lithgow city council agenda attachments 14 february...

135

Upload: others

Post on 07-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 2: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 3: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 4: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 5: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 6: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 7: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 8: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 9: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 10: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 11: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 12: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 13: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 14: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Table of Contents

1 October – 31 December 2010 Quarterly Report 2010 – 2014 1

Introduction ...........................................................................................................2 Summary of Principal Activities Areas..................................................................................................... 2 Summary of Financial Position............................................................................................................... 5 Summary of Principal Activity Achievements ........................................................................................... 7

1. Community.......................................................................................................8 2010/11 Program of Works – Community ............................................................................................... 9 2010/11 – 2013/14 Capital Works and New Initiatives – Community........................................................15 2010/11 – Recommended Variations to Program of Works – Community..................................................17 2010/11 Financial Assistance – Community ...........................................................................................17

2. Transport ..........................................................................................................18 2010/11 Program of Works – Transport ................................................................................................19 2010/11 – 2013/14 Capital Works and New Initiatives – Transport ..........................................................20 2010/11 – Recommended Variations to Program of Works – Transport ....................................................21

3. Employment......................................................................................................22 2010/11 Program of Works - Employment .............................................................................................22 2010/11 – 2013/14 Capital Works and New Initiatives – Employment ......................................................27 2010/11 – Recommended Variations to Program of Works – Employment ................................................28 2010/11 Financial Assistance – Employment..........................................................................................29

4. Heritage............................................................................................................30 2010/11 Program of Works - Heritage...................................................................................................30 2010/11 – 2013/14 Capital Works and New Initiatives – Heritage............................................................31 2010/11 – Recommended Variations to Program of Works – Heritage......................................................31

5. Education..........................................................................................................32 2010/11 Program of Works - Education.................................................................................................32 2010/11 – 2013/14 Capital Works and New Initiatives – Education..........................................................35 2010/11 – Recommended Variations to Program of Works – Education....................................................36 2010/11 Financial Assistance – Education..............................................................................................36

6. Health ...............................................................................................................37 2010/11 Program of Works - Health......................................................................................................37 2010/11 – 2013/14 Capital Works and New Initiatives – Health...............................................................40 2010/11 – Recommended Variations to Program of Works – Health.........................................................42

7. Environment .....................................................................................................43 2010/11 Program of Works - Environment.............................................................................................44 2010/11 – 2013/14 Capital Works and New Initiatives – Environment......................................................48 2010/11 – Recommended Variations to Program of Works – Environment................................................49 2010/11 Financial Assistance – Environment..........................................................................................50

8. Arts and Culture................................................................................................51 2010/11 Program of Works – Arts and Culture.......................................................................................51 2010/11 – 2013/14 Capital Works and New Initiatives – Arts & Culture....................................................53 2010/11 – Recommended Variations to Program of Works – Arts & Culture..............................................53 2010/11 Financial Assistance – Arts & Culture........................................................................................54

9. Youth ................................................................................................................55 2010/11 Program of Works – Youth......................................................................................................55 2010/11 – 2013/14 Capital Works and New Initiatives – Youth................................................................55 2010/11 – Recommended Variations to Program of Works – Youth .........................................................55 2010/11 Financial Assistance – Youth ...................................................................................................56

10. Growth............................................................................................................57 2010/11 Program of Works – Growth....................................................................................................58 2010/11 – 2013/14 Capital Works and New Initiatives – Growth .............................................................60 2010/11 – Recommended Variations to Program of Works – Growth .......................................................60

11. Governance and Administration Services .......................................................61 2010/11 Program of Works – Governance and Administration Services ....................................................61 2010/11 – Recommended Variations to Program of Works – Governance and Administration Services ........68

Page 15: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 2

Introduction The Quarterly Performance Report is a report on Council’s achievements of the performance targets set in the Management Plan and it provides a budget review statement with a revised estimate of income and expenditure for the year. This is a requirement of the Local Government Act 1993 and Local Government (General) Regulation 2005. This Quarterly Performance Report for the period of 1 October 2010 to 31 December 2010 achieves these requirements.

Summary of Principal Activities Areas The Principal Activity Areas within the Quarterly Performance Report reflect the Vision Statements developed in collaboration with the community and adopted by Council at its Policy and Strategy Committee Meeting of 3 October 2006 (Minute No. 06-315). Each quarter, Council Officers, report on the progress of activities and achievements during that quarter for each principle activity area. Below is a selection of highlights for the reporting period of 1 October to 31 December 2010. Information on variations to the works program can be found throughout the report. Community Working with the community to establish Men’s Sheds in Lithgow and Portland has been a major focus for Council over the past year. During the second quarter Council resolved to implement a Section 355 Committee to enable the Lithgow group to renovate the South Littleton Hall. This project has received $50,000 in funding. An additional $10,000 has been allocated to assist the Portland Men’s Shed with projects and the Community Development Officer has also provided additional support, paint and materials to assist with the restoration of the building they occupy at Kremer Park. Transport Major landscaping works have been undertaken to the eastern approaches on Chifley Road to improve the Scenic Hill entrance to Lithgow. Further bitumen sealing has been undertaken on the Glen Davis and Glen Alice Roads in the Capertee Valley as part of the Roads to Recovery Program. A number of community education projects have been run as part of the Road Safety Program including Bike Safety Sessions, Driver Fatigue Programs, Keep Lithgow Kids Safe School Project and the Gateway Speed Prevention Project. Employment Council launched the new Visitors Guide for the Lithgow region during the second quarter and commenced the development of a business prospectus. The second in a series of workshops – Establishing and Growing Your Home based Business - was conducted in November with further workshops planned for February and March.

Page 16: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 3

Heritage The Heritage Development Control Plan Study was reported to Council on 13 December 2010 and will be placed on exhibition with the Land Use Strategy during the third quarter. All items within the Heritage Study have been reviewed and a management framework is being developed. Education The Library has continued to develop and provide a number of quality programs for the community including conducting the Lithgow Forums, hosting the Lithgow Knitting Group and developing a Lithgow Dictionary of Biography. For children and youth a number of events and programs were developed for the school holidays commencing prior to Christmas with “Story time with Santa” attended by 30 children and the “Scare up a Good Book” – Junior Reading Program. Health The Live Well Lithgow Challenge was held again in 2010 during October to November. The challenge was supported by a calendar of healthy lifestyle activities and the successful Live Well Lithgow Healthy Lifestyle Expo which was conducted at the Tony Luchetti Sportsground. Phase 1 of the Work Well Lithgow Project commenced with the Workplace Healthy Audit Tool being completed and workplace interviews undertaken with large employers in the Lithgow LGA. Council has appointed GHD Consultants to undertake the environmental studies and design for the construction of the bulk water supplier and upgrade of the Clarence Transfer System and water transfer to villages serviced by Fish River Water Supply. GHD has commenced a hydro geological assessment on the transfer and hydrology investigation into sustainable yield from Farmers Creek Dam #2. Environment As part of the Urban Sustainability Project a number of community education campaigns were implemented to encourage people to reduce, reuse, recycle and live more sustainably including:

The installation of posters at local supermarkets to remind people to use re-usable bags. A recycling presentation was conducted for kids at the Lithgow Library. Composting workshops were conducted and the first Compost Cook-off was held as part

of the Live Well Lithgow Expo. A Draft Waste and Recycling Strategy has been completed during the second quarter and will be reported to Council for adoption during the 3rd Quarter. This includes closure plans for the Lithgow Waste Management Facility and landfills along with recommendations in relation to the new garbage and recycling contracts. Arts and Culture A Museums Advisor was appointed for Eskbank House, Charlie Pinch and the Small Arms Museum which will assist in raising standards in Lithgow’s museums through training, introducing best practice standards and assisting museums and cultural heritage organisations to identify gaps in skills and ways to meet needs in any definable area of museum practice.

Page 17: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 4

Youth Council provided financial assistance and support to a number of community projects for youth and families conducted by Youthworx including: An Art for Youth Program which enables young people to develop works and exhibit them at Eskbank House Museum; a series of youth band nights and Cinema Under the Stars to be held in January during the School Holidays at the Lithgow High School. Growth A series of Councillor briefing sessions were held to consider emerging trends and directions within the Draft Land Use Strategy. The Draft LUS will be reported to Council for adoption in the third quarter and placed on exhibition for public comment during the third and fourth quarters. Governance and Administration Services As part of the Integrated Planning and Reporting requirements Council has begun a review of the Strategic Plan 2007 to identify achievements over the past three years. This will inform the development of the Community Strategic Plan. A Draft Workforce Plan has been developed which will form part of the Resourcing Strategy required as part of the IP&R Framework. This will be linked to the 2011-2015 Management Plan and 2011-2012 Operations Plan which commenced in November for adoption by 30 June 2011. Roger Bailey GENERAL MANAGER

Page 18: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 5

Summary of Financial Position The December review of the 2009/10 Management Plan predicts a surplus of $1,700. The improvement on the original balanced budget is attributed to the variations identified in the previous quarters and in the following tables.

