list of the pci candidates for the nsi east gas corridor ... regional meetings/library/gas...list of...

44
PCI Label Part of PCI Cluster List of the PCI candidates for the NSI East Gas corridor - 2017 PCI Label TYNDP Project 6.01 - Cluster CZ-PL interconnection upgrade and related internal reinforcements in Western 6.1 North - South Gas Corridor in Western Poland Poland - Czech Republic interconnection (PL section) Poland-Czech Republic Interconnection (CZ) 3 Project(s) 6.02 - Cluster PL-SK interconnection and related internal reinforcements in Eastern Poland 6.2 North - South Gas Corridor in Eastern Poland Poland - Slovakia interconnection Poland - Slovakia interconnection (PL section) 3 Project(s) 6.05.1 LNG Regasification vessel in Krk (HR) 6.5.1 6.5 LNG terminal Krk 1 Project(s) 6.04 PCI Bidirectional Austrian – Czech interconnection 6.4 Bidirectional Austrian Czech Interconnection (BACI) Bidirectional Austrian-Czech Interconnector (BACI, formerly LBL project) 2 Project(s) 6.05.2 Gas pipeline Zlobin – Bosiljevo – Sisak – Kozarac – Slobodnica (HR) 6.5.2 6.5 LNG Evacuation Pipeline Kozarac-Slobodnica LNG evacuation pipeline Omišalj - Zlobin (Croatia) LNG evacuation pipeline Zlobin-Bosiljevo-Sisak-Kozarac 3 Project(s) 6.08 - Cluster Interconnection between GR and BG and necessary reinforcements in Bulgaria 6.8 Interconnection Bulgaria - Serbia Rehabilitation, Modernization and Expansion of the NTS 2 Project(s) 6.08.2 Necessary rehabilitation, modernization and expansion of the Bulgarian transmission system 6.8.2 6.8 Rehabilitation, Modernization and Expansion of the NTS 1 Project(s) 6.08.1 Interconnection Greece – Bulgaria (IGB) 6.8.1 6.8 Compressor Station Kipi Interconnector Greece-Bulgaria (IGB Project) Metering Station at Komotini to IGB 3 Project(s) 6.09 - Cluster LNG terminal in Northern Greece 6.9 Compressor Station Kipi LNG terminal in northern Greece / Alexandroupolis - LNG Section LNG terminal in northern Greece / Alexandroupolis - Pipeline Section Metering and Regulating Station at Alexandroupoli 4 Project(s) 6.10 PCI Gas Interconnection Bulgaria – Serbia 6.10 Interconnection Bulgaria - Serbia 1 Project(s) 6.09.1 Independent Natural Gas System LNG Greece 6.9.1 6.9 LNG terminal in northern Greece / Alexandroupolis - LNG Section LNG terminal in northern Greece / Alexandroupolis - Pipeline Section 2 Project(s)

Upload: others

Post on 28-Jan-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

PCI Label Part of PCI Cluster

List of the PCI candidates for the NSI East Gas corridor - 2017

PCI Label TYNDP Project

6.01 - Cluster CZ-PL interconnection upgrade and related internal

reinforcements in Western

6.1 North - South Gas Corridor in Western PolandPoland - Czech Republic interconnection (PL section)Poland-Czech Republic Interconnection (CZ)3 Project(s)

6.02 - Cluster PL-SK interconnection and related internal

reinforcements in Eastern Poland

6.2 North - South Gas Corridor in Eastern PolandPoland - Slovakia interconnectionPoland - Slovakia interconnection (PL section)3 Project(s)

6.05.1 LNG Regasification vessel in Krk (HR) 6.5.1 6.5 LNG terminal Krk1 Project(s)

6.04 PCI Bidirectional Austrian – Czech interconnection 6.4 Bidirectional Austrian Czech Interconnection (BACI)Bidirectional Austrian-Czech Interconnector (BACI, formerly LBL project)2 Project(s)

6.05.2 Gas pipeline Zlobin – Bosiljevo – Sisak – Kozarac – Slobodnica

(HR)

6.5.2 6.5 LNG Evacuation Pipeline Kozarac-SlobodnicaLNG evacuation pipeline Omišalj - Zlobin (Croatia) LNG evacuation pipeline Zlobin-Bosiljevo-Sisak-Kozarac3 Project(s)

6.08 - Cluster Interconnection between GR and BG and necessary

reinforcements in Bulgaria

6.8 Interconnection Bulgaria - SerbiaRehabilitation, Modernization and Expansion of the NTS2 Project(s)

6.08.2 Necessary rehabilitation, modernization and expansion of the

Bulgarian transmission system

6.8.2 6.8 Rehabilitation, Modernization and Expansion of the NTS

1 Project(s)

6.08.1 Interconnection Greece – Bulgaria (IGB) 6.8.1 6.8 Compressor Station KipiInterconnector Greece-Bulgaria (IGB Project)Metering Station at Komotini to IGB3 Project(s)

6.09 - Cluster LNG terminal in Northern Greece 6.9 Compressor Station KipiLNG terminal in northern Greece / Alexandroupolis - LNG SectionLNG terminal in northern Greece / Alexandroupolis - Pipeline SectionMetering and Regulating Station at Alexandroupoli4 Project(s)

6.10 PCI Gas Interconnection Bulgaria – Serbia 6.10 Interconnection Bulgaria - Serbia1 Project(s)

6.09.1 Independent Natural Gas System LNG Greece 6.9.1 6.9 LNG terminal in northern Greece / Alexandroupolis - LNG SectionLNG terminal in northern Greece / Alexandroupolis - Pipeline Section2 Project(s)

Page 2: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

List of the PCI candidates for the NSI East Gas corridor - 2017

6.15 Interconnection of the national transmission system with the transit system6.15 Interconnection of the NTS with the DTS and reverse flow at IsacceaNew NTS developments for taking over gas from the Black Sea shore2 Project(s)

6.20 - Cluster increase storage capacity in South-East Europe 6.20 Depomures1 Project(s)

6.18 PCI Adriatica pipeline (IT) 6.18 7.1 Development for new import from the South (Adriatica Line)LARINO - RECANATI Adriatic coast backbone2 Project(s)

6.20.4 Depomures storage in Romania 6.20.4 6.20 Depomures1 Project(s)

6.20.2 Chiren UGS expansion 6.20.2 6.20 UGS Chiren Expansion1 Project(s)

6.20.6 Sarmasel underground gas storage in Romania 6.20.6 Sarmasel undeground gas storage in Romania1 Project(s)

6.20.5 New underground gas storage in Romania 6.20.5 New undergound gas storage in Romania1 Project(s)

6.23 Hungary – Slovenia interconnection 6.23 R15/1 Pince - Lendava - KidričevoSlovenian-Hungarian interconnector2 Project(s)

6.24.1 Romanian-Hungarian reverse flow: Hungarian section 1st stage CS at Csanádpalota (1st phase)6.24.1 Ercsi-SzazhalombattaRomanian-Hungarian reverse flow Hungarian section 1st stageVárosföld-Ercsi-Győr3 Project(s)

6.24.2 Development on the Romanian territory of the National Gas Transmission System on the Bulgaria6.24.2 Development on the Romanian territory of the NTS (BG–RO-HU-AT Corridor)Ercsi-SzazhalombattaVárosföld-Ercsi-Győr3 Project(s)

6.24.3 GCA Mosonmagyarovar CS (development on the Austrian side) (1st phase)6.24.3 Ercsi-SzazhalombattaGCA MosonmagyaróvárVárosföld-Ercsi-Győr3 Project(s)

6.24.4 Városföld-Ercsi– Győr pipeline (HU) (2nd phase) 6.24.4 Ercsi-SzazhalombattaVárosföld-Ercsi-Győr2 Project(s)

6.24.5 Ercsi-Százhalombatta pipeline (HU) (2nd phase) 6.24.5 Ercsi-SzazhalombattaVárosföld-Ercsi-Győr2 Project(s)

6.24.6 Városföld compressor station (HU) (2nd phase) 6.24.6 Ercsi-SzazhalombattaVárosföld CSVárosföld-Ercsi-Győr3 Project(s)

Page 3: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

List of the PCI candidates for the NSI East Gas corridor - 2017

6.24.8 Black Sea shore — Podișor (RO) 6.24.8 Development on the Romanian territory of the Southern Transmission Corridor1 Project(s)

6.24.7 Expansion of the transmission capacity in Romania towards Hungary (2nd phase)6.24.7 Development on the Romanian territory of the NTS (BG–RO-HU-AT Corridor)Ercsi-SzazhalombattaVárosföld-Ercsi-Győr3 Project(s)

6.24.9 Romanian-Hungarian reverse flow: Hungarian section 2nd stage Csanádpalota or Algyő (HU)(2nd p6.24.9 Ercsi-SzazhalombattaRomanian-Hungarian reverse flow Hungarian section 2nd stageVárosföld-Ercsi-Győr3 Project(s)

6.25.1 Eastring : Pipeline system from Bulgaria to Slovakia 6.25.1 Eastring - BulgariaEastring - HungaryEastring - RomaniaEastring - Slovakia4 Project(s)

6.25.2 TESLA : Pipeline system from Greece to Austria 6.25.2 Greek part of Tesla projectMacedonian part of Tesla project2 Project(s)

6.25.3 Further enlargement of the Bulgaria — Romania — Hungary —

Austria bidirectional transmission

6.25.3 Azerbaijan, Georgia, Romania Interconnector - AGRIFurther enlargement of the BG—RO—HU—AT transmission corridor (BRUA) phase 32 Project(s)

6.26.1 Interconnection Croatia — Slovenia (Lučko — Zabok - Rogatec) 6.26.1 Interconnection Croatia/Slovenia (Lučko - Zabok - Rogatec)1 Project(s)

6.25.4 Infrastructure to allow the development of the Bulgarian gas hub 6.25.4 Construction of a Looping CS Provadia – Rupcha villageLooping CS Valchi Dol - Line valve Novi IskarVarna-Oryahovo gas pipeline3 Project(s)

6.26.3 Compressor stations at the Croatian gas transmission system 6.26.3 Compressor stations 2 and 3 at the Croatian gas tranmission system1 Project(s)

6.26.2 CS Kidričevo, 2nd phase of upgrade (SI) 6.26.2 CS Kidričevo, 2nd phase of upgrade 1 Project(s)

6.26.5 Upgrade of Murfeld/Ceršak interconnection (AT-SI) 6.26.5 Upgrade of Murfeld/Ceršak interconnection (M1/3 Interconnection Ceršak)1 Project(s)

6.26.4 GCA 2014/04 Murfeld (AT) 6.26.4 GCA 2015/08: Entry/Exit Murfeld1 Project(s)

6.26.6 Upgrade of Rogatec interconnection 6.26.6 Upgrade of Rogatec interconnection (M1A/1 Interconnection Rogatec)1 Project(s)

Capacity increase at IP Lanžhot entry NEW PCI Capacity increase at IP Lanžhot entry1 Project(s)

Gas interconnection Republic of Macedonia-Greece NEW PCI Nea-Messimvria to FYROM pipeline1 Project(s)

Page 4: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

List of the PCI candidates for the NSI East Gas corridor - 2017

Greek part of TESLA project NEW PCI Greek part of Tesla project1 Project(s)

HU-UA reverse flow NEW PCI HU-UA Interconnector (Ukrainian section)HU-UA reverse flow2 Project(s)

Interconnection Croatia-Bosnia and Herzegovina (South) - Zagvozd-

Imotski-Posušje

NEW PCI Interconnection Croatia-Bosnia and Herzegovina (South)Southern Interconnection pipeline BiH/CRO2 Project(s)

Ionian - Adriatic Pipeline (IAP), Fieri (Alb)-Split (Hr) NEW PCI 7.1 Ionian Adriatic Pipeline1 Project(s)

Metering and Regulating Station at UGS South Kavala NEW PCI South Kavala Underground Gas Storage facility1 Project(s)

Nea Messimvria to FYRoM pipeline NEW PCI Interconnection Macedonia-GreeceNea-Messimvria to FYROM pipeline2 Project(s)

South Kavala Underground Gas Storage facility NEW PCI Metering and Regulating Station at UGS South Kavala1 Project(s)

Poland - Ukraine Gas interconnection NEW PCI Poland - Ukraine Gas interconnection (PL section)Poland-Ukraine Interconnector (Ukrainian section)2 Project(s)

Development of Transmission Capacity at Slovak-Hungarian

interconnector

NEW PCI Development of Transmission Capacity at Slovak-Hungarian interconnector

1 Project(s)

Enhancement of Transmission capacity of Slovak-Hungarian

interconnector

NEW PCI Enhancement of Transmission Capacity of Slovak-Hungarian interconnector

1 Project(s)

Vecsés-Városföld gas transit pipeline in Hungary NEW PCI Vecsés-Városföld gas transit pipeline

1 Project(s)

Page 5: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

TYNDP Project

CodeType Type Code Category Description Host Country Promoter Commercial Operator

TRA-N-247 Pipeline including CS TRA Project The invest m ent t asks wit hin t he pr oject const it ut e essent ial elem ent s of t he planned N or t h-Sout h gas int er connect ions in Cent r al-East er n Eur ope. The cor r idor cover s West er n Poland and it is planned t o be connect ed t o PL-CZ int er connect ion. I m plem ent at ion of t he invest m ent t asks wit hin t his pr oject will allow f or exploit ing f ull pot ent ial of gas t r ansm ission f r om LN G t er m inal Świnoujście and Balt ic Pipe t hr ough t he N or t h-Sout h gas cor r idor t o ot her CEE count r ies. This inf r ast r uct ur e will be used f or pur poses of PL-CZ and PL-SK int er connect ions. I t will also enable t he possibilit y of gas t r ansm ission t o Ukr aine. The invest m ent t asks ar e planned t o be com m issioned in 2018. Poland GAZ-SYSTEM S.A. GAZ-SYSTEM S.A.

TRA-N-273 Pipeline including CS TRA Project The pr oject aim s t o incr ease t he cr oss-bor der capacit y bet ween Poland and t he Czech Republic by est ablishing a lar ge t r anspor t at ion cor r idor t hat will allow f or f lexible t r anspor t of gas in Cent r al-East er n Eur ope wit hin t he N or t h-Sout h cor r idor . The developm ent of t he physical int er connect ion bet ween Poland and t he Czech Republic will cont r ibut e t o r einf or cem ent of t he ef f ect ive oper at ion of t he gas t r ansm ission syst em s, ef f icient gas exchange bet ween t he m ar ket s, as well as incr ease of t he secur it y of supply not only f or Poland and t he Czech Republic, but also f or t he CEE r egion by enabling t he supply link wit h ot her Eur opean gas m ar ket and global LN G m ar ket via t he t er m inal in Świnoujście.The pr oject consist s of Poland-Czech Republic I nt er connect or ( STO RK I I ) and int er nal t r ansm ission pr oject s in Poland and in t he Czech Republic. Det ailed inf or m at ion on t hese pr oject s is pr ovided in subsiquent sect ions in t he pr oject quest ionnair e. Poland GAZ-SYSTEM S.A. GAZ-SYSTEM S.A.

TRA-N-136 Pipeline including CS TRA Project The Pr oject will be a par t of t he Czech and Polish t r ansm ission syst em and will incr ease a cr oss-bor der capacit y bet ween t hese t wo count r ies by est ablishing a lar ge t r anspor t at ion cor r idor t hat will allow a f lexible bidir ect ional t r anspor t of gas in t he Cent r al Eur ope in dir ect ion N or t h-Sout h. The developm ent of t he physical int er connect ion bet ween Poland and t he Czech Republic will cont r ibut e t o r einf or cem ent of t he ef f ect ive oper at ion of t he gas t r ansm ission syst em s, ef f icient gas exchange bet ween t he m ar ket s, it will incr ease secur it y of supply not only in Poland and t he Czech Republic, but also in t he whole CEE r egion by enabling t he supply link wit h t he Eur opean gas m ar ket and global LN G m ar ket via t he Ter m inal in Świnoujście and f ur t her m or e it will incr ease com pet it ion in t he r egion. I n t he Czech Republic t he Pr oject is consist ed of t he f ollowing sub-pr oject s: 1) Poland-Czech Republic I nt er connect or ( STO RK I I ) and 2) Tvr donice-Libhošť pipeline ( including upgr ade of CS Bř eclav) . Czechia NET4GAS, s.r.o. NET4GAS, s.r.o.

TRA-N-245 Pipeline including CS TRA Project The invest m ent t asks wit hin t he pr oject const it ut e essent ial elem ent s of t he planned N or t h-Sout h gas int er connect ions in Cent r al East er n and Sout h East er n Eur ope. The cor r idor cover s East er n Poland and is planned t o be connect ed t o t wo int er connect or s, i.e. Poland – Lit huania ( GI PL) and Poland – Slovakia int er connect ions. I m plem ent at ion of t he pr oject will allow f or signif icant volum es of gas t o be t r anspor t ed via t he cor r idor in East er n Poland t owar ds PL-SK int er connect ion and t he GI PL pr oject . This invest m ent plays a key r ole in t he int egr at ion of Balt ic St at es ( via GI PL) wit h t he CEE r egion along t he N or t h-Sout h axis. I t will also enhance t he access t o t he USG St r achocina t hat have lar ge expansion pot ent ial and m ay ser ve as essent ial secur it y of supply inf r ast r uct ur e in t he CEE r egion. The invest m ent t asks ar e planned t o be com m issioned in 2023. Poland GAZ-SYSTEM S.A. GAZ-SYSTEM S.A.

TRA-N-190 Pipeline including CS TRA Project To build interconnection between Slovak and Polish transmission system and thus increase the Security of Supply in CEE region, and contribute to establishing a well-functioning internal gas market Slovakia eustream, a.s. eustream, a.s.TRA-N-275 Pipeline including CS TRA Project The m ain goal of t he pr oject is t o cr eat e an im por t ant par t of t he N or t h-Sout h gas int er connect ions in Cent r al-East er n Eur ope by im plem ent ing a m issing int er connect ion bet ween t he t r ansm ission syst em s in Poland and Slovakia and, t hus, incr ease t he secur it y of gas supplies in Cent r al-East er n Eur ope t hr ough t he diver sif icat ion of supply sour ces and r out es, as well as int egr at ion of Sub-Car pat hian Mar ket Ar ea and enhancing m ar ket f unct ionalit y.The pr oject consist s of Poland-Slovakia int er connect or and r elavant int er nal t r ansm ission invest m ent s in Poland and in Slovakia t o ensur e f ull f unct ionalit y of t he int er connect ion. Det ailed inf or m at ion on t hese pr oject s is pr ovided in subsiquent s sect ion in t he pr oject quest ionnair e. Poland GAZ-SYSTEM S.A. GAZ-SYSTEM S.A.

TRA-N-133 Pipeline including CS TRA Project The Bidir ect ional Aust r ian Czech I nt er connect ion ( BACI ) will be a new inf r ast r uct ur e dir ect ly connect ing t he Aust r ian and Czech m ar ket . I t will be connect ed t o t he exist ing Czech t r ansm ission syst em via CS Bř eclav ( N ET4GAS s.r .o.) and t o t he Aust r ian t r ansm ission syst em via Baum gar t en ( GAS CO N N ECT AUSTRI A Gm bH) . The pr oject BACI will enable capacit y t r ansm ission f or t he f ir st t im e bet ween t hese t wo EU m em ber st at es and it will f acilit at e bet t er m ar ket int egr at ion bet ween Aust r ia and t he Czech Republic. The pr oject BACI will also incr ease t he over all f lexibilit y of t he Czech, Aust r ian and also Polish syst em by diver sif icat ion of gas supply r out es and by connect ing UGSs in t he Czech Republic and Aust r ia. Czechia NET4GAS, s.r.o. NET4GAS, s.r.o.TRA-N-021 Pipeline including CS TRA Project The Bidir ect ional Aust r ian Czech I nt er connect ion ( BACI ) will be a new inf r ast r uct ur e dir ect ly connect ing t he Aust r ian and Czech m ar ket . I t will be connect ed t o t he exist ing Czech t r ansm ission syst em via CS Bř eclav ( N ET4GAS s.r .o.) and t o t he Aust r ian t r ansm ission syst em via Baum gar t en ( GAS CO N N ECT AUSTRI A Gm bH) . The pr oject BACI will enable capacit y t r ansm ission f or t he f ir st t im e bet ween t hese t wo EU m em ber st at es and it will f acilit at e bet t er m ar ket int egr at ion bet ween Aust r ia and t he Czech Republic. The pr oject BACI will also incr ease t he over all f lexibilit y of t he Czech, Aust r ian and also Polish syst em by diver sif icat ion of gas supply r out es and by connect ing UGSs in t he Czech Republic and Aust r ia. Austria GAS CONNECT AUSTRIA GmbH Gas Connect Austria GmbH

LNG-N-082 LNG Terminal LNG Project The im por t t er m inal f or t he liquef ied nat ur al gas ( LN G) will be sit uat ed in O m išalj on t he I sland of Kr k, Republic of Cr oat ia. The pr oject is planned as a st age developm ent : wit h: 1st st age - FSRU wit h annual send-out capacit y of 1- 4 bcm /y ( accor ding t o FSRU ship and pipeline availabilit y) , 2nd st age - LN G onshor e t er m inal wit h annual send-out capacit y of 3.5 bcm /y, 3r d st age - LN G onshor e t er m inal wit h annual send-out capacit y of 5 bcm /y and 4t h st age - LN G onshor e t er m inal wit h annual send-out capacit y of 8.75 bcm /y. Const r uct ion and t he size of t he onshor e t er m inal will depend on t he m ar ket need. Fut ur e LN G Ter m inal will be an im por t ant par t f or t he secur it y of supply f or Cent r al and Sout h-East er n Eur opean count r ies. Gas supply in t he r egion is heavily dependent on one supply sour ce and t her ef or e LN G t er m inal in Cr oat ia would r epr esent a m ajor diver sif icat ion gas supply r out e in t he r egion. Croatia LNG Hrvatska d.o.o. za poslovanje ukapljenim prirodnim plinom LNG Hrvatska d.o.o.

TRA-N-1058 Pipeline including CS TRA Project Gas pipeline Kozar ac - Slobodnica joint ly wit h gas pipeline syt em Zlobin - Bosiljevo - Sisak-Kozar ac and wit h gas pipeline O m išalj-Zlobin m akes LN G Main Evacuat ion Pipeline connect ing LN G f r om t he LN G solut ion on t he island of Kr k wit h Cent r al East er n Eur opean count ies. The pipeline syst em is a cont inuat ion of t he exist ing Hungar y – Cr oat ia int er connect ion ( gas pipeline Var osf öld-Dr avaszer dahely-Donji Miholjac-Slobodnica) will be connect ed t o t he f ut ur e I onian Adr iat ic Pipeline ( I AP) will be connect ed t o t he f ut ur e LN G solut ion in O m išalj I t will be t he "backbone" of t he Cr oat ian gas syst em . Croatia Plinacro Ltd Plinacro LtdTRA-N-90 Pipeline including CS TRA Project The pipeline is t he connect ion of t he LN G on t he Kr k island wit h t he Cr oat ian gas t r ansm ission syst em . Gas pipeline O m išalj-Zlobin joint ly wit h gas pipeline syst em Zlobin - Bosiljevo - Sisak-Kozar ac and wit h gas pipeline Kozar ac-Slobodnica m akes LN G Main Evacuat ion Pipeline connect ing LN G f r om t he LN G solut ion on t he island of Kr k wit h Cent r al East er n Eur opean count ies. The pipeline is a cont inuat ion of t he exist ing Hungar y – Cr oat ia int er connect ion ( gas pipeline Var osf öld-Dr avaszer dahely-Donji Miholjac-Slobodnica) will be connect ed t o t he f ut ur e I onian Adr iat ic Pipeline ( I AP) will be connect ed t o t he f ut ur e LN G solut ion in O m išalj I t will be t he "backbone" of t he Cr oat ian gas syst em . Croatia Plinacro Ltd Plinacro LtdTRA-N-075 Pipeline including CS TRA Project Gas pipeline Zlobin - Bosiljevo - Sisak – Kozar ac joint ly wit h gas pipeline O m išalj-Zlobin and gas pipeline Kozar ac-Slobodnica m akes LN G Main Evacuat ion Pipeline connect ing LN G f r om t he LN G solut ion on t he island of Kr k wit h Cent r al East er n Eur opean count ies. The pipeline is a cont inuat ion of t he exist ing Hungar y – Cr oat ia int er connect ion ( gas pipeline Var osf öld-Dr avaszer dahely-Donji Miholjac-Slobodnica) will be connect ed t o t he f ut ur e I onian Adr iat ic Pipeline ( I AP) will be connect ed t o t he f ut ur e LN G solut ion in O m išalj I t will be t he "backbone" of t he Cr oat ian gas syst em . Croatia Plinacro Ltd Plinacro Ltd

TRA-F-137 Pipeline including CS TRA Project I BS aim s at connect ing t he nat ional gas t r ansm ission net wor ks of Bulgar ia and Ser bia. I t will be im plem ent ed in 3 st ages. 1st : a pipe will be built f r om N ovi I skar t o Kalot ina, BG ( 62.2 km ) and f r om N is t o Dim it r ovgr ad, SR ( 108 km ) , wit h capacit y f r om BG t o SRB - 1,0 bcm /year , and f r om SRB t o BG - 0.15 bcm /year . 2nd: t he capacit y will be incr eased f r om BG t o SRB t o 2,4 bcm /year , and f r om SRB t o BG t o 0,95 bcm /year , and lat er t o 1,5 bcm /year , by const r uct ion of 2 CSs ( 20 MW each) and 2 new gas pipeline sect ions ( f r om G Bogr ov CS t o N I skar – 19 km and f r om V. O r ašje t o N is – 161 km ) . 3r d: by const r uct ion of t he looping VS Bat ulsi - G Bogr ov CS ( 62 km ) t he capacit y f r om BG t o SRB will be incr eased t o 3,2 bcm /year . I n t he dir ect ion f r om SRB t o BG t he const r uct ion of t he pipeline Bat ajnica - V O r ašje ( 116 km ) will ensur e t r ansm ission of 2 bcm / year , and t he const r uct ion of CS Bat očina ( 20 MW) will incr ease t he capacit y f r om 2.0 bcm /year t o up t o 2.5 bcm /y. Bulgaria Ministry of Energy IBS Future Operator

TRA-N-298 Pipeline including CS TRA Project A m ult icom ponent pr oject which consist s of dif f er ent act ions f or r ehabilit at ion, m oder nizat ion and expansion of t he exist ing gas t r ansm ission inf r ast r uct ur e in Bulgar ia and includes act ivit ies on: CSs m oder nizat ion, inspect ions, r epair and r eplacem ent of pipeline sect ions, expansion of t he exist ing net wor k and im plem ent at ion of syst em s f or opt im izat ion of t he m anagem ent pr ocess of t he net wor k t echnical condit ion. Taking int o account t he com plex nat ur e of t he pr oject , a 3 phases im plem ent at ion is envisaged:Phase 1: Unif ies t he act ions under t aken in t he per iod 2013-2015, planned t o be f inalized in a shor t t er m and f unded wit h BTG own r esour ces.Phase 2: I ncludes act ions planned t o be init iat ed in 2016. They r epr esent logic cont inuat ion of t he over all r ealizat ion of t he pr oject f ollowing t he im plem ent at ion of Phase 1. Phase 3: Condit ional inf r ast r uct ur e necessar y af t er t aking t he FI D f or st age 2 of t he I nt er connect ion Bulgar ia – Ser bia. Bulgaria Bulgartransgaz EAD Bulgartransgaz EAD

TRA-N-128 Pipeline including CS TRA Project The pr oject consist s of a Com pr essor St at ion on t he GR side of t he GR/TK bor der aim ing at incr easing t he capacit y of t he Gr eek t r ansm ission syst em in or der t o m ake possible t he t r ansm ission of nat ur al gas t o t he Gr eek and Eur opean m ar ket s wit h t he use of downst r eam t r ansm ission syst em s. Depending on t he var iant t hat will be im plem ent ed t he conf igur at ion will be ( 1+1) x 4.5 MW or ( 1+1) x 9.7 MW or ( 2+1) x 9.7 MW. Greece DESFA S.A. DESFA S.A.TRA-F-378 Pipeline including CS TRA Project Construction of a bi-directional gas interconnector between the high pressure natural gas systems of Greece and Bulgaria with a technical forward capacity of 3bcm/y, capable to be increased to 5 bcm/y with the installation of a Compressor Station Bulgaria ICGB a.d. ICGB a.d.TRA-N-957 Pipeline including CS TRA Project The project consists of a Metering staton that will enable the Gas Transmission System of Greece to supply gas into the IGB pipeline. Greece DESFA S.A. DESFA S.A.

