recommended for grant of C to E.

JD (WPC)

Page 10: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.05 Name of industry :- Thane Municipal Corporation, Thane. HOD Remarks • Applied for Consent to Establish for proposed STP 3 nos at Kopari120MLD,kalwa

100MLD,Mumbra 32 MLD. • 2) Prposed C.I is 191.28 Crores. • 3) as Per decision taken in heraing extended by Member Secreatry on 911.2009 to TMC,

it was directed to submit Bank Guarantee of rs 10,000 & same is not submitted by TMC. • 4) The consen application t for existing STP was returned by SRO for non submission

of Information. • 5) For proposed STP application industry has not paid consent fees. • 6) RO Thane recommended for grant of Consent for Year subject to Bank Guarantee of

appropriate ammount. • We may grant Cto E.

JD (WPC)

Page 11: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

 

CAC Item No.06 Name of the Industry: Shri Datta Sakhar Karkhana Ltd.,

(A Unit of Dalmia Bharat Sugar & Industries Ltd), Asurle-Porle, Tal - Panhala

HOD Remarks

• Industry has applied for consent to Establish for Expansion. It is RED/LSI Unit. • Industry located 2.2 km away from Panchganga River (A-II). • Total capital investment is 150 Cr. • Industry proposed to increase its capacity 2500 TCD to 5000 TCD & 14.5 MW

CoGen. • Previous consent granted by the Board was valid up to 31.12.2009. • Proposed Water Consumption is 560 CMD. IE generation will be 560 CMD industry

has proposed to upgrade its existing ETP comprising with Primary, Secondary and Tertiary Treatment facility.

• Domestic effluent generation will be 8 CMD & will be treated in septic tank and soak pit.

• Treated effluent will be disposed on 30 Acre land for irrigation which is sufficient. • Industry proposed to install ESP to 70 m stack of 120 T boiler. • Industry has paid consent fee Rs. 3,00,100/- for consent to establish. • SRO Kolhapur has recommended for consent to establish. • We may grant C to E for expansion • Subject to EC with BG 5 + 2

JD (WPC)

Page 12: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.07 Name of Industry: - Lodha Novel Build Farm Pvt. Ltd., Old Survey Nos. 197/1, 197/2, 197/9, 200/1, 200/2, 200/3A, 200/3B etc. Vill Bhayandarpada, Godbunder Road Thane  HOD Remarks 1. Application for consent to establish ( Expansion).

2. Application received at SRO 21/12/2012 at at HQ on 07/02/2013

3. Total C.I. Rs. 703 Crs. And C.I. for the expansion is Rs.361.5 Crs.

4. Previous/Existing C to E granted vide No. CC- 01 dt.10/01/2011 for;

Total Plot Area -1,20,680.0 M2

Total BUA - 2,02,307.19 M2

With C.I. of Rs.341.50 Crs.

5. Previous/Existing EC obtained vide No. SEAC- 2009/CR.145/TC.2 dt. 17/07/2012, for; Total Plot Area -1,20,680.0 M2

Total BUA - 2,02,307.19 M2

6. Revised Amended/ EC obtained vide No. SEAC- 2011/CR.102/TC.2 dt.03/11/2012 for;Total Plot Area - 1,81,958.00 M2(including previous plot area of 1,20,680.0 M2 with diff. of 61278)Total BUA - 6,57,866.00 M2(including previous BUA area of 2,02,307.19 M2 with diff. of 61278)

7. Now applied for; Total Plot Area -1, 81,958.00 M2 Total BUA - 6,57,866.00 M2 Total C.I. is Rs. 703.00 Crs. C.I. for the expansion is Rs. 361.5 Crs.

8. Water Balance in CMD

Previous Consent For Expansion Total

Water consumption 955 3516 4138

Sewage generation 748 2506 3308

4 STP proposed- 3600 CMD

9. Solid Waste generation: Kg/day

Previous Consent For Expansion Total

Page 13: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

Biodegradable 1386 2618 6134

Non-Biodegradable 2079 7123 9202

Onsite Mechanical composting proposed.

10. RO has recommended the Case for C to E in expansion.

11. Consent may be issued with overriding effect to the earlier consent to establish & with validity in consensus with the earlier consent, and existing BG of Rs. 10 lacs to be extended for provision of STP and MSW processing plant.

RO(HQ)

Page 14: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.08 Name of Industry: - JCB India Ltd., Plot No. A & B, Talegaon Floriculture &

Industrial Park, Vill- Ambi, Tal- Maval, Dist – Pune HOD Remarks

• Applied for consent to establish for expansion

• Application received at SRO- Pune on dtd 28/11/2012 and at HQ on 07/ 01/2013

• Previous consent is valid up to 31/07/2013

• Industry located @ 5.0 KM away from A-II class River Indrayani,. Satisfy the RRZ distance criteria.

• ETP will be provided for the treatment of additional 2.5 CMD industrial effluents.

• STP will be provided for additional 91.5 CMD domestic effluents.

• JVS analysis result of existing plant ETP on dated 17/08/2012 submitted which is parameter BOD (270 mg/Lit) COD (680 mg/Lit) are not meeting prescribed limit.

• Stack will be provided to Paint Booth, Paint Kitchen & LPG fired Oven.

• Scrubber will be provided to Paint shop.

• RO Pune has recommended the case for grant of consent to establish for expansion

• We may grant the consent to establish for expansion.

• We may place the consent application before CAC for further consideration.

Joint Director (APC)

Page 15: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.09 Name of Industry: - RSB Transmissions (I) Ltd., Gat No. 908, Nagar Road, Vill- Sanaswadi, Tal- Shirur, Dist – Pune HOD Remarks

• Applied for renewal of consent with expansion

• Application received at SRO- Pune on dtd 20/11/2012 and at HQ on 28/01/2013

• Industry located @ 3.5 KM away from class River Bhima. Satisfy the RRZ distance criteria.

• Industrial Effluent Generation will be 1 CMD (existing 9.5 CMD) for which effluent treatment plant of capacity12 CMD provided.

• Domestic Effluent Generation will be 3.0 CMD (existing 25CMD) for which sewage treatment plant of capacity 30 CMD provided

• Total Land available for use of treated effluent 1700 m2

• JVS analysis result not submitted of existing unit

• Industry proposed to provide adequate ht of chimney to new DG Set of 500 KVA

• RO Pune has recommended the case for grant Consent to Establish for expansion

• We may grant the consent to establish for expansion

• We may place the consent application before CAC for further consideration.