2010/11 Quarterly Budget Comparisons Budget Income

($'000) Expenditure ($'000)

Total ($'000)

Original 73,277 73,269 8

September Quarter 78,356 78,343 13

December Quarter 78,377 78,376 1

The major adjustments to the 2010/11 revised Management Plan to the original budget are as follows and should any areas of additional expenditure be required savings have been achieved in other areas: (Note: Adjustments less than $4,000 are not reported)

2010/11 December Quarterly Budget Variations Budget Variation($)

Variations Greater than

$4,000 Reported

EXECUTIVE

Organisational Development

Worker Compensation Rebate Recurrent Increase Income 28,500

Risk Position (Also Savings Sept) Recurrent Decrease Expenditure 4000

Risk Consultant Recurrent Increase Expenditure 20,000

Tourism

Tourism Commissions Recurrent Increase Income 5,000

Tourism Memberships Recurrent Decrease Income 13,551

Blue Mountains Tourism Membership

Recurrent Decrease Expenditure 13,551

OPERATIONS

Cemeteries Fees Recurrent Decrease Income 40,000

Swimming Pool Kiosk / Entry Recurrent Decrease Income 56,808

Urban Roads Maintenance Recurrent Decrease Expenditure 35,799

Cemetery Operations Recurrent Decrease Expenditure 41,050

TL Sportsground Recurrent Decrease Expenditure 23,206

Page 19: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 6

TL Sportsground Recurrent Decrease Expenditure 23,206

Swimming Pool Maintenance Recurrent Decrease Expenditure 46,750

Bus Shelters / St Seats Recurrent Decrease Expenditure 11,462

Rural Roads Maintenance Recurrent Increase Expenditure 82,888

Wallerawang Oval Recurrent Increase Expenditure 9,210

Kremer Park Recurrent Increase Expenditure 5,693

Centrelink Bld Maintenance Recurrent Increase Expenditure 11,462

Country Passenger Grant Capital Increase Income 15,000

RLCIP Round 3 Capital Increase Income 106,000

Internal Road Access Capital Decrease Expenditure 15,000

Urban Drainage Construction Capital Decrease expenditure 69,687

Village Drainage Construction Capital Decrease Expenditure 15,970

Maple Cres Drainage Construction Capital Increase Expenditure 17,167

Main St Footpath Capital Increase Expenditure 10,000

Country Passenger Grant Capital Increase Expenditure 15,000

RLCIP Round 3 (To Reserve) Capital Increase Expenditure 106,000

INTERNAL SERVICES

Management Account Recurrent Decrease Expenditure 16,000

Debt Recovery Recurrent Decrease Expenditure 6,431

DEVELOPMENT

Sec 94 Contributions Recurrent Increase Income 45,000

Sec 94 Cont (To Future Reserve) Recurrent Increase Expenditure 45,000

COMMUNITY & CUTLURAL

Portland Library Rental new premises

Capital Decrease Expenditure 15,000

Donations (To Fuel Rebate Min) Capital Decrease Expenditure 4,715

Books / Resources Capital Increase Expenditure 15,000

Solid Fuel Rebate (Minute) Capital Increase Expenditure 4,715

WATER

Mains & Services Recurrent Decrease Expenditure 45,000

Water Treatment Operations Recurrent Increase Expenditure 45,000

Page 20: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 7

Portland Water Asset Renewal Capital Decrease Expenditure 13,650

Sth Bowenfels Land Acquisition Capital Decrease Expenditure 10,000

Mains & Services Capital Increase Expenditure 23,650

WASTEWATER

Pumping Station Maintenance Recurrent Decrease Expenditure 20,000

Lithgow Established Mains Capital Decrease Expenditure 50,000

Replace Rising Main PS No 1 Capital Increase Expenditure 25,000

Integrated Water Management Cycle Strategy

Capital Increase Expenditure 25,000

WASTE

Capertee Tip Capital Decrease Expenditure 12,000

Landfill closure plans Capital Increase Expenditure 6,000

Lithgow Tip Rehabilitations Capital Increase Expenditure 6,000

Summary of Principal Activity Achievements The Principal Activity Achievements presents the achievements in terms of the key performance indicators from the Management Plan 2010/11 – 2013/14 for the period of 1 October to 31 December 2010. An estimated timeline for undertaking activities is provided as are alterations to any variations to key performance indicator timelines. The progress of undertaking activities has been satisfactory.

Page 21: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 8

1. Community

Statement of intent - Community

We retain, respect and strengthen both our overall sense of community, and the unique linked communities of groups, rural areas, villages and towns that make up the Lithgow LGA.

Strategies - Community Modelling the population and assessing its needs.

Protecting and enhancing areas of unique qualities and character.

Encouraging equitable access to services and facilities which meet the needs of the community.

Determining and prioritising the recreational needs of the community and explore funding

options.

Encouraging community involvement in recreational activities and the use of facilities.

Providing support to community organisations to improve their ability to plan and deliver

recreational activities.

Ensuring adequate open space is provided throughout towns and villages.

Improving the quality of open space and recreational facilities.

Providing a range of housing opportunities to meet the diverse needs of the community.

Facilitating a safe community.

Budget – Community Recurrent Budget for Community

Original 10/11

Revised Sept 10/11

Revised Dec 10/11

Revised March 10/11

Expenditure 10,252 10,408 10,318 Income -5,078 -5,246 -5,150 Result 5,174 5,162 5,167

Budget – Community Capital

Budget for Community Original

10/11 Revised Sept

10/11 Revised Dec

10/11 Revised March

10/11 Expenditure 3,002 4,759 4,772 Income -1,784 -3,523 -3,546 Result 1,218 1,236 1,226

Page 22: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 9

2010/11 Program of Works – Community

Strategic Objective 2010-2014

Activity 2010-2011

Department Quarterly Achievement

Companion Animals

Maintain animal control in accordance with legislation and policy.

Community & Culture

December

Quarter 2009/10

December Quarter 2010/11

No. of animals impounded

124 101

No. of animals returned to owners

60

(48%)

42

(42%)

No. animals destroyed

36

(29%)

45

(45%)

No. animals sold 28

(23%)

7

(796)

No. Animals given to rescue organisations

5

$5%)

2 animals were stolen

Daily feeding, cleaning and exercising undertaken. Maintain the Lithgow Pound to improve security and ensure the comfort of animals.

Community & Culture

Improvements were made during the 2nd Quarter to the animal feed room and staff office. No activities were undertaken to educate the community on care of and responsibility for companion animals during the 2nd Quarter.

To provide for the effective and responsible care and management of companion animals.

Undertake community education on the care of and responsibility for companion animals to reduce number of un-microchipped and un-registered animals impounded.

Community & Culture

December Quarter 2009/10

December Quarter 2010/11

No. of impounded animals not registered

25 (20% of all impounded animals)

14 (14% of all impounded animals)

No. of impounded animals not microchipped

11 (12% of all impounded animals)

9 (9% of all impounded animals)

Page 23: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 10

Cemeteries

To provide a respectful cemetery service.

Maintain and Operate cemeteries at: Capertee Cullen Bullen Dark Corner Glen Alice Hartley Lithgow (3

cemeteries) Lowther Meadow Flat Palmers Oakey Portland Rydal Wallerawang

Operations No complaints were received regarding the service during the 2nd Quarter. Cemeteries are maintained and operated within budget.

Community Buildings and Structures

To maintain clean and safe community buildings in a cost effective manner.

Clean and maintain community buildings and structures.

Operations Buildings and structures are cleaned and maintained to an acceptable standard and within budged.

Hold meetings of hall and theatre advisory/management committees in accordance with the Terms of Reference. Meadow Flat Union Theatre Crystal Theatre Civic Ballroom

Policy & Planning Operations Development

The following meetings were held during the 1st Quarter: 0 Meadow Flat Hall 1 Union Theatre 1 Crystal Theatre 0 Civic Ballroom – This committee will be

convened following completion of the RLCIP upgrades to the Civic Ballroom.

To manage those community halls and theatres with advisory/management committees in conjunction with the community

Operate the Union Theatre.

Internal Services

December Quarter 2009/10

December Quarter 2010/11

No. Bookings taken

Community Information

Produce and deliver to residents Council Connection Newsletters.

Executive Policy & Planning

One Council Connections newsletter was delivered to the community in October during the 2nd Quarter..

Provide information through Council's and the Mayor's Column in the Lithgow Mercury.

Executive During the 2nd Quarter: 18 Council Columns were produced 5 Mayor’s Columns were produced.

Produce media releases. Executive Media releases were produced on a weekly basis during the 2nd Quarter. With 37 being forwarded to local media and placed on Council’s website.

Provide information through the Mayor's radio spot on local and regional radio.

Executive The Mayor regularly contributes to radio interviews including: Local Radio Bathurst’s B Rock FM (each Thursday)

To disseminate concise and effective information to the community about Council's programs, policies and activities

Maintain the website. Information Technology

The website was maintained and accessible during the quarter.

To provide information Provide community Community & The Community Noticeboard was updated weekly.

Page 24: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 11

information on the Cook Street Plaza noticeboard and in branch libraries.

Culture about community activities and facilities.

Provide a Community Services Guide online.

Community & Culture Information Technology

A Community and Lifestyle section is maintained on www.lithgow.com

Maintenance payments were made during the quarter and complaints were referred to the contract on the day received if a working day.

To provide access to television.

Maintain the Federally funded Blackspot television transmission equipment.

Community & Culture

December Quarter 2009/10

December Quarter 2010/11

No. of complaints received

9 12

The following meetings were attended during the 2nd Quarter by the Community Development Officer: Community Services Interagency – 1 meeting held

this quarter. Multicultural Interagency – 0 meetings held this

quarter. Lithgow Child Protection Committee - 1 meeting. Community Drug Action Team - 4 meetings. Domestic Violence Liaison Committee - 0 meetings

held.

