list of projects and accomplishmentsearmm.wci.com.ph/database_august_2018/all projects.pdfw/...

97
Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/Unit Target Length of Road Length of Paved Appropriation (M) Implemented by: Mode of Procurement Physical Accomp. Remarks 2012 Basilan Al-Barka Road 1. Concreting of Al-Barka Road (Tipo-Tipo Proper-Limbo Kassah-Magkawa-Kuhon Lenno 1.88 1.88 1.88 34.80 LGU Tipo Tipo By Contract 100.00% Completed 2012 Basilan Lamitan City Port 2. Expansion of Lamitan Port 1-unit 0.00 40.00 LGU Lamitan By MOA 100.00% Completed 2012 Basilan Lamitan City Road 1. Road Upgrading (Gravel to Paved) Lamitan-Tuburan Road (Km.36+690 - Km.37+690) 1.00 1.00 1.00 23.00 Basilan C & J Construction By Contract 100.00% Completed 2012 Basilan Lamitan City Road A. Concreting of Road from Sumisip Junction National Road to Buli Buli Port 3.06 3.06 3.06 56.67 BSP & Company Inc/M. Abubakar Const. and Engg (JV) By Contract 100.00% Completed 2012 Basilan Lamitan City Road 3. Concreting of Limook-Balobo-Bulingan-Look Road 0.27 0.27 0.27 5.00 LGU Lamitan By MOA 100.00% Completed 2012 Basilan Lantawan Road 1. Construction of 2.00 Km. Provincial Road from Basilan Circumferential Road Km.18 - Lantawan Proper-Baungis- Tairan-Pangasaan, Lantawan 2.00 2.00 2.00 32.00 Basilan DEO By Admin 100.00% Completed 2012 Basilan Lantawan Road 4. Construction of Isabela Bdry.-Lantawan Road 1.08 1.08 1.08 20.00 PGO Basilan By MOA 100.00% Completed 2012 Basilan Sumisip Bridge a. Bridge Construction: a.Construction of Bacung Bridge, Bacung, Sumisip (Km.67+986) 1 Unit 0.00 94.00 ESR Construction and Supplies By Contract 100.00% Completed 2012 Basilan Sumisip Bridge b.Construction of Limbo Candis Bridge, Sumisip (Km.76+950) 1 Unit 0.00 ESR Construction and Supplies By Contract 2012 Basilan Sumisip Bridge c.Construction of Giong Bridge, Sumisip (Km.70+953) 1 Unit 0.00 ESR Construction and Supplies By Contract 2012 Basilan Sumisip Port B. Construction of Buli-Buli Port, Sumisip 1-Unit 0.00 20.00 ASAP GENERAL Trading Construction By Contract 100.00% 2012 Basilan Sumisip Road A. Concreting of 1.20 Km. circumferential Road from Bitayan- Basak, Sumisip Phase I 1.20 1.20 1.20 20.00 ASAP GENERAL Trading Construction By Contract 100.00% Completed 2012 Lanao del Sur I Ditsaan-Ramain Bridge Construction of Dilausan-Polo Bridge, Ditsaan-Ramain 1-unit 0.00 13.00 Lanao del Sur-1 DEO By Admin 100.00% Completed 2012 Lanao del Sur I Taraka Road Const./Conc. Of Dilabayan-Ririk Road, Taraka 1.25 1.25 1.25 13.00 LGU-Taraka By MOA 100.00% Completed 2012 Lanao del Sur I Wao Road Molundo-Wao Road Bukidnon Bdry.-North Cotabato Bdry. Km 1619+970-Km 1621+890 2.158 2.16 2.16 49.63 LGU-Provincial Gov't of Lanao del Sur By MOA 100.00% Completed 2012 Lanao del Sur II Picong Road Repair of Cotabato-Lanao Norte Road,Biosong, Picong Section km 1957+900 – km 1958+400 0.500 0.50 0.50 12.00 Lanao del Sur-2 DEO By Admin 100.00% Completed 2012 Lanao del Sur II Balindong Road Conc. Of Highway-Dibarosan Bualan Road,Balindong 0.50 0.50 0.50 5.00 Lanao del Sur-2 DEO By Admin 100.00% Completed 2012 Lanao del Sur II Bayang Road Concreting of Sultan Pandapatan-Parao Road,Bayang 0.55 0.55 0.55 5.50 Lanao del Sur-2 DEO By Admin 100.00% Completed 2012 Lanao del Sur II Butig Road Conc. Of Lumbayanague-Butig Road, Butig 0.50 0.50 0.50 5.00 Lanao del Sur-2 DEO By Admin 100.00% Completed 2012 Lanao del Sur II Ganassi Road Conc. Of Taliogan-Ririk Rd,Ganassi 0.50 0.50 0.50 5.00 LGU Ganassi By MOA 100.00% Completed 2012 Lanao del Sur II Ganassi Road Construction of Masiu-Ganassi Road, Bayang,Lanao del Sur,(km 1616+000- km 1624+000) w/ exceptions 0.497 0.50 0.50 24.04 FIAT Const.Services By Contract 100.00% Completed 2012 Lanao del Sur II Ganassi Road Construction of Ganassi-Tubod Road, Madamba,(km 1607+000-km 1620+944)Lanao del Sur 0.548 0.55 0.55 FIAT Const.Services By Contract 100.00% Completed 2012 Lanao del Sur II Tubaran Road Conc. Of Tagoranao-Tangcad Road, Tubaran 0.50 0.50 0.50 5.50 Lanao del Sur-2 DEO By Admin 100.00% Completed 2012 Maguindanao I Datu Odin Sinsuat Road Concreting of Poblacion - Dalican Road, Datu Odin Sinsuat 0.333 0.33 0.33 5.00 LGU DOS By MOA 100.00% Completed LIST OF PROJECTS AND ACCOMPLISHMENTS

Upload: truongdiep

Post on 08-May-2019

248 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2012 Basilan Al-Barka Road 1. Concreting of Al-Barka Road (Tipo-Tipo Proper-Limbo Kassah-Magkawa-Kuhon Lenno 1.88 1.88 1.88 34.80 LGU Tipo Tipo By Contract 100.00% Completed

2012 Basilan Lamitan City Port 2. Expansion of Lamitan Port 1-unit 0.00 40.00 LGU Lamitan By MOA 100.00% Completed

2012 Basilan Lamitan City Road 1. Road Upgrading (Gravel to Paved) Lamitan-Tuburan Road (Km.36+690 - Km.37+690) 1.00 1.00 1.00 23.00 Basilan C & J Construction By Contract 100.00% Completed

2012 Basilan Lamitan City Road A. Concreting of Road from Sumisip Junction National Road to Buli Buli Port 3.06 3.06 3.06 56.67

BSP & Company Inc/M. Abubakar Const. and Engg

(JV) By Contract 100.00% Completed

2012 Basilan Lamitan City Road 3. Concreting of Limook-Balobo-Bulingan-Look Road 0.27 0.27 0.27 5.00 LGU Lamitan By MOA 100.00% Completed

2012 Basilan Lantawan Road1. Construction of 2.00 Km. Provincial Road from Basilan Circumferential Road Km.18 - Lantawan Proper-Baungis-Tairan-Pangasaan, Lantawan

2.00 2.00 2.00 32.00 Basilan DEO By Admin 100.00% Completed

2012 Basilan Lantawan Road 4. Construction of Isabela Bdry.-Lantawan Road 1.08 1.08 1.08 20.00 PGO Basilan By MOA 100.00% Completed

2012 Basilan Sumisip Bridge a. Bridge Construction: a.Construction of Bacung Bridge, Bacung, Sumisip (Km.67+986) 1 Unit 0.00 94.00 ESR Construction and

Supplies By Contract 100.00% Completed

2012 Basilan Sumisip Bridge b.Construction of Limbo Candis Bridge, Sumisip (Km.76+950) 1 Unit 0.00 ESR Construction and Supplies By Contract

2012 Basilan Sumisip Bridge c.Construction of Giong Bridge, Sumisip (Km.70+953) 1 Unit 0.00 ESR Construction and Supplies By Contract

2012 Basilan Sumisip Port B. Construction of Buli-Buli Port, Sumisip 1-Unit 0.00 20.00 ASAP GENERAL Trading Construction By Contract 100.00%

2012 Basilan Sumisip Road A. Concreting of 1.20 Km. circumferential Road from Bitayan-Basak, Sumisip Phase I 1.20 1.20 1.20 20.00 ASAP GENERAL Trading

Construction By Contract 100.00% Completed

2012 Lanao del Sur I Ditsaan-Ramain Bridge Construction of Dilausan-Polo Bridge, Ditsaan-Ramain 1-unit 0.00 13.00 Lanao del Sur-1 DEO By Admin 100.00% Completed

2012 Lanao del Sur I Taraka Road Const./Conc. Of Dilabayan-Ririk Road, Taraka 1.25 1.25 1.25 13.00 LGU-Taraka By MOA 100.00% Completed

2012 Lanao del Sur I Wao Road Molundo-Wao Road Bukidnon Bdry.-North Cotabato Bdry. Km 1619+970-Km 1621+890 2.158 2.16 2.16 49.63 LGU-Provincial Gov't of

Lanao del Sur By MOA 100.00% Completed

2012 Lanao del Sur II Picong Road Repair of Cotabato-Lanao Norte Road,Biosong, Picong Section km 1957+900 – km 1958+400 0.500 0.50 0.50 12.00 Lanao del Sur-2 DEO By Admin 100.00% Completed

2012 Lanao del Sur II Balindong Road Conc. Of Highway-Dibarosan Bualan Road,Balindong 0.50 0.50 0.50 5.00 Lanao del Sur-2 DEO By Admin 100.00% Completed

2012 Lanao del Sur II Bayang Road Concreting of Sultan Pandapatan-Parao Road,Bayang 0.55 0.55 0.55 5.50 Lanao del Sur-2 DEO By Admin 100.00% Completed

2012 Lanao del Sur II Butig Road Conc. Of Lumbayanague-Butig Road, Butig 0.50 0.50 0.50 5.00 Lanao del Sur-2 DEO By Admin 100.00% Completed

2012 Lanao del Sur II Ganassi Road Conc. Of Taliogan-Ririk Rd,Ganassi 0.50 0.50 0.50 5.00 LGU Ganassi By MOA 100.00% Completed

2012 Lanao del Sur II Ganassi Road Construction of Masiu-Ganassi Road, Bayang,Lanao del Sur,(km 1616+000- km 1624+000) w/ exceptions 0.497 0.50 0.50 24.04 FIAT Const.Services By Contract 100.00% Completed

2012 Lanao del Sur II Ganassi Road Construction of Ganassi-Tubod Road, Madamba,(km 1607+000-km 1620+944)Lanao del Sur 0.548 0.55 0.55 FIAT Const.Services By Contract 100.00% Completed

2012 Lanao del Sur II Tubaran Road Conc. Of Tagoranao-Tangcad Road, Tubaran 0.50 0.50 0.50 5.50 Lanao del Sur-2 DEO By Admin 100.00% Completed

2012 Maguindanao I Datu Odin Sinsuat Road Concreting of Poblacion - Dalican Road, Datu Odin Sinsuat 0.333 0.33 0.33 5.00 LGU DOS By MOA 100.00% Completed

LIST OF PROJECTS AND ACCOMPLISHMENTS

Page 2: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2012 Maguindanao I Datu Odin Sinsuat Road1. Concete reblocking along Marbel-Alla Valley-Cotabato Road, Bitu-Dulangan Section DOS, Maguindnao (km1837+000- km 1839+000 w/Exception

1.00 1.00 1.00 15.00 MUST Enterprises & Construction By Contract 100.00% Completed

2012 Maguindanao I Matanog Other Infra Riprapping of Sarakan Br.Approaches,KM 1897+653 Matanog Municipality 1 Unit 0.00 3.00 Maguindanao 1 DEO By Admin 100.00% Completed

2012 Maguindanao I Matanog Road Conc. of Matanog Road, Matanog Municipality 1.00 1.00 1.00 10.00 Maguindanao 1 DEO By Admin 100.00% Completed

2012 Maguindanao I Parang Road Concreting of Padang-Padang Adventure Park Road, Brgy. Moro Point, Parang, Maguindanao 0.333 0.33 0.33 5.00 Maguindanao 1 DEO By Admin 100.00% Completed

2012 Maguindanao I Sultan Kudarat Road Concreting of Talusan Road including retrofitting of double barrel box culvert, Sultan Kudatarat 1 Unit 13.00 Maguindanao 1 DEO By Admin 100.00% Completed

2012 Maguindanao I Sultan Kudarat Road 2. Conc. Reblocking along Cot.-lanao Rd. (km.1855-km.1865 w/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises &

Construction By Contract 100.00% Completed

2012 Maguindanao II Buluan Road Construction of Poblacion Buluan- Maslabong Road, Buluan 0.54 0.54 0.63 10.00 LGU Buluan By MOA 100.00% Completed

2012 Maguindanao II Buluan Road Construction of Poblacion Buluan- Maslabong Road, Buluan 0.54 0.54 0.63 10.00 LGU Mag. Province By MOA 100.00% Completed

2012 Maguindanao II Datu Anggal Midtimbang Road

Reblocking along Marbel- Ala- Cotabato Road Datu Abdullah Sangki (DAS)-Datu Anggal Midtimbang (DAM) Section Km.28+970 – Km 30+540 w/ exceptions

0.670 0.67 0.81 10.05 Maguindanao 2 DEO By Admin 100.00% Completed

2012 Maguindanao II Pandag Road Conc. Of Pandag Road,Pandag Municipality 1.30 1.30 1.18 13.00 LGU Pandag By MOA 100.00% Completed

2012 Maguindanao II Shariff Aguak Road Concrete Pavement Widening,Marbel-Ala-Cot. Rd.Shariff Aguak Sect., L= 2 kms km 1797+113 – km 1799+113 0.767 0.77 0.77 11.50 BAMEC Developer By Contract 100.00% Completed

2012 Maguindanao II Talitay Road Conc. Of Talitay Road,Talitay Municipality 1.30 1.30 1.30 13.00 Maguindanao 2 DEO By Admin 100.00% Completed

2012 Sulu I Indanan Water System Const of Spring Dev't. Brgy. Tagbak, Indanan 1 Unit 0.00 0.30 Sulu 1 DEO By Admin 100.00% Completed

2012 Sulu I Jolo Road Jolo-Indanan-Parang- Silangkan Rd. Km 28+970-Km 30+540 1.75 1.75 1.75 40.21 Sulu 1 DEO By Admin 100.00% Completed

2012 Sulu I Jolo Road Jolo Port-Bud Daho- Romandier Road, Patikul,Sulu Km 9+000-Km 11+030.40 2.03 2.03 2.03 46.70 Sulu 1 DEO By Admin 100.00% Completed

2012 Sulu I Maimbung Road Const. of Prov'l. Road,Brgy. Laum, Maimbung-Brgy.Kulasi-Parang Road,1.2km Phase 1 1.20 1.20 1.20 20.00 Prov Govt of Sulu By MOA 100.00% Completed

2012 Sulu I Maimbung Water System Const of Deep Well Brgy. D. Jambangan, Maimbung 1 Unit 0.00 0.40 Sulu 1 DEO By Admin 100.00% Completed

2012 Sulu I Parang Water System Const of Deep Well Brgy. Lupah Abo, Parang 1 Unit 0.00 0.40 Sulu 1 DEO By Admin 100.00% Completed

2012 Sulu I Patikul Water System Const of Deep Well Brgy. Pagdanon, Patikul 1 Unit 0.00 0.40 Sulu 1 DEO By Admin 100.00% Completed

2012 Sulu I Talipao Port Const. of Tuyang Seaport,Talipao Municipality 1 Unit 0.00 15.00 LGU Talipao By MOA 100.00% Completed

2012 Sulu I Talipao Water System Const of Deep Well Brgy. Samak, Talipao 1 Unit 0.00 0.40 Sulu 1 DEO By Admin 100.00% Completed

2012 Sulu II Luuk Road Concreting of Romandier-Camp Andres-Tandu Bato Rd km 26+00 – km 55+00 w/ exceptions 1.55 1.55 1.55 35.65 Sulu 2nd DEO By Admin 100.00% Completed

2012 Sulu II Luuk Road Concreting of Site Tayungan Camp Andres Roadkm 36+00 – km 45+00 with exceptions 0.58 0.58 0.58 13.35 Sulu 2nd DEO By Admin 100.00% Completed

2012 Sulu II Old Panamao Bridge Const. of 20m-Sapah Malaum Bridge along Seit Tayungan -Camp Andres National Road,Sta. 39+150- Sta. 39+170 0.02 18.00 Sulu 2nd DEO By Admin 100.00% Completed

2012 Sulu II Pandami Port Rehab. Of Hambilan Port, Pandami 1 Unit 1 Unit 7.00 Sulu 2nd DEO By Admin 100.00% Completed

Page 3: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2012 Sulu II Siasi Port Improvement of Siasi Port and Access Road, Siasi 1 Unit 1 Unit 10.00 LGU Siasi By MOA 80.14% on Going

2012 Tawi-Tawi Bongao Port Conc. Of Circumferential Causeway and Docking Port, Bongao-Phase 1 1 Unit 0.00 37.00 Tawi Tawi DEO By Admin 100.00% Completed

2012 Tawi-Tawi Bongao Road Sanga-Sanga-Lapid- Lapid Road Km 004+578.216-Km6+567.476 with exceptions 1.478 1.48 1.48 34.00 Tawi Tawi DEO By Admin 100.00% Completed

2012 Tawi-Tawi Bongao Shore Protection Shore Protection Works along National Road approach to Sanga-Sanga br. 400m 1 Unit 0.00 8.50 Tawi Tawi DEO By Admin 100.00% Completed

2012 Tawi-Tawi Panglima Sugala Water System Const. of Water Supply, Panglima Sugala (realigned to Sanga-Sanga - Lapid-Lapid Road per RLA Res. No. 488) 3.50 3.50 3.50 70.00 Tawi Tawi DEO By Admin 100.00% Completed

2012 Tawi-Tawi Simunul Port Repair/Rehab. Of Simunul Port 1 Unit 0.00 5.00 Tawi Tawi DEO By MOA 100.00% Completed

2012 Tawi-Tawi Tandubas Water System Const. of Community Water Break Tanggah, Tandubas 1 Unit 0.00 1.50 Tawi Tawi DEO By MOA 100.00% Completed

2013 Basilan Akbar Road Construction of Road from Lamitan Proper-Brgy. Kulay Bato Brgy. Bulanting-Brgy. Bato-Bato-Brgy Semmut, Akbar, Phase I 1.25 1.25 1.25 20.00 By Contract 100.00% Completed

2013 Basilan Al-Barka Port Construction of Bato Bato Port, Al-Barka 1-unit 0.00 10.00 ESR Construction and Supplies By Contract 100.00% Completed

2013 Basilan Al-Barka Road Concreting of AL-Barka Road (Tipo-Tipo Proper-Limbo Kassah-Magkawa-Kuhon Lenno , Phase II 3.00 3.00 3.00 30.00 Basilan DEO By Admin 100.00% Completed

2013 Basilan Al-Barka Road Concreting of Magkawa- Ginanta Road, AL-Barka 1.00 1.00 1.00 10.00 Basilan DEO By Admin 100.00% Completed

2013 Basilan Al-Barka RoadConstruction of Road from Bato-Bato Port Al-Barka Kaili-Gananta-Magkawa, Al-Barka Phase I (4.0 km. concreting and 6.0 km road opening)

10.000 10.00 10.00 80.00 By Contract 100.00% Completed

2013 Basilan lamitan City Road Concreting of Lamitan City-Balas Road 1.00 1.00 1.00 18.50 Basilan DEO By Admin 100.00% Completed

2013 Basilan Lamitan City Road Concreting of Bohi-Ibu-Cabobo-Bohe-Bessey Road, Lamitan 1.00 1.00 1.00 10.00 Basilan DEO By Admin 100.00% Completed

2013 Basilan Lamitan City Road Const. of 2-km Provincial Road, Sayugan Lamitan-Bulanting, Lamitan City 2.00 2.00 2.00 31.00 LGU-Lamitan City By MOA 100.00% Completed

2013 Basilan Lantawan Road Concreting of Brgy. Matikang-Atong Atong Road, Lantawan 1.00 1.00 1.00 10.00 Basilan DEO By Admin 100.00% Completed

2013 Basilan Muhammad Ajul Road Construction of Sirogon - Buton Provincial Road, Muhammad Ajul 2.25 2.25 2.25 45.00 Rpge Basilan C & J

Construction (RBCI) Venture By Contract 100.00% Completed

2013 Basilan Sumisip Bridge Construction of Modular Steel Bridge Sub-structure Basak-Babag Bato Coastal Road, Sumisip 1-unit 0.00 5.00 Basilan DEO By Admin 100.00% Completed

2013 Basilan Sumisip Bridge Construction of Modular Steel Bridge Sub-Structure Limbo Candiis-Manngal, Sumisip 1-unit 0.00 5.00 Basilan DEO By Admin 100.00% Completed

2013 Basilan Sumisip Drainage Construction of Manaul Box Culvert, Sumisip 1-unit 0.00 4.00 Basilan DEO By Admin 100.00% Completed

2013 Basilan Sumisip Port Construction of Tinusa Port, Sumisip 1-unit 0.00 5.00 Basilan DEO By Admin 100.00% Completed

2013 Basilan Sumisip Road Construction of Modular Steel Bridge Sub-Structure Bulibuli-Tekos Coastal Road, Sumusip 1-unit 0.00 5.00 Basilan DEO By Admin 100.00% Completed

2013 Basilan Sumisip Road Concreting of 3.5km Bulibuli-Lower Manaul Tikes, Brgy. Road, Sumisip 3.50 3.50 3.50 35.00 Basilan DEO By Admin 100.00% Completed

2013 Basilan Sumisip Road Concreting of 1.5km Basak to Babagbato Brgy. Road, Sumisip 1.50 1.50 1.50 15.00 Basilan DEO By Admin 100.00% Completed

2013 Basilan Sumisip Road Concreting of 1-km Circumferential Road from Bitayan-Basak, Sumisip, Phase II 1.00 1.00 1.00 15.14 By Contract 100.00% Completed

Page 4: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2013 Basilan Sumisip Road Road Upgrading (Gravel to Paved) Limbo-Candiis to Canas Road, Sumisip (Km.76+950 - Km.89+578 w/ exceptions)=110M

2013 Basilan Sumisip Water System Construction of Water Sytem, Level III, Sumisip 1-unit 0.00 40.00 ASAP Gen. Trading Construction By Contract 100.00% Completed

2013 Basilan Tabuan Lasa Port Construction of Sullo Port, Tabuan Lasa 1-unit 0.00 5.00 Basilan DEO By Admin 100.00% Completed

2013 Lanao del Sur I Ditsaan-Ramain Road Concreting of Ditsaan-Ramain Road 0.20 0.20 0.18 2.00 LGU-Provincial Gov't of LDS By MOA 100.00% Completed

2013 Lanao del Sur I Buadipuso Buntong Road Concreting of Buadipuso Buntong Road 0.20 0.20 0.18 2.00 LGU-Provincial Gov't of LDS By MOA 100.00% Completed

2013 Lanao del Sur I Bubong Road Concreting of Bubong Road 0.20 0.20 0.18 2.00 LGU-Provincial Gov't of LDS By MOA 100.00% Completed

2013 Lanao del Sur I Bumbaran Road Concreting of Bumbaran Road 0.10 0.10 0.08 1.00 LGU-Provincial Gov't of LDS By MOA 100.00% Completed

2013 Lanao del Sur I Ditsaan-Ramain Road Concreting of Ditsaan-Ramain-Buadipuso Buntong Road 0.75 0.75 1.09 12.00 LGU-Provincial Gov't of LDS By MOA 100.00% Completed

2013 Lanao del Sur I Maguing Road Concreting of Maguing Road 0.10 0.10 0.09 1.00 LGU-Provincial Gov't of LDS By MOA 100.00% Completed

2013 Lanao del Sur I Marantao Road Concreting of Kalaw Road, Marantao 0.20 0.20 0.20 2.00 Lanao del Sur-1 DEO By Admin 100.00% Completed

2013 Lanao del Sur I Marawi City Other Infra Tourism Development for Plaza Cabili Banggolo, Marawi City 1-unit 5.00 Lanao del Sur-1 DEO By Admin 100.00% Completed

2013 Lanao del Sur I Marawi City Port . Concreting of Port, Lumbac Madaya, Marawi City 1-unit 5.00 Lanao del Sur-1 DEO By Admin 100.00% Completed

2013 Lanao del Sur I Marawi City Road Concreting of Malimono Road, Brgy. Malimono, Marawi City 0.20 0.20 0.20 2.00 Lanao del Sur-1 DEO By Admin 100.00% Completed

2013 Lanao del Sur I Marawi City Water System Construction of Water System, Lumba Bayabao 1-unit 10.00 Lanao del Sur-1 DEO By Admin 100.00% Completed

2013 Lanao del Sur I Marawi City Water System Construction of Water Sytem and Public Toilet Barangay Tolali, Marawi City 1-unit 2.00 Lanao del Sur-1 DEO By Admin 100.00% Completed

2013 Lanao del Sur I Piagapo Road Concreting of Saguiaran-Piagapo Provincial Road (Bobo Section) 0.63 0.63 0.85 10.00 LGU-Provincial Gov't of LDS By MOA 100.00% Completed

2013 Lanao del Sur I Saguiaran Road Road Upgrading (Gravel to Paved) Pantar Diversion Road 1.20 1.20 0.50 23.00 LGU-Provincial Gov't of LDS By MOA 100.00% Completed

2013 Lanao del Sur I Saguiaran Water System Construction of Water System, Brgy. Pawak, Saguiaran 1-unit 1-unit 2.00 Lanao del Sur-1 DEO By Admin 100.00% Completed

2013 Lanao del Sur I Taraka Road Concreting of Dilabayan-Ririk Road, Taraka 0.50 0.50 0.50 5.00 LGU-Taraka By MOA 100.00% Completed

2013 Lanao del Sur I Taraka Road Concreting of Malungun-Buadiaranao Road, Taraka 0.50 0.50 0.50 5.00 LGU-Taraka By MOA 100.00% Completed

2013 Lanao del Sur I Wao Road Concreting of Buot-Milaya Catotongan Road, Wao 1.25 1.25 1.75 20.00 LGU-Provincial Gov't of LDS By MOA 100.00% Completed

2013 Lanao del Sur I Wao Road Concreting of Wao Road 0.20 0.20 0.17 2.00 LGU-Provincial Gov't of LDS By MOA 100.00% Completed

2013 Lanao del Sur II Calanogas Road Concreting of Panta-On Road, Calanogas 0.35 0.35 0.35 3.50 LGU-Provincial Gov't of Lanao del Sur By MOA 100.00% Completed

2013 Lanao del Sur II Lumbaca Unayan Road Concreting of Lumbatan-Lumbaca Unayan Road 1.25 1.25 1.25 20.00 LGU-Provincial Gov't of Lanao del Sur By MOA 100.00% Completed

2013 Lanao del Sur II Lumbatan Road Concreting of Provincial Road (Lumbatan-Macadar Road) 0.67 0.67 0.67 10.00 Lanao del Sur-2 DEO By Admin 100.00% Completed

Page 5: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2013 Lanao del Sur II Madalum Road Concreting of Road, Gadungan, Madalum 0.250 0.25 0.18 2.50 LGU-Provincial Gov't of Lanao del Sur By MOA 70.00% On Going

2013 Lanao del Sur II Madalum Road Concreting of Road, Balintad, Madalum 0.25 0.25 0.25 2.50 LGU-Provincial Gov't of Lanao del Sur By MOA 100.00% Completed

2013 Lanao del Sur II Madalum Road Concreting of Gadungan Road, Madalum 0.300 0.30 0.30 3.00 LGU-Provincial Gov't of Lanao del Sur By MOA 100.00% On Going

2013 Lanao del Sur II Madamba Road Concreting of Poblacion Road, Madamba 0.35 0.35 0.35 3.50 LGU-Provincial Gov't of Lanao del Sur By MOA 100.00% Completed

2013 Lanao del Sur II Malabang Road Concreting of Road, Curahab, Malabang 0.25 0.25 0.25 2.50 LGU-Provincial Gov't of Lanao del Sur By MOA 100.00% Completed

2013 Lanao del Sur II Marogong Road Concreting of Bayang-Marogong Road 1.50 1.50 2.00 24.00 LGU-Provincial Gov't of Lanao del Sur By MOA 100.00% Completed

2013 Lanao del Sur II Picong Road Concreting of Road, Liangan, Picong 0.250 0.25 0.13 2.50 LGU-Provincial Gov't of Lanao del Sur By MOA 51.00% On Going

2013 Maguindanao I Datu Odin Sinsuat RoadRehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads: Concrete Reblocking along marbel-Ala-Cotabato Road Bitu - Dulangan Section (Km.1837+000 - Km.1839+000 w/

1.33 1.33 1.33 19.90 FFJJ Construction By Contract 100.00% Completed

2013 Maguindanao I Datu Odin Sinsuat Water System Construction of Water Sytem, Level II, Brgy. Pinguiaman and Bugawas, Datu Odin Sinsuat 1-unit 0.00 5.00 Maguindanao 1 DEO By Admin 100.00% Completed

2013 Maguindanao I Kabuntalan Water System Construction of Water Sytem, Kabuntalan (Mother) 1-unit 0.00 10.00 Maguindanao 1 DEO By Admin 100.00% Completed

2013 Maguindanao I Matanog Road Concreting of Matanog - Buldon Drainage 1-unit 0.00 20.00 Maguindanao 1 DEO By Admin 100.00% Completed

2013 Maguindanao I North Upi Road Concreting of brgy. Rempis-Poblacion Road, North Upi 0.50 0.50 0.50 5.00 Maguindanao 1 DEO By Admin 100.00% Completed

2013 Maguindanao I North Upi Water System Construction of Water Sytem, Sitio Mereges, Brgy. Darugao, North Upi 1-unit 0.00 10.00 Maguindanao 1 DEO By Admin 100.00% Completed

2013 Maguindanao I Parang Road Concreting of Miramar-Poblacion Road, Parang 0.50 0.50 0.50 5.00 LGU-Parang By MOA 100.00% Completed

2013 Maguindanao I Parang Road Concreting of Campo Uno Road, Brgy. Pinantao, Parang 0.20 0.20 0.20 2.00 LGU-Parang BY MOA 100.00% Completed

2013 Maguindanao I Parang Road Concreting of Water System Access Road, Macasandag, Parang 0.30 0.30 0.30 3.00 LGU-Parang By MOA 100.00% Completed

2013 Maguindanao I Sultan Kudarat Road Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads: Concrete Reblocking along Cotabato-Lanao Road Sultan Kudarat Section

1.33 1.33 1.33 20.00 FFJJ Construction By Contract 100.00% Completed

2013 Maguindanao II Ampatuan Road Concreting of Sitio Binibedan Road, Ampatuan 0.10 0.10 0.20 1.00 Maguindanao 2 DEO By Admin 100.00% Completed

2013 Maguindanao II Ampatuan Road Concreting of Brgy. Matagabong Road, Ampatuan 0.30 0.30 2.28 3.00 Maguindanao 2 DEO By Admin 100.00% Completed

2013 Maguindanao II Buluan Road Concreting of Maslabeng Provincial Road 4.000 4.00 4.30 60.00 FFJJ Construction By Contract 77.00% On Going

2013 Maguindanao II Datu Paglas Road Concreting of Datu Paglas-Columbio Provincial Road 4.268 4.27 1-unit 64.03 FFJJ Construction By Contract 95.76% On Going

2013 Maguindanao II Datu Saudi Road1. Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads: Reblocking along Marbel-Ala-Cotabato Road (Km.1718+000 - Km.1821+838 w/ exceptions)

1.50 1.50 1.70 22.50 Maguindanao 2 DEO By Admin 100.00% Completed

2013 Maguindanao II Datu Saudi Road2. Concrete Pavement Widening of Marbel-Ala-Cotabato Road: Datu Saudi Ampatuan Section - Length=2 kms. (Km.1805+455 - Km.1807+455 Phase 2)

1.00 1.00 1.00 15.00 Maguindanao 2 DEO By Admin 100.00% Completed

2013 Maguindanao II Paglat Drainage Construction of Road Dike, Paglat 0.20 0.20 0.10 2.00 Maguindanao 2 DEO By Admin 100.00% Completed

2013 Maguindanao II Pandag Road Concreting of Road, Pandag (Section II) 0.50 0.50 0.20 5.00 LGU-Pandag By MOA 100.00% Completed

Page 6: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2013 Maguindanao II Pandag Road Concreting of Road, Pandag (Section I) 0.50 0.50 0.50 5.00 LGU-Pandag By MOA 100.00% Completed

2013 Maguindanao II Satu Abdullah Sangki Water System Construction of Water System (Level II), Banaba, Datu Abdullah Sangki 1-unit 0.00 1.00 Maguindanao 2 DEO By Admin 100.00% Completed

2013 Maguindanao II Shariff Aguak Road Concreting of Poblacion-Municipal Cemetery Road, Shariff Aguak 0.20 0.20 0.30 2.00 Maguindanao 2 DEO By Admin 100.00% Completed

2013 Maguindanao II South Upi Water System Construction of Water System (Level II), Sitio Malibacao, Brgy. Romongaob, South Upi 1-unit 1-unit 1.00 Maguindanao 2 DEO By Admin 100.00% Completed

2013 Sulu I Hadji Panglima Tahil Port Construction/ Repair/ Rehabilitation of Panglima Tahil Port, Municipality of Hadji Panglima Tahil 1-unit 0.00 10.00 LGU_Panglima Tahil By MOA 100.00% Completed

2013 Sulu I Indanan Bridge Construction of Mapallam-Bangalan Bridge, Indanan 0.01 0.00 10.00 Sulu First DEO By Admin 100.00% Completed

2013 Sulu I Indanan Port Rehabilitation of Kajatian Port, Indanan 1-unit 0.00 5.00 LGU-Indanan By MOA 100.00% Completed

2013 Sulu I Jolo Drainage Repair and Dredging Works of Jolo Drainage System, Jolo 1 unit 0.00 10.00 Sulu First DEO By Admin 100.00% Completed

2013 Sulu I Jolo Road Road Upgrading (Gravel to Paved) Jolo-Indanan-Parang-Silangkan Road (Km.26+030 - Km.28+455 w/ exceptions) 0.87 0.87 0.87 20.00 Sulu First DEO By Admin 100.00% Completed

2013 Sulu I Jolo Road Road Upgrading (Gravel to Paved) Jolo-Indanan-Parang-Silangkan Road and Drainage Improvement, Jolo/Indanan/Sulu Km. 0+650 - Km 5+514

4.86 4.86 4.86 123.67 Sulu First DEO By Admin 100.00% Completed

2013 Sulu I Jolo Road Road Upgrading (Gravel to Paved) Jolo Port-Bud Daho-Romandier Road (Km0+030 - Km.2+000) 1.37 1.37 1.37 44.70 Sulu First DEO By Admin 100.00% Completed

2013 Sulu I Jolo Road Road Upgrading (Gravel to Paved) Jolo Cadre-Capitol Road (Km0+510 - Km.1+740) 1.23 1.23 1.23 40.15 Sulu First DEO By Admin 100.00% Completed

2013 Sulu I Jolo Water System Construction of Tumantangis-Jolo Level III Water System 1-unit 0.00 30.00 Sulu First DEO By Admin 90.00% On Going

2013 Sulu I Maimbung Road Concreting of Municipal Road, Maimbung 1.00 1.00 1.00 10.00 LGU-Provincial Gov't of Sulu By MOA 100.00% Completed

2013 Sulu I Parang Road Construction of Road from Brgy. Laum Maimbung Junction-Brgy. Kulasi, Parang Road; 1.3Km; Phase II 1.30 1.30 1.30 22.80 LGU-Provincial Gov't of Sulu By MOA 100.00% Completed

2013 Sulu I Parang Road Concreting of Kannaway-Tumangas Road, Parang, Phase I 1.00 1.00 1.00 20.00 Sulu First DEO By Admin 100.00% Completed

2013 Sulu I Patikul Drainage Construction of Anuling Double Box Culvert, Patikul 1-unit 0.00 4.00 Sulu First DEO By Admin 100.00% Completed

2013 Sulu I Patikul Drainage Construction of Suwa-Suwa Single Box Culvert, Patikul 1-unit 0.00 3.80 Sulu First DEO By Admin 100.00% Completed

2013 Sulu I Talipao Road Concreting of Tuyang Road, Talipao 1.00 1.00 1.00 10.00 LGU-Talipao By MOA 100.00% Completed

2013 Sulu II Old Panamao Road Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads: Concreting of Siet Tayungan-Camp Andres Road (Km.36+000 - Km.45+000 w/ exception)

2.52 2.52 2.52 58.00 Sulu 2nd DEO By Admin 100.00% Completed

2013 Sulu II Pata Road Concreting of Brgy. Andalan-Saimbangon Road, Pata 0.65 0.65 0.65 6.50 LGU-Pata By MOA 100.00% Completed

2013 Sulu II Pata Road . Concreting of Brgy. Kipot-Saimbangon Road, Pata 0.35 0.35 0.35 3.50 LGU-Pata By MOA 100.00% Completed

2013 Sulu II Siasi Road Concreting of Minapan Road, Siasi 1.000 1.00 0.35 10.00 LGU-Provincial Gov't of Sulu By MOA 50.00% On Going

2013 Sulu II Siasi Road Concreting of Duhul-Duhul Road, Siasi 1.00 1.00 1.00 10.00 Sulu 2nd DEO By Admin 100.00% Completed

2013 Tawi-Tawi Bongao Road Concreting of Malassa Road, Bongao, Tawi-Tawi 0.20 0.20 0.20 2.00 LGU-Bongao By MOA 100.00% Completed

Page 7: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2013 Tawi-Tawi Bongao Road Road Upgrading (Gravel to Paved) Concreting of Sanga Sanga-Lapid Lapid Road (Km.23+541 - KM. 25+241) 1.70 1.70 1.70 39.00 Tawi Tawi DEO By Admin 100.00% Completed

2013 Tawi-Tawi Bongao Road Concreting of Provincial Road, Bato Bato, Panglima Sugala - Kapatagan, Bongao 5.00 5.00 5.00 80.00 Tawi Tawi DEO By Admin 100.00% Completed

2013 Tawi-Tawi Bongao Road Concreting of MSU Campus Access Road, MSU, Bongao 0.50 0.50 0.50 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2013 Tawi-Tawi Mapun Road Construction of Mapun Municipal Road 0.25 0.25 0.25 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2013 Tawi-Tawi Panglima Sugala Road Concreting of Parangan to Balimbing Road, Panglima Sugala 1.00 1.00 1.00 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2013 Tawi-Tawi Sapa Sapa Road Concreting of Sapa Sapa Pokkoan to Likud Sicubong Road, Sapa Sapa 0.10 0.10 0.10 1.00 LGU-Sapa Sapa By MOA 100.00% Completed

2013 Tawi-Tawi Sapa Sapa Road Construction of Sapa Sapa Port Road 0.25 0.25 0.25 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2013 Tawi-Tawi Sibutu Road Construction of Sibutu Municipal Road 0.25 0.25 0.25 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2013 Tawi-Tawi Simunul Road Concreting of Tubig Indangan Port Road, Tubig Indangan, Simunul 0.50 0.50 0.50 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2013 Tawi-Tawi South Ubian Road Construction of Pierhead, Tabawan, South Ubian 1-unit 0.00 2.00 Tawi Tawi DEO By Admin 100.00% Completed

2013 Tawi-Tawi South Ubian Road Concreting of Likud Tabawan, Lukid Dampong to Putat Road, South Ubian, Tawi-Tawi 0.50 0.50 0.50 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2013 Tawi-Tawi Tandubas Road Construction of Tandubas Municipal Road 0.25 0.25 0.25 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Basilan Akbar Road Construction of 3.5 Km Road from Kulay Bato, Lamitan-Brgy. Bulanting-U Batobato, Brgy. Semmut, Akbar, Phase II 3.500 3.50 3.50 63.78 Municipal Gov't of Akbar,

Basilan Province By MOA 100.00% Completed

2014 Basilan Al-Barka Road Construction of 3.53 km Road from Magkawa to Kaili (gravel to paved) Al-Barka, phase II 3.600 3.60 3.60 58.92 ESR Construction By Contract 100.00% Completed

2014 Basilan Hadji Muhtamad Water System Construction of Water Supply Project for the Municipality of Hj. Mutamad 1 unit 1 unit 2.00 Basilan DEO By Admin 100.00% Completed

2014 Basilan Lamitan City Road Concrete Road Widening of Unpaved Shoulder, Isabela-Lamitan Road 3.491 3.49 3.49 31.42 Basilan DEO By Admin 100.00% Completed

2014 Basilan Lamitan City Road Concrete Road Windening of Unpaved Shoulder, Isabela-Lamitan Road 1.491 1.49 1.49 13.41 Basilan DEO By Admin 100.00% Completed

2014 Basilan Lamitan City Road Concreting of 1.0 km ARMM Learning center Road Inner Lagasan, Lamitan City 0.345 0.35 0.35 6.90 Basilan DEO By Admin 100.00% Completed

2014 Basilan Lamitan City Road Concreting of Parang Basak Lamitan - Bohelebbeng Road 7.000 7.00 7.00 70.00 Basilan DEO By Admin 100.00% Completed

2014 Basilan Lamitan City Road Concreting of 2.0 km. Limook - Balobo-Bulingan Brgy. Road Lamitan City, Phase I 2.000 2.00 2.00 20.00 Municipal Gov't of Lamitan,

Basilan Province By MOA 100.00% Completed

2014 Basilan Lamitan City Road Concreting of 2.5 km. Limook-Balobo-Bulingan Brgy. Road, Lamitan City, Phase II 2.500 2.50 2.50 26.15 Municipal Gov't of Lamitan,

Basilan Province By MOA 100.00% Completed

2014 Basilan Lamitan City Water System Construction/Expansion of Lamitan Water District, Lamitan City 1 unit 15.00 ASAP Construction and

General Trading By Contract 91.50% Ongoing

2014 Basilan Lantawan Road Conreting of 4.0 km. Lantawan Proper-Baungis-Tairan-Pangasaan,Lantawan, Phase II 3.125 3.13 3.13 50.00 Basilan DEO By Admin 100.00% Completed

2014 Basilan Lantawan Road Concreting of Lantawan Proper- Baungis-Tairan pangasaan Prv'l. Road, Lantawan, (Phase III) 2.882 2.88 2.88 49.00 Basilan DEO By Admin 100.00% Completed

2014 Basilan Lantawan Shore Protection Construction of Seawall along Atong Atong-Matikang Road, Lantawan 1 unit 1 unit 5.00 Basilan DEO By Admin 100.00% Completed

Page 8: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2014 Basilan Maluso Port Concreting of Maluso Port to Maluso Fish Port, Maluso Municipality 1 unit 0.80 15.00 Basilan DEO By Admin 100.00% Completed

2014 Basilan Maluso Water System Construction/Expansion of Maluso Water District, Maluso Municipality 1 unit 1 unit 10.00 Basilan DEO By Admin 100.00% Completed

2014 Basilan Muhammad Ajul Road Concreting of Mohammad Adjul-Akbar Road 5.000 5.00 1.10 50.00 - By Contract 53.50% Ongoing

2014 Basilan Sumisip Drainage Construction of Drainage Structure, Bulibuli, Sumisip 1 unit 1 unit 5.00 Basilan DEO By Admin 100.00% Completed

2014 Basilan Sumisip Drainage Construction of Single Barrel Box Culvert, Basak, Sumisip 1 unit 1 unit 1.58 Basilan DEO By Admin 100.00% Completed

2014 Basilan Sumisip Port Construction/Expansion of Sumisip Seaport, Sumisip Municipality 1 unit 1 unit 40.00 ASAP Construction and

General Trading By Contract 100.00% Completed

2014 Basilan Sumisip Road Concreting of Tumahubong-Tikes Road, Sumisip Municipality, Basilan 3.000 3.00 2.40 30.00 Basilan DEO By Admin 98.50% Ongoing

2014 Basilan Sumisip Road Conreting of 4.5 km National Road -Marang- Tong Sengal, Tikes, Brgy Road Sumisip, Phase I 4.500 4.50 4.50 45.00 Basilan DEO By Admin 100.00% Completed

2014 Basilan Sumisip Road Construction of Road from Nat'l Highway - Tumahubong, Sumisip 1.000 1.00 1.00 10.00 Basilan DEO By Admin 100.00% Completed

2014 Basilan Sumisip Road Construction of Road from Nat'l Highway - Manggal, Sumisip 1.000 1.00 1.00 10.00 Basilan DEO By Admin 100.00% Completed

2014 Basilan Sumisip Road Construction of Road from Basak-Sahaya-Bohe Bato, Sumisip 1.500 1.50 1.50 15.00 Basilan DEO By Admin 100.00% Completed

2014 Basilan Sumisip Road Construction of Road Nat'l highway- Kabingbing, Sumisip 1.000 1.00 0.51 10.00 Municipal Gov't of Sumisip, Basilan Province By MOA 69.00% Ongoing

2014 Basilan Sumisip Road Concreting of National Highway-Lower Cabengbeng road 2.000 2.00 0.52 20.00 Municipal Gov't of Sumisip, Basilan Province By MOA 71.00% Ongoing

2014 Basilan Tabuan Lasa Port Construction of Seaport Tabuan Lasa 1 unit 1 unit 5.00 Basilan DEO By Admin 100.00% Completed

2014 Basilan Tipo-Tipo Port Construction of Seaport, Brgy Bana, Tipo-Tipo 1 unit 1 unit 5.00 Basilan DEO By Admin 100.00% Completed

2014 Basilan Tipo-Tipo Road Concreting of 3.0 km Parang Basak-Bohe Baka-Bohe Lebbeng Brgy. Road Tipo-Tipo 3.000 3.00 3.00 30.00 Basilan DEO By Admin 100.00% Completed

2014 Basilan Tipo-Tipo Road Concreting of Lagayas_Pipil Road 2.000 2.00 2.00 20.00 Municipal Gov't of Tipo-Tipo, Basilan Province By MOA 100.00% Completed

2014 Basilan Tipo-Tipo Road Concreting of Tipo-Tipo Highway-Lagayas-Candiis Road 5.000 5.00 5.00 50.00 Municipal Gov't of Tipo-Tipo, Basilan Province By MOA 100.00% Completed

2014 Basilan Tipo-Tipo Road Concreting of National Highway-Bohesuyak-Tongbatu-Amaluy Road 3.000 3.00 2.42 30.00 Municipal Gov't of Ungkaya

Pukan, Basilan Province By MOA 82.50% Ongoing

2014 Basilan Tipo-Tipo Road Concreting of Badja-Bohelebbeng-Banah Road 4.000 4.00 4.00 40.00 Provincial Government of Basilan By MOA 100.00% Completed

2014 Basilan Tipo-Tipo Water System Construction of water Supply Project for Ungkaya Pukan - Tipo-Tipo Municipalities 1 unit 1 unit 10.00 ASAP Construction and

General Trading By Contract 100.00% Completed

2014 Basilan Tuburan Road Construction of Bohe Bohe Mamburing-Kalut Road (gravel to paved) Tuburan 2.900 2.90 2.90 29.64 Basilan DEO By Admin 100.00% Completed

2014 Basilan Ungkaya Pukan Road Construction of Road from National Highway-Tungbato Unkaya Pukan 1.000 1.00 1.00 10.00 Municipal Gov't of Ungkaya

Pukan, Basilan Province By MOA 100.00% Completed

2014 Lanao del Sur I Buadipuso Buntong Road Concreting of Ditsaan Remain-Buadipuso Buntong Road (Phase II) 1.000 1.00 1.05 15.00 Provincial Gov't of Lanao Del

Sur By MOA 100.00% Completed

2014 Lanao del Sur I Ditsaan-Ramain Bridge Rehab./Upgrading of Pugaan Bridge, Ditsaan-Ramain 1 unit 10.00 Provincial Gov't of Lanao Del Sur By MOA 100.00% Completed

Page 9: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2014 Lanao del Sur I Ditsaan-Ramain Bridge Rehab./Upgrading of Ramain Bridge, Ditsaan-Ramain 1 unit 12.77 Provincial Gov't of Lanao Del Sur By MOA 100.00% Completed

2014 Lanao del Sur I Ditsaan-Ramain Port Rehabilitation and Completion of Pugaan Port 1 unit 10.00 Provincial Gov't of Lanao Del Sur By MOA 100.00% Completed

2014 Lanao del Sur I Ditsaan-Ramain Water System Repair & Completion of Ramain Water System, Ditsaan-Ramain 1 unit 15.00 Provincial Gov't of Lanao Del

Sur By MOA 100.00% Completed

2014 Lanao del Sur I Marawi City Flood Control Rehab. Of Sumandad-Buadi Sacayo Flood Control 1 unit 3.77 Provincial Gov't of Lanao Del Sur By MOA 65.00% Ongoing

2014 Lanao del Sur I Marawi City Road Marawi-Marantao Road 0.506 0.51 0.62 7.59 Lanao Del Sur 1st DEO By Admin 100.00% Completed

2014 Lanao del Sur I Marawi City Road Concreting of Biaba Damag-Amito Road, Marawi City 0.400 0.40 0.27 4.00 Lanao Del Sur 1st DEO By Admin 100.00% Completed

2014 Lanao del Sur I Marawi City Road Concreting Marawi-Cabasaran Diversion Road, (Phase II) 0.500 0.50 0.56 10.00 Provincial Gov't of Lanao Del Sur By MOA 100.00% Completed

2014 Lanao del Sur I Masiu Road Buadi Ulok-Buisan Road, Masiu 3.000 3.00 3.00 30.00 Provincial Gov't of Lanao Del Sur By MOA 100.00% Completed

2014 Lanao del Sur I Piagapo Road Concreting of Piagapo Road 1.000 1.00 1.00 10.00 Municipal Gov't of Piagapo By MOA 100.00% Completed

2014 Lanao del Sur I Piagapo Road Concreting of Saguiaran-Radapan Road, Piagapo 7.000 7.00 5.50 70.00 Provincial Gov't of Lanao Del Sur By MOA 100.00% Completed

2014 Lanao del Sur I Poona Bayabao Road Concreting of Poona Bayabao Road 0.500 0.50 0.50 5.00 Provincial Gov't of Lanao Del Sur By MOA 100.00% Completed

2014 Lanao del Sur I Saguiaran Water System Upgrading of Saguiaran Water System 1 unit 12.77 Provincial Gov't of Lanao Del Sur By MOA 100.00% Completed