TRA-N-298 Pipeline including CS TRA Project A m ult icom ponent pr oject which consist s of dif f er ent act ions f or r ehabilit at ion, m oder nizat ion and expansion of t he exist ing gas t r ansm ission inf r ast r uct ur e in Bulgar ia and includes act ivit ies on: CSs m oder nizat ion, inspect ions, r epair and r eplacem ent of pipeline sect ions, expansion of t he exist ing net wor k and im plem ent at ion of syst em s f or opt im izat ion of t he m anagem ent pr ocess of t he net wor k t echnical condit ion. Taking int o account t he com plex nat ur e of t he pr oject , a 3 phases im plem ent at ion is envisaged:Phase 1: Unif ies t he act ions under t aken in t he per iod 2013-2015, planned t o be f inalized in a shor t t er m and f unded wit h BTG own r esour ces.Phase 2: I ncludes act ions planned t o be init iat ed in 2016. They r epr esent logic cont inuat ion of t he over all r ealizat ion of t he pr oject f ollowing t he im plem ent at ion of Phase 1. Phase 3: Condit ional inf r ast r uct ur e necessar y af t er t aking t he FI D f or st age 2 of t he I nt er connect ion Bulgar ia – Ser bia. Bulgaria Bulgartransgaz EAD Bulgartransgaz EAD

TRA-N-128 Pipeline including CS TRA Project The pr oject consist s of a Com pr essor St at ion on t he GR side of t he GR/TK bor der aim ing at incr easing t he capacit y of t he Gr eek t r ansm ission syst em in or der t o m ake possible t he t r ansm ission of nat ur al gas t o t he Gr eek and Eur opean m ar ket s wit h t he use of downst r eam t r ansm ission syst em s. Depending on t he var iant t hat will be im plem ent ed t he conf igur at ion will be ( 1+1) x 4.5 MW or ( 1+1) x 9.7 MW or ( 2+1) x 9.7 MW. Greece DESFA S.A. DESFA S.A.LNG-N-062 LNG Terminal LNG Project Please not e t hat t his par t r ef er s only t o LN G sect ion of t he Pr oject , i.e. t he f loat ing t er m inal and it s Moor ing syst em . The Pipeline sect ion of t he Pr oject is addr essed in TRA-N -063. The pr oject consist s of an LN G of f shor e Float ing St or age Regasif icat ion Unit , a Moor ing & a Pipeline syst em ( 24km Subsea and 4km O nshor e) , connect ing t he f loat ing unit t o t he Gr eek N at ional N at ur al Gas Syst em at t he ar ea of Am f it r it i, 5.5km N E of Alexandr oupolis wher e, DESFA, t he N N GS TSO , will build a m et er ing & r egulat ing st at ion. The f loat ing unit , will be st at ioned in t he sea of Thr ace, 17.6km SW of Alexandr oupolis in N E Gr eece, at an of f shor e dist ance of 5.4 n.m . f r om t he near est shor e. I t will have up t o 170.000m 3 LN G st or age capacit y and a gas send out capacit y of 700.000 N m 3/h cor r esponding t o 6.1bcm /y. Greece Gastrade S.A. Gastrade S.A.TRA-N-063 Pipeline including CS TRA Project Please not e t hat t his par t r ef er s only t o t he pipeline sect ion of t he Pr oject . The LN G sect ion of t he Pr oject is addr essed in LN G-N -062. The pr oject consist s of an LN G of f shor e Float ing St or age Regasif icat ion Unit , a Moor ing & a Pipeline syst em ( 24km Subsea and 4km O nshor e) , connect ing t he f loat ing unit t o t he Gr eek N at ional N at ur al Gas Syst em at t he ar ea of Am f it r it i, 5.5km N E of Alexandr oupolis wher e, DESFA, t he N N GS TSO , will build a m et er ing & r egulat ing st at ion. The r egasif ied LN G will be t r ansm issioned f r om t he f loat ing unit t o t he 30'' subsea and onshor e pipeline t hr ough a Pipeline End Manif old. A valve st at ion will be est ablished t o t he shor e-cr ossing point of t he pipeline. The m axim um capacit y of t he pipeline is 6.1 bcm /y. Greece Gastrade S.A. Gastrade S.A.TRA-N-1090 Pipeline including CS TRA Project The project consists of the implementation of one Metering and Regulating Station at Alexandroupoli (Amphitriti) for the potential intrconnection of the Greek transmission system with the LNG terminal in Northern Greece. Greece DESFA S.A. DESFA S.A.

LNG-N-062 LNG Terminal LNG Project Please not e t hat t his par t r ef er s only t o LN G sect ion of t he Pr oject , i.e. t he f loat ing t er m inal and it s Moor ing syst em . The Pipeline sect ion of t he Pr oject is addr essed in TRA-N -063. The pr oject consist s of an LN G of f shor e Float ing St or age Regasif icat ion Unit , a Moor ing & a Pipeline syst em ( 24km Subsea and 4km O nshor e) , connect ing t he f loat ing unit t o t he Gr eek N at ional N at ur al Gas Syst em at t he ar ea of Am f it r it i, 5.5km N E of Alexandr oupolis wher e, DESFA, t he N N GS TSO , will build a m et er ing & r egulat ing st at ion. The f loat ing unit , will be st at ioned in t he sea of Thr ace, 17.6km SW of Alexandr oupolis in N E Gr eece, at an of f shor e dist ance of 5.4 n.m . f r om t he near est shor e. I t will have up t o 170.000m 3 LN G st or age capacit y and a gas send out capacit y of 700.000 N m 3/h cor r esponding t o 6.1bcm /y. Greece Gastrade S.A. Gastrade S.A.TRA-N-063 Pipeline including CS TRA Project Please not e t hat t his par t r ef er s only t o t he pipeline sect ion of t he Pr oject . The LN G sect ion of t he Pr oject is addr essed in LN G-N -062. The pr oject consist s of an LN G of f shor e Float ing St or age Regasif icat ion Unit , a Moor ing & a Pipeline syst em ( 24km Subsea and 4km O nshor e) , connect ing t he f loat ing unit t o t he Gr eek N at ional N at ur al Gas Syst em at t he ar ea of Am f it r it i, 5.5km N E of Alexandr oupolis wher e, DESFA, t he N N GS TSO , will build a m et er ing & r egulat ing st at ion. The r egasif ied LN G will be t r ansm issioned f r om t he f loat ing unit t o t he 30'' subsea and onshor e pipeline t hr ough a Pipeline End Manif old. A valve st at ion will be est ablished t o t he shor e-cr ossing point of t he pipeline. The m axim um capacit y of t he pipeline is 6.1 bcm /y. Greece Gastrade S.A. Gastrade S.A.

TRA-F-137 Pipeline including CS TRA Project I BS aim s at connect ing t he nat ional gas t r ansm ission net wor ks of Bulgar ia and Ser bia. I t will be im plem ent ed in 3 st ages. 1st : a pipe will be built f r om N ovi I skar t o Kalot ina, BG ( 62.2 km ) and f r om N is t o Dim it r ovgr ad, SR ( 108 km ) , wit h capacit y f r om BG t o SRB - 1,0 bcm /year , and f r om SRB t o BG - 0.15 bcm /year . 2nd: t he capacit y will be incr eased f r om BG t o SRB t o 2,4 bcm /year , and f r om SRB t o BG t o 0,95 bcm /year , and lat er t o 1,5 bcm /year , by const r uct ion of 2 CSs ( 20 MW each) and 2 new gas pipeline sect ions ( f r om G Bogr ov CS t o N I skar – 19 km and f r om V. O r ašje t o N is – 161 km ) . 3r d: by const r uct ion of t he looping VS Bat ulsi - G Bogr ov CS ( 62 km ) t he capacit y f r om BG t o SRB will be incr eased t o 3,2 bcm /year . I n t he dir ect ion f r om SRB t o BG t he const r uct ion of t he pipeline Bat ajnica - V O r ašje ( 116 km ) will ensur e t r ansm ission of 2 bcm / year , and t he const r uct ion of CS Bat očina ( 20 MW) will incr ease t he capacit y f r om 2.0 bcm /year t o up t o 2.5 bcm /y. Bulgaria Ministry of Energy IBS Future Operator

Promoter

GAZ-SYSTEM S.A.GAZ-SYSTEM S.A.NET4GAS, s.r.o.

GAZ-SYSTEM S.A.eustream, a.s.GAZ-SYSTEM S.A.

LNG Hrvatska d.o.o. za poslovanje ukapljenim prirodnim plinom

NET4GAS, s.r.o.GAS CONNECT AUSTRIA GmbH

Plinacro LtdPlinacro LtdPlinacro Ltd

Ministry of EnergyBulgartransgaz EAD

Bulgartransgaz EAD

DESFA S.A.ICGB a.d.DESFA S.A.

DESFA S.A.Gastrade S.A.Gastrade S.A.DESFA S.A.

Ministry of Energy

Gastrade S.A.Gastrade S.A.

Page 6: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

TRA-N-139 Pipeline including CS TRA Project Romania SNTGN Transgaz SA SNTGN Transgaz S.A.

TRA-N-964 Pipeline including CS TRA Project The project consists of the NTS extension for creating an additional overtaking point for the offshore Black Sea blocks gas. In this respect it is considered the building of a transmission pipeline approximately 25 – 30-km long, from the Black Sea shore to the existing T1 international transmission pipeline. Romania SNTGN Transgaz SA SNTGN Transgaz S.A.

TRA-N-007 Pipeline including CS TRA Project The project consists in new on-shore pipeline and compressor station along the center-south of Italy that will allow the increase of transport capacity at new or existing Entry Points in south Italy. Italy Snam Rete Gas S.p.A. Snam Rete Gas S.p.A.

TRA-N-974 Pipeline including CS TRA Project Com plet e t he r ealisat ion of a Gas Tr anpor t at ion syst em on Adr iat ic coast .The pr oject f or sees t he developm ent under 5 phases of t he m ain backbone and t he com pr ession st at ion. O f t hese 5 phases, one sect ion is alr eady com plet ed and anot her one is under const r uct ion. - 1 Const r uct ion of 110 km 24" LARI N O -CHI ETI - 55 km 20" CHI ETI - CELLI N O ( alr eady com plet ed and r unning) - 90 km 20" CELLI N O - SAN MARCO ( 15 km com plet ed and 75 km under const r uct ion) - Const r uct ion of 32 km 24" SAN MARCO Recanat i- Const r uct ion 3 MW com pr ession st at ion SAN MARCO Italy Società Gasdotti Italia Società Gasdotti Italia

UGS-N-233 Storage Facility UGS Project The pr oject consist s in t he r evam ping and expansion of an exist ing gas st or age f acilit y of 300 m cm sit uat ed in Tar gu Mur es, Cent r al Rom ania. The r at ionale of t he pr oject is t hr ee f old ( i) incr ease oper at ional independence by building it s own com pr ession unit as cur r ent ly com pr ession ser vices ar e r ent ed f r om anot her par t y ( ii) gr adually expand t he st or age capacit y ( f r om 300 m cm t o 400 m cm in a f ir st st age and t o 600 m cm in a second st age) and ( iii) incr ease f lexibilit y of t he st or age by incr easing inject ion and wit hdr awing capacit y f r om t he exist ing aver age 1.7 m cm / day t o appr ox. 5.0 m cm /day af t er im plem ent at ion of t he second st age. The im plem ent at ion of t he f ir st st age has alr eady been init iat ed wit h a par t ial invest m ent t o be f inalized in 2016, while t he FI D f or t he ent ir e phase I of t he developm ent pr oject is expect ed in 2016. Romania Engie Romania SA Depomures

UGS-N-138 Storage Facility UGS Project Ca pa city incre a se of the only ga s stora ge fa ci l ity on the te rritory of Bulga ria in orde r to a chie ve la rge r ga s volum e s store d, incre a se d ga s re se rvoir pre ssure s a nd highe r da ily a ve ra ge inje ction a nd withdra wa l flowra te s. T he proje ct provide s for the incre a se in the working ga s volum e up to 1 bcm a nd incre a se in the inje ction a nd withdra wa l ra te up to 8 – 10 m cm /da y. Bulgaria Bulgartransgaz EAD Bulgartransgaz EAD

UGS-N-233 Storage Facility UGS Project The pr oject consist s in t he r evam ping and expansion of an exist ing gas st or age f acilit y of 300 m cm sit uat ed in Tar gu Mur es, Cent r al Rom ania. The r at ionale of t he pr oject is t hr ee f old ( i) incr ease oper at ional independence by building it s own com pr ession unit as cur r ent ly com pr ession ser vices ar e r ent ed f r om anot her par t y ( ii) gr adually expand t he st or age capacit y ( f r om 300 m cm t o 400 m cm in a f ir st st age and t o 600 m cm in a second st age) and ( iii) incr ease f lexibilit y of t he st or age by incr easing inject ion and wit hdr awing capacit y f r om t he exist ing aver age 1.7 m cm / day t o appr ox. 5.0 m cm /day af t er im plem ent at ion of t he second st age. The im plem ent at ion of t he f ir st st age has alr eady been init iat ed wit h a par t ial invest m ent t o be f inalized in 2016, while t he FI D f or t he ent ir e phase I of t he developm ent pr oject is expect ed in 2016. Romania Engie Romania SA Depomures

UGS-N-366 Storage Facility UGS Project Sever al opt ions f or t he const r uct ion of a new gas st or age f acilit y in deplet ed gas f ield ( onshor e) t o be consider ed. The pr oject t o be locat ed in t he East er n par t of Rom ania ( Moldova r egion) , near Falt iceni.The locat ion of t he deplet ed r eser voir s t o be conver t ed int o UGS was det er m ined accor ding t o t he f ollowing cr it er ia:- t he envisaged r eser voir s allow t he const r uct ion of a sm all-m edium sized UGS of 200 m illion m 3/cycle, wit h f ut ur e developm ent possibilit ies;- t he locat ion is next t o ar eas wit h consum pt ion def icit and ver y low t em per at ur es dur ing wint er season;- t he UGS is t o be locat ed near im por t ant indust r ial gas consum er s and households- it m ay be used f or incr easing t he secur it y of supply in Rom ania and f or f acilit at ing possible gas expor t s t o Republic of Moldova- exist ing pr oject s t o develop gas r esour ces in t he Black Sea and t he possibilit y t o cr eat e int er connect ions t o pr oject s par t of t he sout her n Eur opean t r ansm ission cor r idor - m ain pipeline close t o t he ar ea Romania Societatea Naţională de Gaze Naturale ROMGAZ S.A. SNTGN Romgaz S.A.

UGS-N-371 Storage Facility UGS Project I m pr ovem ent of t he inject ion capacit y of t he seasonal st or age f acilit y and inst allat ion of com pr essor s at UGS Sar m asel. Pr oject m ay gr eat ly cont r ibut e t o incr easing t he over all UGS capacit y in Sout h-East Eur ope by connect ing Sar m asel UGS t o “Bulgar ia-Rom ania-Hungar y-Aust r ia Cor r idor ” , a pr oject developed by SN TGN Tr ansgaz S.A. Medias, consist ing of gr adual const r uct ion of a new gas t r ansm ission line bet ween Podisor Technological N ode and Hor ia gas m et er ing st at ion.The pr oject consist s of :1 incr easing t he wor king capacit y of Sar m asel UGS by 650 m illion m 3, up t o a t ot al of 1,550 m illion m 3/cycle wit h a cushion gas of 1,130 m illion m 3;2 incr easing t he secur it y and ef f iciency of Sar m asel UGS3 incr easing t he ener gy secur it y by ensur ing a higher volum e of st or ed gas ( incr ease of appr oxim at ely 18% ) .4 incr easing t he daily deliver y capacit y by 3 m illion m 3/day.5 lower ing t he dependence on im por t gas dur ing wint er t im e by appr oxim at ely 40% on a daily basis. Romania Societatea Naţională de Gaze Naturale ROMGAZ S.A. SNTGN Romgaz S.A.

TRA-N-112 Pipeline including CS TRA Project Inte rconne ctor with the tra nsm ission syste m of the Hunga ria n T SO. Cross-borde r tra nsm ission, e na bling a cce ss to unde rground stora ge s in Hunga ry for S love nia n ga s supplie rs, e na bling a cce ss to LNG te rm ina ls in northe rn Adria tic a nd othe r ga s source s for Hunga ria n ga s supplie rs.PCI 6 .23 . Hunga ry – S love nia inte rconne ction (Na gyka nizsa - T ornyisze ntm iklós (HU) - Le nda va (S I) - Kidriče vo) Slovenia Plinovodi d.o.o. Plinovodi d.o.o.TRA-N-325 Pipeline including CS TRA Project Hungary – Slovenia interconnection will establish a bidirectional interconnection between Slovenian and Hungarian gas transmission systems and with that a connection of national gas markets. Hungary FGSZ Ltd. FGSZ Ltd.

TRA-N-061 Pipeline including CS TRA Project Ne w pipe line be twe e n E rcsi a nd Sza zha lom ba tta node s, DN800 PN63 , 11 km .T he 11 km long pipe line conne cting the Vá rosföld-E rcsi-Győr pipe line a t E rcsi to the Buda pe st ring a t S zá zha lom ba tta (Ce ntra l Hunga ry) – it incre a se s the ca pa city of the HU-SK inte rconne ctor up to 152 GWh/d; 600 000 m 3/h (a t 15 °C) in both dire ctions in the FGSZ syste m . Hungary FGSZ Ltd. FGSZ Ltd.TRA-N-286 Pipeline including CS TRA Project A new compressor station at Csanádpalota with 2 units (4.5 MW each) - necessary to create pressure conditions for the transportation capacity of 1.75 bcm/a from and towards Romania. Hungary FGSZ Ltd. FGSZ Ltd.TRA-N-018 Pipeline including CS TRA Project Pipe line be twe e n Vá rosföld-E rcsi a nd Győr node s, DN1000 , PN100 , 210 km .T his proje ct wil l e na ble the Mosonm a gya rova r inte rconne ction point to re a ch its ful l ca pa city of 153 GWh/d from Austria to Hunga ry. It wil l a lso e na ble the Mosonm a gya rova r inte rconne ction point to re a lize re ve rse flow ca pa city up to 153 GWh/d from Hunga ry to Austria a s we ll . Hungary FGSZ Ltd. FGSZ Ltd.

TRA-N-358 Pipeline including CS TRA Project Romania SNTGN Transgaz S.A. SNTGN Transgaz S.A.

TRA-N-061 Pipeline including CS TRA Project Ne w pipe line be twe e n E rcsi a nd Sza zha lom ba tta node s, DN800 PN63 , 11 km .T he 11 km long pipe line conne cting the Vá rosföld-E rcsi-Győr pipe line a t E rcsi to the Buda pe st ring a t S zá zha lom ba tta (Ce ntra l Hunga ry) – it incre a se s the ca pa city of the HU-SK inte rconne ctor up to 152 GWh/d; 600 000 m 3/h (a t 15 °C) in both dire ctions in the FGSZ syste m . Hungary FGSZ Ltd. FGSZ Ltd.TRA-N-018 Pipeline including CS TRA Project Pipe line be twe e n Vá rosföld-E rcsi a nd Győr node s, DN1000 , PN100 , 210 km .T his proje ct wil l e na ble the Mosonm a gya rova r inte rconne ction point to re a ch its ful l ca pa city of 153 GWh/d from Austria to Hunga ry. It wil l a lso e na ble the Mosonm a gya rova r inte rconne ction point to re a lize re ve rse flow ca pa city up to 153 GWh/d from Hunga ry to Austria a s we ll . Hungary FGSZ Ltd. FGSZ Ltd.

TRA-N-061 Pipeline including CS TRA Project Ne w pipe line be twe e n E rcsi a nd Sza zha lom ba tta node s, DN800 PN63 , 11 km .T he 11 km long pipe line conne cting the Vá rosföld-E rcsi-Győr pipe line a t E rcsi to the Buda pe st ring a t S zá zha lom ba tta (Ce ntra l Hunga ry) – it incre a se s the ca pa city of the HU-SK inte rconne ctor up to 152 GWh/d; 600 000 m 3/h (a t 15 °C) in both dire ctions in the FGSZ syste m . Hungary FGSZ Ltd. FGSZ Ltd.TRA-N-423 Pipeline including CS TRA Project Current planning based on market indications. Potential connection to projects for the potential establishment of a Southern Corridor. Austria GAS CONNECT AUSTRIA GmbH Gas Connect Austria GmbH

TRA-N-018 Pipeline including CS TRA Project Pipe line be twe e n Vá rosföld-E rcsi a nd Győr node s, DN1000 , PN100 , 210 km .T his proje ct wil l e na ble the Mosonm a gya rova r inte rconne ction point to re a ch its ful l ca pa city of 153 GWh/d from Austria to Hunga ry. It wil l a lso e na ble the Mosonm a gya rova r inte rconne ction point to re a lize re ve rse flow ca pa city up to 153 GWh/d from Hunga ry to Austria a s we ll . Hungary FGSZ Ltd. FGSZ Ltd.

TRA-N-061 Pipeline including CS TRA Project Ne w pipe line be twe e n E rcsi a nd Sza zha lom ba tta node s, DN800 PN63 , 11 km .T he 11 km long pipe line conne cting the Vá rosföld-E rcsi-Győr pipe line a t E rcsi to the Buda pe st ring a t S zá zha lom ba tta (Ce ntra l Hunga ry) – it incre a se s the ca pa city of the HU-SK inte rconne ctor up to 152 GWh/d; 600 000 m 3/h (a t 15 °C) in both dire ctions in the FGSZ syste m . Hungary FGSZ Ltd. FGSZ Ltd.TRA-N-018 Pipeline including CS TRA Project Pipe line be twe e n Vá rosföld-E rcsi a nd Győr node s, DN1000 , PN100 , 210 km .T his proje ct wil l e na ble the Mosonm a gya rova r inte rconne ction point to re a ch its ful l ca pa city of 153 GWh/d from Austria to Hunga ry. It wil l a lso e na ble the Mosonm a gya rova r inte rconne ction point to re a lize re ve rse flow ca pa city up to 153 GWh/d from Hunga ry to Austria a s we ll . Hungary FGSZ Ltd. FGSZ Ltd.

TRA-N-061 Pipeline including CS TRA Project Ne w pipe line be twe e n E rcsi a nd Sza zha lom ba tta node s, DN800 PN63 , 11 km .T he 11 km long pipe line conne cting the Vá rosföld-E rcsi-Győr pipe line a t E rcsi to the Buda pe st ring a t S zá zha lom ba tta (Ce ntra l Hunga ry) – it incre a se s the ca pa city of the HU-SK inte rconne ctor up to 152 GWh/d; 600 000 m 3/h (a t 15 °C) in both dire ctions in the FGSZ syste m . Hungary FGSZ Ltd. FGSZ Ltd.TRA-N-018 Pipeline including CS TRA Project Pipe line be twe e n Vá rosföld-E rcsi a nd Győr node s, DN1000 , PN100 , 210 km .T his proje ct wil l e na ble the Mosonm a gya rova r inte rconne ction point to re a ch its ful l ca pa city of 153 GWh/d from Austria to Hunga ry. It wil l a lso e na ble the Mosonm a gya rova r inte rconne ction point to re a lize re ve rse flow ca pa city up to 153 GWh/d from Hunga ry to Austria a s we ll . Hungary FGSZ Ltd. FGSZ Ltd.