Joint Director (APC)

Page 16: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.10 Name of the industry :- Sulzer India Ltd., Gat No. 304, Kondhapuri, Tal- Shirur, Dist – Pune HOD Remarks

• Applied for consent to establish

• Application received at SRO- Pune on dtd 01/11/2012 and at HQ on 19/01/2013

• Existing plant consent is valid up to 31/12/2014

• Location of industry is 9.0 Km from Rive Bhima (class A-II).satisfy distance creitria

• The generation of Industrial effluent is 17 CMD (Proposed 8.0 CMD) to treat industrial effluent ETP is provided

• for 52 CMD domestic effluent (8 CMD) they have provided STP

• JVS analysis result of Moef Lab on 05/08/2012 and 08/10/2012 is under prescribed limit

• Regional officer Pune has Recommended for grant of consent to establish upto commissioning of the unit.

• We may grant consent to establish for expansion

• We may place the consent application before CC for further consideration.

Joint Director (APC)

Page 17: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.11 Name of Industry:- Solar Industries India Ltd., Vill- Chakdoh, Tal- Katol, Dist - Nagpur HOD Remarks 1. Applied for consent to establish for expansion.

2. Consent for existing unit is valid up to 30.06.2016.

3. Total Capital Investment is Rs.136.86 Crores (C.I. of existing unit is Rs.83.86 Crores and

proposed expansion project is Rs.53.0 Crores).

4. D.E- 5 CMD, STP in existing unit Provided. I.E. 27 CMD. Proposed to install 30 CMD

capacity ETP. We may grant consent to establish for expansion.

Joint Director (APC)

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 18: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.12 Name of Industry:- Rashtriya Chemical and Fertilizers Ltd., Chembur, Mumbai  HOD Remarks

• Application received at Mumbai on 03/10/2012

• Application received at HQ on 17/01/2013.

• Industry is engaged in manufacturing of Fertilizers holding consent valid up to

01/08/2016.

• Industry has applied for consent to establish for new potassium nitrate plant of 300

MT/M.

• The proposed plant shall be in existing sodium nitrate plant. All the production units

of sodium nitrate shall be used for the production of potassium nitrate plant with

addition of one new reactor and agitator and circulation tank.

• As per proforma for assessment of pollution load submitted by the industry for the

proposed plant, there will not be any increase in the water pollution and air pollution

load.

• Industry has reported that the total production of sodium nitrate & potassium nitrate

together shall not exceed the consented capacity i.e 5230 MT/A.

• SRO has reported that being a fertilizer unit, EC is required. However, as per the

circular dated 14.12.2006, it is mentioned that in cases of change of product-mix,

changes in the quantities or the numbers of product may be allowed without E.C by

the concerned SPCB provided such changes in the quantities of product are in the

same category and are with the previously granted overall total limits.

• Industry has not submitted the NOC from Directorate of Industries regarding Industry

location policy in MMR.

• Existing I.E. – 9000.0 CMD, D.E. – 2700.00 CMD, ETP consist primary, secondary

and tertiary treatment. No effluent is generated from proposed plant. D.E generation

from the proposed plant is 2 CMD JVS reports are within the limit. STP provided.

• Adequate APC devices provided. Stack provided through Neutralization Tower of

Sodium Nitrate plant.

• RO M has recommended to grant of consent to establish subject to submission of

Industry location policy in MMR from Directorate of Industries

We may recommend for grant of Consent to Establish by imposing the condition of

obtaining NOC regarding Industry Location policy in MMR from Directorate of Industries

before undertaking the establishment of expansion of the unit. 

PAMS

Page 19: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.13 Name of Industry:- Larsen Toubro Realty Ltd., CTS No. 117A, 117A/1, 117/B, Villagae Tungwa, Kurla, Mumbai  HOD Remarks 1. Application Received at SRO on 09/01/2013 and at HQ on 05/02/2013

2. Applied for C to E expansion, for Residential, IT and commercial project

3.a) Previous C to E granted vide No.CC- 480 dt.23/12/2008, upto COU, for;

Total Plot Area-119022 M2

Total BUA- 84068 M2

With C.I. of Rs.190.0 Crs.

b) Consent to Operate issued against this C toE vide No. CC-290 dt. 07/04/2012, valid upto 30/11/2013 for;

Total Plot Area-119022 M2

Total BUA- 84068 M2

With C.I. of Rs.202.76 Crs.

4. Previous/Existing EC obtained vide No. SEAC- 2008/CR.26/TC.3 dt. 07/11/2008, for;

Total Plot Area - ---- M2

Total BUA - 84068.00 M2

5. Fresh EC obtained vide No.SEAC2013/CR- 22/TC-1 dt. 04/02/2013

Total Plot Area-144403.00 M2

Total BUA- 3,52,747.77 M2

With C.I. of Rs.1605 crs. Crs.

6. . Now applied for expansion;

Previous C to O Applied for expansion Total

Total Plot Area- 119022 M2 144403.00 M2 263425.00s M2

Total BUA- 84068 M2 3,52,747.77M2 436815.77 M2

Total C.I. 202.76 1605 Crs. 1807.76

(Rs in Crs.)

Page 20: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

7. Water Requirement for -

Previous C to O Applied for expansion Total

Water consumption- 265CMD 870.0 CMD 1135 CMD

Sewage generation- 216CMD 644.0 CMD 860 CMD

STP proposed- --- 645.00 CMD --

8. Solid Waste generation:

Previous C to O Applied for expansion Total

Biodegradable- 300 kg/day 1661 kg/day 1961kg/day

Non biodegradable- 465 kg/day 968 kg/day 1433 kg/day

Onsite segregation and Organic waste converter proposed

9. SRO has reported that the firm has completed fencing work and also has started excavation work.

10. RO has recommended the Case for C to E -expansion

11. Consent may be issued with the condition of obtaining BG of Rs. 10 lacs for providing STP and MSW processing plant and obtaining Environmental clearance from government of Maharashtra before start of construction activity.

RO(HQ)

Page 21: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.14 Name of Industry Dr. Babasaheb Ambedkar S.S.K. Ltd., (Distillery Unit)

(Expansion Unit), Arvidnagar, Psot- Keshegaon  HOD Remarks  

Applied for Consent to Establish for Expansion of 30KLPD Distillery. Existing Distillery of 30KLPD.

•C.I of Proposed distillery 37.39 Crores. Existing Sugar& co-gen73.48 Crores, Existing Distiiery 21.44 Crores . Total C.I 132.41 Crores.