2014 Lanao del Sur I Tagoloan Road Concreting of Tagaloan Road 1.870 1.87 1.25 16.31 Provincial Gov't of Lanao Del Sur By MOA 100.00% Completed

2014 Lanao del Sur I Tamparan Road Concreting of Tamparan Road 0.400 0.40 0.40 4.00 Provincial Gov't of Lanao Del Sur By MOA 100.00% Completed

2014 Lanao del Sur I Taraka Road Concreting of Dimayon-Pagalamatan Provincial Road, Taraka 0.200 0.20 0.24 3.00 Lanao Del Sur 1st DEO By Admin 100.00% Completed

2014 Lanao del Sur I Taraka Road Concreting of Cadayon-Kawit Road, Taraka 0.500 0.50 0.30 5.00 Lanao Del Sur 1st DEO By Admin 100.00% Completed

2014 Lanao del Sur I Wao Road Concreting of Bout-Milaya-Catotongan Circumferencial Road, Wao 0.759 0.76 0.76 7.59 Provincial Gov't of Lanao Del

Sur By MOA 100.00% Completed

2014 Lanao del Sur II Ganassi Water System Construction of Taliogon Water System, Ganassi 1 unit 6.26 Municipal Gov't of Ganassi By MOA 100.00% Completed

2014 Lanao del Sur II Bacolod Kalawi Water System Construction of Bacolod-Kalawi Water System 1 unit 5.42 Provincial Gov't of Lanao Del Sur By MOA 100.00% Completed

2014 Lanao del Sur II Balabagan Bridge Construction of Barorao Bridge, Balabagan 1 unit 40.78 Provincial Gov't of Lanao Del Sur By MOA 100.00% Completed

2014 Lanao del Sur II Balabagan Drainage Construction of Concrete Line Canal along Cotabato-Lanao del Norte Road (Balabagan Section) 1 unit 10.00 Lanao Del Sur 2nd DEO By Admin 100.00% Completed

2014 Lanao del Sur II Balabagan RoadRehabilitation/Reconstruction of Damaged Paved National Road along Cotabato-Lanao Norte Road, Itil, Balabagan Section

0.203 0.20 0.35 5.00 Lanao Del Sur 2nd DEO By Admin 100.00% Completed

2014 Lanao del Sur II Bayang Road Concreting of Sultan Pandapatan-Parao Road, Bayang 0.626 0.63 0.36 6.26 Provincial Gov't of Lanao Del Sur By MOA 90.00% Ongoing

2014 Lanao del Sur II Bayang Road Concreting of Bayang-Marogong Road (Bayang Section) 0.400 0.40 0.40 5.00 Provincial Gov't of Lanao Del Sur By MOA 100.00% Completed

2014 Lanao del Sur II Bayang Road Concreting of Binidayan-Bayang-Tubaran Road 0.500 0.50 0.50 8.00 Provincial Gov't of Lanao Del Sur By MOA 100.00% Completed

Page 10: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2014 Lanao del Sur II Ganass Road Restoration of Tubod-Ganassi Road, Km 1598+425 - Km 1598+560 0.135 0.14 0.03 6.26 Lanao Del Sur 2nd DEO By Admin 100.00% Completed

2014 Lanao del Sur II Ganassi Road Concrete Widening of Luayan-Taliogon Road, Ganassi 0.500 0.50 0.50 5.00 Municipal Gov't of Ganassi By MOA 100.00% Completed

2014 Lanao del Sur II Madamba Road Reblocking of Marawi-Malabang Road (Madalum-Madamba Section) Km 1591+000 - Km 1600+000 0.361 0.36 0.38 5.42 Lanao Del Sur 2nd DEO By Admin 100.00% Completed

2014 Lanao del Sur II Marogong Road Concreting of Lumbatan-Marogong Road 0.667 0.67 0.67 10.00 Lanao Del Sur 2nd DEO By Admin 100.00% Completed

2014 Lanao del Sur II Tubaran Water System Const. of Tubaran Water System 1 unit 5.00 - By MOA NYS

2014 Maguindanao I Barira Road Concreting of Parang-Barira Road 4.000 4.00 4.00 40.00 Municipal Gov't of Barira, Mag. By MOA 100.00% Completed

2014 Maguindanao I Barira Road Construction of Parang-Birira Road 0.300 0.30 0.30 5.00 Municipal Gov't of Parang, Mag. By MOA 100.00% Completed

2014 Maguindanao I Datu Blah Sinsuat Road Construction of North Upi- Datu Blah Sinsuat Road 0.500 0.50 0.50 5.00 Municipal Gov't of North Upi, Mag. By MOA 100.00% Completed

2014 Maguindanao I Datu Odin Sinsuat Drainage Concrete Drainage along Marbel-Ala-Cotabato Road, Tanuel Section 1 unit 1 unit 3.00 Municipal Gov't of DOS,

Mag. By Admin 100.00% Completed

2014 Maguindanao I Datu Odin Sinsuat Road Reblocking of Marbel-Ala-Cotabato Road, Sapalan Section 0.453 0.45 0.45 6.79 maguindanao 1st DEO By Admin 100.00% Completed

2014 Maguindanao I Datu Odin Sinsuat Road Concreting of Sitio Kawa Bugawas, Datu Odin Sinsuat 2.700 2.70 2.70 27.00 Maguindanao 1st DEO By Admin 100.00% Completed

2014 Maguindanao I Datu Odin Sinsuat Road Reblocking of Awang-Upi-Lebak Road (Tenorio-Labungan sec) Km 1845+000 - Km 1852+000 w/ exceptions 1.340 1.34 1.34 20.00 Municipal Gov't of DOS,

Mag. By MOA 100.00% Completed

2014 Maguindanao I Datu Odin Sinsuat Road Concreting of Access Road from Highway-DSWD-ARMM, Semba, DOS 0.200 0.20 0.20 3.00 Municipal Gov't of DOS,

Mag. By MOA 100.00% Completed

2014 Maguindanao I Datu Odin Sinsuat Road Concreting of Highway Makir-Old Market Road, Datu Odin Sinsuat 0.400 0.40 0.40 4.00 Municipal Gov't of DOS,

Mag. By MOA 100.00% Completed

2014 Maguindanao I Datu Odin Sinsuat Road Concreting of Highway-Bago Inged Road, Datu Odin Sinsuat 0.500 0.50 0.50 5.00 Municipal Gov't of DOS, Mag. By MOA 100.00% Completed

2014 Maguindanao I Datu Odin Sinsuat Road Concreting of Pob National Highway- Pob Old Market 1.000 1.00 1.00 10.00 Municipal Gov't of DOS, Mag. By MOA 100.00% Completed

2014 Maguindanao I Datu Odin Sinsuat Water System Construction of Water System, Bago Inged, Datu Odin Sinsuat 1 unit 1 unit 4.00 Municipal Gov't of DOS, Mag. By MOA 100.00% Completed

2014 Maguindanao I Mother Kabuntalan Road Concreting of Taviran-Ganta-Tuka Road 0.675 0.68 0.68 11.00 Maguindanao 1st DEO By Admin 100.00% Completed

2014 Maguindanao I North Upi Road Concreting of Tinedanan-Pob. Road, Rempis, North Upi 0.400 0.40 0.40 4.00 Municipal Gov't of North Upi, Mag. By MOA 100.00% Completed

2014 Maguindanao I Northern Kabuntalan Port Construction of Fish Landing, Montay, Northerm Kabuntalan 1 unit 1 unit 4.00 Maguindanao 1st DEO By Admin 100.00% Completed

2014 Maguindanao I Northern Kabuntalan Road Concreting of Lagumbingan-Labio Road, Northern Kabuntalan Section 0.600 0.60 0.60 6.79 Maguindanao 1st DEO By Admin 100.00% Completed

2014 Maguindanao I Nothern Kabuntalan Water System Construction of Water System, Gayunga, Northern Kabuntalan 1 unit 1 unit 3.00 Maguindanao 1st DEO By Admin 100.00% Completed

2014 Maguindanao I Parang Drainage Concrete Drainage along Cotabato-Lanao Road, Pob. Parang Section 1 unit 1 unit 2.37 Municipal Gov't of Parang,

Mag. By MOA 100.00% Completed

2014 Maguindanao I Parang Port Const. of Fish Port, Sitio Kalutan, Making Parang 1 unit 1 unit 2.00 Maguindanao 1st DEO By Admin 100.00% Completed

2014 Maguindanao I Parang Port Rehab/Development of Polloc Port 1 unit 1 unit 100.00 Municipal Gov't of Parang, Mag. By MOA 100.00% Completed

Page 11: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2014 Maguindanao I Parang Road Concreting of Brgy. Road, Sitio Kalutan, Making, Parang 0.100 0.10 0.10 1.00 Maguindanao 1st DEO By Admin 100.00% Completed

2014 Maguindanao I Parang Road Concreting of Padang-Padang Adventure Park Road, Phase II, Parang 0.880 0.88 0.88 9.78 Municipal Gov't of Parang,

Mag. By MOA 100.00% Completed

2014 Maguindanao I Parang Road Road Upgrading, Parang-Buldon Road 4.140 4.14 4.14 41.40 Municipal Gov't of Parang, Mag. By MOA 100.00% Completed

2014 Maguindanao I Parang Water System Const. of Water System, Sitio Kalutan, Making, Parang 1 unit 1 unit 1.68 Municipal Gov't of Parang, Mag. By MOA 100.00% Completed

2014 Maguindanao I Parang Water System Construction of Parang Water supply Level III, Parang 1 unit 1 unit 20.00 Municipal Gov't of Parang, Mag. By MOA 100.00% Completed

2014 Maguindanao I Sultan Kudarat Road Concreting of Pinaring-Ibotegen Prov. Road, Sultan Kudarat 0.650 0.65 0.65 10.00 Maguindanao 1st DEO By Admin 100.00% Completed

2014 Maguindanao I Sultan Kudarat Road Concrete Drainage along Cotabato-Lanao Road, Crossing Simuay Section 1 unit 1 unit 2.50 Maguindanao 1st DEO By Admin 100.00% Completed

2014 Maguindanao I Sultan Kudarat Road Concrete Drainage along Cotabato-Lanao Road, Lamsan Junction section 1 unit 1 unit 2.50 Maguindanao 1st DEO By Admin 100.00% Completed

2014 Maguindanao I sultan Mastura Road Concreting of Highway Macabiso-Solon Road, Sultan Mastura 1.000 1.00 1.00 10.00 Maguindanao 1st DEO By Admin 100.00% Completed

2014 Maguindanao II Buluan Water System Construction of Water Supply Project for the Municipality of Buluan I unit 5.00 Maguindanao 2nd DEO BY Admin 100.00% Completed

2014 Maguindanao II Datu Abdullah Sangki Road Concreting of Banaba-Palitan Road, Datu Abdullah Sangki 1.000 1.00 0.85 10.00 Maguindanao 2nd DEO BY Admin 100.00% Completed

2014 Maguindanao II Datu Anggal Midtimbang Water System Construction of Water Supply Project for the Municipality of

Datu Anggal Midtimbang I unit 5.00 Maguindanao 2nd DEO BY Admin 100.00% Completed

2014 Maguindanao II Datu Paglas RoadConcrete Widening along Kidapawan-Ala-Junction Road Km 1644+758 - Km 1650+580 (Phase I), Datu Datu Paglas Section

0.670 0.67 0.61 10.00 Maguindanao 2nd DEO BY Admin 100.00% Completed

2014 Maguindanao II Datu Paglas Shore Protection Concrete Slope Protection of Alip Section, Datu Datu Paglas I unit 12.00 Maguindanao 2nd DEO BY Admin 100.00% Completed

2014 Maguindanao II Datu Piang Bridge Rehab. Of Dulawan Bridge along Midsayap-Dulawan-Makar Road Datu Piang Section, Km 1896+278 1-unit 10.32 Maguindanao 2nd DEO BY Admin 100.00% Completed

2014 Maguindanao II Datu Piang Drainage Upgrading and Concreting of Road Dike,Brgy. Buayan-Brgy. Balong, Datu Piang, Phase II 1.230 1.00 12.32 Maguindanao 2nd DEO BY Admin 100.00% Completed

2014 Maguindanao II Datu Piang Water System Construction of Water Supply Project for the Municipality of Datu Piang I unit 5.00 Maguindanao 2nd DEO BY Admin 100.00% Completed

2014 Maguindanao II Datu Salibo Road Upgrading and Concreting of Road Dike, Brgy. Tee-Sambolawan, Datu Salibo Phase I 4.925 4.93 0.65 7.88 Maguindanao 2nd DEO BY Admin 100.00% Completed

2014 Maguindanao II Datu Saudi RoadConcrete Widening with Line Canal along Marbel-Ala-Cotabato Roads, Km 1807+455 - Km 1809+754, Datu Saudi Section

0.645 0.65 0.60 10.32 Maguindanao 2nd DEO BY Admin 100.00% Completed

2014 Maguindanao II Datu Unsay Bridge Rehab./Improvement of Meta Bridge, Datu Unsay I unit 20.00 Maguindanao 2nd DEO BY Admin 100.00% Completed

2014 Maguindanao II Guindulungan Water System Construction of Water Supply Project for the Municipality of Guindulungan I unit 5.00 Maguindanao 2nd DEO BY Admin 100.00% Completed

2014 Maguindanao II Mamasapano Road Concrete Pavement of Libutan Road 0.670 0.67 0.85 10.00 Maguindanao 2nd DEO BY Admin 100.00% Completed

2014 Maguindanao II Pagalungan Drainage Concreting of Road dike, Brgy. Kudal-Rajamuda,Pagalungan 0.864 0.72 8.64 Maguindanao 2nd DEO BY Admin 100.00% Completed

2014 Maguindanao II Pagalungan Water System Construction of Water Supply Project for the Municipality of Pagalungan I unit 5.00 Maguindanao 2nd DEO BY Admin 100.00% Completed

2014 Maguindanao II Pandag Road Concreting of Pandag Road, Pandag 1.000 1.00 1.21 15.00 Municipal Gov't of Pandag, Mag. By MOA 100.00% Completed

Page 12: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2014 Maguindanao II Rajah Buayan Water System Construction of Water System, Brgy. Sapakan, Rajah Buayan I unit 10.32 Maguindanao 2nd DEO BY Admin 100.00% Completed

2014 Maguindanao II Shariff Aguak Water System Construction of Water Supply Project for the Municipality of Shariff Aguak I unit 5.00 Maguindanao 2nd DEO BY Admin 100.00% Completed

2014 Maguindanao II SK Pendatun Road Upgrading ang Concreting of Road Dike, Brgy. Lansangan-Lao Lao, SK Pendatun 5.000 5.00 0.66 8.00 Maguindanao 2nd DEO BY Admin 100.00% Completed

2014 Sulu I Indanan Road Junction Timbangan-Romandier Road Km 12+500 - 15+500 (with exceptions) 1.626 1.63 1.63 37.24 Sulu 1st DEO By Admin 100.00% Completed

2014 Sulu I Indanan Road Rehabilitation of Kajatian Road, Indanan 1.000 1.00 1.00 10.00 Sulu 1st DEO By Admin 100.00% Completed

2014 Sulu I Indanan Road Concreting of Langtad-Kan-Islam Brgy. Road, Indanan 1.000 1.00 1.00 10.00 Sulu 1st DEO By Admin 100.00% Completed

2014 Sulu I Indanan Water System Const. of Tumantangis-Lasuwag Spring Development, Indanan 1 unit 5.00 Sulu 1st DEO By Admin 90.00% Ongoing

2014 Sulu I Jolo Drainage Rehabilitation/Improvement of Tulay (Zone 3) Open Canal, Jolo 1 unit 1 unit 11.72 Municipal Government of

Jolo By MOA 100.00% Completed

2014 Sulu I Jolo Road Rehabilitation of Barrio Militar Road, Jolo 1.000 1.00 1.00 10.00 0 By MOA 100.00% Completed

2014 Sulu I Jolo Road Rehabilitation of Asturias Road, Jolo 0.500 0.50 0.50 5.00 Municipal Government of Jolo By MOA 100.00% Completed

2014 Sulu I Jolo Road Rehabilitation of Kasalamatan Road, Jolo 0.500 0.50 1.00 10.00 Municipal Gov't of Jolo By MOA 100.00% Completed

2014 Sulu I Jolo Road Upgrading of Jolo-Silangkan Road (Km. 15+000-16+000) 1.000 1.00 1.00 20.00 Sulu 1st DEO By Admin 100.00% Completed

2014 Sulu I Jolo Road Upgrading/Rehabilitation of Bus-Bus Gandasuli Road, Jolo 1.500 1.50 1.00 30.00 Sulu 1st DEO By Admin 100.00% Completed

2014 Sulu I Jolo Road Upgrading of Jolo-Pantao Road 0.400 0.40 1.00 10.00 Sulu 1st DEO By Admin 100.00% Completed

2014 Sulu I Jolo Road Concreting of Jolo Pantao Road, Phase II 4.000 4.00 4.00 40.00 Sulu 1st DEO By Admin 100.00% Completed

2014 Sulu I Maimbung Port Construction of Maimbung Seaports 1 unit 50.00 Provincial Government of Sulu By MOA 90.00% Ongoing

2014 Sulu I Maimbung Road Rehabilitation of Pagsalipangan - Maimbung Road Km. 9+000 - 11+000 (with exception) 1.000 1.00 1.00 20.00 Provincial Government of

Sulu By MOA 100.00% Completed

2014 Sulu I Parang Road Construction/Improvement of Lagasan Dakulah Road, Parang 1.000 1.00 1.00 10.00 - By MOA 100.00% Completed

2014 Sulu I Parang Road Upgrading of Parang-Maimbung Road (Km. 28+000-29+000) 1.000 1.00 1.00 20.00 Municipal Gov't of Parang, Sulu Province By MOA 100.00% Completed

2014 Sulu I Parang Road Upgrading of Parang-Maimbung Road 0.750 0.75 1.00 20.00 Provincial Government of Sulu By MOA 100.00% Completed

2014 Sulu I Parang Road Concreting of Sulu Island Circumferencial Roads, Phase II 20.000 20.00 13.60 200.00 Sulu 1st DEO By Admin 68.00% Ongoing

2014 Sulu I Patikul Road Upgrading of Pangdanon-Taong Road, Patikul 0.250 0.25 0.26 5.40 Sulu 1st DEO By Admin 100.00% Completed

2014 Sulu I Patikul Road Rehabilitation of Bunbun Road, Patikul 1.224 1.22 1.22 12.24 Sulu 1st DEO By Admin 100.00% Completed

2014 Sulu I Talipao Road Upgrading of Sapah Bunuan - Kabungkol Road Km.24+300 - 25+300 1.000 1.00 1.00 20.00 Municipal Gov't of Taipao,

Sulu Province By MOA 100.00% Completed

2014 Sulu I Talipao Road Upgrading of Buntod Road, Talipao 0.500 0.50 1.00 10.00 Municipal Gov't of Taipao, Sulu Province By MOA 100.00% Completed

Page 13: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2014 Sulu I Talipao Road Concreting of Tuyang Road, Talipao 1.000 1.00 1.00 10.00 Municipal Gov't of Taipao, Sulu Province By MOA 100.00% Completed

2014 Sulu I Talipao Water System Construction of Sagay Sagay Water Supply System ( phase I ) Talipao-Patikul-Jolo Municipalities 1 unit 1 unit 30.00 ASAP Construction and

General Trading By Contract 100.00% Completed

2014 Sulu II Banguingui Water System Construction of Water Supply Project for the Mun. of Banguingui 1 unit 1 unit 3.00 Sulu 2nd DEO By Admin 100.00% Completed

2014 Sulu II Kalingalan Caluang Road Construction of Pang Karungdong-Kalingalan Caluang Road 0.600 0.60 0.60 10.00 Sulu 2nd DEO By Admin 100.00% Completed

2014 Sulu II Kalingalan Caluang Water SystemConstruction of Water Supply Project Level II System Phase I (kalingalan Caluang-Estino-Panamao-Luuk-Omar Municipalities

1 unit 1 unit 40.63 Sulu 2nd DEO By Admin 100.00% Completed

2014 Sulu II Lugus Port Construction of Lugus Seaport 1 unit 5.00 Sulu 2nd DEO By Admin 93.54% Ongoing

2014 Sulu II Lugus Water System Construction of Water Supply Project for the Mun. of Lugus 1 unit 1 unit 3.00 Sulu 2nd DEO By Admin 100.00% Completed

2014 Sulu II Luuk Road Upgrading of Camp Andres - Sucuban Road, Luuk 0.750 0.75 0.75 16.05 Sulu 2nd DEO By Admin 100.00% Completed

2014 Sulu II Luuk Road Construction of Lahing-lahing Camp Andres Provincial Road 0.600 0.60 0.60 10.00 Sulu 2nd DEO By Admin 100.00% Completed

2014 Sulu II Old Panamao Port Construction of Panamao Seaport 1 unit 1 unit 4.52 Sulu 2nd DEO By Admin 100.00% Completed

2014 Sulu II Old Panamao Road Rehabilitation/Upgrading of Siet Tayungan-Camp Andres Road 1.000 1.00 1.00 20.00 Sulu 2nd DEO By Admin 100.00% Completed

2014 Sulu II Omar Port Construction of Omar Seaport 1 unit 1 unit 5.00 Sulu 2nd DEO By Admin 100.00% Completed

2014 Sulu II Pandami Water System Construction of Water Supply Project for the Mun. of Pandami 1 unit 1 unit 3.00 Sulu 2nd DEO By Admin 100.00% Completed

2014 Sulu II Panglima Estino Water System Expansion of Sagay Sagay Water Supply System, Phase II 1 unit 1 unit 20.00 Sulu 2nd DEO By Admin 100.00% Completed

2014 Sulu II Pata Port Construction of Pata Seaport 1 unit 1 unit 5.00 Sulu 2nd DEO By Admin 100.00% Completed

2014 Sulu II Pata Water System Construction of Water Supply Project for the Mun. of Pata 1 unit 3.00 Sulu 2nd DEO By Admin 50.00% Ongoing

2014 Sulu II Siasi Road Concreting of Siasi Tausan Road, Phase II 3.000 3.00 3.00 30.00 Sulu 2nd DEO By Admin 100.00% Completed

2014 Sulu II Siasi Water System Construction of Water Supply Project for the Mun. of Siasi 1 unit 1 unit 3.00 Sulu 2nd DEO By Admin 100.00% Completed

2014 Sulu II Tapul Port Construction of Tapul Seaport 1 unit 5.00 Sulu 2nd DEO By Admin 90.77% Ongoing

2014 Sulu II Tapul Water System Construction of Water Supply Project for the Mun. of Tapul 1 unit 3.00 Sulu 2nd DEO By Admin 29.53% Ongoing

2014 Tawi-Tawi Bongao Bridge Const of TanduBato Footbridge w/ Pierhead, Bongao 1 unit 0.00 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Bongao Bridge Const of Mandulan Footbridge w/ Pierhead, Bongao 1 unit 0.00 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Bongao Drainage Concreting of E/S -Awwal Drainage Facilities 1 unit 0.00 5.20 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Bongao Drainage Const. of Tawelco Drainage Facilities, Bongao 1 unit 0.00 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Bongao Drainage Conts. Of Capitol Drainage Facilities, Bongao 1 unit 0.00 5.00 Tawi Tawi DEO By Admin 100.00% Completed

Page 14: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2014 Tawi-Tawi Bongao Drainage Conts. Of old Housing Drainange Facilities, Bongao 1 unit 0.00 2.95 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Bongao Port Concreting of Circumferencial Causeway and Docking Port Bangao, Phase II 1 unit 0.00 23.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Bongao Road Concreting of Lakit Lakit- Mandulan Road 2.300 2.30 2.30 23.30 Municipal Gov't of Bongao, Province of Tawi-Tawi By MOA 100.00% Completed

2014 Tawi-Tawi Bongao Road Concrete Paving of Sanga Snaga-Lapid Lapid National Road, Bongao 0.435 0.44 0.44 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Bongao Road Concreting of Sowangkagang-Nalil Road, Bangao 1.000 1.00 1.00 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Bongao Road Concreting of Patal-Karungdung Road, Bongao 1.000 1.00 1.00 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Bongao Road Const. of Tongsinah-Lagasan Road, Bongao 0.500 0.50 0.50 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Bongao Road Concreting of kamagong Road, Bongao 0.200 0.20 0.20 2.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Bongao Road Concreting of Tubig Boh Road. Bongao 0.200 0.20 0.20 2.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Bongao Shore Protection Const./Rehab. Of Sowangkagang Shore Protection, Bongao 1 unit 0.00 2.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Bongao Shore Protection Const./Rehab. Of Pahut Shore Protection, Bongao 1 unit 0.00 2.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Languyan Road Concret/Improvement of panimusan-Boheh Maheya Road, Languyan 0.365 0.37 0.37 3.65 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Mapun Port Contruction of seaport, Mapun 1 unit 0.00 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Mapun Road Concrete Paving of Lupa Pula-Umus Mataha Road, Mapun 0.385 0.39 0.39 8.85 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Mapun Road Concreting of Boki-Tabulian Road, Mapun 0.500 0.50 0.50 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Mapun Road Concreting of Pawan Road, Mapun 0.200 0.20 0.20 2.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Mapun Road Construction of Taganak Municipal Road, Turtle Island, Mapun 0.500 0.50 0.50 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Panglima Sugala Road Concreting of Bato-Bato-Tarawakan National Road, Panglima Sugala 0.563 0.56 0.56 12.95 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Panglima Sugala Road Concreting of Bato Bato-Parangan Road, Panglima Sugala 1.000 1.00 1.00 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Panglima Sugala Road Concreting of Tarawakan Road, Panglima Sugala 0.300 0.30 0.30 3.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Panglima Sugala Road Concreting of Bato Bato- Parangan Road 4.030 4.03 4.03 40.30 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Panglima Sugala Road Concreting of Bato Bato- Magsaggaw Road 2.500 2.50 2.50 25.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Sapa Sapa Bridge Const of Matabuan FootBridge w/ Pierhead, Sapa sapa 1 unit 0.00 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Sapa Sapa Bridge Const of Palate Footbridge w/ Pierhead, Sapa sapa 1 unit 0.00 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Sapa Sapa Road Concreting of Tapian Bohe North Road, Sapa-Sapa 0.200 0.20 0.20 2.00 Tawi Tawi DEO By Admin 100.00% Completed

Page 15: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2014 Tawi-Tawi Sibutu Bridge Const. of Tando Owak Footbridge, Sibutu 1 unit 0.00 1.55 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Sibutu Road Concreting of Ligayan-Tando Owak Road, Sibutu 1.000 1.00 1.00 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Sibutu Shore Protection Conts. /Rehab. Of Tandubanak Shore Protection, Sibutu 1 unit 0.00 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Simunul Road Concrete Paving of Tampakan-Tonggusong Road, Simunul 0.435 0.44 0.44 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Simunul Road Concreting of Tubig Indangan Road, Simunul 1.000 1.00 1.00 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Simunul Road Concreting of Tungusong - Tubig Indangan Road 1.000 1.00 1.00 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Sitangkai Bridge Const. of Sipangkot Footbridge, Sitangkai 1 unit 0.00 2.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Sitangkai Bridge Conts. Of Sitangkai Footbridge, Sitangkai. 1 unit 0.00 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Sitangkai Road Concreting of Tongmaging-Larap Road, Sitangkai 0.500 0.50 0.50 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Sitangkai Shore Protection Const./Rehab. Of Larap Shore Protection, Sitangkai 1 unit 0.00 2.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi South Ubian Bridge Const. of Tabawan Footbridge, South Ubian 1 unit 0.00 2.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Tandubas Port Expansion of Tandubas Proper Port, Tandubas 1 unit 0.00 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Tandubas Road Concrete Paving of Tandubas-Ungus Matata National Road, Tandubas 0.435 0.44 0.44 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Tandubas Road Concreting of Upper Tanggah Road, Tandubas 0.500 0.50 0.50 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Tandubas Road Concreting of Sapa, Tandubas Road 0.150 0.15 0.15 1.50 Tawi Tawi DEO By Admin 100.00% Completed

2014 Tawi-Tawi Tandubas Road Concreting/Reblocking of Ungus Matata-Buton Road, Tandubas 0.835 0.84 0.84 8.35 Tawi Tawi DEO By Admin 100.00% Completed

2015 Basilan Akbar Port Construction of Semmut Port, Akbar 1-unit 5.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Akbar Road Concreting from Upper Bato Bato - Paguengan - Mangalut - Manguso Road, Akbar (Phase I) 2.000 2.00 2.00 24.00 Municipal Gov't of Akbar By MOA 100.00% Completed

2015 Basilan Akbar Water System Construction of Level II Water System for Tuburan - Akbar 1-unit 39.50 ASAP Gen. Trading & Const. Maintenance By Contract 100.00% Completed

2015 Basilan Al-Barka Bridge Construction of Bridge from Brgy. Bohelebung, Tipotipo - Brgy. Cambug, Al Barka 1-unit 40.00 ESR Construction and

Supply By Contract 65.00% Ongoing

2015 Basilan Al-Barka Port Construction of Municipal Port, Sitio Lakit, Al-Barka (Phase I) 1-unit 20.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Al-Barka Port Construction of Kaulungan Port , Al-Barka 1-unit 5.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Al-Barka Port Construction of Municipal Port, Sitio Lakit, Al-Barka, Phase II 1-unit 20.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Al-Barka Port Construction/Expansion of Port Cambug, Al-Barka 1-unit 15.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Al-Barka Road Concreting from Amaloy-Matata, Ungkaya Pukan-Bucalao Road, Al-Barka 5.000 5.00 60.00 L.S. Lasacar Construction By Contract 20.50% Ongoing

Page 16: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2015 Basilan Al-Barka Road Concreting from Kuhon - Kinukutan Road, Al-Barka 2.000 2.00 1.42 24.00 Municipal Gov't of Al-Barka By MOA 83.00% Ongoing

2015 Basilan Hadji Muhtamad Port Construction of Municipal Port, Hadji Muhtamad (Phase I) 1-unit 10.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Hadji Muhtamad Port Construction of Municipal Port, Hadji Muhtamad, Phase II 1-unit 10.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Hadji Muhtamad Road Concreting from Tausan - Pandukan Road, Hadji Muhtamad 3.000 3.00 0.95 36.00 Municipal Gov't of Hadji Muhtamad By MOA 67.50% Ongoing

2015 Basilan Isabela City Port Construction of White Beach Port, Tmalamawi, Isabela City 1-unit 5.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Isabela City Road Concreting of Brgy. Masola, Isabela City - Brgy. Kapatagan grande, Isabela city 6.000 6.00 4.09 72.00 Basilan DEO By Admin 93.50% Ongoing

2015 Basilan Isabela City Road Concreting of Brgy. Kapatagan grande, Isabela City - Brgy. Kapatagan small, Isabela city 4.500 4.50 3.85 54.00 Basilan DEO By Admin 94.50% Ongoing

2015 Basilan Isabela City Road Concreting of Brgy. Kumalarang, Isabela City - Brgy. Makiri, Isabela City 3.000 3.00 3.00 60.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Isabela City Road Concreting of Brgy. Makiri, Isabela City-Brgy. Balatanay, Isabela City 2.000 2.00 2.00 40.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Lamitan City Bridge Construction of Bulingan Bridge, Lamitan City 1-unit 30.00 Basilan DEO By Admin 89.50% Ongoing

2015 Basilan Lamitan City Drainage

1.5 km Gubawan river channel and Lamitan lateral drainage improvement works, Lamitan City 1-unit 200.00 0 By Contract NYS

2015 Basilan Lamitan City Port Construction of Balas Port, Lamitan City 1-unit 5.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Lamitan City Port Expansion of Lamitan Seaport Phase II (w/ roro head) 1-unit 150.00 CS Santiago Construction By Contract 100.00% Completed

2015 Basilan Lamitan City Road Concreting of Brgy. Sengal, Lamitan City-Brgy. Balas, Lamitan City 3.000 3.00 3.00 60.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Lamitan City Road Concreting of Brgy. Sengal, Lamitan City-Brgy. Balas, Lamitan City 4.500 4.50 4.50 90.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Lamitan City Road Concreting of Inner Lagasan( DPWH Office) Road, Lamitan city 1.000 1.00 1.00 12.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Lamitan City Road Concreting of Brgy. Batu Road, Lamitan City 0.200 0.20 0.20 2.40 Basilan DEO By Admin 100.00% Completed

2015 Basilan Lamitan City Road Concreting of Balagtasan - Tumakid Road, Lamitan City (Phase I) 1.500 1.50 1.50 18.00 Basilan DEO By admin 100.00% Completed

2015 Basilan Lamitan City Road Concreting of Brgy. Kapatagan small, Isabela City - Brgy. Boheh Nange, Lamitan City 6.000 6.00 1.10 72.00 City Gov't of Lamitan By MOA 78.50% Ongoing

2015 Basilan Lamitan City Road Concreting from Lamitan Highway - Ubit - Bohe Yawas - Lumuton Road, Lamitan City 3.000 3.00 2.79 36.00 City Gov't of Lamitan By MOA 98.00% Ongoing

2015 Basilan Lamitan City Road Concreting of Brgy. Calugusan, Lamitan City-Brgy. Luksumbang, Lamitan City 5.000 5.00 4.58 100.00 City Gov't of Lamitan By MOA 98.50% Ongoing

2015 Basilan Lamitan City Road Concreting of Brgy. Boheh Nange, Lamitan City - Brgy. Sta. Clara, Lamitan City 4.500 4.50 4.25 54.00 City Gov't of Lamitan By MOA 98.50% Ongoing

2015 Basilan Lamitan City Road Concreting of Sayugan-Little Cebu, Lamitan city 1.200 1.20 1.17 14.40 City Gov't of Lamitan By MOA 99.00% Ongoing

2015 Basilan Lamitan City Road Concreting of Lagasan ( State College) - City Hall ( Imam Uto), Lamitan city 1.200 1.20 1.20 13.38 City Gov't of Lamitan By MOA 100.00% Completed

2015 Basilan Lamitan City Road Concreting of Limook-Balobo-Bulingan Road, Lamitan City ( Phase I ) 3.000 3.00 3.00 60.00 City Gov't of Lamitan By MOA 100.00% Completed

Page 17: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2015 Basilan Lamitan City Road Concreting of Limook-Balobo-Bulingan Road, Lamitan City (Phase II) 2.000 2.00 2.00 40.00 City Gov't of Lamitan By MOA 100.00% Completed

2015 Basilan Lamitan City Road Concreting of Balobo, Lamitan City-Brgy. Colonia, Lamitan City 1.500 1.50 1.50 18.00 City Gov't of Lamitan By MOA 100.00% Completed

2015 Basilan Lamitan City Road Concreting from Lamitan Highway - Maloong San Jose - Maloong Canal Road, Lamitan City 3.000 3.00 3.00 36.00 Hexaminds Construction By Contract 100.00% Completed

2015 Basilan Lamitan City Shore Protection Construction of Shore Protection, Balas, Lamitan City 1-unit 10.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Lamitan City Water System Construction/Expansion of Lamitan Water District, Lamitan City (Phase II) 1-unit 20.00 ASAP Gen. Trading & Const.

Maintenance By Contract 95.50% Ongoing

2015 Basilan Lamitan City Water System Construction/Expansion of Lamitan water district, Lamitan City (phase III) 1-unit 15.00 ASAP Gen. Trading & Const.

Maintenance By Contract 95.50% Ongoing

2015 Basilan Lamitan City Water System Construction of Deep Well with Elevated Tank, Inner Lagasan, Lamitan City 1-unit 2.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Lantawan Drainage Construction of Atong-Atong Box Culvert, Lantawan 1-unit 2.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Lantawan Drainage Construction of Box Culvert, Bulanza, Lantawan 1-unit 2.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Lantawan Port Expansion of Port, Atong-atong, Lantawan 1-unit 10.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Lantawan Road Concreting of Brgy. Balatanay, Isabela City-Brgy. Lower Manggas, Lantawan 1.200 1.20 1.20 24.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Lantawan Road Concreting of Brgy. Lower Manggas, Lantawan-Brgy. Atong Atong, Lantawan 2.200 2.20 2.20 44.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Lantawan Road Concreting of Brgy. Atong Atong, Lantawan-Brgy. Matikang, Lantawan 2.000 2.00 2.00 40.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Lantawan Road Concreting of Brgy. Matikang Lantawan, Brgy. Bulanza, Lantawan 2.900 2.90 2.90 58.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Lantawan Road Concreting of Brgy. Bulanza, Lantawan-Brgy. Tairan, Lantawan 2.700 2.70 2.70 54.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Lantawan Road Concreting from Lantawan Highway - Matarling - Upper Manggas - Atong Atong Road, Lantawan 2.800 2.80 2.80 33.60 Basilan DEO By Admin 100.00% Completed

2015 Basilan Lantawan Road Concreting from Lantawan Highway - Pamucalin - Parian Baunoh - Canibungan Road, Lantawan 2.000 2.00 1.49 24.00 Municipal Gov't of Lantawan By MOA 94.50% Ongoing

2015 Basilan Lantawan Shore Protection Construction of Seawall along Atong-Atong - Matikang Road, Lantawan (Phase II) 1-unit 10.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Lantawan Water System Construction of Lantawan Water System Level II, Lantawan 1-unit 30.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Lantawan Water System Construction of Lantawan Water System Level II, Lantawan (Phase II) 1-unit 10.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Maluso Port Expansion of Maluso Port 1-unit 20.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Maluso Road Concreting of Port Area Road - Fishing Port, Upper Port Holland, Maluso 0.300 0.30 0.30 6.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Maluso Road Concreting from Maluso Highway - Taborlongan, Maluso( Phase I ) 1.000 1.00 1.00 12.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Maluso Road Concreting of Brgy. Lower Mahayahay-Upper Mahayahay-Puno Mahadje, Maluso (Phase 1) 2.000 2.00 1.90 40.00 Provincial Gov't of Basilan By MOA 99.00% Ongoing

2015 Basilan Maluso Water System Construction/Expansion of Maluso Water District (Phase II ), Maluso 1-unit 15.00 Basilan DEO By Admin 100.00% Completed

Page 18: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2015 Basilan Maluso Water System Construction/Expansion of Maluso Water District (phase III ), Maluso 1-unit 20.39 Basilan DEO By Admin 100.00% Completed

2015 Basilan Muhammad Ajul Bridge Construction of Foot Bridge, Langil Island, Hadji Mohammad Ajul 1-unit 5.00 Basilan DEO By Admin 99.00% Ongoing

2015 Basilan Muhammad Ajul Bridge Construction of Overflow (Bridge), Tuburan Proper, Hadji Mohammad Ajul 1-unit 2.00 Basilan DEO By Admin 99.00% Ongoing

2015 Basilan Muhammad Ajul Port Construction of Port, Buton, Muhammad Ajul 1-unit 5.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Muhammad Ajul Port Construction of Tuburan Proper Port, Muhammad Ajul 1-unit 5.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Muhammad Ajul Road Concreting of Tuburan Proper - Bakud, Mohammad Ajul (Phase I) 2.000 2.00 0.52 24.00 Basilan DEO By Admin 55.00% Ongoing

2015 Basilan Muhammad Ajul Road Concreting of Brgy. Buton, Hadji Mohammad Ajul-Brgy. Tuburan Proper, Hadji Muhamad Ajul 5.100 5.10 1.78 102.00 Basilan DEO By Admin 68.50% Ongoing

2015 Basilan Muhammad Ajul Road Concreting of Road from National Highway Junction Pekok - Candiis - Kasanyangan - Kapagu - Pintasan, Mohammad Ajul 4.000 4.00 3.39 48.00 Basilan DEO By Admin 95.50% Ongoing

2015 Basilan Muhammad Ajul Road Concreting of Brgy. Semut, Akbar-Brgy. Buton, Hadji Mohammad Ajul 4.580 4.58 3.38 91.60 Basilan DEO By Admin 98.80% Ongoing

2015 Basilan Sumisip Drainage Construction of Drainage at Sumisip 1-unit 50.00 Basilan DEO By Admin 92.50% Ongoing

2015 Basilan Sumisip Drainage Construction of Box Culvert, Langarey, Sumisip 1-unit 2.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Sumisip Port Construction of Mangal Port, Sumisip 1-unit 5.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Sumisip Port Construction of Langarey Port, Sumisip 1-unit 5.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Sumisip Port Construction of Buli-Buli Port, Sumisip (Phase III) 1-unit 20.00 ESR Construction and Suuply By Contract 89.50% Ongoing

2015 Basilan Sumisip Road Concreting from Sumisip Highway - Sukaten - Tumahubong Road, Sumisip 3.200 3.20 2.21 38.37 Basilan DEO By Admin 78.00% Ongoing

2015 Basilan Sumisip Road Concreting of Central Sumisip - Kaum Air - Luuk Bait Road, Sumisip 2.500 2.50 1.55 30.00 Basilan DEO By Admin 83.75% Ongoing

2015 Basilan Sumisip Road Concreting of Sumisip Highway - Mebak - Sapah Languyan Road, Sumisip 4.000 4.00 2.79 48.00 Basilan DEO By Admin 88.00% Ongoing

2015 Basilan Sumisip Road Concreting of Roxas Blvd. Fishing Port Road, Upper port, Maluso 0.800 0.80 0.80 16.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Sumisip Road Concreting of Various Bulibuli Road, Sumisip 2.000 2.00 2.00 24.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Sumisip Road Concreting from Sumisip Highway - Upper Benembengan - Mangal Road, Sumisip 2.900 2.90 2.90 34.80 Basilan DEO By Admin 100.00% Completed

2015 Basilan Sumisip Road Concreting from Sumisip Highway - Upper Benembengan - Baiwas Road, Sumisip 2.000 2.00 2.00 24.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Sumisip Road Concreting from Sumisip Highway - Upper Cabengbeng - Lower Cabengbeng Road, Sumisip (Phase II) 2.000 2.00 2.00 24.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Sumisip Road Concreting of Road from Sumisip Highway - Tumahubong Air Strip Road, Sumisip 1.500 1.50 1.50 18.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Sumisip Road Concreting from Sumisip Highway - Guiong - Alpaya Road, Sumisip (Phase I) 2.000 2.00 0.71 24.00 Municipal Gov't of Sumisip By MOA 74.00% Ongoing

2015 Basilan Sumisip Road Concreting of Central Sumisip - Irelley Road, Sumisip 2.500 2.50 1.56 30.00 Municipal Gov't of Sumisip By MOA 93.00% Ongoing

Page 19: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2015 Basilan Sumisip Water System Construction of water supply level II, for Mangal, Upper Benembengan, Lower Benembengan Libug & Cabcaban, Limbucandis, Sumisip

1-unit 29.33 Basilan DEO By Admin 100.00% Completed

2015 Basilan Sumisip Water System Construction of Tumahubong Water System Level II, Sumisip 1-unit 40.00 Basilan DEO By Admin 94,5% Ongoing

2015 Basilan Tabuan Lasa Bridge Construction of Foot Bridge, Pisak-Pisak, Tabuan Lasa 1-unit 5.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Tabuan Lasa Port Construction of Brgy. Babag Port , Tabuan Lasa 1-unit 5.00 Basilan DEO By Admin 99.00% Ongoing

2015 Basilan Tabuan Lasa Port Construction of Brgy. Bukut-Umus Port Saluping Island, Tabuan Lasa 1-unit 5.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Tabuan Lasa Port Construction of Balanting Port, Tabuan Lasa 1-unit 5.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Tabuan Lasa Port Construction of Bulobulu Port, Tabuan Lasa 1-unit 5.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Tabuan Lasa Port Construction of Lanawan Port, Tabuan Lasa 1-unit 5.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Tabuan Lasa Port Construction of Tong Umus Port, Tabuan Lasa 1-unit 5.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Tabuan Lasa Port Construction of Saluping Proper Ports, Tabuan Lasa 1-unit 5.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Tabuan Lasa Port Construction of Tambulig Port , Tabuan Lasa 1-unit 5.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Tabuan Lasa Water System Construction of Deep Well with Elevated Tank, Tambulig, Tabuan Lasa 1-unit 2.00 Basilan DEO By Admin 100.00% Completed

2015 Basilan Tipo-Tipo Road Concreting of Limbo upas - Linuan - Magkawa Road 3.500 3.50 2.05 42.00 Mnicipal Gov't of Tipo Tipo By MOA 90.00% Ongoing

2015 Basilan Tipo-Tipo Road Concreting of Tipo-Tipo Highway - Lagayas- Pipil Road, Tipo-Tipo 1.500 1.50 1.34 18.00 Mnicipal Gov't of Tipo Tipo By MOA 98.50% Ongoing

2015 Basilan Tipo-Tipo Road Concreting of Baguindan-Silangkum, Tipo Tipo 2.000 2.00 2.00 24.00 Mnicipal Gov't of Tipo Tipo By MOA 100.00% Completed

2015 Basilan Tipo-Tipo Water System Construction of Level II Water System for Ungkaya Pukan - Al-Barka - Tipo-Tipo (Phase III) 1-unit 20.00 ASAP Gen. Trading & Const.

Maintenance By Contract 79.00% Ongoing

2015 Basilan Tipo-Tipo Water System Construction of Level II Water System for Ungkaya Pukan - Al-Barka - Tipo-Tipo (Phase II) 1-unit 25.00 ASAP Gen. Trading & Const.