TRA-N-061 Pipeline including CS TRA Project Ne w pipe line be twe e n E rcsi a nd Sza zha lom ba tta node s, DN800 PN63 , 11 km .T he 11 km long pipe line conne cting the Vá rosföld-E rcsi-Győr pipe line a t E rcsi to the Buda pe st ring a t S zá zha lom ba tta (Ce ntra l Hunga ry) – it incre a se s the ca pa city of the HU-SK inte rconne ctor up to 152 GWh/d; 600 000 m 3/h (a t 15 °C) in both dire ctions in the FGSZ syste m . Hungary FGSZ Ltd. FGSZ Ltd.TRA-N-123 Pipeline including CS TRA Project An additional compressor unit (5.7 MW) at the existing compressor station at Városföld, necessary to ensure adequate pressure for the transportation along the HU section of the Corridor. Hungary FGSZ Ltd. FGSZ Ltd.TRA-N-018 Pipeline including CS TRA Project Pipe line be twe e n Vá rosföld-E rcsi a nd Győr node s, DN1000 , PN100 , 210 km .T his proje ct wil l e na ble the Mosonm a gya rova r inte rconne ction point to re a ch its ful l ca pa city of 153 GWh/d from Austria to Hunga ry. It wil l a lso e na ble the Mosonm a gya rova r inte rconne ction point to re a lize re ve rse flow ca pa city up to 153 GWh/d from Hunga ry to Austria a s we ll . Hungary FGSZ Ltd. FGSZ Ltd.

SNTGN Transgaz SASNTGN Transgaz SA

Engie Romania SA

Snam Rete Gas S.p.A.Società Gasdotti Italia

Engie Romania SA

Bulgartransgaz EAD

Societatea Naţională de Gaze Naturale ROMGAZ S.A.

Societatea Naţională de Gaze Naturale ROMGAZ S.A.

Plinovodi d.o.o.FGSZ Ltd.

FGSZ Ltd.FGSZ Ltd.FGSZ Ltd.

SNTGN Transgaz S.A.FGSZ Ltd.FGSZ Ltd.

FGSZ Ltd.GAS CONNECT AUSTRIA GmbHFGSZ Ltd.

FGSZ Ltd.FGSZ Ltd.

FGSZ Ltd.FGSZ Ltd.

FGSZ Ltd.FGSZ Ltd.FGSZ Ltd.

Page 7: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

TRA-N-358 Pipeline including CS TRA Project Romania SNTGN Transgaz S.A. SNTGN Transgaz S.A.

TRA-N-061 Pipeline including CS TRA Project Ne w pipe line be twe e n E rcsi a nd Sza zha lom ba tta node s, DN800 PN63 , 11 km .T he 11 km long pipe line conne cting the Vá rosföld-E rcsi-Győr pipe line a t E rcsi to the Buda pe st ring a t S zá zha lom ba tta (Ce ntra l Hunga ry) – it incre a se s the ca pa city of the HU-SK inte rconne ctor up to 152 GWh/d; 600 000 m 3/h (a t 15 °C) in both dire ctions in the FGSZ syste m . Hungary FGSZ Ltd. FGSZ Ltd.TRA-N-018 Pipeline including CS TRA Project Pipe line be twe e n Vá rosföld-E rcsi a nd Győr node s, DN1000 , PN100 , 210 km .T his proje ct wil l e na ble the Mosonm a gya rova r inte rconne ction point to re a ch its ful l ca pa city of 153 GWh/d from Austria to Hunga ry. It wil l a lso e na ble the Mosonm a gya rova r inte rconne ction point to re a lize re ve rse flow ca pa city up to 153 GWh/d from Hunga ry to Austria a s we ll . Hungary FGSZ Ltd. FGSZ Ltd.

TRA-N-362 Pipeline including CS TRA Project The project consists in the building of a transmission pipeline from the Black Sea shore to the Podișor technological node (Giurgiu county) to connect the gas source which will be available at the Black Sea shore with the BULGARIA – ROMANIA – HUNGARY – AUSTRIA corridor. Romania SNTGN Transgaz SA SNTGN Transgaz S.A.

TRA-N-061 Pipeline including CS TRA Project Ne w pipe line be twe e n E rcsi a nd Sza zha lom ba tta node s, DN800 PN63 , 11 km .T he 11 km long pipe line conne cting the Vá rosföld-E rcsi-Győr pipe line a t E rcsi to the Buda pe st ring a t S zá zha lom ba tta (Ce ntra l Hunga ry) – it incre a se s the ca pa city of the HU-SK inte rconne ctor up to 152 GWh/d; 600 000 m 3/h (a t 15 °C) in both dire ctions in the FGSZ syste m . Hungary FGSZ Ltd. FGSZ Ltd.TRA-N-377 Pipeline including CS TRA Project A third unit (4.5 MW) at Csanádpalota to reach the increased 4.4 bcm/a capacity of the corridor at the RO/HU border. Hungary FGSZ Ltd. FGSZ Ltd.TRA-N-018 Pipeline including CS TRA Project Pipe line be twe e n Vá rosföld-E rcsi a nd Győr node s, DN1000 , PN100 , 210 km .T his proje ct wil l e na ble the Mosonm a gya rova r inte rconne ction point to re a ch its ful l ca pa city of 153 GWh/d from Austria to Hunga ry. It wil l a lso e na ble the Mosonm a gya rova r inte rconne ction point to re a lize re ve rse flow ca pa city up to 153 GWh/d from Hunga ry to Austria a s we ll . Hungary FGSZ Ltd. FGSZ Ltd.

TRA-N-654 Pipeline including CS TRA Project Pr oject Descr ipt ion:East r ing-SK is subpr oject locat ed in Slovakia/Ukr aine and is essent ial par t of t he East r ing pr oject , which connect s I P Veľ ké Kapušany at t he SK-UA bor der , wit h a new ent r y I P at an ext er nal bor der of t he EU on t he t er r it or y of Bulgar ia in t he f ollowing r out ing opt ions: − f r om SK t o RO − via UA, ( exist . pipeline) − via HU, ( new pipeline) . − f r om RO t o TR − O pt ion A – new pipeline passing pr oduct ion & st or age ar ea and cont inuing t o I P I saccea and t o BG/TR bor der by ut ilizing exist ing RO -BG t r ansit asset s − O pt ion B – new pipeline, passing 2 pr oduct ion & st or age ar eas and cont inuing t o an ext er nal bor der of t he EU on t he t er r it or y of Bulgar ia. The pr oject would ( i) secur e supplies in case of RU disr upt ion and t her ef or e it will incr ease gas SoS in t he br oader Cent r al-Sout h-East EU r egion, ( ii) allow access t o alt er nat ive gas sour ces f or Cent r al, West er n & Sout her n Eur ope and ( iii) m ean st ep t owar ds EU single gas m ar ket . Bulgaria Bulgartransgaz EAD Bulgartransgaz EAD

TRA-N-656 Pipeline including CS TRA Project East r ing-HU is subpr oject locat ed in Hungar y and is essent ial par t of t he East r ing pr oject , which connect s I P Veľ ké Kapušany at t he SK-UA bor der , wit h I P at t he BG/TR bor der in t he f ollowing r out ing opt ions: − f r om SK t o RO − via HU, ( new pipeline) . − f r om RO t o TR − O pt ion A – new pipeline passing pr oduct ion & st or age ar ea and cont inuing t o I P I saccea and t hen t o BG/TR bor der by ut ilizing exist ing RO -BG t r ansit asset s − O pt ion B – new pipeline, passing 2 pr oduct ion & st or age ar eas and cont inuing t o BG/TR bor der . The pr oject would ( i) secur e supplies in case of RU disr upt ion and t her ef or e it will incr ease gas SoS in t he br oader Cent r al-Sout h-East EU r egion, ( ii) allow access t o alt er nat ive gas sour ces f or Cent r al, West er n & Sout her n Eur ope and ( iii) m ean st ep t owar ds EU single gas m ar ket . Hungary FGSZ Ltd. FGSZ Ltd.TRA-N-655 Pipeline including CS TRA Project East r ing-RO , locat ed in Rom ania is an essent ial par t of t he East r ing pr oject , which connect s I P Veľ ké Kapušany / Veľ ké Zlievce at t he SK-UA bor der , wit h I P at t he BG/TR bor der . East r ing is a nat ur al gas pipeline pr oject . I t will not own or sell any nat ur al gas and once available, all it s capacit y will be of f er ed t o any shipper on non-discr im inat or y basis r espect ing all EU r ules and laws ( Dir ect ives and Regulat ions) . East r ing will connect t he exist ing gas inf r ast r uct ur e bet ween Slovakia, Hungar y, Rom ania and Bulgar ia in a bidir ect ional conjunct ion br inging a new t r ansit pot ent ial and im pr oving gas m ar ket sit uat ion in each of t he r espect ive count r ies. Maxim um daily bi-dir ect ional capacit y will be of 20 bcm /year ( St age I ) and 40 bcm /year ( St age I I ) .The pr oject would secur e supplies in case of RU disr upt ion and t her ef or e it will incr ease gas SoS in t he br oader Cent r al-Sout h-East EU r egion, as well as will allow access t o alt er nat ive gas sour ces f or Cent r al, West er n & Sout her n Eur ope Romania SNTGN Transgaz SA SNTGN Transgaz S.A.

TRA-N-628 Pipeline including CS TRA Project East r ing-SK is subpr oject locat ed in Slovakia/Ukr aine and is essent ial par t of t he East r ing pr oject , which connect s I P Veľ ké Kapušany at t he SK-UA bor der , wit h a new ent r y I P at an ext er nal bor der of t he EU on t he t er r it or y of Bulgar ia in t he f ollowing r out ing opt ions: − f r om SK t o RO − via UA, ( exist . pipeline) − via HU, ( new pipeline) . − f r om RO t o TR − O pt ion A – new pipeline passing pr oduct ion & st or age ar ea and cont inuing t o I P I saccea and t o BG/TR bor der by ut ilizing exist ing RO -BG t r ansit asset s − O pt ion B – new pipeline, passing 2 pr oduct ion & st or age ar eas and cont inuing t o an ext er nal bor der of t he EU on t he t er r it or y of Bulgar ia. The pr oject would ( i) secur e supplies in case of RU disr upt ion and t her ef or e it will incr ease gas SoS in t he br oader Cent r al-Sout h-East EU r egion, ( ii) allow access t o alt er nat ive gas sour ces f or Cent r al, West er n & Sout her n Eur ope and ( iii) m ean st ep t owar ds EU single gas m ar ket . Slovakia Eastring B.V. Eastring B.V.

TRA-N-631 Pipeline including CS TRA Project T he proje ct consists in the construction of a pipe line a nd thre e com pre ssor sta tions, within the te rritory of Gre e ce , from the GR/T K borde r to the GR/MK borde r.T he proje ct is pa rt of a gre a te r proje ct (T E SLA proje ct) a im ing a t tra nsporting na tura l ga s from the GR/T K borde r to Ce ntra l E urope , via Gre e ce , FYROM, Se rbia , Hunga ry a nd Austria , a s we ll a s Ita ly. Greece DESFA S.A. DESFA S.A.TRA-N-582 Pipeline including CS TRA Project The main aim of the Tesla project is to transport natural gas from the planned Turkish Stream (RU-TR) to Central and Eastern Europe via Greece, Macedonia, Serbia, Hungary and Austria. former Yugoslav Republic of Macedonia GA-MA joint stock company Skopje GA-MA - Skopje

TRA-N-376 Pipeline including CS TRA Project The solut ion f or t he t r ansm ission of nat ur al gas f r om Caspian r egion t hr ough t he t er r it or y of Azer baijan and Geor gia, it s liquef act ion and t r anspor t at ion via Black Sea t o Rom ania and Hungar y and pot ent ially t o ot her Eur opean m ar ket s; As a "st andby LN G pr oject " , AGRI will im plem ent and oper at e t he LN G por t ion: - t he "nat ur al gas t he liquef act ion Facilit ies" ) on Geor gian Shor e; - t r anspor t of LN G f r om Geor gian shor e t o Rom anian shor e; - t he "nat ur al Re-gasif icat ion t er m inal" on Rom anian Shor e.The pr oject is pur e LN G pr oject and has no posibilit y t o include t echnical det ails so please see below:=================================For LN G Pr oject :Maxim um Annual Capacit y: 8.0 bcm /y;Maxim um sendout capacit y: 22.0 m ilion cm /d;St or age capacit y: 160,000.0 cm of LN G;Maxim um ship car go size: 2 x 140,000.0 m c of LN G; ================================== Romania AGRI LNG Project Company SRL (RO) AGRITRA-N-959 Pipeline including CS TRA Project Romania SNTGN Transgaz SA SNTGN Transgaz S.A.

TRA-N-594 Pipeline including CS TRA Project Moder nisat ion of t he exist ing net wor k f or t r ansit t r ansm ission wit ht he const r uct ion of 50 km looping wit h pr evailing diam et er Dn 1200f r om Pr ovadia t o t he village of Rupcha, r eplacem ent of 20 km ( 2х10 km ) 12 of exist ing gas pipelines wit h diam et er of Dn 1000 f r om CS St r andja t ot he bor der wit h Tur key and incr ease in t he capacit y of CS St r andjawit h 10 MW. The r ealizat ion of t he pr oject will ensur e new capacit y of 6 bcm /y ( 192,5 GWh/d) t o Tur key. Bulgaria Bulgartransgaz EAD Bulgartransgaz EAD

TRA-N-592 Pipeline including CS TRA Project Looping t o CS Valchi dol – line valve N ovi I skar :Moder nisat ion of t he nat ional gas t r ansm ission net wor k nor t her sem i-r ing wit h t he const r uct ion of 383 km looping wit h a diam et er of Dn 700 f r om CS Valchi dol t o line valve N ovi I skar . The r ealizat ion of t he pr oject will ensur e new exit capacit y of 4 bcm /y ( 128,3 GWh/d) int he dir ect ion t o Rom ania ( t hr ough I BR) and Chir en UGS ( f or t r ansm ission dur ing inject ion and wit hdr awal am ount ing t o 500 m cm /y) . I n t he cont ext of t he Eur opean object ives t o build an int er connect ed and single pan-Eur opean m ar ker , t he r ealizat ion of t he pr esent ed pr oject s, f or m ing t he gas hub concept , is in line wit h t he pr oject s f or t he developm ent of t he Sout her n gas cor r idor and in f ull com pliance wit h t he plans f or developm ent of gas inf r ast r uct ur e in Eur ope t o enhance t he secur it y of supply and t he diver sif icat ion of nat ur al gas supply sour ces. Bulgaria Bulgartransgaz EAD Bulgartransgaz EAD

TRA-N-593 Pipeline including CS TRA Project Construction of ne w infra structure , consisting of 844 km of ga s pipe line with pre va il ing dia m e te r Dn 1200 from Va rna to Orya hovo (sta rting a t a ne w IP a t Va rna to a ne w IP a t Bulga ria /Rom a nia n borde r ne a r Orya hovo city), e nsuring a n a dditiona l ca pa city of 42 ,6 bcm /y (1366 GWh/d) a nd two ne w com pre ssor sta tions with a tota l insta l le d ca pa city of 265 MW se curing the pre ssure re quire d for tra nsm ission. Bulgaria Bulgartransgaz EAD Bulgartransgaz EAD

TRA-F-86 Pipeline including CS TRA Project N ew pipeline which will upgr ade t he exist ing int er connect ion Cr oat ia/Slovenia. Along wit h t he exist ing int er connect ion Kar lovac-Lučko-Zabok-Rogat ec, a new gas pipeline syst em has been planned which would signif icant ly incr ease t he capacit y of t he int er connect ion of t he Cr oat ian and t he Slovenian gas t r ansm ission syst em s in t his dir ect ion. Consider ing alm ost all exist ing and new supply dir ect ions in t he sur r ounding r egion and t he Cr oat ian st or age pot ent ials t his opens signif icant t r ansit pot ent ials in bot h dir ect ions. Along t his t r ansit r out e, it is planned t o upgr ade t he capacit y t o 5 bcm /y. Croatia Plinacro Ltd Plinacro Ltd

TRA-N-094 Pipeline including CS TRA Project Upgrade of CS for higher operational pressure in existing M1/1 and M2/1 pipelines, higher flow and bidirectional operation. The project aims to assure additional necessary compressor power for the PCI 6.26 Cluster Croatia - Slovenia - Austria at Rogatec. Slovenia Plinovodi d.o.o. Plinovodi d.o.o.

TRA-N-1057 Pipeline including CS TRA Project Const r uct ion of such f acilit ies is necessar y due t o t he opening of t he gas m ar ket , as well as pr oviding suf f icient t r ansm ission capacit ies and nat ur al gas deliver y pr essur e condit ions and f or developm ent of t he gas m ar ket in Cr oat ia and t he neighbour ing count r ies. Com pr essor st at ions will signif icant ly incr ease ef f iciency of t he Cr oat ian gas t r ansm ission syst em . Com pr essor st at ions ar e int egr al par t of t he t r ansm ission syst em , int egr at ed in t he syst em , pr im ar ily in a m anner t o incr ease t he f lexibilit y of m anaging t he exist ing t r ansm ission capacit ies of t he syst em , and t o pr ovide r at ional incr ease of t r ansm ission capacit ies accor ding t o user needs, t hat is, t he r equir em ent s of t he m ar ket and t o sat isf y m ar ket condit ions ar ising f r om t he applicat ion of new legal r egulat ion. Croatia Plinacro Ltd Plinacro Ltd

TRA-N-361 Pipeline including CS TRA Project The Project enables incremental capacity at the IP Murfeld in both directions (AT->SI, SI->AT). Moreover, physical RF capacity at the Entry Point Murfeld is achieved. Austria GAS CONNECT AUSTRIA GmbH Gas Connect Austria GmbH

TRA-N-389 Pipeline including CS TRA Project Adjustment to operating parameters of the transmission system of the Austrian TSO, increasing the transmission capacity and enabling bidirectional operation. The project is a part of the PCI 6.26 Cluster Croatia - Slovenia - Austria at Rogatec. Slovenia Plinovodi d.o.o. Plinovodi d.o.o.

TRA-N-390 Pipeline including CS TRA Project Adjustment to operating parameters of the transmission system of the Croatian TSO, increasing the transmission capacity and enabling bidirectional operation. The project is a part of the PCI 6.26 Cluster Croatia - Slovenia - Austria at Rogatec. Slovenia Plinovodi d.o.o. Plinovodi d.o.o.

TRA-N-902 Pipeline including CS TRA Project The goal of t he pr oject Capacit y incr ease at I P Lanžhot ( Ent r y - Eust r eam ) is t he upgr ade of cr oss-bor der capacit y at t he ent r y I P Lanžhot . Pr oject is am ong ot her s developed in t he cont ext of East r ing pr oject , t he aim is t o pr ovide suf f icient f ut ur e t r ansit capacit y f or deliver y of gas f or t he r egion of CEE/SEE Eur ope, nam ely Balkan count r ies, as well as ensur ing secur it y supplies t o Ukr aine as well as int egr at ion of CEE/SEE r egion t o t he developed spot m ar ket s. Slovakia eustream, a.s. eustream, a.s.

TRA-N-967 Pipeline including CS TRA Project The project consists of a pipeline from Nea-Messimvria to the GR/MK border allowing the supply of FYROM by the Greek Gas Transmission System Greece DESFA S.A. DESFA S.A.

SNTGN Transgaz SA

SNTGN Transgaz S.A.FGSZ Ltd.FGSZ Ltd.

FGSZ Ltd.FGSZ Ltd.FGSZ Ltd.

Bulgartransgaz EADFGSZ Ltd.SNTGN Transgaz SAEastring B.V.

DESFA S.A.GA-MA joint stock company Skopje

AGRI LNG Project Company SRL (RO)SNTGN Transgaz SA

Plinacro Ltd

Bulgartransgaz EADBulgartransgaz EADBulgartransgaz EAD

Plinacro Ltd

Plinovodi d.o.o.

Plinovodi d.o.o.

GAS CONNECT AUSTRIA GmbH

Plinovodi d.o.o.

eustream, a.s.

DESFA S.A.

Page 8: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

TRA-N-631 Pipeline including CS TRA Project T he proje ct consists in the construction of a pipe line a nd thre e com pre ssor sta tions, within the te rritory of Gre e ce , from the GR/T K borde r to the GR/MK borde r.T he proje ct is pa rt of a gre a te r proje ct (T E SLA proje ct) a im ing a t tra nsporting na tura l ga s from the GR/T K borde r to Ce ntra l E urope , via Gre e ce , FYROM, Se rbia , Hunga ry a nd Austria , a s we ll a s Ita ly. Greece DESFA S.A. DESFA S.A.

TRA-N-645 Pipeline including CS TRA Project Cur r ent ly at t he Hungar ian-Ukr ainian bor der at int er connect ion point Ber egdar oc 800 ( HU>UA) only int er r upt ible capacit y is available. The m ain aim of t he pr oject is t o pr ovide f ir m capacit y in t he Hungar y - Ukr aine dir ect ion in or der t o ensur e 178 GWh/d. This pr oject needs cer t ain syst em developm ent in Ukr aine and Hungar y. Ukr ainian sect ion was f inished in Apr il 2016 and Hungar ian sect ion needs r econst r uct ion and syst em enhancem ent which will be f inished in t wo year s af t er f inal invest m ent decision. Ukraine PJSC Ukrtransgaz UkrtransgazTRA-N-586 Pipeline including CS TRA Project The main aim of the project is to ensure firm capacity at IP Beregdaróc in the Hungary-Ukraine direction. Hungary FGSZ Ltd. FGSZ Ltd.

TRA-N-302 Pipeline including CS TRA Project South Interconnection of Croatia and B&H - the pipeline is a new supply route for Bosnia and Herzegovina that will enable the reliable and dievrsifed natural gas supply. The pipeline will enable the flow of IAP to Bosnia and Herzegovina Croatia Plinacro Ltd Plinacro LtdTRA-N-851 Pipeline including CS TRA Project Southe rn Inte rconne ction pipe line BIH/CRO (Za gvozd-Posusje -T ra vnik with m a in bra nch to Mosta r) - Proje ct wil l inte gra te BiH with ne w supply route re ce iving ga s from Croa tia n ga s tra nsm ission syste m which wil l e na ble it to ge t ga s supply from othe r m a rke ts (LNG, Ca spia n a nd Middle E a st source s). Proje ct wil l be bi-dire ctiona l a nd toge the r with ga spipe line Ze nica -Brod cre a te s a pa rt of E C Ga s Ring. Bosnia Herzegovina BH-GAS d.o.o. BH Gas d.o.o.

TRA-N-068 Pipeline including CS TRA Project The pipeline will cr oss t he t er r it or y along t he Adr iat ic coast f r om Fier i in Albania via Mont enegr o t o Split in Cr oat ia and will be linked t o t he exist ing Cr oat ian gas t r ansm ission syst em ( m ain dir ect ion Bosiljevo – Split ) . The I onian-Adr iat ic Pipeline is consider ed a par t of t he Ener gy Com m unit y Gas Ring, which is t he concept of gasif icat ion f or t he ent ir e r egion. I AP is t he m ost im por t ant gas pr oject in t he Sout heast er n Eur ope suppor t ed by t he Ener gy Com m unit y. The I AP pr oject is based on t he idea of connect ing t he exist ing Cr oat ian gas t r ansm ission syst em , via Mont enegr o and Albania, wit h t he TAP gas pipeline syst em ( Tr ans Adr iat ic Pipeline) an exit Bosnia and Her zegovina is planned. Plinacr o is t he pr oject pr om ot er f or subm it t ing t he pr oject t o TYN DP. I n addit ion, Mont enegr in and Albanian count er par t s sent t heir appr oval. Croatia Plinacro Ltd Plinacro Ltd

UGS-N-385 Storage Facility UGS Project The projects consists in converting the offshore depleted gas field of South Kavala to an Underground Gas Storage Facility. Greece Hellenic Republic Asset anagement Fund Hellenic Republic Asset Management Fund

TRA-N-980 Pipeline including CS TRA Project Main gas pipeline sect ion St ip-Ham zali-St ojakovo ( bor der wit h Gr eece) Wit hin t his sect ion t he f ollowing object s and syst em s ar e included: - Line par t in lengt h of 110 km wit h pipe diam et er DN 700 ( 28” ) ,- Valve st at ions - Pig Launching-Receiving St at ion DN 700, -Syst em f or aut om at ic oper at ing wit h t he t echnological pr ocess f or nat ur al gas t r anspor t ( DCS/SCADA) ;-Line f or connect ion wit h opt ic f ibr es;-Power supply syst em -Cat hodic pr ot ect ion syst em - Secur it y Signaling Syst em and f ir e signalizat ion.wor king ( oper at ing) pr essur e p= 40 bar s;m axim um pr essur e ( pr oject ed) pm ax = 54 bar sm inim um pr essur epm in = 25 bar s -Capacit y 326.000 m 3/h ( 76,4 GWh/day) former Yugoslav Republic of Macedonia MER JSC Skopje MER JSC SkopjeTRA-N-967 Pipeline including CS TRA Project The project consists of a pipeline from Nea-Messimvria to the GR/MK border allowing the supply of FYROM by the Greek Gas Transmission System Greece DESFA S.A. DESFA S.A.

