Sr. No . Name & Address Capital Investment Applied For Section Page No. Remarks 1 M/s. Endurance Technologies Pvt. Ltd., L-6/3, MIDC Waluj, Dist - Aurangabad 99.0 Crs Establish for expansion JD(APC) 2 M/s Nirmal Lifestyle Ltd, 491-A, 491-B, 491-A/1 to 4, 491-a/7 to 9, 491-E, Vill Nahur, Mumbai 788 Crs Establish RO(HQ) 3 M/s. Cummins India Ltd No. 30/5, 31/3, 32, 33/2, 35/1+2, 3741pt, 43 pt, 44pt, Dahanukar Colony, Kothrud, Pune 411038 1270.59/- Crs Establish for Expansion JD(APC) 1 M/s. BHEL (Power Equipment Fabrication Plant), MIDC Mandipar, Tal- Sakoli, Dist -Bhandara 522.26 Crs Establish JD(APC) 2 M/s. ABB Ltd., (formerly known as ABB Global Services Ltd.,) 79, MIDC Satpur, Nashik 125.24 Crs Establish JD(APC) 3 M/s. Sona Alloys Pvt. Ltd., C-1, MIDC Lonand, Tal- Khandala, Dist - Satara 445.38 Crs Establish for expansion JD(APC) 4 M/s. Endress + Hauser Flowtec (India) Pvt. Ltd.,M-171 to 176, MIDC Waluj, Dist - Aurangabad 176.89 Crs Establish for expansion JD(APC) 5 M/s Oakwood Premier, S No. 81, H No. 1+4b+5A, Plot No. 4, Mundhwa, Pune 163.67Crs Establish & Operate RO(HQ) 6 M/s. Mazgaon Dock Ltd, Wet Basin, Modernisation Project, The New Wet Basin, South Yard, Mazgaon Dock, Dockyard, Mumbai 285 Crs Establish RO(HQ) 7 Ms/. Kiayana Properties Pvt Ltd CTS no. 283, 283/1 to 17, LBS Marg, Village Bhandup, Taluka Kurla, Mumbai 363.08Crs Establish RO(HQ) 8 M/s. Shree Samrat Pulp & Paper Pvt. Ltd., D-2 MIDC Kurkumbh, Tal. Daund, Dist. Pune 103.54 Crs. Establish (Expansion) JD(WPC) 9 M/s. Schreiber Dynamix Dairies Ltd., (Gat No. 88-89 & 91-92, Rui, Tal. Baramati, Dist. Pune 367.73 Crs. Establish (for Boiler) JD(WPC) Section No of Cases JD(APC) 6 JD(WPC) 2 AS(T) 0 List of Cases to be submitted before 7th Consent Appraisal Committee Meeting to be held on 12.7.2013 Resubmitted Agenda Fresh Agenda

Upload: others

Post on 27-Jun-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Sr. No.

Name & Address Capital Investment Applied For Section Page No. Remarks

1 M/s. Endurance Technologies Pvt. Ltd., L-6/3, MIDC Waluj, Dist - Aurangabad

99.0 Crs Establish for expansion

JD(APC)

2 M/s Nirmal Lifestyle Ltd, 491-A, 491-B, 491-A/1 to 4, 491-a/7 to 9, 491-E, Vill Nahur, Mumbai

788 Crs Establish RO(HQ)

3 M/s. Cummins India LtdNo. 30/5, 31/3, 32, 33/2, 35/1+2, 3741pt, 43 pt, 44pt, Dahanukar Colony, Kothrud, Pune 411038

1270.59/- Crs

Establish for Expansion

JD(APC)

1 M/s. BHEL (Power Equipment Fabrication Plant), MIDC Mandipar, Tal- Sakoli, Dist -Bhandara

522.26 Crs Establish JD(APC)

2 M/s. ABB Ltd., (formerly known as ABB Global Services Ltd.,) 79, MIDC Satpur, Nashik

125.24 Crs Establish JD(APC)

3 M/s. Sona Alloys Pvt. Ltd., C-1, MIDC Lonand, Tal- Khandala, Dist - Satara

445.38 Crs Establish for expansion

JD(APC)

4 M/s. Endress + Hauser Flowtec (India) Pvt. Ltd.,M-171 to 176, MIDC Waluj, Dist - Aurangabad

176.89 Crs Establish for expansion

JD(APC)

5 M/s Oakwood Premier, S No. 81, H No. 1+4b+5A, Plot No. 4, Mundhwa, Pune

163.67Crs Establish & Operate

RO(HQ)

6 M/s. Mazgaon Dock Ltd, Wet Basin, Modernisation Project, The New Wet Basin, South Yard, Mazgaon Dock, Dockyard, Mumbai

285 Crs Establish RO(HQ)

7 Ms/. Kiayana Properties Pvt Ltd CTS no. 283, 283/1 to 17, LBS Marg, Village Bhandup, Taluka Kurla, Mumbai

363.08Crs Establish RO(HQ)

8 M/s. Shree Samrat Pulp & Paper Pvt. Ltd., D-2 MIDC Kurkumbh, Tal. Daund, Dist. Pune

103.54 Crs. Establish (Expansion) JD(WPC)

9 M/s. Schreiber Dynamix Dairies Ltd., (Gat No. 88-89 & 91-92, Rui, Tal. Baramati, Dist. Pune

367.73 Crs. Establish (for Boiler) JD(WPC)

Section No of Cases

JD(APC) 6JD(WPC) 2AS(T) 0

List of Cases to be submitted before 7th Consent Appraisal Committee Meeting to be held on 12.7.2013

Resubmitted Agenda

Fresh Agenda

RO(HQ) 4TOTAL 12

Sr. No.

Name & Address Capital Investment Applied For Section Page

No. Remarks

1 M/s. Agnre Port Ltd., (Formerly known as Jaigad Port Infrastructure Pvt. Ltd.,) a/p- Sande Lavgan, Tal & Dist - Ratnagiri

217.18 Crs 1st Operate JD(APC)

2 M/s. Adani Power Maharashtra Ltd., A-101, Tiroda Growth Centre, MIDC Tiroda, Dist - Gondia

2627.09 Crs 1st operate unit-3

JD(APC)

3 M/s. Wokhardt Hospital Ltd., C.S. No. 1877, Dr. Anand Rao Nair Marg, Agripada, Byculla, Mumbai

220.00 Crs. 1st Operate RO(HQ)

4 M/s. Raghuleela Leasing & Real Estate Pvt. Ltd., 'The Capital', Plot No. C-70 Bandra Kurla Complex Bandra (E), Mumbai - 400 001

1896.84 Crs. 1st Operate RO(HQ)

5 M/s. Bombay Rayon Fashion Ltd., Vill. Peth Naka, Islampur, Tal. Walwa, Dist. Sangli

171.53 Crs. 1st OperateJD(WPC)

6 M/s. Nirlon Ltd, CTS No. 257/1, 257/B,257/C,257/D,257/E,257/F,557 to 559 and 571, 586/3 part of 257E, Village Goregaon (E), Tal Borivli, Mumbai

581.48 Crs 1st Operate RO(HQ)

1 M/s. Siyaram Silk Mills Ltd., MIDC Boisar-Tarapur, Tal. Palghar, Dist. Thane

86.66 Crs. 1st Operate JD(WPC)

2 M/s. Skylark Buildcon Pvt ltd, Plot bearing C S No. 286(p), F P No. 1076, 1077 and 1078, IV Mahim, Worli, Mumbai

717 Crs Operate RO(HQ)

3 M/s Resort and Health Farm Writer Lifestyle Pvt ltd, Vill Shilim & Chawser, Tal Maval, Dist Pune

201.31 Crs 1st Operate RO(HQ)

4 M/s.Cummins Technologies India Ltd., B-3/1, Phaltan SEZ Indl Area, Tal- Phaltan, Dist -Satara

319.48 Crs Operate JD(APC)

5 EMCO Energy Ltd (Phase I and II), MIDC Warora, Tal Warora, Dist Chandrpaur

3480 Crs 1st Operate JD(APC)

6 M/s. ITC Ltd, Plot No. B-27, MIDC Ranjangaon, Tal Shirur, Dist. Pune

1032 Crs Operate JD(WPC)

List of Cases to be submitted before 7th Consent Appraisal Committee Meeting to be held on 12.7.2013

Resubmitted Agenda

Fresh Agenda

7 M/s. Topworth Urja & Metals Ltd., Mouza Ukkerwahi, Vill- Heti, Tal- Umred, Dist - Nagpur

325.70 Crs 1st operate JD(APC)

8 M/s. JSW Steel Ltd., S. No. 176,180/01,180/2,180/3,180/4,180/5,6,7,8, Vill- Vashind, Tal- Sahapur, Dist - Thane

121.0 Crs Operate for expansion

JD(APC)

9 M/s. JSW Steel Ltd., B-6, MIDC Tarapur, Navapur Road, Boisar, Tal- Palghar, Dist - Thane

775.70 Crs Operate for expansion

with amalgamatio

n

JD(APC)

10 M/s. Brintons Carpets Asia Pvt. Ltd. (Urawade), Gat No. 414/415/416, Vill. Urawade, Tal. Mulshi, Dist. Pune

131.23 Crs. 1st Operate (expansion

with amalgamatio

n

JD(WPC)

11 M/s. Tessitura Monti India (P) Ltd., Gat. No. 147, Village Tamgaon, Tal. Karveer, Dist. Kolhapur

232.17 Crs. 1st Operate for

Expansion & Renewal

JD(WPC)

12 M/s. B.G. Chitale, A/p. Bhilawadi Station, Tal. Palus, Dist. Sangli

84.12 Crs. 1st Operate for

Expansion & Renewal

JD(WPC)

Section No of CasesJD(APC) 7JD(WPC) 6AS(T) 0RO(HQ) 5TOTAL 18

Sr. No.

Name & Address Capital Investment Applied For Section Page

No. Remarks

1 M/s. Sandvik Asia Pvt. Ltd., Mumbai-Pune road, Dapodi, Dist - Pune

647.16 Crs Renewal JD(APC)

2 M/s. Walchandnagar Industries Ltd., Walchandnagar, Tal- Indapur, Dist - Pune

186.17 Crs Renewal with expansion

JD(APC)

3 M/s. Varroc Polymers Pvt. Ltd., (VPPL-II) E-88, MIDC Ranjangaon, Tal- Shirur, Dist - Pune

82.88 Crs Renewal with expansion

JD(APC)

4 M/s. JBM MA Automotive Pvt. Ltd., C-1, (Part), MIDC Chakan Talegaon Road, Tal- Khed, Dist - Pune

214.53 Crs Renewal with expansion

JD(APC)

5 M/s. ISMT Ltd., (Steel Plant) Jejuri Morgaon Road, Po- Jejuri, Dist - Pune

245.43 Crs Renewal JD(APC)

6 M/s. Virgo Engineers, 278, Raisoni Park, Tal- Mulshi, Dist - Pune

92.05 Crs Renewal with expansion

JD(APC)

7 M/s. Haier Appliances (India) Pvt. Ltd., B-3, Ranjangaon Growth Centrem MIDC Ranjangaon, Tal- Shirur, Dist - Pune

96.21 Crs Renewal with expansion

JD(APC)

8 M/s. Crompton Greaves Ltd., S. No. 1005,1007- 09,1011,1013,1014,1017,1019, Kanjurmarg, Mumbai

280.06 Crs Renewal JD(APC)

9 M/s. Thyssenkrupp Electric Steel India Pvt. Ltd., A/p- Gonde, Vill- Wadivarhe, Tal- Igatpuri, Dist - Nashik

474.13 Crs Renewal JD(APC)

10 M/s. Bombay Rayon Fashions Ltd, Plot No. C-6, C-7, MIDC Tarapur Dist Thane

7.91 Crs Renewal JD(WPC)

1 M/s. Ghatge Patil Industries Ltd., S. No. 362, A/365, A/4B, A/p Uchgaon, Dist - Kolhapur

125.15 Crs Renewal and operate for expansion

JD(APC)