Maintenance By Contract 84.50% Ongoing

2015 Basilan Tuburan Drainage Construction of Box Culvert, Tuburan Proper 1-unit 2.00 Basilan DEO By Admin 99.00% Ongoing

2015 Basilan Tuburan Road Concreting from National Highway - Libug - Marang - Panuburan, Tuburan Municipality 1.500 1.50 1.50 18.00 Municipal Gov't of Tuburan By MOA 100.00% Completed

2015 Basilan Ungkaya Pukan Road Concreting of Road from Tipo Tipo Highway-Brgy. Sungkayut, Ungkaya Pukan 2.000 2.00 0.18 40.00 L.S. Lasacar Construction By Contract 32.50% Ongoing

2015 Basilan Ungkaya Pukan Road Concreting of Brgy. Sungkayut, Ungkaya Pukan-Brgy. Bohesuyak, Ungkaya Pukan 1.400 1.40 0.15 28.00 L.S. Lasacar Construction By Contract 33.80% Ongoing

2015 Basilan Ungkaya Pukan Road Concreting of Road from Ungkaya Pukan Highway - Materling - Tong Bato - Baloy Road, Ungkaya Pukan ( Phase I ) 1.000 1.00 0.65 12.00 L.S. Lasacar Construction By Contract 86.50% Ongoing

2015 Lanao del Sur I Buadipuso Buntong Road Concreting of Dansalan Provl Road, Buadi Puso Buntong 1.750 1.75 1.61 33.00 LDS-I DEO By Admin 92.00% Ongoing

2015 Lanao del Sur I Buadipuso Buntong Water System Construction of Water System Level I, Buadipuso Buntong 1-unit 0.50 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Bubong Bridge Construction of Carigongan Bridge (Carigongan-Palao Section), Bubong 0.010 7.00 LDS-I DEO By Admin 100.00% Completed

Page 20: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2015 Lanao del Sur I Bubong Road Concreting of Batangan - Basingan - Alinun Municipal Road, Bubong 1.000 1.00 0.80 12.00 LDS-I DEO By Admin 80.00% Ongoing

2015 Lanao del Sur I Bubong Road Concreting of Basingan-Miyabalawag Municipal Road, Bubong 1.000 1.00 0.80 12.00 LDS-I DEO By Admin 80.00% Ongoing

2015 Lanao del Sur I Bubong Road Concreting of Palao - Carigongan Provincial Road, Bubong 1.200 1.20 1.20 24.00 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Bubong Road Concreting of Dilabayan-Punod Provincial Road, Bubong 0.500 0.50 0.50 10.00 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Bubong Water System Rehabilitation/Expansion of Bubong Water System Level I (Spring Source), Bubong 2-Units 9.00 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Ditsaan-Ramain Flood Control Construction of Flood Control/River Wall Bagua Ingud Bayabao Talub Section/Dangimprampiai, Ditsaan-Ramain 10.000 100.00 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Ditsaan-Ramain Port Barimbingan Fish Port, Ditsaan-Ramain 0.050 5.00 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Ditsaan-Ramain Port Taana Fish Port, Ditsaan-Ramain 0.050 5.00 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Kapai Bridge Construction of Lingiyan Bridge, Kapai 0.025 10.00 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Kapai Road Concreting of Marawi-Kapai Provincial Road (Parao-Kining-Doronan Section), Kapai 0.500 0.50 0.48 10.00 LDS-I DEO By Admin 95.00% Ongoing

2015 Lanao del Sur I Maguing Shore Protection Const. of River Protection Wall along Taraka-Maguing Provincial Road (Dilausan-Malungun Section), Maguing 0.600 5.00 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Marawi City Bridge Construction of Guimba Bridge, Marawi City 0.015 7.50 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Marawi City Road Concreting of Cabingan - Bacung Road, Marawi City 1.000 1.00 1.00 12.00 City Gov't of Marawi By MOA 100.00% Completed

2015 Lanao del Sur I Marawi City Road Concreting of Dulay-Cabasaran Road, Marawi City 1.000 1.00 1.00 12.00 City Gov't of Marawi By MOA 100.00% Completed

2015 Lanao del Sur I Marawi City Road Concreting of Banggolo Brgy. Road, Marawi City 1.000 1.00 0.90 12.00 LDS-I DEO By Admin 90.00% Ongoing

2015 Lanao del Sur I Marawi City Road Concreting of Gata - Siwagat Provincial Road (Taluan - Mapantao - Gambai Section), Lumba Bayabao 1.000 1.00 1.00 20.00 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Marawi City Road Reconstruction of Domocao Alonto Sr. (Formerly Osmena St.) Road, Marawi City 0.750 0.75 0.75 15.00 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Marawi City Road Reconstruction of Dangcal St. Road, Marawi City 0.300 0.30 0.30 6.00 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Marawi City Road Concreting of Buadi-Mibayao Provincial Road (Lumbac-Mibayao Section), Lumba Bayabao 0.500 0.50 0.50 10.00 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Marawi City Road Concreting of Raya - Saduc Proper Provincial Road, Marawi City 0.556 0.56 10.00 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Marawi City Road Concreting of Panggao - Lilod Saduc Road, Marawi City 0.556 0.56 0.56 10.00 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Marawi City Road Concreting of Dialongana Road, Lumba Bayabao 0.200 0.20 0.20 2.40 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Marawi City Road Concreting of Caloocan Cove Road, Marawi City 1.000 1.00 1.00 12.00 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Marawi City Shore Protection Const. of River Protection Wall along Gata Siwagat Provincial Road (Mibayao Taif Section), Lumba Bayabao 0.600 5.00 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Marawi City Water System Construction of Gadungan Water System Level II (Elevated Reservoire & Solar Water Pump), Marawi City 2-Units 20.00 LDS-I DEO By Admin 92.00% Ongoing

Page 21: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2015 Lanao del Sur I Mulondo Bridge Construction of Buadi Bayawa Bidge, Mulondo 0.012 5.00 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Mulondo Road Concreting of Mulondo Kitambugun-Bayawa Provincial Road (Kitambugun-Bayawa Section), Mulondo 0.500 0.50 0.50 10.00 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Piagapo Bridge Construction of Radapan - Olango Bridge, Piagapo 0.042 24.70 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Piagapo Road Concreting of Tambo Ulango Provincial Road, Piagapo 1.000 1.00 1.00 20.00 Municipal Gov't of Piagapo By MOA 100.00% Completed

2015 Lanao del Sur I Poona Bayabao Road Concreting of Sheik Berua Provincial Road (Gata-Cairan Rogon Section), Poona Bayabao 0.500 0.50 0.50 10.00 Municipal Gov't of Poona

Bayabao By MOA 100.00% Completed

2015 Lanao del Sur I Poona Bayabao Road Concreting of Lumbacainged - Ragayan Road, Poona Bayabao 0.500 0.50 0.50 6.00 Municipal Gov't of Poona

Bayabao By MOA 100.00% Completed

2015 Lanao del Sur I Saguiaran Road Concreting of Cadayonan Patpangkat Provincial Road (Cadayonan-MaliwanagPatpangkat Section), Saguiaran 0.500 0.50 0.50 10.00 Municipal Gov't of Saguiran By MOA 100.00% Completed

2015 Lanao del Sur I Tagoloan Road Concreting of Kapai - Tagoloan Provincial Road, Tagoloan (Phase II) 11.000 11.00 8.25 220.00 LDS-I DEO By Admin 75.00% Ongoing

2015 Lanao del Sur I Tagoloan Road Concreting of Kapai - Tagoloan Provincial Road, Tagoloan (Phase I) 1.055 1.06 1.06 21.10 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Tamparan Road Concreting of Tubok Municipal Road, Tamparan 1.000 1.00 0.64 12.00 Municipal Gov't of Tamparan By MOA 64.00% Ongoing

2015 Lanao del Sur I Tamparan Water System Construction of Dilausan District Water System Level I, Tamparan 1-unit 0.50 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Tamparan Water System Construction of Proper District Water System Level I, Tamparan 1-unit 0.50 LDS-I DEO By Admin 100.00% Completed

2015 Lanao del Sur I Taraka Bridge Construction of Salvador Concha Bridge, Taraka 0.048 26.80 LDS-I DEO By Admin 60.00% Ongoing

2015 Lanao del Sur I Taraka Road Concreting to Ririk to Gapao Balindong Road, Taraka 1.500 1.50 0.15 18.00 Municipal Gov't of Taraka By MOA 35.00% Ongoing

2015 Lanao del Sur I Taraka Road Upgrading of Sigayan National Road to Brgy. Somiorang, Taraka 1.000 1.00 0.60 12.00 Municipal Gov't of Taraka By MOA 60.00% Ongoing

2015 Lanao del Sur I Taraka Shore Protection Const. of River Protection Wall along Sundig Dimayon Road, Taraka 0.600 5.00 Municipal Gov't of Taraka By MOA 100.00% Completed

2015 Lanao del Sur I Taraka Shore Protection Const. of River Protection Wall along Masolun Road, Taraka 0.400 3.00 Municipal Gov't of Taraka By MOA 100.00% Completed

2015 Lanao del Sur I Taraka Shore Protection Const. of River Protection Wall along tupaan Road, Taraka 0.400 3.00 Municipal Gov't of Taraka By MOA 100.00% Completed

2015 Lanao del Sur I Wao Road Concreting of Buot - Milaya Road, Wao (Phase III) 2.000 2.00 2.00 24.00 Municipal Gov't of WAO By MOA 100.00% Completed

2015 Lanao del Sur II Butig Road Concreting of Dolangan Road, Butig 0.500 0.50 0.50 6.00 LDS II By Admin 100.00% Completed

2015 Lanao del Sur II Calanogas Road Concrete Widening of National Higway Junction Road - Pantaon, Calanogas 0.840 0.84 0.75 5.00 LDS II By Admin 89.00% Ongoing

2015 Lanao del Sur II Lumbatan Road Concreting of Dilausan-Oriental Beta Road, Lumbatan 0.500 0.50 0.43 6.00 LDS II By Admin 85.00% Ongoing

2015 Lanao del Sur II Lumbatan Road Concreting of Lonai-Macadar Road, Lumbatan 1.000 1.00 1.00 12.00 LDS II By Admin 100.00% Completed

2015 Lanao del Sur II Lumbayanague Road Concreting of Lumbayanague Provincial Road, Lumbayanague - Dilabayan Sect. 0.500 0.50 0.39 9.00 LDS II By Admin 78.00% Ongoing

2015 Lanao del Sur II Bacolod Kalawi Road Concreting of Kalawi Provincial Road 0.420 0.42 0.25 5.00 LDS II By Admin 60.00% Ongoing

Page 22: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2015 Lanao del Sur II Balindong Road Concreting of Balindong Provincial Road Wato - Raya Road 0.420 0.42 0.42 5.00 Municipal Gov't of Balindong By MOA 100.00% Completed

2015 Lanao del Sur II Bayang Road Concreting of Linuk-Pama-an Road, Bayang 0.500 0.50 0.43 6.00 LDS II By Admin 86.00% Ongoing

2015 Lanao del Sur II Bayang Road Const.Palao-Sugod Road, Bayang 0.583 0.58 0.58 7.00 LDS II By Admin 100.00% Completed

2015 Lanao del Sur II Butig Bridge Construction of Tambo-Tocasan Foot Bridge, Butig 0.100 0.00 3.00 LDS II By Admin 15.00% Ongoing

2015 Lanao del Sur II Butig Road Concreting of Pindulonan Road, Butig 1.000 1.00 0.70 12.00 LDS II By Admin 70.00% Ongoing

2015 Lanao del Sur II Butig Road Concreting of Lumbayanague-Butig Provincial Road (Kasalayan -Kabuntonga-Kasalaya Section) 1.000 1.00 0.80 18.00 LDS II By Admin 80.00% Ongoing

2015 Lanao del Sur II Butig Road Concreting of Butig Provincial Road (Tiowi - Dilabayan - Bayabao Section) 1.500 1.50 1.29 27.00 LDS II By Admin 86.00% Ongoing

2015 Lanao del Sur II Ganassi Road Concreting of Para-Aba - Pinalanca Provincial Road, Ganassi 0.420 0.42 0.42 5.00 Municipal Gov't of Ganassi By MOA 100.00% Completed

2015 Lanao del Sur II Ganassi Road Concreting Pantaon A-Pantaon Proper Road, Ganassi 0.500 0.50 0.45 6.00 Municipal Gov't of Ganassi By MOA 90.00% Ongoing

2015 Lanao del Sur II Ganassi Road Concreting of Brgy. Baya Road, Ganassi 0.420 0.42 0.42 5.00 Municipal Gov't of Ganassi By MOA 100.00% Completed

2015 Lanao del Sur II Ganassi Road Concreting of Road Widening(Taganonok-Para-aba Sect.), Ganassi 2.000 2.00 2.00 5.00 Municipal Gov't of Ganassi By MOA 100.00% Completed

2015 Lanao del Sur II Ganassi Road Concreting of Pantaon A-Pantaon Proper-Batobaroray Road, Ganassi 0.500 0.50 0.50 6.00 Municipal Gov't of Ganassi By MOA 100.00% Completed

2015 Lanao del Sur II Ganassi Road Concrete Widening of of Barit-Tabuan Road, Ganassi 2.000 2.00 2.00 5.00 Municipal Gov't of Ganassi By MOA 100.00% Completed

2015 Lanao del Sur II Kapatagan Road Concreting of Proper Kapatagan - Kabaniakawan Road, Phase I 1.000 1.00 1.00 18.00 LDS II By Admin 100.00% Completed

2015 Lanao del Sur II Lumbatan Road Concreting of Tambac - Macadar Road 3.000 3.00 3.53 54.00 LDS II By Admin 100.00% Completed

2015 Lanao del Sur II Lumbatan Road Concreting of Butig-Lumbatan Provincial Road (Bayabao-Lumbatan Road Section) 1.000 1.00 1.00 18.00 LDS II By Admin 100.00% Completed

2015 Lanao del Sur II Lumbayanague Road Concreting of Deromoyod Road, Lumbayanague 0.500 0.50 0.45 6.00 LDS II By Admin 89.00% Ongoing

2015 Lanao del Sur II Madalum Road Concreting of Salongabanding Road, Madalum 0.420 0.42 0.35 5.00 LDS II By Admin 84.00% Ongoing

2015 Lanao del Sur II Madalum Road Concreting of Gadungan-Upper Madalum Road, Madalum 0.420 0.42 0.36 5.00 LDS II By Admin 85.00% Ongoing

2015 Lanao del Sur II Madalum Road Concreting of Madalum Provincial Road 0.420 0.42 0.40 5.00 LDS II By Admin 95.24% Ongoing

2015 Lanao del Sur II Madamba Road Concreting of Lake Uya-an Circuferencial Road, Madamba 0.420 0.42 0.42 5.00 LDS II By Admin 100.00% Completed

2015 Lanao del Sur II Malabang Road Concreting of Curahab road, Malabang 0.420 0.42 0.42 5.00 LDS II By Admin 100.00% Completed

2015 Lanao del Sur II Malabang Water System Construction of Water System (Level II), Brgy. Betayan, Malabang 1-Unit 0.00 5.26 LDS II By Admin 90.00% Ongoing

2015 Lanao del Sur II Marogong Road Concreting of Bayang-Marogong-Malabang Road 17.000 17.00 12.10 204.00 LDS II By Admin 85.15% Ongoing

2015 Lanao del Sur II Picong Road Concreting of Punung Road, Picong 0.420 0.42 0.42 5.00 LDS II By Admin 100.00% Completed

Page 23: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2015 Lanao del Sur II Pualas Road Concreting of Lake Dapao Circumferencial Road at Purog-Tanaun Section, Pualas (Phase I) 3.000 3.00 1.35 54.00 LDS II By Admin 45.00% Ongoing

2015 Lanao del Sur II Pualas Road Concreting of Pualas Road, Pualas 0.500 0.50 0.50 6.00 LDS II By Admin 100.00% Completed

2015 Lanao del Sur II Pualas Road Concreting of Lake Dapao Circumferencial Road, Pualas (Phase II) 2.000 2.00 36.00 Provincial Gov't of LDS By MOA 0.00% NYS

2015 Lanao del Sur II Sultan Domalundong Road Concreting of Malalis-Dinganun Road, Sultan Domalundong 0.500 0.50 0.50 6.00 LDS II By Admin 100.00% Completed

2015 Lanao del Sur II Sultan Dumalundong Road Concreting of Poblacion Road, Sultan Dumalundong 0.500 0.50 0.50 6.00 LDS II By Admin 100.00% Completed

2015 Lanao del Sur II Tubaran Road Concreting of Binidayan-Tubaran Provincial Road (Tagoranao-Tangcal Section) 1.000 1.00 0.95 18.00 LDS II By Admin 95.00% Ongoing

2015 Lanao del Sur II Tubaran Road Concreting of Binidayan - Tubaran Provincial Road 0.420 0.42 0.42 5.06 LDS II By Admin 100.00% Completed

2015 Lanao del Sur II Tugaya Road Concreting of Tugaya Provincial Road 0.420 0.42 0.42 5.00 LDS II By Admin 100.00% Completed

2015 Maguindanao I Barira Water System Construction of Water Supply Level II (Spring Source), Brgy. Lipawan, Barira 1-unit 5.00 Municipal Gov't of Barira By MOA 95.00% Ongoing

2015 Maguindanao I Barira Water System Construction of Water System Level II, Brgy. Barira 1-unit 5.00 Municipal Gov't of Barira By MOA 100.00% Completed

2015 Maguindanao I Buldon Bridge Construction of Bridge, Nuyo River, Nuyo Buldon 0.038 30.00 CS Construction and Supply By Contract 100.00% Completed

2015 Maguindanao I Buldon Road Concreting of Parang - Buldon (Aratuc- Ampuan- Cabayuan ), Buldon 0.900 0.90 1.30 18.00 MAG-1 DEO By Admin 100.00% Completed

2015 Maguindanao I Buldon Road Construction/Concreting of Mataya- Kulimpang Piers, Buldon 1.33 1.33 1.00 10.00 MAG-1 DEO By Admin 100.00% Completed

2015 Maguindanao I Buldon Road Concreting of Parang - Buldon Road 4.000 4.00 6.20 72.00 Municipal Gov't of Buldon By MOA 98.00% Ongoing

2015 Maguindanao I Buldon Water System Construction of Water Supply level II, Brgy. Dinganen, Buldon 1-unit 5.00 MAG-1 DEO By Admin 100.00% Completed

2015 Maguindanao I Buldon Water System Construction of Water Supply level II, Brgy. Mataya, Buldon 1-unit 5.00 MAG-1 DEO By Admin 100.00% Completed

2015 Maguindanao I Buldon Water System Construction of Water System Level II, Brgy. Kalaan-Mataya-Cabayuan 1-unit 10.00 MAG-1 DEO By Admin 100.00% Completed

2015 Maguindanao I Datu Odin Sinsuat Road Concreting Tapian- Datu Blah Sinsuat Road, Phase II 9.500 9.50 2.50 114.00 BRE Construction By Contract 60.00% Ongoing

2015 Maguindanao I Datu Odin Sinsuat Road Concreting of Tamontaka - Kusiong - Tapian Road, Datu Odin Sinsuat, Maguindanao 2.500 2.50 2.60 50.00 BRE Construction By Contract 100.00% Completed

2015 Maguindanao I Datu Odin Sinsuat Road Concreting of Dalican - Labungan Road, Datu Odin Sinsuat 0.900 0.90 1.10 18.00 MAG-1 DEO By Admin 95.00% Ongoing

2015 Maguindanao I Datu Odin Sinsuat Water System Construction of Water System Level II, Datu Odin Sinsuat 1-unit 10.00 MAG-1 DEO By Admin 95.00% Ongoing

2015 Maguindanao I Kabuntalan Road Concreting of Ganta - Gambar - Libungan Road, Kabuntalan, Maguindanao 1.114 1.11 0.66 13.37 MAG-1 DEO By Admin 100.00% Completed

2015 Maguindanao I Matanog Road Concreting of Sapad Road, Matanog 3.000 3.00 2.80 30.00 MAG-1 DEO By Admin 95.00% Ongoing

2015 Maguindanao I Matanog Road Concreting of Alternate Road (Matanog - Barira - Buldon ), Matanog, Maguindanao 1.000 1.00 2.00 20.00 Municipal Gov't of Barira By MOA 100.00% Completed

2015 Maguindanao I Matanog Water System Construction of Water System Level II, Central Langkong, Matanog 1-unit 5.00 MAG-1 DEO By Admin 100.00% Completed

Page 24: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2015 Maguindanao I Matanog Water System Construction of Water System Level II, Bayanga Sur, Matanog 1-unit 5.00 MAG-1 DEO By Admin 100.00% Completed

2015 Maguindanao I North Upi Road Concreting of North Upi-Datu Blah Sinsuat Provincial Road, North Upi & DBS 3.600 3.60 3.80 72.00 Dalanon Construction By Contract 90.00% Ongoing

2015 Maguindanao I North Upi Road Concreting of Kibleg - Bugabungan - Darugao - Nuro Road, Upi, Maguindanao 4.167 4.17 5.00 50.00 MAG-1 DEO By Admin 100.00% Completed

2015 Maguindanao I North Upi Road Concreting of North Upi - Datu Blah Sinsuat - Lebak Road, Phase II 3.000 3.00 3.00 36.00 Must Construction By Contract 100.00% Completed

2015 Maguindanao I Northern Kabuntalan Road Concreting of Road, Brgy. Gayonga - Brgy. Damatog, Northen Kabuntalan, Maguindanao 2.000 2.00 2.60 40.00 MAG-1 DEO By Admin 95.00% Ongoing

2015 Maguindanao I Parang Port Construction of Tagudtungan Port, Bongo Island, Parang 1-unit 10.00 Municipal Gov't of Parang By MOA 5.00% Ongoing

2015 Maguindanao I Parang Port Construction of Litayin Seaport, Bongo Island (eastern side), Parang 1-unit 5.00 Municipal Gov't of Parang By MOA 100.00% Completed

2015 Maguindanao I Parang Port Construction of Boat landing, Tuka Maror, Bongo Island (western side), Parang 1-unit 5.00 Municipal Gov't of Parang By MOA 100.00% Completed

2015 Maguindanao I Parang Port Rehab/Development of Polloc Port, Phase II 1-unit 50.00 Municipal Gov't of Parang By MOA 100.00% Completed

2015 Maguindanao I Parang Road Concreting of Parang - Barira Road (Rakoray - Pamtad Section) 2.820 2.82 4.22 56.40 Municipal Gov't of Barira By MOA 100.00% Completed

2015 Maguindanao I Parang Road Concreting of Sarmiento- Landasan, Parang Maguindanao 1.000 1.00 1.50 20.00 Municipal Govt of Parang By MOA 100.00% Completed

2015 Maguindanao I Parang Road Concreting of Access Road to Padang- Padang Adventure Park, Parang Maguindanao 2.000 2.00 2.16 24.00 Municipal Gov't of Parang By MOA 100.00% Completed

2015 Maguindanao I Sultan Kudarat Road Concreting of Road: Connecting Dvo-Cot. National Road (Km. 1720) and Pinaring-Ibotegen Provincial Road, Brgy. Tula, Sultan Kudarat

4.000 4.00 3.20 30.00 MAG-1 DEO By Admin 100.00% Completed

2015 Maguindanao I Sultan Kudarat Road Concreting of Access Road from National Highway - TESDA-ARMM Compound, Sultan Kudarat 0.500 0.50 0.50 3.75 MAG-1 DEO By Admin 100.00% Completed

2015 Maguindanao I Sultan Kudarat Road Concreting of Pinaring -Ibotegen - Panatan Road, Sultan Kudarat, Maguindanao 3.500 3.50 6.00 70.00 Municipal Gov't of Sultan

Kudarat By MOA 100.00% Completed

2015 Maguindanao I Sultan Kudarat Water System Water System Level II, Brgy. Lasangan, Sultan Kudarat 1-unit 5.00 MAG-1 DEO By Admin 100.00% Completed

2015 Maguindanao I Sultan Mastura Road Concreting of Macabiso - Namuken - Tareken Road, Sultan Mastura, Maguindanao 2.000 2.00 4.20 40.00 Municipal Gov't of Sultan

Mastura By MOA 100.00% Completed

2015 Maguindanao II Ampatuan Road Concreting of Dicalongan - Eka - Kakal - Dimampao, Sapakan - Pidsadawan - Bakat Road 3.622 3.62 3.51 65.20 MAG-II DEO By Admin 96.32% Ongoing

2015 Maguindanao II Ampatuan Road Concreting of National Road - Saniag - Tubak Road, Ampatuan 1.400 1.40 1.40 25.20 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Ampatuan Road Concreting of National Road Saniag - Tubak Road 1.994 1.99 2.00 35.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Ampatuan Water System Construction of Water System (Level II), Ampatuan 2-Units 9.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Buluan Road Concreting of Buluan - Mangudadatu - Paitan - Lutayan Road 6.778 6.78 3.13 121.82 Provincial Gov't of

Maguindanao II By MOA 45.80% Ongoing

2015 Maguindanao II Datu AbdullahgDatu Water System Construction of Water System (Level II), Datu Abdullah Sangki 2-Units 9.00 Municipal Gov't of Datu Sangki By MOA 70.00% Ongoing

2015 Maguindanao II Datu Anggal Midtimbang Road Concreting of Mapayag - Talitay Sapalan (DOS) Provincial

Road 1.667 1.67 1.50 30.00 MAG-II DEO By Admin 91.33% Ongoing

2015 Maguindanao II Datu Anggal Midtimbang Road Mapayag - Talitay Road, Datu Anggal Midtimbang 1.000 1.00 1.20 18.00 MAG-II DEO By Admin 100.00% Completed

Page 25: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2015 Maguindanao II Datu Hoffer Water System Construction of Water System (Level II), Datu Hoffer 2-Units 9.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Datu Montawal Water System Construction of Water System (Level II), Datu Montawal 2-Units 9.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Datu Paglas Drainage Construction of Box Culvert, Brgy. Mangadeg, Datu Datu Paglas 1-Unit 2.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Datu Paglas Drainage Construction of Box Culvert, Brgy. Puya, Datu Datu Paglas 1-Unit 2.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Datu Paglas Drainage Construction of Box Culvert, Brgy. Mao, Datu Datu Paglas 1-Unit 2.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Datu Paglas Drainage Construction of Box Culvert, Brgy. Makat, Datu Datu Paglas 1-Unit 2.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Datu Paglas Road Concreting of Alip - Lumoyon Provincial Road 2.222 2.22 2.23 40.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Datu Piang Road Concreting of Ligawasan Provincial Road( Paglas, Paglat, GSKP, SSB, Rajah Buayan, Datu Piang) 10.042 10.04 6.22 180.75 MAG-II DEO By Admin 63.10% Ongoing

2015 Maguindanao II Datu Piang Road Concreting of Poblacion Circumferential Road, Datu Piang 1.000 1.00 1.00 10.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Datu Piang Water System Construction of Water Supply (Level II), Datu Piang 2-Units 9.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Datu Salibo Road Concreting of Madia-Andavit, Datu Salibo 1.000 1.00 1.00 12.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Datu Salibo Water System Construction of Water System (Level II), Datu Salibo 2-Units 9.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Datu Saudi Road Concreting of Sitio Kabingi - Sitio Perez Road, Datu Saudi Ampatuan 2.000 2.00 1.89 20.00 MAG-II DEO By Admin 91.93% Ongoing

2015 Maguindanao II Datu Saudi Road Concreting of Datu Pendililang Piang Road 1.000 1.00 1.00 12.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Datu Unsay Water System Construction of Water Supply (Level II), Datu Unsay 2-Units 9.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Mamasapano Water System Construction of Water System (Level II), Mamasapano 2-Units 9.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Mangudadatu Road Concreting of Sitio Ampupao - Sitio Dunguan, Mangudadatu 2.000 2.00 20.00 Provincial Gov't of Maguindanao II By MOA 9.20% Ongoing

2015 Maguindanao II Mangudadatu Water System Construction of Water System (Level II), Mangudadatu 2-Units 9.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Pagalungan Road Concreting of Layog - Dunguan Road, Pagalungan 1.000 1.00 1.20 18.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Pagalungan Road Concreting of Kilangan - Nabundas Limbalud Road, Pagalungan 1.000 1.00 1.20 18.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Pagalungan Road Concreting of Damalasak - Capitol Road 0.529 0.53 0.53 9.53 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Pagdag Bridge Construction of Concrete Bridge Connecting Barangay Pandag - Barangay Lepak 0.096 67.20 Municipal Gov't of Pandag By MOA 90.00% Ongoing

2015 Maguindanao II Paglat Water System Construction of Water System (Level II), Paglat 2-Units 9.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Pandag Road Concreting of Brgy. Malangit-Upper Dlag Road, Pandag 1.000 1.00 1.00 10.00 Municipal Gov't of Pandag By MOA 100.00% Completed

2015 Maguindanao II Pandag Water System Construction of Water System (Level II), Pandag 2-Units 9.00 Municipal Gov't of Pandag By MOA 100.00% Completed

Page 26: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2015 Maguindanao II Rajah Buayan Road Concreting of Baital - Dapantis Road, Rajah Buayan 2.000 2.00 1.89 20.00 MAG-II DEO By Admin 98.03% Ongoing

2015 Maguindanao II Shariff Saidona Water System Construction of Water System (Level II), Shariff Saidona 2-Units 9.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Shariff Saydona Road Concreting of Nabundas-Dapiawan Provincial Road 1.000 1.00 1.20 18.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Shariff Saydona Road Concreting of Nabundas - Datu Kilad Road, Shariff Saidona Mustapha 2.000 2.00 2.00 20.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II SK Pendatun Drainage Construction of Box Culvert (Double Barrel), Makainis, Gen. Salipada K. Pendatun 1-Unit 1.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II SK Pendatun Drainage Construction of Box Culvert (Double Barrel), Lao-Lao, Gen. Salipada K. Pendatun 1-Unit 1.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II SK Pendatun Drainage Construction of Box Culvert (Double Barrel), Panosolen, Gen. Salipada K. Pendatun 1-Unit 1.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II SK Pendatun Drainage Construction of Box Culvert (Double Barrel), Sitio Piatopon, Gen. Salipada K. Pendatun 1-Unit 1.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II SK Pendatun Drainage Construction of Box Culvert (Double Barrel), Badak, Gen. Salipada K. Pendatun 1-Unit 1.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II SK Pendatun Road Concreting of Ramcor - Badak Provincial Road 2.222 2.22 2.09 40.00 MAG-II DEO By Admin 96.89% Ongoing

2015 Maguindanao II SK Pendatun Road Concreting of Ramcor - Badak Provincial Road, Gen. Salipada K. Pendatun 0.846 0.85 1.00 15.22 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II SK Pendatun Water System Construction of Water System (Level II), GSKP 2-Units 9.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II South Upi Drainage Construction of Reinforced Concrete Box Culvert Crossing, Liko-Liko Creek, Romangaob - San Jose, South Upi 1 Line 1.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II South Upi Road Concreting of Romongaob-Pandan-Pilar-Itao San Jose Road, South Upi 1.000 1.00 1.00 18.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II South Upi Road Concreting of Romangaob - Kuhan Road, South Upi 1.000 1.00 1.00 10.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II South Upi Water System Construction of Water System (Level II), South Upi 2-Units 9.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Sultan sa Barongis Road Barurao - Masulot Road, Sultan Sa Barongis 1.000 1.00 1.20 18.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Sultan sa Barongis Road Concreting of Barurao - Masulot Provincial Road 1.667 1.67 1.68 30.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Sultan sa Barongis Road Concreting of Buluan - Pandag - Paglat - GSKP - SSB Road 1.667 1.67 1.67 30.00 Provincial Gov't of Maguindanao II By MOA 100.00% Completed

2015 Maguindanao II Sultan sa Barongis Water System Construction of Water System (Level II), Sultan sa Barongis 2-Units 9.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Talayan Water System Construction of Water System (Level II),Talayan 2-Units 9.00 MAG-II DEO By Admin 100.00% Completed

2015 Maguindanao II Talitay Water System Construction of Water System (Level II), Talitay 2-Units 9.00 MAG-II DEO By Admin 100.00% Completed

2015 Sulu I Hadji Panglima Tahil Port Construction of Panglima Tahil Port ( Phase II) 1-Unit 10.00 Municipal Gov't of Panglima Tahil By MOA 31.15% Ongoing

2015 Sulu I Hadji Panglima Tahil Road Concreting of Jundam Abbang Road, Panglima Tahil 1.000 1.00 0.93 12.00 Municipal Gov't of Panglima Tahil By MOA 95.14% Ongoing

2015 Sulu I Hadji Panglima Tahil Road Concreting of Mapiat Road, Panglima Tahil 0.382 0.38 0.38 4.58 Municipal Gov't of Panglima Tahil By MOA 100.00% Completed

Page 27: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2015 Sulu I Hadji Panglima Tahil Shore Protection Construction of Bangas Seawall Panglima Tahil 1-Unit 10.00 Municipal Gov't of Panglima Tahil By MOA 100.00% Completed

2015 Sulu I Indanan Road Concreting of Pasil - Tukay Road, Indanan 1.000 1.00 1.00 12.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Indanan Road Concreting of Tanjung Road, Indanan 1.000 1.00 1.00 7.50 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Indanan Road Concreting of Tanjung-Fisheries Road, Indanan 1.000 1.00 1.00 7.50 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Jolo Drainage Rehabilitation/Improvement of Hadji Buto-Matada Open Canal, Jolo 1-Unit 10.00 Municipal Gov't of Jolo By MOA 100.00% Completed

2015 Sulu I Jolo Drainage Construction of Secondary Drainage along Jolo Airpoort Road, Jolo 1-Unit 15.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Jolo Drainage Construction of Secondary Drainage Structure along Lahi - Habena St. Jolo 1-Unit 10.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Jolo Drainage Rehabilitation/Improvement of Hadji Buto-Tulay Box Culvert, Jolo 1-Unit 10.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Jolo Drainage Construction of Sanitarium-Lahi Box Culvert, Jolo 1-Unit 6.63 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Jolo Drainage Rehabilitation/Improvement of Tulay Zone 3 Open Canal ( Phase II), Jolo 1-Unit 10.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Jolo Drainage Construction of Bus-Bus Drainage System, Jolo 1-Unit 8.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Jolo Drainage Rehabilitation/Improvement of Kakuyagan Drainage, Jolo 1-Unit 8.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Jolo Port Expansion of Jolo Seaport 1-Unit 50.00 CS Santiago Construction By Contract 100.00% Completed

2015 Sulu I Jolo Road Reconstruction of South Market Road, Jolo 0.67 0.67 0.67 8.00 Municipal Gov't of Jolo By MOA 100.00% Completed

2015 Sulu I Jolo Road Reconstruction of North Market Road, Jolo 0.67 0.67 0.67 8.00 Municipal Gov't of Jolo By MOA 100.00% Completed

2015 Sulu I Jolo Road Concreting of Tulay Zone III, Jolo 1.00 1.00 1.00 7.50 Municipal Gov't of Jolo By MOA 100.00% Completed

2015 Sulu I Jolo Road Concreting of Lahi - Habena Road, Jolo 1.00 1.00 1.00 7.50 Municipal Gov't of Jolo By MOA 100.00% Completed

2015 Sulu I Jolo Road Concreting of Dan-Dan Street, Jolo 1.00 1.00 1.00 20.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Jolo Road Concreting of Hadji Buto Street, Jolo 0.68 0.68 0.34 8.16 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Jolo Road Concreting of Vice Mayor Abbang Isahac St.(Muralla), Jolo 0.62 0.62 0.62 7.44 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Jolo Road Reconstruction of General Arosal St. Jolo (Km. 0+740 - Km. 1+740) 1.00 1.00 1.00 20.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Jolo Road Reconstruction of Kakuyagan Road, Jolo (Km. 2+200 - Km. 4+200) 1.00 1.00 1.00 20.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Jolo Road Reconstruction of Moore Avenue - Serantes Road (Km. 1+800 - Km. 2+800) 1.00 1.00 1.00 20.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Jolo Road Reconstruction of Matada - Plaza Tulay Road, Jolo 1.00 1.00 1.00 20.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Jolo Road Concreting of Taglibi-Lahunay Road 0.50 0.50 0.50 10.00 Sulu 1 DEO By Admin 100.00% Completed

Page 28: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2015 Sulu I Jolo Water System Jolo Waterworks Expansion and Source Development 1-Unit 70.00 Sulu 1 DEO By Admin 0.00% NYS

2015 Sulu I Maimbung Bridge Construction of Jinggan Bridge along Maimbung - Talipao-Panglima Estino Road 0.360 30.00 0 0 0.00% NYS

2015 Sulu I Maimbung Road Concreting of Maimbung - Ipil - Bilaan Road, Km 16+400 - Km 19+400 3.000 3.00 3.00 60.00 Provincial Gov't of Sulu By MOA 100.00% Completed

2015 Sulu I Maimbung Road Concreting of Anak Jati - Matatal Road, Maimbung 1.000 1.00 1.00 12.00 Provincial Gov't of Sulu By MOA 100.00% Completed

2015 Sulu I Maimbung Road Concreting of Maimbung - Ipil - Bilaan Road (Km 19+400 - Km 28+400) 1.000 1.00 1.00 20.00 Provincial Gov't of Sulu By MOA 100.00% Completed

2015 Sulu I Maimbung Road Reconstruction/Concreting of Pagsalipangan - Maimbung Road (Km 5+600 - Km 9+000) 1.000 1.00 1.00 20.00 Provincial Gov't of Sulu By MOA 100.00% Completed

2015 Sulu I Maimbung Road Concreting of Gulangan - Ipil Road, Maimbung 1.000 1.00 1.00 7.50 Provincial Gov't of Sulu By MOA 100.00% Completed

2015 Sulu I Maimbung Road Concreting of Maimbung - Talipao - Panglima Estino Road, Phase II (Km 37+280 - Km 51+950) - 0.40 40.00 Sulu 1 DEO By Admin 24.00% Ongoing

2015 Sulu I Maimbung Road Concreting of Maimbung - Talipao - Panglima Estino Road (Phase II), Km 27+276 - Km 37+276 10.000 10.00 7.83 200.00 Sulu 1 DEO By Admin 87.11% Ongoing

2015 Sulu I Maimbung Road Concreting of Poblacion Indanan - Lapa Road, Maimbung 1.000 1.00 1.00 20.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Pangutaran Port Expansion of Pangutaran Port 1-Unit 10.00 Sulu 1 DEO By Admin 0.00% NYS

2015 Sulu I Pangutaran Road Concreting of Kihi Niog Road, Pangutaran 0.500 0.50 0.50 6.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Parang Road Concreting of Bawisan - Tumangas Road, Parang 1.000 1.00 1.00 12.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Parang Road Concreting of Nunukan - Bagsak Road, Parang 1.667 1.67 1.67 20.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Parang Road Concreting of Bagsak - Lagasan Higad Road, Parang 1.000 1.00 1.00 20.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Parang Road Concreting of Kaha - Piyahan - Lanao Bato Road, Parang 1.000 1.00 20.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Parang Road Concreting of Kaha - Alu Layag Road, Parang 2.000 2.00 2.00 15.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Parang Water System Construction of Saldang Deepwell, Parang 1-Unit 0.50 Sulu 1 DEO By Admin 15.00% Ongoing

2015 Sulu I Parang Water System Construction of Tikong Deepwell, Parang 1-Unit 0.50 Sulu 1 DEO By Admin 37.12% Ongoing

2015 Sulu I Parang Water System Construction of Alu Deepwell, Parang 1-Unit 0.50 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Parang Water System Construction of Kaha Deepwell, Parang 1-Unit 0.50 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Patikul Port Construction of Pangdanon Port, Patikul 1-Unit 10.00 Sulu 1 DEO By Admin 54.34% Ongoing

2015 Sulu I Patikul Road Concreting of Patikul - Panamao Road, Km 15+000 - Km 20+000 5.000 5.00 5.00 100.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Patikul Road Concreting of Taglibi - Subah Road, Patikul 1.000 1.00 1.00 12.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Patikul Road Concreting of Pungod - Parian Salah Road, Patikul 1.000 1.00 1.00 12.00 Sulu 1 DEO By Admin 100.00% Completed

Page 29: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2015 Sulu I Patikul Road Concreting of Patikul - Panamao Road (Km 20+000 - Km 35+000) - 1.89 37.75 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Patikul Road Reconstruction of Bus - Bus-Mauboh Road, Patikul (Km. 1+000 - Km. 2+000) 1.000 1.00 1.00 20.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Patikul Road Concreting of Anuling - Langhub Road, Patikul 1.000 1.00 1.00 12.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Patikul Road Concreting of Pangdanon-Taung Road 0.500 0.50 0.50 10.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Patikul Road Concreting of Wanni-Pansul Road 0.500 0.50 0.50 10.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Patikul Road Concreting of Kadday Mampallam-Kan Tayang Road 0.500 0.50 0.50 10.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Patikul Road Concreting of Usaw - Kaban - Kaban Road, Patikul 1.000 1.00 1.00 7.50 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Patikul Road Concreting of Timpok - Laha Road, Patikul 1.000 1.00 1.00 7.50 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Patikul Road Concreting of Kasiya-kan Badjo Road, Patikul 1.000 1.00 1.00 7.50 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Patikul Road Concreting of Tuwak-Bunbun Road, Patikul 1.333 1.33 1.00 10.00 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Patikul Water System Construction of Panglayahan - Pangdanon Water System, Patikul 1-Unit 2.22 Sulu 1 DEO By Admin 80.11% Ongoing

2015 Sulu I Patikul Water System Construction of Parian Salasah Deep Well, Patikul 1-Unit 0.50 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Patikul Water System Construction of Taung Deepwell, Patikul 1-Unit 0.50 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Patikul Water System Construction of Subah Pukol Deepwell, Patikul 1-Unit 0.50 Sulu 1 DEO By Admin 100.00% Completed

2015 Sulu I Talipao Road Concreting of Buntod - Sagay-Sagay Road, Talipao 1.000 1.00 1.00 12.00 Municipal Gov't of Talipao By MOA 100.00% Completed

2015 Sulu I Talipao Road Concreting of Tuyang Road ( Phase III ), Talipao 1.000 1.00 1.00 7.50 Municipal Gov't of Talipao By MOA 100.00% Completed

2015 Sulu I Talipao Road Concreting of Mahala Road, Talipao - 1.33 10.00 Municipal Gov't of Talipao By MOA 100.00% Completed

2015 Sulu I Talipao Road Concreting of Tuyang Road ( Phase IV), Talipao 1.333 1.33 1.33 10.00 Municipal Gov't of Talipao By MOA 100.00% Completed

2015 Sulu I Talipao Water System Construction of Sagay Sagay Water System ( Phase IV), Talipao 1-Unit 30.00 ASAP Gen. Trading & Const.

Maintenance By Contract 100.00% Completed

2015 Sulu II Kalingalan Caluang Port Construction of Pitogo Seaport, Kalingalan Caluang 1-Unit 0.00 10.00 Sulu 2 DEO By Admin NYS

2015 Sulu II Kalingalan Caluang Road Kalingalan Caluang - Omar - Luuk Road, (Km 75+576 - Km 117+000) 7.500 7.50 2.03 150.00 Sulu 2 DEO By Admin 51.36% Ongoing

2015 Sulu II Kalingalan Caluang Road Concreting of Karungdong - Niyog-Niyog Road, Kalingalan Caluang 5.000 5.00 5.00 100.00 Sulu 2 DEO By Admin 100.00% Completed

2015 Sulu II Kalingalan Caluang Road Concreting of Kanpagayo - Dagahit Road, Kalingalan Caluang 1.000 1.00 1.00 7.50 Sulu 2 DEO By Admin 100.00% Completed

2015 Sulu II Kalingalan Caluang Road Concreting of Lambago - Masjid Bayli - Pang Road, Kalingalan Caluang 2.000 2.00 2.00 15.00 Sulu 2 DEO By Admin 100.00% Completed

2015 Sulu II Kalingalan Caluang Road Concreting of Pangdan-Pangdan Road, K. Caluang 1.000 1.00 1.00 7.50 Sulu 2 DEO By Admin 100.00% Completed

Page 30: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2015 Sulu II Kalingalan Caluang Water System Const. of Deep Well at Sitio Kan Sandaan, Kalingalan Caluang 2-Units 0.00 1.00 Sulu 2 DEO By Admin 38.40% Ongoing

2015 Sulu II Kalingalan Caluang Water System Const. of Deep Well at Sitio Kan Pagayo, Kalingalan Caluang 1-Unit 0.00 0.50 Sulu 2 DEO By Admin NYS

2015 Sulu II Lugus Water System Brgy. Rugasan Water Supply Project, Lugus 1-Unit 0.00 5.00 Sulu 2 DEO By Admin 88.73% Ongoing

2015 Sulu II Luuk Drainage Replacement of Pipe Culvert to Box Culvert, Along Nat'l. Road, Tubig Putih, Luuk 2 lines 2.00 Sulu 2nd By Admin 100.00% Completed

2015 Sulu II Luuk Port Expansion of Tandu Bato Seaport, Luuk 1-Unit 0.00 30.00 Sulu 2 DEO By Admin 38.74% Ongoing

2015 Sulu II Luuk Road Concreting of Camp Andres - Lahing-Lahing Road, Luuk 5.000 5.00 5.00 100.00 Sulu 2 DEO By Admin 100.00% Completed

2015 Sulu II Luuk Road Concreting of Camp Andres - Sucuban Road, Luuk 2.500 2.50 2.50 50.00 Sulu 2 DEO By Admin 100.00% Completed

2015 Sulu II Luuk Road Luuk - Panamao - Patikul Circumferential Road, (Km 117+000 - Km 139+750) 5.000 5.00 5.00 100.00 Sulu 2 DEO By Admin 100.00% Completed

2015 Sulu II Luuk Road Concreting of Lambago - Kan Bulak Road, Luuk 1.144 1.14 1.14 13.73 Sulu 2 DEO By Admin 100.00% Completed

2015 Sulu II Luuk Road Concreting of Tandu Bato - Bual Road, Luuk 2.420 2.42 1.40 18.16 Sulu 2 DEO By Admin 100.00% Completed

2015 Sulu II Luuk Shore Protection Kan Hadjili - Kan Mindus Shore Protection, luuk 400 m 0.00 5.00 Sulu 2nd By Admin 75.82% Ongoing

2015 Sulu II Luuk Water System Expansion of Luuk Water System, Luuk 1-Unit 0.00 30.00 Sulu 2 DEO By Admin 12.30% Ongoing

2015 Sulu II Luuk Water System Expansion of Luuk Water System, Phase II, Luuk 1-Unit 0.00 20.00 Sulu 2 DEO By Admin NYS

2015 Sulu II Omar Port Construction of Sucuban Seaport, Omar 1-Unit 0.00 5.00 Sulu 2 DEO By Admin 91.83% Ongoing

2015 Sulu II Omar Road Concreting of Pitogo - Sucuban Road, Omar 5.600 5.60 4.86 112.00 Sulu 2 DEO By Admin 89.36% Ongoing

2015 Sulu II Panamao Road Panglima Estino - Panamao - Kalingalan Caluang Road, (Km 55+926 - Km 75+576) 6.000 6.00 6.00 120.00 Sulu 2 DEO By Admin 100.00% Completed

2015 Sulu II Panamao Road Concreting of Kan Dayok - Sultan Jamalul Kiram Road, Panamao 1.400 1.40 1.40 10.50 Sulu 2 DEO By Admin 100.00% Completed

2015 Sulu II Panamao Road Concreting of Kan Dayok - Su-uh Road, Panamao 2.000 2.00 2.00 15.00 Sulu 2 DEO By Admin 100.00% Completed

2015 Sulu II Panamao Water System Expansion of Sagay-Sagay Water System (Phase III) 1-Unit 50.00 ASAP Gen. Trading & Const. Maintenance By Contract 100.00% Completed

2015 Sulu II Panamao Water System Const. of Deep Well at Brgy. Tayungan, Panamao 1-Unit 0.00 0.50 Sulu 2 DEO By Admin NYS

2015 Sulu II Panamao Water System Const. of Deep Well at Brgy. Kan Asaali, Panamao 1-Unit 0.00 0.50 Sulu 2 DEO By Admin NYS

2015 Sulu II Pandami Road Concreting of Brgy Datag - Lapak - Parian, Pandami 1.000 1.00 0.18 7.50 Sulu 2 DEO By Admin 32.11% Ongoing

2015 Sulu II Panglima Estino Drainage Construction of Box Culvert Gata-Gata, Panglima Estino 2 lines 2.00 Sulu 2nd By Admin 100.00% Completed

2015 Sulu II Panglima Estino Road Concreting of Gata-Gata - Lihbug Kabaw Road, P. Estino 2.000 2.00 1.51 15.00 Sulu 2 DEO By Admin 84.25% Ongoing

2015 Sulu II Panglima Estino Road Concreting of Asin - Kulay-Kulay Road, Panamao 2.000 2.00 2.00 15.00 Sulu 2 DEO By Admin 100.00% Completed

Page 31: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2015 Sulu II Panglima Estino Road Concreting of Gata-Gata-Lihbug Kabaw Road, P. Estino Phase II 1.000 1.00 1.00 7.50 Sulu 2 DEO By Admin 100.00% Completed

2015 Sulu II Pata Port Construction of Saimbangon Port, Pata 1-Unit 0.00 5.00 Sulu 2 DEO By Admin NYS

2015 Sulu II Pata Road Concreting of Saimbangon - Pisak Road, Pata 1.500 1.50 1.50 11.25 Sulu 2 DEO By Admin 100.00% Completed

2015 Sulu II Siasi Port Construction of Laminusa Port, Siasi 1-Unit 0.00 5.00 Sulu 2 DEO By Admin 98.09% Ongoing

2015 Sulu II Siasi Port Construction of Siasi Market Fish Port, Siasi 1-Unit 0.00 5.00 Sulu 2 DEO By Admin NYS

2015 Sulu II Siasi Road Concreting of Minapan - Ratag Road Phase II, Siasi 1.000 1.00 0.00 7.50 Sulu 2 DEO By Admin 10.40% Ongoing

2015 Sulu II Siasi Road Concreting of Tausan - Manta Siburi - Pamangunan - Buan Circumferencial Road (Phase III) Siasi 4.529 4.53 0.00 54.35 Sulu 2 DEO By Admin 22.14% Ongoing

2015 Sulu II Siasi Road Concreting of Nipa-Nipa - Siasi Road, Siasi 1.000 1.00 0.30 7.50 Sulu 2 DEO By Admin 30.28% Ongoing

2015 Sulu II Siasi Road Concreting of Laminusa Port Access Road, Laminusa, Siasi 1.000 1.00 1.00 7.50 Sulu 2 DEO By Admin 100.00% Completed

2015 Sulu II Siasi Water System Const. of Minapan Water Supply Project, Siasi 1-Unit 0.00 3.00 Sulu 2 DEO By Admin NYS

2015 Sulu II Tapul Port Expansion of Tapul Port, Tapul 1-Unit 0.00 5.00 Sulu 2 DEO By Admin NYS

2015 Sulu II Tapul Road Concreting of Kalang Port Access Road, Kalang, Tapul 1.000 1.00 1.00 7.50 Sulu 2 DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Bridge Construction of Tingul-Tingol Concrete Footbridge with Pierhead, Bongao 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Bridge Construction of Panyungan Concrete Footbridge with Pierhead, Bongao 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Bridge Construction of Luuk Mangit Concrete Footbridge, Bongao 1-unit 3.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Bridge Construction of Poblacion Concrete Footbridge, Bongao 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Drainage Construction of Tubig Boh Drainage System, Bongao 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Other Infra Construction of Access Roads and Development of Bongao Peak Eco-Tourism 1-unit 0.10 0.10 56.00 Municipal Gov't of Bongao By MOA 100.00% Completed

2015 Tawi-Tawi Bongao Port Expansion/Upgrading of Ridjiki Boulevard Road, Bongao 1-unit 30.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Port Expansion of Bongao Port with Roro 1-unit 50.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Road Concreting of Lakit-Lakit - Mandulan Road, Bongao 2.000 2.00 2.00 24.00 Municipal Gov't of Bongao By MOA 100.00% Completed

2015 Tawi-Tawi Bongao Road Concreting of Capitol - Tubig Tanah Road, Bongao 0.600 0.60 0.70 12.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Road Concreting of Simandagit - Kasulutan - Badjao Village Road, Bongao 1.000 1.00 1.00 12.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Road Concreting of IPHO Access Road, Bongao 0.500 0.50 0.50 6.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Road Concreting of Luuk Bangkah - Nalil Road, Bongao 0.500 0.50 0.50 6.00 Tawi Tawi DEO By Admin 100.00% Completed

Page 32: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2015 Tawi-Tawi Bongao Road Concreting of Lapid-Lapid - Masantong Road, Bongao 0.250 0.25 0.25 3.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Road Concreting of Pababag Road, Bongao 0.250 0.25 0.25 3.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Road Concreting of Tongsinah Road, Bongao 0.417 0.42 0.42 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Road Concreting of Luuk Siabun Road, Bongao 0.417 0.42 0.42 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Road Concreting of Kamagong - Tarawakan Road, Bongao 0.417 0.42 0.42 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Shore Protection Construction of Simandagit shore Protection, Bongao 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Shore Protection Construction of Tubig Basag shore Protection, Bongao 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Shore Protection Construction of shore Protection along Bongao-Pahut-Sanga-Sanga Road km.3+300 - 8+000 with exemption 1-unit 25.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Water System Construction of Luuk Pangdan Deep Well, Bongao 1-unit 0.30 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Water System Construction of Silubbog Deep Well, Bongao 1-unit 0.30 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Water System Construction of Luuk Tulay Deep Well, Bongao 1-unit 0.30 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Water System Construction of Mandulan Deep Well, Bongao 1-unit 0.30 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Water System Construction of Masantong Deep Well, Bongao 1-unit 0.30 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Bongao Water System Construction of Sumanagat Deep Well, Bongao 1-unit 0.30 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Languyan Road Concreting of Maraning - Marang-Marang Road, Languyan 17.00 17.00 1.20 204.00 FFJJ By Contract 36.00% Ongoing

2015 Tawi-Tawi Languyan Road Concreting of Sikullis - Basnunuk - Biradali Junction Road, Languyan 1.000 1.00 1.00 20.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Languyan Road Concreting of Biradali - Paraitan - Seratang Junction Road, Languyan 0.850 0.85 0.85 16.99 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Languyan Road Concreting of Seratang Junction - Subah Mamah Road, Languyan 1.500 1.50 1.50 30.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Languyan Road Concreting of Darulakram - Sikullis Circumferential Road, Languyan 1.000 1.00 1.10 20.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Languyan Water System Construction of Tahaw Water System Level II, Languyan 1-unit 15.00 Tawi Tawi DEO By Admin 82.00% Ongoing

2015 Tawi-Tawi Mapun Bridge Construction of Lupah Pula Concrete Footbridge, Mapun 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Mapun Bridge Construction of Pawan Concrete Footbridge, Mapun 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Mapun Road Concreting of Gupah - BatutaiRoad, Mapun 0.500 0.50 0.54 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Mapun Road Concreting of Duhol Bato - Gupah Road, Mapun 1.000 1.00 1.05 20.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Mapun Road Concreting of Sapah - Duhol Bato Road, Mapun 1.000 1.00 1.05 20.00 Tawi Tawi DEO By Admin 100.00% Completed