•Consent of Existing distillery is valid till 30.06.2013.

•Existing Distillery has provided Biomethanisation followed by Composting to achieve Zero Discharge.

•Existing Distillery is CREP Complied.

•Proposed industry will be located at a distance of 12 Kms from notified river Terna. Satisfy RRZ policy.

•Requires Environmental Clearance.

•Proposed Industrial effluent (Spent wash)generation 240CMD.

• Proposed to provide Bio methanisation ,Multiple effect evaporation plant followed by composting as per CREP norms.

•SRO Latur & RO Aurangabad reported compliance and recommended for consent to establish.

We may Grant Consent to Establish.

JD(WPC)

Page 22: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.15

Name of Industry: Dinshaws Dairy Ltd.,

K - 41/42, MIDC Butibori, Dist – Nagpur  HOD Remarks •Applied for Consent to Establish for installation of Non HW Incinerator. •Proposed C.i 15 lacs. •NO IE generated. •Eexisting industry is Industrial effluent generated 667 CMD. •Provided Secondary treatment plant. Treated effluent is send to Butibori CETP for further treatment and disposal. •Provided STP for domestic effluent generated. Treated domestic effluent is used on land for gardening. •Provided dust collector to coal fired boiler.. •JVS results dated 22.05.2012,25.06.12&26.07.12 are within prescribed limits. •As per consent issued industry has Submitted bank Guarantee of Rs 5.0 lakhs. •Envt statement for Year 2011-12 submitted by Ind. •We may grant Consent to Establish.

JD(WPC)

Page 23: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.16 Name of Industry: - Crompton Greaves Ltd., (Switchgear Complex, Plot No. A-3, MIDC Ambad, Tal- & Dist – Nashik HOD Remarks

1. Applied for grant of Consent to Establish for expansion

2. Existing unit consent is valid up to 31.12.2014

3. The capital investment of existing plant is Rs.90 Crores and C.I. of Proposed plant is

Rs.50/- Crores. Total Capital is above Rs.100/- Croes. Hence Consent granting authority

is CAC

4. Water Cess paid up to October, 2012.

5. Environment Statement for the year 2011-2012 submitted.

6. SRO/RO Nashik recommended to grant consent to establish for expansion.

Recommended. to grant establish for expansion.

Joint Director (APC)

Page 24: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.17 Name of Industry:- Wockhardt Hospital Ltd., C.S. No. 1877, Dr. Anand Rao Nair Marg, Agripada, Byculla, Mumbai HOD Remarks 1. Application for grant of Consent to 1ST Operate of Hospital Building (320 Beds) having

total construction BUA of 29,266.54 sq. mtrs. received at R.O. (Mumbai) on 22/03/2012. 2. R.O.(Mumbai) forwarded application to A.S.(T) on 15/12/12. 3. Firm has obtained Consent to Establish vide Consent No. BO/RO-Mumbai/AS(T)/EIC

No. MU-3046-11/CAC-443 dtd. 7/06/2012 for construction of Hospital Building (320 Beds) having total construction BUA of 25,015.26 sq. mtrs.

4. Firm has obtained Environmental Clearance vide letter bearing File No.: SEAC-2009/CR.14/TC.3 dtd. 12/10/2011 for construction of Hospital Building (320 Beds) having total construction BUA of 25,015.26 sq. mtrs.

5. Firm has provided STP of capacity 325 CMD consisting of primary, secondary & tertiary treatment for treatment of sewage effluent. After treatment, the treated sewage will be utilized upto maximum extent for flushing, firefighting, cooling tower, gardening and rest is discharged into Municipal sewer.

6. Solid wastes (Dry - 75 Kg/day & Wet - 95 Kg/day) will be disposed off at MCGM dumping ground.

7. Firm has not submitted reason for not providing Cost of land in CA Certificate and caused loss of revenue in terms of Consent fee at the time obtaining CtE as well as at the time of applying for Ct1stO.

8. Firm has not submitted clarification for applying for grant of Ct1stO for total construction BUA 29,266.54 sq. mtrs whereas granted EC & CtE for total construction BUA 25,015.26

sq. mtrs. Thereby violated conditions of EC & CtE.

9. Firm has not submitted application for grant of an authorization under BMW (M&H) Rules.

10. RO(Mumbai) has reported in the processing report that HCE has not yet started and not submitted copy of OC.

11. SRO(Mumbai-II) / RO(Mumbai) have recommended for grant of Consent to 1st Operate subject to condition of submission of application for obtaining BMW Authorization and submission of B.G.

12. Firm has paid Consent to Operate fees of Rs. 4,16,000/- for period of 1 year. 13. SCN for refusal may be issued for non submission of C.I. in prescribed format, non

submission of clarification regarding excess BUA mentioned in the application form, and for non submission of application for grant of an authorization under BMW (M&H) Rules.

Asst. Secretary (Tech.)

 

Page 25: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.18 Name of Industry: Ashland India Pvt. Ltd.,

Plot No. G-3, MIDC Additional Ambernath, Dist- Thane. HOD Remarks

1. Application for 1st Consent to Operate. 2. Product- Lubricating oils, greases or petroleum based products. 3. Application received at SRO on 07/12/2012 and at HQ on 15/01/2013. 4. I. E. generation is Nil. DE generation is 24 CMD. Industry has provided full-

fledge STP consisting of Preliminary treatment, Aerobic biodegradation (Moving Bed Bio-Film Reactor) followed by tertiary treatment. Treated domestic effluent used for flushing and gardening in premises.

5. Industry has provided 27 mtrs. Height chimney to control air emissions from Boiler and acoustic enclosure to DG set.

6. CI as per C to E was Rs. 95.61 Crore. Now applied with CI of Rs. 129 Crore. Hence this is new entry in CAC list. Industry has paid consent fees of Rs. 2,58,700/- & difference consent fees of Rs. 75,000/- for increase in CI.

In view of above, we may consider the case for grant of 1st Consent to Operate. 

PAMS 

Page 26: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.19 Name of industry :- Urjankur Shree Tatyasaheb Kore Warana Power Co. Ltd., Gat No. 630 A/p Waranagar, Tal - Panhala, Dist – Kolhapur HOD Remarks

• This case was discussed in 10th CAC meeting dt. 31.01.2013 and was not approved. • It was decided to keep in abeyance till conditions of C to E complied. Revert back to

CAC, thereafter. • Industry vide letter dt. 08.02.2013 has submitted the compliance of C to E and EC

conditions as follows, − Industry has placed order for continuous monitoring system and it will be ready

within fore night. − Due to implementation and construction of project low lying location is difficult

to find for rain water harvesting system, however industry has awarded contract for carrying out the rain water system.