2 M/s. Sunflag Iron & Steel Co. Ltd., At- Eklari, Tal- Mohadi, Dist - Bhandara.

1268.81 Crs Renewal with amalgamation

JD(APC)

List of Cases to be submitted before 7th Consent Appraisal Committee Meeting to be held on 12.7.2013

Resubmitted Agenda

Fresh Agenda

3 M/s. D-décor Exports, Plot No. G-7/1, MIDC Tarapur, Palghar, Dist. Thane

251.97 Crs. RenewalJD(WPC)

4 M/s. Naval Dockyard, Lion Gate, Shahid Bhagatsingh Marg, Mumbai

100.00 Crs. Renewal RO(HQ)

5 M/s. Maharashtra State Power Generation Co. Ltd., Bhusawal TPS, Unit 4 & 5, At - Deepnagar, Dist - Jalgaon

4697.80 Crs Renewal JD(APC)

6 M/s. Ceat Ltd, Plot No 82, MIDC, Satpur, Dist Nashik

309.8 Crs Renewal AS(T)

7 M/s. Seya Industries Ltd (Formly Known as M/s Sriman Organic Chemical Ind Ltd), Plot No T-13/14, MIDC, Tarapur, Dist Thane

99.22 Crs Renewal AS(T)

8 M/s Lupin Ltd, T-142, MIDC S No. 30/10, to 13 & 64/7, Tarapur, Dist Thane

628.94 Crs Renewal AS(T)

9 M/s. Kirloskar Brothers Ltd., A/p- Kirloskarwadi, Tal- Palus, Dist - Sangli

150.66 Crs Amendment in consent

JD(APC)

10 M/s. Ascent Hotels Pvt. Ltd.32/1 A & B, Weikfield IT Park, Wadgaonsheri, Pune Nagar Road, Tal Haveli, Dist Pune

347.94/- Crs Renewal

RO(HQ)

11 M/s. JSW Energy Ltd., At- Nandivade, Po- Jaigad, Tal & Dist - Ratnagiri

538.72 Crs Renewal JD(APC)

12 M/s. Grace Industries Ltd., A-23, MIDC Industrial Area, Tadali Growth Centre, Dist - Chandrapur

161.77 Crs Renewal JD(APC)

1 M/s. JSW Ispat Steel Ltd., (Captive Jetty), Geetapuram Dolvi, Tal- Pen, Dist - Raigad

JD(APC)

2 M/s. Century Rayon, Murbad Road, Shahad, Kalyan Dist Thane

AS(T)

Section No of Cases

JD(APC) 16JD(WPC) 2AS(T) 4RO(HQ) 2TOTAL 24

Review Item

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

Establish

RESUBMISSION

CAC Item No. 01

Name of Industry:- M/s. Endurance Technologies Pvt. Ltd. L-6/3, MIDC Waluj, Aurangabad Applied for consent to establish for expansion. expansion will be increase in product quantities of product Automobile casting:- 150 MT/M.

Existing consent is valid upto 28/2/2013, the renewal application is discussed in CAC meeting held on 31/5/2013 and decided that case to be exmined by TAC.

CI for expansion is Rs.18.0 crores and existing CI is Rs.81.0 crores.

There is no increase in water consumption & effluent generation due to expansion.

There will be increase in fuel consumption and accordingly the stack will be provided.

The RO reported that latest JVS report is within limits.

Submitted environment statement for the year 2011-2012.

SRO/RO recommended the grant of consent to establish for expansion.

We may grant consent to establish for expansion.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 02

Name of the Industry : M/s. .Nirmal Lifestyle Ltd. 491-A,491-b,491A/1 to 4,491 A/7to 9,491- E,Village:Nahur,Mumbai

• Application for grant of C to Establish for Residential and commercial Project for,

A.Total Plot Area - 1,22,011.00 Sq.mtrs. B.Praposed BUA[As per FSI ]- 2,22,271.50 Sq.mtrs. i. Praposed BUA [As per FSI] for Existing Bldg : 1,17,104.00 Sq.mtrs ii.Proposed BUA [As per FSI] for Proposed construction:1,05,168.00 Sq.Mtrs C.Total Construction BUA - 3,86,319.80 Sq.mtrs.

i. Total Construction BUA of Existing Building : 1,52,235 Sq.mtrs ii. Total Construction BUA Proposed construction : 2,34,085 Sq.Mtrs

• Application received at RO, dt: 2/1/2012 and at HQ on dt: 21/02/2012.

• Project proponent has obtained EC from GOI dated 1/4/2011 (C-36)

A.Total Plot Area - 1,22,011.00 Sq.mtrs.

B.Praposed BUA[As per FSI ]- 2,22,271.50 Sq.mtrs.

i. Praposed BUA [As per FSI] for Existing Building : 1,17,104.00 Sq.mtrs ii.Proposed BUA [As per FSI] for Proposed construction : 1,05,168.00 Sq.Mtrs C.Total Construction BUA - 3,86,319.80 Sq.mtrs. i. Total Construction BUA of Existing Building : 1,52,235 Sq.mtrs ii. Total Construction BUA Proposed construction : 2,34,085 Sq.Mtrs

• Water consumption - 2386 CMD. Sewage Generation - 1765 CMD. Said Project consist of total 10 Nos of Buildings (5 Nos of existing+ 5 Nos. of Praposed Buildings)

• Construction Status:

Existing Buildings: construction work of all buildings are completed & occupied. Proposed ConstructionBldg.No.4:Construction work completed for E & F wing completed upto G+19 Floors. Bldg.No.5:Foundation work is in progress. Bldg.No.6:Construction work completed upto 5p+1 St+ 8 Upfloor completed. Bldg.No.7:Construction work completed upto 5p+1 St+ 2 floor completed. Bldg.No.8:Construction work completed upto 5p+1 St is in progress.

• the case was discussed in CAC Meeting dated 24/5/2013 and It was decided to re-examine the case with datewise chronology and to get clarification regarding since when the consent fees should be charged on increased in CI and It was decided to keep the case in abeyance and revert after getting clarification on why C to E was not obtained prior to starting and completing construction.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

• We may Place the application in CC for further decision.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 03

Name of the industry: - M/s. Cummins India Ltd., No.30/5,31/3,32,33/2,35/1+2,3741pt,43pt,44pt, Dahanukar colony,Kothrud,Pune 411 038

Applied for consent to establish for expansion Application received at SRO-Pune-I on dtd 09/02/2013 and at HQ on 30/04/2013. Existing plant consent is valid up 30/9/2014 Total capital investment is Rs.1270.59 Crs (Proposed 468.84Crs + existing Rs.801.75 crs) Industry will generates trade effluent to the tune of 29CMD,for which they proposed to provide effluent treatment plant. (exiting IE 30.2 CMD) Industry will generate domestic effluent (63 CMD) for which they propose to provide sewage treatment plant. (existing 450 CMD) The proposed built-up area is 129704.72Sq.Mtr and total plot area is 344154 Sq.mtr. As the total built up area exceeds the 20000 Sq.mtr., it attracts EIA Notification 2006 and requires environmental clearance. Industry has applied for Environment Clearance and EC is not yet obtained. As per existing consent condition No. 09, industry has submitted BG of Rs. 5/- Lakhs towards operation & maintenance which is valid up to 30/09/2014. Regional officer Pune forwarded the case to HQ for decision at higher level The proposed built-up area is 129704.72Sq.Mtr and total plot area is 344154 Sq.mtr. As the total built up area exceeds the 20000 Sq.mtr., EC obtained. Case was discussed in CAC meeting dt. 04/06/2013 and decided to keep the case in abeyance and revert to CAC after getting distance certificate of EE, irrigation dept. as per RRZ policy. Accordingly, letter was issued on 18/06/2013. Reply was received from RO with copy of EE, irrigation dept., stating that distance is 1460 mtrs. We may place the consent application before CAC for further consideration.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

FRESH AGENDA

CAC Item No. 01 Name of the Industry: M/s. BHEL (Power Equipment Fabrication Plant), MIDC Mandipar, Tal: Sakoli, Dist: Bhandara.

1. Applied for consent to Establish (for power equipment fabrication plant). 2. The Capital Investment of the industry is Rs.522.26 Crores.

Application for Consent to Establish.

RRZ Policy satisfied.

We may grant Consent to Establish subject to Environment Clearance as area is more than

20,000 sq. Meter.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 02 Name of the Industry:- M/s. ABB Ltd, [Formerly known as ABB Global Services Ltd]

Plot no.79, MIDC, Satpur, Tal & Dist: Nashik

1. Application for grant of consent to establish for additional production submitted by industry on 17.04.2013.

2. Application received at H.Q. on 19.06.2013. 3. Industry has submitted Environmental statement for the period 2011-2012. 4. RO- Nashik has recommended case for grant of consent to establish. 5. Recommended case for grant of consent to establish with condition that industry shall install

ARP for treatment of spent acid or sent spent acid to authorized industry having ARP facility.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 03 Name of the Industry :- M/s. Sona Alloys Pvt. Ltd.

Plot No. C-1, MIDC Lonand, Tal. Khandala, Dist. Satara 415 521

• Applied for consent to establish for expansion

• Application received at SRO- Satara on dtd 18/04/2013 and at HQ on 20/05/2013.

• Existing plant consent is valid up to 30/11/2015

• Generation of industrial effluent will be NIL (Existing 37 CMD) ETP provided for existing.

• Domestic effluent generation will be 4.8 CMD (existing 21 CMD + Proposed 4.8 CMD)

• SRO reported that the industry has almost erected 80% GGBF’s concrete mix plant (before applying for consent to Establish) by assembling and erecting readymade/pre-fabricated equipments, such as drying unit, feeding unit, crushing unit, packaging unit etc.

• Industry has submitted letter dated 18/03/2013 stating that their activity is slag grinding not cement grinding so that not applicable EC.

• The unit has already applied for ENv. Clearance to GOM on 08/01/2013

• RO Pune has recommended the case for grant of consent to establish with condition to obtain EC from MoEF & also recommended to issue the stop work directions as the industry has already started construction of plant.

• We may issue SCN for Refusal of the consent due to above violations.

• We may place the consent application before CAC for further consideration.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 04

Name of Industry:- M/s. Endress+Hauser Flowtec (India) Pvt. Ltd. M-171 to 176, MIDC Waluj, Aurangabad Applied for consent to establish for expansion.

Will be increasing product quantity of the product Flow meter & its parts by MT/M or 800 Nos./M. The existing consent is valid upto 28/2/2014 for manufacturing of flow meters & its parts 20 MT/M. The CI for expansion is Rs.48.38 crores and existing CI is Rs. 128.51 crores.

There will be generation of industrial effluent to the tune of 0.1 CMD from expansion and existing quantity is 0.15 CMD.

The domestic effluent will be 3.0 CMD from expansion and existing is 9.0 CMD.

Both the effluents will be treated in existing STP of 20 CMD capacity.

JVS result is within limit. SRO/ RO recommended grant of consent to establish.

We may consider grant of consent to establish for expansion.