Page 33: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2015 Tawi-Tawi Panglima Sugala Road Concreting of Batu-Batu - Parangan Road, Panglima Sugala 2.500 2.50 2.60 50.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Panglima Sugala Road Concreting of MSU - Magsaggaw Road, Panglima Sugala 0.500 0.50 0.50 6.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Panglima Sugala Road Concreting of T. Redoble Road, Batu-Batu, Panglima Sugala 0.300 0.30 0.30 3.60 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Panglima Sugala Road Concreting of H. Jalambo Road, Batu-Batu, Panglima Sugala 0.250 0.25 0.25 3.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Panglima Sugala Road Concreting of Feraren Road, Batu-Batu, Panglima Sugala 0.300 0.30 0.30 3.60 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Panglima Sugala Road Concreting of M. Jacoba Road, Batu-Batu, Panglima Sugala 0.218 0.22 0.22 2.61 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Panglima Sugala Road Concreting of Ajijul Road, Batu-Batu, Panglima Sugala 0.100 0.10 0.10 1.20 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Panglima Sugala Road Concreting of Aming Road, Batu-Batu, Panglima Sugala 0.100 0.10 0.10 1.20 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Panglima Sugala Road Concreting of Ekol Road, Batu-Batu, Panglima Sugala 0.100 0.10 0.10 1.20 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Sapa Sapa Bridge Construction of Baldatal Concrete Footbridge with Pierhead, Sapa-Sapa 1-unit 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Sapa Sapa Bridge Construction ofBannaran - Tonggusong Concrete Footbridge with Pierhead, Sapa-Sapa 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Sapa Sapa Road Concreting of Secubong Circumferential Road, Sapa-Sapa 3.400 3.40 3.57 68.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Sapa Sapa Road Concreting of Gadjaminah - Palate Road, Sapa-Sapa 0.417 0.42 0.42 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Sapa Sapa Road Concreting of Palate Road, Sapa-Sapa 0.167 0.17 0.17 2.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Sibutu Bridge Construction of Tandu-Owak Concrete Footbridge, Sibutu 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Sibutu Bridge Construction of Hadji Bidin Concrete Footbridge, Sibutu 1-unit 2.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Sibutu Bridge Construction of Tandubanak - Sheikh Makdum Concrete Footbridge, Sibutu 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Sibutu Bridge Construction of Ambutong Sapal Concrete Footbridge, Sibutu 1-unit 2.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Sibutu Port Construction of Tongehat Concrete Boat/ Fish Landing, Sibutu 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Sibutu Road Concreting of Ligayan - Tandu Owak Road, Sibutu 1.000 1.00 1.10 20.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Sibutu Road Concreting of Sheikh Makdum Road, Sibutu 0.250 0.25 0.25 3.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Simunul Road Concreting of Bagid - Tubig Indangan Road, Simunul 1.000 1.00 1.05 20.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Simunul Road Concreting of Manuk Mangkaw Circumferential Road, Simunul 1.500 1.50 2.23 30.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Simunul Road Concreting of Simunul Wharf Road, Simunul 0.417 0.42 0.42 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Simunul Shore Protection Construction of Bakong - Pagasinan shore Protection, Simunul 1-unit 10.00 Tawi Tawi DEO By Admin 100.00% Completed

Page 34: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2015 Tawi-Tawi Sitangkai Bridge Construction of Panglima Alari Concrete Footbridge, Sitangkai 1-unit 30.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Sitangkai Bridge Construction of Imam Sapie Concrete Footbridge, Sitangkai 1-unit 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Sitangkai Road Concreting of Larap - Tonggusong Road, Sitangkai 0.600 0.60 0.66 12.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Sitangkai Road Concreting of Larap - Tongmaging Road, Sitangkai 1.000 1.00 1.05 20.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi South Ubian Bridge Construction of Unas-Unas Concrete Footbridge, South Ubian 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi South Ubian Bridge Construction of Pampang Concrete Footbridge, South Ubian 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Tandubas Bridge Construction of Sapa Concrete Footbridge, Tandubas 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Tandubas Road Concreting of Sallangan - Ungus Matata Road, Tandubas 2.000 2.00 2.10 40.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Tandubas Road Concreting of Sapa - Kepeng Road, Tandubas 1.500 1.50 1.58 30.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Turtle Island Bridge Construction fo Buan Island Concrete Footbridge, Turtle Island 1-unit 10.00 Tawi Tawi DEO By Admin 96.00% Ongoing

2015 Tawi-Tawi Turtle Island Port Const. of turtle Island Municipal Port, Turtle Island 1-unit 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2015 Tawi-Tawi Turtle Island Road Concreting of Dambilah - Likud Bakkaw Road, Turtle Island 0.833 0.83 0.83 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Basilan Akbar Drainage Construction of Box Culvert @ Caddayan, Akbar 1-unit 2.50 Basilan DEO By Admin 100.00% Completed

2016 Basilan Akbar Port Construction of seaport @ Sitio Canas, Akbar 1-unit 20.00 Basilan DEO By Admin 63.00% Ongoing

2016 Basilan Akbar Road Concreting of Lower Sinangkapan-Upper Sinangkapan Road, Akbar 2.00 2.00 28.00 Municipal Gov't of Akbar By MOA 16.00% Ongoing

2016 Basilan Akbar Road Concreting from Lower Sinangkapan - Upper Sinangkapan Road, Akbar 1.00 1.00 14.00 Municipal Gov't of Akbar By MOA 16.00% Ongoing

2016 Basilan Akbar Road Concreting from Bohe Bakung - Mangalut - Mangguso Road, Akbar 2.00 2.00 0.28 28.00 Municipal Gov't of Akbar By MOA 39.00% Ongoing

2016 Basilan Akbar Road Concreting from Caddayan - Lower Batobato (Masilung) Road, Akbar 1.40 1.40 1.00 19.60 Municipal Gov't of Akbar By MOA 83.00% Ongoing

2016 Basilan Al-Barka Drainage Construction of Box Culvert @ Bohe Piang, Al Barka 1-unit 2.00 Basilan DEO By Admin 100.00% Completed

2016 Basilan Al-Barka Road Concreting of Brgy. Bohe Lebung, Tipo-Tipo - Brgy. Cambug, Al Barka 2.00 2.00 28.00 Municipal Gov't of Al-Barka By MOA 15.00% Ongoing

2016 Basilan Hadji Muhtamad Shore Protection Construction of Lukbungsud Seawall, Hadji Muhtamad 1-unit 3.00 Basilann DEO By Admin 98.20% Ongoing

2016 Basilan Isabela City Bridge Construction of Kumalarang Bridge, Isabela 0.04 40.00 By Contract NYS

2016 Basilan Lamitan City Bridge Construction of Bulingan-Lo-ok Bridge, Lamitan City 0.04 40.00 By Contract NYS

2016 Basilan Lamitan City Drainage Construction of Box Culvert @ Bohe Nange 1, Lamitan Municipality 1-Unit 2.00 Basilan DEO By Admin 100.00% Completed

2016 Basilan Lamitan City Other Infra Expansion/Renovation of Basilan DEO Compound, Lamitan City 1-Unit 0.00 20.00 Basilan DEO By Admin 85.40% Ongoing

Page 35: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2016 Basilan Lamitan City Road Concreting from Lamitan Highway- Colonia-Lower Sinangkapan Road, Tuburan 2.50 2.50 1.15 35.00 Basilan DEO BY Admin 84.00% Ongoing

2016 Basilan Lamitan City Road Concreting from National Road to Sengal, Lamitan City 1.50 1.50 1.03 21.00 Basilan DEO By Admin 95.00% Ongoing

2016 Basilan Lamitan City Road Concreting of Balagtasan - Tumakid Road, Lamitan City Phase I 2.00 2.00 1.71 28.00 Basilan DEO By Admin 99.00% Ongoing

2016 Basilan Lamitan City Road Concreting of Sta. Clara Breeding Station Road, Lamitan City (with Sidewalk, Curb and Gutter) 1.00 1.00 0.70 14.00 Basilan DEO By Admin 99.00% Ongoing

2016 Basilan Lamitan City Road Concreting of Barangay Sengal to Brgy. Ubit, Lamitan City 1.00 1.00 0.72 14.00 Basilan DEO By Admin 100.00% Completed

2016 Basilan Lamitan City Road Concreting of Brgy. Baimbing, Lamitan City - Brgy. Balobo, Lamitan City 2.00 2.00 28.00 City Gov't of Lamitan By MOA 15.00% Ongoing

2016 Basilan Lamitan City Road Concreting of Brgy. Bohe Bessey, Lamitan City - Brgy, Baimbing, Lamitan City 2.00 2.00 28.00 City Gov't of Lamitan By MOA 18.00% Ongoing

2016 Basilan Lamitan City Road Concreting of Brgy. Luksumbang, Lamitan City - Brgy. Baluno, Isabela City 3.00 3.00 0.62 42.00 City Gov't of Lamitan By MOA 36.00% Ongoing

2016 Basilan Lamitan City Road Concreting from Lamitan Highway - Parangbasak - Baimbing - Cabobo Road, Lamitan City 2.00 2.00 0.72 28.00 City Gov't of Lamitan By MOA 45.00% Ongoing

2016 Basilan Lamitan City Road Concreting from Lamitan Highway - Limook - Balobo - Bulingan Road, Lamitan City Phase III 3.00 3.00 0.96 54.00 City Gov't of Lamitan By MOA 45.80% Ongoing

2016 Basilan Lamitan City Road Construction of Lamitan Highway - Baas - Lebbuh Road, Lamitan City 2.00 2.00 0.70 28.00 City Gov't of Lamitan By MOA 46.00% Ongoing

2016 Basilan Lamitan City Road Concreting of Lamitan City to Palm Beach (T-Type) 0.50 0.50 0.28 7.00 City Gov't of Lamitan By MOA 89.00% Ongoing

2016 Basilan Lamitan City Road Concreting from Lamitan Highway - Ubit - Bohe Yawas - Lumuton Road, Lamitan City 1.00 1.00 0.85 14.00 City Gov't of Lamitan By MOA 95.50% Ongoing

2016 Basilan Lamitan City Road Concreting of Brgy. Campo Uno, Lamitan City - Brgy. Balobo, Lamitan City 2.00 2.00 1.83 28.00 City Gov't of Lamitan By MOA 96.00% Ongoing

2016 Basilan Lamitan City Road Concreting from Lamitan Highway - Maloong San Jose - Maloong Canal Road, Lamitan City 2.00 2.00 28.00 By Contract 15.00% Ongoing

2016 Basilan Lamitan City Road Concreting from Lamitan Highway - Sta. Clara - Maluong San Jose Road, Lamitan City 1.00 1.00 14.00 By Contract 42.00% Ongoing

2016 Basilan Lamitan City Road Concreting from Lamitan Highway - Sta. Clara - Tumakid Road, Lamitan City 1.00 1.00 0.82 14.00 By Contract 100.00% Completed

2016 Basilan Lamitan City Shore Protection Construction of Shore Protection, Balas, Lamitan City 1-unit 5.00 Basilann DEO By Admin 100.00% Completed

2016 Basilan Lamitan City Water System Construction of Balas Water system, Lamitan City 1-unit 10.00 Basilan DEO By Admin 41.00% Ongoing

2016 Basilan Lantawan Drainage Construction of Box Culvert @ Subaan, Lantawan Municipality 1-Unit 2.00 Basilan DEO By Admin 100.00% Completed

2016 Basilan Lantawan Drainage Construction of Box Culvert @ Atong Atong A, Lantawan Municipality 1-Unit 2.00 Basilan DEO By Admin 100.00% Completed

2016 Basilan Lantawan Road Concreting of Lantawan Highway -. Campo Barnes, Lantawan 1.00 1.00 0.53 14.00 Municipal Gov't of Lantawan By MOA 85.00% Ongoing

2016 Basilan Lantawan Road Concreting from Tairan - Lawila Road, Lantawan 1.50 1.50 1.50 21.00 Provincial Gov't of Basilan By MOA 100.00% Completed

2016 Basilan Lantawan Shore Protection Construction of Seawall along Atong-Atong - Matikang Road, Lantawan (Phase II) 1-unit 5.00 Basilann DEO By Admin 99.00% Ongoing

2016 Basilan Maluso Bridge Construction of Gaunan footbridge, Maluso 1-unit 2.00 Basilan DEO By Admin 100.00% Completed

Page 36: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2016 Basilan Maluso Bridge Construction of Lower Portholland footbridge, Maluso 1-unit 2.00 Basilan DEO By Admin 100.00% Completed

2016 Basilan Maluso Bridge Construction of Lower Mahayahay Bridge, Maluso 0.04 35.00 By Admin 37.00% Ongoing

2016 Basilan Maluso Drainage Construction of Drainage, Maluso 1-Unit 5.00 Basilan DEO By Admin 100.00% Completed

2016 Basilan Maluso Port Construction of Seaport, Calang, Maluso 1-unit 5.00 Basilan DEO By Admin 86.00% Ongoing

2016 Basilan Maluso Road Concreting of from Maluso Highway - Lower Mahayahay Road 3.00 3.00 1.57 70.50 Basilan DEO By Admin 68.00% Ongoing

2016 Basilan Maluso Road Concreting from Maluso Highway - Garlayan - Upper Garlayan Road, Maluso 3.00 3.00 1.85 42.00 Basilan DEO By Admin 93.50% Ongoing

2016 Basilan Maluso Road Concreting of Maluso Highway - Kanas - Kalang Road, Maluso 1.50 1.50 0.82 21.00 Basilan DEO By Admin 95.00% Ongoing

2016 Basilan Maluso Road Concreting of from Lower Sampinit - Masola 2.80 2.80 65.55 Basilan DEO By Admin NYS

2016 Basilan Maluso Road Concreting of from Lower Mahayahay - Upper Mahayahay Road 2.00 2.00 47.00 By Admin NYS

2016 Basilan Maluso Road Concreting of from Lower Upper Mahayahay - Punoh Mahadje Rd 4.00 4.00 94.00 By Contract NYS

2016 Basilan Maluso Road Concreting of from Lower Upper Punoh Mahadje - Sampinit 5.00 5.00 117.50 By Contract NYS

2016 Basilan Muhammad Ajul Port Construction of Port, Brgy. Sironggon, Mohammad Ajul 1-unit 5.00 Basilan DEO By Admin 36.00% Ongoing

2016 Basilan Muhammad Ajul Road Concreting of Sironggon - Mangalut Road, Hdji Mohammad Ajul 2.00 2.00 0.46 28.00 Municipal Gov't of

Muhammad Adjul By MOA 48.00% Ongoing

2016 Basilan Muhammad Ajul Water System Construction of water supply Level II, Basakan, Hdji. Mohammad Ajul 1-unit 2.00 Basilan DEO By Admin 100.00% Completed

2016 Basilan Sumisip Bridge Construction of Footbridge at Buli Buli , Sumisip 1-unit 10.00 Basilan DEO By Admin 41.00% Ongoing

2016 Basilan Sumisip Bridge Construction of footbridge @ Tinutungan, Tabuan Lasa 1-unit 3.00 Basilan DEO By Admin 99.50% Ongoing

2016 Basilan Sumisip Bridge Construction of Boheh Panansalan Bridge 1, Sumisip 0.04 40.00 By Contract NYS

2016 Basilan Sumisip Bridge Construction of Boheh Panansalan Bridge 2, Sumisip 0.04 40.00 By Contract NYS

2016 Basilan Sumisip Bridge Construction of Bridge from Punoh Fuente Eggas - Sampinit, Sumisip 0.04 40.00 By Contract NYS

2016 Basilan Sumisip Drainage Construction of Box Culvert @ Libug, Sumisip Municipality 1-Unit 2.00 Basilan DEO By Admin 100.00% Completed

2016 Basilan Sumisip Flood Control Construction of Flood Control Structure at Bulibuli, Sumisip Municipality 1-Unit 5.00 Basilan DEO By Admin 100.00% Completed

2016 Basilan Sumisip Other Infra Construction of Bulibuli Cause Way, Sumisip Municipality 1-Unit 30.00 Basilan DEO By Admin 63.00% Ongoing

2016 Basilan Sumisip Port Construction of Port, Tikes, Sumisip 1-unit 5.00 Basilan DEO By Admin 72.00% Ongoing

2016 Basilan Sumisip Port Construction of Sahaya Batu port, Sumisip 1-unit 5.00 Basilan DEO By Admin 100.00% Completed

2016 Basilan Sumisip Road Concreting of Various Road in Buli Buli, Sumisip 2.23 2.23 0.32 31.17 Basilan DEO By Admin 46.00% Ongoing

Page 37: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2016 Basilan Sumisip Road Construction of Road from Lukbait to Kaum Air , Sumisip 2.00 2.00 0.49 28.00 Basilan DEO By Admin 61.00% Ongoing

2016 Basilan Sumisip Road Concreting of Sumisip Highway - Brgy. Limbo Candiis, Sumisip - Brgy. Baiwas, Sumisip 6.50 6.50 2.10 91.00 Basilan DEO By Admin 71.00% Ongoing

2016 Basilan Sumisip Road Concreting from Sumisip Highway - Mangal Road, Sumisip (Phase II) 1.50 1.50 1.10 21.00 Basilan DEO By Admin 100.00% Completed

2016 Basilan Sumisip Road Concreting from Guiong - Sahaya Bohebato Road, Sumisip 1.80 1.80 1.80 25.20 Municipal Gov't of Sumisip By MOA 100.00% Completed

2016 Basilan Sumisip Road Concreting of Brgy. Tumahubong - Puno Dahingan Road 7.00 7.00 164.50 By Contract NYS

2016 Basilan Sumisip Road Concreting of Brgy. Puno Dahingan - Sampinit Road 7.00 7.00 164.50 By Contract NYS

2016 Basilan Sumisip Road Concreting of Brgy. Puno Sampinit - Masola Road 3.50 3.50 82.50 By Contract NYS

2016 Basilan Sumisip Shore Protection Construction of Shore Protection, Bulibuli, Sumisip 1-unit 5.00 Basilann DEO By Admin 100.00% Completed

2016 Basilan Tabuan Lasa Bridge Construction of footbridge @ Pisak-Pisak, Tabuan Lasa 1-unit 3.00 Basilan DEO By Admin 100.00% Completed

2016 Basilan Tabuan Lasa Water System Construction of Level II Water System for Babag, Tabuan Lasa Municipality 1-unit 2.00 Basilan DEO By Admin 96.50% Ongoing

2016 Basilan Tabuan Lasa Water System Construction of Level II Water System for Suligan, Tabuan Lasa Municipality 1-unit 2.00 Basilan DEO By Admin 97.00% Ongoing

2016 Basilan Tabuan Lasa Water System Construction of Level II Water System for Tairan, Tabuan Lasa Municipality 1-unit 3.00 Basilan DEO By Admin 100.00% Completed

2016 Basilan Tabuan Lasa Water System Construction of Level II Water System for Tong Umus, Tabuan Lasa Municipality 1-unit 2.00 Basilan DEO By Admin 100.00% Completed

2016 Basilan Tipo-Tipo Road Concreting of Brgy. Badja (National Rd.), Tipo-Tipo - Brgy. Bohe Bessey, Lamitan City 2.00 2.00 0.95 28.00 City Gov't of Lamitan By MOA 98.00% Ongoing

2016 Basilan Tipo-Tipo Road Concreting of Tipotipo National Highway- Badja - Danit Road, Tipotipo 2.00 2.00 28.00 Municipal Gov't of Tipo Tipo By MOA 16.20% Ongoing

2016 Basilan Tipo-Tipo Road Concreting from Ungkaya Pukan Highway - Bohe Pahu-Kamamburingan - Pipil Road, Tipotipo (Phase I) 2.00 2.00 28.00 Municipal Gov't of Tipo Tipo By MOA 25.00% Ongoing

2016 Basilan Tipo-Tipo Road Concreting of Pipil - Kamamburingan Road, Tipotipo 4.00 4.00 1.49 56.00 Municipal Gov't of Tipo Tipo By MOA 70.00% Ongoing

2016 Basilan Tipo-Tipo Road Concreting from Baguindan - Silangkum - Matata Road, Tipo-Tipo 1.00 1.00 1.00 14.00 Municipal Gov't of Tipo Tipo By MOA 100.00% Completed

2016 Basilan Tuburan Port Construction of Libug port, Tuburan 1-unit 5.00 Basilan DEO By Admin 92.00% Ongoing

2016 Basilan Tuburan Road Concreting from Tuburan Highway - Mahawid - Calut Road , Tuburan 2.50 2.50 0.36 35.00 Municipal Gov't of Tuburan By MOA 41.00% Ongoing

2016 Basilan Tuburan Road Concreting from Sinulatan - Bato Babag - Tambutambo, Tuburan 2.00 2.00 1.04 28.00 Municipal Gov't of Tuburan By MOA 63.00% Ongoing

2016 Basilan Tuburan Road Concreting of Lower Sinangkapan-Katipunan Road, Tuburan 2.00 2.00 1.29 28.00 Municipal Gov't of Tuburan By MOA 71.00% Ongoing

2016 Basilan Tuburan Road Concreting of Tablas Usew-Lower Tablas, Tuburan 1.00 1.00 0.85 14.00 Municipal Gov't of Tuburan By MOA 95.00% Ongoing

2016 Basilan Tuburan Road Concreting from Katipunan - Lower Sinangkapan Road, Tuburan 1.20 1.20 1.06 16.80 Municipal Gov't of Tuburan By MOA 98.00% Ongoing

2016 Basilan Tuburan Road Concreting of Tuburan Highway - Brgy. Bohe Tambis, Road, Tuburan (Phase I) 1.00 1.00 0.95 14.00 Municipal Gov't of Tuburan MOA 99.00% Ongoing

Page 38: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2016 Basilan Tuburan Road Concreting of Tuburan Highway - Brgy. Bohe Tambis, Road, Tuburan 2.00 2.00 1.49 28.00 Municipal Gov'tof Tuburan By MOA 81.00% Ongoing

2016 Basilan Ungkaya Pukan Port Construction of Port, Amaloy, Ungkaya Pukan 1-unit 5.00 Basilan DEO By Admin 100.00% Completed

2016 Basilan Ungkaya Pukan Water System Construction/Expansion Ungkaya Pukan-Tipo Tipo-Al Barka Water System Phase III 1-unit 24.97 By Contract NYS

2016 Lanao del Sur I Buadipuso Buntong Road Completion of Buadipuso Buntong Provincial Road, Buadi-Puso Buntong 1.00 1.00 0.70 20.00 Lanao Del Sur 1st DEO By Admin 70.00% Ongoing

2016 Lanao del Sur I Bubong bridge Replacement of Pindogoan Bridge (Along Karokotan P/R), Bubong 0.01 0.00 11.00 By Contract 15.00% Ongoing

2016 Lanao del Sur I Bubong Road Concreting of Batangan Road, Bubong 0.50 0.50 0.50 6.00 Lanao Del Sur 1st DEO By Admin 50.00% Ongoing

2016 Lanao del Sur I Bubong Road Concreting of Palao-Carigongan Road (Phase II) , Bubong 1.00 1.00 0.68 20.00 Lanao Del Sur 1st DEO By Admin 68.00% Ongoing

2016 Lanao del Sur I Bumbaran Road Concreting of Pagalamatan-Natangcopan Road, Bumbaran 2.00 2.00 0.30 40.00 Lanao Del Sur 1st DEO By Admin 15.00% Ongoing

2016 Lanao del Sur I Bumbaran Road Concreting of Bagumbayan Road, Bumbaran 0.50 0.50 0.08 6.00 By Contract 15.00% Ongoing

2016 Lanao del Sur I Ditsaan-Ramain bridge Repair/Rehab. Of Bayabao Ramain Bridge, Ditsaan-Ramain 0.02 0.00 15.00 By Contract 15.00% Ongoing

2016 Lanao del Sur I Ditsaan-Ramain Road Rehabilitation/Completion of Ditsaan-Ramain Diversion Road,Ditsaan-Ramain 1.00 1.00 1.00 20.00 Lanao Del Sur 1st DEO By Admin 100.00% Completed

2016 Lanao del Sur I Ditsaan-Ramain Road Construction of Line Canal along Marawi-Masiu Road,Pagalongan,D.Ramain 0.40 0.40 4.00 Lanao Del Sur 1st DEO By Admin 100.00% Completed

2016 Lanao del Sur I Maguing Road Concreting of Malungun-Dilimbayan Road, Maguing 2.00 2.00 1.60 40.00 Lanao Del Sur 1st DEO By Admin 80.00% Ongoing

2016 Lanao del Sur I Marantao Road Concreting of Cawayan-Tower Road, Marantao 1.00 1.00 0.15 12.00 By Contract 15.00% Ongoing

2016 Lanao del Sur I Marantao Road Concreting of Dialongana Cawayan Road, Marantao 1.00 1.00 0.15 12.00 By Cotract 15.00% Ongoing

2016 Lanao del Sur I Marantao Water System Construction of Dialongan-Cawayan Water System, Marantao 1-Unit 0.00 5.00 Lanao Del Sur 1st DEO By Admin 80.00% Ongoing

2016 Lanao del Sur I Marawi City bridge Construction of Lalangitan-Macagiling Bridge, Lumba Bayabao 0.02 0.00 20.00 Lanao Del Sur 1st DEO By Admin NYS

2016 Lanao del Sur I Marawi City Drainage Rehab./Repair of Main Drainage along Gomesa Ave (Quezon. Ave), Marawi City 0.90 0.00 10.00 Lanao Del Sur 1st DEO By Admin 60.00% Ongoing

2016 Lanao del Sur I Marawi City Other Infra Expansion/Renovation of DPWH-ARMM Lanao Del Sur 1st DEO, Marawi City 1-Unit 0.00 20.97 Lanao Del Sur 1st DEO By Admin 55.00% Ongoing

2016 Lanao del Sur I Marawi City Other Infra Expansion/Renovation of Area Equipment Services Office, Marawi City 1-Unit 0.00 5.00 Lanao Del Sur 1st DEO By Admin 95.00% Ongoing

2016 Lanao del Sur I Marawi City Other Infra Construction of DPWH-LANAO DEL SUR First Eng'g District Staff House 1-Unit 5.00 Lanao Del Sur 1st DEO By Admin 100.00% Completed

2016 Lanao del Sur I Marawi City Road Completion of Marawi Diversion Road (Cadayonan-Bacolod Chico Section),Marawi City 1.00 1.00 0.10 20.00 Lanao Del Sur 1st DEO By Admin 10.00% Ongoing

2016 Lanao del Sur I Marawi City Road Rehab./Repair of Banga-Piagapo Road, Marawi city 0.50 0.50 0.13 10.00 Lanao Del Sur 1st DEO By Admin 25.00% Ongoing

2016 Lanao del Sur I Marawi City Road Rehab./Repair of Gadungan Road, Gadungan, Marawi City 1.00 1.00 0.45 12.00 Lanao Del Sur 1st DEO By Admin 45.00% Ongoing

2016 Lanao del Sur I Marawi City Road Rehabilitation of Old Capitol Road, Marawi City 1.00 1.00 0.50 12.00 Lanao Del Sur 1st DEO By Admin 50.00% Ongoing

Page 39: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2016 Lanao del Sur I Marawi City Road Concreting of Sabala Bantayan Road,Lumba-Bayabao 0.20 0.20 0.10 2.40 Lanao Del Sur 1st DEO By Admin 50.00% Ongoing

2016 Lanao del Sur I Marawi City Road Upgrading of Marawi - Bito Road( Emei Section), Marawi City 0.40 0.40 0.32 8.00 Lanao Del Sur 1st DEO By Admin 80.00% Ongoing

2016 Lanao del Sur I Marawi City Road Rehabilitation of Raya Saduc-Saduc Proper to Lilod Saduc Road,Marawi City 1.00 1.00 1.00 20.00 Lanao Del Sur 1st DEO By Admin 100.00% Completed

2016 Lanao del Sur I Marawi City Road Concreting of Taluan-Mapantao-Gambai Road (Phase II), Lumba Bayabao 1.00 1.00 1.00 20.00 Lanao Del Sur 1st DEO By Admin 100.00% Completed

2016 Lanao del Sur I Masiu Road Concreting of Arangca-Buadi Acopa Road, Masiu 1.04 1.04 0.42 12.50 Lanao Del Sur 1st DEO By Admin 40.00% Ongoing

2016 Lanao del Sur I Masiu Road Concreting of Dimapatoy-Sawer Road, Masiu 1.00 1.00 0.55 12.00 Lanao Del Sur 1st DEO By Admin 55.00% Ongoing

2016 Lanao del Sur I Mulondo Road Concreting of Kitambugun-Dalama Road, Mulondo 1.00 1.00 0.45 20.00 Lanao Del Sur 1st DEO By Admin 45.00% Ongoing

2016 Lanao del Sur I Mulondo Road Rehabilitation of Nat'l Highway to Buadinsuba-Cabasaran Road, Mulondo 1.00 1.00 0.65 12.00 Lanao Del Sur 1st DEO By Admin 65.00% Ongoing

2016 Lanao del Sur I Mulondo Water System Construction of Balindong Water System, Mulondo 1-Unit 0.00 5.00 Lanao Del Sur 1st DEO By Admin 90.00% Ongoing

2016 Lanao del Sur I Piagapo Road Concreting of Gacap-Tawaon Road(Wato-Pantaoragat Road), Piagapo 3.00 3.00 2.22 60.00 Municipal Gov't of Piagapo By MOA 74.00% Ongoing

2016 Lanao del Sur I Piagapo Road Concreting of Ilian Proper Road,Piagapo 1.00 1.00 1.00 12.00 Municipal Gov't of Piagapo By MOA 100.00% Completed

2016 Lanao del Sur I Piagapo Road Concreting of Udalo - Palacat Road,Piagapo 1.00 1.00 1.00 12.00 Municipal Gov't of Piagapo By MOA 100.00% Completed

2016 Lanao del Sur I Poona-Bayabao Road Conc./Rehab of Liangan-Cadayonan Provincial Road, Poona-Bayabao 1.00 1.00 0.70 12.00 Lanao Del Sur 1st DEO By Admin 70.00% Ongoing

2016 Lanao del Sur I Poona-Bayabao Road Concreting of Bansayan - Lumbac Road, Poona Bayabao 1.25 1.25 1.13 15.00 Lanao Del Sur 1st DEO By Admin 90.00% Ongoing

2016 Lanao del Sur I Poona-Bayabao Water System Completion of Poona Bayabao Water System,Poona -Bayabao 1-Unit 0.00 15.00 Municipal Gov't of Poona

Bayabao By MOA 55.00% Ongoing

2016 Lanao del Sur I Saguiaran Road Concreting of Salacop-Dimacaling Road, Saguiaran 0.30 0.30 0.30 3.60 Lanao Del Sur 1st DEO By Admin 100.00% Completed

2016 Lanao del Sur I Saguiaran Road Rehab./Repair of Saguiran Road(Bualan-Bagoaingud Section), Saguiaran 1.00 1.00 0.15 20.00 By MOA 15.00% Ongoing

2016 Lanao del Sur I Tagoloan Road Concreting of Tagoloan-Talakag Road (Tagoloan Section),Tagoloan 13.07 13.07 4.57 235.20 Lanao Del Sur 1st DEO By Admin 35.00% Ongoing

2016 Lanao del Sur I Tamparan Road Concreting of Tubok Municipal Road, Tamparan 0.50 0.50 0.40 6.00 Lanao Del Sur 1st DEO By Admin 80.00% Ongoing

2016 Lanao del Sur I Tamparan Road Concreting of Lalabuan-Tamparan Mun. Road, Tamparan 0.30 0.30 0.30 3.60 Lanao Del Sur 1st DEO By Admin 100.00% Completed

2016 Lanao del Sur I Taraka Road Construction of Pindolonan-Mangayao-Caramat Road, Taraka 1.00 1.00 0.35 12.00 Lanao Del Sur 1st DEO By Admin 35.00% Ongoing

2016 Lanao del Sur I Wao Road Completion of Katotongan-Milaya-Boot Road, Wao 4.00 4.00 4.00 48.00 Municipal Gov't of Wao By MOA 100.00% Completed

2016 Lanao del Sur II Balindong Road Concreting of Nusa Road (New), Balindong 0.50 0.50 1.48 7.00 Lanao Del Sur 2nd DEO By Admin 95.00% Ongoing

2016 Lanao del Sur II Ganassi Road Concreting of Brgy. Balintad A – Brgy. Paggaoalupa Road, Ganassi 1.00 1.00 0.90 12.00 Municipal Gov't of Ganassi By MOA 90.00% Ongoing

2016 Lanao del Sur II Pagayawan bridge Construction of Ngingir Bridge, Pagayawan 1-Unit 10.00 Municipal Govent of Pagayawan By MOA 95.00% Ongoing

Page 40: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2016 Lanao del Sur II Pagayawan Road Concreting of Linindingan-Diampaca Road, Pagayawan 1.00 1.00 0.75 12.00 Municipal Gov't of Pagayawan By MOA 75.00% Ongoing

2016 Lanao del Sur II Pagayawan Water System Construction of Ngingir Water System-Level II, Pagayawan 1-Unit 0.00 5.00 Municipal Gov't of Pagayawan By MOA 65.00% Ongoing

2016 Lanao del Sur II Pualas Road Concreting of Lake Dapao Circumferential Road (Phase II), Pualas 3.00 3.00 1.05 54.00 Lanao Del Sur 2nd DEO By Admin 35.00% Ongoing

2016 Lanao del Sur II Pualas Water System Construction of Masao Water System-Level II, Pualas 1-Unit 0.00 5.00 Lanao Del Sur 2nd DEO By Admin 75.00% Ongoing

2016 Lanao del Sur II Tubaran Road Concreting of Tangkal-Campu-Buribid Road (Phase II), Tubaran 1.00 1.00 0.49 12.00 Lanao Del Sur 2nd DEO By Admin 45.00% Ongoing

2016 Lanao del Sur II Tugaya Road Concreting of Puthad-Lumbac-Raya Road, Tugaya 3.00 3.00 1.51 36.00 Lanao Del Sur 2nd DEO By Admin 50.00% Ongoing

2016 Lanao del Sur II Bacolod Kalawi Road Concreting of Sugod-Tuka1 Road, Bacolod Kalawi 2.00 2.00 1.00 28.00 Municipal Gov't of Bacolod Kalawi By MOA 50.00% Ongoing

2016 Lanao del Sur II Bacolod Kalawi Road Concreting of Ampao-Raya Road, Bacolod Kalawi 1.00 1.00 0.50 12.00 Municipal Gov't of Bacolod Kalawi By MOA 50.00% Ongoing

2016 Lanao del Sur II Balabagan Road Concreting of Barorao-Banago Road, Balabagan, Phase I 3.86 3.86 1.74 46.29 Lanao Del Sur 2nd DEO By Admin 45.00% Ongoing

2016 Lanao del Sur II Balindong Road Concreting of Abaga Road, Balindong 0.50 0.50 0.48 6.00 Municipal Gov't of Balindong By Admin 95.00% Ongoing

2016 Lanao del Sur II Balindong Road Concreting of Borowa Lumbayao Road, Balindong 0.50 0.50 0.48 6.00 Municipal Gov't of Balindong By MOA 95.00% Ongoing

2016 Lanao del Sur II Balindong Road Concretiong Talob-Dagandal Road, Balindong 0.50 0.50 0.48 6.00 Municipal Gov't of Balindong By MOA 95.00% Ongoing

2016 Lanao del Sur II Balindong Road Concreting of Limbo Road, Wato Balindong 0.50 0.50 0.48 6.00 Municipal Gov't of Balindong By MOA 95.00% Ongoing

2016 Lanao del Sur II Balindong Water System Construction of Salipongan-Bantogawato-Cadayunan Water System-Level II, Balindong 1-Unit 0.00 5.00 Municipal Gov't of Balindong By MOA 75.00% Ongoing

2016 Lanao del Sur II Balindong Water System Construction of Lalabuan Water System-Level II, Balindong 1-Unit 0.00 5.00 Municipal Gov't of Balindong By MOA 90.00% Ongoing

2016 Lanao del Sur II Bayang bridge Construction of Cadingilan Occidental-Linao Bridge, Bayang 1-Unit 6.00 Lanao Del Sur 2nd DEO By Admin 100.00% Completed

2016 Lanao del Sur II Bayang Road Concreting of Cadingilan Occidental-Linao Road, Bayang 1.00 1.00 0.83 12.00 Lanao Del Sur 2nd DEO By Admin 80.00% Ongoing

2016 Lanao del Sur II Binidayan Road Concreting of Picalilangan-Baguiangen Road, Binidayan 1.00 1.00 0.40 12.00 Municipal Gov't of Binidayan By MOA 40.00% Ongoing

2016 Lanao del Sur II Binidayan Water System Construction of Bubonga Ranao Water System-Level II, Binidayan 1-Unit 0.00 5.00 Municipal Gov't of Binidayan By MOA 50.00% Ongoing

2016 Lanao del Sur II Butig Road Concreting of Butig Highway Junction, Butig 0.50 0.50 0.52 9.00 Lanao Del Sur 2nd DEO By Admin 65.00% Ongoing

2016 Lanao del Sur II Butig Road Concreting of Butig-Barira-Buldon Provincial Road ( Opening ), Butig 5.00 5.00 90.00 Lanao Del Sur 2nd DEO By Admin NYS

2016 Lanao del Sur II Calanogas Road Concreting of Pantaon-Inudaran-Luguna Road, Calanogas 1.00 1.00 1.00 12.00 Municipal Gov't of Calanogas By MOA 100.00% Completed

2016 Lanao del Sur II Ganassi Flood Control Construction of Flood Control (Brgys. Poblacion, Taganonok, Macabao and Compongaraya) Ganassi 50.00 Lm 0.00 6.00 Municipal Gov't of Ganassi By MOA 95.00% Ongoing

2016 Lanao del Sur II Ganassi Road Concrete Widening of Brgy. Madaya – Brgy. Tabuan Road 1.00 1.00 1.00 6.00 Municipal Gov't of Ganassi By MOA 100.00% Completed

2016 Lanao del Sur II Ganassi Road Concreting of Brgy. Pagalongan – Brgy. Barit Road, Ganassi 0.50 0.50 0.50 6.00 Municipal Gov't of Ganassi By MOA 100.00% Completed

Page 41: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2016 Lanao del Sur II Ganassi Water System Construction of Brgy. Poblacion Water System-Level III, Ganassi 1-Unit 0.00 10.00 Municipal Gov't of Ganassi By MOA 95.00% Ongoing

2016 Lanao del Sur II Kapatagan Road Concreting of Pinanto Road (Plasen - Lower Itil Section), Kapatagan 1.00 1.00 0.80 12.00 Municipal Gov't of

Kapatagan By MOA 80.00% Ongoing

2016 Lanao del Sur II Kapatagan Road Concreting of Kabaniakawan-Tabuan-Bayanga Road, Kapatagan 3.00 3.00 1.00 36.00 Municipal Gov't of

Kapatagan By MOA 65.00% Ongoing

2016 Lanao del Sur II Kapatagan Road Concreting of Bongabong Proper-Bowan Road (New), Kapatagan 1.00 1.00 0.80 14.00 Municipal Gov't of

Kapatagan By MOA 80.00% Ongoing

2016 Lanao del Sur II Lumbaca Unayan Road Concreting of Tringun Road, Lumbaca Unayan 1.00 1.00 0.70 12.00 Lanao Del Sur 2nd DEO By Admin 70.00% Ongoing

2016 Lanao del Sur II Lumbaca Unayan Road Concreting of Lumbaca Unayan-Tubaran Road (Brgys. Dimapaok and Lumbac Dilausan Section) Lumbaca Unayan 1.00 1.00 0.78 12.00 Lanao Del Sur 2nd DEO By Admin 75.00% Ongoing

2016 Lanao del Sur II Lumbatan Road Concreting of Penaring-Macadar Road, Lumbatan 1.00 1.00 0.70 12.00 Lanao Del Sur 2nd DEO By Admin 70.00% Ongoing

2016 Lanao del Sur II Lumbatan Road Concreting of Brgy. Lumbac - Brgy. Madaya Road 1.00 1.00 0.40 12.00 Municipal Gov't of Ganassi By MOA 70.00% Ongoing

2016 Lanao del Sur II Lumbatan Road Concreting of Lumbatan-Marogong Road (Brgys. Alog, Buad and Dalipuga Section), Lumbatan 3.73 3.73 3.54 44.70 Municipal Gov't of Lumbatan By MOA 95.00% Ongoing

2016 Lanao del Sur II Lumbatan Water System Construction of Lumbac Macadar Water System-Level III, Lumbatan 1-Unit 0.00 10.00 Lanao Del Sur 2nd DEO By Admin 80.00% Ongoing

2016 Lanao del Sur II Lumbayanague Road Concreting of Pitatangalan Road, Lumbayanague 0.50 0.50 0.25 6.00 Lanao Del Sur 2nd DEO By Admin 50.00% Ongoing

2016 Lanao del Sur II Lumbayanague Road Concreting of Nanagun-Butig-Lumbayanague, Lumbayanague 3.00 3.00 1.47 36.00 Lanao Del Sur 2nd DEO By Admin 70.00% Ongoing

2016 Lanao del Sur II Madalum Road Concreting of Gadongan-Liangan Road, Madalum 2.00 2.00 1.18 24.00 Lanao Del Sur 2nd DEO By Admin 70.00% Ongoing

2016 Lanao del Sur II Madalum Water System Construction of Gadongan Water System-Level III, Madalum 1-Unit 0.00 10.00 Lanao Del Sur 2nd DEO By Admin 75.00% Ongoing

2016 Lanao del Sur II Madamba Road Concreting of Lake Uyaan Circumferential Road, Madamba 1.00 1.00 0.70 12.00 Lanao Del Sur 2nd DEO By Admin 70.00% Ongoing

2016 Lanao del Sur II Malabang bridge Construction of Boniga Foot Bridge, Malabang 1-Unit 2.00 Lanao Del Sur 2nd DEO By Admin 75.00% Ongoing

2016 Lanao del Sur II Malabang Other Infra Construction of Motorpoll Building, DPWH-ARMM LDS 2nd DEO, Malabang 1-Unit 0.00 8.00 Lanao Del Sur 2nd DEO By Admin 40.00% Ongoing

2016 Lanao del Sur II Malabang Other Infra Expansion/renovation of DPWH-ARMM LDS 2nd DEO, Malabang 1-Unit 0.00 20.00 Lanao Del Sur 2nd DEO By Admin 50.00% Ongoing

2016 Lanao del Sur II Malabang Road Concreting of Manggahan-Bunkhouse Road, Malabang 1.00 1.00 0.10 12.00 Lanao Del Sur 2nd DEO By Admin 10.00% Ongoing

2016 Lanao del Sur II Malabang Road Concreting of Malabang-Marogong-Tubaran-Bayang Road (Calumbog Section), Malabang 9.00 9.00 2.38 108.00 Lanao Del Sur 2nd DEO By Admin 25.00% Ongoing

2016 Lanao del Sur II Malabang Road Concreting of Bacayawan Road, Malabang 0.50 0.50 0.24 6.00 Lanao Del Sur 2nd DEO By Admin 45.00% Ongoing

2016 Lanao del Sur II Malabang Road Concreting of Bago Inged Road, Malabang 0.50 0.50 0.23 6.00 Lanao Del Sur 2nd DEO By Admin 45.00% Ongoing

2016 Lanao del Sur II Malabang Road Concreting of Brgy. Cabasaran Road (East Pagilidan Section), Malabang 0.20 0.20 0.15 2.40 Lanao Del Sur 2nd DEO By Admin 70.00% Ongoing

2016 Lanao del Sur II Malabang Road Consruction of Brgy Boniga Road, Malabang 0.67 0.67 0.54 8.00 Lanao Del Sur 2nd DEO By Admin 75.00% Ongoing

2016 Lanao del Sur II Malabang Water System Construction of Water System Level II, Brgy Bunkhouse, Malabang 1-Unit 0.00 10.00 Lanao Del Sur 2nd DEO By Admin 65.00% Ongoing

Page 42: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2016 Lanao del Sur II Marogong Road Concreting of Bayang-Marogong-Malabang Road (Phase II), Marogong 1.00 1.00 0.70 12.00 Municipal Gov't of Marogong By MOA 70.00% Ongoing

2016 Lanao del Sur II Marogong Road Concreting of Marogong-Malabang Road (Road Opening), Marogong 1.00 1.00 1.00 18.00 Municipal Gov't of Marogong By MOA 100.00% Completed

2016 Lanao del Sur II Marogong Water SystemConstruction of Marogong Water System-Level II, (Bagumbayan, Mantailoco, Cabasaran and Cahera), Marogong

1-Unit 0.00 10.00 Municipal Gov't of Marogong By MOA 80.00% Ongoing

2016 Lanao del Sur II Picong Road Concreting of Inudaran Road Phase I (New), Picong 1.00 1.00 0.38 12.00 Lanao Del Sur 2nd DEO By Admin 70.50% Ongoing

2016 Lanao del Sur II Picong Water System Construction of Pitibekan Water System-Level II, Picong 1-Unit 0.00 10.00 Lanao Del Sur 2nd DEO By Admin 65.00% Ongoing

2016 Lanao del Sur II Pualas Road Concreting of Gadungan Road, Pualas 0.50 0.50 0.37 6.00 Lanao Del Sur 2nd DEO By Admin 88.00% Ongoing

2016 Lanao del Sur II Sultan Dumalondong Road Concreting of Sultan Dumalondong - Lumbatan Road (Brgys. Dinganen- Lunay-Madaya Section) Sultan Dumalondong 2.00 2.00 1.68 24.00 Lanao Del Sur 2nd DEO By Admin 80.00% Ongoing

2016 Lanao del Sur II Tubaran Road Concreting of Tangkal-Campu-Buribid Road, Tubaran 1.00 1.00 0.53 12.00 Lanao Del Sur 2nd DEO By Admin 53.00% Ongoing

2016 Lanao del Sur II Tubaran Water System Construction of Buribid Water System-Level II, Tubaran 1-Unit 0.00 5.00 Lanao Del Sur 2nd DEO By Admin 70.00% Ongoing

2016 Lanao del Sur II Tugaya Water System Construction of Dilimbayan-Salipongan Water System-Level III, Tugaya 1-Unit 0.00 10.00 Lanao Del Sur 2nd DEO By Admin 40.00% Ongoing

2016 Maguindanao I Barira Road Concreting of Mother Barira - Sitio Kalilangan - Sitio Madalum, Nabalawag Road, Barira 5.80 5.80 3.10 69.60 Municipal Gov't of Barira By MOA 70.00% Ongoing

2016 Maguindanao I Barira Road Concreting of Liong-Mother Barira Road, Barira 9.00 9.00 5.00 108.00 Municipal Gov't of Barira By MOA 76.00% Ongoing

2016 Maguindanao I Buldon bridge Repair of Dinganen-Edcor Bridge, Buldon 0.05 19.06 Maguindanao 1st DEO By Admin 75.00% Ongoing

2016 Maguindanao I Buldon Road Concreting of Edcor-Dinganen-Pigcawayan Road, (Phase I), Buldon 7.00 7.00 4.80 84.00 Municipal Gov't of Buldon By MOA 60.00% Ongoing

2016 Maguindanao I Cotabato City Flood Control Flood Control Project, Lagundungan Creek 1-unit 10.00 Maguindanao 1st DEO By Admin 100.00% Completed

2016 Maguindanao I Cotabato City Other Infra Renovation/Improvement of DPWH-Mag 1 DEO Building 1-unit 15.00 Maguindanao 1st DEO By Administration 50.00% Ongoing

2016 Maguindanao I Datu Blah Sinsuat Port Construction of Fish Port, Brgy. Kinimi, Datu Blah Sinsuat 1-unit 5.00 Maguindanao 1st DEO By Admin 30.00% Ongoing

2016 Maguindanao I Datu Blah Sinsuat Road Concreting of Pura-Matuber Coastal Road, Datu Blah Sinsuat 4.00 4.00 1.10 56.00 Maguindanao 1st DEO By Administration 35.00% Ongoing

2016 Maguindanao I Datu Blah Sinsuat Water System Construction of Water System Level II, Brgy Tubuan, Datu Blah Sinsuat 1-unit 4.00 Maguindanao 1st DEO By Admin 95.00% Ongoing

2016 Maguindanao I Datu Odin Sinsuat bridge Riprapping of Bagoenged Bridge and Portion of Baguengud River, Datu Odin Sinsuat 1-unit 5.00 Maguindanao 1st DEO By Admin 100.00% Completed

2016 Maguindanao I Datu Odin Sinsuat Road Concreting of Road: National Highway-Sapalan, Datu Odin Sinsuat 4.00 4.00 3.70 48.00 FFJJ Construction By Contract 100.00% Completed

2016 Maguindanao I Datu Odin Sinsuat Road Concreting of Road: National Highway-Ambolodto Road ,Datu Odin Sinsuat 3.00 3.00 2.80 30.00 Maguindanao 1st DEO By Administration 90.00% Ongoing

2016 Maguindanao I Datu Odin Sinsuat Shore Protection Dimapatoy Riverbank Protection (Revetment), Dimapatoy, Datu Odin Sinsuat 1-unit 3.00 Maguindanao 1st DEO By Admin 100.00% Completed

2016 Maguindanao I Datu Odin Sinsuat Water System Construction of Water System Level II, Brgy Badak, Datu Odin Sinsuat 1-unit 3.50 Maguindanao 1st DEO By Admin 95.00% Ongoing

2016 Maguindanao I Datu Odin Sinsuat Water System Construction of Water System Level II, Brgy Dimapatoy, Datu Odin Sinsuat 1-unit 3.50 Maguindanao 1st DEO By Admin 100.00% Completed

Page 43: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2016 Maguindanao I Kabuntalan Road Concreting of Taviran-Ganta Road, Kabuntalan 6.00 6.00 2.50 120.00 R.C.Tagala Construction By Contract 55.00% Ongoing

2016 Maguindanao I Matanog Other Infra Development of Marayag Lake for irrigation and Eco-Tourism Project, Matanog 1-unit 20.00 Municipal Gov't of Matanog By MOA 60.00% Ongoing

2016 Maguindanao I Matanog Road Concreting of Poblacion Teba Municipal Road, Matanog 0.16 0.16 0.10 1.92 Maguindanao 1st DEO By Administration 60.00% Ongoing

2016 Maguindanao I Matanog Road Concreting of Tabangao, Bugasan Norte Road, Matanog 0.30 0.30 0.26 3.60 Maguindanao 1st DEO By Administration 70.00% Ongoing

2016 Maguindanao I Matanog Road Concreting of Sapad-Pangtoon, Matanog 2.00 2.00 1.55 24.00 Maguindanao 1st DEO By Administration 89.00% Ongoing

2016 Maguindanao I Matanog Road Concreting of Katubo-Kapatagan Provincial Road, Matanog 3.00 3.00 3.35 36.00 Maguindanao 1st DEO By Administration 95.00% Ongoing

2016 Maguindanao I Matanog Road Construction of Sapad-Kidama Coastal Road, Matanog 8.00 8.00 0.10 96.00 Municipal Gov't of Matanog By MOA 25.00% Ongoing