− The requirement of coal for the plant will be after June 2013. The construction of coal shed is in progress & expected to complete before June 2013 till such time industry will use Bagasse as fuel and having ESP.

• SRO Kolhapur vide email dt. 26.02.2013 has reported that, • Industry has completed installed continuous stack monitoring to boiler stack

and the work of temporary shed for coal yard is in progress & permanent shed work is also in progress.

• From the above it is noted that Company has , • Provided ESP on boiler stack & propose to use Bagasse as fuel till facilities to

store coal are provided and ready to use. • Installed continues stack monitoring system as per SRO dt. 26.02.2013. • Rain water harvesting work is awarded to private party as reported by

industry and there is still time for rain/rainy season. • Hence we may grant consent to operate with condition of BG Rs. Ten Lakh

and • To complete coal shed work and not to store and use coal till facility is

verified by MPCB and permitted. (Allow to use Bagasse till then) • Rain water harvesting shall be completed on or before 31st May 2013 • Submitted for consideration in CAC.

JD(WPC)

Page 27: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.20 Name of industry :- Macrotech Construction Pvt. Ltd. Lodha Pavilion, Appolo Mills Compounds, N. M. Joshi marg, Mahalaxmi, Mumbai HOD Remarks

1. Application for grant of 1st Consent to Operate in part for MCGM car parking .

2. Application Received at SRO on 16/01/2013 and at HQ on 23/01/2013

3. The firm has obtained C to E vide no CC-232 dt. 23/06/2010 for ;

Total Plot Area- 37,006.39 M2

Built up area- 89077.7 M2

4. The firm has obtained EC vide No./SEAC-2010/CR.291/TC.2 dt. 19/01/2011, for .

Total Plot Area - 37,006.39 M2

Built up area (FSI) - 89076.10 M2

Total Construction area - 2,32,450.0 M2

MCGM car parking - 42,037.0 M2

5. Now applied for in part for car parking. Total Plot Area - 37,006.39 M2

Total construction area- 42,037.0 M2

6. Earlier consent to operate on same plot valid upto 31/11/2012, for which the firm has applied for renewal of consent through separate application for,

Total Plot Area - 37,006.39 M2

Total Construction area - 21,3270.77 M2

7. Water requirement is - 43.0 M3 /day Sewage generation- 42.0 M3 /day

STP provided - 50.0 M3 /day

8. The Solid Waste generation - Wet garbage- 60.0 kgs/day

Disposed to MCGM sites

Recyclable- 16.0 kgs/day

Page 28: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

Reuse/recycle

Inert Waste- 19.0 kgs/day

Disposal at MCGM

STP sludge- 7.0 kgs/day

Used as Manure

9. RO has recommended the case for 1st consent to operate 10. The case may be considered for a amalgamation with earlier consent, being

on same plot.

RO(HQ) 

Page 29: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.21 Name of industry :- Indiabulls Power Ltd., Amravati Thermal Power Project (Ph 1), Plot No. D-2 and D-2 ( Part), Addl. Industrial Area, Nandgaon Peth, Amravati HOD Remarks

1. Applied for 1st Consent to operate for (Ph-I) for manufacturing of Electricity generation – 540 ( 2 ×270 MW).

2. Application received at SRO - Amravati - I on dtd 4/12/2012 and at HQ on dtd 02.02.2013.

3. The Board was granted combined consent for consent to establish for Ph-I & Ph-II for 2700 MW (10x270MW) vide letter dtd. 11.10.11

4. Industry effluent is 9811 CMD. Industry has provided primary ETP. 5. Domestic effluent is 230 CMD. Provided STP. 6. SRO visited the unit on dtd 2.1.13 and observed-

I) Water Pollution Control Status: Indl. Effluent: The primary ETP is provided. The condenser tank is provided for collection of boiler blow down for recycle. The flow meter for measurement of effluent is not provided. The same is proposed as reported by them.

II) Air Pollution Control Status: 1) Boilers (2no) are provided with ESP (2nos)

sampling arrangement is provided.

2) Coal Handling Plant: They proposed bag filters are crusher house coal

bunkers. 4 nos close type crushers are installed.

3) Ash Handling & Disposal: i) 2 no.Ash Silo of capacity 450 Ton (each) provided with filter bags. ii) High conc. Slurry disposal system wherein no treatment or effluent recovery system is required as they reported. iii) The ash disposal area is 270 AC. They have not provided Bund type Ash pond. Due to high conc. slurry disposal system & ground slope area, ash bund wall is not required as reported. The LDPE lining was undertaken & reported that the work of same will be completed within one month as reported. The pond of capacity 15000 Kl for effluent generated from as disposal area is provided. The LDPE lining for this pond was undertaken & the same will be completed within fortnight as reported. iv) Most of the treated effluent has to be recycle/reused & rest shall be utilized for ash/coal handling dust suppression and thus their shall be no discharge of effluent outside the factory premises.

III) General: 1) As per consent condition, they have not adopted clean technology like Ozonisation for cooling water treatment. 2) As per condition of Env. Clearance issued MoEF, transportation of coal has to be down by Rly. Rly siding work from Walgaon was undertaken. It is reported that the coal from WCL will be transported by mech. Closed type containers till Rly siding work is completed. The washed coal will be utilized for boiler to reduce the ash content as reported. 3) Env. cell is not formed. 4) They proposed continuous monitoring equipments for stack emission analysis. The equipments are received as site & under installation.

Page 30: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

7. SRO recommended that the application for consent to operate for electric generation 540 MW (2x 270MW) may please be considered only after fulfillment of required pollution control systems.

8. HOD Remark – Work of the most pollution control system not yet completed. Also consent to establish compliance/ Environmental Clearance compliance not done. In view of above, we may keep the 1st consent to operate in abeyance till the completion of pollution control system including railway sidding & completion report from RO/SRO.

9. We may pace the consent application before CAC for further consideration.

Joint Director (APC)

Page 31: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.22 Name of Industry :- Grace Industries Ltd., (25 MW TPP),

A-23, MIDC Tadali Growth Centre, Chandrapur HOD Remarks 1. Applied for 1st consent to operate for 25 MW Power Plant.