We may place the case before CAC for further discussions.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 05 Name of the Industry : Oakwood Premier ,

S.No.81, H.No.1+4B+5A, Plot No.4, Mundhwa, Pune- 411036

1. PP has applied for of consent to establish & operate for Hotel with 200 Rooms. [Built-up

area-16,266.13 sq.mtrs]

2. Date of commissioning of hotel is Oct. 2010

3. Capital investment in 2010 was Rs.146.96 accordingly PP has paid Rs.293920 in 2010.

4. Now capital investment as on 28.02.2013 was Rs 163.67.Cr. pp has paid total consent fees

of Rs 11,28,980/- for period upto 31.10.2014

5. Domestic water consumption is 66 CMD & waste water generated about 55 CMD for which

pp has provided 25 CMD STP. (Inadequate capacity of STP)

6. PP has provided ozone generator to swimming pool.

7. Organic waste convertor is installed for disposal of Wet MSW waste.

8. PP has installed DG set of capacity 750 & 380KVA capacity with APC.

9. Hazardous Waste category 5.1- 750 Lit/Year is disposed to Auth Reprocessor

10. SRO Pune has issued query letter on 30/03/2013 reply not received.

11. RO Pune recommends the case for grant of consent; subject to reply of query letter.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 06 Name of the Industry : M/s. Mazagaon Dock Ltd.,

Wet Basin , Modernisation Project, South Yard, Mazagaon Dock Ltd, Dockyard Road, Mumbai.

1. Application received for Consent to Establish and Operate for the construction of new wet basin for Mazgaon Dock Modernization for

2. Total Plot Area:35,135.32 Sq. Mtrs. BUA:9750 Sq. Mtrs. (excluding gate)

3. Said Project is funded through Projects of Indian Navy.

4. Said Project Consist of berthing space(like swimming pool) having area of 27,000 Sq.Mtrs,Deapth of Basin is 6 Mtrs to facilitate sufficient draft for larger size warship & vessels and equipped with all necessary fitting, electrical & mechanical services bags.

5. Said project meant for berthing outfitting activities of Warships and Submarines of Indian Navy is the part of Modernization Project of Mazgaon Dock Ltd.

6. Said project is falls under exception category to the prohibited activities in CRZ hence require CRZ Clearance and PP has applied to CRZ Clearance dated 28/1/2013

7. Total Cost of Project is Rs.285 Cr.

8. MDL has paid Rs. 11,40,100/- Fees paid for Establish & operate.

9. Earlier consent for existing activity is valid upto 28.02.2012 MDL has applied for renewal on 27/02/2012 which was refused by board on 23.10.2012.

Construction Status:

10. SRO Reported that construction of wet basin started since September, 2008 and now completed and it is expected to commission in next two months. Civil work is completed installation of four cranes is in progress

11. RO recommended for grant of Consent to Operate upto 31.03.2014 for Wet dock activity.

12. Since C.I. of Project is Rs. 285 Cr. We may place the application in CAC for further decision.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 07 Name of the Industry : M/s. Kiyana Properties Pvt. ltd ,

CTS No. 283, 283/1 to 17, LBS Marg, Village Bhandup (W), Taluka Kurla,

Mumbai-400078.

• Application for grant of consent to establish for proposed Residential project for,

Total Plot Area - 17,408.00 Sq.mtrs.

Permissible FSI(including TDR) - 39,964.51 Sq.Mtrs.

Total Construction BUA - 82,921.36 Sq.mtrs

• Application received at RO, Nashik, dt: 29/1/2013 and at HQ on dt: 25/02/2013.

• Applicant has obtained EC from GOM Dated 8/4/2013 for , Total Plot Area - 17,408.00 Sq.mtrs. Permissible FSI(including TDR) - 39,964.51 Sq.Mtrs. Total Construction BUA - 82,921.36 Sq.mtrs

• Non Hazardous Waste: Wet Garbage: 655 Kg/Day will be treated in organic waste Converter Dry Garbage:281 Kg/Day will be handed over to MCGM. STP Sludge; 28 Kg/Day

• SRO-Mumbai-III reported that, excavation work is in progress and no any construction activity is observed

• RO Recommended C to E for commissioning of project or 5 years whichever is earlier

• We may grant C to E subject to condition of EC and by taking Board Resolution not to start any activity without C to E from Board and submission of Bank Guarantee of Rs.10 Lakh for providing STP and MSW Processing Plant.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 08 Name of the Industry : Shree Samrat Pulp & Paper Pvt. Ltd.,

D-2, MIDC Kurkumbh, Tal-Daund, Dist-Pune

1. Applied for C to E for expansion. 2. Application received at HQon dtd.18.04.2013. 3. Engaged in mfg. of Kraft paper / paper Board. 4. Industry has obtained consent dated 24.01.2013 & same is valid upto 30.11.2014 for mfg of

Kraft paper/Paper Board-900 MT/M with the condition of recycling 100% treated effluent in the process.

5. Now industry has applied for consent to establish for Kraft Paper /Paper Board of capacity 15000 MT/M in name of Shree Samrat Pulp and Paper Pvt Ltd.

6. Industry plot D-2 is located in the MIDC Kurkumbh area which is about 5KM from river Bhima and about 0.05KMfrom Pune-Solapur Highway.

7. Industry has changed their name from M/s Godavari Pulp and Paper Mills Pvt. Ltd, to Shree Samrat Pulp and Paper Pvt Ltd.

8. Industry proposes to provide ETP for I.E. generated to the tune of 450 CMD and propose that the treated industrial effluent will reuse for manufacturing process and sprinkling on coal and ash.

9. For Domestic effluent to the tune of 9CMD proposed to provide septic tank and soak pit. 10. Industry proposes to provide APCS for bagasse/coal fired boiler. 11. Considering above the case is recommended for Grant of C to E with BG of Rs.5.0 Lakhs

towards compliance of C to E conditions with 100% recycle in process making Zero Discharge.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 09

Name of the Industry : M/s. Schreiber Dynamix Dairies Ltd., Gat No.88-89 & 91-92,Rui,Tal-Baramati, Dist-Pune.

1. Applied for the C to E for the additional Biomass boiler for the exiting unit. 2. Application received at HQ on dtd.15.04.2013. 3. Existing industry engaged in mfg. Of Dairy products having valid consent upto 31.12.2014. 4. Existing 5 Nos of boilers – fuel is Furnace oil and adequate height of stack is provided. 5. Now proposed new additional biomass/ briquette/coal fired Boiler of capacity 40 TPH. 6. Industry has proposed that the new boiler will be operated continuously and existing furnace

oil fired boilers will be operated when Biomass boiler will be not in operation. 7. SRO reported that the proposed boiler installation site is on the other side of mfg. unit, and

Bhigwan-Baramati road is passing in between the mfg. unit and proposed site. 8. Industry has proposed High efficiency Deduster (HEDD)/ Cyclone separator as an APC

system. 9. The case is recommended for grant of C to E for installation of New biomass/coal fired

boiler, with BG of Rs.5.0 lakhs and with condition not to start without C to O.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

OPERATE RESUBMISSION CAC Item No. 01

Name of Industry:- M/s. Angre Port Ltd.(Formerly known as Jaigad Port Infrastructure Pvt Ltd.) A/P:- Sande Lavgan, Tal& Dist:- Ratnagiri Case again discussed in CAC meeting dated 22/3/2013, it was decided to keep the case in abeyance and put up case in CAC after compliance of EC/C to E conditions. Now the report is received from SRO and reported that most of EC & C to E conditions are complied except Envt. Cell/Green Belt. We may consider grant of consent to operate subject to condition that unit shall commission STP before 31/1/2014 with BG of Rs. 5/- lacs and operational BG of Rs. 5.0 lacs.

We may place the case before CAC for further discussions

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 02

Name of the Industry: M/s. Adani Power Maharashtra Private Ltd.,

Plot No.A-01, Vill: Tiroda, Dist: Gondia.

1. Applied for renewal of consent of power plant 1320 MW.

2. SRO Bhandara has submitted the compliance report and reported the compliance but monitoring results are not submitted.

Discussed in CAC meeting held on 27.12.2012 and not approved the renewal of consent. It was decided to call monitoring results from SRO & resubmit in next CAC Meeting. The analysis results are submitted by SRO & are within the limit (Copy enclosed).

Discussed in CAC meeting held on 31.1.2013 and It was decided to keep the case in abeyance due to non submission of consent & EC condition compliance.

The first unit of 660 MW is taken on trial in july 2012 & synchronized in sept 2012.As per EC condition the unit’s coal requirement is from WCL & SECL by rail transportation up to their plant site in tiroda but presently as the railway siding of the unit is not yet completed. As temporary arrangement the unit is presently (since july 2012) loading/unloading coal at railway siding at Ramtek in Nagpur district & from this railway siding same is transported by trucks.

RO Nagpur has submitted the report on 3.2.2013 and reported that strengthening of pollution control system is needed at railway siding at Ramtek and also extension of cladding over the 700 meter length. The AAQM results are high.

We may grant renewal for 1 year with condition that;

i) The unit shall ensure the adequate case shall be taken while transportation of coal by Road from Ramtek Railway Good Yard up to unit’s coal stock yard so that no stillages/overloading all along the road transportation with tarpaulin cover on it shall be observed. The operational B.G. of Rs.5/- lakh may be taken.

ii) The unit shall commission the Railway siding for transportation of coal by railway up to company coal stock yard on/or before 30.11.2013, with B.G. of Rs.10/- Lakhs for same.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 03 Name of Industry : M/s. Wokhardt Hospital Ltd, C.S. No: 1877, Dr. Anandrao Nair Marg, Agripada, Byculla, Mumbai. 1] Application received for grant of Consent to Operate (1st) for the hospital activity (320- beds)

having Total construction BUA of 29,266.54 sq.mtrs. Application received at RO-Mumbai on 22/03/2012.

2] RO-Mumbai forwarded application to AST on 15/12/2012. 3] Applicant has obtained Consent to Establish vide no: BO/RO-Mumbai/AST/eic No: MU-3046-

11/CAC-443, dt: 07/06/2012 for construction of hospital building with total construction BUA of 25,015.26 sq.mtrs.

4] Applicant has obtained Environment clearance, dt: 12/10/2011 2012 for construction of hospital building with total construction BUA of 25,015.26 sq.mtrs.

5] Applicant has provided STP of capacity 325 CMD comprising of primary, secondary & tertiary treatment of generated sewage. After treatment the treated sewage will be utilized upto maximum extent for flushing, firefighting, cooling towers & gardening and rest shall be sent to municipal sewerline.

6] Solid waste generation will be (Dry waste – 75 kg/d, wet – 95kg/d) will be disposed to MCGM dumping ground.

7] Applicant has not submitted reason for not providing cost of land in CA Certificate and caused loss of revenue in terms of consent fee at the time of C to E as well at the time of application of C to O (1ST).

8] Applicant has applied for Total construction BUA of 29,266.54 sq.mtrs but EC & C to E obtained for total construction BUA of 25,015.26 sq.mtrs.

9] Applicant has not applied for grant of authorization as per BMW Rules. 10] RO-Mumbai has reported that HCE yet not started and not submitted OC. 11] SRO-II, Mumbai / RO-Mumbai has recommended for C to O (1st) subject to submission of

application of authrisation under BMW Rules and BG. 12] Applicant has paid consent fee of Rs. 4,16,000/- for period of 1-year. 13] SCN for refusal may be issued for non submission of C.I in prescribed format, non submission

of clarification on excess BUA and non submission of application of authrisation under BMW Rules.

14] The case was discussed in Board’s CAC meeting, dt: 12/03/2013 & it was decided to issued

SCN for refusal for non submission of C.I in prescribed format, non submission of clarification on excess BUA and non submission of application of authrisation under BMW Rules. SCN for refusal issued vide dt: 01/06/2013.