2016 Maguindanao I North Upi Road Concreting of North Upi-Datu Blah Sinsuat Prov'l Road, Phase II, North Upi & DBS 2.00 2.00 28.00 Maguindanao 1st DEO By Administration 5.00% Ongoing

2016 Maguindanao I North Upi Road Concreting of Crossing Magutay - Renede, Upi 4.60 4.60 0.70 55.20 Maguindanao 1st DEO By Administration 40.00% Ongoing

2016 Maguindanao I Northern Kabuntalan bridge Construction of Tumaginting-Ganta Bridge, Northern Kabuntalan 0.12 120.00 By Contract 24.05% Ongoing

2016 Maguindanao I Northern Kabuntalan Road Concreting of Gayonga-Indatuan Road, Northern Kabuntalan 2.00 2.00 1.50 24.00 Maguindanao 1st DEO By Administration 75.00% Ongoing

2016 Maguindanao I Northern Kabuntalan Water System Construction of Water System Level II, Brgy Balong, Northern Kabuntalan 1-unit 3.50 Maguindanao 1st DEO By Admin 100.00% Completed

2016 Maguindanao I Nothern Kabuntalan Water System Construction of Water System Level II, Brgy Montay, Kabuntalan 1-unit 3.50 Maguindanao 1st DEO By Admin 100.00% Completed

2016 Maguindanao I Parang Port Construction of Litayin Seaport, (Phase II), Bongo Island, Parang 1-unit 5.00 Municipal Gov't of Parang By MOA 70.00% Ongoing

2016 Maguindanao I Parang Road Concreting of Brgy Timbangan-Magsaysay Road, Parang 2.00 2.00 1.60 24.00 Municipal Gov't of Parang By MOA 72.00% Ongoing

2016 Maguindanao I Parang Road Concreting of Circumferential Road, Brgy. Sarmiento, Parang 1.00 1.00 1.20 12.00 Municipal Gov't of Parang By MOA 100.00% Completed

2016 Maguindanao I Parang Water System Construction of Water System Level II, Bongo Island, Parang 1-unit 4.00 Maguindanao 1st DEO By Admin 100.00% Completed

2016 Maguindanao I Simuay Other Infra Expansion/Renovation of Area Equipment Services Office, Simuay 1-unit 15.00 Maguindanao 1st DEO By Administration 95.00% Ongoing

2016 Maguindanao I Sultan Kudarat Road Concreting of Darapanan Road, Sultan Kudarat 5.00 5.00 6.00 60.00 Maguindanao 1st DEO By Administration 100.00% Completed

2016 Maguindanao I Sultan Kudarat Road Concreting of Road: Ibotegen-Panatan-Boundary Pigcawayan, Sultan Kudarat 4.00 4.00 2.80 48.00 Municipal Gov't of Sultan

Kudarat By MOA 70.00% Ongoing

2016 Maguindanao I Sultan Kudarat Road Concreting of Sultan Mastura Road, Sultan Kudarat, Phase I 1.11 1.11 1.30 13.27 Municipal Gov't of Sultan Kudarat By MOA 100.00% Completed

2016 Maguindanao I Sultan Kudarat Water System Construction of Water System Level II, Brgy. Alamada, Sultan Kudarat 1-unit 3.50 Maguindanao 1st DEO By Admin 100.00% Completed

2016 Maguindanao I Sultan Kudarat Water System Construction of Water System Level II, Talusan, Brgy salimbao, Sultan Kudarat 1-unit 3.50 Maguindanao 1st DEO By Admin 100.00% Completed

2016 Maguindanao I Sultan Mastura Port Construction of Simuay Seashore Fish Port, Sultan Mastura 1-unit 10.00 MUnicipal Gov't of Sultan Mastura By MOA 100.00% Completed

2016 Maguindanao I Sultan Mastura Road Concreting of Solon-Limakaso Road, Sultan Mastura 1.50 1.50 1.00 18.00 Municipal Gov't of Sultan Mastura By MOA 70.00% Ongoing

Page 44: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2016 Maguindanao I Sultan Mastura Road Concreting of Macabiso-Namuken-Tareken Road, (Phase II), Sultan Mastura 6.00 6.00 6.39 72.00 Municipal Gov't of Sultan

Mastura By MOA 88.00% Ongoing

2016 Maguindanao I Sultan Mastura Water System Construction of Water System Level II, Brgy Solon, Sultan Mastura 1-unit 3.50 Maguindanao 1st DEO By Admin 95.00% Ongoing

2016 Maguindanao II Ampatuan Flood Control Construction of Slope Protection along Roadside of Marbel-Ala-Cotabato Road, Ampatuan 0.50 0.50 1-unit 15.00 Maguindanao II DEO By Admin 100.00% Completed

2016 Maguindanao II Ampatuan Other Infra Construction of Concrete Revetment w/ Spur Dike at Dikalungan, Ampatuan 0.10 0.10 0.00 12.00 Maguindanao II DEO By Admin 18.00% Ongoing

2016 Maguindanao II Datu Abdullah Sangki bridge Construction of RCDG Bridge at Talisawa, Datu Abdullah Sangki 0.02 0.00 28.00 Maguindanao II DEO By Admin NYS

2016 Maguindanao II Datu Paglas Road Construction of Slope Protection w/ Concrete Wall and Line Canal at Alip Section, Datu Paglas 0.08 0.08 1-unit 2.40 Maguindanao II DEO By Admin 100.00% Completed

2016 Maguindanao II Datu Paglas Road Reblocking of Kidapawan - Ala - Junction Road (Buluan - Datu Paglas Section), Datu Paglas 5.00 5.00 3.32 100.00 By Contract 55.63% Ongoing

2016 Maguindanao II Datu Piang Other Infra Construction of Concrete Revetment crossing to Municipal Hall, Datu Piang 0.74 0.74 0.00 40.00 Maguindanao II DEO By Admin 5.00% Ongoing

2016 Maguindanao II Datu Piang Road Concreting of Rio Grande Road, Datu Piang (Road Opening) 0.74 0.74 10.36 Maguindanao II DEO By Admin 5.00% Ongoing

2016 Maguindanao II Datu Piang Road Concreting of Ligawasan Provincial Road (Phase 2), Rajah Buayan-Shariff Saidona-Datu Piang-Kabuntalan 10.00 10.00 0.16 180.00 Maguindanao II DEO By Admin 10.07% Ongoing

2016 Maguindanao II Datu Piang Road Reblocking of Datu Piang Avenue, Datu Piang 2.00 2.00 0.50 24.00 Maguindanao II DEO By Admin 45.32% Ongoing

2016 Maguindanao II Datu Piang Road Concrete Widening of Midsayap - Dulawan - Makar Road (Datu Piang - Pagatin Section), Datu Piang 1.00 1.00 0.76 18.00 Maguindanao II DEO By Admin 86.32% Ongoing

2016 Maguindanao II Datu Salibo Road Concreting of Sambolawan-Andavit Road, Datu Salibo 1.00 1.00 0.92 14.00 Maguindanao II DEO By Admin 95.39% Ongoing

2016 Maguindanao II Datu Saudi Road Reblocking of Datu Saudi - Datu Unsay - Shariff Aguak 1.00 1.00 0.70 20.00 Maguindanao II DEO By Admin 75.31% Ongoing

2016 Maguindanao II Datu Saudi Road Concreting of Nabundas - Dapiawan Provincial Road (Phase 2), Datu Saudi 7.00 7.00 5.52 105.00 Maguindanao II DEO By Admin 85.96% Ongoing

2016 Maguindanao II Datu Saudi Road Concreting of Kitango-Maganoy, Datu Saudi (Road Opening) 2.00 2.00 1.80 28.00 Maguindanao II DEO By Admin 92.06% Ongoing

2016 Maguindanao II Datu Saudi Road Concrete Widening of Kitango Section, Datu Saudi 1.00 1.00 0.96 15.00 Maguindanao II DEO By Admin 97.33% Ongoing

2016 Maguindanao II Datu Saudi Road Concrete Widening of Salbo Section, Datu Saudi 1.00 1.00 1.00 15.00 Maguindanao II DEO By Admin 100.00% Completed

2016 Maguindanao II Datu Saudi Road Concrete Widening of Dapiawan Section, Datu Saudi 1.00 1.00 1.00 15.00 Maguindanao II DEO By Admin 100.00% Completed

2016 Maguindanao II Datu Unsay Other Infra Construction of Spur Dike @ Meta Bridge Waterways, Datu Unsay 0.04 5.00 Maguindanao II DEO By Admin 95.00% Ongoing

2016 Maguindanao II Maguindanao Other Infra Dev't/Construction of new DPWH-ARMM 2nd DEO Compound/Buildings, Maguindanao 1-Unit 0.00 46.12 Maguindanao II DEO By Admin NYS

2016 Maguindanao II Mamasapano bridge Construction of RCDG Bridge at Tukanalipao, Mamasapano 0.12 0.00 180.00 Maguindanao II DEO By Admin 20.00% Ongoing

2016 Maguindanao II Mamasapano Road Concreting of Libutan Road Phase-2, Mamasapano 1.00 1.00 0.70 12.00 Maguindanao II DEO By Admin 72.33% Ongoing

2016 Maguindanao II Mamasapano Road Concreting of Tukanalipao - Pidsandawan Road, Mamasapano (Road Opening) 2.00 2.00 1.63 28.00 Maguindanao II DEO By Admin 78.33% Ongoing

2016 Maguindanao II Mamasapano Road Concreting of Malingao-Libutan Road, Mamasapano (Road Opening) 1.00 1.00 1.00 14.00 Maguindanao II DEO By Admin 100.00% Completed

Page 45: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2016 Maguindanao II Pagalungan Road Concreting of Layog - Dungguan - Poblacion Provincial Road (Phase 2), Pagalungan 1.50 1.50 1.50 22.50 Maguindanao II DEO By Admin 100.00% Completed

2016 Maguindanao II Pagdag Road Construction of Barangay Lepak - Barangay Kabuling, Pandag (Road Opening) 2.00 2.00 0.40 28.00 Municipal Gov't of Pandag By MOA 35.71% Ongoing

2016 Maguindanao II Paglat Road Concreting of New York Road, Paglat 1.00 1.00 1.00 12.00 Maguindanao II DEO By Admin 100.00% Completed

2016 Maguindanao II Pandag Road Concreting of Barangay Lower Dlag - Barangay Upper Dlag Road, Pandag 1.00 1.00 0.53 12.00 Municipal Gov't of Pandag By MOA 44.98% Ongoing

2016 Maguindanao II Pandag Road Concreting of Barangay Upper Dlag - Barangay Malangit Road, Pandag 1.20 1.20 0.55 14.40 Municipal Gov't of Pandag By MOA 55.31% Ongoing

2016 Maguindanao II South Upi Flood Control Construction of Slope Protection along Awang - Upi - Lebak Road (Timanan - Tran Section), South Upi 0.29 1-unit 8.70 Maguindanao II DEO By Admin 100.00% Completed

2016 Maguindanao II Talayan Road Reblocking of Marbel - Ala - Cotabato Road (Talayan Section), Talayan 3.00 3.00 1.41 60.00 Maguindanao II DEO By Admin 55.14% Ongoing

2016 Sulu I Hadji Panglima Tahil Port Construction of Bubuan Port, Hadji Panglima Tahil 1-Unit 0.00 10.00 Sulu 1st DEO By Admin NYS

2016 Sulu I Hadji Panglima Tahil Road Concreting of Avo Avo Road, Panglima Tahil 1.00 1.00 0.00 14.00 Sulu 1st DEO By Admin NYS

2016 Sulu I Hadji Panglima Tahil Road Concreting of Sitio Mapiyak Road, Bangas, Panglima Tahil 0.50 0.50 0.00 7.00 Sulu 1st DEO By Admin NYS

2016 Sulu I Hadji Panglima Tahil Shore Protection Construction of Abu Abu Seawall, Panglima Tahil 1-Unit 1-unit 5.00 Sulu 1st DEO By Admin 100.00% Completed

2016 Sulu I Indanan Port Rehabilitation of Buwansa Port, Indanan 1-Unit 0.00 3.00 Sulu 1st DEO By Admin NYS

2016 Sulu I Indanan Road Concreting of Pasil-Tukay Road, Indanan 2.00 2.00 0.37 28.00 Sulu 1st DEO By Admin 20.11% Ongoing

2016 Sulu I Indanan Road Concreting of Indanan-Lapa Road ( Phase II), Indanan Km 12+600 - Km 19+600 7.00 7.00 3.29 168.00 Sulu 1st DEO By Admin 50.33% Ongoing

2016 Sulu I Indanan Road Concreting of Km. 2-Jati Road, Indanan 1.00 1.00 0.49 9.00 Sulu 1st DEO By Admin 51.61% Ongoing

2016 Sulu I Indanan Road Concreting of Mampallam-Adjid Road, Indanan 2.00 2.00 1.62 18.00 Sulu 1st DEO By Admin 84.11% Ongoing

2016 Sulu I Indanan Road Concreting of Kajatian Road Phase II, Indanan 1.00 1.00 1.00 14.00 Sulu 1st DEO By Admin 100.00% Completed

2016 Sulu I Indanan Road Concreting of Kamardikahan Road, Indanan 0.50 0.50 0.50 4.50 Sulu 1st DEO By Admin 100.00% Completed

2016 Sulu I Indanan Road Concreting of Ummul Qura Road , Indanan(Phase I) 2.44 2.44 2.44 21.94 Sulu 1st DEO By Admin 100.00% Completed

2016 Sulu I Indanan Water System Brgy Bud Taran Water Supply Level II, Indanan 1-Unit 0.00 4.00 Sulu 1st DEO By Admin NYS

2016 Sulu I Indanan Water System Rehabilitation of Water Supply Level II, Bato Bato, Indanan 1-Unit 0.00 3.00 Sulu 1st DEO By Admin NYS

2016 Sulu I Indanan Water System Rehabilitation of Water Supply Level II, Brgy Bunot, Indanan 1-Unit 0.00 3.00 Sulu 1st DEO By Admin NYS

2016 Sulu I Indanan Water System Brgy. Sawaki-Kuppong-Paligue-Sapah Malaum Water Supply Level II, Indanan 1-Unit 0.00 7.00 Sulu 1st DEO By Admin NYS

2016 Sulu I Jolo Drainage Construction of Drainage for Sanitarium-San Raymundo, Jolo 1-Unit 0.00 10.00 Sulu 1st DEO By Admin 10.15% Ongoing

2016 Sulu I Jolo Drainage Concreting of Access road & Drainage of Dan-Dan Ututalum Elem. School, Jolo 1-Unit 0.00 10.00 Sulu 1st DEO By Admin 22.18% Ongoing

Page 46: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2016 Sulu I Jolo Drainage Construction/Improvement of Alat Open Canal, Jolo 1-Unit 0.00 10.00 Sulu 1st DEO By Admin 29.56% Ongoing

2016 Sulu I Jolo Drainage Construction of Serantes Drainage System, Jolo 1-Unit 0.00 20.00 Sulu 1st DEO By Admin 74.88% Ongoing

2016 Sulu I Jolo Other Infra Expansion/Renovation of Sulu 1st DEO Compound, Jolo 1-Unit 0.00 20.00 Sulu 1st DEO By Admin NYS

2016 Sulu I Jolo Other Infra Expansion/Renovation of Area Equipment Services Office, Sulu 1-Unit 0.00 15.00 Sulu 1st DEO By Admin NYS

2016 Sulu I Jolo Road Reconstruction of Serantes- Bus-Bus Road, Jolo Km 0+360 -Km 2+360 2.00 2.00 2.00 48.00 Sulu 1st DEO By Admin 100.00% Completed

2016 Sulu I Jolo Road Reconstruction of Moore Avenue Road, Jolo Km 2+800 - Km 3+800 1.00 1.00 1.00 24.00 Sulu 1st DEO By Admin 100.00% Completed

2016 Sulu I Jolo Road Reconstruction of Plaza Tulay-Chinese Pier Road, Jolo 1.00 1.00 1.00 14.00 Sulu 1st DEO By Admin 100.00% Completed

2016 Sulu I Jolo Water System Jolo Waterworks Expansion & Source Development Phase II 1-Unit 0.00 50.00 Sulu 1st DEO By Admin NYS

2016 Sulu I Maimbung Port Construction of Ipil Seaport, Maimbung 1-Unit 0.00 5.00 Sulu 1st DEO By Admin NYS

2016 Sulu I Maimbung Road Concreting of Maimbung-Talipao-Panglima Estino Road (Phase II) Km 37+276 -Km 45+276 8.00 8.00 0.00 192.00 Sulu 1st DEO By Admin NYS

2016 Sulu I Maimbung Road Concreting of Maimbung-Parang Road (Phase III), Maimbung/Parang Km 21+600 - m 26+600 5.00 5.00 0.00 120.00 Sulu 1st DEO By Admin NYS

2016 Sulu I Maimbung Road Concreting of Bualo-Lapa Road, Maimbung 2.00 2.00 0.00 28.00 Sulu 1st DEO By Admin NYS

2016 Sulu I Maimbung Road Concreting of Lihdung-Kulasi Road, Maimbung 0.50 0.50 0.00 4.50 Sulu 1st DEO By Admin NYS

2016 Sulu I Parang Port Construction of Mini Port, Brgy. Tumangas Parang 1-Unit 0.00 10.00 Sulu 1st DEO By Admin NYS

2016 Sulu I Parang Road Concreting of Silangkan-Parang Road, Parang 3.00 3.00 0.41 66.00 Sulu 1st DEO By Admin 20.19% Ongoing

2016 Sulu I Parang Road Concreting of Brgy. Tukay - Brgy. Bukid Road, Parang 2.00 2.00 0.70 18.00 Sulu 1st DEO By Admin 36.19% Ongoing

2016 Sulu I Parang Road Concreting of Nunukan-Bagsak Road, Parang 2.00 2.00 0.86 18.00 Sulu 1st DEO By Admin 44.55% Ongoing

2016 Sulu I Parang Road Concreting of Wanni Piyanjihan-Kuta Sairap Road, Parang 2.00 2.00 1.49 18.00 Sulu 1st DEO By Admin 75.88% Ongoing

2016 Sulu I Parang Road Concreting of Kannaway-Bawisan Road, Parang 2.00 2.00 2.00 28.00 Sulu 1st DEO By Admin 100.00% Completed

2016 Sulu I Parang Road Concreting of Brgy. Pasil-Brgy. Bukid Road, Parang 2.00 2.00 2.00 18.00 Sulu 1st DEO By Admin 100.00% Completed

2016 Sulu I Parang Water System Kaha Deepwell , Parang 1-Unit 0.50 Sulu 1st DEO By Admin 100.00% Completed

2016 Sulu I Parang Water System Alu Deepwell , Parang 1-Unit 0.50 Sulu 1st DEO By Admin 100.00% Completed

2016 Sulu I Parang Water System Brgy. Manilop-Kabbon Maas-Tubig Parang Water Supply Level II 1-Unit 0.00 6.00 Sulu 1st DEO By Admin NYS

2016 Sulu I Patikul Drainage Construction of Drainage for Jolo Cadre - Capitol Road, Patikul 1-Unit 0.00 20.00 Sulu 1st DEO By Admin 94.24% Ongoing

2016 Sulu I Patikul Port Construction of Taglibi Seaport, Patikul 1-Unit 0.00 10.00 Sulu 1st DEO By Admin 40.12% Ongoing

Page 47: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2016 Sulu I Patikul Road Concreting of Godinez Village-MSU Road, Patikul 2.00 2.00 1.08 18.00 Sulu 1st DEO By Admin 55.77% Ongoing

2016 Sulu I Patikul Road Concreting of Jolo-Baunoh-Bangkal Road,Patikul Km 1+800 - Km 3+800 2.00 2.00 1.80 48.00 Sulu 1st DEO By Admin 95.92% Ongoing

2016 Sulu I Patikul Road Concreting of Tuburan-Taung Road, Patikul 1.00 1.00 1.00 9.00 Sulu 1st DEO By Admin 100.00% Completed

2016 Sulu I Patikul Road Concreting of Anuling-Chinese Garden Road, Patikul 1.00 1.00 1.00 9.00 Sulu 1st DEO By Admin 100.00% Completed

2016 Sulu I Patikul Road Concreting of Baunoh Bangkal Road, Patikul 1.00 1.00 1.00 9.00 Sulu 1st DEO By Admin 100.00% Completed

2016 Sulu I Patikul Road Concreting of Kalimayahan Village Road, Patikul 2.00 2.00 2.00 18.00 Sulu 1st DEO By Admin 100.00% Completed

2016 Sulu I Patikul Shore Protection Rehabilitation of Mauboh Shore Protection 1-Unit 1-unit 5.00 Sulu 1st DEO By Admin 100.00% Completed

2016 Sulu I Patikul Water System Kalimayahan Deepwell, Patikul 2-Units 0.00 1.04 Sulu 1st DEO By Admin NYS

2016 Sulu I Patikul Water System Tuburan Deepwell, Patikul 1-Unit 0.00 0.50 Sulu 1st DEO By Admin NYS

2016 Sulu I Patikul Water System Brgy Bon Bon Deep Well, Patikul 1-Unit 0.00 0.50 Sulu 1st DEO By Admin NYS

2016 Sulu I Talipao Road Concreting of Mahala Road (Phase II) , Talipao 1.75 1.75 1.21 15.75 Sulu 1st DEO By Admin 80.38% Ongoing

2016 Sulu I Talipao Road Concreting of Mt.Bayug Road, Talipao (Access toTourist Destination) 1.50 1.50 1.50 13.50 Sulu 1st DEO By Admin 100.00% Completed

2016 Sulu I Talipao Road Concreting of Pantao Bud Road, Talipao 1.00 1.00 1.00 9.00 Sulu 1st DEO By Admin 100.00% Completed

2016 Sulu II Kalingalan Caluang Road Kalingalan Caluang - Omar - Luuk Road 10.00 10.00 1.34 220.00 Sulu 2nd DEO By Admin 25.25% Ongoing

2016 Sulu II Kalingalan Caluang Road Concreting of Karungdong - Kulay-Kulay Road, Kalingalan Caluang 4.10 4.10 4.10 90.20 Sulu 2nd DEO By Admin 100.00% Completed

2016 Sulu II Kalingalan Caluang Road Concreting of Karungdong - Niog-Niog Road, Kalingalan Caluang 2.00 2.00 2.00 44.00 Sulu 2nd DEO By Admin 100.00% Completed

2016 Sulu II Kalingalan Caluang Water System Expansion of Sagay-Sagay Water System (Phase IV), Kalingalan Caluang 1-Unit 0.00 50.00 NYS

2016 Sulu II Luuk Other Infra Construction of New Sulu 2nd DEO Compound, Luuk 1-Unit 0.00 30.00 31.68% Ongoing

2016 Sulu II Luuk Port Tambanan Port, Luuk, Sulu 1-Unit 0.00 5.00 34.68% Ongoing

2016 Sulu II Luuk Port Tulayan Port, Luuk, Sulu 1-Unit 0.00 10.00 44.95% Ongoing

2016 Sulu II Luuk Port Extension and Reclamation of Tandu Bato Wharf, Luuk, Sulu 1-Unit 0.00 50.00 NYS

2016 Sulu II Luuk Road Concreting of Lambago - Kan Bulak Road, Luuk 4.00 4.00 2.82 56.00 Sulu 2nd DEO By Admin 79.63% Ongoing

2016 Sulu II Luuk Water System Expansion of Luuk Water System (Luuk-Omar) 1-Unit 0.00 30.00 NYS

2016 Sulu II Old Panamao Shore Protection Shore Protection Bual, Undanan, Bulangsih, Panamao, Sulu 800 m 0.00 10.00 77.42% Ongoing

2016 Sulu II Omar Road Concreting of Camp. Andres - Lahing-Lahing Road, Omar 2.30 2.30 2.30 50.00 Sulu 2nd DEO By Admin 100.00% Completed

Page 48: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2016 Sulu II Panamao Road Concreting of Kulay Kulay - Tabuh Manok Road, Panamao 1.50 1.50 1.45 21.00 97.82% Ongoing

2016 Sulu II Pandami Port Singanggang Port, Pandami, Sulu 1-Unit 0.00 10.00 23.40% Ongoing

2016 Sulu II Panglima Estino Road Panglima Estino - Panamao - Kalingalan Caluang Road 8.30 8.30 0.89 182.07 Sulu 2nd DEO By Admin 25.86% Ongoing

2016 Sulu II Pata Road Concreting of Saimbangon - Kayawan Road 3.00 3.00 0.24 42.00 26.54% Ongoing

2016 Sulu II Tapul Road Concreting of Kalang - Kamaunggi Road, Tapul 2.00 2.00 0.57 28.00 Sulu 2nd DEO By Admin 38.40% Ongoing

2016 Sulu II Tapul Road Concreting of Kalang - Kamaunggi Road, Tapul 0.69 0.69 0.30 9.64 50.02% Ongoing

2016 Tawi-Tawi Bongao bridge Construction of Fisheries Concrete Footbridge, Bongao 1-unit 10.00 Tawi Tawi DEO By Admin 75.00% Ongoing

2016 Tawi-Tawi Bongao bridge Construction of Lupah Pula Concrete Footbridge with Pierhead, Bongao 1-unit 10.00 Tawi Tawi DEO By Admin 85.00% Ongoing

2016 Tawi-Tawi Bongao bridge Construction of Luuk Bangkah Concrete Footbridge, Bongao 1-unit 15.00 Tawi Tawi DEO By Admin 90.00% Ongoing

2016 Tawi-Tawi Bongao bridge Construction of Tongsinah Concrete Footbridge, Bongao 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Bongao Drainage Construction of Notre Dame - Awwal Drainage System, Bongao 1-unit 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Bongao Drainage Construction of Box Culvert Along Salamat Street, Poblacion, Bongao 1-unit 25.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Bongao Drainage Construction of Pag-Asa Drainage System, Bongao 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Bongao Drainage Repair/Rehab of DepEd - Awwal Drainage System, Bongao 1-unit 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Bongao Other Infra Improvement of Access Road, Drainage, Water System & Compound of TTSAT, Bongao 1-unit 5.80 Tawi Tawi DEO By Admin 15.00% Ongoing

2016 Tawi-Tawi Bongao Other Infra Improvement of Access Road, Drainage, Water System & Compound of TTSAT, Bongao 1-unit 4.20 Tawi Tawi DEO By Admin 15.00% Ongoing

2016 Tawi-Tawi Bongao Other Infra Expansion/Renovation of Tawi-Tawi DEO Compound, Bongao 1-unit 20.00 Tawi Tawi DEO By Admin 47.00% Ongoing

2016 Tawi-Tawi Bongao Other Infra Development of New Area Equipment Services Office, Bongao 1-unit 25.00 Tawi Tawi DEO By Admin 55.00% Ongoing

2016 Tawi-Tawi Bongao Port Expansion/Upgrading of Ridjiki Boulevard Road, Bongao 1-unit 128.55 Tawi Tawi DEO By Admin 75.00% Ongoing

2016 Tawi-Tawi Bongao Road Concreting of Sanga-Sanga-Lapid-Lapid Road, Bongao 1.00 1.00 1.00 22.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Bongao Road Concreting of Sowangkagang-Nalil Road, Bongao 0.50 0.50 0.50 7.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Bongao Road Concreting/Replacement of Datu Halun-Lamion Road, Bongao 2.00 2.00 2.00 28.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Bongao Road Concreting of MSU-Science High School Road, Bongao 0.25 0.25 0.25 3.50 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Bongao Road Concreting of Lupah Pula Road, Bongao 0.80 0.80 0.80 11.20 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Bongao Road Concreting of New Housing Project Road, Bongao 1.00 1.00 1.00 14.00 Tawi Tawi DEO By Admin 100.00% Completed

Page 49: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2016 Tawi-Tawi Bongao Road Concreting of Pagasinan-Karungdong Road, Bongao 0.50 0.50 0.50 7.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Bongao Road Concreting of Patal-Karungdong Road, Bongao 0.50 0.50 0.50 7.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Bongao Road Concreting of Mandulan Road, Bongao 0.80 0.80 0.80 11.20 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Bongao Road Concreting of Silubbog - Lapid-Lapid Road, Bongao 0.80 0.80 0.80 11.20 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Bongao Road Concreting of Kalye Bisaya - Cockpit -Tubig Tanah Road, Bongao 0.40 0.40 0.40 5.60 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Bongao Road Concreting of Siola Road, Bongao 0.40 0.40 0.40 5.60 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Bongao Shore Protection Construction of Pagasinan Shore Protection, Bongao 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Bongao Shore Protection Construction of Simandagit Shore Protection, Bongao 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Languyan bridge Construction of SitioSubah Mamah, Darussalam Bridge, Single Lane, Languyan 8.00 5.10 Tawi Tawi DEO By Admin 70.00% Ongoing

2016 Tawi-Tawi Languyan bridge Construction of Tubig Dakula Bridge, Single Lane, Languyan 8.50 5.10 Tawi Tawi DEO By Admin 80.00% Ongoing

2016 Tawi-Tawi Languyan Port Expansion of Languyan Port, Languyan 1-unit 10.00 Tawi Tawi DEO By Admin 75.00% Ongoing

2016 Tawi-Tawi Languyan Road Concreting of Darussalam New Hospital Road, Languyan 0.70 0.70 0.35 9.80 Tawi Tawi DEO By Admin 73.00% Ongoing

2016 Tawi-Tawi Languyan Road Concreting of Bas Nunok Road, Languyan 0.40 0.40 0.40 5.60 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Languyan Road Concreting of Panimusan Road, Languyan 0.40 0.40 0.40 5.60 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Languyan Water System Construction of Paraitan-Darussalam Water System Level II, Languyan 1-unit 5.00 Tawi Tawi DEO By Admin 70.00% Ongoing

2016 Tawi-Tawi Languyan Water System Construction of Seratang-Darussalam Water System Level II, Languyan 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Languyan Water System Construction of Maraning Water System Level II, Languyan 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Mapun bridge Construction of Taganak Concrete Footbridge with Pierhead, Turtle Island 1-unit 10.00 Tawi Tawi DEO By Admin 70.00% Ongoing

2016 Tawi-Tawi Mapun bridge Construction of Lupah Pula Concrete Footbridge, Mapun 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Mapun bridge Construction of Umus Mataha Concrete Footbridge, Mapun 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Mapun Road Concreting of Tabulian Road, Mapun 0.40 0.40 0.40 5.60 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Mapun Road Concreting of Tabulian - Upper Mahalu Road, Mapun 0.40 0.40 0.40 5.60 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Mapun Road Concreting of Tambulian Road, Mapun 0.40 0.40 0.40 5.60 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Mapun Road Concreting of Boki - Iruk-Irok Road, Mapun 0.40 0.40 0.40 5.60 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Panglima Sugala bridge Construction of Karaha Concrete Footbridge with Pierhead, Panglima Sugala 1-unit 20.00 Tawi Tawi DEO By Admin 75.00% Ongoing

Page 50: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2016 Tawi-Tawi Panglima Sugala Drainage Upgrading of Batu-Batu Drainage System, Panglima Sugala 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Panglima Sugala Road Concreting of Bato Bato-parangan Road, Panglima Sugala 0.81 0.81 0.81 11.38 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sapa Sapa bridge Construction of Bannaran Concrete Footbridge with Pierhead, Sapa-Sapa 1-unit 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sapa Sapa bridge Construction of Gadjaminah Concrete Footbridge with Pierhead, Sapa-Sapa 1-unit 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sapa Sapa Port Repair of Pierhead, Sapa-Sapa Proper 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sapa Sapa Road Concreting of Baldatal Islam Road, Sapa-Sapa 0.80 0.80 0.80 11.20 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sapa Sapa Road Concreting of Laum Sicubong-Likud Sicubong Road, Sapa-Sapa 0.80 0.80 0.80 11.20 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sapa Sapa Shore Protection Construction of Malanta Shore Protection, Sapa-Sapa 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sapa Sapa Shore Protection Construction of Likud Secubong Shore Protection, Sapa-Sapa 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sibutu bridge Construction of Sheikh Makdum Concrete Footbridge, Sibutu 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sibutu bridge Construction of Tanduowak Concrete Footbridge, Sibutu 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sibutu bridge Construction of Sibutu Proper Concrete Footbridge with Pierhead, Sibutu 1-unit 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sibutu Road Concreting of Moktar-Ungus-Ungus Road, Sibutu 0.50 0.50 0.42 11.00 Tawi Tawi DEO By Admin 85.00% Ongoing

2016 Tawi-Tawi Sibutu Road Concreting of Sheikh Makdum-Tandubanak Road, Sibutu 1.00 1.00 1.05 22.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sibutu Road Concreting of Tahing Road, Sibutu 1.00 1.00 1.00 22.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sibutu Road Concreting of Tongsibalo Road, Sibutu 0.25 0.25 0.30 5.50 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sibutu Shore Protection Construction of Ungus-Ungus Shore Protection, Sibutu 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sibutu Shore Protection Construction of Tongehat Shore Protection, Sibutu 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sibutu Water System Construction of Ungus-Ungus Water System Level II, Sibutu 1-unit 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Simunul bridge Construction of Tubig Indangan Concrete Footbridge with Pierhead, Simunul 1-unit 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Simunul Other Infra Improvement of Access Road & Tourism Devt. of Sheikh Makdum Cultural Center, Simunul 1-unit 80.00 Municipal Gov't of Simunul By MOA 100.00% Completed

2016 Tawi-Tawi Simunul Road Concreting of Look-Total Road, Simunul 1.50 1.50 21.00 Tawi Tawi DEO By Admin 35.00% Ongoing

2016 Tawi-Tawi Simunul Road Concreting of Ubol-Total Road, Simunul 1.00 1.00 1.00 14.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Simunul Shore Protection Construction of Bakong - Pagasinan Shore Protection, Simunul 1-unit 5.00 Tawi Tawi DEO By Admin 65.00% Ongoing

2016 Tawi-Tawi Simunul Shore Protection Rehab. of Tampakan Shore Protection, Simunul 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

Page 51: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2016 Tawi-Tawi Simunul Water System Construction of Tubig Indangan - Doh Tong water System Level II, simunul 1-unit 15.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sitangkai bridge Construction of Sitangkai Proper Concrete Footbridge with Pierhead, Sitangkai 1-unit 10.00 Tawi Tawi DEO By Admin 35.00% Ongoing

2016 Tawi-Tawi Sitangkai bridge Construction of Sipangkot Concrete Footbridge, Sitangkai 1-unit 15.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sitangkai bridge Construction of Poblacion Concrete Footbridge, Sitangkai 1-unit 15.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sitangkai bridge Construction of Tonggusong Concrete Footbridge, Sitangkai 1-unit 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sitangkai bridge Construction of South Larap Concrete Footbridge, Sitangkai 1-unit 10.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sitangkai Road Concreting of Tonggusong Road, Sitangkai 0.80 0.80 0.80 11.20 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sitangkai Road Concreting of Tongmaging Road, Sitangkai 0.80 0.80 0.80 11.20 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sitangkai Shore Protection Construction of North Larap Shore Protection, Sitangkai 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sitangkai Shore Protection Construction of Tongmageng Shore Protection, Sitangkai 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Sitangkai Water System Construction of South Larap Various Water Supply Projects, Sitangkai 1-unit 15.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi South Ubian bridge Construction of Lambih-Lambian Concrete Footbridge, South Ubian 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi South Ubian bridge Construction of Bintaulan Concrete Footbridge, South Ubian 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi South Ubian Road Concreting of Tong Tampakan - Tubig Dayang Road, South Ubian 1.00 1.00 0.75 14.00 Tawi Tawi DEO By Admin 90.00% Ongoing

2016 Tawi-Tawi Tandubas bridge Construction of Tangngah Concrete Footbridge, Tandubas 1-unit 5.00 Tawi Tawi DEO By Admin 95.00% Ongoing

2016 Tawi-Tawi Tandubas bridge Construction of Silantop Concrete Footbridge, Tandubas 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Tandubas Port Construction of Paliungan Fish Landing Port, Tandubas 1-unit 5.00 Tawi Tawi DEO By Admin 75.00% Ongoing

2016 Tawi-Tawi Tandubas Port Construction of Himbah Fish Landing Port, Tandubas 1-unit 5.00 Tawi Tawi DEO By Admin 75.00% Ongoing

2016 Tawi-Tawi Tandubas Port Construction of Lahay-Lahay Fish Landing Port, Tandubas 1-unit 5.00 Tawi Tawi DEO By Admin 86.00% Ongoing

2016 Tawi-Tawi Tandubas Road Concreting of Ungus Matata - Sallangan Road, Tandubas 1.00 1.00 1.00 22.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Tandubas Road Concreting of Ungus Matata - Buton Road, Tandubas 1.00 1.00 1.00 22.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Tandubas Road Concreting of Dangloy-Sibakloon Road, Tandubas 0.50 0.50 0.50 11.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Tandubas Road Concreting of Sibakloon - Sapa Road, Tandubas 0.50 0.50 0.50 11.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Tawi-Tawi Tandubas Shore Protection Construction of Tandubas - Sapa Shore Protection, Tandubas 1-unit 5.00 Tawi Tawi DEO By Admin 85.00% Ongoing

2016 Tawi-Tawi Tandubas Shore Protection Expansion of Tandubas Proper - Nusa Shore Protection, Tandubas 1-unit 5.00 Tawi Tawi DEO By Admin 100.00% Completed

Page 52: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2016 Tawi-Tawi Tandubas Water System Construction of Kepeng Water System Level II, Tandubas 1-unit 15.00 Tawi Tawi DEO By Admin 75.00% Ongoing

2014 PAMANA Basilan Akbar Road Concreting of Sayugan-Semmut Road, Akbar 10.000 10.00 10.00 100.00 Basilan DEO By Admin 100.00% Completed

2014 PAMANA Basilan Al-Barka Road Concreting Al-Barka-Hamja Road, AL-Barka 5.000 5.00 5.00 50.00 Basilan DEO By Admin 96.10% Ongoing

2014 PAMANA Basilan Al-Barka Road Concreting of Tipo Proper-Kuhuh Lennoh, Al-Barka 5.000 5.00 2.50 50.00 ESR Construction (C.P. 6.2) By Contract 88.50% Ongoing

2014 PAMANA Basilan Al-Barka Road Concreting of Tipo-Tipo National Highway to Kambug - Bohelebbeng- Tipo Tipo Road, Al-Barka 9.000 9.00 4.10 90.00 L.G. Lasacar Const. (C.P.

6.3) By Contract 66.50% Ongoing

2014 PAMANA Basilan Hadji Muhtamad Road Concreting of Pilas Circumferential Road 5.000 5.00 4.10 50.00 Basilan DEO By Admin 95.20% Ongoing

2014 PAMANA Basilan Lamitan City Road Concreting of Ahas Limook-Boheh Ibu-Bohey Bessey, Lamitan 5.000 5.00 5.00 50.00 Basilan DEO By Admin 100.00% Completed

2014 PAMANA Basilan Lantawan Road Concreting of Km. 18 Lantawan Proper-Tairan-Atong Atong-Isabela Road, Lantawan 8.500 8.50 8.50 85.00 Basilan DEO By Admin 100.00% Completed

2014 PAMANA Basilan Maluso Road Concreting of Mahayahay-Sumisip Road, Maluso 5.000 5.00 2.92 50.00 Provincial Government of Basilan MOA 80.00% Ongoing

2014 PAMANA Basilan Tipo-Tipo Road Concreting of Lagayas-Limpunpas Road, Tipo-Tipo 3.000 3.00 3.00 30.00 Municipal Gov't of Tipo Tipo MOA 100.00% Completed

2014 PAMANA Basilan Tipo-Tipo Road Concreting of Baguindan-Tipo Tipo Proper, Tipo-Tipo 5.000 5.00 5.00 50.00 Municipality Government of

Tipo Tipo, Province of Basilan

MOA 100.00% Completed

2014 PAMANA Basilan Ungkaya Pukan Road Concreting of road from Natioanal Highway-Amaloy,Ungkaya Pukan Phase I, Ungkaya Pukan 5.000 5.00 3.95 50.00 Municipal Gov't of Ungkaya

Pukan, Basilan Province MOA 88.50% Ongoing

2014 PAMANA Lanao del Sur I Taraka Road Taraka-Maguing Road 6.300 6.30 6.300 63.00 Municipal Gov't of Taraka, LDS By MOA 100.00% On Going

2014 PAMANA Lanao del Sur II Balabagan Road Itel Banago, Balabagan 5.007 5.01 4.25 50.07 Lanao Del Sur 2nd DEO By Admin 89.00% On Going

2014 PAMANA Lanao del Sur II Butig Road Concreting of Lumbatan-Butig Dialongan Road, Butig 2.950 2.95 2.95 29.50 Lanao Del Sur 2nd DEO By Admin 100.00% On Going

2014 PAMANA Lanao del Sur II Lumbatan Road Malabang-Lumbatan Road 5.000 5.00 5.00 50.00 Lanao Del Sur 2nd DEO By Admin 100.00% On Going

2014 PAMANA Maguindanao I Barira Road Mercedez-Barira-Matanog-Road, Barira 5.000 5.00 5.30 50.00 Municipal Gov.t of Barera, Mag By MOA 100.00% Completed

2014 PAMANA Maguindanao I Buldon Road Road Upgrading, Parang-Buldon Road, Buldon 5.000 5.00 5.00 50.00 MunicipalGo't of Buldon By MOA 100.00% Completed

2014 PAMANA Maguindanao I Datu Blah Sinsuat Road Road Opening/Concreting of Laguitan-Highway Road, Datu Blah Sinsuat 10.000 10.00 10.00 100.00 MUST Enterprises By Contract 100.00% On Going

2014 PAMANA Maguindanao I sultan Mastura Road Tapayan-Dagorongan-Simuay Seashore Road, Sultan Mastura 6.083 6.08 6.20 60.83 Municipal Gov.t of Sultan

Mastura, Mag By MOA 100.00% Completed

2014 PAMANA Maguindanao II Ampatuan Road Poblacion-Tubak Road, Ampatuan 5.000 5.00 3.50 50.00 Maguindanao 2nd DEO By Admin 100.00% Completed

2014 PAMANA Maguindanao II Buluan Road Buluan-GSKP Road, Buluan 5.000 5.00 4.73 50.00 Provinciall Gov't of Maguindanao MOA 96.62% On Going

2014 PAMANA Maguindanao II Datu Anggal Midtimbang Road Brgy. Andaon-Brgy. Mapayao, Datu Anggal 5.000 5.00 5.00 50.00 Maguindanao 2nd DEO By Admin 100.00% On Going

2014 PAMANA Maguindanao II Datu Piang Road Brgy. Buayan-Brgy. Balong, Datu Piang 5.000 5.00 5.00 50.00 Maguindanao 2nd DEO By Admin 100.00% On Going

2014 PAMANA Maguindanao II Talayan Road Pob. Talayan to Marader Road 7.000 7.00 7.00 70.00 Municipal Gov't of Talayan, Maguindanao By MOA 100.00% Completed

Page 53: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2014 PAMANA Sulu I Indanan Road Sulu Island Circumferential Road, Phase I 15.000 15.00 15.00 150.00 Sulu 1st DEO By Admin 100.00% Completed

2014 PAMANA Sulu I Jolo Road Jolo-Bato-Bato Silangkan Road, Phase I, Jolo 5.000 5.00 3.50 50.00 Sulu 1st DEO By Admin 70.00% On going

2014 PAMANA Sulu I Jolo Road Jolo-Pantao Road, Phase I, Jolo 5.000 5.00 5.00 50.00 Sulu 1st DEO By Admin 100.00% Completed

2014 PAMANA Sulu I Jolo Road Jolo-Gandasuli Kauyanan Road, Jolo 6.460 6.46 6.46 64.60 Sulu 1st DEO By Admin 100.00% On going

2014 PAMANA Sulu I Maimbung Road Parang-Maimbung Road, Maimbung 5.000 5.00 5.00 50.00 Municipal Gov't of Parang, Sulu Province By MOA 100.00% On going

2014 PAMANA Sulu I Parang Road Pob. Indanan-Silangkan-Parang Road, Parang 9.800 9.80 9.80 98.00 Sulu 1st DEO By Admin 100.00% Completed

2014 PAMANA Sulu I Patikul Road Umangay-Patikul Higad Road, Patikul 4.000 4.00 4.00 40.00 Sulu 1st DEO By Admin 100.00% Completed

2014 PAMANA Sulu II Siasi Road Siasi-Tausan Road, Phase I, Siasi 5.000 5.00 5.00 50.00 Sulu 2nd DEO By Admin 100.00% On going

2014 PAMANA Tawi-Tawi Bongao Road Concreting of Malassa-Lupa Pula, Bongao 7.140 7.14 7.14 71.40 Tawi Tawi DEO By Admin 100.00% Completed

2014 PAMANA Tawi-Tawi Sapa Sapa Road Concreting of Sicubong Circumferential Road, Sapa Sapa 5.000 5.00 5.00 50.00 Tawi Tawi DEO By Admin 100.00% Completed

2016 Above Ceiling Sulu I Indanan Road Concreting of Tagbak--Bud Daho Road, Indanan Km 4+800 -

Km 6+800 1.00 1.00 0.00 20.00 0.00% NYS

2016 Above Ceiling Sulu I Indanan Road Concreting of Brgy Kan Islam Road Phase II, Indanan 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu I Indanan Road Concreting of Brgy Kagay - Sawaki - Taran - Kuppong Road,

Indanan 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu I Indanan Road Concreting of Brgy Kagay - Malimbaya Road, Indanan 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu I Jolo Road Reconstruction of Plaza Tulay-Chinese Pier Road, Jolo 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu I Jolo Road Reconstruction of Shiek Mustapha Road, Jolo 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu I Maimbung Road Concreting of Maimbung-Talipao-Panglima Estino Road

(Phase III), Km 45+276 - Km 51+950 6.67 6.67 0.00 146.30 0.00% NYS

2016 Above Ceiling Sulu I Maimbung Road Concreting of Maimbung-Ipil-Bilaan Road (Phase II),

Maimbung/Talipao Km 19+400 - Km 28+400 9.00 9.00 0.00 180.00 0.00% NYS

2016 Above Ceiling Sulu I Maimbung Road Concreting of Maimbung-Parang Road (Phase III),

Maimbung/Parang Km 26+600 - Km 34+800 8.20 8.20 0.00 164.00 0.00% NYS

2016 Above Ceiling Sulu I Maimbung Road Concreting of Matatal-Anak Jati Road, Maimbung 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu I Maimbung Road Concreting of Bualo-Lapa Road, Maimbung 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu I Pangutaran Road Concreting of Simbahan Road, Pangutaran 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu I Parang Road Concreting of Kaha-Alu Layag Road, Parang 2.00 2.00 0.00 28.00 0.00% NYS

2016 Above Ceiling Sulu I Patikul Road Reconstruction of Liang-Tagbak Road, Patikul Km 3+900 -

Km 10+900 7.00 7.00 0.00 154.00 0.00% NYS

2016 Above Ceiling Sulu I Patikul Road Concreting of Patikul-Panamao Road (Phase II), Km 22+000 -

Km 35+000 13.00 13.00 0.00 260.00 0.00% NYS

Page 54: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2016 Above Ceiling Sulu I Patikul Road Concreting of Liang Spring Road, Patikul 1.00 1.00 0.00 20.00 0.00% NYS

2016 Above Ceiling Sulu I Patikul Road Concreting of Tugas-Maligay Road, Patikul Km 2+500 - Km

7+500 5.00 5.00 0.00 100.00 0.00% NYS

2016 Above Ceiling Sulu II Kalingalan Caluang Road Concreting of Karungdong - Pitogo Road, Kalingalan Caluang 3.00 3.00 0.00 66.00 0.00% NYS

2016 Above Ceiling Sulu II Kalingalan Caluang Road Concreting of Kan Lagay - Pitogo Road, Kalingalan Caluang 2.00 2.00 0.00 18.00 0.00% NYS

2016 Above Ceiling Sulu II Kalingalan Caluang Road Concreting of Lambago - Masjid Bayli - Pang Road Phase II,

Kalingalan Caluang 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu II Kalingalan Caluang Road Concreting of Brgy. Pitogo Road, K. Caluang 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu II Lugus Road Concreting of Lugus Proper Huwit Huwit Road, Lugus 2.00 2.00 0.00 28.00 0.00% NYS

2016 Above Ceiling Sulu II Luuk Road Luuk - Panamao - Patikul Circumferential Road 10.00 10.00 0.00 220.00 0.00% NYS

2016 Above Ceiling Sulu II Luuk Road Concreting of Kan Salasain - Samak - Sanao Road, Luuk 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu II Luuk Road Concreting of Sitio Kansimba - Sitio Kanbusi,Brgy Tubig Putih,

Luuk 2.50 2.50 0.00 35.00 0.00% NYS

2016 Above Ceiling Sulu II Luuk Road Concreting of Sitio Kungan - Brgy. Tubig Putih Road, Luuk 2.00 2.00 0.00 28.00 0.00% NYS

2016 Above Ceiling Sulu II Luuk Road Concreting of Sitio Kandurah - Sitio Kanjarera Brgy. Niog Niog,

Luuk 2.00 2.00 0.00 28.00 0.00% NYS

2016 Above Ceiling Sulu II Luuk Road Concreting of Sitio Masjid Duguhan - Brgy. Lianutan, Luuk 2.00 2.00 0.00 28.00 0.00% NYS

2016 Above Ceiling Sulu II Omar Road Concreting of Angilan - Niangkaan Road, Omar 4.00 4.00 0.00 56.00 0.00% NYS

2016 Above Ceiling Sulu II Omar Road Concreting of Kan Muni -Piyayo Road, Omar 2.50 2.50 0.00 35.00 0.00% NYS

2016 Above Ceiling Sulu II Omar Road Concreting of Kan Muni - Lianutan Road, Omar 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu II Omar Road Concreting of Tangkuan - Kan Ummal Road, Omar 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu II Omar Road Concreting of Kan Muni -Piyayo Road, Omar 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu II Omar Road Concreting of Andalan - Huwit-Huwit Road, Omar 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu II Omar Road Concreting of Andalan - Sucuban Road, Omar 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu II Omar Road Concreting of Brgy Road Sitio Bulaghaw - Sitio Taluk Taluk

Capual, Omar 2.00 2.00 0.00 62.00 0.00% NYS

2016 Above Ceiling Sulu II Omar Road Concreting of Brgy. Road Sitio Lumagtih - Tangkuan, Omar 2.00 2.00 0.00 28.00 0.00% NYS

2016 Above Ceiling Sulu II Omar Road Concreting of Brgy.Road Sitio Pati Bud Lahing Lahing -

Patutol, Omar 2.00 2.00 0.00 28.00 0.00% NYS

2016 Above Ceiling Sulu II Omar Road Concreting of Lahing-Lahing - KalianTanah, Omar 2.00 2.00 0.00 28.00 0.00% NYS

2016 Above Ceiling Sulu II Omar Road Concreting of Tabuh Pangdan-Sition Buhanginan, Omar 2.00 2.00 0.00 28.00 0.00% NYS

Page 55: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2016 Above Ceiling Sulu II Panamao Road Concreting of Viray - Kan Sipat Road, Panamao 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu II Panamao Road Concreting of Kan Asali - Puhagan - Kamalig Road, Panamao 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu II Panamao Road Concreting of Gaggil - Seit Higad Road, Panamao 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu II Panamao Road Concreting of Brgy. Suuh - Brgy. Sayaw Sayaw, Panamao 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu II Pandami Road Concreting of Baligtang - Sibaud Proper Road, Pandami 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu II Pandami Road Concreting of Sitio Lio Proper Subah-Subah Pandami 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu II Pandami Road Concretng of Suba-Suba Siganggang Road, Pandami 2.00 2.00 0.00 28.00 0.00% NYS

2016 Above Ceiling Sulu II Panglima Estino Road Concreting of Brgy Lihbug Kabaw from National Road - Masjid

P. Estino 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu II Pata Road Concreting of Saimbangun Road Phase II, Pata 1.50 1.50 0.00 21.00 0.00% NYS

2016 Above Ceiling Sulu II Siasi Road Concreting of Siasi Proper Road/Boulevard, Siasi 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu II Siasi Road Concreting of Laminusa Road Phase II, Siasi 2.00 2.00 0.00 28.00 0.00% NYS

2016 Above Ceiling Sulu II Siasi Road Concreting of Siasi Port-Sablay Raod, Siasi 3.57 3.57 0.00 50.00 0.00% NYS

2016 Above Ceiling Sulu II Tapul Road Concreting of Brgy. Kalang - Brgy. Puok, Tapul 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu II Tapul Road Concreting of Brgy. Kamaunggi to Brgy. Puok, Tapul 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu II Tapul Road Concreting of Brgy. Sumambat to Brgy. Pangdan,Tapul 1.00 1.00 0.00 14.00 0.00% NYS

2016 Above Ceiling Sulu II Tongkil Road Concreting of Sigumbal Road, Tongkil 1.20 1.20 0.00 10.80 0.00% NYS

2017 Within Ceiling Basilan Maluso Port Construction of Shipyard Tabuk Port, Maluso 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Muhammad Ajul Port Construction of Basakan Port, Muhammad Ajul 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Akbar port Expansion of Sitio Canas Seaports (Phase II), Akbar 1-unit 0.00 15.00 0.00% NYS

2017 Within Ceiling Basilan Akbar Road Concreting of Paguengan - Upper Sinangkapan Road, Akbar 3.00 3.00 0.00 45.00 0.00% NYS

2017 Within Ceiling Basilan Akbar Road Concreting of Upper Bato-Bato Road - Lower Bato-Bato Road,

Akbar 0.80 0.80 0.00 12.00 0.00% NYS

2017 Within Ceiling Basilan Akbar Water System Construction of Water Supply Level II, Mangalut, Akbar 1-unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Basilan Al-Barka Bridge Construction of Bridge from Brgy. Bohelebung, Lamitan City -

Brgy. Cambug (Phase II), Al-Barka 0.04 0.00 15.00 0.00% NYS

2017 Within Ceiling Basilan Al-Barka Bridge Construction of Bohe Basilan Bridge, Danapah, Al-Barka 0.04 0.00 40.00 0.00% NYS

2017 Within Ceiling Basilan Al-Barka Flood Control Construction of Box Culvert, Cambug, Al-Barka 1-unit 0.00 3.00 0.00% NYS

Page 56: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2017 Within Ceiling Basilan Al-Barka Road Concreting of Kuhun - Lakit Road, Al-Barka 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Basilan Al-Barka Road Concreting of Linuan - Brgy. Macalang Road, Al-Barka 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Basilan Al-Barka Shore Protection Construction of Sea Wall, Look Bisaya, Kaulungan Island, Al-

Barka 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Al-Barka Water System Construction of Water Supply Level II for Brgy. Baguindan &

Bohe Piang, Al-Barka 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Al-Barka Water System Construction of Water Supply Level II, Poblacion of Al-Barka 1-unit 0.00 4.50 0.00% NYS

2017 Within Ceiling Basilan Hadji Muhtamad Port Construction of Dasalan Port, Hadji Muhtamad 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Hadji Muhtamad Port Construction of Panducan Port, Hadji Muhtamad 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Hadji Muhtamad Port Construction of Sangbay Big Port, Hadji Muhtamad 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Isabela City Bridge Construction of Masola Bridge, Isabela City 0.03 0.03 0.00 30.00 0.00% NYS

2017 Within Ceiling Basilan Isabela City Port Construction of Diki Port, Malamawi, Isabela City 1-unit 0.00 30.00 0.00% NYS

2017 Within Ceiling Basilan Isabela City Road Road Widening of Kapatagan - Masola Road, Isabela City 10.50 10.50 0.00 45.50 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Drainage Construction of Drainage System along Lamitan - Isabela

Road, Lamitan City 1-unit 0.00 10.00 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Drainage Construction of Drainage System along Lamitan - Tipo-Tipo

Road, Lamitan City 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Drainage Construction of Basilan Government Center Drainage System,

Sta. Clara, Lamitan City 1-unit 0.00 45.00 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Flood Control Construction of Box Culvert, Bohe Nange 1, Lamitan City 1-Unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Other Infra Construction of Various Government Offices/Center (Phase II),

Sta. Clara, Lamitan City 1-Unit 0.00 100.00 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Port Construction of Tumakid Port, Lamitan City 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Road Road Widening of Lamitan City - Isabela Road, Sta. Clara

Section, Lamitan City 1.00 1.00 0.00 28.00 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Road Road Widening of Sta. Clara - Bohe Nange - Kapatagan

Road, Lamitan City 10.50 10.50 0.00 45.50 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Road Repair/Improvement (Paved Shoulder) along Isabela -

Lamitan City Road, Balagtasan Section, Lamitan City 2.00 2.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Road Concreting of Basilan Government Center Road Network, Sta.