Participate in the following community groups and activities: Community

Services Interagency

Domestic Violence Liaison Committee

Lithgow Child Protection Agency

Lithgow Multicultural Interagency.

Community & Culture

The following community activities were supported during the 2nd Quarter. Opening Mike Night at YouthWorx. Live Well Lithgow Expo. Aboriginal Learning Circle.

Men’s Shed Lithgow Men’s Shed Council resolved in 2nd Quarter to accept a proposal to allow the Lithgow Men’s Shed group to undertake renovations of the South Littleton Hall and to establish a s355 committee to oversee these renovations. A total of $50,000 in funding from the Commonwealth and NSW Governments and Council was allocated to the South Littleton Hall project in the 2nd Quarter. Portland Men’s Shed Council’s Community Development Officer has provided support, paint and other materials in the 2nd Quarter. $10,000 in Council funding has been allocated to the Portland Men’s Shed Group in the 2nd Quarter.

To support the activities of community groups and organisations.

Provide and promote Council's Financial Assistance Program.

Community & Culture

During the 2nd Quarter, Council called for applications from the community for the 2nd round of 2010/11. Non-Recurrent Financial Assistance. 19 projects to the value of $40,467. 61 were approved for funding.

Page 25: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 12

Provide advice and assistance to not-for-profit community groups and organisations in identifying appropriate funding sources and preparing grant applications.

Policy & Planning

18 Community Groups were directly assisted in identifying funding and preparing grant applications in the Lithgow LGA.

Provide support for special community events.

Tourism The Live Well Lithgow Expo is scheduled for 2nd Quarter

Australia Day is scheduled for 3rd Quarter The Flash Gift is scheduled for 3rd Quarter

To implement the Social Plan 2006-2011.

Consider Social Plan actions in Council’s strategic planning instruments.

Community & Culture

Priority items are included in the 2010/11 Management Plan. Social Plan actions have also been considered in conjunction with the development of the following plans during the 2nd Quarter: Ageing Strategy Crime Prevention Committee 2 meetings of the Ageing Strategy Working Party were held during the 2nd Quarter.

Progress development of the Ageing Strategy

Community & Culture

The following progress was made with the development of the Ageing Strategy: Community consultations were held in Lithgow,

Portland, Wallerawang and Capertee. A community profile of older people and draft

report structure were developed in the 2nd Quarter.

To plan for projected changes to community structure and demographics

Undertake population modelling to assist with planning for future needs

Policy & Planning

Council has purchased and made available for the community on its website the community profile and atlas for the local government area. This information is used to develop plans and strategies and to inform population trends and forecasts.

Crime Prevention

Maintain street lighting. Operations Regular monthly payments have been made. Participate in the Police Community Safety Precinct meetings and the Lithgow Correctional Centre Community Consultative Committee.

Executive The following meetings were attended during the 2nd Quarter: 0 Police Action Community Team Forum 3 Lithgow Correctional Centre Consultative

Committee.

Participate in the Local Liquor Accord.

Community & Culture

1 meeting of the Liqueur Accord was attended during the 2nd Quarter.

Implement key actions from Crime Prevention Plan

Community & Culture

0 meetings of the Crime Prevention Committee were attended during the 2nd Quarter.

White Ribbon Day was held during the 2nd Quarter with Financial Assistance from Council and support from the Crime Prevention Committee.

To promote a safe community.

Remove graffiti from public places and liaise with Police.

Operations All graffiti is removed within 5 workings days of being notified.

Page 26: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 13

Customer Service

December Quarter 2009/10

December Quarter 2010/11

Work Requests Received

1,107 1,254

Counter Receipts Issued

4,805 3,622

Community Facilities Bookings

20 19

Certificates Processed

575 508

Development Applications Registered

19 18

Development Application Construction Certificates Registered

57 58

Construction Certificates Registered

6 9

Complying Development Applications Registered

15 7

Sec 68 Solid Fuel Heater Applications

3 6

Quotes for Applications Issued

120 92

Operate the one stop customer service counter including: Works requests Bookings for

community facilities Cashiering Certificate

production Customer enquiries Daily mail and

accounts Maintaining registers Registering of

development applications, construction certificates and complying development applications.

Internal Services

During the 2nd Quarter: All receipts were balanced without error and all

signatures were completed. Daily processing of mail was completed and the

monthly bill paid on time. Registers were all maintained to date. During the 2nd Quarter a number of complaints were

received concerning: Major flooding in early December

To provide an effective and efficient customer service.

Provide responses to correspondence.

Internal Services

During the 2nd Quarter all correspondence was completed on time.

Emergency Service

To plan and assist for emergencies.

Participate in emergency services committees including the Bushfire Advisory Committee and the Local Emergency Management Committee in accordance with their

Executive Operations

During the 2nd quarter the following meetings were attended: 1 Bushfire Advisory Committee 1 Local Emergency Management Committee

Page 27: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 14

terms of reference. Provide annual and

discretionary contributions to the NSW Rural Fire Service and fulfil responsibilities under the Memorandum of Understanding.

Operations Payments paid as per the management plan.

Private Works

To undertake private works on request.

To provide quotations and/or undertake private works.

Operations A 20% profit margin listed in the fees is being charged accordingly unless the work is for a charity or a not for profit organisation.

Recreation Facilities

Finalise Open Space and Recreational Needs Study

Policy & Planning

Open Space and Recreation Study has commenced. The Draft study is expected for review during 2nd quarter.

Commence preparation of Community/Crown Lands Plans of Management in accordance with the 2010 adopted priority program.

Policy & Planning

Scheduled to commence 4th quarter.

Continue to review development options for an Indoor Aquatic Centre

Operations Proceeding with construction of Stage 1.

Review hours and operations of the Lithgow Swimming Pool

Operations Completed

To deliver to the community a co-ordinated and well-managed system of open space complimented by sporting and recreational facilities to meet a full range of recreational needs.

Review Service Levels at the Lithgow Golf Course

Operations Completed

Maintain gardens, parks, reserves, street trees and other public spaces.

Operations

Maintained to an acceptable standard and within budget.

Manage and prepare playing fields including: Conran Oval Glanmire Oval Kremer Park Marjorie Jackson

Oval Saville Park Tony Luchetti

Sportsground Wallerawang Oval Watsford Oval Zig Zag Oval. Jim Monaghan

Athletics Oval

Operations All playing fields were available for use except in exceptional wet weather conditions.

Operate the Lithgow Swimming Pool.

Operations The Swimming Pool opened on Saturday 2 October 2010.

To provide quality recreational facilities for the community.

Manage and prepare the Lithgow Golf Course

Operations The course was available for play in a presentable condition, except during exceptional wet weather conditions.

Page 28: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 15

To provide a forum for sporting groups to discuss matters relating to local sport and advise Council.

Organise the Sports Advisory Committee meetings in accordance with the terms of reference.

Operations During the 2nd Quarter the meetings of the Sports Advisory Committee were convened and attended on a 6 weekly basis.

Street Numbering

To identify premises. To provide street and rural numbers to premises upon request and at subdivision stage.

Development During the 2nd Quarter the following street and rural numbers were issued: 6 Street Numbers 20 Rural Numbers

2010/11 – 2013/14 Capital Works and New Initiatives – Community

Project Name Description of Works Program/Key

Performance Indicator Department Quarterly Achievement

Cemeteries

Develop a program for cemetery improvement works and commence implementation

10 year Cemetery Improvements Program developed and adopted by Council.

Operations Proceeding with implementation of stage 1: Removal of pine trees at Lithgow

Cemetery. Construction of new columbarium

wall and landscaping at Wallerawang Cemetery.

Community Buildings and Structures

Develop a program for toilet and facilities improvements in recreation areas.

Investigate the feasibility and options for the installation of toilet facilities at Hassans Walls Lookout.

Development Toilet facilities at Hassans Walls Lookout will be reviewed in line with development of plans for the area.

Toilet upgrade for Marjorie Jackson Oval is scheduled for 4th quarter.

Develop a program for building improvements and commence implementation

10 year Building Improvements Program developed and adopted by Council.

Development Works being undertaken as part of the RLCIP funding include: Hermitage Hall Civic Ballroom Ashley Grandstand

Undertake improvements to the Meadow Flat Hall

This project is dependent on successful grant funding from RLCIP

Development To be undertaken as part of RLCIP Grant Funding Program – scheduled to commence 3rd quarter.

Lithgow Golf Club building improvements

Continue Building improvements Development An electrical upgrade of the building was undertaken and works are completed.

Crystal Theatre building improvements

Continue upgrading program Development This has not been funded.

Lithgow CCTV Cameras Add an additional camera Development The current system has been upgraded and is completed for 2010/11.

Civic Ballroom Purchase 50 new chairs Development Completed Wallerawang Memorial Hall – Replace Flooring

Scheduled for 3rd Quarter Special Rate Variation – Four year works program 2010/11 – 2013/14 Civic Ballroom

Facility upgrade

Development

In progress as part of the RLCIP Grant Funding program.

Community Support

Conduct International Womens Day activities with the Domestic

Activities developed and implemented within budget

Community & Culture

Funding received and planning commenced during the 2nd Quarter for International Women’s Day 2011, to be

Page 29: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 16

Violence Liaison Committee

held in March 2011.