15] M/s. Wokhardt Hospital Ltd,has submitted reply against SCN issued vide dt: 31/05/2013 and submitted as under :

a) the applicant has submitted CA Certificate stating C.I is Rs. 220 Cr and they are ready to pay additional fees.

b) In their reply applicant further states that there was a typographical mistake in Area statement of 1st consent to operate application and applicant has submitted corrected area statement which as per EC and Consent to establish granted as under:

• Area of Plot : 3586.98 sq.metrs ( As per EC and c to E) • Permissible BUA : 15397.96 sq.metrs • Proposed BUA : 14779.65 sq.meters ( As per EC) • Total Construction BUA :- 25,015.26 sq.metrs. ( As per EC and c to E)

The actual total construction BUA is 25,015.26 sq.mtrs. C) Applicant has applied for BMW authorization on 23/04/2013 at RO Mumbai office.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 04 Name of the Industry : M/s. Raghuleela Leasing & Real Esatae Pvt Ltd., ‘The Capital’ Plot No C-70 Bandra Kurla Complex

Bandra (E) Mumbai-400051

1. Application for 1st consent to operate for Commercial Complex. 2. Application received at SRO on19/03/2013 at HQ on 09/05/2013

3. Resubmission case was placed before of 04/06/2013, wherein it was decided to to keep the case in abeyance and revert to CAC to CAC after confirming compliance of C to E conditions.

4. Mail was sent to Sent to RO Mumbi on 18/06/2013.

5. Reply received from SRO Mumbai-II on 01/07/2013 giving the compliances of C to E conditions as under :

a. It is purely commercial building having G+ 19 structures. Water consumption: 637 CMD

Effluent generation: 425 CMD

Provided STP of 450 Capacity found in operation.

b. Non hazardous waste details: i) Wet garbage : 1.69 MT/day ii) Dry Grabage : 2.53 MT/day iii) Treatment facility provided organic waste convertor, found in operation.

6. RO has recommended the case for 1st consent to operate

7. May be granted with BG of Rs. 10 Lakhs for O & M of MSW processing plant & STP.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 05

Name of the Industry :- M/s. Bombay Fashion Rayon Ltd., MIDC Tarapur, Dist. Thane

1)Applied for renewal of consent. Application submitted at SRO on01.01.13 & received at HQ on 20.02.13

2) Textile manufacturing industry Consent of power plant in same premises is valid till 31.08.13

3) IE generation 3 MLD and privided ETP of 8 MLD. JVS results are within limits. Treated effluent is recycled to the tune of 150 CMD & remaining is sent to CETP.

4) Capital investment is increased to the tune of 40.29 Crores as compared to earlier capital Investment.

5)Ind has not paid fees for increased C.I as well as Consent fees for renewal is also Short.

6) SRO & RO recommended for renewal of Consent as JVS results are within prescribed Limits.

7)Application was discussed in CAC dtd 24.05.13 7 decided to call report of RO Thane that why at the time of renewal Zero discharge was recommended Details of power plant & detils of investment.

8) RO Thane submitted reply, considering the reply Submitted to CAC for whether to grant renewal only to textile industry or renew with amalgamation with power plant.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 06 Name of Industry: M/s Nirlon Ltd. CTS No. 257/1, 257/B, 257/C, 257/D, 257/E, 257/F, 557, 558, 559, 571, 586/3, part of 257E Village Goregaon (E) and Pahadi Taluka Borivali, Mumbai

1. Resubmission case for 1st consent to Operate in part ,was placed before CAC of 27/12/2012, wherein it was decided to examine the case with respect to Boards Circular of validity period of consent to establish.

2. Application Received at SRO on 27/08/2012 and at HQ on 07/12/2012

3. C to E granted vide No. BO/RO(P&P)/B- 2376 dt. 11/09/2006 for

Total Area of - 10,39,27.70 M2

4. Water Consumption- 230.0 M3/day

Sewage generation- 190.0 M3/day

STP provided – 525.0 M3/day

5. Solid waste generation processing details not furnished

6. The firm has obtained EC of MoEF vide No. 21- 777/2006-IA.III dt.28/09/2007.

Plot area - 1,03,928 M2

Built up Area-1,52,796.20 M2

7. RO Mumbai has recommended the case for 1st C to O in part

8. Consent may be granted with the condition of obtaining BG of Rs. 10 lacs for operation and maintenance of STP and MSW processing plant, upto 31/12/2014

• Case was discussed in the CAC meeting dated 04/06/2013 it was decided to keep the case in abeyance and putup along with fresh C to E application after examining EC validity.

• PP has submitted fresh EC obtained from MoEF on 17/05/2013.

As per new EC issued on17/05/2013

Plot area:- 106608.10 sq. mtrs

Proposed built up area:-2,87,054 sq mtrs

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

• PP has applied consent to operate for B1,B2,B3,B7,& MLCP1 building and obtained OC for the same from local body. Having built up area 157891.99 sq mtrs out of total BUA 287054.0 sq.mtrs.

• Earlier consent to establish was not valid and part of project is under construction & as per CAC decision PP has applied for fresh C to E with additional fees of Rs. 11,62,960 at RO Mumbai. Detail about Earlier EC and fresh EC

Building No

EC obtained 28/09/2007

EC obtained 17/05/2013

Applied for Opeate

B1 Yes No change in earlier EC

Occupancy certificate obtained

B2 Yes No change in earlier EC

Occupancy certificate obtained

B3 Yes No change in earlier EC

Occupancy certificate obtained

B7 Yes No change in earlier EC

Occupancy certificate obtained

MLCP1 Yes No change in earlier EC

Occupancy certificate obtained

Hotel Yes It will be now IT office building

Not Obtained

B4, B5 Yes Not Obtained

MLCP2 Yes

B4,B5,MLCP2 proposed as single unit Not Obtained

Nirlon Corporation office

Yes G+Mezzanine+6 Amenity Building

Not Obtained

Two wheeler parking structure

No Stilt+3 levels Not Obtained

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

FRESH AGENDA CAC Item No. 01 Name of the industry :- M/s. Siyaram Silk Mills Ltd ,

E-125, MIDC Boisar-Tarapur,

Tal. Palghar, Dist. Thane

1 Applied for Ist Consent to operate for sizing activity.. Application received at SRO on02.05.13 & at HQ

on 19.06.13

2.Existing consent for weaving in green category is valid till 31.05.14 & C to E for Sizing activity is obtained by ind.

3.Due to sizing activity IE mentioned as 1 CMD.

4.Provided Secondary & Tert treatment . Treaed effluent will be 100% recycled & reused i.e Zero discharge.

5.SRO & RO recommended for grant of Consent to Operate and amalgamation of consent upto 31.07.14.

6.We may place application in CAC as Total C.I is 86.66 Crores.(Existing Green Rs. 64.78 crores & Sizing activity Rs.21.88 Crores.)

7. We may grant ist C to O with amalgamation of existing green category in RED category with validity upto 31.05.14 . During subsequent renewal shall be considered for sectorial approved till Jan or we can grant this C to O seperte upto 31.01.14 as may be decided with condition of BG of Rs 5.0 lakhs for 100% recycle/reuse of Effluent.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 02 Name of Industry : M/s. Sky lark Buildcon Pvt. Ltd., Plot bearing C.S.No.286(pt),F.P.No.1076, 1077 and 1078,TPS iv,Mahim,Worli. Application for grant of C to Operate(part)for Rehabilitation Project for, Total Plot Area - 38,857.50 Sq.mtrs. Total Construction BUA - 28,413.14 Sq.mtrs. Application Received at SRO Mumbai on 6/3/2013 and at HQ on 7/05/2013. Board has granted C to E Dated 3/5/2009 Total Plot Area - 39,701.00 Sq.mtrs. Total Construction BUA -2,64,770.33 Sq.mtrs. Wet Garbage-449 Kg/Day (dumping at MCGM not as per EC Condition). Dry Garbage- 312Kg/Day (handed over to authorised recycler). Legal wing reported that Stoppage of construction work issued on 30/3/2009 Project proponent has obtained EC from GOM dated 6/3/2009 Total Plot Area - 39,701.00 Sq.mtrs. Total Construction BUA -2,64,770.33 Sq.mtrs. Conditional direction for restart issued on 9/4/2009 and directed to applicant to obtained C to E and submit BG Rs.50,000/- Board has granted C to E Dated 3/5/2009 Total Plot Area - 39,701.00 Sq.mtrs. Total Construction BUA -2,64,770.33 Sq.mtrs NGT is its order dt 5/12/2012 has passed order and directing MPCB and SEIAA to initiate suitable panel action against the occupier for commencement work without C to E and EC. Project proponent has obtained revise EC from GOM dated 6/3/2012 Total Plot Area - 38,857.50 Sq.mtrs. Total Construction BUA -2,64,770.33 Sq.mtrs. But SRO Reported that PP has allotted occupancy to 5 Buildings without C to Operate from Boardand installed temporary STP having capacity 140 CMD which is inadequate and PP also filed to provided MSW Plant Legal wing has an opinion to issuance SCN for Refusal of Consent. RO Mumbai recommended grant of C to Operate at HQ Level. We may issue SCN for Refusal for inadequate capacity of ETP and non providing of MSW Processing Plant.

CAC Item No. 03

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

Name of the Industry : M/s. Resort & Health Farm Writer Lifestyle Pvt.Ltd. Village Shillim & Chawsar, Tal:- Maval, Dist:- Pune

1. PP has applied for 1st operate for Resort & Health Farm having Total Plot Area- 1,32,4930 Sq. mtr, Total Construction built up area 28829.53 Sq. mtr.

2. PP has obtained C to E on dated 30/4/2005 & 3. Environmental Clearance on dated 29/12/2010 (Copies enclosed) 4. PP has completed the construction work and operated Resort & Health Farm (partly) since

Feb. 2013. 5. Total water consumption and sewage generation is 309 CMD and 248 CMD respectively.

Project proponent has provided 05 nos of large capacity STP’s (Capacity- 87 CMD, 36 CMD, 30 CMD, 25 CMD, 10 CMD) for common structures & 69 nos. of small capacity STP’s (0.7 CMD-34 Nos, 1.4 CMD-14 Nos, 2.1 CMD-12 nos, 2.8 CMD-06, 4.2 CMD-01 no, 4.9 CMD-01 no & 5.6 CMD-01) for individual structures. One large capacity STP is in operation and remaining STPs are ready for commissioning. Treated sewage is utilized for gardening purpose. Laundry effluent to the tune of 4.0 CMD connected to Back up House STP (87 CMD). Total 20 nos. of swimming pools constructed at different locations and back wash of swimming pool filter connected to nearest STP.

6. Total Bio-degradable and Non bio degradable waste generation is 141 Kg/day and 157 Kg/day respectively. Project proponent is disposing the same through local body collection system.

7. DG Sets having capacities (750 KVA-03 Nos, 500 KVA-02 Nos, 250 KVA-01 No & 200 KVA-01 No) are acoustically enclosed and with sufficient height of stack.

8. Rain Water harvesting system adopted in the form of constructing earthen dam on natural drainage system. (Total 03 nos. of earthen dam constructed).

9. Board office has issued proposed direction followed by interim direction for operation of the activity without obtaining Consent to Operate of the Board and also asked to submit BG of Rs. 10.0 Lakh. BG not submitted. Copies of the directions are enclosed.

10. This office has called additional information from the project proponent (Copy enclosed) and reply is awaited.

11. Location of the resort is about 1.5 Km from back water of Pawana Dam (A-I).. 12. Total project cost is 201.31 Crores and project proponent has submitted consent fee of Rs.

500100/- as per revised fee structure. 13. RO Pune has recommended the case by Considering the C to E & EC granted; provision of

pollution control measures and location of the resort, decision for grant of Consent to Operate may be taken at higher level, if approved.