Clara, Lamitan City 4.00 4.00 0.00 96.00 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Road Concreting of Luksumbang - Tandung Ahas Road, Lamitan

City 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Road Concreting of Luksumbang - Calugusan National High School

Road, Lamitan City 1.00 1.00 0.00 15.00 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Road Concreting of Road from Lamitan Highway - Kulaybatu - Brgy.

Batu, Lamitan City 1.50 1.50 0.00 22.50 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Road Concreting of Road from Lamitan Highway - Colonia -

Cabobo, Lamitan City 1.60 1.60 0.00 24.00 0.00% NYS

Page 57: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2017 Within Ceiling Basilan Lamitan City Road Concreting of Road from Sumisip Highway - Limbocandis -

Pamatsaken - Baiwas (Phase II), Sumisip 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Road Concreting of Ulame - Tumakid Road, Lamitan City 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Road Concreting of Road from Lamitan Highway - Baas - Lebbuh

(Phase ll), Lamitan City 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Road Concreting of Luksumbang - Maloong Canal Road, Lamitan

City 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Road Concreting of Sayugan - Little Cebu Road (Phase II), Lamitan

City 1.20 1.20 0.00 18.00 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Road Concreting of Sta. Clara - Maloong San Jose - Sitio Sugimol,

Lamitan City 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Water System Construction of Water Supply Level II, Balagtasan, Lamitan

City 1-unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Water System Expansion of Water Supply Level III, Sta. Clara, Lamitan City 1-unit 0.00 30.00 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Water System Construction of Water Supply Level II for Brgy. Sengal,

Lumutun & Ubit, Lamitan City 1-unit 0.00 15.00 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Water System Construction of Water Supply Level II for Brgy. Bohe Ibu, Bohe

Bessey & Colonia, Lamitan City 1-unit 0.00 10.00 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Water System Construction of Water Supply Level II, Brgy. Bohe Yawas,

Lamitan City 1-unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Water System Construction of Water Supply Level II, Baungus, Lamitan 1-unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Basilan Lamitan City Water System Construction of Water Supply Level II, Tumakid, Lamitan 1-unit 0.00 4.00 0.00% NYS

2017 Within Ceiling Basilan Lantawan Flood Control Construction of Box Culvert, Atong Atong, Lantawan 1-Unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Basilan Lantawan Flood Control Construction of Box Culvert (Double Barrel), Parian Bawnuh,

Lantawan 1-Unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Basilan Lantawan Flood Control Construction of Box Culvert (Double Barrel), Matarling,

Lantawan 1-Unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Basilan Lantawan Road Repair/Improvement (Paved Shoulder) along Lantawan -

Maluso Road, Matarling - Pamucalin Section, Lantawan 2.00 2.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Basilan Lantawan Road Concreting of Road from Lantawan Highway - Switch Yakal,

Lantawan 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Basilan Lantawan Road Concreting of Tairan - Pangasaan Road, Lantawan 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Basilan Lantawan Road Concreting of Kagihit - Bulan Bulan Road, Lantawan 1.30 1.30 0.00 19.50 0.00% NYS

2017 Within Ceiling Basilan Lantawan Road Concreting of Road from Lantawan Highway - Upper Manggas

(Phase II), Lantawan 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Basilan Lantawan Road Concreting of Bulanza - Baungis Road, Lantawan 3.00 3.00 0.00 45.00 0.00% NYS

2017 Within Ceiling Basilan Lantawan Road Concreting of Tairan - Calugusan - Bagbagon Junction

Provincial Road, Lantawan 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Basilan Lantawan Road Concreting of Golden Harvest - Canibungan Road, Lantawan 3.00 3.00 0.00 45.00 0.00% NYS

2017 Within Ceiling Basilan Lantawan Water System Construction of Water Supply Level II for Brgy. Bulan-Bulan &

Paniyungan, Lantawan 1-unit 0.00 4.00 0.00% NYS

Page 58: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2017 Within Ceiling Basilan Lantawan Water System Construction of Water Supply Level II, Upper Manggas,

Lantawan 1-unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Basilan Lantawan Water System Construction of Water Supply Level II, Lower Manggas,

Lantawan 1-unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Basilan Lantawan Water System Construction of Water Supply Level II, Banyas, Lantawan 1-unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Basilan Maluso Bridge Construction of Footbridge, New Road St., Lower Portholland,

Maluso 1-unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Basilan Maluso Drainage Construction of Municipal Drainage, Maluso 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Maluso Drainage Construction of Drainage System along Lantawan - Maluso

Road, Maluso 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Maluso Port Construction of Main Shipyard Port, Maluso 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Maluso Road Concrete Reblocking along Isabela - Maluso Road, Maluso 2.30 2.30 0.00 65.50 0.00% NYS

2017 Within Ceiling Basilan Maluso Road Concreting of Road from Maluso Highway - Taborlongan

(Phase II), Maluso 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Basilan Maluso Road Concreting of Shipyard Tabuk - Main Shipyard Road, Maluso 0.20 0.20 0.00 3.00 0.00% NYS

2017 Within Ceiling Basilan Maluso Road Repair/Improvement (Paved Shoulder) Maluso Townsite

Road, Maluso 1.20 1.20 0.00 24.00 0.00% NYS

2017 Within Ceiling Basilan Maluso Shore Protection Construction of Shore Protection, Main Shipyard, Maluso 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Maluso Shore Protection Construction of Rockcauseway Sitio Bakkaw-bakkaw, Lower

Portholland, Maluso 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Maluso Shore Protection Construction of Shore Protection, Shipyard Tabuk, Maluso 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Maluso Water System Construction of Water Supply Level II, Upper Garlayan,

Maluso 1-unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Basilan Maluso Water System Construction of Water Supply Level II, Abong-abong, Maluso 1-unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Basilan Muhammad Ajul Port Construction of Candiis Port, Muhammad Ajul 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Muhammad Ajul Port Construction of Buton Port (Phase II), Muhammad Ajul 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Muhammad Ajul Road Concreting of Serongon - Semmut, Mohammad Ajul 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Basilan Muhammad Ajul Shore Protection Construction of Shore Protection, Tuburan Proper,

Mohammad Ajul 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Muhammad Ajul Water System Construction of Water Supply Level II, Seronggon,

Muhammad Ajul 1-unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Basilan Sumisip Bridge Construction of Mahatallang Bridge, Sumisip 0.04 0.04 0.00 40.00 0.00% NYS

2017 Within Ceiling Basilan Sumisip Bridge Installation of Super Structure Steel Bridge along Buli-Buli -

Tekos, Coastal Road, Sumisip 0.02 0.00 1.70 0.00% NYS

2017 Within Ceiling Basilan Sumisip Bridge Installation of Super Structure Steel Bridge along Basak -

Babagbato, Coastal Road, Sumisip 0.04 0.00 2.00 0.00% NYS

2017 Within Ceiling Basilan Sumisip Bridge Installation of Super Structure Steel Bridge, Limbo Candiis -

Mangal Road, Sumisip 0.04 0.00 2.50 0.00% NYS

Page 59: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2017 Within Ceiling Basilan Sumisip Flood Control Construction of Box Culvert (Single Barrel), Look Bait,

Sumisip 1-Unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Basilan Sumisip Other Infra Construction of Various Government Building, Bulibuli,

Sumisip 1-Unit 0.00 59.30 0.00% NYS

2017 Within Ceiling Basilan Sumisip Port Construction of Datu Kahapan Port, Bulibuli, Sumisip 1-unit 0.00 10.00 0.00% NYS

2017 Within Ceiling Basilan Sumisip Port Expansion of Mangal Port, Sumisip 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Sumisip Road Concreting of Marang - Ettub Ettub - Lower Cabembeng

Road, Sumisip 3.50 3.50 0.00 52.50 0.00% NYS

2017 Within Ceiling Basilan Sumisip Road Concreting of Road from Sumisip Highway- Tandoh -

Tongsikotong, Sumisip 1.50 1.50 0.00 22.50 0.00% NYS

2017 Within Ceiling Basilan Sumisip Road Concreting of Road from Sumisip Highway - Sapah Bulak -

Ettub-Ettub, Sumisip 1.00 1.00 0.00 15.00 0.00% NYS

2017 Within Ceiling Basilan Sumisip Road Concreting of Tumahubong - Sukaten Road, Sumisip 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Basilan Sumisip Road Concreting of Municipal Road, Sumisip 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Basilan Sumisip Water System Construction of Water Supply Level II, Poblacion Sumisip,

Sumisip 1-unit 0.00 10.00 0.00% NYS

2017 Within Ceiling Basilan Sumisip Water System Construction of Water Supply Level II, Cabembeng, Sumisip 1-unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Basilan Sumisip Water System Improvement of Water Supply Level II, Bohe Languyan,

Sumisip 1-unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Basilan Sumisip Water System Construction of Water Supply Level II for Erelley, Central

Sumisip & Limbocandis, Sumisip 1-unit 0.00 15.00 0.00% NYS

2017 Within Ceiling Basilan Sumisip Water System Construction of Water Supply Level II for Baiwas &

Pamatsaken, Sumisip 1-unit 0.00 10.00 0.00% NYS

2017 Within Ceiling Basilan Sumisip Water System Construction of Water Supply Level II, Mahatalang, Sumisip 1-unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Basilan Sumisip Water System Construction of Water Supply Level II, Guiong, Sumisip 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Tabuan Lasa Port Construction of Suligan Ports & Wharves, Tabuan Lasa 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Tabuan Lasa Port Costruction of Kaumpurnah Seaport, Lanawan Island, Tabuan

Lasa 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Tabuan Lasa Port Expansion of Saluping Proper Port (Phase II), Tabuan Lasa 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Tabuan Lasa Port Expansion of Tambulig Port (Phase II), Tabuan Lasa 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Tabuan Lasa Road Concreting of Pisak-Pisak - Bukut Umus - Bulanting - Saluping

Proper Road, Tabuan Lasa 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Basilan Tabuan Lasa Road Concreting of Tapiantanah Circumferential Road, Tabuan

Lasa 3.50 3.50 0.00 52.50 0.00% NYS

2017 Within Ceiling Basilan Tabuan Lasa Road Concreting of Babag - Boloh Boloh - Suligan Road (Phase II),

Tabuan Lasa 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Basilan Tabuan Lasa Shore Protection Construction of Shore Protection, Bukut Umus, Tabuan Lasa 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Tabuan Lasa Water System Construction of Water Supply Level II for Bukut Umus and

Pisakpisak, Tabuan Lasa 1-unit 0.00 4.00 0.00% NYS

Page 60: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2017 Within Ceiling Basilan Tabuan Lasa Water System Construction of Water Supply Level II, Suligan, Tabuan Lasa 1-unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Basilan Tabuan Lasa Water System Construction of Water Supply Level II, Saluping, Tabuan Lasa 1-unit 0.00 4.00 0.00% NYS

2017 Within Ceiling Basilan Tipo-Tipo Drainage Construction of Municipal Drainage, Tipo-Tipo 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Tipo-Tipo Water System Construction of Water Supply Level II for Brgy. Bohe Baka,

Bangcoang, Banah & Bohe Lebbeng, Tipo-Tipo 1-unit 0.00 4.00 0.00% NYS

2017 Within Ceiling Basilan Tipo-Tipo Water System Construction of Water Supply Level II for Brgy. Badja & Bohe

Biti, Tipo-Tipo 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Tuburan Road Road Widening of Campo Uno, Lamitan City - Lower Tablas

Section, Tuburan 1.00 1.00 0.00 28.00 0.00% NYS

2017 Within Ceiling Basilan Tuburan Road Concreting of Lower Tablas Road, Tuburan 0.30 0.30 0.00 4.50 0.00% NYS

2017 Within Ceiling Basilan Tuburan Road Concreting of Sinulatan - Mangalut Road, Tuburan 2.50 2.50 0.00 37.50 0.00% NYS

2017 Within Ceiling Basilan Tuburan Road Concreting of Road from Tuburan Highway - Lahilahi - Dugaa,

Tuburan 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Basilan Tuburan Water System Construction of Water Supply Level II for Tuburan & Akbar

(Phase II) 1-unit 0.00 20.00 0.00% NYS

2017 Within Ceiling Basilan Ungkaya Pukan Bridge Construction of Bridge along Amaloy - Matata, Ungkaya

Pukan 0.04 0.00 40.00 0.00% NYS

2017 Within Ceiling Basilan Ungkaya Pukan Flood Control Construction of Box Culvert, Tongbato, Ungkaya Pukan 1-Unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Basilan Ungkaya Pukan Port Construction of Matata Seaport, Ungkaya Pukan 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Basilan Ungkaya Pukan Road Concreting of Road from Ungkaya Pukan Highway - Camalig -

Ulitan - Tong Bato (Phase II), Ungkaya Pukan 3.00 3.00 0.00 45.00 0.00% NYS

2017 Within Ceiling Basilan Ungkaya Pukan Water System Construction of Potable Water Supply for Pipil Sring & Brgy.

Danit, Ungkaya Pukan 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Bayabao Road Concreting of Taporog - Punud Section Lake Shore Road,

Poona Bayabao 1.50 1.50 0.00 30.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Bayabao Road Concreting of Ragayan - Bantayao Road, Poona Bayabao 2.00 2.00 0.00 26.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Bayabao Road Completion of Gata Siwagat Road, Lumba Bayabao 1.50 1.50 0.00 19.50 0.00% NYS

2017 Within Ceiling Lanao del Sur I Bayabao Road Concreting of Upper Ragayan Road, Poona Bayabao 1.50 1.50 0.00 19.50 0.00% NYS

2017 Within Ceiling Lanao del Sur I Buadipuso Buntong Port Construction of Dansalan Port, Buadipuso Buntong 1-Unit 5.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Buadipuso Buntong Road Concreting of Bacolod - Minanga Buntong Section Lake Shore

Road, Buadipuso Buntong 2.00 2.00 0.00 40.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Buadipuso Buntong Road Concreting of Road from National Highway Pagalongan -

Ragondingan, Buadipuso Buntong 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Bubong Road Concreting of Rogero - Ramain Valley Road, Bubong 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Bubong Shore Protection Construction of Montian River Bank Protection, Bubong 1-Unit 4.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Bubong Water System Expansion of Pantar - Montian Water System Level II, Bubong 1-Unit 4.10 0.00% NYS

Page 61: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2017 Within Ceiling Lanao del Sur I Bumbaran Road Concreting of Mogot Road, Bumbaran 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Bumbaran Water System Construction of Pagalamatan Water Supply Level II,

Bumbaran 1-Unit 10.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I City Road Upgrading of Amai Pakpak Avenue Road, Marawi City 2.00 2.00 0.00 40.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Ditsaan-Ramain Road Concreting of Gadungan Section Lake Shore Road, Ditsaan

Ramain 1.00 1.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Kapai Bridge Construction of Pendulunan Bridge, Kapai 1-Unit 25.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Maguing Road Concreting of Pagalongan - Balawag Road, Maguing 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Maguing Road Concreting of Botud - Lumbac Road, Maguing 0.77 0.77 0.00 10.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Maguing Shore Protection Construction of Malungun River Bank Protection (Phase II),

Maguing 1-Unit 10.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Maguing Water System Construction of Batobato Water Supply Level II, Maguing 1-Unit 4.20 0.00% NYS

2017 Within Ceiling Lanao del Sur I Marantao Port Construction of Linuk Cawayan Port, Marantao 1-Unit 5.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Marantao Road Concreting of Bacong - Banga Road, Marantao 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Marantao Road Concreting of Bubong Madanding Road, Marantao 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Marawi City Drainage Construction of Line Canal along Buadi Sakayo, Marawi City 1.00 10.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Marawi City Drainage Construction of Line Canal along Amai Pakpak Avenue,

Marawi City 1.00 10.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Marawi City Road Concreting of Lilod - Saduc - Mapandi Road, Marawi City 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Marawi City Road Concreting of Tampilong Road, Marawi City 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Marawi City Road Concreting of Matampay - Cormatan Road, Marawi City 2.00 2.00 0.00 26.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Marawi City Road Concreting of Khalid bin Walid St., Padian Madaya Blvd.

Road, Marawi City 0.30 0.30 0.00 6.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Marawi City Road Concreting of Barrio Marawi Poblacion (Back UTC Main

Campus) Road, Marawi City 0.20 0.20 0.00 2.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Marawi City Shore Protection Construction of Poblacion Marawi to Lakeshore Box

Culvert/Cross Drainage, Marawi City 1-Unit 12.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Masiu Road Concreting of Punud - Mimbalay Section Road, Masiu 1.00 1.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Masiu Road Concreting of Amai Sindaolan - Dansalan Road, Masiu 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Masiu Road Concreting of Lumbaca Ingud - Casim Road, Masiu 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Masiu Road Concreting of Sawir - Dimabara Road, Masiu 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Mulondo Bridge Construction of Salipongan Bridge, Mulondo 1-Unit 10.00 0.00% NYS

Page 62: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2017 Within Ceiling Lanao del Sur I Mulondo Road Concreting of Bubong - Luboga -Dilabayan Section Lake

Shore Road, Mulondo 2.00 2.00 0.00 40.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Mulondo Road Concreting of Road from National Highway - Bubong, Mulondo 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Piagapo Road Concreting of Bobo - Mentring - Basak Road, Piagapo 3.00 3.00 0.00 39.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Piagapo Road Concreting of Udalo - Kalinganan Road, Piagapo 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Piagapo Road Concreting of Palakat - Talao - Taporog Road, Piagapo 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Piagapo Road Concreting of Bansayan - Udalo Road, Piagapo 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Piagapo Water System Construction of Water Supply Level II for Bansayan &

Radapan , Piagapo 1-Unit 15.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Poona Bayabao Bridge Construction of Liangan Footbridge, Poona Bayabao 1-Unit 5.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Saguiaran Road Concreting of Dilausan - Cadayunan Road, Saguiaran 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Tagoloan Road Concreting of Saroyong - Dumalana Section Road, Tagoloan 2.05 2.05 0.00 45.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Tagoloan Road Concreting of Dumalana - Bayug Road, Tagoloan 1.82 1.82 0.00 40.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Tagoloan Road Concreting of Bayug - Bagoingud Road, Tagoloan 1.82 1.82 0.00 40.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Tagoloan Road Concreting of Bagoingud - Talakag Section Road, Tagoloan 1.82 1.82 0.00 40.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Tagoloan Water System Construction of Bagoingud Water Supply Level II, Tagoloan 1-Unit 4.20 0.00% NYS

2017 Within Ceiling Lanao del Sur I Tamparan Bridge Construction of Dosomalong Bridge, Tamparan 1-Unit 25.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Tamparan Road Concreting of Linuk - Bangon - Dolawan Section Lake Shore

Road, Tamparan 1.00 1.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Tamparan Road Rehabilitation of Talub Guinapa Tubok Provincial Road,

Tamparan 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Taraka Port Construction of Brgy. Ririk Port, Taraka 1-Unit 10.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Taraka Road Concreting of Cadayunan - Bucalan Section Lake Shore

Road, Taraka 1.00 1.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Taraka Road Upgrading of National Road Lumba Bagoa Ingud, Taraka 1.50 1.50 0.00 19.50 0.00% NYS

2017 Within Ceiling Lanao del Sur I Taraka Shore Protection Construction of Shore Protection (Grouted Riprap), Taraka 1-Unit 10.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Wao Road Concreting of Muslim Village - Christian Village Road, Wao 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Wao Road Concreting of Road from National Highway - Pilintangan, Wao 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Wao Road Concreting of Road from National Highway - Kadingilan, Wao 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Lanao del Sur I Wao Road Concreting of Milaya Maradugao Road, Wao 1.00 1.00 0.00 15.00 0.00% NYS

Page 63: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2017 Within Ceiling Lanao del Sur II Balabagan Road Concreting of Balabagan Coastal Road, Balabagan 2.00 2.00 0.00 36.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Balabagan Road Concreting of Budas - Batuan - Poblacion Road, Balabagan 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Balindong Road Concreting of Lati Road, Balindong 0.60 0.60 0.00 7.80 0.00% NYS

2017 Within Ceiling Lanao del Sur II Balindong Road Road Widening of Pagayawan - Dado Road, Balindong 2.00 2.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Balindong Road Concreting of Pantaragoo - Pagayawan Road, Balindong 1.20 1.20 0.00 15.60 0.00% NYS

2017 Within Ceiling Lanao del Sur II Balindong Road Concreting of Mapantao - Abaga Road, Balindong 1.47 1.47 0.00 19.12 0.00% NYS

2017 Within Ceiling Lanao del Sur II Balindong Road Concreting of Malaig - Paigoay Road, Balindong 0.30 0.30 0.00 3.90 0.00% NYS

2017 Within Ceiling Lanao del Sur II Balindong Water System Construction of Water Supply Level II, Lati, Balindong 1-Unit 5.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Bayang Road Road Widening of Padang Karbala Road, Bayang 2.00 2.00 0.00 6.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Bayang Road Concreting of Upper Lalapung - Lower Lalapung Road,

Bayang 1.50 1.50 0.00 19.50 0.00% NYS

2017 Within Ceiling Lanao del Sur II Bayang Shore Protection Construction of Lake Wall, Central Lalapung, Bayang 1-Unit 10.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Binidayan Road Concreting of Picalilangan - Masolun Road, Binidayan 2.50 2.50 0.00 25.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Butig Road Concreting of Butig - Barira - Buldon Provincial Road (Phase

II), Butig 2.50 2.50 0.00 50.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Butig Water System Construction of Water Supply Level II, Samer, Butig 1-Unit 10.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Calanogas Road Rehabilitation of Pantaon - Inudaran - Luguna - Cota Road,

Calanogas 2.00 2.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Calanogas Road Concreting of Sitio Kodongan - Sitio Matling Road, Calanogas 1.50 1.50 0.00 13.50 0.00% NYS

2017 Within Ceiling Lanao del Sur II Calanogas Water System Construction of Water Supply Level II, Codongan, Calanogas 1-Unit 5.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Ganassi Road Concreting of Ganassi - Madamba Road, Ganassi 2.00 2.00 0.00 40.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Ganassi Road Concreting of Ganassi - Pagayawan Road, Ganassi 2.00 2.00 0.00 40.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Ganassi Road Concreting of Macabao - Ganassi Road, Ganassi 0.70 0.70 0.00 9.10 0.00% NYS

2017 Within Ceiling Lanao del Sur II Ganassi Water System Construction of Water Supply Level II, Baya, Ganassi 1-Unit 4.20 0.00% NYS

2017 Within Ceiling Lanao del Sur II Kalawi Road Concreting of Bubong Road, Bacolod Kalawi 2.00 2.00 0.00 26.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Kapatagan Port Construction of Salamun Fish Port, Kapatagan 1-Unit 15.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Kapatagan Road Concretng of Balabagan - Kapatagan Road (Barao - Bakikis

Section), Kapatagan 2.50 2.50 0.00 50.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Kapatagan Road Concreting of Kapatagan Coastal Road, Kapatagan 2.00 2.00 0.00 36.00 0.00% NYS

Page 64: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2017 Within Ceiling Lanao del Sur II Kapatagan Water System Construction of Water Supply Level II, Poblacion of Kapatagan 1-Unit 4.10 0.00% NYS

2017 Within Ceiling Lanao del Sur II Lumbatan Port Construction of Fish Port, Lumbatan 1-Unit 10.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Lumbatan Road Concreting of Lumbatan - Bayang Road (Lalapung Section),

Lumbatan 1.95 1.95 0.00 39.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Lumbatan Road Concreting of Lunay - Dalama - Macadar Road, Lumbatan 2.40 2.40 0.00 48.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Lumbatan Road Concreting of Lumbatan - Sultan Dumalondong Road

(Mantapoli - Minanga - Somalindao Section), Lumbatan 2.50 2.50 0.00 50.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Lumbatan Road Concreting of Picotaan - Mantapoli Road, Lumbatan 1.54 1.54 0.00 20.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Lumbatan Road Concreting of Bayasungen Road, Lumbatan 0.50 0.50 0.00 7.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Lumbatan Water System Construction of Water Supply Level II, Alog and Poblacion,

Lumbatan 1-Unit 10.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Lumbatan Water System Construction of Water Supply Level II, Madaya, Lumbatan 1-Unit 4.20 0.00% NYS

2017 Within Ceiling Lanao del Sur II Lumbayanague Road Concreting of Biruar Road, Lumbayanague 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Madalum Road Concreting of Madalum - Uyaan Road, Madalum 0.50 0.50 0.00 6.50 0.00% NYS

2017 Within Ceiling Lanao del Sur II Malabang Other Infra Construction of DPWH-ARMM LDS 2nd DEO Administration

Building for MQC and COA, Malabang 1-Unit 20.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Malabang Port Construction of Tambara Fish Port, Malabang 1-Unit 5.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Malabang Road Concreting of BPS Village Extension - Municipal Jail,

Malabang 0.60 0.60 0.00 5.40 0.00% NYS

2017 Within Ceiling Lanao del Sur II Malabang Road Concreting of Airport - Landfill Road, Malabang 0.30 0.30 0.00 3.90 0.00% NYS

2017 Within Ceiling Lanao del Sur II Malabang Water System Construction of Water Supply Level II, Banday and Chinatown,

Malabang 1-Unit 10.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Malabang Water System Construction of Water Supply Level II, Bakayawan, Malabang 1-Unit 5.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Marogong Road Concreting of Lumbatan - Marogong Road (Phase II) (Brgys.

Calipapa - Lugitip Section), Marogong 0.65 0.65 0.00 13.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Pagayawan Road Concreting of Padas - Kalaludan Road, Pagayawan 1.80 1.80 0.00 36.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Pagayawan Road Concreting of Linindingan Road - Diampaca Road,

Pagayawan 0.50 0.50 0.00 7.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Pagayawan Shore Protection Construction of Ngingir K. Bubong, Lake Dapao River Control,

Pagayawan 1-Unit 5.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Picong Port Construction of Ramitan Fish Port, Picong 1-Unit 10.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Picong Road Concreting of Illana - Dapao Road, Picong 2.50 2.50 0.00 50.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Picong Road Concreting of Baraas Road, Picong 0.50 0.50 0.00 7.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Pualas Bridge Construction of Masao Bridge, Pualas 1-Unit 15.00 0.00% NYS

Page 65: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2017 Within Ceiling Lanao del Sur II Pualas Road Concreting of Talambo - Masao Provincial Road, Pualas 0.60 0.60 0.00 12.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Pualas Road Concreting of Dapao - Illana Road, Pualas 2.50 2.50 0.00 50.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Pualas Road Concreting of Masao - Romagondong Road, Pualas 0.50 0.50 0.00 6.50 0.00% NYS

2017 Within Ceiling Lanao del Sur II Pualas Water System Construction of Water Supply Level II, Maligo, Pualas 1-Unit 5.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Tubaran Road Concreting of Sitio Beta Poblacion - Sitio Mapantao, Tubaran 1.50 1.50 0.00 13.50 0.00% NYS

2017 Within Ceiling Lanao del Sur II Tugaya Road Concreting of Tugaya - Balindong Provincial Road 0.50 0.50 0.00 10.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Unayan Road Concreting of Bangon - Dilausan - Linao Road, Lumbaca

Unayan 3.64 3.64 0.00 72.70 0.00% NYS

2017 Within Ceiling Lanao del Sur II Unayan Road Concreting of Tringun - Cadayonan Road, Lumbaca Unayan 1.30 1.30 0.00 26.00 0.00% NYS

2017 Within Ceiling Lanao del Sur II Unayan Water System Construction of Water Supply Level II, Poblacion Dilausan,

Lumbaca Unayan 1-Unit 5.00 0.00% NYS

2017 Within Ceiling Maguindanao I Barira Bridge Construction of Ambal Bridge, Brgy. Nabalawag, Barira 0.02 0.02 0.00 22.00 0.00% NYS

2017 Within Ceiling Maguindanao I Barira Flood Control Construction of Flood Control Project, Lipawan, Barira 6.00 6.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Maguindanao I Barira Road Concreting of Marang - Orandang Road, Barira 2.50 2.50 0.00 30.00 0.00% NYS

2017 Within Ceiling Maguindanao I Barira Road Road Widening of Parang - Barira Road (Marang - Bualan

Section), Barira 4.00 4.00 0.00 16.00 0.00% NYS

2017 Within Ceiling Maguindanao I Barira Road Concreting of Marang - Panggao - Bualan Taled Road, Barira 2.50 2.50 0.00 30.00 0.00% NYS

2017 Within Ceiling Maguindanao I Buldon Bridge Construction of Kumagingking - Rumidas Bridge, Buldon 0.04 0.04 0.00 42.00 0.00% NYS

2017 Within Ceiling Maguindanao I Buldon Road Concreting of Karim - Minabay Road, Buldon 2.50 2.50 0.00 32.50 0.00% NYS

2017 Within Ceiling Maguindanao I Buldon Water System Construction of Water Supply Level II, Aratuc, Buldon 1-unit 1-unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Maguindanao I Datu Blah Sinsuat Road Concreting of Pura - Sitio Kapayawi Road, D.B.S 3.50 3.50 0.00 63.00 0.00% NYS

2017 Within Ceiling Maguindanao I Datu Blah Sinsuat Road Concreting of Sitio Kapayawi - Renede Road, D.B.S 2.50 2.50 0.00 45.00 0.00% NYS

2017 Within Ceiling Maguindanao I

Datu Northernlah Kabuntalaninkabuntala

nuatRoad Concreting of Indatuan - Tumaguinting Road Phase I,

Northern Kabuntalan 2.00 2.00 0.00 26.00 0.00% NYS

2017 Within Ceiling Maguindanao I Datu Odin Sinsuat Road Concreting of Dalican - Neketan - Sifaran - Labungan Road

(Phase II), D.O.S 2.50 2.50 0.00 32.50 0.00% NYS

2017 Within Ceiling Maguindanao I Datu Odin Sinsuat Road Concreting of Sibuto - Kenebeka Road, D.O.S 5.00 5.00 0.00 65.00 0.00% NYS

2017 Within Ceiling Maguindanao I Datu Odin Sinsuat Road Concreting of Kenebeka - North Upi Provincial Road, D.O.S 7.00 7.00 0.00 91.00 0.00% NYS

2017 Within Ceiling Maguindanao I Datu Odin Sinsuat Road Concreting of Road from National Highway - Dados, D.O.S 1.00 1.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Maguindanao I Datu Odin Sinsuat Road Concreting of Road from National Highway - Poblacion

Crosslink, D.O.S 2.00 2.00 0.00 20.00 0.00% NYS

Page 66: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2017 Within Ceiling Maguindanao I Datu Odin Sinsuat Road Concreting of Sarilikha Subdivision Main Road, Semba, D.O.S 1.00 1.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Maguindanao I Datu Odin Sinsuat Road Concreting of Makir - Kurintem Road, D.O.S 4.50 4.50 0.00 45.00 0.00% NYS

2017 Within Ceiling Maguindanao I Datu Odin Sinsuat Road Concreting of Baka - Bugawas Road, D.O.S 1.20 1.20 0.00 12.00 0.00% NYS

2017 Within Ceiling Maguindanao I Datu Odin Sinsuat Water System Construction of Water Supply Level II, Sitio Proper Dinaig,

Dimapatoy, D.O.S 1-unit 1-unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Maguindanao I Datu Odin Sinsuat Water System Construction of Water Supply Level II, Datu Odin Sinsuat 1-unit 1-unit 0.00 4.20 0.00% NYS

2017 Within Ceiling Maguindanao I Kabuntalan Bridge Construction of Bagumbayan - Langeban Bridge, Kabuntalan 0.10 0.10 0.00 105.00 0.00% NYS

2017 Within Ceiling Maguindanao I Matanog Port Construction of Kidama Fish Port, Matanog 1-unit 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Maguindanao I Matanog Road Concreting of Katbo - Kuludan - Timpag Road, Matanog 3.00 3.00 0.00 39.00 0.00% NYS

2017 Within Ceiling Maguindanao I Mother Kabuntalan Water System Construction of Water Supply Level II, Mother Kabuntulan 1-unit 1-unit 0.00 4.20 0.00% NYS

2017 Within Ceiling Maguindanao I North Upi Water System Construction of Water Supply Level II, Rempis, Upi 1-unit 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Maguindanao I North Upi Water System Construction of Water Supply Level II, North Upi 1-unit 1-unit 0.00 4.10 0.00% NYS

2017 Within Ceiling Maguindanao I Northern Kabuntalan Flood Control Construction of Flood Control Project, Tumaginting - Sitio

Talitay, Northern Kabuntalan 4.00 4.00 0.00 5.00 0.00% NYS

2017 Within Ceiling Maguindanao I Northern Kabuntalan Road Concreting of Access Road to Gayonga National High School,

Northern Kabuntalan 0.50 0.50 0.00 6.00 0.00% NYS

2017 Within Ceiling Maguindanao I Northern Kabuntalan Water System Construction of Water Supply Level II, Damatog, Northern

Kabuntalan 1-unit 1-unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Maguindanao I Northern Kabuntalan Water System Construction of Water Supply Level II, Indatuan, Northern

Kabuntalan 1-unit 1-unit 0.00 3.00 0.00% NYS

2017 Within Ceiling Maguindanao I Parang Port Construction of Sittio Kursi Port, Tuka Marror, Parang 1-unit 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Maguindanao I Parang Port Development of Polloc Port, Parang 1-unit 1-unit 0.00 30.50 0.00% NYS

2017 Within Ceiling Maguindanao I Parang Road Concreting of Timbangan Road (Relocation Site of Polloc),

Parang 1.00 1.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Maguindanao I Parang Road Concreting of Timbangan - Magsaysay Road, Parang 1.00 1.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Maguindanao I Parang Road Concreting of Poblacion II - Making - Campo Islam, Parang 1.50 1.50 0.00 15.00 0.00% NYS

2017 Within Ceiling Maguindanao I Parang Road Concreting of Padang-Padang - Sittio Kandulit Road, Brgy.

Moropoint, Parang 1.00 1.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Maguindanao I Parang Road Concreting of Manion (Cuba) Road, Parang 0.75 0.75 0.00 7.50 0.00% NYS

2017 Within Ceiling Maguindanao I Parang Road Concreting of Nituan Road, Parang 1.00 1.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Maguindanao I Parang Road Concreting of Notre Dame of Parang Site - Mt. Carmel Church

Road, Poblacion I, Parang 1.00 1.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Maguindanao I Parang Road Concreting of Pinantao Road, Parang 1.00 1.00 0.00 10.00 0.00% NYS

Page 67: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2017 Within Ceiling Maguindanao I Parang Road Concreting of Samberen Road, Parang 1.00 1.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Maguindanao I Parang Road Concreting of Polloc Port Road, Parang 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Maguindanao I Parang Water System Completion of Water Supply Level III, Macasandag, Parang 1-unit 1-unit 0.00 30.00 0.00% NYS

2017 Within Ceiling Maguindanao I Sultan Kudarat Flood Control Construction of Flood Control Project, Nuling Creek, Sultan

Kudarat 1.00 1.00 0.00 2.00 0.00% NYS

2017 Within Ceiling Maguindanao I Sultan Kudarat Road Concreting of Ladia - Ibotigen Road, Sultan Kudarat 2.00 2.00 0.00 24.00 0.00% NYS

2017 Within Ceiling Maguindanao I Sultan Kudarat Road Concreting of Dagurungan - Boliok - Tambo Road, Sultan

Mastura 4.00 4.00 0.00 48.00 0.00% NYS

2017 Within Ceiling Maguindanao I Sultan Kudarat Road Concreting of Ibotigen - Narra - Katidtuan Road, Sultan

Kudarat 2.50 2.50 0.00 30.00 0.00% NYS

2017 Within Ceiling Maguindanao I Sultan Kudarat Road Concreting of Sultan Mastura Road (Phase II), Sultan Kudarat 2.00 2.00 0.00 24.00 0.00% NYS

2017 Within Ceiling Maguindanao I Sultan Kudarat Road Concreting of Mulaug - Sinditan Road, Sultan Kudarat 1.70 1.70 0.00 17.00 0.00% NYS

2017 Within Ceiling Maguindanao I Sultan Kudarat Road Concreting of Access Road from National Highway -

Orphanage, Gang, Sultan Kudarat 0.50 0.50 0.00 5.00 0.00% NYS

2017 Within Ceiling Maguindanao I Sultan Mastura Port Construction of Simuay Fish Port (Phase II), Sultan Mastura 1-unit 1-unit 0.00 10.00 0.00% NYS

2017 Within Ceiling Maguindanao I Sultan Mastura Road Concreting of Balut - Bongabong Road, Sultan Mastura 3.00 3.00 0.00 36.00 0.00% NYS

2017 Within Ceiling Maguindanao I Upi Road Concreting of Rempes - Renede - Pura Road, Upi 1.00 1.00 0.00 15.00 0.00% NYS

2017 Within Ceiling Maguindanao I Upi Road Concreting of Bugabungan - Crossing Magutay Road, Upi 2.50 2.50 0.00 32.50 0.00% NYS

2017 Within Ceiling Maguindanao II Ampatuan Road Concreting of Purok Maligaya - Kamasi Road, Ampatuan 1.50 1.50 0.00 19.50 0.00% NYS

2017 Within Ceiling Maguindanao II Ampatuan Water System Construction of Water Supply Level II, Tomicor, Ampatuan 1-Unit 1-Unit 0.00 4.00 0.00% NYS

2017 Within Ceiling Maguindanao II Ampatuan Water System Construction of Water Supply Level II, Kauran, Ampatuan 1-Unit 1-Unit 0.00 4.10 0.00% NYS

2017 Within Ceiling Maguindanao II Buluan Drainage Construction of Poblacion Drainage System, Buluan 1.00 0.00 14.00 0.00% NYS

2017 Within Ceiling Maguindanao II Buluan Other Infra Development of Maguindanao Government Center, Buluan,

Maguindanao 1-Unit 0.00 100.00 0.00% NYS

2017 Within Ceiling Maguindanao II Buluan Road Concreting of Poblacion - Lower Siling Road, Buluan 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Maguindanao II Buluan Road Concreting of Poblacion Road, Buluan 0.50 0.50 0.00 6.50 0.00% NYS

2017 Within Ceiling Maguindanao II Buluan Road Concreting of Popol Road, Buluan 0.50 0.50 0.00 6.50 0.00% NYS

2017 Within Ceiling Maguindanao II Buluan Road Concreting of Siling Road, Buluan 0.50 0.50 0.00 6.50 0.00% NYS

2017 Within Ceiling Maguindanao II Buluan Road Concreting of Malingaon Road, Buluan 0.50 0.50 0.00 6.50 0.00% NYS

2017 Within Ceiling Maguindanao II Buluan Water System Construction of Water Supply Level II, Lower Silling, Buluan 1-Unit 1-Unit 0.00 4.00 0.00% NYS

Page 68: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2017 Within Ceiling Maguindanao II Buluan Water System Construction of Water Supply Level II,Digal, Buluan 1-Unit 1-Unit 0.00 4.20 0.00% NYS

2017 Within Ceiling Maguindanao II Datu Abdullah Sangki Bridge Construction of Mao Bridge, Datu Abdullah Sangki 0.04 0.04 0.00 37.00 0.00% NYS

2017 Within Ceiling Maguindanao II Datu Abdullah Sangki Water System Construction of Water Supply Level II, Talisawa, Datu

Abdullah Sangki 1-Unit 1-Unit 0.00 4.00 0.00% NYS

2017 Within Ceiling Maguindanao II Datu Abdullahlah

Sangkiinsangkiuat Road Concreting of Old Maganoy - Dimampao Road, Datu Abdullah Sangki 1.50 1.50 0.00 19.50 0.00% NYS

2017 Within Ceiling Maguindanao II Datu Anggal

Midtimbang Road Concreting of Adaon Road, Datu Anggal Midtimbang 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Maguindanao II Datu Hoffer Road Concreting of Limpongo - Sayap Road, Datu Hoffer 1.50 1.50 0.00 19.50 0.00% NYS

2017 Within Ceiling Maguindanao II Datu Montawal Road Concreting of Tunggol - Talapas - Bulod Road, Datu Montawal 2.31 2.31 0.00 30.00 0.00% NYS

2017 Within Ceiling Maguindanao II Datu Montawal Water System Construction of Water Supply Level II, Pagagawan, Datu

Montawal 1-Unit 1-Unit 0.00 4.00 0.00% NYS

2017 Within Ceiling Maguindanao II Datu Paglas Road Concreting of Poblacion - Malala Road, Datu Paglas 1.00 1.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Maguindanao II Datu Paglas Road Concreting of Kalomenga - Lomoyon Road, Datu Paglas 1.00 1.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Maguindanao II Datu Paglas Road Concreting of Alip - Lomoyon Road (Phase II), Datu Paglas 1.00 1.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Maguindanao II Datu Paglas Water System Construction of Water Supply Level II, Napok, Datu Paglas 1-Unit 1-Unit 0.00 4.00 0.00% NYS

2017 Within Ceiling Maguindanao II Datu Piang Road Concreting of Ambadao - Montay Road, Datu Piang 2.00 2.00 0.00 26.00 0.00% NYS

2017 Within Ceiling Maguindanao II Datu Piang Road Concreting of Mokalid Street, Datu Piang 0.20 0.20 0.00 2.60 0.00% NYS

2017 Within Ceiling Maguindanao II Datu Piang Water System Construction of Water Supply Level II, Dado, Datu Piang 1-Unit 1-Unit 0.00 4.00 0.00% NYS

2017 Within Ceiling Maguindanao II Datu Piang Water System Construction of Water Supply Level II, Magaslong, Datu Piang 1-Unit 1-Unit 0.00 4.20 0.00% NYS

2017 Within Ceiling Maguindanao II Datu Salibo Road Concreting of Pandi Road, Datu Salibo 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Maguindanao II Datu Saudi Road Concreting of Municipal Road, Datu Saudi 1.50 1.50 0.00 19.50 0.00% NYS

2017 Within Ceiling Maguindanao II Datu Unsay Road Concreting of Maitumaig Road, Datu Unsay 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Maguindanao II GSKP Road Concreting of Midconding - Kulasi Road, GSKP 1.00 1.00 0.00 13.00 0.00% NYS

2017 Within Ceiling Maguindanao II Guindulungan Road Concreting of Tambunan - Muti - Lambayao - Ahan Road,

Guindulungan 1.50 1.50 0.00 19.50 0.00% NYS

2017 Within Ceiling Maguindanao II Guindulungan Road Concreting of Tambunan II - Kalumamis Road, Guindulungan 2.00 2.00 0.00 26.00 0.00% NYS

2017 Within Ceiling Maguindanao II Mamasapano Road Concreting of Manungkaling - Sitio Barter Road, Mamasapano 1.50 1.50 0.00 19.50 0.00% NYS

2017 Within Ceiling Maguindanao II Mangudadatu Road Concreting of Poblacion Road, Mangudadatu 1.50 1.50 0.00 19.50 0.00% NYS

2017 Within Ceiling Maguindanao II Mangudadatu Road Concreting of Poblacion - Dungguan Road, Mangudadatu 1.50 1.50 0.00 19.50 0.00% NYS

Page 69: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2017 Within Ceiling Maguindanao II Pagalungan Road Concreting of Poblacion - Kudal Road, Pagalungan 1.85 1.85 0.00 24.00 0.00% NYS

2017 Within Ceiling Maguindanao II Pagalungan Road Concreting of Road from National Highway Layog - Inug-ug,

Pagalungan 2.00 2.00 0.00 26.00 0.00% NYS

2017 Within Ceiling Maguindanao II Pagalungan Water System Construction of Water Supply Level II, Linandangan,

Pagalungan 1-Unit 1-Unit 0.00 4.00 0.00% NYS

2017 Within Ceiling Maguindanao II Paglat Road Concreting of Riyadh Road, Paglat 1.80 1.80 0.00 23.40 0.00% NYS

2017 Within Ceiling Maguindanao II Pandag Road Concreting of Malala - Lepak Road, Pandag 2.50 2.50 0.00 50.00 0.00% NYS

2017 Within Ceiling Maguindanao II Pandag Road Concreting of Lepak - Pandag Road, Pandag 2.50 2.50 0.00 50.00 0.00% NYS

2017 Within Ceiling Maguindanao II Rajah Buayan Road Concreting of Road from National Highway - Baital, Rajah

Buayan 1.50 1.50 0.00 19.50 0.00% NYS

2017 Within Ceiling Maguindanao II Shariff Aguak Road Concreting of Labu-Labu - Poblacion I - Poblacion Mother

Road, Shariff Aguak 1.80 1.80 0.00 23.40 0.00% NYS

2017 Within Ceiling Maguindanao II Shariff Aguak Water System Construction of Water Supply Level II, Satan, Shariff Aguak 1-Unit 1-Unit 0.00 4.00 0.00% NYS