Undertake accessibility audit of Council footpaths and facilities

Community & Culture Operations

Scheduled for 3rd Quarter.

Disability Access Plan developed and adopted by Council

Community & Culture

Scheduled for 4th Quarter

Develop a Disability Access Plan

Actions implemented and included within Council’s Delivery and Operations Plans.

Community & Culture Operations

Scheduled for 4th Quarter

Support the development of a residents committee

Scheduled for 3rd Quarter Work with the Department of Housing, the community and other stakeholders to implement programs to address community needs and concerns in the Bowenfels community.

Support the provision and development of afterschool and weekend activities for children and youth.

Community & Culture

Scheduled for 3rd Quarter

Planning

Undertake Gap Analysis of Social Plan and prepare issues paper

Community & Culture

To commence in 2nd half of 2010/11. Prepare a revised social plan in line with Council’s Integrated Planning and Reporting Framework

Incorporate Social Planning issues and actions into the Community Strategic Plan

Policy & Planning

To be included as part of the IPR Framework during development of the Community Strategic Plan during 4th Quarter.

Commence Generic Community Lands Plans of Management for: Sporting Fields Parks Halls

Progress the development of Community/Crown Lands Plans of Management in accordance with 2010 adopted priority programs

Commence Generic Crown Lands Plan of Management for Hassans Walls Reserve

Policy & Planning

Works scheduled to commence during 3rd Quarter.

Open Space and Recreational Needs Study

Commence Open Space and Recreational Needs Study

Policy & Planning

Draft study prepared including community consultation during 1st Quarter.

Draft Study to be considered by Council during 2nd Quarter.

Findings to be integrated with the Draft Land Use Strategy during 2nd Quarter.

Recreation Facilities

Tony Luchetti Sportsground

Upgrade cricket practice wickets Operations Construction to be undertaken during 3rd Quarter.

Develop a program for Stage 1 of the Lithgow Aquatic Centre Project.

Program for Stage 1 implemented and included within Council’s Delivery and Operations Plans.

Operations Tenders to be invited for stage 1 in 3rd Quarter.

10 year works program for Active & Passive Recreation Areas developed and adopted by Council.

Operations Adopted in Annual plan. Develop a program of improvement works to active and passive recreation areas. Program implemented and included

within Council’s Delivery and Operations Plans.

Operations Adopted in Annual plan.

Page 30: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 17

Walking/Cycleway

Seek funding to establish a Walking and Cycleway along Farmers Creek to Lake Pillans Wetlands.

Policy & Planning, Community & Culture Operations

Funding has been received with construction to commence on Stage 1; the section from Geordie Street Crossing to George Coates Avenue Walkway during the 3rd quarter.

A funding submission for additional stages has been submitted.

Tree Planting/Beautification Plan

Investigate a tree planting/beautification plan for the Lithgow Local Government Area.

Operations Draft prepared.

2010/11 – Recommended Variations to Program of Works – Community

There are no variations to the Program of Works for Community as detailed in the Management Plan adopted by Council on 21 June 2010 (Min No. 10-245).

2010/11 Financial Assistance – Community

Financial Assistance Timeframe Quarterly Achievement

Recurrent Financial Assistance Lithgow Show 2010/11 – 2013/14 Awaiting invoice Ironfest 2010/11 - 2013/14 Awaiting invoice White Ribbon Day 2010/11 – 2013/14 Paid 1st Quarter

Non-Recurrent financial Assistance Non-Recurrent Financial Assistance requests determined in April and November 2010 in accordance with Council’s Financial Assistance Policy

2010/11 The following community groups received financial assistance during the 2nd Quarter. Lithgow Information &

Neighbourhood Centre. Gumnut House. Mingaan Aboriginal Corporation. Lithgow District & District Poultry

Club. Glen Alice Community Assn. Portland Gold Club Open

Championships. Hartley District Progress

Association. Vale Ladies Club. First Australian Muzzle Loading

Club. Rydal H&P Society. Lithgow Family Support Service. Zig Zag Railway.

Page 31: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 18

2. Transport

Statement of intent - Transport

Providing a choice of effective public and private transport options for those who live, work and visit our community.

Strategies - Transport Providing road infrastructure which meets the needs of residents.

Continuing to lobby for improved access to and from Sydney over the Bells Line Expressway.

Promoting equitable access to public transport.

Maximising the number of passenger train services terminating at Lithgow and provide a fast

train service.

Improving and expanding the pedestrian and bicycle network.

Budget – Transport Recurrent Budget for Community

Original 10/11

Revised Sept 10/11

Revised Dec 10/11

Revised March 10/11

Expenditure 9,804 9,733 9,784 Income -2,568 -2,568 -2,568 Result 7,236 7,165 7,215

Budget – Transport Capital

Budget for Community Original

10/11 Revised Sept

10/11 Revised Dec

10/11 Revised March

10/11 Expenditure 3,090 3,319 3,229 Income -1,418 -1,557 -1,557 Result -1,672 1,762 1,672

Page 32: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 19

2010/11 Program of Works – Transport

Strategic Objective

2010-2014 Activity

2010-2011 Department Quarterly Achievement

Abandoned Articles

To improve safety and amenity of the neighbourhood

Impound abandoned articles from public places

Community & Culture

3 articles were impounded in accordance with the Impounding Act during the 2nd Quarter.

Access to and from Sydney

Participate in the Bells Line Expressway Group.

Executive 2 meetings of the Bells Line Expressway Group were attended during the 2nd Quarter

To lobby for improved access to and from Sydney over the Blue Mountains.

Lobby the State Government to maximise the number of passenger train services that terminate at Lithgow.

Executive Lobbying undertaken

Council Plant and Equipment

To provide plant and equipment to undertake works.

Maintain Council's fleet of plant and equipment.

Operations Plant serviced in accordance with manufacturer’s recommendations and repairs conducted in a timely and efficient manner.

Weekly reporting of plant off the road to Operations staff indicating less than 0.05%.

Parking Enforcement

To provide available parking for residents and visitors.

Conduct on-street parking enforcement in the Central Business District of Lithgow and school zones.

Community & Culture

During the 2nd Quarter:

34 parking patrols were undertaken 4 School zone patrols were undertaken

Transport Groups

To provide a forum for community and government authorities to discuss issues relating to local traffic and advise Council.

Organise the Traffic Authority Local Committee in accordance with the terms of reference.

Community & Culture

2 meetings of the Traffic Authority Local Committee were attended during the 2nd Quarter.

To improve access to public transport in the LGA.

Participate in Transport Working Party forum.

Community & Culture

No meetings of the Transport Working Party Forum were attended during the 2nd Quarter.

Roads and Associated Infrastructure

Maintain roads, bridges, footpaths, cycleways, drainage, roadside vegetation, carparks and kerb and guttering.

Operations Maintenance undertaken to provide safe and acceptable standards and within budget.

Clean footpaths and streets in Lithgow, Portland and Wallerawang.

Operations Cleaning undertaken to provide safe and acceptable standards and within budget.

To provide safe and serviced roads within the LGA.

Maintain traffic signs and other associated furnishings.

Operations Maintained to acceptable standard and within budget.

Page 33: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 20

Road Safety Program

Host the Roads Safety Officer for Lithgow and Mid-Western Regional Council.

Community & Culture

Council continued to host the Road Safety Officer. To develop and deliver the road safety message.

Implement the road safety strategy and actions plans including:

Bike Safety sessions

Driver Fatigue Project

Gateway Speed Prevention Project

School Parking Education

Community & Culture

The following activities were undertaken during the 2nd Quarter:

Community bike safety session at Wallerawang. Bike safety sessions at Live Life well expo. Drive fatigue project. Keep Lithgow Kids Safe School project. Traffic Authority Local Committee (TALC). Gateway Speed Prevention project. School Parking education project. Community projects-including motorcycle

awareness week.

2010/11 – 2013/14 Capital Works and New Initiatives – Transport

Project Name Description of Works Program/Key

Performance Indicator Department Quarterly Achievement

Plant

Backhoe Purchased during 2nd Quarter Mower To be undertaken during 3rd Quarter Mower To be undertaken during 3rd Quarter

Provide an ongoing plant & vehicle replacement program suitable to Councils Operational needs. Larger annual plant purchases

Light vehicles

Operations

3 light vehicles were replaced for Administrative and Inspectorial Staff.

Roads and Associated Infrastructure

Continue the clean and seal paver program in Main Street, Lithgow

Continue Main Street Paver program

Operations Completed

10 year Timber Bridge Improvements Program developed and adopted by Council.

Operations Works commenced during 2nd Quarter on the bridge on Palmers Oakey Road.

Develop a timber bridge improvement program and commence implementation Program implemented and included

within Council’s Delivery and Operations Plans.

Operations To be included in the development of the 2011/12 Management Plan.

Various urban drainage projects in Lithgow and Portland as per 10 year program

Park Street Portland Operations Deferred to 4th Quarter

10 year Village Drainage Improvements Program developed and adopted by Council.

Additional drainage culverts will be installed in Rydal during the 4th Quarter.

Develop program of village drainage improvements and commence implementation

Program implemented and included within Council’s Delivery and Operations Plans.

Operations

To be included in the development of the 2011/12 Management Plan.