TRA-N-621 Pipeline including CS TRA Project The object ive of t he pr oject is t o cr eat e a lar ge t r anspor t at ion cor r idor bet ween Poland and Ukr aine. Scope of t he Pr oject :1. Pipeline DN 1000 Her m anowice-PL/UA bor der -1,5 km 2. Met er ing st at ion in Poland3. Ext enst ion of CS St r achocina N ecessar y addit ional t r ansm ission syst em developm ent in Poland 1. Pipeline DN 700 Her m anowice-St r achocina, 72 km 2. Pipeline DN 1000 St r achocina-Pogór ska Wola, 98 km 3. Pipeline DN 1000 Pogór ska Wola-Twor zeń, 160 km 4. Pipeline DN 1000 Twor óg-Twor zeń, 56 km The Pr oject will cont r ibut e t owar ds:• est ablishm ent of a well- int egr at ed gas m ar ket in t he r egion ( PL, UA, CZ, SK, HU, RO , MD) • diver sif icat ion of gas r out es and sour ces f or Ukr aine• enhancem ent of secur it y of gas supply f or Ukr aine• r educing dependency on single gas supplier f or Ukr aine• st r engt hening ener gy solidar it y bet ween EU Ener gy Com m unit y and EU cont r act ing count r ies• access t o t he gas st or ages in Ukr aine f or Poland and EU count r ies Poland GAZ-SYSTEM S.A. GAZ-SYSTEM S.A.

TRA-N-561 Pipeline including CS TRA Project The object ive of t he pr oject is t o cr eat e a lar ge t r anspor t at ion cor r idor bet ween Poland and Ukr aine which will cont r ibut e t owar ds:• est ablishm ent of a well- int egr at ed gas m ar ket in t he r egion ( PL, UA, CZ, SK, HU, RO , MDA) • diver sif icat ion of gas r out es and sour ces f or Ukr aine• enhancem ent of secur it y of gas supply f or Ukr aine• r educing dependency on single gas supplier f or Ukr aine• st r engt hening ener gy solidar it y bet ween EU Ener gy Com m unit y and EU cont r act ing count r ies• access t o t he gas st or ages in Ukr aine f or Poland and t he EU count r ies Using I nt er connect or in f or war d and r ever se dir ect ion will enable inject and wit hdr aw nat ur al gas f r om Ukr ainian UGS f or f or eign owner s up t o 15 billion cubic m et er s. Ukraine PJSC Ukrtransgaz Ukrtransgaz

TRA-N-1092 Pipeline including CS TRA Project The project consists of the implementation of one Metering and Regulating Station at Kavala for the potential intrconnection of the Greek transmission system with the UGS in South Kavala. Greece DESFA S.A. DESFA S.A.

TRA-N-636 ############ ENTSOG

TRA-N-524 ############ ENTSOG

TRA-N-831 ############ ENTSOG

DESFA S.A.

PJSC Ukrtransgaz FGSZ Ltd.

Plinacro LtdBH-GAS d.o.o.

Plinacro Ltd

Hellenic Republic Asset anagement Fund

MER JSC SkopjeDESFA S.A.

DESFA S.A.

GAZ-SYSTEM S.A.PJSC Ukrtransgaz

Magyar Gáz Tranzit Zrt.

Magyar Gáz Tranzit Zrt.

Magyar Gáz Tranzit Zrt.

Page 9: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

FID Status Regulatory Decisions CBCA Decision CBCA Decision Date Link General Comments Is Part of a NDP NDP Name NDP Number

Non-FID Advanced Non-FID http://en.gaz-system.pl// Yes Network Development Plan 2016-2025 N/ANon-FID Advanced Non-FID Yes 24/06/2014 00:00:00 http://en.gaz-system.pl// Yes Network Development Plan 2016-2025 N/ANon-FID Advanced Non-FID CBCA ERO Decision from 17/10/2014, CBCA URE Decision from 24/06/2014. Yes 17/10/2014 00:00:00 http://www.net4gas.cz/en/1629/ Yes NDP 2016-2025 TRA-N-136

Non-FID Less-Advanced Non-FID http://en.gaz-system.pl// Yes Network Development Plan 2016-2025 N/ANon-FID Advanced Non-FID Yes 28/11/2014 00:00:00 http://www.eustream.sk/en_transmission-system/en_pl-sk-interconnector Yes National Development Plan 2016-2025 10.1.2.-PL-SKNon-FID Advanced Non-FID Yes 28/11/2014 00:00:00 http://en.gaz-system.pl// Yes Network Development Plan 2016-2025 N/A

Non-FID Advanced Non-FID http://www.net4gas.cz/en/1703/ Yes NDP 2016-2025 TRA-N-133Non-FID Advanced Non-FID Yes NDP 2016-2025 GCA 2015/01a

Non-FID Advanced Non-FID Croatian Energy Regulatory Agency has given to LNG Croatia LLC on 03.02.2016, a permit for performing energy activities which enables LNG Croatia LLC to operate the terminal. http://www.lng.hr Inclusion in NDPThe full name of the NDP in which our project is included is: Desetogodišnji plan razvoja plinskog transportnog sustava Republike Hrvatske 2015. - 2024/ Ten-Year Development Plan of the Gas Transmission System of the Republic of Croatia 2015 - 2024 (issued by Croatian TSO). Yes Desetogodišnji plan razvoja plinskog... 6.5.1.

Non-FID Less-Advanced Non-FID http://www.plinacro.hr/ Yes 2017-2026 1.21Non-FID Advanced Non-FID http://www.plinacro.hr Yes 2017-2026 1.17Non-FID Advanced Non-FID http://www.plinacro.hr It is a link between Krk LNG terminal and Interconnection HR/HU. This pipeline (as well as all the pipelines to which it connects and the associated gas nodes) will provide gas transmission in all directions, i.e. it will satisfy all transmission requirements and will maximise the value of the IAP a Yes 2017-2026 1.18, 1.19, 1.20

FID FID http://me.government.bg/bg/themes/mejdusistemna-gazova-vrazka-balgariya-sarbiya-ibs-1477-347.html IBS is developed by Ministry of Energy (ME), beneficiary of Competitiveness Operational Programme (2007-2013 and 2014-2020). The source of financing is the European Fund for Regional Development. Yes 2016-2025 Ten-year network development plan of BTG Sectin 5.2 (5.2.3)Non-FID Less-Advanced Non-FID http://www.bulgartransgaz.bg/en/index.php The modernization, rehabilitation and expansion of the existing gas transmission infrastructure will guarantee secure and reliable natural gas transmission, enhance the efficiency, reliability and flexibility of the transmission system and provide the required capacities and pressures. Yes 2016-2025 Ten-year network development plan of BTG Section 5.5.

Non-FID Less-Advanced Non-FID http://www.desfa.gr The CAPEX mentioned above corresponds to the variant considered for modelling. Yes Development Plan NNGS 2015-2024 2.2.1.3FID FID The cur r ent m ar ket t est is conduct ed under guidelines and not ice appr oved and issued by t he N at ional Regulat or y Aut hor it ies in accor dance t o ar t . 36 of t he 2009/73/EC gas dir ect ive:RAE decision N o.438/23.11.2015 , EWRC decision N o.y-2/27.11.2015 : “Updat ed Guidelines f or m anagem ent and allocat ion of capacit y on t he I GB I N TERCO N N ECTO R accor ding t o par agr aph 6 of ar t icle 36 of Dir ect ive 2009/73/EC – PHASE I : I nvit at ion of int er est ed par t ies t o expr ess t heir int er est in r eser ving capacit y) . RAE decision N o.472/1.12.2015, EWRC decision N o.y-3/10.12.2015) : "EoI N ot ice" http://icgb.eu Capex do not include development costs Yes Included in both the TYNDPs of Greece and Bulgaria not applicable

Non-FID Less-Advanced Non-FID No This project is included in the 10-year Development Study. The D. S. includes projects which are likely to be implemented but are not yet part of the compulsory Projects. N/A

Non-FID Less-Advanced Non-FID http://www.bulgartransgaz.bg/en/index.php The modernization, rehabilitation and expansion of the existing gas transmission infrastructure will guarantee secure and reliable natural gas transmission, enhance the efficiency, reliability and flexibility of the transmission system and provide the required capacities and pressures. Yes 2016-2025 Ten-year network development plan of BTG Section 5.5.

Non-FID Less-Advanced Non-FID http://www.desfa.gr The CAPEX mentioned above corresponds to the variant considered for modelling. Yes Development Plan NNGS 2015-2024 2.2.1.3Non-FID Advanced Non-FID No TPA exemption requested NRA only gave opinion on the Independent Natural Gas System License issued by the Ministry of Energy & Environment on 19.08.2011 (opin. number: 29/2011) http://www.gastrade.gr The floating unit as part of the Project creates a new natural gas entry gate to SEE Europe with the following main objectives:Increase security of supply through diversification of sources and routes,Support market integration and price convergence,Enhance competition,in the Region. No The Project is not included in the NDP because it is an Independent Natural Gas System and therefore the NTSO is not obliged to include it in the NDP because it is not the Project's promoter and/or operator. N/ANon-FID Advanced Non-FID No TPA exemption requested NRA only gave opinion on the Independent Natural Gas System License issued by the Ministry of Energy & Environment on 19.08.2011 (opin. number 29/2011) http://www.gastrade.gr The pipeline as part of the Project creates a new natural gas entry gate to SEE Europe with the following main objectives:Increase security of supply through diversification of sources and routes, Support market integration and price convergence,Enhance competition,in the Region. No The Project is not included in the NDP because it is an Independent Natural Gas System and therefore the NTSO is not obliged to include it in the NDP because it is not the Project's promoter and/or operator. N/ANon-FID Less-Advanced Non-FID No This project is not included in the National Development Plan because no application has been made, by the promoter of the LNG terminal in Northern Greece, for the connection of this project to the Greek gas transmission system. N/A

Non-FID Advanced Non-FID No TPA exemption requested NRA only gave opinion on the Independent Natural Gas System License issued by the Ministry of Energy & Environment on 19.08.2011 (opin. number: 29/2011) http://www.gastrade.gr The floating unit as part of the Project creates a new natural gas entry gate to SEE Europe with the following main objectives:Increase security of supply through diversification of sources and routes,Support market integration and price convergence,Enhance competition,in the Region. No The Project is not included in the NDP because it is an Independent Natural Gas System and therefore the NTSO is not obliged to include it in the NDP because it is not the Project's promoter and/or operator. N/ANon-FID Advanced Non-FID No TPA exemption requested NRA only gave opinion on the Independent Natural Gas System License issued by the Ministry of Energy & Environment on 19.08.2011 (opin. number 29/2011) http://www.gastrade.gr The pipeline as part of the Project creates a new natural gas entry gate to SEE Europe with the following main objectives:Increase security of supply through diversification of sources and routes, Support market integration and price convergence,Enhance competition,in the Region. No The Project is not included in the NDP because it is an Independent Natural Gas System and therefore the NTSO is not obliged to include it in the NDP because it is not the Project's promoter and/or operator. N/A

FID FID http://me.government.bg/bg/themes/mejdusistemna-gazova-vrazka-balgariya-sarbiya-ibs-1477-347.html IBS is developed by Ministry of Energy (ME), beneficiary of Competitiveness Operational Programme (2007-2013 and 2014-2020). The source of financing is the European Fund for Regional Development. Yes 2016-2025 Ten-year network development plan of BTG Sectin 5.2 (5.2.3)

Page 10: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

Non-FID Less-Advanced Non-FID http://new.transgaz.ro/sites/default/files/uploads/users/admin/onal_de_transport_gaze_naturale_cu_sistemul_de_transport_international_si_asigurarea_curgerii_reversibile_la_isaccea.pdf Yes Developement Plan for the National GTS 2016 - 2025 7.3Non-FID Less-Advanced Non-FID Yes Development Plan for the National GTS 2016 - 2025 7.6

Non-FID Less-Advanced Non-FID http://www.snamretegas.it/en/services/Thermal_Year_2015_2016/Ten-year-Plan/index.html Yes Snam Rete Gas TYNDP 2016-2025 TRA-N-007(into text)

Non-FID Advanced Non-FID The const r uct ion and oper at ion of each pr oject sect ion has been alr eady aut hor ized by MI SE ( I t alian Minist r y of Econom ic Developm ent ) as par t of t he N at ional Gas N et wor k. Decr ee N o. 14624 of 25 May 2016, t he I t alian Minist r y of Econom ic Developm ent has assessed t he consist ency of SGI 's TYN DP wit h t he N at ional Ener gy St r at egy.SGI has included t he pr oject in it s own TYN DP, as subm it t ed t o MiSE and t he N RS ( AEEGSI ) . TYN DP appr oval pr ocess is cur r ent ly being r evised due t o t he t r ansf er of t he r elevant com pet ences f r om MiSE t o AEEGSI . Yes There is no NDP currently in force Not applicable

Non-FID Advanced Non-FID http://depomures.ro No As far as we are aware, currently there is no comprehrensive system wide national development plan, only one regarding the gas transmission infrastructure put together by the TSO. Nevertheless, the operator submitted a 5-year investment plan to Romanian NRA in 2015, which is updated anually. N/A

Non-FID Less-Advanced Non-FID http://www.bulgartransgaz.bg/en/pages/pcis-118.html Chiren UGS is the only one storage facility on the territory of Bulgaria and has been in operation since 1974. Subject matter of the current project is its expansion. After the expansion injection and withdrawal rates will increase from 44.5 to 106 GWh/d and the WGV from 550 mcm to 1 bcm. Yes 2016-2025 Ten-year network development plan of BTG Section 5.3 (5.3.1)

Non-FID Advanced Non-FID http://depomures.ro No As far as we are aware, currently there is no comprehrensive system wide national development plan, only one regarding the gas transmission infrastructure put together by the TSO. Nevertheless, the operator submitted a 5-year investment plan to Romanian NRA in 2015, which is updated anually. N/A

Non-FID Less-Advanced Non-FID http://www.romgaz.ro/activitati/inmagazinare/pci.html No S.N.G.N. ROMGAZ, the project promoter, is not a TSO, it is only storage operator, therefore it is not mandatory to have a TYNDP, as Transgaz has. There is no NDP country level. N/A

Non-FID Less-Advanced Non-FID http://www.romgaz.ro/en/activities/storage/pci/ugs-n-371-sarmasel-storage-facility-upgrading.html No S.N.G.N. ROMGAZ S.A., the project promotor, is not a TSO, therefore it is not mandatory to have a TYNDP, as Transgaz does. There is no NDP at country level. N/A

Non-FID Less-Advanced Non-FID http://www.plinovodi.si/wp-content/uploads/2011/09/plinovodi-ten-year-dev-plan-2016-2025.pdf Yes TYNDP for the period 2016-2025 C3Non-FID Less-Advanced Non-FID http://www.fgsz.hu Yes Hungarien TYNDP 2015 12.12.1.-12.12.2

Non-FID Less-Advanced Non-FID Yes 31/12/2016 00:00:00 Yes Hungarian TYNDP 2015 12.9.Non-FID Less-Advanced Non-FID Yes 06/10/2016 00:00:00 The procurement procedure of the studies is already in progress (it includes design studies, basic and detailed engineering, environmental impact assessment and environmental compliances report). Yes Hungarian TYNDP 2015 12.6.1.Non-FID Less-Advanced Non-FID Yes 06/10/2016 00:00:00 Yes Hungarian TYNDP 2015 12.7.

Non-FID Advanced Non-FID Cross Border Cost Allocation Decision (CBCA) Yes 06/10/2015 00:00:00 http://www.transgaz.ro/sites/default/files/uploads/users/admin/dezvoltarea_pe_teritoriul_romaniei_a_sistemului_de_transport_gaze_naturale_pe_culoarul_bulgaria-romania-austria.pdf A funding contract for a grant of 1.519.342 EUR was signed with the Innovation and Networks Executive Agency (INEA), for the design of the three compressor stations, summing up 50% of total estimated value of the costs related to the design of the three compressor stations. In order to obtain gran Yes Development Plan for the National GTS 2016-2025 7.1Non-FID Less-Advanced Non-FID Yes 31/12/2016 00:00:00 Yes Hungarian TYNDP 2015 12.9.Non-FID Less-Advanced Non-FID Yes 06/10/2016 00:00:00 Yes Hungarian TYNDP 2015 12.7.

Non-FID Less-Advanced Non-FID Yes 31/12/2016 00:00:00 Yes Hungarian TYNDP 2015 12.9.Non-FID Advanced Non-FID Yes NDP 2016 - 2025 GCA 2015/05Non-FID Less-Advanced Non-FID Yes 06/10/2016 00:00:00 Yes Hungarian TYNDP 2015 12.7.

Non-FID Less-Advanced Non-FID Yes 31/12/2016 00:00:00 Yes Hungarian TYNDP 2015 12.9.Non-FID Less-Advanced Non-FID Yes 06/10/2016 00:00:00 Yes Hungarian TYNDP 2015 12.7.

Non-FID Less-Advanced Non-FID Yes 31/12/2016 00:00:00 Yes Hungarian TYNDP 2015 12.9.Non-FID Less-Advanced Non-FID Yes 06/10/2016 00:00:00 Yes Hungarian TYNDP 2015 12.7.

Non-FID Less-Advanced Non-FID Yes 31/12/2016 00:00:00 Yes Hungarian TYNDP 2015 12.9.Non-FID Less-Advanced Non-FID 31/12/2016 00:00:00 http://www.fgsz.hu The CS increases the capacity and flexibility in the AT>HU and the HU>AT direction as well as in the SK>HU and the HU>SK direction. Yes Hungarian TYNDP 2015 12.10.Non-FID Less-Advanced Non-FID Yes 06/10/2016 00:00:00 Yes Hungarian TYNDP 2015 12.7.

Page 11: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

Non-FID Advanced Non-FID Cross Border Cost Allocation Decision (CBCA) Yes 06/10/2015 00:00:00 http://www.transgaz.ro/sites/default/files/uploads/users/admin/dezvoltarea_pe_teritoriul_romaniei_a_sistemului_de_transport_gaze_naturale_pe_culoarul_bulgaria-romania-austria.pdf A funding contract for a grant of 1.519.342 EUR was signed with the Innovation and Networks Executive Agency (INEA), for the design of the three compressor stations, summing up 50% of total estimated value of the costs related to the design of the three compressor stations. In order to obtain gran Yes Development Plan for the National GTS 2016-2025 7.1Non-FID Less-Advanced Non-FID Yes 31/12/2016 00:00:00 Yes Hungarian TYNDP 2015 12.9.Non-FID Less-Advanced Non-FID Yes 06/10/2016 00:00:00 Yes Hungarian TYNDP 2015 12.7.

Non-FID Advanced Non-FID http://www.transgaz.ro/sites/default/files/uploads/users/admin/dezvoltarea_pe_teritoriul_romaniei_a_coridorului_sudic_pentru_preluarea_gazelor_din_marea_neagra.pdf Yes Development Plan for the National GTS 2016-2025 7.2

Non-FID Less-Advanced Non-FID Yes 31/12/2016 00:00:00 Yes Hungarian TYNDP 2015 12.9.Non-FID Less-Advanced Non-FID Yes 06/10/2016 00:00:00 Yes Hungarian TYNDP 2015 12.6.1.Non-FID Less-Advanced Non-FID Yes 06/10/2016 00:00:00 Yes Hungarian TYNDP 2015 12.7.

Non-FID Less-Advanced Non-FID http://www.eastring.eu; http://www.bulgartransgaz.bg/en/pages/pcis-118.html The IP on the BG/TR border is subject to change with other new entry IP at an external border of the EU on the territory of Bulgaria. Yes 2016-2025 Ten-year network development plan of BTG Section 5.1(5.1,2)Non-FID Less-Advanced Non-FID http://www.eastring.eu Yes Eastring pipeline 12.16Non-FID Less-Advanced Non-FID http://www.eastring.eu No For the moment, the project lacks sufficient descriptive elements in order for it to be included in the National Gas Transmission System Development Plan. N/ANon-FID Less-Advanced Non-FID http://www.eastring.eu The IP on the BG/TR border is subject to change with other new entry IP at an external border of the EU on the territory of Bulgaria Yes National Development Plan 2016-2025 10.1.2. Eastring

Non-FID Less-Advanced Non-FID No The NDP 2016-2025, (in consultation) presently refers to this project as a second stage of the M/R station installation that will enable the flow from TAP into the Greek Transmission System (TRA-N-941). At that second stage the Compressor station will also enable the flow from the Greek TS to TAP. N/ANon-FID Less-Advanced Non-FID http://www.gama.com.mk/Default.aspx?id=4f723409-9589-4b9e-979a-377ff0b775e9 No This project is part of the development plan of GAMA and it is provided to the relevant Ministry of economy, which is responsible for energy matters. N/A

Non-FID Less-Advanced Non-FID http://agrilng.com No AGRI is not a Transmission System Operator, so it is not necessary for its project to be part of a National Development Plan. N/ANon-FID Less-Advanced Non-FID Yes Developement Plan for the National GTS 2016 - 2025 7.5

Non-FID Less-Advanced Non-FID http://www.bulgartransgaz.bg/en/pages/pcis-118.html Yes 2016-2025 Ten-year network development plan of BTG Section 5.1. (5.1.1)

Non-FID Less-Advanced Non-FID http://www.bulgartransgaz.bg/en/pages/pcis-118.html Yes 2016-2025 Ten-year network development plan of BTG Section 5.1. (5.1.1)

Non-FID Less-Advanced Non-FID http://www.bulgartransgaz.bg/en/pages/pcis-118.html Yes 2016-2025 Ten-year network development plan of BTG Section 5.1. (5.1.1)

FID FID http://www.plinacro.hr -provides security of supply for Croatia (N-1 criterion has not been met!) and a reverse flow (from Croatia to Slovenia); It provides access to the gas markets of Austria and Italy via the Slovenian system ; It provides import and significant transit of gas from the direction of Italy and Austria Yes 2017-2026 1.24, 1.25

Non-FID Less-Advanced Non-FID http://www.plinovodi.si/wp-content/uploads/2011/09/plinovodi-ten-year-dev-plan-2016-2025.pdf Yes TYNDP for the period 2016-2025 C5

Non-FID Less-Advanced Non-FID http://www.plinacro.hr/ Yes 2017-2026 5.2 and 5.3

Non-FID Advanced Non-FID Yes NDP 2016 - 2025 GCA 2015/08

Non-FID Less-Advanced Non-FID http://www.plinovodi.si/wp-content/uploads/2011/09/plinovodi-ten-year-dev-plan-2016-2025.pdf Yes TYNDP for the period 2016-2025 C4

Non-FID Advanced Non-FID http://www.plinovodi.si/wp-content/uploads/2011/09/plinovodi-ten-year-dev-plan-2016-2025.pdf Yes TYNDP for the period 2016-2025 C12

Non-FID Advanced Non-FID Yes National Development Plan 2016-2025 10.1.2. Lanžhot

Non-FID Less-Advanced Non-FID No The Project is included in the 10-year Development Study. The D. S. includes projects which are likely to be implemented but are not yet part of the compulsory Projects. N/A

Page 12: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

Non-FID Less-Advanced Non-FID No The NDP 2016-2025, (in consultation) presently refers to this project as a second stage of the M/R station installation that will enable the flow from TAP into the Greek Transmission System (TRA-N-941). At that second stage the Compressor station will also enable the flow from the Greek TS to TAP. N/A

Non-FID Less-Advanced Non-FID Yes Ten-Year Network Development Plan of UTG N/ANon-FID Less-Advanced Non-FID Yes Hungarian TYNDP 2015 12.17.

Non-FID Advanced Non-FID http://www.plinacro.hr The Project is awarded by WBIF grant for the Prefeasibility Study in the total amount of 0,4 mil €. Yes 2017-2026 1.3Non-FID Less-Advanced Non-FID BH-Gas over last years has applied to the available funds for FS,ESIA,CBA and Preliminary Design (WBIF, Programme of Public Investment of FBiH), but imposed measures frOm the Ministerial Council of the Energy Community to BiH on Dec. 2015. are currently stopped these activities. Yes SPP-Strategic plan and programme of FBiH PTG2

Non-FID Advanced Non-FID http://www.plinacro.hr Host Countries are Croatia, montenegro and Albania. Capex includes the CS in Split (Croatia) .Project was granted by WBIF for :- the Comprehensive Feasibility Study (3,5 mil EUR)- Gas Master Plan for Albania and MontenegroExit to BiH is under project TRA-N-302 Yes 2017-2026 1.1, 1.2,1.4,1.5,5.4

Non-FID Less-Advanced Non-FID http://www.hradf.com/en/portfolio/south-kavala-natural-gas-storage No The Project Promoter is not a Transmission System Operator and as such does not have the obligation to submit a National Development Plan. N/A

Non-FID Less-Advanced Non-FID All data refers to the part of the interconnection line on the territory of the Republic of Macedonia. Yes Work Program of the Government of R.Macedonia N/ANon-FID Less-Advanced Non-FID No The Project is included in the 10-year Development Study. The D. S. includes projects which are likely to be implemented but are not yet part of the compulsory Projects. N/A

Non-FID Less-Advanced Non-FID Yes Network Development Plan 2016-2025 N/ANon-FID Less-Advanced Non-FID Yes Ten-Year Network Development Plan of UTG N/A

Non-FID Less-Advanced Non-FID No This project is not included in the National Development Plan because no application has been made, by the promoter of the UGS in South Kavala, for the connection of this project to the Greek gas transmission system. N/A

0%

0%

0%

0%

0%

0%

Page 13: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

Reason for NDP non inclusion PCI Status Market Survey Date Market Survey Type PCI General Criteria Fulfilled PCI Specific Criteria Comments Main Driver Main Driver Explanation Benefit Description

PCI 02/10/2016 00:00:00 Other Yes Others The project is driven by SoS and market demand considerations I m plem ent at ion of t he invest m ent t asks wit hin t his pr oject will allow f or ensur ing f ull f unct ionalit y of PL-CZ and PL-SK int er connect ions. This pr oject will have an im pact on:enhancing f unct ionalit y of t r ansm ission syst em in Cent r al and Sout her n Poland in or der t o f acilit at e bet t er oper at ional f unct ioning of t he upgr aded PL-CZ int er connect ion and t o init iat e gas f low on t he planned PL-SK int er connect ion;incr easing t he secur it y of supply sour ces, r out es and count er par t s, as well as on pr oviding an over all f lexibilit y f or t he CEE r egion;im pr oving Eur opean gas gr id int er connect ions;cr eat ing a well-f unct ioning int er nal m ar ket in t he CEE r egion by ensur ing high r eliabilit y of t he cr oss-bor der t r ansm ission bet ween Poland, t he Czech Republic and Slovakia.