2017 Within Ceiling Maguindanao II Shariff Saydona Road Concreting of Pamalian Road, Shariff Saydona 1.50 1.50 0.00 19.50 0.00% NYS

2017 Within Ceiling Maguindanao II South Upi Road Concreting of Romangaob - Bum Road, South Upi 2.00 2.00 0.00 44.00 0.00% NYS

2017 Within Ceiling Maguindanao II South Upi Road Concreting of Bum - Bisang Road, South Upi 2.00 2.00 0.00 44.00 0.00% NYS

2017 Within Ceiling Maguindanao II South Upi Road Concreting of Bisang - Kohan Road, South Upi 2.00 2.00 0.00 44.00 0.00% NYS

2017 Within Ceiling Maguindanao II Sultan sa Barongis Bridge Construction of one-lane Bailey Bridge (Papakan connecting

Gadungan), Sultan sa Barongis 0.03 0.03 0.00 4.80 0.00% NYS

2017 Within Ceiling Maguindanao II Sultan sa Barongis Bridge Construction of one-lane Bailey Bridge, Brgy Tukanakuden,

Sultan sa Barongis 0.03 0.03 0.00 4.80 0.00% NYS

2017 Within Ceiling Maguindanao II Sultan sa Barongis Road Concreting of Barurao - Gadangan - Papakan Road, Sultan sa

Barongis 1.50 1.50 0.00 19.50 0.00% NYS

2017 Within Ceiling Maguindanao II Talayan Road Concreting of Tamar - South Upi Road, Talayan 2.00 2.00 0.00 26.00 0.00% NYS

2017 Within Ceiling Maguindanao II Talayan Road Concreting of Timbaluan - Tamar Road, Talayan 2.50 2.50 0.00 25.00 0.00% NYS

2017 Within Ceiling Maguindanao II Talitay Road Concreting of Kuden - Mapayag Road, Talitay 1.00 1.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Sulu I Hadji Panglima Tahil Port Construction of Teomabal Seaport, Hadji Panglima Tahil 1-Unit 10.00 0.00% NYS

2017 Within Ceiling Sulu I Hadji Panglima Tahil Shore Protection Construction of Pagasinan Seawall, Panglima Tahil 1-Unit 5.00 0.00% NYS

2017 Within Ceiling Sulu I Indanan Bridge Construction of Baitamal Bridge, Buansa, Indanan 1-Unit 0.00 10.00 0.00% NYS

2017 Within Ceiling Sulu I Indanan Road Concreting of Bangalan - Adjid Road, Indanan 2.50 2.50 0.00 25.00 0.00% NYS

2017 Within Ceiling Sulu I Indanan Road Concreting of Ummul Qura Road (Phase II), Indanan 1.80 1.80 0.00 18.00 0.00% NYS

2017 Within Ceiling Sulu I Indanan Road Concreting of Pasil - Langpas Road, Indanan 1.50 1.50 0.00 15.00 0.00% NYS

Page 70: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2017 Within Ceiling Sulu I Indanan Road Concreting of Kabbon Maas - Tabuh Bato Road, Indanan 2.00 2.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Sulu I Indanan Road Concreting of Tagbak - Bud Dato Road (Phase II), Indanan 2.00 2.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Sulu I Indanan Road Concreting of Kan-Islam - Bunot Road, Indanan 1.00 1.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Sulu I Indanan Road Concreting of Sitio Langtad - Adjid Road, Indanan 2.00 2.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Sulu I Indanan Road Concreting of Bilukan Road, Kajatian, Indanan 0.40 0.40 0.00 4.00 0.00% NYS

2017 Within Ceiling Sulu I Indanan Water System Construction of Water Supply Level II for Brgy. Sawaki,

Kuppong, Paligi & Sapah Malaum, Indanan 1-Unit 7.00 0.00% NYS

2017 Within Ceiling Sulu I Indanan Water System Construction of Water Supply Level II for Brgy. Manilop,

Kabbon Maas & Tubig Parang, Indanan 1-Unit 6.00 0.00% NYS

2017 Within Ceiling Sulu I Indanan Water System Rehabilitation of Water Supply Level II, Bunot, Indanan 1-Unit 3.00 0.00% NYS

2017 Within Ceiling Sulu I Indanan Water System Construction of Water Supply Level II, Tagbak, Indanan 1-Unit 4.00 0.00% NYS

2017 Within Ceiling Sulu I Indanan Water System Construction of Water Supply Level II, Pasil, Indanan 1-Unit 2.50 0.00% NYS

2017 Within Ceiling Sulu I Indanan Water System Construction of Water Supply Level II, Kajatian, Indanan 1-Unit 2.00 0.00% NYS

2017 Within Ceiling Sulu I Jolo Drainage Construction of Timbayan Street Drainage System, Jolo 1-Unit 10.00 0.00% NYS

2017 Within Ceiling Sulu I Jolo Drainage Construction of Serantes Drainage System, Jolo 1-Unit 15.00 0.00% NYS

2017 Within Ceiling Sulu I Jolo Drainage Construction of Fish Market Drainage System, Jolo 1-Unit 12.00 0.00% NYS

2017 Within Ceiling Sulu I Jolo Drainage Construction of Matada - Sarang Bangun - Alat Bridge

Drainage System, Jolo 1-Unit 10.00 0.00% NYS

2017 Within Ceiling Sulu I Jolo Drainage Construction of Gen. Arolas Drainage System, Jolo 1-Unit 15.00 0.00% NYS

2017 Within Ceiling Sulu I Jolo Drainage Construction of (Bus-Bus) - (Dan-Dan) - Mauboh Drainage

System, Jolo 1-Unit 20.00 0.00% NYS

2017 Within Ceiling Sulu I Jolo Drainage Construction of Muralla Drainage System, Jolo 1-Unit 10.00 0.00% NYS

2017 Within Ceiling Sulu I Jolo Drainage Construction of Kalimayahan(18) - Sanitarium Drainage

System (load bearing), Jolo 1-Unit 15.00 0.00% NYS

2017 Within Ceiling Sulu I Jolo Drainage Construction of IPHO - Scott Drainage System, Jolo 1-Unit 10.00 0.00% NYS

2017 Within Ceiling Sulu I Jolo Port Expansion of Jolo Port, Jolo 1-Unit 100.00 0.00% NYS

2017 Within Ceiling Sulu I Jolo Road Concreting of Shiek Mustapha Road, Jolo 1.00 1.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Sulu I Maimbung Road Concreting of Kandang-Gulangan-Ipil Road, Maimbung 1.96 1.96 0.00 25.50 0.00% NYS

2017 Within Ceiling Sulu I Panglima Estino Road Concreting of Maimbung - Talipao - Panglima Estino (Phase

III), Panglima Estino 3.00 3.00 0.00 72.00 0.00% NYS

2017 Within Ceiling Sulu I Pangutaran Port Construction of Tonggasan Port, Pangutaran 1-Unit 15.00 0.00% NYS

Page 71: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2017 Within Ceiling Sulu I Pangutaran Water System Construction of Water Supply Level II, Kihi Niog, Pangutaran 1-Unit 2.00 0.00% NYS

2017 Within Ceiling Sulu I Pangutaran Water System Construction of Water Supply Level II, Tunggasan,

Pangutaran 1-Unit 2.00 0.00% NYS

2017 Within Ceiling Sulu I Parang Port Expansion of Municipal Port, Kananway, Parang 1-Unit 10.00 0.00% NYS

2017 Within Ceiling Sulu I Parang Port Expansion of Alu Layag Port, Parang 1-Unit 15.00 0.00% NYS

2017 Within Ceiling Sulu I Parang Road Concreting of Bagsak - Laum Suwah Road, Parang 2.00 2.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Sulu I Parang Road Concreting of Kaha - Alu Layag Road (Phase II), Parang 2.00 2.00 0.00 26.00 0.00% NYS

2017 Within Ceiling Sulu I Parang Road Concreting of Sampunay - Kutah Sairap - Wanni Piyanjihan

Road, Parang 2.00 2.00 0.00 26.00 0.00% NYS

2017 Within Ceiling Sulu I Parang Road Concreting of Nunukan Road, Parang 2.00 2.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Sulu I Parang Road Concreting of Brgy. Duyan Kabaw Road, Parang 1.00 1.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Sulu I Parang Road Concreting of Payuhan - Bawisan Road, Parang 2.00 2.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Sulu I Parang Road Concreting of Lower Sampunay - Upper Sampunay Road,

Parang 2.00 2.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Sulu I Parang Road Concreting of Tumangas - Bawisan - Alu Pangku - Alu Layag

Road, Parang 2.00 2.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Sulu I Parang Road Concreting of Kaha - Sampunay Road, Parang 2.00 2.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Sulu I Parang Water System Construction of Water Supply Level II, Nunukan, Parang 1-Unit 10.00 0.00% NYS

2017 Within Ceiling Sulu I Parang Water System Construction of Deepwell, Lipunos, Parang 1-Unit 0.50 0.00% NYS

2017 Within Ceiling Sulu I Parang Water System Construction of Deepwell, Lupah Abo II, Parang 1-Unit 0.50 0.00% NYS

2017 Within Ceiling Sulu I Parang Water System Construction of Water Supply Level II, Alu Layag, Parang 1-Unit 5.00 0.00% NYS

2017 Within Ceiling Sulu I Parang Water System Construction of Water Supply Level II, Tukay, Parang 1-Unit 3.00 0.00% NYS

2017 Within Ceiling Sulu I Parang Water System Construction of Water Supply Level II, Laum Suwah, Parang 1-Unit 3.00 0.00% NYS

2017 Within Ceiling Sulu I Parang Water System Construction of Water Supply Level II, Tumangas, Parang 1-Unit 3.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Bridge Construction of Taotao Concrete Bridge, Patikul 1-Unit 0.00 10.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Port Construction of Bon Bon (Kan Piruh) Seaport, Patikul 1-Unit 10.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Port Construction of Kan Tayang, Kadday Mampallam Seaport,

Patikul 1-Unit 10.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Road Concreting of Patikul - Panamao Road (Phase II), Patikul 3.00 3.00 0.00 72.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Road Concreting of Kasanyangan - Suwah-Suwah Road, Anuling,

Patikul 1.70 1.70 0.00 25.50 0.00% NYS

Page 72: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2017 Within Ceiling Sulu I Patikul Road Concreting of Sapah Alim - Subah Pukol Road, Patikul 1.50 1.50 0.00 15.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Road Concreting of Lumaang - Panglayahan Road, Patikul 1.50 1.50 0.00 15.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Road Concreting of Kaban Kaban - Niog Tu Road, Patikul 1.50 1.50 0.00 15.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Road Concreting of Pansul Road - National Road, Patikul 1.50 1.50 0.00 15.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Road Concreting of Panglayahan Road, Patikul 1.50 1.50 0.00 15.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Road Concreting of Anuling - Chinese Garden Road, Patikul 1.00 1.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Road Concreting of Kalimayahan Village Road, Patikul 2.00 2.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Road Concreting of Kabuntakas Road, Patikul 1.00 1.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Road Concreting of Anuling Mosque Road, Patikul 1.50 1.50 0.00 15.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Road Concreting of Kaban-Kaban Patikul - Bagsak-Lambana

Talipao Road 1.00 1.00 0.00 15.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Shore Protection Rehabilitation of Mauboh Shore Protection, Patikul 1-Unit 5.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Water System Construction of Deepwell, Kasalamatan B-13, Patikul 1-Unit 0.50 0.00% NYS

2017 Within Ceiling Sulu I Patikul Water System Construction of Deepwell, Pungod, Patikul 1-Unit 0.50 0.00% NYS

2017 Within Ceiling Sulu I Patikul Water System Construction of Deepwell, Kasalamatan B-12, Patikul 1-Unit 1.50 0.00% NYS

2017 Within Ceiling Sulu I Patikul Water System Construction of Water Supply Level II, Langhub, Patikul 1-Unit 4.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Water System Construction of Water Supply Level II, Tandawan NHA, Patikul 1-Unit 4.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Water System Construction of Water Supply Level II, Gandasuli, Patikul 1-Unit 4.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Water System Construction of Water Supply Level II, Pansul, Patikul 1-Unit 4.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Water System Construction of Water Supply Level II, Kaban Kaban Timpok,

Patikul 1-Unit 4.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Water System Construction of Water Supply Level II, Panglayahan, Patikul 1-Unit 4.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Water System Construction of Water Supply Level II, Kan Piruh Bun-Bun,

Patikul 1-Unit 4.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Water System Construction of Water Supply Level II, Pansul, Patikul 1-Unit 2.00 0.00% NYS

2017 Within Ceiling Sulu I Patikul Water System Construction of Water Supply Level II, Timpuk, Patikul 1-Unit 2.00 0.00% NYS

2017 Within Ceiling Sulu I Talipao Road Concreting of Mungit-Mungit - Taming-Taming Road, Talipao 1.60 1.60 0.00 16.00 0.00% NYS

2017 Within Ceiling Sulu I Talipao Road Concreting of Bandang - Lumping - Kagay Road,Talipao 1.00 1.00 0.00 20.00 0.00% NYS

Page 73: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2017 Within Ceiling Sulu I Talipao Road Concreting of Buntod - Gata Road, Talipao 2.00 2.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Sulu II Kalingalan Caluang Road Concreting of Pang-Masjid Punjungan - Tabuh Samal Road,

Kalingalan Caluang 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Sulu II Banguingui Port Construction of Sigumbal Port, Banguingui 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Sulu II Banguingui Road Concreting of Dungon Road, Banguingui 1.00 1.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Sulu II Banguingui Water System Construction of Water Supply Level II, Banguingui 1-unit 0.00 2.00 0.00% NYS

2017 Within Ceiling Sulu II Kalingalan Caluang Port Construction of Sungab Seaport, Kalingalan Caluang 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Sulu II Kalingalan Caluang Port Construction of Karungdong Port, Kalingalan Caluang 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Sulu II Kalingalan Caluang Road Concreting of Brgy. Pangdan-Pangdan - Tunggol Road,

Kalingalan Caluang 1.00 1.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Sulu II Kalingalan Caluang Road Concreting of Mangal Mangal - Kan Basih Road, Kalingalan

Caluang 1.50 1.50 0.00 22.50 0.00% NYS

2017 Within Ceiling Sulu II Kalingalan Caluang Water System Construction of Water Supply, Pangdan-Pangdan, Kalingalan

Caluang 1-unit 0.00 1.00 0.00% NYS

2017 Within Ceiling Sulu II Lugus Port Construction of Pangdan Port, Lugus 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Sulu II Lugus Port Expansion of Lugus Proper Seaport, Lugus 1-unit 0.00 20.00 0.00% NYS

2017 Within Ceiling Sulu II Lugus Road Concreting of Lugus Proper - Lanao Road, Lugus 1.00 1.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Sulu II Luuk Road Concreting of Kan Mindus - Sapang Circumferential Road,

Luuk 2.00 2.00 0.00 48.00 0.00% NYS

2017 Within Ceiling Sulu II Luuk Road Concreting of Sapang - Tandu Bato Circumferential Road,

Luuk 2.00 2.00 0.00 48.00 0.00% NYS

2017 Within Ceiling Sulu II Luuk Road Concreting of Mananti - Bailawak Road, Luuk 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Sulu II Luuk Road Concreting of Tandu Bato - Kan Mindus Road, Luuk 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Sulu II Luuk Road Concreting of Kungan - Tubig Putih Road, Luuk 1.20 1.20 0.00 18.00 0.00% NYS

2017 Within Ceiling Sulu II Luuk Road Concreting of Allayon Fish Port Road, Luuk 1.00 1.00 0.00 15.00 0.00% NYS

2017 Within Ceiling Sulu II Luuk Road Concreting of Brgy. Tulayan Coastal Road, Luuk 1.00 1.00 0.00 15.00 0.00% NYS

2017 Within Ceiling Sulu II Luuk Road Concreting of Tambanan Coastal Road, Luuk 1.00 1.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Sulu II Luuk Road Concreting of Guimbaon Road, Luuk 1.00 1.00 0.00 15.00 0.00% NYS

2017 Within Ceiling Sulu II Luuk Shore Protection Construction of Tandu Bato Shore Protection, Luuk 1.00 1.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Sulu II Luuk Shore Protection Construction of Bual - Undanan - Bulangsih - Seit Higad Shore

Protection, Luuk 2.00 2.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Sulu II Luuk Water System Construction of Water Supply Level II, Tulayan, Luuk 1-unit 0.00 4.20 0.00% NYS

Page 74: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2017 Within Ceiling Sulu II Omar Bridge Retrofitting/Expansion of Kan Muni Bridge, Tangkuan, Omar 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Sulu II Omar Port Construction of Capual Seaport, Omar 1 unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Sulu II Omar Port Construction of Niangkaan Seaport, Omar 1-unit 0.00 10.00 0.00% NYS

2017 Within Ceiling Sulu II Omar Road Concreting of Lahing-Lahing - Buhangin Mahaba

Circumferential Road, Omar 1.90 1.90 0.00 45.60 0.00% NYS

2017 Within Ceiling Sulu II Omar Road Concreting of Angilan - Tangkuan Circumferential Road, Omar 2.00 2.00 0.00 48.00 0.00% NYS

2017 Within Ceiling Sulu II Omar Road Concreting of Tangkuan - Kan Mindus Circumferential Road,

Omar 1.80 1.80 0.00 43.20 0.00% NYS

2017 Within Ceiling Sulu II Omar Road Concreting of Angilan - Niangkaan Road (Phase II), Omar 1.50 1.50 0.00 22.50 0.00% NYS

2017 Within Ceiling Sulu II Omar Road Concreting of Brgy. Capual Road, Omar 1.50 1.50 0.00 15.00 0.00% NYS

2017 Within Ceiling Sulu II Omar Shore Protection Rehabilitation of Sucuban Causeway, Omar 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Sulu II Omar Water System Construction of Water Supply, Capual, Omar 1-unit 0.00 2.00 0.00% NYS

2017 Within Ceiling Sulu II Panamao Road Concreting of Kan Ukol - Kandangan Road, Panamao 1.00 1.00 0.00 15.00 0.00% NYS

2017 Within Ceiling Sulu II Panamao Road Concreting of Tabuh Sukal - Viray Road, Panamao 1.50 1.50 0.00 15.00 0.00% NYS

2017 Within Ceiling Sulu II Panamao Road Concreting of Kansipat - Binuwang - Tinah Road, Panamao 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Sulu II Panamao Road Concreting of Seit - Tubig Gantang - Lunggang Maasin Road,

Panamao 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Sulu II Panamao Road Concreting of Gaggil - Seit Higad Road (Phase II), Panamao 1.40 1.40 0.00 21.00 0.00% NYS

2017 Within Ceiling Sulu II Panamao Road Concreting of Seit - Camp Seit Road, Panamao 1.00 1.00 0.00 15.00 0.00% NYS

2017 Within Ceiling Sulu II Panamao Road Concreting of Kan Asali - Puhagan - Kamalig Road, Panamao 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Sulu II Panamao Water System Construction of Water Supply Level II, Tayungan, Panamao 1-unit 0.00 4.20 0.00% NYS

2017 Within Ceiling Sulu II Pandami Port Construction of Lahi Port, Pandami 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Sulu II Pandami Road Concreting of Siganggang - Hambilan Road (Phase II),

Pandami 2.00 2.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Sulu II Pandami Road Concreting of Kabbon - Lapak - Bud Sibaud Road, Pandami 1.00 1.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Sulu II Panglima Estino Road Concreting of Jinggan - Kabungkol Circumferential Road,

Panglima Estino 1.00 1.00 0.00 24.00 0.00% NYS

2017 Within Ceiling Sulu II Panglima Estino Road Concreting of Kabungkol - Gata-Gata Circumferential Road,

Panglima Estino 1.30 1.30 0.00 31.20 0.00% NYS

2017 Within Ceiling Sulu II Panglima Estino Road Concreting of Brgy. Gata-Gata Road, Panglima Estino 1.00 1.00 0.00 15.00 0.00% NYS

2017 Within Ceiling Sulu II Panglima Estino Road Concreting of Brgy. Jinggan Road, Panglima Estino 1.20 1.20 0.00 12.00 0.00% NYS

Page 75: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2017 Within Ceiling Sulu II Pata Port Construction of Likud Port, Pata 1 unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Sulu II Pata Road Concreting of Brgy. Saimbangon - Kayawan Road, Pata 3.00 3.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Sulu II Pata Road Concreting of Timuddas - Niog-Niog Road, Pata 2.00 2.00 0.00 30.00 0.00% NYS

2017 Within Ceiling Sulu II Siasi Port Expansion of Siasi Proper Seaport, Siasi 1-unit 0.00 15.00 0.00% NYS

2017 Within Ceiling Sulu II Siasi Road Concreting of Tong-Tong - Campo Islam - Sablay Road, Siasi 2.50 2.50 0.00 25.00 0.00% NYS

2017 Within Ceiling Sulu II Siasi Road Concreting of Singko - Siasi Road, Siasi 1.00 1.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Sulu II Siasi Water System Construction of Water Supply Level II, Laminusa, Siasi 1-unit 0.00 4.10 0.00% NYS

2017 Within Ceiling Sulu II Tapul Port Construction of Kalang Port, Tapul 1-unit 0.00 10.00 0.00% NYS

2017 Within Ceiling Sulu II Tapul Road Concreting of Pangdan - Sayli Road, Tapul 1.00 1.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Sulu II Tapul Road Concreting of Brgy. Hawan - Kanmangon Road, Tapul 1.00 1.00 0.00 10.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Bongao Bridge Construction of Simandagit Concrete Footbridge, Bongao 1-unit 0.00 2.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Bongao Bridge Construction of Lamion Walking Blackboard Concrete

Footbridge, Bongao 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Bongao Bridge Construction of PC Compound Concrete Footbridge, Bongao 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Bongao Bridge Improvement/Expansion of Swangkagang Bridge Approach,

Bongao 1-Unit 1-Unit 0.00 20.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Bongao Drainage Construction of Tubig Boh Drainage System, Bongao 1-unit 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Bongao Drainage Construction of Nalil - Poblacion Drainage System, Bongao 1-unit 1-unit 0.00 10.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Bongao Port Expansion of Chinese Pier Boulevard, Bongao 1-Unit 1-Unit 0.00 50.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Bongao Road Concreting of Karungdong - Lato-lato Road, Bongao 1.00 1.00 0.00 15.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Bongao Shore Protection Construction of Simandagit Shore Protection, Bongao 0.30 0.30 0.00 3.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Bongao Shore Protection Construction of Pasiagan Shore Protection, Bongao 0.55 0.55 0.00 5.50 0.00% NYS

2017 Within Ceiling Tawi-Tawi Bongao Shore Protection Construction of Tubig Basag Shore Protection, Bongao 0.20 0.20 0.00 2.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Bongao Water System Construction of Water Supply Level II, Darul Akram TTSAT

Compound, Bongao 1-unit 0.00 4.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Languyan Bridge Contruction of Subah Marutsi Bridge, Languyan 0.02 0.02 0.00 20.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Languyan Bridge Contruction of Maraning Bridge, Languyan 0.03 0.03 0.00 30.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Languyan Drainage Construction of Sikullis Drainage System, Languyan 1-unit 1-unit 0.00 5.00 0.00% NYS

Page 76: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2017 Within Ceiling Tawi-Tawi Languyan Port Construction of Languyan Port, Languyan 1-unit 0.00 10.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Languyan Port Expansion of Kuala Baro Port, Languyan 1-unit 0.00 7.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Languyan Road Concreting of Marang-Marang - Bakung Road, Languyan 4.00 4.00 0.00 96.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Languyan Road Concreting of Bakung - Maraning Road, Languyan 4.00 4.00 0.00 96.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Languyan Road Concreting of Rotonda - Sikullis - Basnunuk Road, Languyan 3.00 3.00 0.00 72.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Languyan Road Concreting of Basnunuk - Tubig Dakula - Jakarta Road,

Languyan 3.00 3.00 0.00 72.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Languyan Road Concreting of Languyan - Dungon Road, Languyan 3.00 3.00 0.00 45.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Languyan Shore Protection Construction of Darul Akram Shore Protection, Languyan 0.50 0.50 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Mapun Bridge Construction of Boki Concrete Footbridge, Mapun 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Mapun Bridge Construction of Tapian Marang Concrete Footbridge, Mapun 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Mapun Bridge Construction of Guppah Concrete Footbridge, Mapun 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Mapun Drainage Construction of Lupa-Pula Drainage System, Mapun 1-unit 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Mapun Port Expansion of Liyubud Municipal Port, Mapun 1-unit 0.00 10.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Mapun Road Concreting of Sikub Road, Mapun 1.00 1.00 0.00 15.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Mapun Road Concreting of Guppah - Duhul Bato Road, Mapun 1.00 1.00 0.00 15.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Mapun Water System Construction of Water Supply Level II, Lake Singuang, Mapun 1-unit 0.00 10.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Panglima Estino Road Concreting of Karaha - Dungon Road, Panglima Sugala 4.00 4.00 0.00 96.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Panglima Estino Road Concreting of Thumbhill - Masantong Road, Panglima Sugala 4.00 4.00 0.00 96.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Panglima Sugala Bridge Contruction of Karaha Bridge, Panglima Sugala 0.05 0.05 0.00 50.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Panglima Sugala Bridge Construction of Balimbing Concrete Footbridge with Pier

Head, Panglima Sugala 1-unit 0.00 10.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Panglima Sugala Bridge Construction of Lambug Concrete Footbridge with Pier Head,

Panglima Sugala 1-unit 0.00 10.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Panglima Sugala Drainage Construction of Batu-Batu Drainage System, Panglima Sugala 1-unit 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Panglima Sugala Port Construction of Balimbing Proper Port, Panglima Sugala 1-unit 0.00 10.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Panglima Sugala Road Concreting of Sitio Km 3, Batu-Batu - Interior Magsaggao

Road, Panglima Sugala 1.50 1.50 0.00 22.50 0.00% NYS

2017 Within Ceiling Tawi-Tawi Panglima Sugala Water System Improvement of Water Supply Level II, Buan, Panglima Sugala 1-unit 0.00 10.00 0.00% NYS

Page 77: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2017 Within Ceiling Tawi-Tawi Sapa-Sapa Bridge Construction of Banaran - Lookan Concrete Footbridge, Sapa-

Sapa 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Sapa-Sapa Bridge Construction of Latuan Concrete Footbridge with Pier Head,

Sapa-Sapa 1-unit 0.00 10.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Sapa-Sapa Bridge Construction of Gumanting Concrete Footbridge, Sapa-Sapa 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Sapa-Sapa Road Concreting of Tonggusong - Lookan Road, Sapa-Sapa 1.00 1.00 0.00 24.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Sapa-Sapa Road Concreting of Malanta - Look Nato Road, Sapa-Sapa 1.00 1.00 0.00 15.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Sapa-Sapa Road Concreting of Latuan - Palate Road, Sapa-Sapa 1.00 1.00 0.00 15.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Sapa-Sapa Shore Protection Construction of Latuan - Lookan Shore Protection, Sapa-Sapa 0.50 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Sapa-Sapa Shore Protection Construction of Latuan - Sunsang Shore Protection, Sapa-

Sapa 0.30 0.00 3.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Sapa-Sapa Water System Construction of Water Supply Level II, Baldatal, Sapa-Sapa 1-unit 0.00 10.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Sapa-Sapa Water System Construction of Water Supply Level II, Look Nato, Sapa Sapa 1-unit 0.00 4.50 0.00% NYS

2017 Within Ceiling Tawi-Tawi Sibutu Bridge Construction of Tongsibalo Concrete Footbridge, Sibutu 1-unit 0.00 2.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Sibutu Bridge Construction of Ungus Ungus Concrete Footbridge, Sibutu 1-unit 0.00 2.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Sibutu Bridge Construction of Nunukan Concrete Footbridge, Sibutu 1-unit 0.00 2.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Sibutu Port Construction of Ligayan Seaport, Sibutu 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Sibutu Road Concreting of Bakong Road, Sibutu 1.00 1.00 0.00 15.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Sibutu Shore Protection Construction of Hadji Moktar Shore Protection, Sibutu 0.50 0.50 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Simunul Road Concreting of Tahing Tahing - Tubig Indangan Road, Simunul 1.00 1.00 0.00 20.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Simunul Road Concreting of Pagasinan - Bakong Road, Simunul 1.00 1.00 0.00 24.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Simunul Road Concreting of Tampakan - Pagasinan Road, Simunul 1.50 1.50 0.00 22.50 0.00% NYS

2017 Within Ceiling Tawi-Tawi Sitangkai Bridge Construction of Poblacion Concrete Footbridge, Sitangkai 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Sitangkai Bridge Construction of North Larap Concrete Footbridge, Sitangkai 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Sitangkai Bridge Construction of South Larap Concrete Footbridge, Sitangkai 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Sitangkai Port Concreting of Tongmageng Junction to Port, Sitangkai 0.50 0.50 0.00 7.50 0.00% NYS

2017 Within Ceiling Tawi-Tawi Sitangkai Port Construction of Poblacion Fish Port, Sitangkai 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Sitangkai Port Construction of Sitangkai Port, Sitangkai 1-unit 0.00 24.00 0.00% NYS

Page 78: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2017 Within Ceiling Tawi-Tawi South Ubian Bridge Construction of Nusa-Nusa Concrete Footbridge, South Ubian 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi South Ubian Bridge Construction of Tinda-Tindahan Concrete Footbridge, South

Ubian 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi South Ubian Bridge Construction of Tukkai Concrete Footbridge, South Ubian 1-unit 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi South Ubian Port Construction of Tubig Dayang Riverside Fish Port, South

Ubian 1-unit 0.00 10.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi South Ubian Road Concreting of East Taisay - Gampong Bunai Bunai Lookan

Road, South Ubian 1.00 1.00 0.00 15.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Tandubas Bridge Construction of Taruk Concrete Footbridge, Tandubas 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Tandubas Bridge Construction of Naungan Concrete Footbridge, Tandubas 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Tandubas Port Construction of Sibakloon Municipal Port, Tandubas 1-unit 0.00 10.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Tandubas Road Concreting of Kula Kula - Karaha Road, Tandubas 1.20 1.20 0.00 28.80 0.00% NYS

2017 Within Ceiling Tawi-Tawi Tandubas Road Concreting of Ungus Matata - Sapa Road, Tandubas 1.00 1.00 0.00 15.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Tandubas Shore Protection Construction of Naungan Shore Proptection, Tandubas 0.45 0.45 0.00 4.50 0.00% NYS

2017 Within Ceiling Tawi-Tawi Tandubas Shore Protection Construction of Kepeng Proper Shore Proptection, Tandubas 0.50 0.50 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Tandubas Water System Construction of Water Supply Level II, Silantop, Tandubas 1-unit 0.00 10.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Tandubas Water System Construction of Water Supply Level II, Butun, Tandubas 1-unit 0.00 4.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Turtle Island Bridge Construction of Bakungan Concrete Footbridge, Turtle Island 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Turtle Island Port Construction of Boan Fish Port, Turtle Island 1-unit 0.00 5.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Turtle Island Port Construction of Bakungan Fish Port, Turtle Island 1-unit 0.00 10.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Turtle Island Road Concreting of Taganak Circumferential Road, Turtle Island 1.00 1.00 0.00 15.00 0.00% NYS

2017 Within Ceiling Tawi-Tawi Turtle Island Water System Construction of Potable Water Supply Level II, Taganak, Turtle

Island 1-unit 0.00 5.00 0.00% NYS

2018 Within Ceiling Basilan Akbar Drainage Construction of Drainage System along Caddayan - Semmut

Road, Akbar 1-Unit 2.00 0.00% NYS

2018 Within Ceiling Basilan Akbar Road Concreting of Caddayan-Upper Sinangkapan Road, Akbar 2.00 2.00 0.00 32.00 0.00% NYS

2018 Within Ceiling Basilan Albarka Port Construction of Apil Apil Port, Albarka 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Basilan Al-Barka Road Concreting of Bato-Bato - Bucalao Road, Al-Barka 2.50 2.50 0.00 40.00 0.00% NYS

2018 Within Ceiling Basilan Al-Barka Road Concreting of Bucalao-Sitio Lakit, Brgy. Kuhun Lennuh, Al-

Barka 2.50 2.50 0.00 40.00 0.00% NYS

2018 Within Ceiling Basilan Hadji Muhtamad Port Construction of Sangbay Small Port, Hadji Muhtamad 1-Unit 5.00 0.00% NYS

Page 79: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2018 Within Ceiling Basilan Hadji Muhtamad Shore Protection Construction of Panducan Shore Protection, Hadji Muhtamad 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Basilan Isabela City Bridge Construction of Kumalang Bridge, Isabela City 0.04 40.00 0.00% NYS

2018 Within Ceiling Basilan Lamitan City Bridge Construction of Maloong Canal Bridge, Lamitan City 0.04 35.00 0.00% NYS

2018 Within Ceiling Basilan Lamitan City Bridge Construction of Bohe Yawas Bridge, Lamitan City 0.04 40.00 0.00% NYS

2018 Within Ceiling Basilan Lamitan City Flood Control Construction of Flood Control Structure @ Gubawan River,

Lamitan 1-Unit 20.00 0.00% NYS

2018 Within Ceiling Basilan Lamitan City Flood Control Construction of Box Culvert II, Ulame, Lamitan 1-Unit 2.00 0.00% NYS

2018 Within Ceiling Basilan Lamitan City Other Infra Construction of Various Government Facilities, DEO

Compound, Lamitan City 1-Unit 0.00 19.90 0.00% NYS

2018 Within Ceiling Basilan Lamitan City Port Construction of Batu Port, Lamitan City 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Basilan Lamitan City Road Concreting of Sta. Clara - Tumakid Road (Phase 3), Lamitan

City 3.00 3.00 0.00 54.00 0.00% NYS

2018 Within Ceiling Basilan Lamitan City Road Concreting of Road from Lamitan Highway - Ubit - Bohe

Yawas - Lumuton (Phase II), Lamitan City 2.00 2.00 0.00 32.00 0.00% NYS

2018 Within Ceiling Basilan Lamitan City Road Concreting of Road from Lamitan Highway - Lumuton - Look -

Arco - Bohe Sapa (Phase II), Lamitan City 1.10 1.10 0.00 17.60 0.00% NYS

2018 Within Ceiling Basilan Lamitan City Road Concreting of Bohe Bessey - Baimbing Road (Phase II),

Lamitan City 1.00 1.00 0.00 16.00 0.00% NYS

2018 Within Ceiling Basilan Lamitan City Road Concreting of Sta. Clara - Kapengkongan Road, Lamitan City 2.00 2.00 0.00 32.00 0.00% NYS

2018 Within Ceiling Basilan Lamitan City Road Concreting of Road from Lamitan Highway - Panansangan

Road, Lamitan 1.00 1.00 0.00 16.00 0.00% NYS

2018 Within Ceiling Basilan Lamitan City Road Concreting of Road from Lamitan Highway - Monte Santo

Road, Lamitan 1.00 1.00 0.00 16.00 0.00% NYS

2018 Within Ceiling Basilan Lamitan City Shore Protection Construction of Drainage System along Sengal-Tinambakan

Section, Lamitan 1-Unit 6.50 0.00% NYS

2018 Within Ceiling Basilan Lamitan City Shore Protection Construction of Slope Protection, Balagtasan-Ubit Section,

Lamitan 1-Unit 2.00 0.00% NYS

2018 Within Ceiling Basilan Lamitan City Shore Protection Construction of Shore Protection, Tandung Ahas, Lamitan City 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Basilan Lamitan City Water System Construction of Water Supply Level II, Bohe Yakan, Lamitan

City 1-Unit 3.00 0.00% NYS

2018 Within Ceiling Basilan Lantawan Drainage Construction of Drainage System along Matarling - Tairan

Road, Lantawan 1-Unit 3.00 0.00% NYS

2018 Within Ceiling Basilan Lantawan Port Construction of Lower Manggas Port, Lantawan 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Basilan Lantawan Road Concreting of Kalayan Road, Lantawan 2.00 2.00 0.00 32.00 0.00% NYS

2018 Within Ceiling Basilan Lantawan Shore Protection Construction of Slope Protection, Conception-Pamucalin

Section, Lantawan 1-Unit 4.00 0.00% NYS

2018 Within Ceiling Basilan Maluso Bridge Construction of Footbridge, Samal Village, Maluso 1-Unit 10.00 0.00% NYS

2018 Within Ceiling Basilan Maluso Bridge Construction of Footbridge, Lower Port Holland, Maluso 1-Unit 15.00 0.00% NYS

Page 80: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2018 Within Ceiling Basilan Maluso Bridge Construction of Shipyard Footbridge, Maluso 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Basilan Maluso Drainage Construction of Maluso Drainage System Phase III, Maluso 1-Unit 20.00 0.00% NYS

2018 Within Ceiling Basilan Maluso Other Infra Construction of Maluso Government Center, Maluso 1-Unit 0.00 50.00 0.00% NYS

2018 Within Ceiling Basilan Maluso Port Maluso Port Development with RORO, Maluso 1-Unit 100.00 0.00% NYS

2018 Within Ceiling Basilan Maluso Port Construction of Port at Tamuk, Maluso 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Basilan Maluso Port Construction of Gaunan Port, Maluso 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Basilan Maluso Road Repair/Improvement (Paved Shoulder) along Sumisip -

Maluso Road, Tinggilan - Kamanggaan Section, Maluso 2.00 2.00 0.00 20.00 0.00% NYS

2018 Within Ceiling Basilan Maluso Road Concreting of Road from Maluso Highway-1L, Maluso 4.00 4.00 0.00 88.00 0.00% NYS

2018 Within Ceiling Basilan Maluso Water System Construction of Water Supply Level II, Upper Mahayahay,

Maluso 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Basilan Maluso Road Concreting from Maluso National Highway - Tubigan-Ulih

Road, Maluso (Phase II) 2.00 2.00 0.00 32.00 0.00% NYS

2018 Within Ceiling Basilan Maluso Road Concreting from Maluso National Highway - Calang Road,

Maluso (Phase II) 0.50 0.50 0.00 8.00 0.00% NYS

2018 Within Ceiling Basilan Moh Ajul Road Concreting of Pintasan-Capago Road, Moh Ajul 2.00 2.00 0.00 32.00 0.00% NYS

2018 Within Ceiling Basilan Muhammad Ajul Port Construction of Tuburan Proper Port Phase II, Muhd. Ajul 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Basilan Muhammad Ajul Port Construction of Matangal Port, Muhammad Ajul 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Basilan Muhammad Ajul Water System Construction of Water Supply Level II, Pintasan, Muhammad

Ajul 1-Unit 3.00 0.00% NYS

2018 Within Ceiling Basilan Muhammad Ajul Water System Construction of Water Supply Level II, Capago, Muhammad

Ajul 1-Unit 3.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Bridge Construction of Bohe Mangal Bridge, Sumisip (Transcentral

Road) 1-unit 30.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Drainage Construction of Drainage System along Marang - Tikes Road,

Sumisip 1-Unit 3.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Drainage Construction of Drainage System along Bitayan - Basak Road,

Sumisip 1-Unit 3.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Drainage Construction of Drainage System along Upper Cabembeng -

Lower Cabembeng Road, Sumisip 1-Unit 2.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Drainage Construction of Drainage System along Bakung Basak Road,

Sumisip 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Flood Control Construction of Box Culvert, Bohe Languyan, Sumisip 1-Unit 2.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Flood Control Construction of Box Culvert, Irelley, Sumisip 1-Unit 2.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Flood Control Construction of Triple Box Culvert, Limbocandis, Sumisip 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Flood Control Construction of (Double) Box Culvert @ Puno Dahingan 1,

Sumisip (Transcentral Road) 1-Unit 3.00 0.00% NYS

Page 81: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2018 Within Ceiling Basilan Sumisip Flood Control Construction of (Double) Box Culvert @ Puno Dahingan 2 ,

Sumisip (Transcentral Road) 1-Unit 3.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Flood Control Construction of (Double) Box Culvert @ Puno Dahingan 3,

Sumisip (Transcentral Road) 1-Unit 3.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Flood Control Construction of Box Culvert, Mebak, Sumisip 1-Unit 2.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Flood Control Construction of Box Culvert II, Kaum Air, Sumisip 1-Unit 2.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Port Construction of Subah Languyan port, Sumisip 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Port Expansion of Lukbait Port, Sumisip 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Port Expansion of Sumisip Municipal Port, Sumisip 1-Unit 55.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Road Repair/Improvement (Reblocking) along Sumisip Highway,

Manaul-Bacung Section, Sumisip 1.80 1.80 0.00 68.40 0.00% NYS

2018 Within Ceiling Basilan Sumisip Road Concreting of Ettub-Ettub-Lower Cabembeng Road, Sumisip 2.50 2.50 0.00 55.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Road Concreting of Datu Kahapan Road, Buli-Buli, Sumisip 1.00 1.00 0.00 18.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Road Concreting of Road from Sumisip Highway - Manaul -

Langarey, Sumisip 3.00 3.00 0.00 54.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Road Repair/Improvement (Paved Shoulder) along Crossing Bitayan-

Basak Road, Sumisip 1.00 1.00 0.00 10.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Road Concreting of Tumahubong-Baiwas Road, Sumisip 4.50 4.50 0.00 99.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Road Concreting of Irelley-Baiwas Road, Sumisip 2.70 2.70 0.00 48.60 0.00% NYS

2018 Within Ceiling Basilan Sumisip Road Concreting of Lower Cabembeng-Suba Languyan Road,

Sumisip 2.00 2.00 0.00 32.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Road Concreting of Road from Sumisip Highway - Limbubong -

Baiwas, Sumisip 1.00 1.00 0.00 16.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Road Concreting of Sumisip Highway - Irelley Road (Phase 2),

Sumisip 1.00 1.00 0.00 16.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Road Concreting of Tumahubong - Mahatallang Road, Sumisip 3.00 3.00 0.00 54.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Shore Protection Construction of Tolong Shore Protection, Sumisip 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Water System Construction of Water Supply Level II, Cabembeng, Sumisip 1-Unit 4.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Water System Construction of Water Supply Level II, Sahayabatu, Sumisip 1-Unit 4.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Water System Expansion of Sumisip Water System Level II Phase II, Sumisip 1-Unit 30.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Port Construction of Sahaya Batu Port, Sumisip (Phase 2) 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Basilan Sumisip Road Concreting of Mangal-Tolong Road, Sumisip (Phase 2) 1.00 1.00 0.00 16.00 0.00% NYS

2018 Within Ceiling Basilan Tabuan Lasa Road Concreting of Lanawan Road, Tabuan Lasa 1.50 1.50 0.00 27.00 0.00% NYS

Page 82: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2018 Within Ceiling Basilan Tipo-Tipo Flood Control Construction of Box Culvert, Subah Pitas - Banah, Tipo-Tipo 1-Unit 2.00 0.00% NYS

2018 Within Ceiling Basilan Tipo-Tipo Port Expansion of Banah Port, Tipo-Tipo 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Basilan Tipo-Tipo Road Concreting of Bohelebbeng-Cambug Road, Tipotipo 1.50 1.50 0.00 24.00 0.00% NYS

2018 Within Ceiling Basilan Tipo-Tipo Road Concreting of Baguindan - Matata, Tipotipo Phase II 2.00 2.00 0.00 32.00 0.00% NYS

2018 Within Ceiling Basilan Tipo-Tipo Road Concreting of Bakud-Banah Road, Tipo-Tipo 0.60 0.60 0.00 9.60 0.00% NYS

2018 Within Ceiling Basilan Tipo-Tipo Water System Construction of Water Supply Level II, Bohetambak, Tipo-Tipo 1-Unit 3.00 0.00% NYS

2018 Within Ceiling Basilan Tipo-Tipo Water System Construction of Water Supply Level II, Pipil, Tipo-Tipo 1-Unit 3.00 0.00% NYS

2018 Within Ceiling Basilan Tipo-Tipo Water System Construction of Water Supply Level II, Mabeh, Tipotipo 1-Unit 3.00 0.00% NYS

2018 Within Ceiling Basilan Tuburan Road Repair/Road Improvement (Reblocking) along Campo Uno -

Tuburan Road, Tablas Section, Tuburan 1.00 1.00 0.00 38.00 0.00% NYS

2018 Within Ceiling Basilan Tuburan Road Repair/Improvement along Lamitan - Tuburan Road, Campo

Uno-Lower Tablas Section, Tuburan 0.90 0.90 0.00 30.60 0.00% NYS

2018 Within Ceiling Basilan Tuburan Road Concreting of Duga-a - Sawiti Road, Tuburan 2.00 2.00 0.00 32.00 0.00% NYS

2018 Within Ceiling Basilan Tuburan Road Concreting of Calut - Dugaa Road, Tuburan 2.00 2.00 0.00 32.00 0.00% NYS

2018 Within Ceiling Basilan Ungkaya Pukan Flood Control Construction of Bohe Lubluban Box Culvert, Tong Bato,

Ungkaya Pukan 1-Unit 2.00 0.00% NYS

2018 Within Ceiling Basilan Ungkaya Pukan Road Concreting of Subah Languyan-Amaloy Road, Ungkaya

Pukan 5.00 5.00 0.00 90.00 0.00% NYS

2018 Within Ceiling Basilan Ungkaya Pukan Road Concreting of Road from National Highway - Danit, Ungkaya

Pukan 2.67 2.67 0.00 46.80 0.00% NYS

2018 Within Ceiling Basilan Ungkaya Pukan Water System Construction of Water Supply Level II, Amaloy, Ungkaya

Pukan 1-Unit 4.00 0.00% NYS

2018 Within Ceiling Basilan Ungkaya Pukan Port Construction of Amaloy Port, Ungkaya Pukan (Phase 2) 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Buadipuso Buntong Road Concreting of Ragondingan-Rantian Road, Buadipuso

Buntong 1.00 1.00 0.00 15.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Buadipuso Buntong Water System Expansion of Brgy Dirisan Water System level II, Buadipuso

Buntong 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Bubong Flood Control Construction of Panalawan River Wall Flood Control, Bubong 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Bumbaran Road Upgrading/ Rehab of Somogut- Frankfort National Road,

Bumbaran 1.00 1.00 0.00 20.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Ditsaan Ramain Bridge Construction of Lilod - Rantian Bridge, Ditsaan Ramain 1-Unit 10.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Ditsaan Ramain Road Concreting of Rantian- Ragondingan Road, Ditsaan Ramain 1.00 1.00 0.00 15.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Ditsaan Ramain Shore Protection Construction of Polo-Darimbangan-Buadi Babai Shoreline

Protection, Ditsaan Ramain 1-Unit 10.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Kapai Flood Control Construction of Pindolonan River Wall Flood Control, Kapai 1-Unit 5.00 0.00% NYS

Page 83: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2018 Within Ceiling Lanao del Sur I Lumba Bayabao Bridge Reconstruction of Buad Lumbac Bridge, Lumba Bayabao mn 15.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Lumba Bayabao Bridge Construction of Lalangitun Bridge (Phase II), Lumba Bayabao 1-Unit 20.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Lumba Bayabao Flood Control Constuction of Macaguiling Riverbank Protection, Lumba

Bayabao 1-Unit 10.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Lumba Bayabao Water System Expansion of Lumba Bayabao Intergrated Water System 1-Unit 25.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Maguing Road Concreting Malungun to Pagalungan Road, Maguing 1.00 1.00 0.00 15.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Maguing Road Concreting of Bato bato- Maguing Proper Road, Maguing 1.00 1.00 0.00 15.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Marantao Port Construction of Lubo Lininding Lake Port, Marantao 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Marantao Road Upgrading/ Rehab of Marantao- Malabang Road ( Marantao

Section), Marantao 1.00 1.00 0.00 25.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Marawi City Drainage Upgrading of Padian Reclamation Drainage System, Marawi

City 1-Unit 15.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Marawi City Drainage Construction of Bito-Marawi Drainage System, Marawi City 1-Unit 25.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Marawi City Drainage Construction of Marawi-Bacung Drainage System, Marawi City 1-Unit 25.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Marawi City Other Infra Expansion/Renovation of DPWH-ARMM Lanao del Sur 1st

DEO (Phase II), Marawi City 1-Unit 15.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Marawi City Road Upgrading/ Widening of Bangon- Biaba Diversion (Phase II),

Marawi City 2.00 2.00 0.00 40.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Marawi City Road Upgrading/ Rehab of Gomesa Avenue, Marawi City 1.00 1.00 0.00 20.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Marawi City Road Concreting of Kabingan-Piagapo Road, Marawi City 0.50 0.50 0.00 15.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Marawi City Road Concreting of New Capitol Road, Marawi City 0.50 0.50 0.00 10.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Marawi City Road Concreting Of Road Bito- Rorogagus Road, Marawi City 1.00 1.00 0.00 15.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Marawi City Road Upgrading/Concreting Marinaut- Caloocan-Timbangalan

Road, Marawi City 2.00 2.00 0.00 30.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Marawi City Water System Expansion of Marawi City Water System, Marawi City 1-Unit 50.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Masiu Port Construction of Rogan Brgy. Alimraya Caramian Lake Port,

Masiu 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Masiu Road Concreting of Muhammad Tangul - Dalog Balt Road, Masiu 1.00 1.00 0.00 15.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Mulondo Flood Control Construction of Rayabala-Baudi Abala River Wall Protection

Flood Control, Mulondo 1-Unit 10.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Mulondo Port Expansion of Dalama Lake Port, Mulondo 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Mulondo Road Upgrading/ Concreting of Raya Balai- Salipongan Lumbaca-

Ingud Road, Mulondo 1.00 1.00 0.00 20.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Piagapo Road Concreting of Udalo-Kalungunan-Linindingan Road (Phase II),

Piagapo 1.00 1.00 0.00 20.00 0.00% NYS

Page 84: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2018 Within Ceiling Lanao del Sur I Piagapo Road Upgrading/Concreting of MSU Bubo Road, Piagapo 1.00 1.00 0.00 15.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Poona Bayabao Road Concreting Ragayan-Bantayao Road, Poona Bayabao 1.00 1.00 0.00 15.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Poona Bayabao Road Concreting Upper Ragayan Road (Phase II), Poona Bayabao 1.00 1.00 0.00 15.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Poona Bayabao Road Concreting of Punud - Taporog Road, Poona Bayabao 1.00 1.00 0.00 15.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Saguiaran Bridge Construction of Box Culvert, Brgy Dilimbayan, Saguiaran 1-Unit 2.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Saguiaran Road Upgrading/Concreting Marawi-Iligan Road, Saguiaran 2.00 2.00 0.00 50.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Saguiaran Road Completion of Kadingilan- Patpangkat Road, Saguiaran 2.00 2.00 0.00 30.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Saguiaran Water System Construction of Water System,Brgy. Linao (Spring Source),

Saguiaran 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Saguiaran Water System Improvement of Batangan Water Supply Level II, Saguiaran 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Tagoloan Bridge Construction of Cadayonan Bridge, along the Tagoloan -

Talakag Road, Tagoloan 1-Unit 100.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Tagoloan Bridge Construction of Bayug Bridge, Tagoloan 1-Unit 25.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Tagoloan Road Concreting of Tagoloan- Bukidnon Bdry Road (Phase III),

Tagoloan 6.00 6.00 0.00 150.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Tamparan Road Upgrading of Dilausan-Sitio Caluntay Mun. Road, Tamparan 1.00 1.00 0.00 15.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Tamparan Road Concreting of Dasomalong -lakelanao Mun. Road, Tamparan 1.00 1.00 0.00 15.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Taraka Bridge Construction of Salvador Concha Bridge (Phase II), Taraka 1-Unit 20.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Taraka Drainage Construction Boriongan Moriatao Luksadato Flood Control,

Taraka 1-Unit 20.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Taraka Road Upgrading/ Concreting of Brgy. Bucalan to National Road,

Taraka 1.00 1.00 0.00 15.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Taraka Road Upgrading of Road from national Highway Sigayan-Dilabayan,

Taraka 1.00 1.00 0.00 15.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Taraka Water System Upgrading/Expansion of Brgy. Moriatao Lucsadatu Water

System, Taraka 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Wao Drainage Construction of Poblacion Drainage Line Canal, Wao 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Lanao del Sur I Wao Road Concreting of Mimbuaya Road, Wao 1.00 1.00 0.00 15.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Bacolod Kalawi Road Concreting of Bubong - Raya Road, Bacolod Kalawi 1.00 1.00 0.00 16.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Balabagan Water System Construction/ Renovation of Balabagan Potable water system

Level II, Balabagan 1-Unit 20.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Balindong Road Concreting of Brgy. Dibarosan, Balindong 1.00 1.00 0.00 17.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Bayang Flood Control Construction of Pamaan-Sapa Lake Wall, Bayang 1-Unit 30.00 0.00% NYS

Page 85: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2018 Within Ceiling Lanao del Sur II Bayang Road Concreting of Bairan - Tangcal Road - Bayang 4.00 4.00 0.00 100.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Bayang Road Construction of Lalapung-Linuk Road , Bayang 3.00 3.00 0.00 75.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Bayang Road Construction/ Opening of Brgy. Linuk-Brgy. Maliwanag Road

Phase I, Bayang 2.00 2.00 0.00 40.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Bayang Water System Construction of Bayang Water System Level II, Bayang 1-Unit 40.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Butig Road Concreting of Butig-Barira Road Phase 4, Butig 3.00 3.00 0.00 50.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Butig Road Concreting of Bayabao Butig Proper-Sundig Road

Circumferential Road, Butig 2.19 2.19 0.00 35.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Butig Water System Construction of Butig Water System Level II, Butig 1-Unit 40.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Calanogas Road Concreting of Sitio Codongan to Sitio carmen Road,

Calanogas 2.00 2.00 0.00 20.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Ganassi Road Concreting of Ganassi - Pagayawan Road (Phase II), Ganassi 2.00 2.00 0.00 40.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Ganassi Road Concreting of Ganassi - Binidayan Road, Ganassi 1.00 1.00 0.00 18.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Ganassi Road Concreting of Pantaon Road, Ganassi 2.00 2.00 0.00 30.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Kapatagan Road Concreting of Barao Falls Access road, Kapatagan 1.00 1.00 0.00 16.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Kapatagan Road Concreting of Barao-Bakikis Road, Kapatagan 1.50 1.50 0.00 19.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Kapatagan Water System Construction of Tabuan Water System Level II, Kapatagan 1-Unit 6.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Kapatagan Water System Construction of Bongabong Water Supply Level II, Kapatagan 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Kapatagan Water System Construction of Kapatagan Water Supply Level II, Kapatagan 1-Unit 20.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Lumbaca Unayan Road Concreting of Proper Beta to Calalon Municipal Road,

Lumbaca Unayan 1.00 1.00 0.00 18.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Lumbatan Road Concreting of Lalapung - Macadar Road, Lumbatan 0.50 0.50 0.00 7.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Lumbatan Road Concreting of Macadar-Bubong-Madaya Road , Lumbatan 2.10 2.10 0.00 32.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Lumbatan Road Concreting of Dalama-Bubong-Lumbaca Bacayawan Road

(Brgy. Dalama, Bubong and Lumbaca Bacayawan), Lumbatan 1.40 1.40 0.00 24.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Lumbatan Road Concreting of Circumferential Road-Lumbatan Government

Site 1.00 1.00 0.00 15.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Lumbatan Road Concreting of Madaya-Minanga Road, Lumbatan 3.00 3.00 0.00 43.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Lumbatan Road Construction of Lumbac Alog-Buad-Dalipuga Road (Brgy.