Develop footpath construction program and

Construct footpath heading west from Col Drewe Drive, South

Operations To be undertaken during the 3rd Quarter

Page 34: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 21

Bowenfels, Birch Place and connection to Sweet Briar Estate.

commence implementation with the construction of a footpath heading west from Col Drewe Drive, South Bowenfels, Birch place and connection to Sweet Briar Estate

Develop 10 year program and include in Councils Delivery Program and Operations Plan

To be included in the development of the 2011/12 Management Plan.

Browns Gap road, To be undertaken during the 3rd Quarter Glen Alice Road, Glen Alice To be completed during the 3rd Quarter Glen Davis Road Completed

Roads to recovery program upgrades

Rydal Hampton Road, Hampton

Operations

To be undertaken during the 3rd Quarter Cox’s River Road To be undertaken during the 3rd Quarter Rural sealed roads

rehabilitation Program Magpie Hollow Road, South Bowenfels

Operations To be undertaken during the 3rd Quarter

Short Street, Lithgow To be undertaken during the 3rd Quarter Urban Roads Reseals Ivatt Street, Lithgow

Operations To be undertaken during the 3rd Quarter

Sodwalls Road To be undertaken during the 3rd Quarter Cox’s River Road To be undertaken during the 3rd Quarter Reseals – 10mm – program Short Street, Lithgow

(additional) Wallerawang Reseals

To be undertaken during the 3rd Quarter

Special Rate Variation –Works program 2010/11

Lithgow/Portland Lanes

Operations

To be undertaken during the 3rd Quarter Improve signage as part of the Marketing and Branding Strategy

Tourism To be undertaken during the 4th Quarter Improve the Scenic Hill Entrance to Lithgow

Improve Landscaping at the lookout to include tree removal and planting of suitable shrubs and greenery.

Operations Major landscaping works and cleanup is being undertaken to the eastern approaches on Chifley Road.

2010/11 – Recommended Variations to Program of Works – Transport

There are no variations to the Program of Works for Transport as detailed in the Management Plan adopted by Council on 21 June 2010 (Min No. 10-245).

Page 35: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 22

3. Employment

Statement of intent - Employment

Developing and embracing diverse job opportunities for all ages and abilities.

Strategies - Employment Planning for a diversified economy which supports local employment.

Encouraging local employment opportunities for the community.

Protecting the economic assets.

Providing employment generation lands.

Promoting retailing opportunities in the LGA.

Developing our natural and cultural assets for the tourism market.

Budget – Employment Recurrent Budget for Community

Original 10/11

Revised Sept 10/11

Revised Dec 10/11

Revised March 10/11

Expenditure 834 1,030 1,151 Income -412 -602 -644 Result 422 428 507

2010/11 Program of Works - Employment

Strategic Objective 2010-2014

Activity 2010-2011

Department Quarterly Achievement

Economic Development

Commence implementation of the economic development strategy for Lithgow LGA.

Policy & Planning

The following activities have been undertaken during the 2nd Quarter:

Preparation of the business prospectus. Preparation of demographic profile

document. Two business workshops completed. Creative cluster meeting held. Main Street shop vacancy review.

Provide opportunities for business through the leasing of Council owned retail and office space.

Internal Services

During the 2nd Quarter 7 premises were leased and 3 were vacant.

To facilitate economic development in the LGA.

Regularly meet with and coordinate economic programs with the Economic Development

Policy & Planning

During the 2nd Quarter the following meetings were attended:

2 Economic Development Advisory

Page 36: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 23

Advisory Committee, the Lithgow Business Association and other stakeholders as required.

Committee 3 Lithgow Business Association 0 AusIndustry 2 Enterprise Connect

To provide a forum to discuss Sister City matters and advise Council.

Organise the Sister City Advisory Committee meetings in accordance with the terms of reference.

Policy & Planning

1 meetings of the Sister City Advisory Committee were attended during the 2nd Quarter.

Marketing and Branding

Implement a marketing and branding strategy that includes specific actions for the promotion of:

Lithgow Local Government Area

Lithgow City Council Economic Growth Tourism

Policy & Planning

Tourism

Scheduled to be undertaken during 4th Quarter.

Develop a brand that encompasses the LGA, Council, economic growth, tourism

Policy & Planning, Tourism

Scheduled to be undertaken during 4th Quarter.

Prepare marketing and branding collateral that promotes:

the LGA and Council activities

economic growth tourism

Policy & Planning

Tourism

The following activities have been undertaken during the 2nd Quarter:

Development of Lithgow Visitors Guide

Develop and implement an interpretative signage program for the LGA

Tourism This is contingent upon the development and adoption of the Marketing and Branding Strategy.

To promote Lithgow Local Government Area as a place to live, invest and visit.

Upgrading of the brown and white tourism signs.

Tourism No signs were installed during the 2nd quarter.

Tourism

Develop a tourism development strategy through tourism Operators and community consultation that includes, land use allocation and planning, facility development, product development and marketing.

Tourism Community Consultation on the Tourism Strategy is deferred to the 4th Quarter.

To develop and implement a tourism development strategy for the Lithgow LGA

Provide input into community tourism development initiatives, eg Capertee Valley and other Groups

Tourism The following activities have been undertaken during the 2nd Quarter:

Hartley Progress Association – developing ideas for events for example Roaring 20’s

Page 37: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 24

and Anniversary of the crossing of the Blue Mountains.

December Quarter 2009/10

December Quarter 2010/11

No. visited Visitors Information Centre

11,698 12,885

Value of retail Sales $17,243.45 $22,095.20

Operator Membership of Lithgow Tourism

65 84

Visitors who booked accommodation through the VIC 2nd Quarter 2010/11

Month Total accommodation

Booked

Commission

October 10 $5,294.00 $529.40

November 10 $1,263.00 $126.30

December 10 $2,055.00 $205.50

The Tourism Ambassador Program is scheduled to be developed during 3rd Quarter.

The ‘What’s in your Backyard’ campaign is scheduled to be undertaken during 3rd Quarter.

Operate the Lithgow Visitor Information Centre including the provision of tourism marketing services such as:

Tourism Ambassador Program

'What's in your Backyard' campaign

Sale of LGA souvenirs.

Promotion of the LGA in a range of media.

Tourism

The following media campaigns have been coordinated by Lithgow Tourism during the 2nd Quarter:

Launch of Lithgow Visitors Guide.

To foster tourism in the LGA through promotional activities.

Participate in the activities of Blue Mountains Tourism Ltd which promote the LGA including:

Participation in Board meetings,

Tourism The following Blue Mountains Tourism Limited meetings were attended during the 2nd Quarter:

3 BMTL Board Meetings 3 Promotional Target Team Meetings 0 Education Network Target Team Meetings (no

meetings convened).

Page 38: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 25

The following Trade Shows were attended during the 2nd Quarter:

Canberra Home and Leisure 4WD Show.

1 activity was undertaken as part of the Visiting Journalists Program during the 2nd Quarter.

Advertising in the Blue Mountains Experience Guide will be renewed in 3rd Quarter.

promotional target team for the domestic and international markets and education network target team.

Attendance at trade shows.

Participation in the visiting journalist program.

Advertising in the Blue Mountains Experience and Holiday Guide 2010/11.

Promotion of local events.

A Public Relations Taskforce has been set up by Blue Mountains Lithgow Oberon Tourism.

Implement collaborative partnership strategies across LGA’s including:

The Greater Blue Mountains Drive.

The Botanists’ Way The Tablelands

Way.

Tourism 3 meetings of the Tourism Advisory Committee were convened and organised by staff during the 2nd Quarter.

To provide a forum for tourism Operators to discuss matters relating to local tourism and advise Council.

Organise the Tourism Advisory Committee meetings in accordance with the terms of reference.

Tourism No meetings of Film Central were convened during the 2nd Quarter.

The following filming was undertaken on location in the Lithgow local government area during the 2nd Quarter:

48 hour film festival - Blast Furnace Park Praetorian Pictures - ADI Gates FIFA World Cup Bid - Mt Wilson Zig Zag So who do you think you are

To promote filming in the LGA.

Participate in the activities of CENTROC's Film Central.

Tourism

The following activities were implemented during the 2nd Quarter:

Ten Tunnels 100 year Celebrations October 2010.

Lions Club 2012 Event confirmed. Motorcycle Event proposed in October 2011. Lithgow Flash Gift marketing funding

applications. 1920’s February Event 2011.

Page 39: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 26

Blue Mountains Crossing Celebration 2013.

Implement the Festivals and Events Strategy

Tourism The following activities were undertaken during the 2nd to implement the Festivals and Events Strategy:

System developed to accurately assess Councils contribution towards events and outcomes achieved.

Assisted with poster displays and flyer distribution.

To support and develop significant events for the LGA

Organise and stage the Lithgow Flash Gift.

Tourism The following activities were undertaken during the 2nd Quarter in preparation for the Lithgow Flash Gift to be held in the 3rd Quarter:

3 meetings of the committee were held.

Indentify and support local tourism events:

Daffodils at Rydal Rally of Lithgow Hartley’s Big

Backyard Celebrate Lithgow Portland Spring Fair KTM Sunny Corner

Trail Bikes Wallerawang Autumn

Festival – 125th Anniversary of Charles Darwin visit to Wallerawang

Other events supported/developed by council.