2. Obtained Consent to Establish dated 18.11.2006.

3. The issue of environment clearance is under consideration with SEIAA, Govt. of

Maharashtra

The reply on Environment Clearance is not yet received. E.C. not obtained. Hence

we may keep Consent to Operate in abeyance till issue get resolve.

Joint Director (APC)

Page 32: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.23 Name of Industry :- Sudarshan Jeans Pvt Ltd., (Expansion)

Plot No. T-2, MIDC Kagal, Hatkanangale Industrial Area, Tal- Kagal, Kolhapur

HOD Remarks

• Industry has applied for Consent to establish for expansion and the case was untraceable in the office now industry has applied for the consent to operate for expansion. It is RED/LSI unit.

• Existing consent is valid up to 31.10.2013 for manufacturing 8 lakhs m/month and now applied for 24 lakhs m/month.

• Industry has increased its CI by Rs. 90 Cr. for expansion. The existing CI is Rs. 60.1 Cr. The total CI is Rs. 150.10 Cr. for which industry has paid additional fees of Rs. 1,25,000/- for C to E and 1,25,000/- for C to O

• Existing water consumption is - 285 CMD; IE - 126 CMD; DE - 4 CMD • Water consumption will be increased by - 160 CMD; IE - 120 CMD; DE - 10 CMD • Now total consumption will be - 446 CMD; IE - 246 CMD; DE - 14 CMD • Industry has ETP comprising Primary, Secondary and Dual media filter facility of

capacity 300 m3/day and member of CETP. • Industry has installed one more boiler and with stack height of 33 m, provided with

multi-cyclone type dust collector as ASP. • Industry has installed five stage multiple evaporating system to reduce effluent

quantity. • Industry has obtained membership of CHWTSDF. • Industry has paid Cess up to Dec 2012 • Industry has submitted Environmental Statement for the year 2011-2012 • JVS results dt. 31.08.2012, 30.09.2012 is within limit. Sample collected dt.

17.10.2012 BOD found higher. • SRO Kolhapur has recommended application for renewal of consent to operate up to

31.10.2013 • Considering above the case is submitted with recommendation to grant C to E and O

at a time up to 31.10.2013 i.e. coterminous with existing consent. • Submitted for consideration in CAC

Page 33: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.24 Name of Industry :- WCL Mungoli OCM,

Po- Sakhara (Kolgaon), Mugoli Sub Area, Dist – Yavatmal

HOD Remarks 1. Applied for consent to operate fir expansion from 1.5 Million ton per year to 4.0 Million

ton per year. 2. Earlier consent for existing unit was valid up to 31/12/2012, for coal production of 1.55

Million ton per year. The Board has already refused the Consent to Establish of the expansion of the

mine, but still unit has applied for consent to operate. R.R.Z. not satisfied. In view of above,

we may communicate to W.C.L. that without Consent to Establish, Board will not grant

Consent to Operate. Also we may forfeit the existing Bank Guarantee of Rs.10/- Lakhs due

to above not-compliances.

Joint Director (APC)

Page 34: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.25 Name of Industry :- Sanjivani (T) SSK Ltd., (Distilery Unit), Sahajanand, Tal - Kopargaon, Ahmednagar HOD Remarks • Applied for first consent to operate for expansion to distillery unit for (25 KLPD). • Industry Category RED/LSI. • Existing total Capital Investment of the units are as below. • C. I. of Sugar & Chemical unit Rs. 48.76 Cr. • C.I. of Country liquor unit is Rs. 2.10 Cr. • C.I. of existing Distillery unit is Rs. 6.62 Cr. • C.I. of Co-generation Plant Rs. 40.97 Cr. • C.I. of proposed Distillery unit Rs. 8.16 Cr. • Total C.I. Rs. 106.61. • Existing distillery unit C.I. increased by 8.93 Cr. & Proposed unit C.I. has been decreased by 1.40 Cr • At present total C.I. of the units are Rs 114.14 Cr. • Earlier consent dtd. 12.03.010 valid up to: Commissioning of the unit. • I.E. effluent generation to the tune 290 CMD and D. E. generation to the tune 0.90 CMD. • ETP provided Primary & secondary treatment, disposal on land for gardening. • Earlier consent dtd. 12.03.2010 granted by Board subject to achieve zero discharge. • Industry has not provided Bio-methanization followed by five stage multiple evaporation & anaerobic bio -composting to achieve zero discharge. • SRO/RO recommended consent to operate may be refused as industry has failed to comply the stipulated consent conditions imparted in the consent order. • The case is under purview of CAC committee. • Submitted for further order & line of action please.

Page 35: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.26 Name of Industry :- Wardha Power Co. Pvt. Ltd.,

B-2, MIDC Warora, Warora Growth Centre, Chandrapur HOD Remarks 1. Applied for Renewal of consent with Amalgamation. 2. Earlier Consent for Phase-I is valid 31.01.2013 & Phase-II is valid up to 31.05.2013. Total C.I. Rs.2829.16 Crores. Amalgamation of Phase-I & Phase-II. Phase-I 2 x 135 MW - 31.05.2013. Phase-II 2 x 135 MW - 31.01.2013. Rs.20 Lakhs B.G. obtained. Analysis results of stack/Ambient exceeding. Strengthening of Water Sprinklers required. In view of above we may issue SCN for refusal of unit.

Joint Director (APC)

Page 36: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.27 Name of Industry :- WCL Durgapur OCM, Durgapur, Chandrapur HOD Remarks

1. Applied for Renewal of consent with Amalgamation.

2. Earlier Consent of existing unit was valid up to 31.12.2012 for coal mining 2.3 mtpa.

3. Consent to Establish for expansion project of coal mining from 2.3 mtpa to 3.0 mtpa

obtained.

Renewal of consent to be amalgamated. Existing validity up to 31.12.2013 for 2.3

MMT/Annum. Consent to Establish obtain for 2.3 MMT/Annum to 3.0 MMT/A. Now applied

for Consent to operate with renewal. E.C. obtained.

Work of Water Sprinklers are not yet completed. Results of AAQMS are exceeding. B.G. of

Rs.1/- Lakh against interim directions issued by R.O. Chandrapur is with Board.

We may issue Show Cause Notice for refusal of Consent as results of AAQM are exceeding

and work of Water sprinkling is not yet done.