PCI 24/04/2012 00:00:00 Other Yes Others Regulation SoS and market integrationI m plem ent at ion of PL-CZ int er connect ion will have an im pact on:incr easing t he secur it y of gas supply, pr oviding over all f lexibilit y f or t he CEE r egion and diver sif ying t he supply r out es f or t he CEE r egion;im pr oving Eur opean gas gr id int er connect ion;incr easing t he secur it y and r eliabilit y of t he cr oss-bor der gas t r ansm ission bet ween t he Czech Republic and Poland ( f ulf ilm ent of N -1 r ule in Poland) ;cr eat ing a r obust , well-f unct ioning int er nal m ar ket in t he Czech Republic and Poland and pr om ot ing t he com pet it ion;cont r ibut ing t o t he cr eat ion of an int egr at ed and com pet it ive gas m ar ket in t he CEE r egion;est ablishing adequat e t echnical condit ions necessar y t o cover t he f or ecast ed gr owt h of t he gas dem and in Poland based on t he developm ent of t he power gener at ion sect or and possible lever age f or m ar ket coupling pot ent ial in Cent r al-East er n Eur ope.

PCI 17/05/2012 00:00:00 Other Yes Others Regulation SoS, Route Diversification as well as Market IntegrationThe Pr oject benef it s ar e: ( a) The Pr oject aim s t o incr ease t he cr oss-bor der capacit y bet ween Poland and t he Czech Republic by est ablishing a lar ge t r anspor t at ion cor r idor t hat will allow f or f lexible t r anspor t of gas in Cent r al Eur ope in dir ect ion N or t h-Sout h; ( b) I m plem ent at ion of t he Pr oject will incr ease t he secur it y of gas supply and pr ovide t he over all f lexibilit y f or t he CEE r egion and diver sif y t he supply r out es f or t he CEE r egion; ( c) I m pr ove Eur opean gas gr id int er connect ion; ( d) I ncr ease t he secur it y and r eliabilit y of t he cr oss-bor der gas t r ansm ission bet ween t he Czech Republic and Poland ( f ulf ilm ent of N -1 r ule in Poland) ; ( e) Cr eat e a r obust , well-f unct ioning int er nal m ar ket in t he Czech Republic and Poland and pr om ot e t he com pet it ion; ( f ) Cont r ibut e t o t he cr eat ion of t he int egr at ed and com pet it ive gas m ar ket in CEE r egion.

PCI 02/10/2016 00:00:00 Other Yes Others Regulation SoS, market demandThe pr oject will allow t o t r anspor t signif icant volum es of gas via PL-SK and PL-UA int er connect ions. I t will also enhance t he access t o t he USG St r achocina t hat have lar ge expansion pot ent ial and m ay ser ve as essent ial secur it y of supply inf r ast r uct ur e in t he CEE r egion.Const r uct ion of t he pipelines wit hin t his pr oject , t oget her wit h com plet ion of t he PL-SK int er connect ion and GI PL, will have a posit ive im pact on t he com pet it ion in t he CEE and Balt ic r egions, as t he pr oject will pr ovide a possibilit y t o open t he m ar ket f or m or e gas supplier s. This would in t ur n m ean ending t he st at e of m ajor dependency on one single gas supplier f or t he count r ies in t he r espect ive r egions t hanks t o t he pot ent ial access t o gas deliver ies f r om new sour ces.The pr oject s in East er n Poland ar e locat ed in t he ar ea which of f er s t he possibilit y t o ext r act unconvent ional gas. I f r eser ves ar e conf ir m ed, t he t r ansm ission inf r ast r uct ur e in East er n Poland m ight be used t o t r anspor t gas t o adjecent syst em s.

PCI 01/06/2016 00:00:00 Open Season Yes Others Incease of SoS in the CEE regionIntegration of gas infrastructure in the CEE region by constructing a cross-border interconnection between PL and SK that is currently missing. List of countrie s a s de fine d by the 2013/2014 PS-CBA a na lysis.E ve n though Ukra ine is not a m e m be r sta te of the E U, the Proje ct ha s im porta nt im pa ct to the country due to a doption of re ve rse flow ca pa city from S lova kia towa rds Ukra ine . Furthe rm ore , Ukra ine ha s a dopte d the Associa tion Agre e m e nt with the E urope a n Union a lre a dy.

PCI 01/07/2016 00:00:00 Open Season Yes Others Increase of SoS in the CEE region. Integration of gas infrastructure in the CEE region by constructing a cross-border interconnection between PL and SK that is currently missing.I m plem ent at ion of PL-SK int er connect ion will have an im pact on:cr eat ing t he cr oss-bor der capacit y bet ween Poland and Slovakia by est ablishing a lar ge t r anspor t at ion cor r idor t hat will allow f or f lexible t r anspor t of gas in Cent r al Eur ope wit hin t he N or t h-Sout h axis;incr easing t he secur it y of gas supply and diver sif icat ion of supply r out es f or t he CEE r egion;im pr oving Eur opean gas gr id int er connect ion;incr easing t he secur it y and r eliabilit y of t he cr oss-bor der gas t r ansm ission bet ween Slovakia and Poland ( cont r ibut ion t o N -1 st andar d in Poland and Slovakia) ;cr eat ing a r obust , well-f unct ioning int er nal m ar ket in Slovakia and Poland and pr om ot e t he com pet it ion;est ablishing adequat e t echnical condit ions necessar y t o cover t he f or ecast ed gr owt h of t he gas dem and in Poland based on t he developm ent of t he power gener at ion sect or and possible lever age f or m ar ket coupling pot ent ial in Cent r al-East er n Eur ope.

PCI 11/06/2015 00:00:00 Other Yes Others Market IntegrationThe BACI will ensur e t r ansm ission capacit y bet ween t he t wo m em ber st at es and will f acilit at e bet t er m ar ket int egr at ion and secur it y of gas supply also f or adjacent count r ies. I t cont r ibut es t o t he diver sif icat ion of gas supply and t he incr eased t r anspor t at ion oppor t unit ies t o and f r om ot her count r ies in CEE r egion and access t o new and exist ing t r ading m ar ket s. The BACI will enhance t he m ar ket developm ent due t o access t o UGSs bot h on t he Aust r ian and Czech side and t her ef or e will enhance t he m ar ket developm ent by pr oviding peak r egulat ion and t he f lexibilit y of gas f low. The BACI is a key elem ent in cr eat ing a well-f unct ioning int er nal m ar ket in t he CEE r egion due t o access t o exist ing and new im por t inf r ast r uct ur es such as a new LN G t er m inal in Poland and Cr oat ia, N or d St r eam and unconvent ional gas sour ces. Wit h t he BACI t he CEE r egion would becom e less vulner able t o a supply disr upt ion t hr ough Ukr aine and Belar us and t her ef or e t he r egion will have an incr ease of secur it y of supply.

PCI 11/06/2015 00:00:00 Other Yes Others Market IntegrationThe pr oject BACI will ensur e t r ansm ission capacit y bet ween t he t wo m em ber st at es and will f acilit at e bet t er m ar ket int egr at ion and secur it y of gas supply also f or adjacent count r ies. I t cont r ibut es t o t he diver sif icat ion of gas supply and t he incr eased t r anspor t at ion oppor t unit ies t o and f r om count r ies like Hungar y, Poland, Ger m any, I t aly, Fr ance, Slovenia, Cr oat ia and Slovakia and access t o new and exist ing t r ading m ar ket s. The pr oject BACI will enhance t he m ar ket developm ent due t o access t o under gr ound gas st or ages bot h on t he Aust r ian and Czech side and t her ef or e will enhance t he m ar ket developm ent by pr oviding peak r egulat ion and t he f lexibilit y of gas f low. The pr oject BACI is a key elem ent in cr eat ing a well-f unct ioning int er nal m ar ket in t he CEE r egion due t o access t o exist ing and new im por t inf r ast r uct ur es such as a new LN G t er m inal in Poland and Cr oat ia, N or d St r eam and unconvent ional gas sour ces. Wit h t he pr oject BACI t he CEE r egion would becom e less vulner able t o a supply

The project of building an LNG terminal on the Island of Krk was included in the Plinacro Ltd. (Croatian Transmission Operator) NDP where it was analysed in detail. The reason why the project does not have a code in the NDP is that LNG Croatia LLC became the project promoter in May 2014. PCI 08/12/2014 00:00:00 Open Season Yes All specific criteria are fulfilled by this project Regulation SoS I m por t ance of LN G t er m inal in Cr oat ia is in possibilit y of pr oviding nat ur al gas t o m ult iple count r ies in t he r egion. Count r ies included: Hungar y, Slovenia, Aust r ia, I t aly, Ger m any, Czech Republic, Slovak Republic, f or m er Yugoslav Republic of Macedonia, Albania, Kosovo, Ser bia, Mont enegr o, Bosnia and Her zegovina, Ukr aine, Rom ania, and Bulgar ia. Gas supply in t he r egion is heavily dependent on one supply sour ce and t her ef or e LN G t er m inal in Cr oat ia r epr esent s a m ajor diver sif icat ion gas supply r out e in t he r egion. Project benefits include: providing diversity of supply of natural gas, providing security of supply of natural gas, introducing the ecologically sound energy source in the region, reducing CO₂emissions in the region, facilitating economic development, etc.

PCI 01/08/2016 00:00:00 Open Season Yes Pr oject will connect sever al, in t he f ut ur e except ionally im por t ant , point s of t he Cr oat ian gas t r ansm ission syst em . I t is t he f ut ur e st r at egic gas t r ansm ission connect or of gr eat signif icance and is an int egr al par t of t he N or t h – Sout h Eur opean Cor r idor nam edas t he N or t h-Sout h ( Balt ic – Adr iat ic) Gas Connect ion. I t s pur pose is linkingt he Polish and t he Cr oat ian LN G ( Liquef ied N at ur al Gas) solut ions.This gas pipeline ( as well as all t he pipelines t o which it connect s and t he associat ed gas nodes) will pr ovide gas t r ansm ission in all dir ect ions, i.e. it will sat isf y all t r ansm ission r equir em ent s and will m axim ise t he value of t he I AP and LN G pr oject s in Cr oat ia and t he r egion. I n addit ion, it will incr ease t he use of t he exist ing syst em and t he new int er connect ion wit h Hungar y.Market Demand This gas pipeline passes only t hr ough t he t er r it or y of t he Republic of Cr oat ia. However , it has r egional signif icance since it is t he m ain evacuat ion gas pipeline f r om t he LN G solut ion on t he island of Kr k t owar ds Hungar y and it is it s m ain r ole. This gas pipeline incr eases ut ilisat ion of t he int er connect ion wit h Hungar y so it has inf luence on Hungar y but also f ur t her on Slovakia and Ukr aine. The gas pipeline shall be also signif icant f or t hir d count r ies; Ser bia, Bosnia and Her zegovina by const r uct ing int er connect ion wit h t hese count r ies.The pr oject is t he m ain gas pipeline f or t r anspor t of LN G f r om t he t er m inal on t he island of Kr k as well as f r om ot her possible sour ces, such as gas f r om t he I onian-Adr iat ic Pipeline , t owar ds CEE and SEE count r ies. At t he sam e t im e, in addit ion t o alr eady const r uct ed int er connect ion gas pipeline wit h Hungar y, Slobodnica-Donji Miholjac-Dr avaszer dahely, it pr esent s t he Cr oat ian par t of t he st r at egic t r ansr egional gas pipeline connect ion Adr iat ic-Balt ic t he aim of which is t o connect t he Polish and Cr oat ian LN G t er m inal. The m ost im por t ant im pact s and benef it s of t his pr oject :1. I t pr ovides viable and secur e supply of CEE and SEE count r ies, which ar e heavily dependent on t he Russian gas and jeopar dized by t he Russian giving up on t he Sout h St r eam pr oject and t he announcem ent r egar ding t er m inat ion of gas t r ansm ission via Ukr aine af t er 20192. I t pr ovides diver sif icat ion of supply ( also in case t he pr eviously m ent ioned t hr eat s f ail t o occur ) and t her eby com pet it iveness and lower pr ice

Non-PCI 01/08/2016 00:00:00 Open Season Yes Pr oject will connect sever al, in t he f ut ur e except ionally im por t ant , point s of t he Cr oat ian gas t r ansm ission syst em . I t is t he f ut ur e st r at egic gas t r ansm ission connect or of gr eat signif icance and is an int egr al par t of t he N or t h – Sout h Eur opean Cor r idor nam edas t he N or t h-Sout h ( Balt ic – Adr iat ic) Gas Connect ion. I t s pur pose is linkingt he Polish and t he Cr oat ian LN G ( Liquef ied N at ur al Gas) solut ions.This gas pipeline ( as well as all t he pipelines t o which it connect s and t he associat ed gas nodes) will pr ovide gas t r ansm ission in all dir ect ions, i.e. it will sat isf y all t r ansm ission r equir em ent s and will m axim ise t he value of t he I AP and LN G pr oject s in Cr oat ia and t he r egion. I n addit ion, it will incr ease t he use of t he exist ing syst em and t he new int er connect ion wit h Hungar y.Market Demand This gas pipeline passes only t hr ough t he t er r it or y of t he Republic of Cr oat ia. However , it has r egional signif icance since it is t he m ain evacuat ion gas pipeline f r om t he LN G solut ion on t he island of Kr k t owar ds Hungar y and it is it s m ain r ole. This gas pipeline incr eases ut ilisat ion of t he int er connect ion wit h Hungar y so it has inf luence on Hungar y but also f ur t her on Slovakia and Ukr aine. The gas pipeline shall be also signif icant f or t hir d count r ies; Ser bia, Bosnia and Her zegovina by const r uct ing int er connect ion wit h t hese count r ies.The pr oject is t he m ain gas pipeline f or t r anspor t of LN G f r om t he t er m inal on t he island of Kr k as well as f r om ot her possible sour ces, such as gas f r om t he I onian-Adr iat ic Pipeline , t owar ds CEE and SEE count r ies. At t he sam e t im e, in addit ion t o alr eady const r uct ed int er connect ion gas pipeline wit h Hungar y, Slobodnica-Donji Miholjac-Dr avaszer dahely, it pr esent s t he Cr oat ian par t of t he st r at egic t r ansr egional gas pipeline connect ion Adr iat ic-Balt ic t he aim of which is t o connect t he Polish and Cr oat ian LN G t er m inal. The m ost im por t ant im pact s and benef it s of t his pr oject :1. I t pr ovides viable and secur e supply of CEE and SEE count r ies, which ar e heavily dependent on t he Russian gas and jeopar dized by t he Russian giving up on t he Sout h St r eam pr oject and t he announcem ent r egar ding t er m inat ion of gas t r ansm ission via Ukr aine af t er 2019.2. I t pr ovides diver sif icat ion of supply ( also in case t he pr eviously m ent ioned t hr eat s f ail t o occur ) and t her eby com pet it iveness and lower pr ice

PCI 01/08/2016 00:00:00 Other Yes Pr oject will connect sever al, in t he f ut ur e except ionally im por t ant , point s of t he Cr oat ian gas t r ansm ission syst em . I t is t he f ut ur e st r at egic gas t r ansm ission connect or of gr eat signif icance and is an int egr al par t of t he N or t h – Sout h Eur opean Cor r idor nam edas t he N or t h-Sout h ( Balt ic – Adr iat ic) Gas Connect ion. I t s pur pose is linkingt he Polish and t he Cr oat ian LN G ( Liquef ied N at ur al Gas) solut ions.This gas pipeline ( as well as all t he pipelines t o which it connect s and t he associat ed gas nodes) will pr ovide gas t r ansm ission in all dir ect ions, i.e. it will sat isf y all t r ansm ission r equir em ent s and will m axim ise t he value of t he I AP and LN G pr oject s in Cr oat ia and t he r egion. I n addit ion, it will incr ease t he use of t he exist ing syst em and t he new int er connect ion wit h Hungar y. Market Demand This gas pipeline passes only t hr ough t he t er r it or y of t he Republic of Cr oat ia. However , it has r egional signif icance since it is t he m ain evacuat ion gas pipeline f r om t he LN G solut ion on t he island of Kr k t owar ds Hungar y and it is it s m ain r ole. This gas pipeline incr eases ut ilisat ion of t he int er connect ion wit h Hungar y so it has inf luence on Hungar y but also f ur t her on Slovakia and Ukr aine. The gas pipeline shall be also signif icant f or t hir d count r ies; Ser bia, Bosnia and Her zegovina by const r uct ing int er connect ion wit h t hese count r ies.The pr oject is t he m ain gas pipeline f or t r anspor t of LN G f r om t he t er m inal on t he island of Kr k as well as f r om ot her possible sour ces, such as gas f r om t he I onian-Adr iat ic Pipeline , t owar ds CEE and SEE count r ies. At t he sam e t im e, in addit ion t o alr eady const r uct ed int er connect ion gas pipeline wit h Hungar y, Slobodnica-Donji Miholjac-Dr avaszer dahely, it pr esent s t he Cr oat ian par t of t he st r at egic t r ansr egional gas pipeline connect ion Adr iat ic-Balt ic t he aim of which is t o connect t he Polish and Cr oat ian LN G t er m inal. The m ost im por t ant im pact s and benef it s of t his pr oject :1. I t pr ovides viable and secur e supply of CEE and SEE count r ies, which ar e heavily dependent on t he Russian gas and jeopar dized by t he Russian giving up on t he Sout h St r eam pr oject and t he announcem ent r egar ding t er m inat ion of gas t r ansm ission via Ukr aine af t er 2019.2. I t pr ovides diver sif icat ion of supply ( also in case t he pr eviously m ent ioned t hr eat s f ail t o occur ) and t her eby com pet it iveness and lower pr

PCI 01/05/2017 00:00:00 Other Yes Others The project should enhance the system flexibility and contribute to the security of supply within the region (increased interconnection between Bulgaria and Serbia)

PCI 02/05/2017 00:00:00 Other The m oder nizat ion, r ehabilit at ion and expansion of t he exist ing gas t r ansm ission inf r ast r uct ur e will guar ant ee secur e and r eliable nat ur al gas t r ansm ission, enhance t he ef f iciency, r eliabilit y and f lexibilit y of t he t r ansm ission syst em and pr ovide t he r equir ed capacit ies and pr essur es. The im plem ent at ion of t he act ivit ies planned will secur e t he t echnical capabilit ies f or t r ansm ission of addit ional nat ur al gas quant it ies t hr ough t he t er r it or y of t he count r y, com ing in t hr ough t he exist ing and new ent r y and exit point s, and oppor t unit ies f or diver sif icat ion of t he dir ect ions of t r ansm ission depending on t he m ar ket int er est . Others Wit h t he im plem ent at ion of t he pr oject im pr ovem ent of t he t r ansm ission syst em ’s ef f iciency, r eliabilit y and f lexibilit y will be achieved, ensur ing t he necessar y capacit ies and pr essur es including pr essur e r ecover y, bot t lenecks r em oval, pr oviding t echnical capabilit ies f or t r ansm ission of addit ional nat ur al gas quant it ies t hr ough t he t er r it or y of t he count r y, in r elat ion t o t he planned new ent r y and exit point s and oppor t unit ies f or diver sif icat ion of t he t r ansm ission dir ect ions depending on t he m ar ket int er est and last but not least m anagem ent opt im izat ion of t he gas f lows and set t ing t he f acilit ies m eet ing t he ecologic r equir em ent s. Thus t he t echnical and econom ic par am et er s of t he exist ing gas inf r ast r uct ur e which has been in oper at ion f or f or t y year s now will be im pr oved.The pr oject im plem ent at ion will cont r ibut e t o incr easing t he degr ee of m ar ket int egr at ion, cr eat ing a com pet it ive gas m ar ket , encour aging t he t r ade developm ent , ensur ing gr eat er syst em s’ f lexibilit y, r isk m anagem ent opt im izat ion.I t is dir ect ly r elat ed t o t he planned new int er connect ions wit h Gr eece ( I GB) , Rom ania ( I BR) , Tur key ( I TB) and Ser bia ( I BS) and wit h t he use of t he UGS Chir en’s capacit y in r elat ion t o t he pr oject f or it s expansion, m ost of t hem labeled as PCI s, and wit h t he developm ent of t he signif icant cr oss-bor der gas pr oject s in t he r egion. Their ef f icient use is r elat ed t o t he t echnical capacit ies of t he exist ing gas t r ansm ission inf r ast r uct ur e on t he t er r it or y of Bulgar ia t o ensur e suf f icient capacit y and adequat e t echnical condit ions f or t he t r anspor t of t he planned new nat ur al gas quant it ies. The pr oject was suppor t ed at t he highest polit ical level, as well as at r egional level – it is a pr ior it y CESEC pr oject .

PCI 11/12/2017 00:00:00 Other Yes Market DemandPCI 08/09/2016 00:00:00 Auction Yes As regional gas interconnector, IGB will bring benefits on all criteria, an in particular will secure new gas sources and market integration in a SEE region, suffering from a high level of dependcy on single source of imports and lack of regional cross-border gas interconnections. Market Demand Schedule towards commissioning will be affected by binding requests from shippers IGB development is not associated with a specific supply source. The pipeline can interact with alternative supply sources - such as, Southern Corridor pipeline gas, LNG through Greece/ Turkey.

This project is included in the 10-year Development Study. The D. S. includes projects which are likely to be implemented but are not yet part of the compulsory Projects. Non-PCI 11/12/2007 00:00:00 Other Yes Market Demand

PCI 02/05/2017 00:00:00 Other The m oder nizat ion, r ehabilit at ion and expansion of t he exist ing gas t r ansm ission inf r ast r uct ur e will guar ant ee secur e and r eliable nat ur al gas t r ansm ission, enhance t he ef f iciency, r eliabilit y and f lexibilit y of t he t r ansm ission syst em and pr ovide t he r equir ed capacit ies and pr essur es. The im plem ent at ion of t he act ivit ies planned will secur e t he t echnical capabilit ies f or t r ansm ission of addit ional nat ur al gas quant it ies t hr ough t he t er r it or y of t he count r y, com ing in t hr ough t he exist ing and new ent r y and exit point s, and oppor t unit ies f or diver sif icat ion of t he dir ect ions of t r ansm ission depending on t he m ar ket int er est . Others Wit h t he im plem ent at ion of t he pr oject im pr ovem ent of t he t r ansm ission syst em ’s ef f iciency, r eliabilit y and f lexibilit y will be achieved, ensur ing t he necessar y capacit ies and pr essur es including pr essur e r ecover y, bot t lenecks r em oval, pr oviding t echnical capabilit ies f or t r ansm ission of addit ional nat ur al gas quant it ies t hr ough t he t er r it or y of t he count r y, in r elat ion t o t he planned new ent r y and exit point s and oppor t unit ies f or diver sif icat ion of t he t r ansm ission dir ect ions depending on t he m ar ket int er est and last but not least m anagem ent opt im izat ion of t he gas f lows and set t ing t he f acilit ies m eet ing t he ecologic r equir em ent s. Thus t he t echnical and econom ic par am et er s of t he exist ing gas inf r ast r uct ur e which has been in oper at ion f or f or t y year s now will be im pr oved.The pr oject im plem ent at ion will cont r ibut e t o incr easing t he degr ee of m ar ket int egr at ion, cr eat ing a com pet it ive gas m ar ket , encour aging t he t r ade developm ent , ensur ing gr eat er syst em s’ f lexibilit y, r isk m anagem ent opt im izat ion.I t is dir ect ly r elat ed t o t he planned new int er connect ions wit h Gr eece ( I GB) , Rom ania ( I BR) , Tur key ( I TB) and Ser bia ( I BS) and wit h t he use of t he UGS Chir en’s capacit y in r elat ion t o t he pr oject f or it s expansion, m ost of t hem labeled as PCI s, and wit h t he developm ent of t he signif icant cr oss-bor der gas pr oject s in t he r egion. Their ef f icient use is r elat ed t o t he t echnical capacit ies of t he exist ing gas t r ansm ission inf r ast r uct ur e on t he t er r it or y of Bulgar ia t o ensur e suf f icient capacit y and adequat e t echnical condit ions f or t he t r anspor t of t he planned new nat ur al gas quant it ies. The pr oject was suppor t ed at t he highest polit ical level, as well as at r egional level – it is a pr ior it y CESEC pr oject .

PCI 11/12/2017 00:00:00 Other Yes Market DemandThe Project is not included in the NDP because it is an Independent Natural Gas System and therefore the NTSO is not obliged to include it in the NDP because it is not the Project's promoter and/or operator. PCI 01/03/2017 00:00:00 Open Season Yes Ma rke t Inte gra tion - Re giona l (SE E + Se rbia + FYROM) a nd be yond (e .g. Hunga ry a nd through a cross the NS I ga s corridor)Se curity of Supply through inte r a l ia source a nd route dive rsifica tion- Gre e ce , Bulga ria , Se rbia , FYROM, Hunga ry, Ukra ine , T urke yE nha nce s com pe tition in the re gion by introducing ne w source s a nd route s of supplySusta ina bil ity - Supports ba ck up to re ne wa ble s a nd powe r to ga s Market Demand Main drivers:1. Expressed requirement for diversif ication of supply sources and routes for SEE markets (Bulgaria, Serbia, FYROM, Romania,Hungary) creates market / demand opportunities for the project2. Regional demand growthLN G t er m inal in nor t her n Gr eece will:Secur e new nat ur al gas quant it ies f or t he supply of t he Gr eek and t he SE Eur opean m ar ket s, hence enhancing t he secur it y of supply of t hese m ar ket s.Diver sif y t he supply sour ces and r out es in par t icular wit h r egar ds t o m ar ket s wit h lim it ed supply opt ions ( Bulgar ia, Ser bia, Rom ania, FYRO M, Hungar y, Ukr aine) and t o t his ext ent lif t exist ing isolat ion wit h an aim t o r educe dependency on Russian gas while pr ovide access f or new gas f indings in t he East Med basin t o t he m ar ket s of SEE.Suppor t t he Sout h Cor r idor pr oject ( s) by pr oviding alt er nat ive/addit ional supply quant it ies when/ if r equir ed and t he int er oper abilit y of syst em s and t he cr eat ion of a r egional gas t r ading hub.The Pr oject t echnical design will include pr ovision f or LN G-r eloading abilit y f or t he pur pose of suppor t ing LN G bunker ing act ivit ies or r egional dist r ibut ion of LN G t o r em ot e island locat ions f or power gener at ion and ot her indust r ial and com m er cial act ivit ies.