• Board has issued C to E on 30/4/2005 which is not valid. • RO Pune has issued ID on 26/04/2013 as per ID PP has not submitted BG of 10

Lakhs. Also PP has not replied to scrutiny letter. Hence we may place the case in the CAC for taking further decision.

CAC Item No. 04

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

Name of the industry: - M/s. Cummins Technologies India Ltd.. Plot No. B-3/1, Phaltan SEZ Industrial Area, Tq. Phaltan, Dist. Satara

• Applied for consent to 1st Operate.

• Application received at SRO-Satara on dtd 16/05/2013 and at HQ on 12/06/2013.

• Existing plant consent is valid up Commissioning of Unit

• Total capital investment is Rs.319.48 Crs (C to E CI was Rs. 500/- Crs)

• Industry will generates trade effluent to the tune of 14 CMD,for which they have provided effluent treatment plant. (Capacity 30 CMD)

• Industry will generate domestic effluent (121 CMD) for which they have provided sewage treatment plant. (Capacity 130 CMD)

• Regional officer Pune forwarded the case to HQ with recommendation to grant consent to 1st Operate upto 31/07/2014.

• C to E obtained for Rs. 500/- Crs. Now shown 319.48/- Crs We may grant consent to 1st Operate upto 30/06/2014 with Operational BG of Rs. 5/- Lakhs towards O & M of Pollution control systems

• Rs.638960/- We may place the consent application before CAC for further consideration.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 05

Name of the Industry: M/s. EMCO Energy Ltd. (Phase-I & Phase-II), MIDC Warora, Tal: Warora, Dist: Chandrapur.

1. Applied for renewal of consent for Phase-I ( 1x300 MW) & first consent to operate for Phase-II ( 1 x 300 MW) & their amalgamation.

2. Earlier Consent for Phase-I (800 MW) is valid up to 31.08.2013 and for Phase-II (300 MW) consent to Establish obtained.

3. Total Capital Investment of the industry is Rs.3480 Crores (Phase-I & Phase-II).

The unit has submitted present status report dated 29.06.2013 of the unit stating that Silo is

completed, pneumatic fly ash disposal system, other APC completed.

In view of above, we may grant 1st Consent to Operate for unit No. Phase-II along with

amalgamation to the existing consent with operational Bank Guarantee of Rs. 5/- Lakhs.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 06

Name of the Industry : ITC Limited, Plot No. B-27, MIDC Ranjangaon, Tal:- Shirur.

1. Applied for the C to 1st O for expansion (part of C to E) with amalgamation to the existing

consent to operate. 2. Previous consent details are as follows;

a) Consent to Establish obtained dt. 07.04.2006. b) Consent to Operate obtained dt. 16.12.2011 for Part – (Part –I) c) Consent to Establish for expansion Dt. 22.02.2013 d) Now Applied for the amalgamated quantities for the consents at Sr. No. b & c.

3. Located in MIDC Ranjangaon and is about 8 Kms from river Ghod (A-II Class), therefore satisfies the river distance criteria.

4. Industrial effluent generation will be 99 CMD and domestic effluent is 77 CMD. 5. Industry requested to incorporate the RO reject total 60 CMD (Domestic -3.0 CMD and Industrial

57 CMD) in consent, which is not included in the effluent quantity, as the TDS of RO reject ranges between 1000 -2000 ppm and discharged directly into final collection tank.

6. Provided adequate capacity of the ETP and STP. 7. JVS analysis results of existing unit dt.11.03.2013 is submitted which are marginally exceeding

w.r.t BOD and COD. 8. APC’s are provided to D.G set and Boiler. 9. Recommended to grant 1st Consent to Operate to part products of C to E with amalgamation of

existing consent to operate up to 31.10.2012 (as per sectoral approach with additional fees) with condition of BG of Rs.5.0 Lakhs towards O & M of PCS and allowing 60 CMD of RO reject of drinking water treatment plant to be mixed with treated industrial effluent to act as diluent to be used on land within premises for plantation gardening

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 07 Name of the Industry: M/s. Topworth Urja & Metals Ltd., Mouza –Ukkerwahi, Vill: Heti, Umred Road,

Tal: Umred, Dist: Nagpur.

1. Applied for first consent to Operate for Rolling Mills. 2. Total C.I. Rs.325.70 Crores. (CI of existing unit is Rs.278.65 Crores and CI of Rolling Mill is

Rs.47.05 Crores)

The application for only Rolling Mill. The unit has obtained E.C. from GoM for setting up of

70 MW P.P. & Rolling Mill. The unit has installed gasifier/30 Mtr. Tall Chimney. Recommended by

SRO.

We may grant Consent to Operate to rolling Mill amalgamating with existing consent for

period up to 31.05.2014 with operational Bank Guarantee of Rs.5/- Lakhs towards O & M of

pollution control system.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 08 Name of Industry:- M/s. JSW Steel Ltd., Vill:- Vasind, Tal:- Shahapur, Thane. .

Applied for consent to operate for expansion. Obtained consent to Establish for same. Will be manufacturing Colour coated Coils/Profile Sheets:- 18750 MT/M. The existing consent is valid upto 31/12/2013. The CI for expansion is Rs. 121 crores, which was Rs. 90 crores during obtaining consent to establish, now the increase is of Rs. 31 crores. Existing CI is Rs.779.4 crores. The unit is located in A-I zone of Bhatsa river. The industrial effluent quantity will be generated is 110 CMD and existing is 105 CMD, the total will be 215 CMD. The existing treatment plant is upgraded by constructing additional tank for neutralisation, aeration & storage, now the treatment plant is of 250 CMD capacity. Treated effluent is used in acid recovery plant & in pickling section. The emissions from painting section will be incinerated using Regeneration thermal oxidation and heat will be connected to the waste heat recovery boiler. Industry have submitted the no increase in pollution certificate from IIT Bombay. The JVS results of treated effluent from ETP, STP are within limit. The JVS results of stack air monitoring are also within limit. Submitted Environment statement for year 2011-2012. Submitted cess returns upto March-2013. SRO & RO recommended that the decision of grant of consent to operate may be taken at higher level. Industry vide letter dated 7/6/2013 requsted the change in name of industry from M/s. JSW Steel Ltd. To M/s. JSW Steel Coated Products Ltd., the Hiigh Court order in this regard is submitted by industry. We may place the case before CAC for further discussions. Submitted for further orders please.

We may grant consent to operate with amalgamation to the existing consent with operational BG of Rs. 10/- lacs and also consider change of name.

We may place the case before CAC for further discussions.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 09 Name of the Industry: M/s. JSW Steel Ltd., Plot No. B-6, MIDC Tarapur, Navapur Road, Boisar, Tal. Palghar, Dist. Thane

• Industry has applied consent to operate for expansion with amalgamation

• Details regarding sewage treatment plant & sewage treated effluent disposal not submitted

along with application form.

• Completion work of water pollution control system to achieve 100 % recycling as per consent condition not submitted

• Details regarding B.G. of Rs. 10 Lacs as per existing unit consent dtd. 07/06/2012 not

submitted.

• Letter issued to RO/SRO office for requisite information & present status report. In view of above we may kept case in abeyance till satisfactory reply from RO/SRO

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 10 Name of the Industry : M/s. Brintons Carpets Asia Pvt. Ltd. (Urawade),

Gat No. 414/415/416, Vill. - Urawade,

Tal. Mulshi, Dist. Pune.

1. Applied for the 1st C to O for the expansion along with amalgamation to the existing consent. 2. Application received at HQ on dtd.10.05.2013. 3. Industry has obtained C to E for expansion for the weaving of Carpet 30000 Sq. Mtrs./M and

briquette fired Boiler on dtd.13.02.2013. 4. Total I.E is 152.0 CMD and D.E is 54.0 CMD. 5. For I.E. ETP is provided with tertiary treatment and for D.E. 3 Nos of package type STPs is

provided. 6. JVS analysis results dt.15.02.2013 are well within limits and JVS dtd. 30.03.2013 and

12.04.2013 are awaited. 7. Treated effluent is used for gardening on 11.9 Acres of land, which seems to be adequate. 8. Existing two boilers – fuel furnace oil- stack of height 37 mtrs is provided. 9. One Briquette fired boiler – provided dust collector as an APC system. 10. It is recommended for grant of 1st C to O along with amalgamation of existing consent upto

31.12.2013 (upto existing consent period for co-terminus validity and subsequently we shall go for sectorial approach i.e 1st Jan validity) and BG of Rs.5.0 lakhs for O & M of PCS with overriding effect for existing consent OR separate 1st C to O till Jan 2014 as agreed. Submitted to CAC for consideration and further orders.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 11 Name of the Industry : M/s. Tessitura Monti India (P) Ltd.,

Gat No. 147, Village – Tamgaon, Tal - Karveer, Dist - Kolhapur.

• Applied for 1st C to O expansion of cotton yarn and caustic recovery with amalgamation of existing C to R.

• Previous consent for renewal was valid up to 31.12.2012. & C to E was issued dt. 10.01.2012.

• Industry is engaged in shirting fabrics, textile processing yarn dying process activity and 6 MW Co-gen plant.

• CI of existing plant was Rs. 227.34 and CI of expansion is Rs. 12.62 Cr. • Total CI of industry is Rs. 232.17 Cr. as per gross block 2012 submitted by industry.

Difference in CI is 7.79Cr. • Water consumption - 2596 CMD, IE - 1927 CMD, DE - 80 CMD. • Provided ETP comprising of Primary, secondary, tertiary followed by chlorination capacity

1700 CMD and new ETP with 1500 CMD is commissioned. • Treated effluent will be disposed on 78 acre + 20 acre private land of farmer. • JVS results are within limit after June 2012. • Septic tank and soak pit is provided for treatment of DE. • Provide bag filter to boiler, engine & DG set while dust collector to singing machine and

stenter as an APC. • Submitted environmental statement for 2011-2012. • Paid cess up to may 2012 and submitted up to Oct 2012. • BG of Rs. 10 lakhs, the Board has forfeited BG of Rs. 1 + 4 lakhs towards exceeding JVS

results. • RO has recommended renewal with amalgamation up to 31.12.2013. • As per sectoral this industry falls in month of January, We may grant renewal of consent

with 1st operate up to 31.01.2014 after obtaining requisite fees from the industry. • Considering compliance of C to E, it is recommended to grant 1st C to O with amalgamating

existing consent valid up to 31.12.2012 (existing validity) OR till 31.01.2014 by calling additional fees as per sectoral approach, with additional condition as to set up RO plant with MEE to make zero discharge plant and STP considering sewage quantity of 80 CMD within 1 year, with BG of Rs. 5 lakhs for O and M and PCS and Rs. 2.5 Lakhs for providing STP and Rs. 2.5 lakhs for providing RO + MEE if agreed.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 12 Name of Industry : M/s. B G Chitale Pvt. Ltd.

A/p. Bhilwadi, Station, Tal – Palus Dist - Sangali.

• Industry has applied for consent to operate with consent to 1st operate RED /MSI

category. • Previous consent for processing of Milk and various milk products was valid up to

30.06.2011. • Consent to establish for expansion was issued dt. 12.08.2011. • Earlier industry has applied for C to O with expansion up to 30.09.2012 in 2011 but

consent was not granted. • CI of the industry is increased from 84.12 Cr. • Water consumption - 2300 CMD, IE – 1800 CMD, DE - 80 CMD • Industry provided ETP comprising Primary, Secondary and Tertiary treatment. • Treated effluent is used on land for gardening. Land available for disposal on 91 acrea.