Joint Director (APC)

Page 37: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.28 Name of Industry :- Pad Dr. V. V. Patil S. S. K. Ltd., (Distillery Division + Acetaldehyde Unit), A/p Pravaranagar, Tal Rhata, Dist - Ahmednagar HOD Remarks

• Applied for renewal of consent with amalgamation of (Distiller & Chemical unit). • Category RED/LSI. • Existing consent dtd. 29.07.2010, valid up to: 31.12.2010 (Distillery Divn.) • Existing consent dtd.29.07.2008, valid up to: 31.12.2008 (acid plant) • C.I. of sugar unit of Rs. 165.0 Cr. • Previous C.I. of Distillery Rs. 49.91 Cr. • Enhanced C.I. of Rs. 07.91 Cr. • C.I. of Distillery unit of Rs. 57.52 Cr. • Previous C.I. of acid plant Rs. 31.58 Cr. • Enhanced C.I. of acid plant Rs. 01.25 Cr. • C.I. of acid plant of Rs. Rs. 32.35 Cr. • Total C.I. (Sugar+ Distillery + acid plant) of Rs. 255.35 Cr. • C.I. increased due to modernization of the plant. (removed old machinery). • I.E. generated to the tune of 720 CMD. • D.E. generated to the tune of 25.0 CMD. • Air pollution Control – Sugar boiler used for sugar, Distillery & chemical plant. • Boiler with chimney height 30.0 mtr, wet scrubber provided. • Bio-methanization followed by bio-composting provided. • 30 days & 5 days spent wash storage tanks provided. • 10 acres HDPL lined compost yard provided as per CREP norms. • Industry proposed to install RO, MEE followed by bio-methanization & it will be

completed in Dec-2013. • Water cess paid up to : Sept. 2011 & Env. Statement not submitted. • B.G. of Rs . 2.0 Lakh, valid up to 31.12.2012. obtained towards compliance of

consent conditions. • RO/SRO recommended renewal of consent to operate may be granted on receipt of

the additional fees & said information’s/documents. • The case is under purview of CAC committee. • Submitted for further order & line of action, please

Page 38: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.29 Name of Industry :- Watson Pharm Pvt. Ltd. Plot No. N-15, MIDC Additional Ambernath, Dist - Thane HOD Remarks

1. Application for amendment in consent for additional Boiler, use of Bagasse as alternate fuel, Inclusion of HW, addition of new scrubbers and increase in CI.

2. Product- Bulk Drugs. 3. Application received at SRO on 29/10/2010 and at HQ on 05/01/2013. 4. I. E. generation is 200 CMD. DE generation is 25 CMD. There is no change in

water consumption as well as effluent generation. Industry has provided full-fledge ETP consisting of Primary, Secondary and tertiary treatment. Treated effluent is recycled & reused. Industry is a member of CETP.

5. Industry has provided Scrubbers to process reactor, adequate height chimney to Boiler and acoustic enclosure to DG set.

6. CI of the unit is increased from Rs. 29.50 Crore to Rs. 139.28 Crore. It is new entry to CAC. CI increased without obtaining C to E. CI increased due to construction of new R & D facility, admin. Block, storage yard & Pilot plant.

In view of above, we may consider the case for amendment in consent by forfeiting existing BG of Rs. 5 lakh and imposing fresh BG of Rs. 10 lakh and Rs. 2 lakh towards submission of Board Resolution in time. 

 

Page 39: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.30 Name of Industry :- Ratnagiri Gas and Power Pvt. Ltd., A/p- Anjenvel, Tal- Guhagar, Dist - Ratnagiri HOD Remarks

1. Applied for renewal of .consent.

2. Treated effluent is disposed into sea at distance of 250 mtrs. The disposal

point is approved by NIO.

3. Domestic effluent is 340 CMD, provided STP.

4. JVS analysis reports of trade effluent are within consented limits.

5. For water management installed water meters at different locations.

6. JVS analysis reports of AAQM and stack air monitoring are within limits.

7. Provided online continuous online monitoring system and AAQM system.

8. Provided ventury scrubber to incinerator.

9. Repairing work of incinerator is completed within time period.

10. Submitted environmental audit statement for the year 2011-12 and cess paid

upto Dec 2010.

11. SRO & RO recommended the grant of renewal of consent.

12. We may place the consent application before CAC for further consideration.

Joint Director (Air Pollution Control)

Page 40: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.31 Name of Industry :- Siemens Rolling Stock Pvt. Ltd., Plot No. 1/2, MIDC Shendra, Aurangabad HOD Remarks 1. This renewal of consent. No change in product and its quantities.

2. CI shown in Rs.103.78 Crs existing was Rs.110 Crs this is due to Rs.110 Crs was

estimated cost and actual cost as per book of accounts is Rs.103.78 Crs. Industry

have paid the fees of Rs.2,20,000/- which is as per CI of Rs.110 Crs.

3. Mfg. Railway Boggies.

4. Indl. Eff is NIL. Do, Eff- 10 CMD provided STP.

5. Shot blasting is provide with bag dust collector, grinding is provide with air filters paint

booth is provided with down draft system with paint filters.

6. Cess returns filed upto Nov. 2012, Envt. State for period of 2011-12 is submitted. RO

recommended the grant of consent.

7. In view of above we may consider grant of consent renewal upto 31/12/2013

considering CI of Rs.110 Crs only as this is case of renewal of consent.

8. We may place the case before CAC for further discussions.

Joint Director (Air Pollution Control)

Page 41: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.32 Name of Industry :- Kirloskar Ferros Industries Ltd.,

Gat No. 12 to 18/1 +2 and 25/1, Shivashai Solapur, Tal- North Solapur

HOD Remarks

• Applied renewal of consent

• Application received at SRO- Solapur on dtd 10/12/2012 and at HQ on 28/01/2013.

• Industrial effluent (cooling) is 4.87 for which ETP provided

• Domestic effluent is 50 CMD from which they have provided STP

• Ventury scrubber to core oven section and wind turbo ventilators provided to different section for control of air pollution

• RO Pune has recommended for grant of consent to operate

• We may grant of consent to operate up to 31/01/2016 with operational BG of Rs. 5/- Lakhs

• We may place the consent application before CAC for further consideration.

Joint Director (APC)

Page 42: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.33 Name of Industry :- Asahi India Glass Ltd., T-7, MIDC Taloja, Dist - Raigad HOD Remarks

• Applied for renewal of consent

• Application received at SRO- Navi Mumbai on dtd 03/11/2012 and at HQ on 20/12/2012

• Existing consent shows industrial effluent quantity 24 CMD. Now the same is shown nil in application form

• Domestic effluent quantity is 111.0 CMD. Sewage effluent plant of capacity 120 CMD is provided. Treated effluent is used on land for gardening purpose.