Tourism The following activities were held during the 2nd Quarter:

100th Anniversary of Ten Tunnels Celebrate Lithgow Portland Spring Fair

To further develop and upgrade the interior layout of the Lithgow Visitor Information Centre

Upgrade facilities within the Lithgow Visitor Information Centre to incorporate additional storage area, interpretive information and meeting facility space

Tourism Plans to upgrade the interior of the Visitors Centre during the 3rd quarter are dependent upon budget

Page 40: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 27

2010/11 – 2013/14 Capital Works and New Initiatives – Employment

Project Name Description of Works Program/Key

Performance Indicator Department Quarterly Achievement

Council Employment

Review the corporate structure and implement

Develop workforce strategy Organisational Development

Scheduled for 3rd Quarter

Economic Development

Develop business prospectus Business prospectus chapters determined and being written.

Prospectus scheduled for completion by end of 2nd quarter.

Support forums, business development initiatives

A series of business workshops have been coordinated to assist with business development.

Upgrade and maintain website New pages being identified with additional ‘business support’ page to be added by the end of the 2nd quarter.

Implement programs in the Economic Development Strategy

Develop promotional material to attract investors and residents and participate in relevant exhibitions.

Policy & Planning

Business Prospectus chapters determined and being written.

Prospectus scheduled for completion by the end of the 2nd quarter.

Business expos to be identified by the end of the 3rd quarter.

Identify and develop publications to promote business and investment opportunities for the area..

Provide professional corporate promotional and informational publications in line with the Marketing and Branding Strategy.

Policy & Planning

Business prospectus chapters determined and being written.

Prospectus scheduled for completion by end of 2nd quarter.

Main Street Program Consult with Main Street Business Owners in Lithgow, Wallerawang and Portland to identify strategies and/or an incentives program to upgrade/restore shop fronts.

Policy & Planning

Program to be investigated by the end of the 3rd quarter.

Derelict Buildings Program

Investigate the feasibility of an incentives program for upgrading and repairs to property owners of derelict buildings and yards.

Policy & Planning

Program to be investigated by the end of the 3rd quarter.

Council attended the LGSA Conference and put a motion to the conference “That the LGA lobbies the NSW Government for increased and more streamlined powers to allow local councils to require owners and occupiers of commercial premises to improve the cleanliness and appearance of neglected shop front.” A report went to the Ordinary meeting of Council on 22 November 2010 and the information was noted that the motion was classified as a Category 2 Motion and hence was a motion that was referred to the Executive of the Association.

Page 41: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 28

Marketing and Branding

Develop promotional material to attract visitors to the Lithgow LGA

Development of the Lithgow Visitors Guide.

Develop marketing collateral to promote the Lithgow LGA as a tourist and events destination.

Develop promotional material to support event development

Tourism

Events Promotional Material to be developed in 3rd Quarter.

Identify and develop corporate publications.

Provide professional corporate promotional and informational publications in line with the Marketing and Branding Strategy.

Identification of items is scheduled to commence during 3rd Quarter. However, development of promotional materials cannot commence until the Branding and Marketing Strategy is completed and adopted by Council.

Christmas Program developed and adopted by Council

The following activities were undertaken during the 2nd Quarter. The Mayor’s Christmas appeal was

conducted and functions were held at the local nursing homes for the distribution of gifts to residents.

Banner Poles and Christmas Banners were installed at Quota Park, the Visitors Centre, Wallerawang Library and the entrance to Portland.

A Christmas display was installed in the Hartley Building.

Develop a Christmas decorations program throughout the LGA

Program implemented and included within Council’s Delivery and Operations Plans.

Completed.

Council Banners Program developed and adopted by Council

During the 1st Quarter development of a Draft Banner Poles Policy and Standard Working Procedure was commenced.

Program implemented and included within Council’s Delivery and Operations Plans.

Banner Poles were installed at Quota Park, the Visitors Centre, Wallerawang Library and the entrance to Portland.

Welcome to Lithgow, Portland and Wallerawang Banners were developed and were installed during 2nd quarter following the Christmas period.

Develop a Council Banners Program for the Lithgow LGA

Identify locations for banner poles and install as per strategy.

Policy & Planning

Discussions have been held internally to identify suitable locations for Banner Poles.

2010/11 – Recommended Variations to Program of Works – Employment

There are no variations to the Program of Works for Employment as detailed in the Management Plan adopted by Council on 21 June 2010 (Min No. 10-245).

Page 42: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 29

2010/11 Financial Assistance – Employment

Financial Assistance Timeframe Quarterly Achievement

Recurrent Financial Assistance Lithgow Business Association 2010/11 – 2013/14 Paid during 2nd Quarter.

Page 43: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 30

4. Heritage

Statement of intent - Heritage

Celebrating, protecting and sustaining our unique industrial and natural heritage, its cultural landscapes and its built heritage.

Strategy - Heritage Identifying, preserving, improving and promoting the LGA's indigenous and non indigenous built

and natural heritage.

Budget – Heritage Capital Budget for Community

Original 10/11

Revised Sept 10/11

Revised Dec 10/11

Revised March 10/11

Expenditure 60 72 117 Income -60 -72 -117 Result 0 0 0

2010/11 Program of Works - Heritage

Strategic Objective 2010-2014

Activity 2010-2011

Department Quarterly Achievement

Undertake work identified within the Heritage Audit Gap Analysis to enable items to be listed in principal LEP in line with priority program for completion.

Policy & Planning

The following activities have been undertaken during the 2nd Quarter:

Reviewed items list to ensure information accuracy and currency.

To identify, conserve, enhance and promote the conservation of the LGA’s heritage.

Undertake development of a Heritage Development Control Plan Study to identify local heritage values and develop appropriate heritage management policy and tools to assist implementation.

Policy & Planning

The following activities have been undertaken during the 2nd Quarter:

Heritage DCP Study reported to Council on the 13th December 2010. Council resolved to support recommendation of the study and approve its public exhibition with the Land Use Strategy in the 3rd Quarter.

All items have been reviewed and recommended management framework is being developed and will be finalised in the 3rd Quarter.

To promote the conservation of the LGA's heritage.

Provide a heritage advisor program.

Development

December Quarter 2009/10

December Quarter 2010/11

No. people utilising this program

10 8

Page 44: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 31

Presentation of the John Wellings Heritage Award

Community & Culture

Investigation scheduled for 3rd quarter

Investigate the establishment of a local Heritage Committee through development of a discussion paper to be considered by Council.

Policy & Planning

Investigation scheduled for 4th quarter.

2010/11 – 2013/14 Capital Works and New Initiatives – Heritage

Project Name Description of Works Program/Key

Performance Indicator Department Quarterly Achievement

Progress the implementation of the Heritage Study

Ensure recommendations are included within relevant planning instruments and Council policy.

Policy & Planning

Recommendations from the Heritage Development Control Plan Study to be included in the LEP in 4th quarter.

Progress the implementation of the Heritage Development Control Plan

Ensure recommendations are included within relevant planning instruments and Council policy

Policy & Planning

Draft Heritage Development Control Plan to be publicly exhibited during 3rd Quarter.

Commence Plans of Management for key Council owned or controlled sites including management plans and conservation management plans as required to include ways to interpret, protect and conserve both European and Aboriginal Heritage.

Develop Conservation Management and Management Planning in accordance with an adopted priority program commencing with: Blast Furnace Park Union Theatre Eskbank House Museum Black Fellows Hands Hassans Walls Lookout Bracey Lookout

Policy & Planning

Scheduled to commence during 4th Quarter.

Continue with the Heritage Planning Program

Implement actions identified within the Heritage Planning Program in conjunction with the Heritage Advisor.

Development Property inspections have been carried out with the Heritage Advisor.

Investigate options for the establishment of a community heritage orchard in association with the Landscape Conservation Management Plan for the grounds.

Heritage Orchard – Eskbank House Museum

Program implemented and included within Council’s Delivery and Operations Plans.

Community & Culture

Project under review to determine the level of community support.

2010/11 – Recommended Variations to Program of Works – Heritage

There are no variations to the Program of Works for Heritage as detailed in the Management Plan adopted by Council on 21 June 2010 (Min No. 10-245).

Page 45: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 32

5. Education

Statement of intent - Education

Progressing to a “learning city of excellence” with a broad range of formal and non-formal education services.

Strategies – Education Encouraging and supporting a university presence in the Learning City that aligns with our needs

for skilled workers.

Enhancing the Learning City by providing learning opportunities which meet the needs of the

community.

Budget – Education Recurrent Budget for Community

Original 10/11

Revised Sept 10/11

Revised Dec 10/11

Revised March 10/11

Expenditure 1767 1777 1,777 Income -130 -130 -130 Result 1,637 1,647 1,647

Budget – Education Capital

Budget for Community Original

10/11 Revised Sept

10/11 Revised Dec

10/11 Revised March

10/11 Expenditure 105 95 95 Income -14 -14 -14 Result 0 0 81

2010/11 Program of Works - Education

Strategic Objective 2010-2014

Activity 2010-2011

Department Quarterly Achievement

Learning City To provide the community with opportunities to develop knowledge and skills through Learning City Programs.

Implement activities identified in the Learning City Action Plan according to priorities.

Community & Culture

The following activities undertaken during the 2nd Quarter:

Lithgow Forum. Weekly knitting group. Community Computer classes. Supervising External Exams. Lithgow Dictionary of Biography.