Seems to be sufficient for effluent generated. • Provided sooth arrestor, multicyclone type Dust Collector, and • JVS results dt. 26.04.12, 20.07.12 & 13.08.12 are within limits. • Industry has paid fees of Rs. 1,43,850/- for consent to operate. • Industry has submitted Environmental Statement for year • Industry has paid cess up to 31.12.2011. • SRO Sangli has recommended to grant consent to operate up to 30.09.2013 • Industry has paid additional fees Rs. 1,25,000/- • RO, Kolhapur has recommended to grant consent to operate up to 30.09.2014 after

receipt of additional fees. • As per sectoral this industry falls in month of April, We may grant renewal of consent up

to 30.04.2014 or we may grant consent up to 30.04.2015 after obtaining fees for 7 months from industry if approved.

• Considering compliance as reported above, it is recommended to grant renewal with 1st C to O up to 30.04.2014 (with balance fees of 5 months) and BG of Rs. 5 Lakhs towards O and M of PCS. And fresh / additional condition for providing STP (as DE is 80 CMD) in one year with BG of Rs. 5 Lakhs.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

RENEWAL RESUBMISSION

CAC Item No. 01 Name of the Industry:- M/s. Sandvik Asia PrivIte Limited., Mumbai-Pune Road, Dapodi, Pune 412 220

• Applied renewal of consent

• Application received at SRO- PC on dtd 19/01/2013 and at HQ on 28/02/2013.

• Industry located @ 0.1 KM away from river Pawana (A-IV Class) attract RRZ

• Industrial effluent is 70.0 CMD & Domestic effluent is 180.0 CMD for which they have provided combine ETP & STP.

• Analysis results of JVS dated 30/03/2012,20/04/2012 are within the prescribed consent limits (copy enclosed).

• APC’s are provided to DG Set, process stack & paint booth section

• RO Pune has forwarded the case to HQ for Decision regarding grant of renewal of consent to operate with enhancement in C.I.

• SCN issued. Industry replied SCN vide dated 29/06/2013. CI increased due to construction of new building, change in technology, Plant & machinery etc. Also installed water curtails to paint booth. Industry requested for grant of consent for 5 years.

• We may grant renewal upto 31/03/2015 subject to install full fledged APC to paint booth within 4 months with BG of Rs. 2/- Lakhs, submission oc company board resolution as they have increased CI by approxi. 466 Crs. Without permission of MPCB with BG of Rs. 2/- Lakhs, Operational BG of Rs. 10/- Lakhs towards O & M of pollution control system.

• We may place the consent application before CAC for further consideration.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 02

Name of the industry :- M/s. Walchandnagar Industries Ltd. Walchandnagar,Tal-Indapur,

Dist. Pune 413 114

• Applied for renewal of consent with expansion

• Application received at SRO- Pune on dtd 09/08/2012 and at HQ on 02/04/2013

• Previous consent was valid up to 31/07/2011 in GREEN category.

• Generation industrial effluent such as coolent (Quantity not mentioned). SRO Pune -I reported that at present coolent is being discharged without treatment with domestic effluent.

• SRO reported that as per the consent, water consumption for domestic purpose is 2800 CMD and effluent generation is 454 CMD whereas actual water consumption for domestic purpose is an average 5728 CMD as per irrigation bill for the month of Nov. to Feb. 2012.

• Industry has near about 60-70 acres of land available for gardening purpose.

• For domestic effluent industry has provided following treatment facility at 06 locations.

• JVS result of on 30/10/2012 submitted in which one location parameter of BOD (140) COD (288) is exceeded the consented standards

• Industry has 02 nos.LDO fired furnace followed by 14 mtrs. Chimney.

• Industry has carried out shot blasting activity in temporary shed without any air pollution control system.

• RO Pune recommended for grant for renewal of consent after obtaining undertaking along with time bound programme form the industry to provide full-fledged STP for treatment of domestic sewerage generated from the industry.

• SCN issued. Industry replied SCN vide dated 29/06/2013. We may grant consent for enhance capacity for period upto 31/07/2014 with operational BG of Rs. 5/- Lakhs with company Board resolution with BG of Rs. 2/- Lakhs & subject to payment of consent fees.

• We may place the consent application before CAC for further consideration.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 03

Name of the industry: - M/s. Varroc Polymers Pvt. Ltd. (VPPL-II).

E-88, MIDC Ranjangaon, Tal-Shirur,

Dist-Pune.412 220

• Applied for renewal of consent with expansion

• Application received at SRO- Pune II on dtd 07/06/2012 and at HQ on 13/02/2013

• Previously consent was valid up to 31/05/2012

• Generation of Industrial effluent is 2.5 CMD & domestic effluent 61 CMD for which they have provided combine ETP & STP (Capacity of 70.0 CMD).

• APCS is provided to DG Set. Industry has shown the paint booth in application form, but as per visit report & their request letter they have stopped the painting activity.

• SRO Pune –II reported that, industry has already carried out expansion of the unit and started production without Boards consent to establish.

• Regional officer Pune has forwarded the case for Decision regarding grant of consent may be taken at HQ level as the industry has done expansion without obtaining consent to establish from the Board.

• SCN issued on 18/06/2013 as per decision of CAC. Industry replied SCN vide dated 28/06/2013 stating that they have not yet started production.

• We may grant renewal upto 31/05/2014 with Expansion with Operational BG of Rs. 5/- Lakhs.

• We may place the consent application before CC for further consideration.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 04

Name of the Industry:- M/s. JBM MA AUTOMOTIVE PVT.LTD.,

C - 1 (Part) MIDC Chakan Talegaon Road

Tal - Khed Dist – Pune 410 501

• Applied renewal of consent with expansion

• Application received at SRO- Pune on dtd 07/01/2013 and at HQ on 14/03/2013.

• Previous consent was valid up to 30/04/2012 in GREEN Category

• Now as per the revised CPCB guidelines sheet metal components with fabrication is under red category.

• Industry located @ 3.0 KM away from River Indrayani (A-II Class) Satisfy the distance criteria

• Industrial effluent generation is NIL

• For 40 CMD domestic effluent industry has provided septic tank & soak pit STP & industry has started work of STP and it will be completed up to April end

• RO Pune recommended the case for grant of Renewal of consent with expansion by obtaining BG for providing STP in time bound manner.

• SCN issued as per CAC decision on 18/06/2013. Industry replied on 28/06/2013 and now STP is commissioned.

• We may grant renewal with Expansion with Operational BG of Rs. 5/- Lakhs and Company Board Resolution as they have done expansion without permission from Board &* BG of Rs. 2/- Lakhs for same along with additional consent fees.

• We may place the consent application before CAC for further consideration.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 05

Name of the Industry :- M/s. ISMT Ltd (Steel Plant),

Jejuri-Morgaon Road, P.O.- Jejuri,

Dist- Pune 412 303

• Applied for renewal of consent

• Application received at SRO- Puneon dtd 11/12/2012 and at HQ on 28/01/2013

• Previous consent was valid up to 31/12/2012

• Industry has obtained consent to establish for up-gradation at Air Pollution Control systems

• Industrial effluent is 15 CMD for which industry has provided physico-chemical Effluent Treatment Plant.

• Domestic effluent is 60 CMD for which STP provided.

• SRO Pune-I reported that secondary APC system is installed which is in operation.

• As earlier consent condition Industry has not yet submitted the Bank Guarantee.

• Regional officer Pune Recommended for grant of consent to operate with amalgamation for period upto 31.12.2013, subject to submission of Bank Guarantees.

• Industry replied SCN. The work of CAAQ/Stack within consented standard will be taken up before 15/07/2013 & unit requested for exemption of BG. We may not consider the request of unit for exemption of BG & get the status report from RO/SRO on the APC

• We may place the consent application before CAC for further consideration.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 06 Name of the industry: - M/s. Virgo Engineers,

Plot No. 278, Raisoni Park, Tal:- Mulshi, Dist:- Pune 411057

• Applied for renewal of consent with expansion.

• Application received at SRO-Pune-I on dtd 22/02/2013 and at HQ on 18/04/2013.

• Previous consent was valid up to 30/09/2011

• Indl. Effluent quantity 4.5 CMD for which they have provided effluent treatment plant of 5.0 CMD capacity and Dom. Effluent 41.0 CMD provided sewage treatment plant of 55 CMD capacity.

• Industry has provided APCs to paint booth, shot blasting unit and DG sets.

• Regional officer Pune recommended for grant of renewal of consent with expansion subject to submission of reply to queries raised by SRO.

• Unit & SRO-II replied SCN. The increase in CI is due to modernization/replacement of machineries to achieve better quality. They have upgraded ETP and also submitted reply to queries raised by SRO. We may grant renewal with expansion for period upto 30/09/2014 with BG of Rs. 5/- Lakhs towards O & M & submission of company Board Resolution as unit has done expansion without permission of Board..

• We may place the consent application before CAC for further consideration.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 07 Name of the industry: - M/s. Haier Appliances (India) Pvt. Ltd. B-3, Ranjangaon growth center, MIDC,

RanjangaonTal. Shirur, Dist. , Dist Pune. 412 208

• Applied for renewal of consent with expansion.

• Application received at SRO-Pune-II on dtd 27/02/2013 and at HQ on 07/05/2013.

• Previous consent was valid up to 28/02/2013

• Earlier C. I. of industry 70. 52crs now it is 96.21 cr (Increase Rs. 25.69 Crs )

• Industrial effluent is 58.0 CMD for which ETP of 60 CMD capacity is provided which comprises of collection tank, equalization tank, Oil and Grease trap, dosing tank, primary settling tank, neutralization tank, Intermediate tank, PSF, ACF, SDB, treated water tank.

• Domestic effluent is 52 CMD for which they have provided septic tank and soak pit. Industry has proposed to install STP of capacity 75.0 CMD for treatment of Domestic Effluent. Proposal regarding installation of STP is submitted by industry (copy enclosed) and further reported that work of STP will be completed by end of May-2013.

• Dry type paint booth with filter is provided. Phosphating is carried out with diluted acid and provided with fume extraction system. For paint oven adequate height of stack is provided.

• Industry has carried out expansion without obtaining consent to establish from the Board Thus RO Pune has forwarded the case for the decision taken at higher level.

• As per inspection report dated 28/06/2013 & report submitted by SRO Pune-II, they have carried out expansion, but present production level is below the present consented limit. Work of STP is under progress and likely to complete by July 2013. Unit is disposing Haz. Waste to CHWTSDF. We may keep the renewal of Expansion in abeyance till the completion of STP.

• We may place the consent application before CAC for further consideration.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 08

Name of the Industry : M/s. Crompton Greaves Ltd, Survey no.1005, 1007-9, 1011, 1013,1014,1017,1019 Kanjurmarg East, Mumbai-400042.

1. Application for grant of renewal of consent to operate submitted by industry on 21.12.2012.

2. Application received at H.Q. on 09.04.2013.

3. Industry has submitted Environmental statement for the period 2011-2012.

4. RO- Mumbai has recommended case for grant of consent to operate subject to verification of

no increase in production quantity.

5. This case was discussed in the CAC meeting held on 31.05.2013.In this meeting it was

decided to issue SCN for refusal of consent as STP is not provided ,there is increase in

production qty but non submission of no increase in production qty and expansion is

prohibited in MMR-I area.

6. SCN was issued to industry on 18.06.2013.Industry has submitted reply on 28.06.2013 stating

that Domestic effluent /sewage arising from workers washing activities. They have provided

preliminary treatment facility[Screening ,settling and anaerobic septic tank].BOD and SS

parameters achieved within consented limits and overflow is connected to sewer system of

MCGM. Industry has proposed to install STP up to March, 2014.Industry has requested to

grant consent for only existing consented production quantity.