• RO NM reported that industry has using natural gas & replaced earlier fuel furnace oil

• Regional Officer, Navi Mumbai, has recommended for grant of renewal of consent after receipt of reply

• Industry submitted the reply on 20/02/2013

• We may grant consent to operate 30/11/2013 with imposing BG of 5/- Lakhs towards Operation & Maintenance of pollution control system

• We may place the consent application before CC for further consideration.

Joint Director (APC)

Page 43: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.34 Name of Industry :- Balaji Infra Projects Ltd., (Port Activities at Dighi), Tal- Shirvardhan, Dist - Raigad HOD Remarks

1. Applied on 28.11.201 for grant of renewal of consent to operate.

2. Application for grant of renewal of consent to operate received to HQ on

19.01.2013.

3. Industry has paid consent fee of Rs.15, 13,384/- in the Board.

4. Industry has not submitted copy of Environment Statement and H.W. returns. 5. Recommended case for grant of renewal of consent to operate up to

31.11.2013.After submission of forfeiture of BG of RS.5 Lakhs and new BG of

Rs.10 Lakhs and subject to condition of provision of full fledged STP.

6. Recommended to issue SCN for refusal case for grant of renewal of consent to

operate. 

Joint Director (Air Pollution Control)

Page 44: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.35 Name of Industry :- Thyssemkrupp Electric Steel India Pvt. Ltd.,

A/p- Gonde, Vill- Wadivarhe, Tal- Igatpuri, Dist- Nashik HOD Remarks 1. Applied for grant of renewal of Consent to Operate on 24.12.2012.

2. Application grant of renewal of Consent to operate at H.Q. on 28.01.2013.

3. Paid Consent fee of Rs.48, 66,310/-.

4. Water Cess paid up to Sept-2012.

5. Environment Statement for the year 2011-2012 submitted.

6. SRO/RO Nashik recommended for grant of renewal of Consent to Operate up to

28.02.2018.

7. Recommended for grant of renewal of consent to operate up to 28.02.2018 with

submission of operational BG of RS.10 Lakhs.

Joint Director (APC)

Page 45: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.36 Name of Industry :- Shree Sidhbali Ispat Ltd., MIDC Tadali Growth Centre, Chandrapur HOD Remarks 1. Applied for renewal of consent. 2. Earlier Consent validity is up to 31.12.2012. 3. Renewal of consent. Earlier validity 31.12.2012. Results are exceeding. Air Pollution Control needs improvement.

We may issued Show Cause Notice for refusal.

Joint Director (APC)

Page 46: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.37 Name of Industry :- Shree Dnyaneshwar SSK Ltd., (Distillery Division),

Bhende BK, Newasa HOD Remarks

• Applied for renewal of consent. • Category RED/LSI. • Existing consent dtd.29.09.2011, valid up to: 31.12.2012. • C.I. of Sugar & Co-gen plant of Rs. 184.50 Cr. • Previous C.I. of distillery is Rs. 14.37 Cr. • Enhanced C.I. of unit is Rs. 06.59 Cr. • C.I. of Distillery unit is Rs. 20.96 Cr. • I.E. to the tune of 450 CMD. • D.E. to the tune of 4.0 CMD. • Bio-Mechanization followed by Bio-Composting provided. • Re-boiler provided. • 30 days spent was storage tank & 12 acres composting yard provided. • For air pollution control. • Wet scrubber to Co-gen. boiler with chimney height 30 mtr., provided. • SRO/RO recommended to grant consent subject obtaining BG of Rs. 2.0 Lakh for

scrapping of 1 katcha lagoon. • Case is under purview of CAC committee. • Submitted for further order & line of action please.

JD(WPC)

Page 47: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.38 Name of Industry :- Kisanveer SSK Ltd., (Distillery Division) At- Bhuinj, Post- Kisanveernagar, Tal - Wai, Dist- Satara HOD Remarks

• Applied for the Renewal of consent for 60 KLPD Distillery Unit. • Application received at SRO on dt.24.12.2012 and at HQ on 24.01.2013. • C.I of the Distillery unit is shown as Rs.33.73 Crs. • Spent wash generation is to the tune of 355 CMD. • To achieve Zero Discharge Industry has provided Bio-methanisation, Multiple Stage

evaporation and Surface composting. • Compost yard of 9.91 Acres provided. • SRO reported that 4.91 Acres old compost yard need upgradation/ repairs and

industry vide letter dt.26.12.2012 reported that upgradation of old the compost yard will be done before next season.

• Provided Multicyclone Dust Collector as an APC to bagasse fired boiler provided to Distillery unit.

• Industry has submitted BG of Rs. 1.0 Lakhs valid upto 12.04.2013 towards the compliance of consent conditions dt.06.10.2009.

• The BG of Rs. 5.0 Lakhs submitted against the compliance of CREP conditions as per the Consent dt. 20.01.2012 was released vide letter dt.01.09.2012.

• SRO/RO has recommended for Renewal of Consent. • Recommended for renewal of consent with Bank Guarantees toward continuous

compliance of CREP and upgradation / repairs of old compost yard before next season as committed by company

JD(WPC)  

Page 48: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.39 Name of Industry :- Apar Sacks Ltd., Unti Ashti,

Tal - Charmoshi, Dist - Chandrapur HOD Remarks

• Applied for Renewal of Consent. • Application received at SRO on Dt.07.12.2011 and at HQ on dt.02.04.2012. • C.I is increased by Rs. 31.66 Crs from C.I Rs. 30.05 Cr. Now the total C.I is of

Rs.61.71 Crs. • Located in the Premises of the M/s. Ballarpur Industries Ltd., (C.I of

Rs. 310.20 Cr).

• However RO Chandrapur vide email dt.15.09.2012 has reported that M/s. Ballarpur Industries Ltd., and M/s. APR Sacks Ltd., Unit Ashti are in the same premises and are of two different companies under same Avanta Group.

• Previous consent is granted under red category, now industry has requested to grant in Green Category as industry is manufacturing Multiwall Paper sacks by using sack paper, starch for pasting and ink for printing.

• Trade effluent is Nil. • SRO has asked to deposit the additional consent fees for the Increased C.I • SRO recommended Consent category may be considered accordingly and consent

may be granted after deposition of Consent fees. • Application was placed in the Consent Committee meeting and discussed. It was

decided to amalgamate the consent and based on total capital investment, the case to be put up to the concerned consent granting authority, i.e CC/CAC.