Lumbac Alog, Buad and Dalipuga), Lumbatan 1.00 1.00 0.00 17.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Lumbatan Road Concreting of Ligue Road, Lumbatan 1.20 1.20 0.00 18.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Lumbatan Water System Construction of Lumbatan Water System Level II, Lumbatan 1-Unit 40.00 0.00% NYS

Page 86: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2018 Within Ceiling Lanao del Sur II Lumbayanague Water System Construction of Lumbayanague Water System Level II,

Lumbayanague 1-Unit 40.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Madalum Road Opening/Construction of Madalum-Munai Road

(Salongabanding-Munai Road), Madalum 2.22 2.22 0.00 40.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Madamba Drainage Construction of Balintad Line Canal, Madamba 1.00 6.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Madamba Road Concreting of Bonong Road, Madamba 1.00 1.00 0.00 12.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Malabang Other Infra Construction of PowerHouse (with Generator Set 200 KVA)

and Stock Room 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Malabang Road Concreting of Bonga - Fabrica - Purakan - Calumbog Road,

Malabang 3.00 3.00 0.00 40.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Picong Road Construction/Concreting of Mapantao-Dabaw Road, (Brgy.

Mapantao-Brgy. Anas Sec.)Picong 2.79 2.79 0.00 50.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Pualas Road Concreting of Illana Dapao Road Phase 4, Pualas 2.50 2.50 0.00 50.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Tubaran Road Concreting of Tangkal Mindamdag Road, Tubaran 2.50 2.50 0.00 35.00 0.00% NYS

2018 Within Ceiling Lanao del Sur II Tugaya Road Concreting of Brgy. Roads @ Brgy. P'tad to Pandiaranao

with Exception, Tugaya 2.10 2.10 0.00 36.00 0.00% NYS

2018 Within Ceiling Maguindanao I Barira Road Const/Concreting of Barira-Butig Road, Barira, Mag. 6.00 6.00 0.00 138.00 0.00% NYS

2018 Within Ceiling Maguindanao I Barira Road Concreting of Panggao - Bualan Taled Road, Barira 1.50 1.50 0.00 27.00 0.00% NYS

2018 Within Ceiling Maguindanao I Buldon Road Concreting of Dinganen-Pigcawayan Road (Phase II), Buldon,

Mag. 1.00 1.00 0.00 20.00 0.00% NYS

2018 Within Ceiling Maguindanao I Buldon Road Conreting of Edcor-Oring Road, Buldon, Mag. 1.40 1.40 0.00 25.20 0.00% NYS

2018 Within Ceiling Maguindanao I Buldon Road Concreting of Road: Karim - Bagiangan - Binaan Falls (Phase

I), Buldon 1.00 1.00 0.00 18.00 0.00% NYS

2018 Within Ceiling Maguindanao I Cotabato City Other Infra Concrete Widening/Reblocking of Gutierrez Ave. (ARMM

Access Road) 0.68 0.68 0.00 25.00 0.00% NYS

2018 Within Ceiling Maguindanao I Cotabato City Other Infra Expansion of ARMM-DPWH Regional Office, Cotabato City 1-unit 0.00 30.00 0.00% NYS

2018 Within Ceiling Maguindanao I Datu Blah Sinsuat Bridge Construction of Matuber Bridge, Datu Blah Sinsuat, Mag. 0.10 110.00 0.00% NYS

2018 Within Ceiling Maguindanao I Datu Blah Sinsuat Road Const/Concreting of Pura-Matuber Coastal Road (Phase 2),

D.B.S, Mag. 1.30 1.30 0.00 29.90 0.00% NYS

2018 Within Ceiling Maguindanao I Datu Blah Sinsuat Water System Construction of Water Supply Level II, Matuber, D.B.S 1-unit 3.50 0.00% NYS

2018 Within Ceiling Maguindanao I Datu Odin Sinsuat Road Concreting of Brgy. Baka-Labungan Road, Phase I, D.O.S 2.00 2.00 0.00 50.00 0.00% NYS

2018 Within Ceiling Maguindanao I Datu Odin Sinsuat Road Concreting of Dulangan Road, D.O.S 1.00 1.00 0.00 18.00 0.00% NYS

2018 Within Ceiling Maguindanao I Datu Odin Sinsuat Road Concreting of Brgy. Tulugan,Dinaig Proper Road, D.O.S 0.50 0.50 0.00 9.00 0.00% NYS

2018 Within Ceiling Maguindanao I Datu Odin Sinsuat Shore Protection Construction of Sea Wall Protection and Guard Rail at Tapian-

Matuber Road, D.O.S, 1-unit 50.00 0.00% NYS

2018 Within Ceiling Maguindanao I Datu Odin Sinsuat Water System Construction of Water Supply Level II, Sitio Cawa, Bugawas,

D.O.S 1-unit 3.50 0.00% NYS

Page 87: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2018 Within Ceiling Maguindanao I Kabuntalan Road Concreting of Maitong-Langeban road, Kabuntalan (Datu

Piang-Kabuntalan) 5.50 5.50 0.00 137.50 0.00% NYS

2018 Within Ceiling Maguindanao I Matanog Road Concreting of Matanog - Pindulunan Road (Phase I), Matanog 2.00 2.00 0.00 36.00 0.00% NYS

2018 Within Ceiling Maguindanao I Northern Kabuntalan Road Concreting of Damatog - Sabaken Road, Northern Kabuntalan 1.00 1.00 0.00 23.00 0.00% NYS

2018 Within Ceiling Maguindanao I Northern Kabuntalan Road Concreting of Labio-Lagumbingan, Northern Kabuntalan, Mag. 0.50 0.50 0.00 9.00 0.00% NYS

2018 Within Ceiling Maguindanao I Parang Port Development of Polloc Port (Phase III), Parang 1-unit 100.00 0.00% NYS

2018 Within Ceiling Maguindanao I Parang Road Concreting of Gadungan - Cabuan Road, Parang 1.00 1.00 0.00 18.00 0.00% NYS

2018 Within Ceiling Maguindanao I Parang Road Concreting of Samberen-Cabuan Road (Phase 1), Parang,

Mag. 1.50 1.50 0.00 25.50 0.00% NYS

2018 Within Ceiling Maguindanao I Parang Road Concreting of Litayen - Tagudtungan Road, Bongo Island,

Parang 1.00 1.00 0.00 23.00 0.00% NYS

2018 Within Ceiling Maguindanao I Sultan Kudarat Road Concreting of Ladia-Darapanan Lake Road, Sultan Kudarat 1.00 1.00 0.00 16.00 0.00% NYS

2018 Within Ceiling Maguindanao I Sultan Kudarat Road Concreting of Banubo - Mulaog - Senditan Road, Sultan

Kudarat 3.00 3.00 0.00 54.00 0.00% NYS

2018 Within Ceiling Maguindanao I Sultan Kudarat Road Concreting of Calsada - Limbo Road, Sultan Kudarat 1.00 1.00 0.00 16.00 0.00% NYS

2018 Within Ceiling Maguindanao I Sultan Kudarat Road Concreting of Limbo - Senditan Road (Phase I), Sultan

Kudarat 1.00 1.00 0.00 20.00 0.00% NYS

2018 Within Ceiling Maguindanao I Sultan Kudarat Road Concreting of Raguisi - Rio Grande Road, Sultan Kudarat 1.00 1.00 0.00 22.00 0.00% NYS

2018 Within Ceiling Maguindanao I Sultan Mastura Port Construction of Simuay Seashore Fish Port, Phase 3, Sultan

Mastura, Mag. 1-unit 20.00 0.00% NYS

2018 Within Ceiling Maguindanao I Sultan Mastura Road Concreting of Limakasako - Tawigen Road, Sultan Mastura 1.00 1.00 0.00 16.00 0.00% NYS

2018 Within Ceiling Maguindanao I Sultan Mastura Road Concreting of Sitio Kinugkungan - Macabiso Road, Sultan

Mastura 1.00 1.00 0.00 16.00 0.00% NYS

2018 Within Ceiling Maguindanao I Sultan Mastura Road Concreting of Namuken - Margues - Tapayan Road, Sultan

Mastura 1.00 1.00 0.00 14.00 0.00% NYS

2018 Within Ceiling Maguindanao I Upi Road Concreting of Renede - Pura Road, Upi 2.30 2.30 0.00 46.00 0.00% NYS

2018 Within Ceiling Maguindanao I Upi Road Concreting of Upi-DOS Provincial Road (Blensong & Nuro

Section), Upi, Mag. 7.00 7.00 0.00 140.00 0.00% NYS

2018 Within Ceiling Maguindanao I Upi Water System Construction of Water Supply Level II, Sitio Kiga, Upi 1-unit 3.50 0.00% NYS

2018 Within Ceiling Maguindanao II Ampatuan Road Concreting of Kauran - Matagabung - Kapimpilan Road

(Phase 1), Ampatuan 2.00 2.00 0.00 30.00 0.00% NYS

2018 Within Ceiling Maguindanao II Buluan Road Upgrading of Kidapawan-Ala Junction Road (Digal Section) 4.00 4.00 0.00 90.00 0.00% NYS

2018 Within Ceiling Maguindanao II Buluan Road Concreting Of Poblacion Streets (Phase 1), Buluan 2.60 2.60 0.00 34.20 0.00% NYS

2018 Within Ceiling Maguindanao II Buluan Road Concreting of Digal Road, Buluan 1.00 1.00 0.00 15.00 0.00% NYS

2018 Within Ceiling Maguindanao II Datu Abdullah Sangki Road Concreting of Old Maganoy and Dimampao - Municipality of

Ampatuan, Datu Abdullah Sangki 1.30 1.30 0.00 19.50 0.00% NYS

Page 88: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2018 Within Ceiling Maguindanao II Datu Abdullah Sangki Road Concreting of Old Maganoy to Dimampao Road to Rajah

Buayan (Phase 1), Datu Abdullah Sangki 1.50 1.50 0.00 30.00 0.00% NYS

2018 Within Ceiling Maguindanao II Datu Abdullah Sangki Road Concreting of Banaba-Tukanarugong Road, Datu Abdullah

Sangki 2.00 2.00 0.00 30.00 0.00% NYS

2018 Within Ceiling Maguindanao II Datu Anggal

Midtimbang Road Concreting of Tulunan - Sitio Glian Road with 2 Box Culvert, Datu Anggal Midtimbang 1.50 1.50 0.00 26.00 0.00% NYS

2018 Within Ceiling Maguindanao II Datu Anggal

Midtimbang Road Concreting of Brar - Sitio Taganeken, Dam , Mag. Service Road (Phase 1), Datu Anggal Midtimbang 1.10 1.10 0.00 17.00 0.00% NYS

2018 Within Ceiling Maguindanao II Datu Hoffer Road Concreting of Road from National Highway to brgy. Tuayan

Mother Proper, Datu Hoffer 2.00 2.00 0.00 30.00 0.00% NYS

2018 Within Ceiling Maguindanao II Datu Montawal Road Concreting of Maridagao Road (Phase 1), Datu Montawal 2.10 2.10 0.00 31.60 0.00% NYS

2018 Within Ceiling Maguindanao II Datu Paglas Road Concreting of Kalomenga - Lomoyon Road, Datu Paglas 1.00 1.00 0.00 15.00 0.00% NYS

2018 Within Ceiling Maguindanao II Datu Paglas Road Concreting of Damalusay - Datang - Napok Road, Datu

Paglas 1.00 1.00 0.00 15.00 0.00% NYS

2018 Within Ceiling Maguindanao II Datu Paglas Road Concreting of Alip - Lomoyon Road (Phase 3), Datu Paglas 0.50 0.50 0.00 10.00 0.00% NYS

2018 Within Ceiling Maguindanao II Datu Piang Road Concreting of Poblacion - Circumferential Road (Phase II),

Datu Piang 0.70 0.70 0.00 11.00 0.00% NYS

2018 Within Ceiling Maguindanao II Datu Piang Road Concreting of Montay - Balong Road, Datu Piang 2.00 2.00 0.00 30.00 0.00% NYS

2018 Within Ceiling Maguindanao II Datu Piang Road Concreting of Mokalid St. Phase II, Datu Piang 0.40 0.40 0.00 6.00 0.00% NYS

2018 Within Ceiling Maguindanao II Datu Salibo Road Concreting of Sambolawan - Andavit Road, Phase 2 (Road

Opening), Datu Salibo 1.00 1.00 0.00 15.00 0.00% NYS

2018 Within Ceiling Maguindanao II Datu Salibo Road Construction of Wye Length (Dulawan - Marbel Road) with

Block Wall Slope Protection, Pagatin Section, Datu Salibo 0.20 0.20 0.00 11.00 0.00% NYS

2018 Within Ceiling Maguindanao II Datu Salibo Road Construction of Channelized intersection (rotonda) Junction

Salbu - Pagatin - Dulawan, Datu Salibo 1.00 1.00 0.00 5.00 0.00% NYS

2018 Within Ceiling Maguindanao II Datu Salibo Road Rehabilitation of Dulawan-Marbel Makar Road (Pagatin

Section), Datu Salibo 0.50 0.50 0.00 15.00 0.00% NYS

2018 Within Ceiling Maguindanao II Datu Saudi Road Concreting of Elian - Gawang Road (Phase 1), Datu Saudi 2.00 2.00 0.00 30.00 0.00% NYS

2018 Within Ceiling Maguindanao II Datu Unsay Bridge Deck Slab Replacement of Meta Bridge Along Marbel Ala Cot.

Road, Datu Unsay 1-UNIT 0.00 5.00 0.00% NYS

2018 Within Ceiling Maguindanao II Datu Unsay Road Concreting of Meta - Iganagampong - Maitumaig Road (Phase

1), Datu Unsay 2.00 2.00 0.00 30.00 0.00% NYS

2018 Within Ceiling Maguindanao II GSKP Road Concreting of Ramcor-Badak Road Phase III, GSKP 1.00 1.00 0.00 20.00 0.00% NYS

2018 Within Ceiling Maguindanao II Guindulungan Road Concreting of Lower Bagan- Kitapok Road (Phase 1),

Guindulungan 1.50 1.50 0.00 30.00 0.00% NYS

2018 Within Ceiling Maguindanao II Mamasapano Road Concreting of Manungkaling - Tugunan Road, Mamasapano 1.50 1.50 0.00 22.50 0.00% NYS

2018 Within Ceiling Maguindanao II Mamasapano Road Concreting of Datu Taup Unto Street (Phase 1), Mamasapano 1.10 1.10 0.00 17.00 0.00% NYS

2018 Within Ceiling Maguindanao II Mamasapano Road Widening of Dulawan-Marbel Makar Road (Libutan Section),

Mamasapano 1.50 1.50 0.00 34.00 0.00% NYS

2018 Within Ceiling Maguindanao II Mangudadatu Road Concreting of Upper Saiden - Panapan & Luayan Road

(Phase 1), Mangudadatu 0.80 0.80 0.00 12.00 0.00% NYS

Page 89: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2018 Within Ceiling Maguindanao II Mangudadatu Road Concreting Of Calean - Tenok - Paitan Road (Phase 1),

Mangudadatu 2.00 2.00 0.00 40.00 0.00% NYS

2018 Within Ceiling Maguindanao II Pagalungan Road Concreting of Poblacion - Kalbugan Road (Phase 1),

Pagalungan 1.50 1.50 0.00 30.00 0.00% NYS

2018 Within Ceiling Maguindanao II Pagalungan Road Concreting of Dungguan, Datu Montawal - Poblacion

Pagalungan Road, Pagalungan Phase (I) 0.90 0.90 0.00 14.73 0.00% NYS

2018 Within Ceiling Maguindanao II Paglat Road Concreting of Riyadh Road (Phase II), Paglat 1.20 1.20 0.00 18.20 0.00% NYS

2018 Within Ceiling Maguindanao II Paglat Road Concreting of Middle East St. Junction Washington St. (Phase

1), Paglat 1.10 1.10 0.00 17.00 0.00% NYS

2018 Within Ceiling Maguindanao II Pandag Road Concreting Of Kayaga Proper - Sitio Talingko Road, Pandag 2.00 2.00 0.00 30.00 0.00% NYS

2018 Within Ceiling Maguindanao II Pandag Road Concreting Of Pandag To Lower D'lag Road (Phase 1),

Pandag 1.50 1.50 0.00 22.50 0.00% NYS

2018 Within Ceiling Maguindanao II Pandag Road Concreting of Malangit - Sinakulay Road, Pandag 1.50 1.50 0.00 22.50 0.00% NYS

2018 Within Ceiling Maguindanao II Pandag Road Concreting of Bakutoy - Paglat, Pandag 1.00 1.00 0.00 15.00 0.00% NYS

2018 Within Ceiling Maguindanao II Pandag Road Concreting Of Lower D'lag to Sitio Bakutoy Road, Pandag 1.50 1.50 0.00 22.50 0.00% NYS

2018 Within Ceiling Maguindanao II Rajah Buayan Road Concreting of Zapakan - Dapantis Road, Rajah Buayan 1.00 1.00 0.00 15.00 0.00% NYS

2018 Within Ceiling Maguindanao II Rajah Buayan Road Concreting of Sampao - Dapantis Road (Phase 1), Rajah

Buayan 2.00 2.00 0.00 30.00 0.00% NYS

2018 Within Ceiling Maguindanao II Shariff Aguak Road Concreting of Lower Satan - Bagong Road (Phase 1), Shariff

Aguak 2.00 2.00 0.00 30.00 0.00% NYS

2018 Within Ceiling Maguindanao II Shariff Aguak Road Concreting of Kitango - Maganoy Road (Phase 3), Shariff

Aguak 0.90 0.90 0.00 13.50 0.00% NYS

2018 Within Ceiling Maguindanao II Shariff Saydona Road Concreting of Sitio Bangkuwang - Sitio Malik Road, Datu Kilay,

Shariff Saydona 1.50 1.50 0.00 22.50 0.00% NYS

2018 Within Ceiling Maguindanao II Shariff Saydona Road Concreting of Sitio Minangat - Sitio Basag Road (Phase 1),

Bakat, Shariff Saydona 0.80 0.80 0.00 12.00 0.00% NYS

2018 Within Ceiling Maguindanao II South Upi Road Concreting of Portion of Romangaob - Pandan Road, South

Upi 1.50 1.50 0.00 22.50 0.00% NYS

2018 Within Ceiling Maguindanao II South Upi Road Concreting Romangaob - San Jose Road (Balete Section)

(Phase 1), South Upi 1.85 1.85 0.00 41.00 0.00% NYS

2018 Within Ceiling Maguindanao II Talayan Road Concreting of Tamar - Marader Road, Talayan 2.40 2.40 0.00 36.00 0.00% NYS

2018 Within Ceiling Maguindanao II Talitay Road Concreting of Gadungan - Pageda Road, Talitay 1.00 1.00 0.00 18.00 0.00% NYS

2018 Within Ceiling Maguindanao II Talitay Road Concreting of Pagada-Tugal (DAM) Road, Talitay 1.00 1.00 0.00 15.00 0.00% NYS

2018 Within Ceiling Sulu I Indanan Road Concreting of Sawaki-Buwahan Road, Indanan 1.00 1.00 0.00 18.36 0.00% NYS

2018 Within Ceiling Sulu I Indanan Road Concreting of Siunugan-Kagay Road, Indanan 1.00 1.00 0.00 18.00 0.00% NYS

2018 Within Ceiling Sulu I Indanan Water System Construction of Indanan Municipal Water System, Level II 1-Unit 35.00 0.00% NYS

2018 Within Ceiling Sulu I Indanan Water System Expansion of Talatak Water System Level II, Indanan 1-Unit 1.00 0.00% NYS

Page 90: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2018 Within Ceiling Sulu I Jolo Port Expansion of South Side Jolo Port,Phase II, Jolo 1-Unit 100.00 0.00% NYS

2018 Within Ceiling Sulu I Jolo Port Rehabilitation of North Side Jolo Port, Jolo 1-Unit 100.00 0.00% NYS

2018 Within Ceiling Sulu I Jolo Port Construction of Fish Landing Port,Serantes,Jolo 1-Unit 20.00 0.00% NYS

2018 Within Ceiling Sulu I Jolo Road Reconstruction of Jolo Airport Road,Jolo 0.50 0.50 0.00 17.00 0.00% NYS

2018 Within Ceiling Sulu I Jolo Road Construction of Jolo Boulevard Phase 1(Coastal Line

Boulevard) 0.25 0.25 0.00 200.00 0.00% NYS

2018 Within Ceiling Sulu I Jolo Road Rehabilitation of Loai Bridge, Jolo 1.00 1.00 0.00 30.00 0.00% NYS

2018 Within Ceiling Sulu I Jolo Road Reconstruction of Tulay Zone 3 Bridge 1.00 1.00 0.00 25.00 0.00% NYS

2018 Within Ceiling Sulu I Jolo Road Improvement/Upgrading of Serantes Fish Market Road, Jolo 1.00 1.00 0.00 18.00 0.00% NYS

2018 Within Ceiling Sulu I Maimbung Road Concreting of Maimbung-Talipao-Panglima Estino Road

(Phase IV) 2.00 2.00 0.00 64.00 0.00% NYS

2018 Within Ceiling Sulu I Maimbung Water System Construction of Maimbung Municipal Water System, Level II 1-Unit 40.00 0.00% NYS

2018 Within Ceiling Sulu I Panglima Tahil Bridge Construction of Footbridge, Kabukan Proper,Kabukan,Hji.

Panglima Tahil 0.35 10.00 0.00% NYS

2018 Within Ceiling Sulu I Panglima Tahil Port Expansion of Port,Poblacion,Bangas,Hadji Panglima Tahil 1-Unit 10.00 0.00% NYS

2018 Within Ceiling Sulu I Panglima Tahil Shore Protection Extension of Likud Seawall, Bangas, Hadji Panglima Tahil 1.00 10.00 0.00% NYS

2018 Within Ceiling Sulu I Pangutaran Road Concreting of Panitikan-Pandan Niog road, Pangutaran 1.00 1.00 0.00 18.00 0.00% NYS

2018 Within Ceiling Sulu I Parang Port Construction of Nunukan Seaport, Parang 1-Unit 20.00 0.00% NYS

2018 Within Ceiling Sulu I Parang Port Expansion of Kanaway port with Pierhead, Parang 1-Unit 20.00 0.00% NYS

2018 Within Ceiling Sulu I Parang Road Reblocking of Kaha-Payuhan Road, Parang 1.00 1.00 0.00 22.00 0.00% NYS

2018 Within Ceiling Sulu I Parang Water System Construction of Parang Municipal Water System, Level II 1-Unit 50.00 0.00% NYS

2018 Within Ceiling Sulu I Parang Water System Construction of Water Supply Level II Brgy. Lipunos, Parang 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Sulu I Parang Water System Construction of Duyan Deep Well, Parang 1-Unit 0.50 0.00% NYS

2018 Within Ceiling Sulu I Parang Water System Construction of Bagsak Deep Well, Parang 1-Unit 0.50 0.00% NYS

2018 Within Ceiling Sulu I Parang Water System Construction of Kaha Water System Level II, Parang 1-Unit 5.00 0.00% NYS

2018 Within Ceiling Sulu I Patikul Port Construction of Pangdanon Port,Patikul 1-Unit 10.00 0.00% NYS

2018 Within Ceiling Sulu I Patikul Port Expansion of Taglibi Port, Patikul 1-Unit 15.00 0.00% NYS

2018 Within Ceiling Sulu I Patikul Road Concreting of Timpok-Sayaw Sayaw Road, Patikul

(Circumferential road) 2.00 2.00 0.00 64.00 0.00% NYS

Page 91: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2018 Within Ceiling Sulu I Patikul Road Concreting of Kaban Kaban - Bagsak-Labanah Road, Patikul 1.00 1.00 0.00 18.00 0.00% NYS

2018 Within Ceiling Sulu I Patikul Road Concreting of Tuwak-Bitih Road, Patikul Sulu 1.00 1.00 0.00 18.00 0.00% NYS

2018 Within Ceiling Sulu I Patikul Road Concreting of Timpok-Niyog Tu Road, Patikul Sulu 1.00 1.00 0.00 18.00 0.00% NYS

2018 Within Ceiling Sulu I Patikul Shore Protection Extention of Taglibi-Kaunayan Seawall , Patikul 0.50 5.00 0.00% NYS

2018 Within Ceiling Sulu I Patikul Shore Protection Construction of Seawall at Bitih Bun Bun, Patikul Sulu 1.00 15.00 0.00% NYS

2018 Within Ceiling Sulu I Patikul Water System Construction of Patikul Municipal Water System, Level II 1-Unit 30.00 0.00% NYS

2018 Within Ceiling Sulu I Patikul Water System Construction of Bitih Bun Bun Water Supply Level II, Patikul 1-Unit 10.00 0.00% NYS

2018 Within Ceiling Sulu I Talipao Water System Construction of Talipao Municipal Water System, Level II 1-Unit 35.00 0.00% NYS

2018 Within Ceiling Sulu II Banguingui Road Concreting of Tubig Datu -Libi, Banguingui 1.20 1.20 0.00 20.40 0.00% NYS

2018 Within Ceiling Sulu II Banguingui Road Concreting of North Paarol - South Paarol, Banguingui 2.81 2.81 0.00 28.10 0.00% NYS

2018 Within Ceiling Sulu II Banguingui Road Concreting of Tainga Bakkaw - Larang Road, Banguingui 1.00 1.00 0.00 17.00 0.00% NYS

2018 Within Ceiling Sulu II Banguingui Road Concreting of Danao-Tambunbubu, Banguingui 2.00 2.00 0.00 32.00 0.00% NYS

2018 Within Ceiling Sulu II Banguingui Water System Construction of Deep Well at Sigumbal, Banguingui 1 unit 0.50 0.00% NYS

2018 Within Ceiling Sulu II Banguingui Water System Construction of Water System Level II at Danao, Banguingui 1 unit 5.00 0.00% NYS

2018 Within Ceiling Sulu II Banguingui Water System Construction of Water System Level II at Dungon, Banguingui 1 unit 5.00 0.00% NYS

2018 Within Ceiling Sulu II Kalingalan Caluang Road Concreting of Lingah - Uwis - Masjid Bayli Road, Kalingalan

Caluang 2.00 2.00 0.00 34.00 0.00% NYS

2018 Within Ceiling Sulu II Kalingalan Caluang Water System Construction of Deep Well at Passal, Kalingalan Caluang 1 unit 0.50 0.00% NYS

2018 Within Ceiling Sulu II Kalingalan Caluang Water System Construction of Deep Well at Kan Mundok, Kalingalan

Caluang 1 unit 0.50 0.00% NYS

2018 Within Ceiling Sulu II Kalingalan Caluang Water System Construction of Deep Well at Karungdong, Kalingalan Caluang 1 unit 0.50 0.00% NYS

2018 Within Ceiling Sulu II Kalingalan Caluang Water System Construction of Deep Well at Niog-Niog, Kalingalan Caluang 1 unit 0.50 0.00% NYS

2018 Within Ceiling Sulu II Lugus Road Concreting of Parian Kayawan - Alu duyong, Lugus 2.00 2.00 0.00 34.00 0.00% NYS

2018 Within Ceiling Sulu II Lugus Road Concreting of Kayawan - Laha, Lugus 2.00 2.00 0.00 34.00 0.00% NYS

2018 Within Ceiling Sulu II Lugus Water System Construction of Gapas Deep Well, Lugus 1 unit 0.50 0.00% NYS

2018 Within Ceiling Sulu II Luuk Bridge Construction of Kabingaan Footbridge, Tapul 1-unit 10.00 0.00% NYS

2018 Within Ceiling Sulu II Luuk Bridge Construction of Tulayan Footbridge, Luuk 1-unit 10.00 0.00% NYS

Page 92: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2018 Within Ceiling Sulu II Luuk Drainage Replacement of Garid Pipe Culvert to Box Culvert along

National Road, Luuk 1-unit 4.00 0.00% NYS

2018 Within Ceiling Sulu II Luuk Drainage Expansion of Box Culvert along National Road, Luuk 1-unit 2.00 0.00% NYS

2018 Within Ceiling Sulu II Luuk Other Infra Construction of DPWH-ARMM SULU II COMPOUND (Phase

II) 1-unit 30.00 0.00% NYS

2018 Within Ceiling Sulu II Luuk Port Construction of Parian Kayawan Port, Lugus 1-Unit 20.00 0.00% NYS

2018 Within Ceiling Sulu II Luuk Port Construction of Seit Higad Seaport, Panamao 1-Unit 15.00 0.00% NYS

2018 Within Ceiling Sulu II Luuk Port Construction of Dungon Port, Banguingui 1-Unit 20.00 0.00% NYS

2018 Within Ceiling Sulu II Luuk Port Construction of Karungdong Port, Kalingalang Caluang

(Phase II) 1-Unit 10.00 0.00% NYS

2018 Within Ceiling Sulu II Luuk Port Construction of Guimbaon Rock Causeway with Pierhead,

Luuk 1-Unit 15.00 0.00% NYS

2018 Within Ceiling Sulu II Luuk Port Expansion of Hambilan Port, Pandami 1-Unit 15.00 0.00% NYS

2018 Within Ceiling Sulu II Luuk Road Concreting of Kan Simba - Kan Busi Road, Luuk 2.00 2.00 0.00 34.00 0.00% NYS

2018 Within Ceiling Sulu II Luuk Road Concreting of Kan Busi - Lianutan Road, Luuk 2.00 2.00 0.00 34.00 0.00% NYS

2018 Within Ceiling Sulu II Luuk Road Concreting of Tubig Putih - Kan Salasain Road, Luuk 1.00 1.00 0.00 17.00 0.00% NYS

2018 Within Ceiling Sulu II Luuk Shore Protection Construction of Tandu Bato Shore Protection Phase II, Luuk 0.15 15.00 0.00% NYS

2018 Within Ceiling Sulu II Luuk Water System Construction of Kan Busi Water System, Luuk 1-unit 20.00 0.00% NYS

2018 Within Ceiling Sulu II Luuk Water System Construction of Deep Well at Tandu Bato, Luuk 1 unit 0.50 0.00% NYS

2018 Within Ceiling Sulu II Luuk Water System Construction of Deep Well at Suligpang, Luuk 1 unit 0.50 0.00% NYS

2018 Within Ceiling Sulu II Luuk Water System Construction of Deep Well at Camp. Andres Elem. School,

Luuk 1 unit 0.50 0.00% NYS

2018 Within Ceiling Sulu II Luuk Water System Construction of Deep Well at Kan Ajim, Luuk 1 unit 0.50 0.00% NYS

2018 Within Ceiling Sulu II Luuk Water System Construction of Deep Well at Kan Asirul, Luuk 1 unit 0.50 0.00% NYS

2018 Within Ceiling Sulu II Omar Drainage Construction of Sucuban - Niangkaan Concrete Open Canal,

Omar 2.00 8.00 0.00% NYS

2018 Within Ceiling Sulu II Omar Road Concreting of Andalan - Huwit-Huwit Road, (Phase II), Omar 2.00 2.00 0.00 34.00 0.00% NYS

2018 Within Ceiling Sulu II Omar Shore Protection Construction of Slope Protection along Sucuban - Niangkaan

Road (Phase II), Omar 1.00 20.00 0.00% NYS

2018 Within Ceiling Sulu II Omar Water System Construction of Deep Well at Kan Muni, Omar 1 unit 0.50 0.00% NYS

2018 Within Ceiling Sulu II Omar Water System Construction of Deep Well at Niangkaan, Omar 1 unit 0.50 0.00% NYS

2018 Within Ceiling Sulu II Panamao Road Concreting of Tiptipon - Sultan Jamalul Kiram, Panamao 1.00 1.00 0.00 17.00 0.00% NYS

Page 93: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2018 Within Ceiling Sulu II Panamao Road Concreting of Tabuh Samal - Kan Sandaan Road, Panamao 2.00 2.00 0.00 34.00 0.00% NYS

2018 Within Ceiling Sulu II Panamao Road Concreting of Lower Patibulan - Bitanag Road, Panamao 2.00 2.00 0.00 34.00 0.00% NYS

2018 Within Ceiling Sulu II Panamao Road Concreting of Siet - Camp Seit, Panamao 1.00 1.00 0.00 17.00 0.00% NYS

2018 Within Ceiling Sulu II Panamao Shore Protection Construction of Brgy. Seit Higad Shore Protection, Panamao 0.80 10.00 0.00% NYS

2018 Within Ceiling Sulu II Panamao Water System Expansion of Sagay-Sagay Water System (Phase V),

Panamao/Kalingalan Caluang 1 unit 80.00 0.00% NYS

2018 Within Ceiling Sulu II Panamao Water System Construction of Deep Well at Bulangsih, Panamao 1 unit 0.50 0.00% NYS

2018 Within Ceiling Sulu II Panamao Water System Construction of Deep Well at Jati, Panamao 1 unit 0.50 0.00% NYS

2018 Within Ceiling Sulu II Panamao Water System Construction of Deep Well at Puhagan, Panamao 1 unit 0.50 0.00% NYS

2018 Within Ceiling Sulu II Panamao Water System Construction of Deep Well at Asin, Panamao 1 unit 0.50 0.00% NYS

2018 Within Ceiling Sulu II Panamao Water System Construction of Deep Well at Viray, Panamao 1 unit 0.50 0.00% NYS

2018 Within Ceiling Sulu II Pandami Road Concreting of Kabbon - Lapak - Bud Sibaud Road, Phase II,

Pandami 2.00 2.00 0.00 34.00 0.00% NYS

2018 Within Ceiling Sulu II Pandami Water System Construction of Deep Well at Siganggang, Pandami 1 unit 0.50 0.00% NYS

2018 Within Ceiling Sulu II Panglima Estino Road Concreting of Gata Gata - Punay Circumferential Road, P.

Estino 2.00 2.00 0.00 50.00 0.00% NYS

2018 Within Ceiling Sulu II Panglima Estino Road Concreting of Marsada Brgy. Road, P. Estino 1.00 1.00 0.00 17.00 0.00% NYS

2018 Within Ceiling Sulu II Panglima Estino Road Concreting of Brgy. Pandakan Road, P.Estino 1.00 1.00 0.00 17.00 0.00% NYS

2018 Within Ceiling Sulu II Panglima Estino Road Concreting of Bud Sibalo Road, P. Estino 1.50 1.50 0.00 25.50 0.00% NYS

2018 Within Ceiling Sulu II Pata Road Concreting of Pisak - Kayawan Road, Pata 1.50 1.50 0.00 25.00 0.00% NYS

2018 Within Ceiling Sulu II Pata Water System Construction of Deep Well at Likud Pata, Pata 1 unit 0.50 0.00% NYS

2018 Within Ceiling Sulu II Pata Water System Construction of Deep Well at Pob. Pata, Pata 1 unit 0.50 0.00% NYS

2018 Within Ceiling Sulu II Siasi Road Concreting of Siasi - Buan Provincial Road, Siasi 2.00 2.00 0.00 50.00 0.00% NYS

2018 Within Ceiling Sulu II Siasi Road Concreting of Siasi Boulevard, Siasi 1.00 1.00 0.00 17.00 0.00% NYS

2018 Within Ceiling Sulu II Siasi Water System Construction of Siasi Peak Water System, Level II, Siasi 1 unit 10.00 0.00% NYS

2018 Within Ceiling Sulu II Siasi Water System Construction of Deep Well at Pob. Siasi, Siasi 1 unit 0.50 0.00% NYS

2018 Within Ceiling Sulu II Tapul Road Concreting of Kan Mangon - Hawan Road, Tapul 1.00 1.00 0.00 17.00 0.00% NYS

2018 Within Ceiling Sulu II Tapul Road Congreting of Banting - Kan away Road, Tapul 2.00 2.00 0.00 34.00 0.00% NYS

Page 94: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2018 Within Ceiling Tawi-Tawi Bridge Construction of Lamion Concrete Footbridge, Bongao 1-unit 10.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Bridge Costruction of Ungus Ungus Concrete Footbridge, Bongao 1-unit 5.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Bridge Construction/ Extension of Mandulan Concrete Footbridge

with Pierhead 1-unit 5.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Bridge Construction of Saluag Concrete Footbridge, Sitangkai 1-unit 10.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Bridge Construction of Tinambak Concrete Footbridge, Sitangkai 1-unit 10.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Bridge Construction of Brgy. Hadji Moctar Concrete Footbridge,

Sibutu 1-unit 5.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Bridge Conctruction of Tangngah Concrete Footbridge, South Ubian 1-unit 5.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Bridge Construction of Bohe Concrete Footbridge, South Ubian 1-unit 5.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Bridge Construction of Laitan Concrete Footbridge, South Ubian 1-unit 5.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Bridge Construction of Tabuh Salasa Concrete Footbridge, Mapun 1-unit 5.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Bridge Construction of Belatan Halo Concrete Footbridge, Panglima

Sugala 1-unit 5.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Bridge Construction of Malacca Concrete Footbridge, Panglima

Sugala 1-unit 5.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Bridge Construction of North Simbay Tahaw Concrete Footbridge,

Languyan 1-unit 5.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Bridge Construction of Simalak Concrete Footbridge, Languyan 1-unit 5.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Bridge Construction of Tambunan Concrete Footbridge with pierhead,

Sapa-Sapa 1-unit 10.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Bridge Construction of Tapian Concrete Footbridge, Tandubas 1-unit 5.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Bridge Construction of Salamat concrete Footbridge, Tandubas 1-unit 5.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Drainage Construction of Tubig Mampallam Drainage System, Bongao 0.50 5.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Drainage Construction/ Rehabilitation of Bongao - Nalil Drainage,

Bongao 0.50 5.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Drainage Construction of GNA Drainage System, Bongao 1.00 10.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Other Infra Construction of Datu Puti viaduct, Sitangkai 0.50 40.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Other Infra Construction of Tung Salagan Viaduct, Sitangkai 0.50 40.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Port Expansion of Bongao Port Phase III, Bongao 1-Unit 80.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Port Expansion of Sitangkai Port with RoRo, Sitangkai 1-Unit 40.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Port Expansion of Mapun Port with roro, Mapun 1-Unit 40.00 0.00% NYS

Page 95: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2018 Within Ceiling Tawi-Tawi Port Expansion of Tandubanak Municipal Port, Sibutu 1-Unit 20.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Port Construction of Taganak Port, Turtle Island 1-Unit 20.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Port Expansion of Ubul Port, Simunul 1-Unit 20.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting/ Rehabilitation of Capitol Access Road, Bongao 0.50 0.50 0.00 12.50 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting/ Rehabilitation of Bongao - Nalil Road, Bongao 0.70 0.70 0.00 24.50 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting/ Rehabilitation of Bongao - Pahut Road, Bongao 0.70 0.70 0.00 24.50 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting/ Rehabilitation of Awwal - Market - Lamion Road,

Bongao 0.70 0.70 0.00 24.50 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting of Tapian Sapa Road, Tandubas 0.60 0.60 0.00 15.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting of Sapah National Road, Mapun 0.70 0.70 0.00 17.50 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting of Nalil Pantay pantay road, Bongao 0.90 0.90 0.00 18.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting of Mandulan - Lambus lambus road, Bongao 0.90 0.90 0.00 18.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting of Motorpool - Simandagit Road, Bongao 0.30 0.30 0.00 5.10 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting of Tubig Tanah - Simandangit Road, Bongao 0.50 0.50 0.00 8.50 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting of Pag-asa Road (Shell Section), Bongao 0.20 0.20 0.00 3.40 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Reblocking of Sea Orchids Road, Bongao 0.50 0.50 0.00 8.50 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting/ Rehab of Daerah Road, Bongao 1.00 1.00 0.00 17.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting of Saldang (Upper Malum) – Katipunan Segment

Road leading to Busay Falls, Panglima Sugala 1.50 1.50 0.00 37.50 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting of Parangan - Balimbing Road, Panglima Sugala 1.00 1.00 0.00 25.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting of Kulape- Bud bud road, Panglima Sugala 0.50 0.50 0.00 12.50 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting of Tarawakan - Marang Marang Road, Languyan 4.00 4.00 0.00 100.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting of Tumahubong - Marang marang, Languyan 2.00 2.00 0.00 50.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting of Tumbagaan road, Languyan 1.00 1.00 0.00 17.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting of Kualabaro road, Languyan 1.00 1.00 0.00 20.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting of Gadjaminah - Palate Road Phase II, Sapa-Sapa 1.00 1.00 0.00 17.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting of Tung Salagan-Coastal Road, Sitangkai 1.50 1.50 0.00 30.00 0.00% NYS

Page 96: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2018 Within Ceiling Tawi-Tawi Road Concreting of Ambutung - Hji Biding Coastal Road, Sibutu 0.40 0.40 0.00 6.80 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting of Panglima Mastul Road, Simunul 1.00 1.00 0.00 20.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting of Laum Tabawan – Likud Tabawan Road, South

Ubian 0.90 0.90 0.00 15.30 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting of Putat – Tahing tahing Beach Road, South Ubian 1.00 1.00 0.00 20.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting of Iruk iruk access road, Mapun 0.50 0.50 0.00 10.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting of Tabulian – Boki road, Mapun 0.50 0.50 0.00 10.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Road Concreting of Dambilah National High School Road, Turtle

Island 0.50 0.50 0.00 10.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Shore Protection Construction of Sumangat Shore Protection, Bongao 0.30 3.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Shore Protection Construction of Luuk Tulay Shore Protection, Bongao 0.50 5.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Shore Protection Construction of Marlboro Cemetry Shore Protection, Bongao 0.50 5.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Shore Protection Construction of Tabunan Shore Protection, Panglima Sugala 0.50 5.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Shore Protection Construction of Darul akram Shore Protection, Languyan 0.68 6.82 0.00% NYS

2018 Within Ceiling Tawi-Tawi Shore Protection Construction of Darusslam Shore Protection, Languyan 0.50 5.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Shore Protection Construction of Kiniktal Shore Protection, Languyan 0.50 5.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Shore Protection Construction of Sapa-Sapa Poblacion Shore Protection, Sapa-

Sapa 0.80 8.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Shore Protection Construction of Kepeng Shore Protection, Tandubas 0.50 5.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Shore Protection Riprapping of Poblacion Rock Causeway (both side), Sitangkai 0.60 6.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Shore Protection Riprapping of Imam Shafie Rock Causeway (both side),

Sitangkai 0.40 4.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Shore Protection Riprapping of Datu Puti Rock Causeway (both side), Sitangkai 0.32 3.20 0.00% NYS

2018 Within Ceiling Tawi-Tawi Shore Protection Construction of Likud Bakkaw Shore Protection, Turtle Island 0.30 3.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Water System Construction of Balimbing Water System level II, Panglima

Sugala 1 unit 10.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Water System Construction of Secubong Water Supply Level II, Sapa-Sapa 1 unit 10.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Water System Construction of Jakarata Water System Level II, Sapa-Sapa 1-unit 10.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Water System Construction of Sapa Water System Level II, Tandubas 1 unit 10.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Water System Construction of Tongmageng Water System Level II, Sitangkai 1 unit 10.00 0.00% NYS

Page 97: LIST OF PROJECTS AND ACCOMPLISHMENTSearmm.wci.com.ph/database_august_2018/ALL PROJECTS.pdfw/ Exceptions) Sultan Kudarat, Mag. 1.30 1.30 1.30 19.50 MUST Enterprises & Construction By

Year Province/DEO Municipality Types of Projects Name of Project/ Location Length/UnitTarget

Length of Road

Length of Paved

Appropriation (M) Implemented by: Mode of

ProcurementPhysical Accomp. Remarks

2018 Within Ceiling Tawi-Tawi Water System Construction of Shiek Makdum Water System Level II, Sibutu 1 unit 10.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Water System Construction of Bohe Palong Palong Water System Level II,

Simunul 1 unit 10.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Water System Construction of Bohe Tabawan Water System, South Ubian 1 unit 10.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Water System Construction of Bintawlan Water System level II, South Ubian 1 unit 10.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Water System Construction of Turtle Island water supply Level II 1 unit 10.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Water System Expansion of Water Supply Level II, Lake Singuang, Mapun 1 unit 20.00 0.00% NYS

2018 Within Ceiling Tawi-Tawi Water System Construction of deepwell at Sitio Tahau, Brgy. Darussalam,

Languyan 1 unit 0.50 0.00% NYS

2018 Within Ceiling Tawi-Tawi Water System Construction of deepwell at Sitio Bubuan, Brgy. Darul Akram,

Languyan 1 unit 0.50 0.00% NYS

2018 Within Ceiling Tawi-Tawi Water System Construction of deepwell at Sitio Kuala Baru, Brgy. Ungusan,

Languyan 1 unit 0.50 0.00% NYS

2018 Within Ceiling Tawi-Tawi Water System Construction of deepwell at Sitio Sugbay, Brgy. Adnin,

Languyan 1 unit 0.50 0.00% NYS

2018 Within Ceiling Tawi-Tawi Water System Construction of deepwell at Sitio Nusa Tubbu, Brgy.

Tumahubong, Languyan 1 unit 0.50 0.00% NYS

2018 Within Ceiling Tawi-Tawi Water System Construction of deepwell , Brgy. Simalac, Languyan 1 unit 0.50 0.00% NYS

2018 Within Ceiling Tawi-Tawi Water System Construction of deepwell, Brgy. Parang Pantay, Languyan 1 unit 0.50 0.00% NYS

2018 Within Ceiling Tawi-Tawi Water System Construction of deepwell at Sitio Pangdanan, Brgy. Kalupag,

Languyan 1 unit 0.50 0.00% NYS

2018 Within Ceiling Tawi-Tawi Water System Construction of deepwell at Sitio Panimusan, Brgy. Tubig

Dakulah, Languyan 1 unit 0.50 0.00% NYS

2018 Within Ceiling Tawi-Tawi Water System Construction of deepwell, Brgy. Bas Bas Likud, Languyan 1 unit 0.50 0.00% NYS