7. Recommended to grant consent to operate up to 31.05.2016 subject to industry shall submit

the BG of Rs.5 Lakhs towards installation of STP up to 31.03.2014 and industry shall not

undertake additional production without permission from the Board.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 09 Name of the Industry: Thyssenkrupp Electric Steel India Pvt Ltd. A/p –Gonde, Vill: Wadivarhe, Tal: Igatpuri, Dist: Nashik.

1. Applied for grant of renewal of Consent to Operate on 24.12.2012.

2. Application grant of renewal of Consent to operate at H.Q. on 28.01.2013.

3. Paid Consent fee of Rs.48, 66,310/-.

4. Water Cess paid up to Sept-2012.

5. Environment Statement for the year 2011-2012 submitted.

6. SRO/RO Nashik recommended for grant of renewal of Consent to Operate up to 28.02.2018.

7. This case was discussed in the CAC meeting held on 19.03.2013 and it was decided to keep

case in abeyance and put up in next CAC with verification of C.I.

8. Industry has submitted justification vide letter dated 05.04.2013.Copy of letter is enclosed.

9. This case was again discussed in the CAC meeting held on 31.05.2013 and it was decided to

revert to CAC with compliance of PD issued to the industry on 02.04.2012.

10. RO Nashik has submitted compliance report on 29.06.2013 in respect of proposed directions

issued. The directions were issued to the industry on 02.04.2012 due to an accident occurred

at cold rolling no.2 in the industry 30.03.2012. Also industry was directed not to start operation

of that particular section where accident occurred till prior to inspection and certification of

DISH. Industry has informed on 6.4.2012 that Dy. Director, Health and Safety visited industry

on 31.03.2012 and conducted the inspection of the said unit and manufacturing activities of the

said unit started thereafter.

Recommended grant of renewal of consent to operate up to 28.02.2018

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 10 Name of the Industry : M/s. Bombay Rayon Fashion Ltd. C/o. Islampur Integrated Textile Park Pvt. Ltd. Vill- Peth Naka, Islampur, Tq- Walwa, Dist- Sangli.

• Industry has applied for 1st Consent to Operate. It is RED/LSI unit. • Total capital investment is 171.53 Cr. as per CA certificate submitted by industry. • The proposed site is located in M/s. Islampur Integrated Textile Park (IITP), Gut. No.

905/A4, 905/A5, 924, 926, 944/2, 946/2, 949/2. A/p. Peth, Tq- Walwa, Dist- Sangli – 415407.

• M/s. Islampur Integrated Textile Park has obtained consent to establish for infrastructure project.

• Industry has proposed to manufacture of Gray Fabric - 300 T/M, Yarn waste (By Product) - 12.5 T/M.

• The industry has started trail run of the weaving machinery since December 2011 for training of workers.

• As per C to E granted by board, total consented effluent were 166 CMD (Industrial -106 CMD + Domestic 60 CMD), however now industry has curtailed generation of total effluent to (Industrial 22 CMD + 42 CMD = 64 CMD)

• Industry will be generating of 42 CMD domestic effluents at full capacity utilization which will be treated in ETP comprising of following units as Equalization tank, pH Correction tank, Bar Screen, O & G Trap, Flocculation, Settling Clarifier, UASB Reactor.

• Industry is generating 22 CMD Industrial Effluent from sizing, Boiler Blow Down and Humidification Activity which will be treated by ETP comprising the unit as Equalization tank, Bar screen, O&G Trap, pH Correction tank, Ozone contact tank, Flocculation, Settling Clarifier etc.

• Industry has provided mechanical type Dust Collector to Boiler having stalk height of 30 m. • Industry has paid requisite consent fees Rs 3,43,060/- • SRO Sangali has recommended for consent to operate up to 31.07.2013. • Considering modification made by industry and provided ETP and STP with network for

disposal of treated effluent partly for toilet flushing and remaining on land for plantation for this reduced quantity of effluent and water consumption as (DE- 22 CMD & DE – 42 CMD as per mail dt. 03.07.2013) it is recommended to reconsider and review CAC decision dt. 26.09.2012 to keep case in abeyance till completion of CETP and to grant 1st C to O with reduced IE and DE for disposal on land in company’s premises making zero discharge outside the premises till CETP is commissioned. Once CETP is commissioned Company shall discharge treated effluent to CETP if agreed. As per FO report dt. 11.01.2013 and 29.05.2013 industry has started partial production without C to O.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

FRESH AGENDA CAC Item No. 01 Name of the Industry:- M/s. Ghatge Patil Industries Ltd , S.No-362,A/365,A/4B,A/P-Uchgaon, Kolhapur. Applied for renewal of consent & consent to operate for expansion. Existing consent is valid upto 31/7/2013 and have obtained consent to Establish for Expansion. Obtained Environmental Clearance for the increased product quantities.

Provided ETP for indl. effluent, provided fume extraction system followed by cyclone dust collector, provided cassette type dust collector for sand plant, knock out section.

Provided scrubber to nickel plating section.

Submitted Environment statement for year 2011-2012. Cess paid upto May 2012 and submitted returns upto April 2013.

Submitted BG of Rs.5.0 lacs as per earlier consent condition.

SRO/RO recommended grant of consent upto 30/9/2014.

We may grant renewal with first operate for expansion for period upto 30/9/2014, with extension of BG of Rs. 5.0 lacs upto 31/1/2015.

We may place the case before CAC for further discussions.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 02

Name of the Industry: M/s. Sunflag Iron and Steel Co.Ltd., At: Eklari, Tal: Mohadi, Dist: Bhandara. 1. Board has granted conditional consent vide letter dated 18.10.2011 which is valid up to

31.07.2013.

2. R.O. Nagpur vide letter dated 01.12.212 received on 24.12.2012 has submitted the present

status report of the industry mentioning the non-compliances of consent conditions and

directions.

i) Heavy emission from DRI Plant.

ii) Emission in SMS plant.

iii) Discharge of effluent into local nalla.

iv) Scrubbing system at pickling plant not in operation.

v) ESP Field of DRI Plant-1 was out of order.

vi) Fugitive emission observed.

3. Analysis results of ambient air quality monitoring, Stack emission monitoring are exceeding the

standards.

In view of above , we may forfeit the Bank Guarantee of Rs. 15 lakhs towards non-

compliance of consent conditions and directions.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 03

Name of the Industry :- M/s. D-décor Exports, Plot No. G-7/1, MIDC Tarapur, Palghar Dist. Thane.

1)Applied for renewal of consent . Application submitted at SRO on 22.04.13 & at HQ on 22.06.13

2)Textile processing industry. IE 1844 CMD. Provided secondary & tert. treatment.

3.JVS results dtd 20.03.13 are slightly higher than consented parameters i.e SS 106 mg/ltrs, BOD 120 mg/Ltrs,COD 296 mg/Ltrs as compared to standards, how cever JVS results dtd 05.02.13 are within prescribed limits. Treated effluent is sent to CETP.

4.Multicyclone dust collector provided to Coal fired boiler as an APC system,.

5.Cess paid upto September 2012 & returns submitted upto 31.03.13.

6.SRO & RO recommended for renewal of Consent upto 31.05.16.

7.AS per sectorial approach consent validity to textile ind is upto Jan.

8) Recommended for renewal upto 31.01.16 with balance fees of 4 months & BG of Rs 5.0 lakhs for O & M of PCS ,Rs 5 lakhs for provision of Wet scrubber as an APC within six Months Period. Considering Tarapur MIDC area we may insist for upgrading ETP to at least recyle/reuse 50% of treated effluent by providing RO & MEEwith I year time with BG of rs 5.0 lakhs towards improvement in CETP functioning.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 04 Name of the Industry : M/s. Naval Dockyard , Lion Gate,

Shahid Bhagat Singh Road, Mumbai 23

Application received for grant of Renewal of Consent for Naval Warships/submarines Repair Activity(Defense Industrial Establishment) Application Received at SRO Mumbai on 11/3/2013 and at HQ on 31/05/2013.

Previous Consent was valid upto 31/12/2012.

Water Consumption-1500 CMD.

Industrial Effluent generation-20 CMD

Domestic effluent generation-1200 CMD.

SRO Reported that,Applicant has not provided STP and ETP.

Non Hazardous Waste generation is Nil.

Applicant is member of CHWTSDF,Mumbai Waste Mangement Ltd.,Taloja which is valid upto 31/3/2014.

Applicant has submitted

1)Environmetal Statement for the year 2011-2012.

2)Cess paid upto 31/12/2012.

There is no BG Condition mentioned in earlier consent granted by the Board.

RO Mumbai has submitted query letter to applicant for following non compliances:

1) Installation of ETP consisting primary ,secondary and tertiary treatment. 2) Since PP has not provided STP, ie untreated sewge is being discharged to MCGM Sewer

line/drain,as working strength of industry is 6-7 thousands alongwith floting population of 3-4 thusand indicate quantum of domestic waste water generation may be in the range of 7-8 thousand CMD.

3) PP has started construction of new dry dock in same premises without consent from Board. 4) RO has requested to PP to submit time bound programme for installation of ETP and STP.

Applicant has submitted reply of said letter dated 10/5/2013(Copy attached)

ROMumbai recommended C to Renewal subject to obtaining necessary BG for installation and operation of STP and ETP.

We may place the application in CAC for further decision.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 05 Name of Industry : M/s. Maharashtra State Power Generation Co. Ltd., Bhusawal Thermal Power Station (Unit 4 & 5), At. Deepnagar, Tal. Bhusawal, Dist. Jalgaon.

1. Application for grant of renewal of consent to operate submitted by industry on 11.10.2013.

2. Application received at H.Q. on 22.05.2013.

3. Regular complaints are received by nearby villagers regarding leakages of ash slurry carrying

pipeline to velhala bund due to that ash slurry effluent goes to Velhala Lake, nearby canal,

nearby farms, Bhogawati and Tapi river.

4. Analysis results of stack and ambient are exceeding the consented limits.

5. Unit authority has submitted BG as per the previous consent condition.

Recommended to issue SCN for refusal of renewal of consent to operate.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 06 Name of the Industry: M/s Ceat Ltd., Plot No. 82, MIDC, Satpur, Tal. & Dist. Nashik.

1. Industry had submitted application at SRO Office on 5/04/13 for grant of renewal of Consent to Operate.

2. Industry was granted Consent to Operate on 19/01/2012 for mfg. of Automotive Tyres-6,300 MT/M; Automotive Tubes-720 MT/M & Flaps-210 MT/M with the validity upto 31/05/2013.

3. R.O.(Nashik) had issued proposed directions to the industry on 16/06/12 for non-compliances observed and interim directions were issued on 15/09/12.

4. S.R.O.(Nashik) has reported about compliance of the conditions of the interim directions made by the industry to R.O.(Nashik) on 7/06/13.

5. Now, industry has applied for grant of renewal of Consent to Operate of existing unit with increased C.I. of 57 lakhs on account of modification of existing plant & machinery.

6. SRO has reported that as per CPCB’s direction regarding categorization, “Tyres and tube vulcanization/hot retreading” is covered in Orange category at Sr. No. O-72. But, “Synthetic Rubber excluding Moulding” is placed in Red Category at Sr. No. R-79. Hence, renewal of Consent to Operate may be granted under Red category due to higher pollution potential.

7. Industry has paid Consent to Operate fee for 2 years including fee towards CtE for increased C.I. of Rs. 57 Lakh as follows:

DD No. Amount dtd. drawn on

020172 12,39,200/- 26/03/2013 ICICI Bank

020171 5,000/- 26/03/2013 ICICI Bank

8. Renewal of Consent to Operate may be granted under Red category for 2 years by imposing condition to extend existing B.G. of Rs. 5.0 Lakh towards O&M of pollution control Systems after its expiry.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 07 Name of Industry: M/s Lupin Ltd., T-142, MIDC, S.Nos. 30/10 to 13 & 64/7, Tarapur, Tal. Palghar, Dist. Thane.