The Project is not included in the NDP because it is an Independent Natural Gas System and therefore the NTSO is not obliged to include it in the NDP because it is not the Project's promoter and/or operator. PCI 01/03/2017 00:00:00 Open Season Yes Ma rke t Inte gra tion - Re giona l (SE E + Se rbia + FYROM) a nd be yond (e .g. Hunga ry a nd through a cross the NS I ga s corridor)Se curity of Supply through inte r a l ia source a nd route dive rsifica tion- Gre e ce , Bulga ria , Se rbia , FYROM, Hunga ry, Ukra ine , T urke yE nha nce s com pe tition in the re gion by introducing ne w source s a nd route s of supplySusta ina bil ity - Supports ba ck up to re ne wa ble s a nd powe r to ga s Market Demand Main drivers:1. Expressed requirement for diversif ication of supply sources and routes for SEE markets (Bulgaria, Serbia, FYROM, Romania, Hungary) creates market / demand opportunities for the project2. Regional demand growthLN G t er m inal in nor t her n Gr eece will:Secur e new nat ur al gas quant it ies f or t he supply of t he Gr eek and t he SE Eur opean m ar ket s, hence enhancing t he secur it y of supply of t hese m ar ket s.Diver sif y t he supply sour ces and r out es in par t icular wit h r egar ds t o m ar ket s wit h lim it ed supply opt ions ( Bulgar ia, Ser bia, Rom ania, FYRO M, Hungar y, Ukr aine) and t o t his ext ent lif t exist ing isolat ion wit h an aim t o r educe dependency on Russian gas while pr ovide access f or new gas f indings in t he East Med basin t o t he m ar ket s of SEE.Suppor t t he Sout h Cor r idor pr oject ( s) by pr oviding alt er nat ive/addit ional supply quant it ies when/ if r equir ed and t he int er oper abilit y of syst em s and t he cr eat ion of a r egional gas t r ading hub.The Pr oject t echnical design will include pr ovision f or LN G-r eloading abilit y f or t he pur pose of suppor t ing LN G bunker ing act ivit ies or r egional dist r ibut ion of LN G t o r em ot e island locat ions f or power gener at ion and ot her indust r ial and com m er cial act ivit ies.

This project is not included in the National Development Plan because no application has been made, by the promoter of the LNG terminal in Northern Greece, for the connection of this project to the Greek gas transmission system. Non-PCI 30/06/2017 00:00:00 Other Yes Market Demand

The Project is not included in the NDP because it is an Independent Natural Gas System and therefore the NTSO is not obliged to include it in the NDP because it is not the Project's promoter and/or operator. PCI 01/03/2017 00:00:00 Open Season Yes Ma rke t Inte gra tion - Re giona l (SE E + Se rbia + FYROM) a nd be yond (e .g. Hunga ry a nd through a cross the NS I ga s corridor)Se curity of Supply through inte r a l ia source a nd route dive rsifica tion- Gre e ce , Bulga ria , Se rbia , FYROM, Hunga ry, Ukra ine , T urke yE nha nce s com pe tition in the re gion by introducing ne w source s a nd route s of supplySusta ina bil ity - Supports ba ck up to re ne wa ble s a nd powe r to ga s Market Demand Main drivers:1. Expressed requirement for diversif ication of supply sources and routes for SEE markets (Bulgaria, Serbia, FYROM, Romania,Hungary) creates market / demand opportunities for the project2. Regional demand growthLN G t er m inal in nor t her n Gr eece will:Secur e new nat ur al gas quant it ies f or t he supply of t he Gr eek and t he SE Eur opean m ar ket s, hence enhancing t he secur it y of supply of t hese m ar ket s.Diver sif y t he supply sour ces and r out es in par t icular wit h r egar ds t o m ar ket s wit h lim it ed supply opt ions ( Bulgar ia, Ser bia, Rom ania, FYRO M, Hungar y, Ukr aine) and t o t his ext ent lif t exist ing isolat ion wit h an aim t o r educe dependency on Russian gas while pr ovide access f or new gas f indings in t he East Med basin t o t he m ar ket s of SEE.Suppor t t he Sout h Cor r idor pr oject ( s) by pr oviding alt er nat ive/addit ional supply quant it ies when/ if r equir ed and t he int er oper abilit y of syst em s and t he cr eat ion of a r egional gas t r ading hub.The Pr oject t echnical design will include pr ovision f or LN G-r eloading abilit y f or t he pur pose of suppor t ing LN G bunker ing act ivit ies or r egional dist r ibut ion of LN G t o r em ot e island locat ions f or power gener at ion and ot her indust r ial and com m er cial act ivit ies.

The Project is not included in the NDP because it is an Independent Natural Gas System and therefore the NTSO is not obliged to include it in the NDP because it is not the Project's promoter and/or operator. PCI 01/03/2017 00:00:00 Open Season Yes Ma rke t Inte gra tion - Re giona l (SE E + Se rbia + FYROM) a nd be yond (e .g. Hunga ry a nd through a cross the NS I ga s corridor)Se curity of Supply through inte r a l ia source a nd route dive rsifica tion- Gre e ce , Bulga ria , Se rbia , FYROM, Hunga ry, Ukra ine , T urke yE nha nce s com pe tition in the re gion by introducing ne w source s a nd route s of supplySusta ina bil ity - Supports ba ck up to re ne wa ble s a nd powe r to ga s Market Demand Main drivers:1. Expressed requirement for diversif ication of supply sources and routes for SEE markets (Bulgaria, Serbia, FYROM, Romania, Hungary) creates market / demand opportunities for the project2. Regional demand growthLN G t er m inal in nor t her n Gr eece will:Secur e new nat ur al gas quant it ies f or t he supply of t he Gr eek and t he SE Eur opean m ar ket s, hence enhancing t he secur it y of supply of t hese m ar ket s.Diver sif y t he supply sour ces and r out es in par t icular wit h r egar ds t o m ar ket s wit h lim it ed supply opt ions ( Bulgar ia, Ser bia, Rom ania, FYRO M, Hungar y, Ukr aine) and t o t his ext ent lif t exist ing isolat ion wit h an aim t o r educe dependency on Russian gas while pr ovide access f or new gas f indings in t he East Med basin t o t he m ar ket s of SEE.Suppor t t he Sout h Cor r idor pr oject ( s) by pr oviding alt er nat ive/addit ional supply quant it ies when/ if r equir ed and t he int er oper abilit y of syst em s and t he cr eat ion of a r egional gas t r ading hub.The Pr oject t echnical design will include pr ovision f or LN G-r eloading abilit y f or t he pur pose of suppor t ing LN G bunker ing act ivit ies or r egional dist r ibut ion of LN G t o r em ot e island locat ions f or power gener at ion and ot her indust r ial and com m er cial act ivit ies.

PCI 01/05/2017 00:00:00 Other Yes Others The project should enhance the system flexibility and contribute to the security of supply within the region (increased interconnection between Bulgaria and Serbia)

Page 14: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

PCI 05/12/2016 00:00:00 Other Yes Regulation-Interroperability

Non-PCI 05/12/2016 00:00:00 Open Season Regulation SoS Posit ive im pact f or secur it y of supply wit h gas f or Rom ania and Bulgar ia t hr ough t he diver sif icat ion of t he gas t r ansm ission r out es and enabling access t o new sour ces ( t he Black Sea zone) ;- I ncr ease of secur it y of supply wit h gas f or Rom ania. Since t his pipleine enables access t o new supply sour ces over t he long t er m , t he pr obabilit y t o int er r upt gas supply will be r educed, and in case of an int er r upt ion, t he consequences will be less ser ious. This incr ease of secur it y of supply has benef it s also f or Bulgar ia t hr ough a lar ger gas deliver y availabilit y, ensur ing t hus t he cr oss-bor der ext er nalit ies; - I ncr ease of com pet it ion t hr ough t he diver sif icat ion of t he gas supply sour ces and t r ansm ission r out es, and t he t he em er ging of new player s on t he r egional gas m ar ket , wit h posit ive ef f ect s on t he gas pr ice, t hus decr easing m ar ket concent r at ion f or each im pact ed count r y;- I ncr ease of sust ainabilit y t hr ough dim inishing CO 2 em issions, as a r esult of r eplacing gas wit h liquid ( oil) or solid f ossil f uels ( coal) wit h higher CO 2 em issions.

PCI 31/03/2023 00:00:00 Other Yes The project fulfills also the criteria of diversification of sources, diversification of routes, N-1 National (Italy), back-up for renewables, power-to-gas, market Integration (Increase of competition) and flexibility of the system. Market Demand Security of supply, diversification of sources, diversification of routes, N-1 National (Italy), back-up for renewables, power-to-gas, market Integration (Increase of competition) and flexibility of the system.

Non-PCI 01/01/2012 00:00:00 Other Yes The project appears necessary considering that the stress test on the existing pipeline system have proved critical issues in case of emergency or peak demand in an area where gas flows from the south and from the north merges at a relatively low pressure regime. Regulation SoSThe const r uct ion of t he adr iat ic coast pipeline will st r engt hen t he f low capacit y t o SGI ’s net wor k f r om t he Sout h.The pr oject will enable a new connect ion t o t he St ogit ’s San Salvo St or age f acit it y and t o addit ional pot ent ial f ut ur e st or age f acilit ies planned in t he ar eaI t is expect ed t o deliver incr em ent al capacit y nor t hwar d t hr ough connect ion t o exist ing st or age f acilit ies ( Cellino) and will com plet e a m ajor int egr at ed gas t r anspor t syst em in Cent r al I t alyThe pipe, t oget her wit h t he const r uct ion of t he planned com pr ession st at ion, will allow t he r et ur n t o SRG of volum es com ing f r om St ogit San Salvo st or ageThe pr oject will st r enght en an ar ea wher e gas f lows f r om t he sout h and f r om t he nor t h m er ges at a r elat ively low pr essur e r egim e. I n cr it ical condit ions t his set up will f ace pr oblem in m eet ing peak gas dem and.The pr oject will add 5 m il st andar d cubic m et er s per day t o t he peak gas capacit y in r ever se f low m ode ( bot h in t he f low sout h/nor t h and in t he f low nor t h/sout h) . Increasing flexibility and allowing reverse flow along the Adriatic coasto:1) support the management of Emergency situation by Snam and 2) ensure the capability to meet increasing peak demand requirement in the area.

As far as we are aware, currently there is no comprehrensive system wide national development plan, only one regarding the gas transmission infrastructure put together by the TSO. Nevertheless, the operator submitted a 5-year investment plan to Romanian NRA in 2015, which is updated anually. PCI 30/09/2015 00:00:00 Other Yes Alt hough t he pr oject m eet s all t he cr it er ia, t he m ost signif icant cont r ibut ion it br ings is t o t he EU's secur it y of supply.- The pr oject is even m or e im por t ant in a low inf r ast r uct ur e scenar io, in which t he N -1 indicat or is below 100% and in which t he addit ional st or age capacit y of Depom ur es would par t ially com pensat e a m alf unct ion at Mediesu-Aur it / I saccea gas ent r y point f r om Ukr aine t o Rom ania.- The r em aining f lexibilit y indicat or shows t hat t he pr oject successf ully cont r ibut es t o incr easing r esilience in case of addit ional dem and in alm ost all scenar ios wit h im pact on Rom ania, Bulgar ia, Hungar y, I t aly, Gr eece and Cr oat ia. The im pact is m ost visible in ext r em e scenar ios such as Ukr aine disr upt ion wit h 2 week cold spell.- The pr oject cont r ibut es t o a decr ease of t he disr upt ed dem and in t wo Mem ber s St at es, nam ely Rom ania and Bulgar ia, and also in t he FYR of Macedonia ( alt hough not a Mem ber St at e) in m ost scenar ios.Regulation SoS In addition to those mentioned in the additional comments to the specific criteria, the project is even more important in the current rather potentially unstable geo-political context in the far Eastern Europe in which having sufficient capacities of the gas storage facilities may become critical for ensuring security of supply.Mar ket I nt egr at ion The Pr oject successf ully cont r ibut es t o incr easing r esilience in case of addit ional dem and in alm ost all disr upt ion scenar ios wit h posit ive im pact on Rom ania, Bulgar ia, Hungar y, I t aly, Gr eece and Cr oat ia. Thus, indir ect ly it cont r ibut es t o a m or e int egr at ed gas m ar ket .Sust ainabilit y I t r eplaces exist ing r at her obsolet e gas com pr ession f acilit ies wit h m oder n and high-ef f iciency t echnology ( new elect r o-com pr essor s et c.) which will r educe em issions cur r ent ly gener at ed by t he com pr ession ser vices supplied by t he t hir d par t y.Com pet it ionThe im plem ent at ion of t his pr oject would also incr ease t he com pet it ion on t he Rom anian st or age m ar ket consider ing t hat cur r ent ly t her e ar e only 2 player s: Depom ur es, t he pr ivat e oper at or wit h ~10% m ar ket shar e and Rom gaz, st at e owned, wit h ~90% m ar ket shar e. Af t er pr oject CO D, t he m ar ket shar e of t he pr ivat e sect or would incr ease pr opor t ionally.

PCI 02/05/2017 00:00:00 Other The pr oject f or it s expansion aim s on one hand at cr eat ing condit ions t o ensur e secur it y of supplies t o Bulgar ian user s and user s in t he count r ies f r om t he r egion, and on t he ot her - UGS Chir en developm ent as com m er cial gas st or age in an int er connect ed r egional and Eur ope-wide m ar ket , as UGS Chir en is an int egr al par t of t he plans f or developm ent of t he r egional gas syst em consist ing of int er connect ions, LN G t er m inals, st or age f acilit ies.I n t he m edium t er m UGS Chir en pr om ises t o becom e a com m er cial f acilit y wit h a signif icant r ole in com pet it ion developm ent in t he r egional gas m ar ket and in pr ovision of addit ional f lexibilit y of t he gas t r ansm ission syst em s at r egional level, wit h a signif icant cont r ibut ion t o congest ion m anagem ent and seasonal opt im izat ion of use of t he gas t r ansm ission syst em s.Regulation SoSUGS Chir en has been t he only gas st or age on t he t er r it or y of Bulgar ia f or 40 year s. I t is a key inst r um ent f or t he f unct ioning of t he gas m ar ket in Bulgar ia, cover ing seasonal f luct uat ions in nat ur al gas consum pt ion in t he count r y by secur ing t he necessar y f lexibilit y caused by t he dif f er ences bet ween t he supplies and consum pt ion and ensur es em er gency r eser ve. UGS Chir en is a cr ucial inst r um ent ensur ing t he secur it y of gas supplies.I n t he m edium t er m UGS Chir en pr om ises t o becom e a com m er cial f acilit y wit h a signif icant r ole in com pet it ion developm ent in t he r egional gas m ar ket and in pr ovision of addit ional f lexibilit y of t he gas t r ansm ission syst em s at r egional level, wit h a signif icant cont r ibut ion t o congest ion m anagem ent and seasonal opt im izat ion of use of t he gas t r ansm ission syst em s. The pr oject f or it s expansion aim s on one hand at cr eat ing condit ions t o ensur e secur it y of supplies t o Bulgar ian user s and user s in t he count r ies f r om t he r egion, and on t he ot her - UGS Chir en developm ent as com m er cial gas st or age in an int er connect ed r egional and Eur ope-wide m ar ket , as UGS Chir en is an int egr al par t of t he plans f or developm ent of t he r egional gas syst em consist ing of int er connect ions, LN G t er m inals, st or age f acilit ies.

As far as we are aware, currently there is no comprehrensive system wide national development plan, only one regarding the gas transmission infrastructure put together by the TSO. Nevertheless, the operator submitted a 5-year investment plan to Romanian NRA in 2015, which is updated anually. PCI 30/09/2015 00:00:00 Other Yes Alt hough t he pr oject m eet s all t he cr it er ia, t he m ost signif icant cont r ibut ion it br ings is t o t he EU's secur it y of supply.- The pr oject is even m or e im por t ant in a low inf r ast r uct ur e scenar io, in which t he N -1 indicat or is below 100% and in which t he addit ional st or age capacit y of Depom ur es would par t ially com pensat e a m alf unct ion at Mediesu-Aur it / I saccea gas ent r y point f r om Ukr aine t o Rom ania.- The r em aining f lexibilit y indicat or shows t hat t he pr oject successf ully cont r ibut es t o incr easing r esilience in case of addit ional dem and in alm ost all scenar ios wit h im pact on Rom ania, Bulgar ia, Hungar y, I t aly, Gr eece and Cr oat ia. The im pact is m ost visible in ext r em e scenar ios such as Ukr aine disr upt ion wit h 2 week cold spell.- The pr oject cont r ibut es t o a decr ease of t he disr upt ed dem and in t wo Mem ber s St at es, nam ely Rom ania and Bulgar ia, and also in t he FYR of Macedonia ( alt hough not a Mem ber St at e) in m ost scenar ios.Regulation SoS In addition to those mentioned in the additional comments to the specific criteria, the project is even more important in the current rather potentially unstable geo-political context in the far Eastern Europe in which having sufficient capacities of the gas storage facilities may become critical for ensuring security of supply.Mar ket I nt egr at ion The Pr oject successf ully cont r ibut es t o incr easing r esilience in case of addit ional dem and in alm ost all disr upt ion scenar ios wit h posit ive im pact on Rom ania, Bulgar ia, Hungar y, I t aly, Gr eece and Cr oat ia. Thus, indir ect ly it cont r ibut es t o a m or e int egr at ed gas m ar ket .Sust ainabilit y I t r eplaces exist ing r at her obsolet e gas com pr ession f acilit ies wit h m oder n and high-ef f iciency t echnology ( new elect r o-com pr essor s et c.) which will r educe em issions cur r ent ly gener at ed by t he com pr ession ser vices supplied by t he t hir d par t y.Com pet it ionThe im plem ent at ion of t his pr oject would also incr ease t he com pet it ion on t he Rom anian st or age m ar ket consider ing t hat cur r ent ly t her e ar e only 2 player s: Depom ur es, t he pr ivat e oper at or wit h ~10% m ar ket shar e and Rom gaz, st at e owned, wit h ~90% m ar ket shar e. Af t er pr oject CO D, t he m ar ket shar e of t he pr ivat e sect or would incr ease pr opor t ionally.

S.N.G.N. ROMGAZ, the project promoter, is not a TSO, it is only storage operator, therefore it is not mandatory to have a TYNDP, as Transgaz has. There is no NDP country level. PCI 01/06/2017 00:00:00 Other Yes I ncr ease of secur it y of supply by adding new st or age capacit y in t he East er n par t of Rom ania. This par t of Rom ania includes m ajor cit ies and indust r y and has t he coldest clim at e in Rom ania. Possible incr ease of secur it y of supply in t he Republic of Moldova by connect ion t o t he Rom anian - Moldavian I nt er connect ion. Mar ket int egr at ion: Som e im pact on GPI in RO under var ious pr ice scenar ios.I ncr ease of secur it y of supply by adding new st or age capacit y in t he East er n par t of Rom ania. This par t of Rom ania includes som e m ajor cit ies and indust r y and has t he coldest clim at e in Rom ania. Possible incr ease of secur it y of supply in t he Republic of Moldova by connect ion t o t he Rom anian - Moldavian I nt er connect ion.Sust ainabilit y: Posit ive pr oject im pact higher in 2030 and 2035 on t he t ot al EU bill, Gas Bill ex. N P ex. CO 2, and Disr upt ed Dem and Cost under m ost pr ice scenar ios under FI D. Highest im pact on t he t ot al Disupt ed Dem and Cost f or var ious pr ice sour ces, FI D, in 2035.Regulation SoS The pr oject shall cont r ibut e t o t he enhancem ent of t he ener gy secur it y in Rom ania and Sout h-East Eur ope by cr eat ing t he UGS connect ion t o int er nal consum pt ion ar eas wit h cur r ent gas supply def icit , m aking t hus available gas volum es f or use in ot her consum pt ion dir ect ions. The pr oject shall also have a cont r ibut ion in t er m s of supply of r egional m ar ket in Repubic of Moldova, a count r y associat ed t o EU via I asi-Ungheni int er connect or . We wish t o highlight t he f act t hat any pr esent or f ut ur e pipeline pr oject aim ing t o im pr ove Rom ania’s int er connect ion t o t he gas syst em s in t he r egion does need Under gr ound St or age Facilit ies as a suppor t t o ensur e base-load supply as well as f lexibilit y of supply, bot h t o and f r om Rom ania. Consider ing t he int er connect ion pipelines included in t he TYN DP t o neighbour ing MS ( Hungar y r ever se f low, Bulgar ia) as well as int er connect ions t o N on-m em ber St at es which ar e Associat e St at es t o t he EU ( Ukr aine, Moldova) , UGS f acilit ies ar e indispensable asset s f or t he pr oper oper at ion of such int er connect ions. Anot her r eason f or our pr oposal t o ext end UGS capacit ies in Rom ania ( including t he const r uct ion of a com plet ely new f acilit y in t he N E par t of Rom ania) ar e t he new discover ies in t he Rom anian sect or of t he Black Sea ( e.g Dom ino1) ,

S.N.G.N. ROMGAZ S.A., the project promotor, is not a TSO, therefore it is not mandatory to have a TYNDP, as Transgaz does. There is no NDP at country level. PCI 01/06/2017 00:00:00 Other Yes The pr oject m ay cont r ibut e t o SoS in Rom ania and neighbour ing count r ies in SE Eur ope and lead t o decr ease of dependency on im por t s dur ing t he cold season. Mar ket I nt egr at ion. Som e im pact of t he pr oject on GPI in var ious count r ies, especially in RO and BG under var ious pr ice scenar ios, Som e im pact on Rem aining Flexibilit y f or BG in 2035 f or Ukr aine disr upt ion f or 2 weeks. Cor r elat ed im pact on disr upt ed r at e and disr upt ed dem and.Secur it y of Supply. I m pact of t he pr oject under Ukr aine disr upt ion only in Rom ania, af t er 2030 bot h in DC and 2W . N -1 im pact under low and high inf r ast r uct ur e scenar io.Minor im pact on on supply pr ice diver sif icat ion and supply pr ice dependence .Sust ainabilit y. Posit ive pr oject im pact on t he t ot al EU bill, N P Bill ex. CO 2, CO 2 bill in 2025 and 2030 under m ost pr ice scenar ios under FI D. Posit ive im pact on disr upt ed .Reducing bot t lenecks. Signif icant im pact on Mar ginal Pr ice in Pr ice in RO in 2025 and 2030Regulation SoS The project is able to have a major contribution to SoS on the N-S corridor Bulgaria - Romania - Hungary, which is currently included in the plans of Transgaz S.A. envisaging the construction of a new pipeline between Podisor and Horia.I ncr easing saf et y of gas supply in Rom ania and Sout h-East Eur ope by secur ing higher gas volum es t o be st or ed;- I ncr easing t he daily capacit y and t he nat ur al gas deliver y f lexibilit y;- Reducing gas im por t s dur ing wint er t im e;- Cont r ibut ing t o sust ainabilit y and m ar ket int egr at ion in t he r egionWe wish t o highlight t he f act t hat any pr esent or f ut ur e pipeline pr oject aim ing t o im pr ove Rom ania’s int er connect ion t o t he gas syst em s in t he r egion does need under gr ound st or age f acilit ies as a suppor t t o ensur e base-load supply as well as f lexibilit y of supply, bot h t o and f r om Rom ania. Consider ing t he int er connect ion pipelines included in t he TYN DP t o neighbour ing MS ( Hungar y r ever se f low, Bulgar ia) UGS f acilit ies ar e indispensable asset s f or t he pr oper oper at ion of such int er connect ions. Anot her r easons ar e t he new discover ies in t he Rom anian sect or of t he Black Sea ( e.g Dom ino1) .

PCI 01/09/2017 00:00:00 Auction Yes Market Demand Also essential contribution to Security of supply.

PCI 01/01/2017 00:00:00 Open Season Yes Market Demand o T he Hunga ria n proje cts ta ke n a s a whole m a in a im , is to e nha nce the fle xibi l ity of the Hunga ria n tra nsm ission syste m by conne cting to ne ighbouring syste m s, e nsuring re se rve s flow a va ila bil ity, a nd gua ra nte e ing flow de live ra bil ity which wil l e nha nce the tra nsm ission syste m s se curity of supply position a long with he lping with furthe r m a rke t inte gra tion.

PCI 31/12/2016 00:00:00 Open Season Yes Market Demand o T he Hunga ria n proje cts ta ke n a s a whole m a in a im , is to e nha nce the fle xibi l ity of the Hunga ria n tra nsm ission syste m by conne cting to ne ighbouring syste m s, e nsuring re se rve s flow a va ila bil ity, a nd gua ra nte e ing flow de live ra bil ity which wil l e nha nce the tra nsm ission syste m s se curity of supply position a long with he lping with furthe r m a rke t inte gra tion.

PCI 31/12/2016 00:00:00 Open Season Yes Market DemandPCI 31/12/2016 00:00:00 Open Season Yes Market Demand RO>HU>AT transmission corridor (Black Sea or other gas source) oBlack Sea gas or ot her gas sour ce t r ansm ission t o t he Eur opean Gas Mar ket The Hungar ian pr oject s t aken as a whole m ain aim , is t o enhance t he f lexibilit y of t he Hungar ian t r ansm ission syst em by connect ing t o neighbour ing syst em s, ensur ing r eser ves f low availabilit y, and guar ant eeing f low deliver abilit y which will enhance t he t r ansm ission syst em s secur it y of supply posit ion along wit h helping wit h f ur t her m ar ket int egr at ion.