Page 46: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 33

Maintain membership of the Australian Learning Community Network.

Community & Culture

Membership is due for payment during the 3rd Quarter.

Sharing library resources with other communities

Community & Culture

December Quarter 2009/10

December Quarter 2010/11

No. Inter-Library loans (requests able to be met)

106 122

No. reciprocal borrowers.

339 398

Operate the Lithgow Library Learning Centre and the Portland, Rydal and Wallerawang Libraries.

Community & Culture

December Quarter 2009/10

December Quarter 2010/11

No. of Library loans 21,291 20,399

No. people using Library (est.)

24,790 27,176

No. new members 246 180

No. children at story time activities

215 222

No. children at homework centre

154 197

No. of people utilising the technology centre

6,620 5,793

No. bookings for Meeting room

99 59

Page 47: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 34

Conduct exhibitions and displays in the Lithgow Library Learning Centre.

Community & Culture

December Quarter 2009/10

December Quarter 2010/11

No. of Exhibitions 3 3

Title of Exhibitions 2010/11

Works by Photographers with Disabilities.

Monotremes. Scare Fossils

No. of Displays 6 5

Title of Displays 2010/11

Ruth Park (author display).

Knit as you please - works 1.

Knit as you please - works 2.

Pottery display. China (foyer display)

The community and educations displays were updated twice weekly during the 1st Quarter.

Provide a community and education information service through events, displays and the Learning Shop at the Lithgow Library Learning Centre and the Portland, Rydal and Wallerawang Libraries.

Community & Culture

The following activities were undertaken during the school holidays:

Story time with Santa - 30 children attended.

Scare up a Good Book - junior reading program with rewards & prizes - 44 children participating.

Event name Attendance December Quarter

2010/11

Community Computer classes

54

Knit as you please sessions 148

External Examinations supervised

15

Lithgow Forum: Dr A Musser: Monotremes &

Climate Change

24

Book Fair

Seniors Week

Celebrate Lithgow stall

Lithgow Dictionary of Biography

Page 48: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 35

To lobby for a university in the LGA.

Lobby universities to establish a presence in the LGA.

Policy & Planning

Awaiting further update from UWS regarding their funding submission. Other universities to be identified as potential targets.

2010/11 – 2013/14 Capital Works and New Initiatives – Education

Project Name Description of Works Program/Key

Performance Indicator Department Quarterly Achievement

Learning City Historic photos are being digitised by a volunteer with approximately 25 % are complete. A large number of photos have been donated within the last 12 months resulting in an increasing volume to be digitised. Storage and access to the local studies collection has been enhanced due to:

Outdated books in the stack being weeded, providing much needed archival storage.

Archival indexing by a volunteer continues to make the collection more accessible.

5 copies of “Glen Davis …..” by Leonie Knapman acquired and catalogued.

Map cataloguing project: First 60 maps scanned & catalogued by volunteers.

Develop the local history collection

Photo digitising of the collection. Improved storage and access to

Local Studies Collection Map indexing Mercury indexing of Lithgow

Mercury holdings

Community & Culture

Indexing of the Mercury continued during 2nd Quarter.

Enhance the adult, children, DVD, large print, language and teenage sections of the Library collection and provide kits for the Books for Babies program.

Purchase additional book and other reading resources

Community & Culture

New books and other resources are added weekly to stock and displayed in each branch before being made available for borrowing.

90 Books for Babies were provided during the 2nd Quarter to all newborns at Lithgow hospital and any incoming residents with very young children.

Homework Zone received $11,000 funding from Lithgow High School.

6 new Talking Books acquired with $500 grant from the Commonwealth Bank.

78 DVD’s were added to the collection.

29 Large Print books were added to the collection.

$500 grant for Seniors Week.

Page 49: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 36

Installation of new furnishings, fittings and shelving.

Scheduled for 4th Quarter Upgrade the Portland Library

New premises – rental

Community & Culture

Scheduled for 4th Quarter Preliminary investigation into feasibility developing a home library Service

Community & Culture

Discussions commenced with Lithgow Information and Neighbourhood Centre to recruit volunteers.

Develop a home library service to housebound and isolated residents

Implement Home Library Service Community & Culture

Scheduled for 3rd Quarter

2010/11 – Recommended Variations to Program of Works – Education

There are no variations to the Program of Works for Education as detailed in the Management Plan adopted by Council on 21 June 2010 (Min No. 10-245).

2010/11 Financial Assistance – Education

Financial Assistance Timeframe Quarterly Achievement

Recurrent Financial Assistance Local School Presentations 2010/11 – 2013/14 2 x $50 paid 1st Quarter

Non-Recurrent financial Assistance Non-Recurrent Financial Assistance requests determined in April and November 2010 in accordance with Council’s Financial Assistance Policy

2010/11 No community groups have received financial assistance during the 2nd Quarter in the education category.

Page 50: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 37

6. Health

Statement of intent - Health

Creating a healthy community providing opportunities and facilities for a healthy lifestyle.

Strategies - Health Providing health services which meet the needs of the community.

Developing partnerships with a range of stakeholders to facilitate healthy lifestyles.

Providing safe drinking water.

Budget – Health Recurrent Budget for Community

Original 10/11

Revised Sept 10/11

Revised Dec 10/11

Revised March 10/11

Expenditure 5,392 5,359 5,359 Income -4,421 -4,602 -4,602 Result 971 757 757

Budget – Health Capital

Budget for Community Original

10/11 Revised Sept

10/11 Revised Dec

10/11 Revised March

10/11 Expenditure 2,905 5,309 5,309 Income -3,876 -6,066 -6,066 Result -971 -757 -757

2010/11 Program of Works - Health

Strategic Objective 2010-2014

Activity 2010-2011

Department Quarterly Achievement

Community Health Committee Sydney West Area Health Service to provide regular updates to Council on health issues of concern in the Lithgow Local Government Area.

Community & Culture

No updates have been received from Sydney West Area Health

To provide a forum for the community to discuss matters relating to health and advise Council.

Council to assist the community to establish an oncology facility in the Lithgow area.

Community & Culture

Preliminary discussion held in 1st Quarter with community representative on Health Council. To be followed up in 3rd Quarter.

Page 51: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 38

Drinking Water

To provide safe drinking water.

Provide drinking water to residents within the Farmers Creek reticulated supply system.

Water & Waste

Farmers Creek (Lithgow Water Supply)

No. of times samples failed to meet guideline values.

December Quarter 2009/10

December Quarter 2010/11

pH 0% 0 of 3 samples

No samples failed to meet quideline values

Coliforms 16% of 19 Samples

14% of 22 samples

Aluminium 0% Of 3 Samples

33% of 3 samples

Fish River Water Supply

No. of times samples failed to meet guideline values.

December Quarter 2009/10

December Quarter 2010/11

Coliforms 18% of 28 Samples

25% of 28 samples

Level 2 water restrictions are now in place for all residents through Lithgow and villages receiving water from Lithgow and the Fish River Potable Water Supply. If Oberon dam capacity approaches 60% then a trigger point for further easing water restrictions would be achieved.

Purchase water from State water to supply:

Cullen Bullen Glen Davis Lidsdale Portland Wallerawang Marrangaroo

Water & Waste

Total amount of water purchased from Fish River Water Supply

Months December Quarter 2009/10

December Quarter 2010/11

October 44,100kL 74,000kl

November 60,000kL 75,000kl

December 60,890kL 44,000kl

Total 200,888kL 193,000kl

Maintain the Clarence Water Transfer System.

Water & Waste Water pumping occurred on 34 of the 92 days in the 2nd quarter.

Page 52: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 39

Health Enforcement To provide effective and efficient compliance services to protect the health of the community

Conduct inspections of food premises and provide ongoing educational material.

Community & Culture

December Quarter 2009/10

December Quarter 2010/11

High Risk Food Inspections

27 28

Penalty Infringement Notices issued

0 0

Conduct inspections of skin penetration premises and provide ongoing educational material.

Community & Culture

December Quarter 2009/10

December Quarter 2010/11

No. of Skin Penetration Premises Inspected

2 2

Conduct routine monitoring of Council's reticulated drinking water supplies.

Community & Culture

December Quarter 2009/10

December Quarter 2010/11

Microbiological Samples

50

Chemical Samples 6

Disinfection by products samples

6

Pesticide samples

53 Samples in total

Conduct commercial swimming pools and spa inspections and provide educational material.

Community & Culture

December Quarter 2009/10

December Quarter 2010/11

No. of Swimming Pool Inspections

4 3

No. of Spa Inspections

1 0

All complaints investigated and actions resolved/determined within 24 hours of receipt.

Conduct inspections of cooling towers and associated systems and respond to complaints.

Community & Culture

18 inspections were undertaken during the 2nd Quarter.

Maintain a register of water cooling and warm water systems.

Community & Culture

Compliance with the Public Health (Microbial Control) Regulation at all times.

Page 53: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 40

Undertake routine monitoring of Farmers Creek, Lake Lyell, Pipers Flat Creek and Lake Wallace for blue green algae.

Community & Culture

* Note: Inspections undertaken by Delta Electricity

December Quarter 2009/10

December Quarter 2010/11

Lake Lyell 6 3

Lake Wallace 5 3

Algal levels have remained low

Undertake inspections of caravan parks.

Community & Culture

0 inspections were undertaken during the 2nd Quarter.