7. Industry had submitted application at SRO Office on 20/05/13 for grant of renewal of Consent to Operate for existing products, grant of Consent to 1st Operate for change in product mix with additional 8 Nos. of products & amalgamation of these two Consents.

8. Industry was granted Consent to Operate on 12/07/2012 for mfg. of 33 Nos. of Bulk Drug products with the total production quantity of 1,449.75 TPA and 2 Nos. of byproducts Trans Sertaline-182.5 TPA, Piperazine Diacetate-91.25 TPA with the validity upto 31/07/2013.

9. Industry has obtained Consent to Establish on 23/01/2013 for change in product mix with additional 8 Nos. of Bulk Drug products (total-41 Nos.) with additional C.I. of Rs. 55.0 Crs.

10. Industry has declared that additional C.I. of Rs. 61.36 Crs. for additional 8 Nos. of Bulk Drug products.

11. SRO/RO has recommended to to grant of renewal of Consent to Operate & Consent to 1st Operate with amalgamation.

12. Expansion of Bulk Drug acticity attracts E.C., industry has obtained E.C. on 16/11/2010 and amendment on 4/01/2011.

13. The solid waste Mycellium generated from the process needs to be treated as per the guidelines stipulated for it.

14. Industry has paid Consent to Operate fee (for 1 year) of Rs. 12,57,988/- vide DD No. 536080 dtd. 13/05/13 drawn on SBI as per Env. Dept.’s revised Consent fee G.R. dtd. 25/08/2011.

15. Renewal of Consent to Operate & Consent to 1st Operate may be granted with amalgamation by imposing following conditions-

(i) Instead of fresh water, the industry shall use 150 CMD of treated effluent for gardening purpose in addition to 400 CMD of treated effluent recycled into process thereby reducing net dischargable effluent to CETP from 745 CMD to 595 CMD.

(ii) provision of water meter system at ETP outlet alongwith lock & key arrangement,

(iii) strictly adhere to treated effluent discharge to CETP as per Consented quantity

of 595 m3/day,

(iv) recycle 400 m3/day of the treated effluent into process, 150 m3/day for gardening

and maintain the record in register,

(v) total production quantiity of 41 Nos. of Bulk Drug products shall not exceed

1,449.75 TPA and that of 2 Nos. of byproducts shall not exceed 273.75 TPA.

(vi) extend the validity of existing B.G. of Rs. 5.0 Lakh towards O&M of pollution

control systems.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 08 Name of the Industry: M/s Seya Industries Ltd., (Formerly known as M/s Sriman Organic Chemical Industries Ltd.),

Plot No. T-13/14, MIDC Tarapur, Tal. Boisar, Dist. Thane.

1. Industry had submitted application at SRO Office on 25/03/13 for grant of renewal of Consent to Operate with change in product mix.

2. Industry was granted Consent to Operate in the name of M/s Sriman Organic Chemical Industries Ltd. on 13/12/2011 for mfg. of 5 Nos. of main chemical products with the total production quantity of 1,580 MT/M and 4 Nos. of byproducts with the total quantity of 2,521 MT/M with the validity upto 31/03/2013.

3. Industry has obtained Consent to Establish for expansion in the name of M/s Seya Industries Ltd. on 30/01/13 for mfg. of 2 Nos. of main chemical products with the total production quantity of 514 MT/M and 3 Nos. of byproducts with the total quantity of 4,852.45 MT/M with the validity upto commissioning of the unit with the condition to not to take effective steps for expansion without obtaining EC, to achieve the Zero discharge from expansion activity and submission of B.G. of Rs. 5.0 Lakh.

4. Now, industry has undertaken expansion of its plant & machinery without obtaining E.C. from the Competent Authority and applied for grant of renewal of Consent to Operate of existing unit, Consent to 1st Operate for expansion and amalgamation of the two Consent claiming benefit of change in product mix for mfg. of 7 Nos. of main chemical products with the total production quantity of 2,094 MT/M and 7 Nos. of byproducts with the total quantity of 2,005.35 MT/M

5. Industry has submitted proforma of self assessment of “No increase in pollution load” and Certificate issued in this regard by BATU dtd. 2/05/13.

6. Existing industry was having valid Consent upto 31/03/2013. Also, having Consent to Establish for expansion with E.C. condition. However, E.C. is not obtained so far.

7. C.I. increased from Rs. 48.18 Cr. to Rs. 99.22 Cr. 8. As there is increase in production quantity further basis of calculations for calculating no

increase in pollution load doesn’t support, hence request of the project proponent to consider the case under product mix as per EIA Notification may not be considered.

9. SRO/RO recommended to take decision at higher level. 10. Industry has paid Consent to Operate fee for 5 years as follows:

DD No. Amount dtd. drawn on

051266 6,25,000/- 21/03/2013 HDFC Bank

11. We may consider the case for plain renewal of Consent and issuance of SCN for refusal for expansion with B.G. of Rs. 5.0 Lakh each towards towards O&M of pollution control systems and for not taking effective steps towards expansion.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 09

Name of Industry:- M/s. Kirloskar Brothers Ltd., Vill:- Kirloskarwadi, Tal:- Palus, Sangli.

Applied for modification in existing plant & machineries without any change in the existing products and its quantities.

The CI for modification is Rs. 3.12 crores.

Modification carried out paint booth, Grit Blasting chamber, ACS riser cutting machine fume extraction system, installation of DG set etc.

The modification are already carried out, for this non compliance RO Kolhapur had issued SCN to said industry, industry have submitted the reply and accordingly applied for consent.

There is no additional requirement of any water consumption and no generation of additional indl or domestic effluent.

Have provided ETP for existing indl effluent.

The BG of Rs. 10.0 lacs is valid upto 30/11/2013, which was obtained for compliance of consent conditions.

SRO recommended grant of consent for modification & amendment in original consent.

We may consider Modification, amalgamation to existing consent with extension of existing BG upto 30/4/2014 & company Board resolution as done modification without consent.

We may place the case before CAC for further discussions.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 10 Name of the Industry : M/s. Ascent Hotels Pvt. Ltd., Hyatt Regency Pune,

32/1 A and B, Weikfield IT Park, Wadgaonsheri, Pune Nagar Road, Tal-Haveli, Dist-Pune.

1. Applicant has applied for renewal of consent for Hotel. Commercial & Recreation activity.

2. Earlier consent is valid upto 31.03.2013.

3. PP obtained EC & Cto O for total plot area 15224.0 and total Builtup area 27403.21.

4. Industrial effluent generated from Laundry activity is 7.4CMD For which PP has provided 10

CMD capacity ETP.

5. Total water consumption is 348.15 CMD & effluent generated is 189.0 for which PP has

provided 200CMD capacity STP.

6. PP has provided APC for DG set.

7. Total solid waste generated about 400Kg/D

8. Bio-degradable waste treated composting. Non biodegradable is disposed at MSW site.

9. PP has submitted cess return upto December 2012.

10. Previous the cost of the project was 332.49 Cr. Now the project cost is Rs.347.94 cr. for

which they have paid rs 14,22,760 for C2E & O.

11. RO Pune has recommended the case for grant of renewal of consent to operate with

enhancement in C.I. for period upto 31.03.2017

Consent may be grant for period upto 31.05.2015 after paying the difference fees of 2 month i.e. Rs 1,15,980. This is submitted for placing the case before CAC for further decision.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 11 Name of Industry:- M/s. JSW Energy Ltd. At:- Nandivade, Post:- Jaigad, Tal & Dist:- Ratnagiri Applied for renewal of consent. Coal based Thermal Power Plant of 1200 MW capacity, (4 units of 300 MW each). CI is Rs 5387. 27 crores. The existing CI was Rs. 4698.00 crore., the increase in CI is of Rs. 689.27 crores.

The waste water from DM plant, boiler blow down, service water is reused back in the cooling tower water alongwith sea water. The cooling water is discharged into sea after proper cooling, have provided online temperature monitoring system.

For domestic effluent have provided septic tank & Reed Bed technology. JVS results are within limit.

Provided 4 no. of ESP to Boiler with Ammonia injection syatem for control of particulate matter emission.

As per direction of EC have provided 4 no of FGD and are in operation now. Provided online stack monitoring system & is connected to MPCB server.

Also installed 3 no. of CAAQM system. JVS results are within limit.

For flyash handling provided dry handling system with enclosed conveyor with silos.

Submitted cess returns upto April 2013 and paid upto Sept-2012.

BG of Rs. 52.27 crores is valid upto 29/6/2013, which was against provision of FGD which industry have complied.

There are complaints from villagers regarding the contamination of well water in the viscinity, accordingly RO issued SCN to industry, industry have submitted reply stating that they have appointed expert Geological team of Pune University & work is in progress.

JVS results are within limit.

SRO/ Ro recommended grant of renewal of consent.

We may grant the renewal of consent upto 30/6/2015 with operation BG of Rs. 5.0 lacs against each FGD and another BG of Rs.5.0 lacs towards o&m of other pollution control system.

We may place the case before CAC for further discussions.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

CAC Item No. 12

Name of the Industry: M/s. Grace Industries Ltd.,

A-23, MIDC Tadali Growth Center, Chandrapur.

Applied for 1st consent to operate for 25 MW Power Plant.

1. Obtained Consent to Establish dated 18.11.2006.

2. The issue of environment clearance is under consideration with SEIAA, Govt. of Maharashtra

3. The case was discussed in CAC meeting held on 12.03.2013 and it was decided to keep the

case in abeyance and put up in next CAC with clarification of Environmental Clearance.

4. In view of Established Unit without Environmental Clearance and Board has already refused

the expansion project of power plant from 25 MW to 33 MW. Hence, we may issue stop work

notice to the plant due to construction without E.C./Consent to Operate.

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

REVIEW ITEM NO. 01

Name of the Industry: M/s. JSW Ispat Steel Ltd [Captive Jetty]. Geetapuram, Dolvi, Tal: Pen, Dist: Raigad.

1. In the CAC meeting held on 31.01.2013, Board has granted consent to operate

for captive jetty up to 31.08.2016. with the condition that industry shall submit

operational B.G. of Rs.10 Lakhs

2. Industry has submitted BG of Rs.10 Lakhs.

3. Now, M/s JSW Ispat Steel Ltd vide letter dated 08.05.2013 requested to allow raw

material handling of M/s Amba River Coke Ltd and M/s JSW Cement Ltd at the

above jetty.

4. M/s JSW Ispat Steel Ltd and M/s Amba River Coke Ltd have entered into the

agreement that whole product of M/s Amba River Coke Ltd will be brought by M/s

JSW Ispat Steel Ltd for their proposed expansion requirements. Also, M/s JSW

Cement will import clinker transported through jetty for production of cement. Both

of these companies will perform activities that are integral of the business of M/s

JSW Ispat Steel L

5. td, which otherwise would have required to be performed by JSW Ispat on its

own.

Hence we may amend consent to operate of the jetty and permit the captive

jetty of M/s JSW Ispat Ltd for material handling of M/s Amba River Coke Ltd and

M/s JSW Cement Ltd without any change in material handling qty mentioned in

the consent [Captive jetty] .

Submitted for taking further decision in the matter in the CAC

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

REVIEW ITEM NO. 02

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13 

 

MAHARASHTRA  POLLUTION  CONTROL  BOARD 

Web agenda of CAC Meeting dated 12/07/13