PCI 02/10/2017 00:00:00 Open Season Yes Market Demand Beside Market Demand driver, other important drivers are Security of Supply and Interroperability

PCI 31/12/2016 00:00:00 Open Season Yes Market Demand o T he Hunga ria n proje cts ta ke n a s a whole m a in a im , is to e nha nce the fle xibi l ity of the Hunga ria n tra nsm ission syste m by conne cting to ne ighbouring syste m s, e nsuring re se rve s flow a va ila bil ity, a nd gua ra nte e ing flow de live ra bil ity which wil l e nha nce the tra nsm ission syste m s se curity of supply position a long with he lping with furthe r m a rke t inte gra tion.

PCI 31/12/2016 00:00:00 Open Season Yes Market Demand RO>HU>AT transmission corridor (Black Sea or other gas source) oBlack Sea gas or ot her gas sour ce t r ansm ission t o t he Eur opean Gas Mar ket The Hungar ian pr oject s t aken as a whole m ain aim , is t o enhance t he f lexibilit y of t he Hungar ian t r ansm ission syst em by connect ing t o neighbour ing syst em s, ensur ing r eser ves f low availabilit y, and guar ant eeing f low deliver abilit y which will enhance t he t r ansm ission syst em s secur it y of supply posit ion along wit h helping wit h f ur t her m ar ket int egr at ion.

PCI 31/12/2016 00:00:00 Open Season Yes Market Demand o T he Hunga ria n proje cts ta ke n a s a whole m a in a im , is to e nha nce the fle xibi l ity of the Hunga ria n tra nsm ission syste m by conne cting to ne ighbouring syste m s, e nsuring re se rve s flow a va ila bil ity, a nd gua ra nte e ing flow de live ra bil ity which wil l e nha nce the tra nsm ission syste m s se curity of supply position a long with he lping with furthe r m a rke t inte gra tion.

PCI 01/03/2015 00:00:00 Other Yes Market Demand Pipeline projects are planned according to market demand. Current planning is based on market indications. Strenthening the establishment of a potential Southern Corridor and contribution to a diversification of sources e.g. Black Sea Gas.

PCI 31/12/2016 00:00:00 Open Season Yes Market Demand RO>HU>AT transmission corridor (Black Sea or other gas source) oBlack Sea gas or ot her gas sour ce t r ansm ission t o t he Eur opean Gas Mar ket The Hungar ian pr oject s t aken as a whole m ain aim , is t o enhance t he f lexibilit y of t he Hungar ian t r ansm ission syst em by connect ing t o neighbour ing syst em s, ensur ing r eser ves f low availabilit y, and guar ant eeing f low deliver abilit y which will enhance t he t r ansm ission syst em s secur it y of supply posit ion along wit h helping wit h f ur t her m ar ket int egr at ion.

PCI 31/12/2016 00:00:00 Open Season Yes Market Demand o T he Hunga ria n proje cts ta ke n a s a whole m a in a im , is to e nha nce the fle xibi l ity of the Hunga ria n tra nsm ission syste m by conne cting to ne ighbouring syste m s, e nsuring re se rve s flow a va ila bil ity, a nd gua ra nte e ing flow de live ra bil ity which wil l e nha nce the tra nsm ission syste m s se curity of supply position a long with he lping with furthe r m a rke t inte gra tion.

PCI 31/12/2016 00:00:00 Open Season Yes Market Demand RO>HU>AT transmission corridor (Black Sea or other gas source) oBlack Sea gas or ot her gas sour ce t r ansm ission t o t he Eur opean Gas Mar ket The Hungar ian pr oject s t aken as a whole m ain aim , is t o enhance t he f lexibilit y of t he Hungar ian t r ansm ission syst em by connect ing t o neighbour ing syst em s, ensur ing r eser ves f low availabilit y, and guar ant eeing f low deliver abilit y which will enhance t he t r ansm ission syst em s secur it y of supply posit ion along wit h helping wit h f ur t her m ar ket int egr at ion.

PCI 31/12/2016 00:00:00 Open Season Yes Market Demand o T he Hunga ria n proje cts ta ke n a s a whole m a in a im , is to e nha nce the fle xibi l ity of the Hunga ria n tra nsm ission syste m by conne cting to ne ighbouring syste m s, e nsuring re se rve s flow a va ila bil ity, a nd gua ra nte e ing flow de live ra bil ity which wil l e nha nce the tra nsm ission syste m s se curity of supply position a long with he lping with furthe r m a rke t inte gra tion.

PCI 31/12/2016 00:00:00 Open Season Yes Market Demand RO>HU>AT transmission corridor (Black Sea or other gas source) oBlack Sea gas or ot her gas sour ce t r ansm ission t o t he Eur opean Gas Mar ket The Hungar ian pr oject s t aken as a whole m ain aim , is t o enhance t he f lexibilit y of t he Hungar ian t r ansm ission syst em by connect ing t o neighbour ing syst em s, ensur ing r eser ves f low availabilit y, and guar ant eeing f low deliver abilit y which will enhance t he t r ansm ission syst em s secur it y of supply posit ion along wit h helping wit h f ur t her m ar ket int egr at ion.

PCI 31/12/2016 00:00:00 Open Season Yes Market Demand o T he Hunga ria n proje cts ta ke n a s a whole m a in a im , is to e nha nce the fle xibi l ity of the Hunga ria n tra nsm ission syste m by conne cting to ne ighbouring syste m s, e nsuring re se rve s flow a va ila bil ity, a nd gua ra nte e ing flow de live ra bil ity which wil l e nha nce the tra nsm ission syste m s se curity of supply position a long with he lping with furthe r m a rke t inte gra tion.

PCI 31/12/2016 00:00:00 Open Season Yes Market Demand o T he Hunga ria n proje cts ta ke n a s a whole m a in a im , is to e nha nce the fle xibi l ity of the Hunga ria n tra nsm ission syste m by conne cting to ne ighbouring syste m s, e nsuring re se rve s flow a va ila bil ity, a nd gua ra nte e ing flow de live ra bil ity which wil l e nha nce the tra nsm ission syste m s se curity of supply position a long with he lping with furthe r m a rke t inte gra tion.

PCI 31/12/2016 00:00:00 Open Season Yes Market Demand RO>HU>AT transmission corridor (Black Sea or other gas source) oBlack Sea gas or ot her gas sour ce t r ansm ission t o t he Eur opean Gas Mar ket The Hungar ian pr oject s t aken as a whole m ain aim , is t o enhance t he f lexibilit y of t he Hungar ian t r ansm ission syst em by connect ing t o neighbour ing syst em s, ensur ing r eser ves f low availabilit y, and guar ant eeing f low deliver abilit y which will enhance t he t r ansm ission syst em s secur it y of supply posit ion along wit h helping wit h f ur t her m ar ket int egr at ion.

Page 15: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

PCI 02/10/2017 00:00:00 Open Season Yes Market Demand Beside Market Demand driver, other important drivers are Security of Supply and Interroperability

PCI 31/12/2016 00:00:00 Open Season Yes Market Demand o T he Hunga ria n proje cts ta ke n a s a whole m a in a im , is to e nha nce the fle xibi l ity of the Hunga ria n tra nsm ission syste m by conne cting to ne ighbouring syste m s, e nsuring re se rve s flow a va ila bil ity, a nd gua ra nte e ing flow de live ra bil ity which wil l e nha nce the tra nsm ission syste m s se curity of supply position a long with he lping with furthe r m a rke t inte gra tion.

PCI 31/12/2016 00:00:00 Open Season Yes Market Demand RO>HU>AT transmission corridor (Black Sea or other gas source) oBlack Sea gas or ot her gas sour ce t r ansm ission t o t he Eur opean Gas Mar ket The Hungar ian pr oject s t aken as a whole m ain aim , is t o enhance t he f lexibilit y of t he Hungar ian t r ansm ission syst em by connect ing t o neighbour ing syst em s, ensur ing r eser ves f low availabilit y, and guar ant eeing f low deliver abilit y which will enhance t he t r ansm ission syst em s secur it y of supply posit ion along wit h helping wit h f ur t her m ar ket int egr at ion.

PCI 29/12/2017 00:00:00 Open Season Yes Market Demand - Incre a se of com pe tition through the dive rsifica tion of ga s source s a nd tra nsm ission route s, a nd the e m e rging of ne w pla ye rs on the re giona l ga s m a rke t, with positive e ffe cts on the ga s price , de cre a sing thus m a rke t conce ntra tion for e a ch im pa cte d country;- Incre a se of susta ina bil ity through dim inishing CO2 e m issions, a s a re sult of re pla cing ga s with l iquid (oi l ) or solid fossi l fue ls (coa l) with highe r CO2 e m issions.

PCI 31/12/2016 00:00:00 Open Season Yes Market Demand o T he Hunga ria n proje cts ta ke n a s a whole m a in a im , is to e nha nce the fle xibi l ity of the Hunga ria n tra nsm ission syste m by conne cting to ne ighbouring syste m s, e nsuring re se rve s flow a va ila bil ity, a nd gua ra nte e ing flow de live ra bil ity which wil l e nha nce the tra nsm ission syste m s se curity of supply position a long with he lping with furthe r m a rke t inte gra tion.

PCI 31/12/2016 00:00:00 Open Season Yes Market DemandPCI 31/12/2016 00:00:00 Open Season Yes Market Demand RO>HU>AT transmission corridor (Black Sea or other gas source) oBlack Sea gas or ot her gas sour ce t r ansm ission t o t he Eur opean Gas Mar ket The Hungar ian pr oject s t aken as a whole m ain aim , is t o enhance t he f lexibilit y of t he Hungar ian t r ansm ission syst em by connect ing t o neighbour ing syst em s, ensur ing r eser ves f low availabilit y, and guar ant eeing f low deliver abilit y which will enhance t he t r ansm ission syst em s secur it y of supply posit ion along wit h helping wit h f ur t her m ar ket int egr at ion.

PCI 30/04/2017 00:00:00 Other Yes Others The project brings significant benefits to the SoS of Europe bringing the increasing new sources of gas supply in South Eastern Europe to the markets of Central and Western Europe, while further enhancing the market integration of the affected countries. Com m ent s Benef it s:- Physical alt er nat ive f or pr oviding 100% of all Balkan count r ies' consum pt ion;- Pr oviding secur it y of supply f or 100% of all Balkan count r ies' consum pt ion;- Addit ional ut ilizat ion f or CZ, SK, PL, UA, RO , BG t r ansit and st or age asset s;- Pr oviding West er n shipper s wit h possibilit y t o supply Balkan count r ies and even Tur key f r om N CG/Gaspool/Baum gar t en;- Cor r idor r eady f or f ut ur e gas im por t s t o Eur ope f r om alt er nat ive sour ces – AGRI , TAN AP, Caspian, I r an, I r aq, Egypt , I sr ael, Cypr us, Tur key et c.

Next NDP (2016-17) will be included. PCI 01/10/2015 00:00:00 Other Yes Others The project brings significant benefits to the SoS of Europe bringing the increasing new sources of gas supply in South Eastern Europe to the markets of Central and Western Europe, while further enhancing the market integration of the affected countries. - Physical alt er nat ive f or pr oviding 100% of all Balkan count r ies' consum pt ion;- Pr oviding secur it y of supply f or 100% of all Balkan count r ies' consum pt ion;- Addit ional ut ilizat ion f or CZ, SK, PL, UA, RO , BG t r ansit and st or age asset s;- Pr oviding West er n shipper s wit h possibilit y t o supply Balkan count r ies and even Tur key f r om N CG/Gaspool/Baum gar t en;- Cor r idor r eady f or f ut ur e gas im por t s t o Eur ope f r om alt er nat ive sour ces – AGRI , TAN AP, Caspian, I r an, I r aq, Egypt , I sr ael, Cypr us. Most of t hem f r om per spect ive Tur kish nat ur al gas hub/bor der Tur key/BG;

For the moment, the project lacks sufficient descriptive elements in order for it to be included in the National Gas Transmission System Development Plan. PCI 15/10/2018 00:00:00 Other Yes Regulation SoS The project brings benefits to the SoS, bringing the new sources of gas supply and South-Eastern Europe countries, towards the Central and Western Europe markets, while further enhancing the market integration of the affected countries. - Physical alt er nat ive f or pr oviding gas f r om ot her sour ces, f or all Balkan count r ies' consum pt ion;- Pr oviding secur it y of supply f or t he Balkan count r ies' consum pt ion;- Addit ional ut ilizat ion f or t r ansit and st or age asset s;- Pr oviding West er n shipper s wit h possibilit y t o supply t o Balkan count r ies and even Tur key f r om dif f er ent ot her gas sur ces locat ed in Eur ope;- Cor r idor r eady f or f ut ur e gas im por t s t o Eur ope f r om t he Sout her n Cor r idor and ot her alt er nat ive sour ces.

PCI 30/06/2017 00:00:00 Other Yes Others The project brings significant benefits to the SoS of Europe, bringing the increasing new sources of gas supply in South Eastern Europe to the markets of Central and Western Europe, while further enhancing the market integration of the affected countries. - Physical alt er nat ive f or pr oviding 100% of all Balkan count r ies' consum pt ion;- Pr oviding secur it y of supply f or 100% of all Balkan count r ies' consum pt ion;- Addit ional ut ilizat ion f or CZ, SK, PL, UA, RO , BG t r ansit and st or age asset s;- Pr oviding West er n shipper s wit h possibilit y t o supply Balkan count r ies and even Tur key f r om N CG/Gaspool/Baum gar t en;- Cor r idor r eady f or f ut ur e gas im por t s t o Eur ope f r om alt er nat ive sour ces – AGRI , TAN AP, Caspian, I r an, I r aq, Egypt , I sr ael, Cypr us, Tur key, et c.

The NDP 2016-2025, (in consultation) presently refers to this project as a second stage of the M/R station installation that will enable the flow from TAP into the Greek Transmission System (TRA-N-941). At that second stage the Compressor station will also enable the flow from the Greek TS to TAP. PCI 30/06/2017 00:00:00 Other Yes MI. The project will provide access to natural gas to countries/ regions without adequate access to itSoS. The project will provide a diversified supply routeSustainability. The project will increase gas penetration in countries/regions where it will replace less environment friendly energy sources Market Demand The project investment decision will be taken based on commercial commitments.

This project is part of the development plan of GAMA and it is provided to the relevant Ministry of economy, which is responsible for energy matters. PCI 21/04/2017 00:00:00 Open Season Others The main project driver is to ensure the supply of countries in the Balkan region and Central and Eastern Europe in case the Russian supply will terminate via Ukraine in the future.

AGRI is not a Transmission System Operator, so it is not necessary for its project to be part of a National Development Plan. Non-PCI 01/01/2018 00:00:00 Other Yes Others Diversification of supply sources;New Markets competition;Market demand Links EU market with Azerbaijan (Caspian) gas source by the most direct route wich avoids sole reliance on pipelines..

PCI 22/10/2018 00:00:00 Open Season Yes Market Demand

PCI 02/05/2017 00:00:00 Other Yes Others The concept f or t he cr eat ion of gas hub on t he t er r it or y of Bulgar ia is based on t he idea signif icant quant it ies of nat ur al gas f r om dif f er ent sour ces t o ent er int o a given r eal physical point in t he r egion of Var na f or t heir f ur t her t r anspor t and a venue f or gas t r ade is or ganized at t he sam e t im e at t his point – a hub wher e ever y m ar ket par t icipant could t r ade in gas. The idea of building t he gas hub is suppor t ed by t he st r at egic geogr aphic locat ion of Bulgar ia, t he well-developed exist ing gas inf r ast r uct ur e f or t r ansm ission and st or age and t he pr oject s f or t he const r uct ion of int er connect ions wit h Rom ania, Tur key, Gr eece and Ser bia.The cr eat ion of a gas hub aim s at building t he gas t r ansm issioninf r ast r uct ur e r equir ed t o link t he nat ur al gas m ar ket s f or t he EUm em ber s st at es in t he r egion - Bulgar ia, Gr eece, Rom ania, Hungar y,Cr oat ia, Slovenia and t hr ough t hem t o t he m em ber s st at es f r om Cent r aland West er n Eur ope and t o t he count r ies f r om t he Ener gy Com m unit y -Ser bia, Macedonia, Bosna and Her zegovina and ot her s, t hus cont r ibut ingt o achieving t he m ain pr ior it ies of t he Eur opean ener gy policy.I n t he cont ext of t he Eur opean object ives t o build an int er connect edand single pan-Eur opean m ar ker , t he r ealizat ion of t he pr oject s, f or m ing t he gas hub concept , is in line wit h t he pr oject sf or t he developm ent of t he Sout her n gas cor r idor and in f ullcom pliance wit h t he plans f or developm ent of gas inf r ast r uct ur e inEur ope t o enhance t he secur it y of supply and t he diver sif icat ion of nat ur al gas supply sour ces.

PCI 02/05/2017 00:00:00 Other Yes The concept f or t he cr eat ion of gas hub on t he t er r it or y of Bulgar iais based on t he idea signif icant quant it ies of nat ur al gas f r om dif f er ent sour ces t o ent er int o a given r eal physical point in t her egion of Var na f or t heir f ur t her t r anspor t and a venue f or gas t r adeis or ganized at t he sam e t im e at t his point – a hub wher e ever y m ar ket par t icipant could t r ade in gas. The idea of building t he gas hub issuppor t ed by t he st r at egic geogr aphic locat ion of Bulgar ia, t hewell-developed exist ing gas inf r ast r uct ur e f or t r ansm ission andst or age and t he pr oject s f or t he const r uct ion of int er connect ions wit hRom ania, Tur key, Gr eece and Ser bia. Regulation SoS The concept f or t he cr eat ion of gas hub on t he t er r it or y of Bulgar ia is based on t he idea signif icant quant it ies of nat ur al gas f r om dif f er ent sour ces t o ent er int o a given r eal physical point in t he r egion of Var na f or t heir f ur t her t r anspor t and a venue f or gas t r ade is or ganized at t he sam e t im e at t his point – a hub wher e ever y m ar ket par t icipant could t r ade in gas. The idea of building t he gas hub is suppor t ed by t he st r at egic geogr aphic locat ion of Bulgar ia, t he well-developed exist ing gas inf r ast r uct ur e f or t r ansm ission and st or age and t he pr oject s f or t he const r uct ion of int er connect ions wit h Rom ania, Tur key, Gr eece and Ser bia.The cr eat ion of a gas hub aim s at building t he gas t r ansm issioninf r ast r uct ur e r equir ed t o link t he nat ur al gas m ar ket s f or t he EUm em ber s st at es in t he r egion - Bulgar ia, Gr eece, Rom ania, Hungar y,Cr oat ia, Slovenia and t hr ough t hem t o t he m em ber s st at es f r om Cent r aland West er n Eur ope and t o t he count r ies f r om t he Ener gy Com m unit y -Ser bia, Macedonia, Bosna and Her zegovina and ot her s, t hus cont r ibut ingt o achieving t he m ain pr ior it ies of t he Eur opean ener gy policy.I n t he cont ext of t he Eur opean object ives t o build an int er connect edand single pan-Eur opean m ar ker , t he r ealizat ion of t he pr oject s, f or m ing t he gas hub concept , is in line wit h t he pr oject sf or t he developm ent of t he Sout her n gas cor r idor and in f ullcom pliance wit h t he plans f or developm ent of gas inf r ast r uct ur e inEur ope t o enhance t he secur it y of supply and t he diver sif icat ion of nat ur al gas supply sour ces.

PCI 02/05/2017 00:00:00 Other Yes The concept f or t he cr eat ion of gas hub on t he t er r it or y of Bulgar ia is based on t he idea signif icant quant it ies of nat ur al gas f r om dif f er ent sour ces t o ent er int o a given r eal physical point in t he r egion of Var na f or t heir f ur t her t r anspor t and a venue f or gas t r ade is or ganized at t he sam e t im e at t his point – a hub wher e ever y m ar ket par t icipant could t r ade in gas. The idea of building t he gas hub is suppor t ed by t he st r at egic geogr aphic locat ion of Bulgar ia, t he well-developed exist ing gas inf r ast r uct ur e f or t r ansm ission and st or age and t he pr oject s f or t he const r uct ion of int er connect ions wit h Rom ania, Tur key, Gr eece and Ser bia. Regulation SoS The concept f or t he cr eat ion of gas hub on t he t er r it or y of Bulgar ia is based on t he idea signif icant quant it ies of nat ur al gas f r om dif f er ent sour ces t o ent er int o a given r eal physical point in t he r egion of Var na f or t heir f ur t her t r anspor t and a venue f or gas t r ade is or ganized at t he sam e t im e at t his point – a hub wher e ever y m ar ket par t icipant could t r ade in gas. The idea of building t he gas hub is suppor t ed by t he st r at egic geogr aphic locat ion of Bulgar ia, t he well-developed exist ing gas inf r ast r uct ur e f or t r ansm ission and st or age and t he pr oject s f or t he const r uct ion of int er connect ions wit h Rom ania, Tur key, Gr eece and Ser bia.The cr eat ion of a gas hub aim s at building t he gas t r ansm issioninf r ast r uct ur e r equir ed t o link t he nat ur al gas m ar ket s f or t he EUm em ber s st at es in t he r egion - Bulgar ia, Gr eece, Rom ania, Hungar y,Cr oat ia, Slovenia and t hr ough t hem t o t he m em ber s st at es f r om Cent r aland West er n Eur ope and t o t he count r ies f r om t he Ener gy Com m unit y -Ser bia, Macedonia, Bosna and Her zegovina and ot her s, t hus cont r ibut ingt o achieving t he m ain pr ior it ies of t he Eur opean ener gy policy.I n t he cont ext of t he Eur opean object ives t o build an int er connect edand single pan-Eur opean m ar ker , t he r ealizat ion of t he pr oject s, f or m ing t he gas hub concept , is in line wit h t he pr oject sf or t he developm ent of t he Sout her n gas cor r idor and in f ullcom pliance wit h t he plans f or developm ent of gas inf r ast r uct ur e inEur ope t o enhance t he secur it y of supply and t he diver sif icat ion of nat ur al gas supply sour ces.

PCI 01/06/2015 00:00:00 Other Yes The pr oject incr eases t he int egr at ion of t he Cr oat ian gas m ar ket wit h t he Eur opean gas m ar ket , t he cur r ent int er connect ion capacit y is lim it ed t o 1.5 bcm /y. The pipeline will have t he r ever se f low, so gas can f low f r om LN G Kr k or I AP t o Slovenia and f ur t her t o Cent r al Eur ope expect ed t o r esult in r educed end-user ener gy pr ices pr oviding t he secur it y of supply incr easing t he capacit y along t he r out e pr oviding enhanced access t o Baum gar t en and t he I t alian gas m ar ket pr oviding an addit ional im por t of gas achievem ent of benef it s of t he open gas m ar ket This pr oject is expect ed t o cont r ibut e t o t he pr ovision of gas supply t o pot ent ial cust om er s in t he Cent r al Eur ope count r ies Market Demand The cur r ent capacit y is lim it ed;t he sect ion f r om Lučko t o Rogat ec up t o 1.5 bcm /y.I ncr easing capacit y by 5 bcm opens t he possibilit y f or im por t ing m or e gas f r om t he Baum gar t en.I n addit ion, t he sour ce of t he gas, in t he near f ut ur e) is going t o be t he gas f r om t he LN G solut ion on t he island of Kr k as well as f r om t he I onian – Adr iat ic Pipeline t owar d Slovenia and t he neighbour ing count r ies. I n t his case t he cur r ent pipeline capacit y would not be suf f icient ; t her ef or e it is envisaged t o be incr eased. By doubling t he pipeline, it is possible t o use bot h t he exist ing and f ut ur e Cr oat ian UGSs.The const r uct ion of t his int er connect ion is vit al f or t he secur it y of supply of bot h t he Cr oat ian m ar ket and ot her m ar ket s in t he SE r egion. I t will be signif icant ly incr ease t he capacit y of t he int er connect ion of t he Cr oat ian and Slovenian gas t r ansm ission syst em s in& #160;bot h dir ect ions. I t will incr ease t he capacit y along t he r out e, pr ovide enhanced access t o Baum gar t en and I t alien gas m ar ket . The m ost im por t ant im pact s and benef it s of t his pr oject :1. I t pr ovides secur it y of supply f or Cr oat ia ( N -1 cr it er ion has not been m et ! ) and a r ever se f low ( f r om Cr oat ia t o Slovenia) 2. I t pr ovides access t o t he gas m ar ket s of Aust r ia and I t aly via t he Slovenian syst em 3. I t pr ovides im por t and signif icant t r ansit of gas f r om t he dir ect ion of I t aly and Aust r ia t o CEE and SEE count r ies ( Hungar y, Bosnia and Her zegovina, Ser bia…) 4. I t pr ovides signif icant t r ansit of gas f r om LN G t er m inal, I onian-Adr iat ic Pipeline or ot her sour ces t owar ds Slovenia, Aust r ia and I t aly as well as t he count r ies in t heir sur r ounding 5. I t f acilit at es m ar ket int egr at ion

PCI 30/09/2017 00:00:00 Open Season Yes Market Demand Also essential contribution to Security of supply.

PCI 01/08/2016 00:00:00 Open Season Yes Market Demand Projects will enable the reverse flow in all interconnection point Construction of such fa ci l itie s is ne cce ssa ry due to the ope ning of the ga s m a rke t, a s we ll a s providing sufficie nt tra nsm ission ca pa citie s a nd na tura l ga s de live ry pre ssure conditions a nd for de ve lopm e nt of the ga s m a rke t in Croa tia a nd the ne ighbouring countrie s. Com pre ssor sta tions wil l significa ntly incre a se e fficie ncy of the Croa tia n ga s tra nsm ission syste m .

PCI 01/03/2015 00:00:00 Other Yes Market Demand

PCI 01/09/2017 00:00:00 Open Season Yes Market Demand Also essential contribution to Security of supply.