 

JD(WPC)

Page 49: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.40 Name of Industry :- Sanjivani (T) SSK Ltd., (Sugar + Co-generation)- Kopargaon, Ahmednagar HOD Remarks

• Applied for renewal of consent for Sugar, Co-gen., Acid & Country liquor plant. • Category RED/LSI. • Crushing capacity 3500 TCD. • Existing consent dtd. 27.04.2012 valid up to: 31.12.2012. • Capital investment. • C.I. of sugar unit Rs. 128.80 Cr. • C.I. of Acid plant Rs. 29.39 Cr. • C.I. of Country liquor Plant Rs. 5.59 Cr. • C.I. of Co-gen plant Rs. 37.26 Cr. • Total C.I. of Rs. 201.04 Cr. • I.E. generation to the tune of 295 CMD. • D.E. generation to the tune of 104.35 CMD. • 50 acres land available for disposal of treated effluent. • JVS results exceeding the prescribed standards. • Air pollution control. • Boiler no.1 with chimney height 45.0 mtr. wet scrubber provided. • Boiler no. 2, 3 & 6 with chimney height 45.0 mtr. without ESP/wet scrubber. • Boiler no. 4 & 5 with chimney height 65.0 mtr. without ESP/ wet scrubber. • P.D. issued by RO on 27.12.2012.for non compliances. • Cess paid up to: 30.11.2011 & Env. Statement submitted for the period 2011- 12. • B.G. of Rs. 2.0 lacs submitted valid up to : 20.03.2013 for compliance of CREP. • B.G. of Rs. 5.0 lacs . valid up to: 17.05.2013 for O&M of ETP. • B.G. of Rs. 2.0 lacs. valid up to: 17.05.2013 for covering of effluent. • Industry has not provided adequate ETP need improvement , not provided 15 days

storage tank & ESP/wet scrubber to boilers. Not complied CREP conditions. • SRO/RO recommended to forfeit part of B.G. of Rs. 5.0 lacs. & grant conditional

consent. While forwarding the application the C.I. of distillery unit has not included by SRO/RO. During the scrutiny M/s. Sanjivani (T), SSK. Ltd., (Distillery Unit), A/P. Shingnapur Ahemadnagar Applied for first consent to operate for expansion to distillery unit for (25 KLPD) given total C.I. of plant as below.

• C. I. of Sugar & Chemical unit Rs. 48.76 Cr. • C.I. of Country liquor unit is Rs. 2.10 Cr. • C.I. of existing Distillery unit is Rs. 6.62 Cr. • C.I. of Co-generation Plant Rs. 40.97 Cr. • C.I. of proposed Distillery unit Rs. 8.16 Cr. • Total C.I. Rs.106.61 Cr. • Existing distillery unit C.I. increased by 8.93 Cr. & Proposed unit C.I. has been

decreased by 1.40 Cr. • Total C.I. of the units are shown Rs 114.14 Cr. • Difference of the C.I. Rs. 201.04 - 114.14 = Rs. 86.90 Cr. • Submitted for further order & line of action.

JD(WPC)

Page 50: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.41 Name of Industry :- Jubilant Life Science Ltd., Villagar Nimbut-Nira, Tal - Baramati, Dist- Pune HOD Remarks • Application recd to RO Pune 30.11.2012. • Application recd at HQ on 28/12/2012. • Mfg of chemicals. • The industry location is in RRZ restricted area (Nira river A-IV Zone) • Now Industry has applied for renewal of consent with decreased CI from Rs 307.80

Cr to 198.08 Cr. Clarification called from industry. • Existing I.E. – 1963 CMD, D.E. - 155 CMD. Primary & secondary treatment provided.

Distillery effluent is being treated by bio-methanation followed by RO system and bio-composting. Industry has provided 19 acres bio compost yard with concreting.

• Disposal - For chemical treated effluent is disposed on land for Gardening. Land available – 17 acres.

• JVS results are within limits except July 2012 report wrt BOD and COD. • Industry has submitted clarification. They stated that, the overall CI is 307.80 crs

including existing and proposed. But at present they have not expanded / installed their distillery & power plant of proposed as they had obtained C to E.

• The CI of Existing unit is Rs 198.08 cr and remaining CI is for proposed expansion as per C to E.

• The details of plant and consent No and CA certificate is enclosed. Also industry has submitted their groups annual report 2011-12.

• The file was referred to accounts section regarding re-verification of consent fee. Accordingly, account section submitted fees calculation statement, which is as per existing CI.

• RO Pune has recommended for grant of renewal of consent with additional capacity of existing product ethyl acetate – 120 MT/D, may be taken at higher level.

Earlier change in product mix consent application is granted by CAC held on 24.12.2012 with validity as per existing consent i.e. 31.12.2012 and it was decided to call renewal application from concerned RO.

We may consider the case for renewal of consent as per CAO’s remarks regarding consent fee calculation on decrease in CI Rs 198.08 Crs.

PAMS

Page 51: List of Cases to be submitted before 11th Consent ...164.100.154.113/consentappraisal/pdf/CAC11thmeeting5032013part-II.pdfList of Cases to be submitted before 11th Consent Appraisal

CAC Item No.42 Name of Industry :- National Chemical Laboratory,

Pashan Road, Shivaji Nagar, Pune HOD Remarks

• Application recd at RO Pune on 14.12.2012 • Application recd at HQ on 24.01.2013. • Industry is engaged in R & D activity. • Consent validity was expired on 31.12.2012. • As per earlier consent condition industry has not submitted BG of Rs 5 lakhs. • Unit has sold 100 acres own land to Indian Institute of Science Education and

Research, Pune (IISER). • The institute has informed that the combined ETP of NCL and IISER are being

planned. ETP designed by IIT(B) and tender for the construction of the ETP is in process.

• For domestic effluent institute has also proposed to provide STP and NEERI Nagpur is submitted proposal having capacity 340 CMD.

• RO Pune has remarked that, consent may be grant after receipt of satisfactory reply of SRO’s query letter and submission of BG towards ETP an STP.

We may consider the case for grant of renewal of consent by imposing condition towards provision of ETP and STP of adequate capacity in a time bound manner with BG of Rs 10 lakhs as the industries has not submitted BG Rs 5 lakhs as per earlier consent conditions and RO may initiate action separately based on the reply to SRO Pune-1 query letter to be submitted by industry.

PAMS