PCI 30/09/2017 00:00:00 Open Season Yes Market Demand Also essential contribution to Security of supply.

Non-PCI 01/06/2017 00:00:00 Other Yes Market Demand Project is among others developed in the context of Eastring project, the aim is to provide sufficient future transit capacity for delivery of gas for the region of CEE/SEE Europe, namely Balkan countries, as well as ensuring security supplies to Ukraine as well as integration of CEE/SEE region to the developed spot markets.

The Project is included in the 10-year Development Study. The D. S. includes projects which are likely to be implemented but are not yet part of the compulsory Projects. Non-PCI 01/07/2017 00:00:00 Other Yes Market Demand

Page 16: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

The NDP 2016-2025, (in consultation) presently refers to this project as a second stage of the M/R station installation that will enable the flow from TAP into the Greek Transmission System (TRA-N-941). At that second stage the Compressor station will also enable the flow from the Greek TS to TAP. PCI 30/06/2017 00:00:00 Other Yes MI. The project will provide access to natural gas to countries/ regions without adequate access to itSoS. The project will provide a diversified supply routeSustainability. The project will increase gas penetration in countries/regions where it will replace less environment friendly energy sources Market Demand The project investment decision will be taken based on commercial commitments.

Non-PCI 31/01/2017 00:00:00 Open Season Market Demand Providing firm capacity for shippers working in IP Beregdaroc. Increase of security of supply. The com m issioning of t he pr oject will cont r ibut e t owar ds enlar ging t he ar ea cover ed by t he N or t h-Sout h gas cor r idor via st r onger int egr at ion of Ukr ainian t r ansm ission net wor k wit h t he CEE Region. This is of cr ucial im por t ance in par t icular , as Ukr aine is a count r y t hat plays a vit al r ole f or a secur e f unct ioning of t he gas m ar ket s in t he CEE r egion due t o it s signif icance in t er m s of gas t r ansit f r om Russia. The pr oject will also lar gely incr ease t he volum e of an int egr at ed gas m ar ket in t he r egion. Such scale ef f ect should posit ively inf luence t he com pet it ion and at t r act iveness of t he r egion t owar ds upst r eam player s and shipper s. I n addit ion, t he m ar ket pot ent ial of t he CEE r egion will gr ow signif icant ly t hanks t o int er connect ed gas m ar ket s and will cr eat e a possibilit y of new gas f lows bet ween t he concer ned count r ies.

Non-PCI Market Demand At the moment FGSZ is able to ensure only interruptible capacity at IP Beregdaróc (HU>UA direction). Ukrainian party always requests firm capacity, and this new entry point is very important for Ukraine.

Non-PCI 01/01/2018 00:00:00 Open Season Yes Market Demand Market Demand and SoS for the Southern part of Bosnia and Herzegovina The aim of the project is to establish a new supply route for B&H providing a diversified and reliable natural gas supply.

Non-PCI Regulation SoS Project will increase N-1 for Bosnia and Herzegovina and enable flexibility of natural gas system in BiH in case of disruptions, having in mind that currently BiH gas system is isolated and depending of one supply route. Proje ct wil l im prove im port route a nd supply source price dive rsifica tion. Proje ct wil l e na ble de ve lopm e nt of the na tura l ga s m a rke t in BiH. Lowe r usa ge of fire wood in the e ne rgy consum ption se ctor (re side ntia l a nd industria l) m e a ns se ignifica nt prote ction of BiH fore stry. Proje ct wil l de cre a se CO2 e m issions. Proje ct wil l not ca use a ny da m a ging e nvironm e nta l im pa ct.

Non-PCI 01/01/2017 00:00:00 Open Season Yes Expect ed Benef it s:- gasif icat ion of sout her n par t of Cr oat ia; Bosnia and Her zegovina, Mont enegr o, Albania- Rever se f low capacit y - int r oducing an envir onm ent ally accept able ener gy sour ce in t he r egion ( r eplacem ent f or f ir ewood, coal, f uel oil and com plem ent ar y gener at ion t o r enewable ener gy, and t he pot ent ial f or incr eased cogener at ion and CHP) - pr oviding diver sif ied gas supply t o t he r egion - pr oviding t he access t o Cr oat ian and Albanian st or age capacit ies - pr oviding signif icant t r ansit capacit y and incom e t o Albania, Mont enegr o and Cr oat ia. - Reducing CO 2 em issions in t he r egion - Secur it y of Supply, Rever se f low, I nt egr at ion of m ar ket ar eas ( m ar ket int egr at ion benef it s f or Cr oat ia and r egion ( Albania, Mont enegr o, Bosnia and Her zegovina and neighbour ing count r ies) , diver sif icat ion of sour ces, diver sif icat ion of r out es, N -1 cr it er ia com plet ion on nat ional and r egional level, suppor t back-up t o r enewables Others Gasification of Albania and Montenegro and southern part of Croatia and Bosnia and Herzegovina. Diversification of supply, Security of Supply Security of Supply, Rewerse flow, Integration of market areas (market integration benefits for Croatia and region (Albania, Montenegro, Bosnia and Herzegovina and neighbouring countries), diversification of sources, diversification of routes, N-1 criteria completion on national and regional level, support back-up to renewables

The Project Promoter is not a Transmission System Operator and as such does not have the obligation to submit a National Development Plan. Non-PCI Other Yes Market Demand The project will enhance the national and regional (GR, BG, RO) security of supply and will help Users benefit from market oppportunities, especially in the LNG market.Given the proximity of the project location to the TAP route the benefits might also reach Italy.

Non-PCI Regulation SoS Enormous development of the national gasification systemand hence increased consumption/demand on the market -Security of supply-Diversification of sources-Development of the region (reversible gas pipelines)

The Project is included in the 10-year Development Study. The D. S. includes projects which are likely to be implemented but are not yet part of the compulsory Projects. Non-PCI 01/07/2017 00:00:00 Other Yes Market Demand

Non-PCI 01/12/2016 00:00:00 Other Yes Others The object ive of t he pr oject is t o cr eat e a lar ge t r anspor t at ion cor r idor bet ween Poland and Ukr aine which will cont r ibut e t owar ds:• est ablishm ent of a well- int egr at ed gas m ar ket in t he r egion ( PL, UA, CZ, SK, HU, RO , MDA) • diver sif icat ion of gas r out es and sour ces f or Ukr aine• enhancem ent of secur it y of gas supply f or Ukr aine• r educing dependency on single gas supplier f or Ukr aine• st r engt hening ener gy solidar it y bet ween EU Ener gy Com m unit y and EU cont r act ing count r ies• access t o t he gas st or ages in Ukr aine f or Poland and EU Establishment of a well-integrated gas market in the region (PL, UA, CZ, SK, HU, RO, MD)

Non-PCI 01/02/2017 00:00:00 Open Season Market Demand I nt r oduct ion of pipeline int er connect or wit h capacit y t o 8 bcm /year will allow t o incr ease t echnical abilit ies of gas im por t by Ukr aine f r om Eur opean count r ies by 40% ( t o 29.6 bcm /year ) .Resolut ion of t he issue of connect ion of exist ing pipelines and planned int er connect or s of f our Vyshegr ad St at es t o t he West par t of Ukr ainian GTS and Ukr ainian under gr ound st or age f acilit ies m akes it possible t o cr eat e t he power f ul East -Eur opean gas hub.Pipeline int er connect or will allow f or Ukr aine t o pur chase not nly Russian gas, but also gas t hr ough t he LN G t er m inal in Świnoujście f r om Q at ar , t he Unit ed St at es et c. and gas f r om N or way.

This project is not included in the National Development Plan because no application has been made, by the promoter of the UGS in South Kavala, for the connection of this project to the Greek gas transmission system. Non-PCI Market Demand

2017 2017

2017 2017

2017 2017

2017 2017

2021 2021

2021 2021

Page 17: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

Source Algeria Source Caspia Azerbaijan Source Libya Source Norway Source Russia Source LNG LNG - Countries Source Others TPA Regime Applied For Exemption

Yes Yes Yes Yes Regulated NoYes Yes Yes Yes Regulated No

Regulated No

Yes Yes Yes Yes Regulated NoSpot Regulated No

Yes Yes Yes Regulated No

Regulated NoRegulated No

Gas sourcing will be decided by LNG terminal capacity users, who will have the freedom to arrange gas supplies and gas origin Not Applicable No

Yes it will be gas from Croatia transport system, Croatian UGS and all import routes (LNG and IAP) Regulated NoYes ? it will be gas from Croatia transport system, Croatian UGS and all import routes (LNG and IAP) Regulated No

Yes Yes HR,QA it will be gas from Croatia transport system, Croatian UGS and all import routes (LNG and IAP) Regulated No

Yes Yes GR Regulated NoYes Yes Yes Yes Southern gas corridor gas sources; European gas hubs; Not Applicable Not Relevant

Yes Yes Yes Other Central Asian, Middle Eastern and East-Mediterranean sources Regulated NoYes Yes Yes QA,US Not Applicable Yes

Yes Yes DZ,WO Regulated Yes

Yes Yes Yes Yes Southern gas corridor gas sources; European gas hubs; Not Applicable Not Relevant

Yes Yes Yes Other Central Asian, Middle Eastern and East-Mediterranean sources Regulated NoYes Multi-sourced supply including new sources (e.g. U.S., Mozambique) Regulated NoYes LNG The pipeline will be fed with regasified LNG from the floating unit (LNG-N-062) -hence it means various sources. Regulated No

Regulated Not Relevant

Yes Multi-sourced supply including new sources (e.g. U.S., Mozambique) Regulated NoYes LNG The pipeline will be fed with regasified LNG from the floating unit (LNG-N-062) -hence it means various sources. Regulated No

Yes Yes GR Regulated No

Page 18: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

Regulated NoBlack Sea Regulated No

Regulated NoRegulated No

Regulated No

Yes Yes Yes Southern gas corridor gas sources; European gas hubs; Regulated Not Relevant

Regulated No

Romania Regulated No

Romania Regulated No

Yes Yes Yes Qatar, Egypt, Nigeria, Cyprus, Israel, Austria, UGS in Hungary Regulated NoYes Regulated No

which available from Slovakia direction Regulated NoYes Romanian, sources available from Bulgaria direction Regulated No

Black Sea Regulated No

Yes Yes Black Sea Regulated Nowhich available from Slovakia direction Regulated No

Black Sea Regulated No

which available from Slovakia direction Regulated NoRegulated Yes

Black Sea Regulated No

which available from Slovakia direction Regulated NoBlack Sea Regulated No

which available from Slovakia direction Regulated NoBlack Sea Regulated No

which available from Slovakia direction Regulated NoRegulated No

Black Sea Regulated No

Page 19: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

Yes Yes Black Sea Regulated Nowhich available from Slovakia direction Regulated No

Black Sea Regulated No

Black Sea Regulated No

which available from Slovakia direction Regulated NoBlack Sea Regulated NoBlack Sea Regulated No

Yes Yes Yes Yes Iraq, Iran, Egypt, Israel, Turkmenistan, Kazakhstan, Cyprus, Azerbaijan, Any gas available at Turkish/European HUBs. For dire Not Applicable Not RelevantYes Yes Yes Yes TR Iraq, Iran, Egypt, Israel, Turkmenistan, Kazakhstan, Cyprus, Azerbaijan, Any gas available at Turkish/European HUBs. For dire Not Applicable Not RelevantYes Yes Yes Yes TR Iraq, Iran, Egypt, Israel, Turkmenistan, Kazakhstan, Cyprus, Azerbaijan, Any gas available at Turkish/European HUBs. For dire Regulated NoYes Yes Yes Yes TR Iraq, Iran, Egypt, Israel, Turkmenistan, Kazakhstan, Cyprus, Azerbaijan, Any gas available at Turkish/European HUBs including Not Applicable Not Relevant

Yes Middle East, Central Asia Regulated NoYes Yes Regulated No

Yes Not Applicable Not RelevantBlack Sea or other on-shore blocks Regulated No

Yes Yes Yes Southern gas corridor gas sources; European gas hubs; Black sea shelf gas; Domestic production; Regulated NoYes Yes Yes Southern gas corridor gas sources; European gas hubs; Black sea shelf gas; Domestic production; Regulated NoYes Yes Yes Southern gas corridor gas sources; European gas hubs; Black sea shelf gas; Domestic production; Regulated No

Yes Yes HR,QA IAP project, Baumgarten Regulated No

Regulated No

Not Applicable Not Relevant

Regulated No

Regulated No

Regulated No

Spot Regulated No

Yes Yes DZ,WO Regulated Yes

Page 20: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

Yes Middle East, Central Asia Regulated No

Yes Yes Not Applicable NoYes Yes Yes Yes HR Regulated No

Yes Yes Baumgarten via Slovenia and Croatia Regulated NoYes Yes Yes Yes Yes HR Not Applicable No

Yes Yes HR Regulated No

Yes Yes Yes ? The project may source gas from all gas sources supplying or transitting Greece Regulated No

Yes Yes GR The interconnection allows access to all gas sources from the neighbouring countries. Regulated NoYes Yes DZ,WO Regulated Yes

Yes Yes Yes Regulated NoYes Yes QA,US Not Applicable No

Regulated Yes

SGC Other Yes Yes Yes Yes Yes

SGC Yes Yes Yes Yes Yes

SGC Yes Yes Yes Yes Yes Yes

Page 21: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

Exemption Granted Exempted Percent Entry Exempted Percent Exit Tariff Regime Exemption Stage Reached TPA Regime Comments LNG Reloading Ability LNG Facility LNG Expected Yearly Volume Increase LNG Ship Size Increase

Not Relevant 0% 0% Regulated 0 0Not Relevant 0% 0% Regulated 0 0Not Relevant 0% 0% Regulated 0 0

0% 0%Not Relevant 0% 0% Regulated 0 0

No 0% 0% Regulated 0 0Not Relevant 0% 0% Regulated 0 0

0% 0%Not Relevant 0% 0% Regulated 0 0Not Relevant 0% 0% Regulated 0 0

0% 0%No 0% 0% Not Applicable TPA regime will be defined after market survey procedure (in our case Open Season) Yes The import terminal for the liquefied natural gas(LNG) on the Island of Krk 4 265 000

0% 0%No 70% 30% Regulated 0 0No 70% 30% Regulated 0 0No 70% 30% Regulated TPA regime is not defined yet, Exemption Regime possibly 0 0

70% 30%No 0% 0% Regulated 0 0

Not Relevant 0% 0% Not Applicable 0 00% 0%

Not Relevant 0% 0% Regulated 0 0Not Yet 0% 0% Not Applicable Binding Phase of Market Test under par.6, art.36, Directive 2009/73. 0 0

Yes 0% 0% Regulated 0 00% 0%

Not Relevant 0% 0% Not Applicable 0 0

0% 0%

Not Relevant 0% 0% Regulated 0 0Not Relevant 0% 0% Regulated It is not planned to run a formal Market Test as the Project has not applied for a TPA Exemption and Project's commercial viability will be determined by the success of the negotiations with potential gas offtakers and/or interested LNG suppliers who have interest in using the infrastructure. Yes LNG terminal in northern Greece / Alexandroupolis 6 170 000Not Relevant 0% 0% Regulated It is not planned to run a formal Market Test as the Project has not applied for a TPA Exemption and Project's commercial viability will be determined by the success of the negotiations with potential gas offtakers and/or interested LNG suppliers who have interest in using the infrastructure. 0 0Not Relevant 100% 0% Regulated 0 0

25% 0%Not Relevant 0% 0% Regulated It is not planned to run a formal Market Test as the Project has not applied for a TPA Exemption and Project's commercial viability will be determined by the success of the negotiations with potential gas offtakers and/or interested LNG suppliers who have interest in using the infrastructure. Yes LNG terminal in northern Greece / Alexandroupolis 6 170 000Not Relevant 0% 0% Regulated It is not planned to run a formal Market Test as the Project has not applied for a TPA Exemption and Project's commercial viability will be determined by the success of the negotiations with potential gas offtakers and/or interested LNG suppliers who have interest in using the infrastructure. 0 0

0% 0%No 0% 0% Regulated 0 0

0% 0%

Page 22: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

Not Relevant 0% 0% Regulated 0 0Not Relevant 0% 0% Regulated 0 0

0% 0%No 0% 0% Regulated 0 0No 0% 0% Regulated 0 0

0% 0%Not Relevant 0% 0% Regulated 0 0

0% 0%Not Relevant 0% 0% Regulated 0 0

0% 0%Not Relevant 0% 0% Regulated 0 0

0% 0%No 0% 0% Regulated 0 0

0% 0%No 0% 0% Regulated 0 0

0% 0%No 0% 0% Regulated 0 0No 0% 0% Regulated 0 0

0% 0%No 0% 0% Regulated 0 0No 0% 0% Regulated 0 0No 0% 0% Regulated 0 0

0% 0%Not Relevant 0% 0% Regulated 0 0

No 0% 0% Regulated 0 0No 0% 0% Regulated 0 0

0% 0%No 0% 0% Regulated 0 0Yes 0% 0% Regulated 0 0No 0% 0% Regulated 0 0

0% 0%No 0% 0% Regulated 0 0No 0% 0% Regulated 0 0

0% 0%No 0% 0% Regulated 0 0No 0% 0% Regulated 0 0

0% 0%No 0% 0% Regulated 0 0No 0% 0% Regulated 0 0No 0% 0% Regulated 0 0

0% 0%

Page 23: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

Not Relevant 0% 0% Regulated 0 0No 0% 0% Regulated 0 0No 0% 0% Regulated 0 0

0% 0%Not Relevant 0% 0% Regulated 0 0

0% 0%No 0% 0% Regulated 0 0No 0% 0% Regulated 0 0No 0% 0% Regulated 0 0

0% 0%Not Relevant 0% 0% Not Applicable 0 0Not Relevant 0% 0% Not Applicable 0 0Not Relevant 0% 0% Regulated 0 0Not Relevant 0% 0% Not Applicable 0 0

0% 0%Not Relevant 0% 0% Regulated TPA status and tariff regime will be examined at the next stage. 0 0

No 0% 0% Regulated 0 00% 0%

Not Relevant 0% 0% Not Applicable 0 0Not Relevant 0% 0% Regulated 0 0

0% 0%No 0% 0% Regulated 0 0No 0% 0% Regulated 0 0No 0% 0% Regulated 0 0

0% 0%No 70% 30% Regulated TPA regime is not defined yet 0 0

70% 30%No 0% 0% Regulated 0 0

0% 0%Not Relevant 0% 0% Not Applicable 0 0

0% 0%No 0% 0% Regulated 0 0

0% 0%No 0% 0% Regulated 0 0

0% 0%No 0% 0% Regulated 0 0

0% 0%No 0% 0% Regulated 0 0

0% 0%Yes 0% 0% Regulated 0 0

0% 0%

Page 24: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

Not Relevant 0% 0% Regulated TPA status and tariff regime will be examined at the next stage. 0 00% 0%

No 0% 0% Not Applicable 0 0No 0% 0% Regulated 0 0

0% 0%No 70% 30% Regulated 0 0No 0% 0% Regulated It is expected that TPA regime and Tariff methodology will be covered by gas primary legislation in accordance with Third Package at least up to the end of 2016. 0 0

35% 15%No 0% 0% Regulated TPA regime is not defined yet TPA regime is not defined yet 0 0

0% 0%Not Relevant 0% 0% Regulated At the present stage of maturity of the project the TPA regime is not known. At the present stage of maturity of the project the tariff regime is not known. It is possible that the project capacity might be split into a part under regulated tariff and a part under negociated access. 0 0

0% 0%Not Relevant 0% 0% Regulated The transmission tariff will be regulated according to EU regulations. 0 0

Yes 0% 0% Regulated 0 00% 0%

Not Relevant 0% 0% Regulated 0 0No 0% 0% Not Applicable 0 0

0% 0%Yes 0% 0% Regulated 0 0

0% 0%

Pipeline TRA Project Reducing the Hungary Magyar Gáz Tranzit Zrt. MGT

Pipeline TRA Project Enhancement Hungary Magyar Gáz Tranzit Zrt. MGT

Pipeline TRA Project The aim of the Hungary Magyar Gáz Tranzit Zrt. MGT

Page 25: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

LNG Storage Capacity Increase LNG Yearly Volume Comments LNG Ship Size Comments LNG Storage Capacity Comments UGS Facility UGS Facility Type UGS Is Multiple Cycle

0 Aquifer0 Aquifer0 Aquifer

0 Aquifer0 Aquifer0 Aquifer

0 Aquifer0 Aquifer

300 000 1st stage - 1-4 bcm/y (According to FSRU ship and pepeline availability), 2nd stage - 3,5 bcm/y, 3rd stage - 5bcm/y, 4th stage - 8.75 bcm/y 75,000.00 – 265,000.00 (Jetty construction and sea depth will enable Q Max LNG carriers to bearth at the site. The size of the carriers that are going to berth alongside to the FSRU will depend on the storage and regasification capabilities of the FSRU) 1st stage depending on FSRU storage capacity availability, 2nd stage 1 x 150,000.00, 3rd stage 2 x 150,000.00, 4th stage 2 x 150,000.00 Aquifer

0 Aquifer0 Aquifer0 Aquifer

0 Aquifer0 Aquifer

0 Aquifer0 Aquifer0 Aquifer

0 Aquifer

0 Aquifer170 000 New regaseification technical capacity increment will be available from start of operations. DWT 85,000 MT, LOA 300-310 m., Breadth 46 m., Draft 12m. 4 storage tanks Aquifer

0 Aquifer0 Aquifer

170 000 New regaseification technical capacity increment will be available from start of operations. DWT 85,000 MT, LOA 300-310 m., Breadth 46 m., Draft 12m. 4 storage tanks Aquifer0 Aquifer

0 Aquifer

Page 26: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

0 Aquifer0 Aquifer

0 Aquifer0 Aquifer

0 Depomures Depleted Field

0 UGS Chiren Aquifer

0 Depomures Depleted Field

0 UGS Moldova Depleted Field

0 UGS SARMASEL Depleted Field

0 Aquifer0 Aquifer

0 Aquifer0 Aquifer0 Aquifer

0 Aquifer0 Aquifer0 Aquifer

0 Aquifer0 Aquifer0 Aquifer

0 Aquifer0 Aquifer

0 Aquifer0 Aquifer

0 Aquifer0 Aquifer0 Aquifer

Page 27: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

0 Aquifer0 Aquifer0 Aquifer

0 Aquifer

0 Aquifer0 Aquifer0 Aquifer

0 Aquifer0 Aquifer0 Aquifer0 Aquifer

0 Aquifer0 Aquifer

0 Aquifer0 Aquifer

0 Aquifer0 Aquifer0 Aquifer

0 Aquifer

0 Aquifer

0 Aquifer

0 Aquifer

0 Aquifer

0 Aquifer

0 Aquifer

0 Aquifer

Page 28: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

0 Aquifer

0 Aquifer0 Aquifer

0 Aquifer0 Aquifer

0 Aquifer

0 South Kavala Aquifer Yes

0 Aquifer0 Aquifer

0 Aquifer0 Aquifer

0 Aquifer

Non-FID Less-Advanced Non-FID

Non-FID Less-Advanced Non-FID

Non-FID Less-Advanced Non-FID http://www.gazt

Page 29: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

UGS Working Gas Volume Increase UGS Working Gas Volume Comments Pipelines Total Length Pipelines AVG Diameter Pipelines Total Additional Compressor Power

0 205 1000 200 249 1000 300 207 1000 24

0 1149 900 580 100 1000 160 372 1000 19

0 12 8000 12 800 0

0

0 128 8000 18 10000 180 1000

0 170 7000 120 775 20

0 0 0 900

0 120 775 20

0 0 0 900 28 762 00

00 28 762 0

0 170 700

Page 30: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

0 77 813 220 30

0 430 1200 330 287 550 3

300 The capacity increment is planned to be implemented in 2 phases: 100 mcm in 2019 and 200 mcm with COD in 2022

450 450

300 The capacity increment is planned to be implemented in 2 phases: 100 mcm in 2019 and 200 mcm with COD in 2022

200

650

0 73 500 40 41 500 9

0 11 8000 90 210 1000

0 528 813 500 11 8000 210 1000

0 11 80000 210 1000

0 11 8000 210 1000

0 11 8000 210 1000

0 11 8000 60 210 1000

Page 31: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

0 528 813 500 11 8000 210 1000

0 307 1200

0 11 8000 40 210 1000

0 257 1400 880 112 1400 000 19 1400 52

0 370 1400 2800

00 843 813 82

0 70 1100 100 383 7000 844 1200 265

0 69 700

0 30

0

0

0 0 800

0 4 800

0

0 50 700

Page 32: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

0 370 1400 280

00 0

0 22 5000 165 500 0

0 540 800 1

360

0 110 7000 50 700

0 74 850 300 110 1000

0

No MGT submitted this N/A MGT submitted PCI 01/01/2014 00:00:00 Open Yes

No MGT submitted this N/A MGT submitted PCI 10/11/2014 00:00:00 Open

No This is a new project wich N/A This is a new Non-PCI 01/05/2016 00:00:00 Other

Page 33: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of
Page 34: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of
Page 35: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of
Page 36: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

Market The Reducing Yes Yes Yes Regulated Yes Yes

Market Yes Yes Yes HR,PL Regulated Yes No

Market Security Yes Yes Yes Regulated Yes Yes

Page 37: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of
Page 38: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of
Page 39: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of
Page 40: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

0% 0% Regulated 0 0 0 Aquifer

0% 0%

0% 0% Regulated 0 0 0 Aquifer

0% 0%

0% 0% Regulated 0 0 0 Aquifer

0% 0%

Page 41: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of
Page 42: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of
Page 43: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of
Page 44: List of the PCI candidates for the NSI East Gas corridor ... Regional Meetings/Library/Gas...List of the PCI candidates for the NSI East Gas corridor - 2017 6.15 Interconnection of

0 110 800

0 110 800

0 80 800