2010/11 – 2013/14 Capital Works and New Initiatives – Health

Project Name Description of Works Program/Key

Performance Indicator Department Quarterly Achievement

Community Health Support Develop Work Well Lithgow Strategy and adopt by Council & SWAHS

Strategy under development Continuation of Live Well in Lithgow Health Promotion Project

Implement actions from Work Well Lithgow Strategy adopted by Council and SWAHS

Community & Culture

The following activities were undertaken in the 2nd Quarter:

Live Well Lithgow challenge was run from early October to early November 2010.

A supporting calendar of activities was run over this period, including walking groups, fitness classes, supermarket tours and seminars.

Live Well Lithgow Healthy Lifestyle Expo was held on November 6 at the Tony Luchetti Showground.

Workplace healthy audit tool was completed and phase 1 of workplace interviews was undertaken with larger employers in the Lithgow LGA.

Drinking Water Stage 2 Funding Agreement 2 milestones of stage 2 have been

completed. Environmental investigations and approvals

Consultants GHD are the successful tenderer for environmental studies and design for this project. They have just commenced their hydro geological assessment on the available transfer supply as well as their hydrology investigation into sustainable yield from Farmers Creek Dam #2.

Construction of infrastructure for a bulk water supplier including upgrade of Clarence Transfer System and transfer to villages serviced by Fish River Water Supply

Undertake tender process and commence construction

Water & Waste

Consultation with stakeholders and DEWHA commenced on October 8.

Design and construct water main extensions commencing at South Bowenfels to new

New reticulation main to subdivisions following completion of new reservoir. Design

Water & Waste Pipeline construction to connect the new reservoir has been held up due to difficulties in completing landholder agreements. In December agreement

Page 54: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 41

subdivisions Landholder agreements Construction

was executed by landowners and Council. Draft designs are under development following representations from developers.

10 year Water Mains and Services Renewals Program developed and adopted by Council.

This has been included and adopted as part of the 10 year capital works program.

Develop a program of water mains and services renewals for Lithgow, South Bowenfels, Wallerawang and Portland.

Program implemented and included within Council’s Delivery and Operations Plans.

Water & Waste

The 2010/11 water mains replacement program is under way.

10 year water reservoirs program developed and adopted by Council.

This has been included and adopted as part of the 10 year capital works program.

Upgrade Cook Street water reservoir.

The pipeline below Cook Street High Level Reservoir has been laid and fittings to enable the completion of the connection have been delivered on-site. Given that the final connection and pressure testing could result in service interruption or temporary pressure losses in the system it is considered prudent to await commencing trials at least until the 2nd week of the new year.

Develop a program of upgrades to water reservoirs and commence implementation

Program implemented and included within Council’s Delivery and Operations Plans.

Water & Waste

The 2010/11 Water reservoir upgrade program is under way.

Oakey Park Water Treatment Plant Maintenance

Refurbish the backwash system Commission Feasibility Study

Water & Waste Work on the feasibility study began in September and is scheduled to be completed in 4th Quarter.

Formalise land tenure/access for the existing water reservoir at South Bowenfels

An operational requirement for service delivery

Water & Waste Work on the agreement began in August and is scheduled to be completed by April.

Design developed including fluoridation, alum storage and pen stocks and adopted by Council.

Completed Design and construct upgrade to Oakey Park Water Treatment Plant

Construction Program implemented and included within Council’s Delivery and Operations Plans

Water & Waste

Alum tank has been ordered. Pen stocks have been replaced progressively and fluoridation is expected to be installed by June.

Portland Reservoir Undertake feasibility and options study for recommissioning of Portland Reservoir and adopted by Council.

Water & Waste This has been included and adopted as part of the 10 year capital works program.

Undertake Dam Safety Works as per priority program.

Program developed in accordance with the Dam Safety Audit 2009

Water & Waste Program developed in accordance with the Dam Safety Audit 2009 and new DSC requests received in December 2010..

Works have commenced but the final completion won’t occur until next financial year due to insufficient human resources and finances.

Cathodic protection required as priority to prevent structural deterioration

Water & Waste Quotations underway and scheduled for completion at the end of summer due to a combination of minimisation of service interruption and water demand.

Water Quality Audit Feasibility Study and Undertake Water quality Audit

Water & Waste Commenced in August and scheduled for completion in April.

Page 55: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 42

2010/11 – Recommended Variations to Program of Works – Health

There is 1 variation to the Program of Works for Health as detailed in the Management Plan adopted by Council on 21 June 2010 (Min No. 10-245).

Project Name Description of Works Program/Key Performance Indicator

Proposed Variation Reason

Undertake Dam Safety Works as per priority program

Program developed in accordance with the Dam Safety Audit 2009.

Completion during 2011/12

Works have commenced but the final completion won’t occur until next financial year due to insufficient human resources and finances. It has been difficult finding contractors willing to work on site.

Page 56: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 43

7. Environment

Statement of intent - Environment

Balancing, protecting and enhancing our diverse environmental elements, both natural and built, for the enjoyment and support of both current and future generations.

Strategies - Environment Improving local air quality

Identifying and protecting the Department of Environment and Climate Change Estates.

Protecting and enhancing biodiversity through consultation and development of partnerships.

Ensuring Council land is suitable for its intended use.

Implementing the waste management hierarchy of avoidance, reuse, recycle and dispose.

Protecting and improving our water quality.

Improving our sewage infrastructure.

Securing the community access to water.

Fulfilling responsibilities under the Drinking Water Catchment Regional Environmental Plan No. 1.

Budget – Environment Recurrent Budget for Community

Original 10/11

Revised Sept 10/11

Revised Dec 10/11

Revised March 10/11

Expenditure 7,421 7,381 7,361 Income -9,090 -9,213 -9,213 Result 1,669 1,832 -1852

Budget – Environment Capital

Budget for Community Original

10/11 Revised Sept

10/11 Revised Dec

10/11 Revised March

10/11 Expenditure 20,092 20,228 20,228 Income -18,273 -18,245 -18,225 Result 1,819 1,983 2,002

Page 57: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 44

2010/11 Program of Works - Environment

Strategic Objective

2010-2014 Activity

2010-2011 Department Quarterly Achievement

Air Quality To reduce the number of coal heating appliances.

Provide the Alternate Fuel Rebate for the replacement of coal heaters with a cleaner heating alternative.

Community & Culture

December Quarter 2009/10

December Quarter 2010/11

No. of rebates provided

1 2

Environmental Education Community & Culture

To improve the community's knowledge of environmental issues.

Provide education on environmental matters to the community. Water & Waste

The following educational activities have been undertaken during the 2nd Quarter:

Environmental Advisory Committee To provide a forum for environmental groups to discuss matters relating to the environment and advise Council.

Organise the Environmental Advisory Committee meetings in accordance with the terms of reference.

Community & Culture

2 meetings of the Environmental Advisory Committee was convened and attended during the 2nd Quarter.

Prepare grant applications for funding of environmental improvement works.

Policy & Planning

Community & Culture

0 applications for environmental improvement works were submitted in the 2nd Quarter.

Participate in Save Our Swamps program with Blue Mountains City Council over 3 years

Community & Culture

Council continued to participate in this project during the 2nd Quarter.

Complete conservation projects in former Rylstone Shire

Community & Culture

Project design work being undertaken with the HNCMA during the 2nd Quarter.

To seek opportunities to enhance the environment.

Implement the Urban Sustainability Grant funded project over 3 years.

Community & Culture

The following activities were undertaken during the 2nd Quarter:

Reusable bag reminder posters were displayed at Coles and Woolworths.

Lithgow Environment Group completed a Small Business Energy Efficiency doorknock.

Recycling for kids presentation held at Lithgow Library.

Participation in Live Well Expo with Compost Doctor and Compost Cook-off Competition.

Application submitted to NSW Government for Save Power Kit for residents to borrow from library.

Recommendations for changes to water tank rebate to Council.

Page 58: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 45

Environmental Memberships Participate in the activities of the Water Directorate.

Water & Waste The following activities were undertaken during the 2nd Quarter:

Received a copy of Operator Maintenance Manual for Water Treatment Plants.

Participated in feedback to the Industry Operators Association.

Progressed Water Loss Management Program. Participated in LGSA Environment Awards.

To work together to share information.

Participate in the activities of the saveWater Alliance

Water & Waste Links will be established on Council’s website to the SaveWater Alliance Website during the 2nd Quarter. This will enable searches to include Lithgow City Council branding on the information provided.

Environment Protection Licences To responsibly manage scheduled activities to protect the environment.

Comply with the environment protection licences for:

Lithgow Sewerage Treatment Plant

Lithgow Solid Waste Facility

Lithgow Water Treatment Plant

Portland Landfill Portland Sewerage

Treatment Plant Wallerawang

Sewerage Treatment Plant.

Sewage Pump Truck

Water & Waste The following activities were undertaken during the 2nd Quarter:

Lithgow STP augmentation construction continued.

Undertook weekly inspections of Lithgow SWF to ensure litter control measures were effective.

Oakey Park Water Treatment Plant penstock replacement was completed and alum and fluoridation designs were progressed.

Some Greenwaste mulching was undertaken at Portland Landfill. Repairs to approach roads and surrounds were required as a result of wet weather. Wallerawang STP augmentation construction commenced. The upgrading of the Sewage Pump Truck was completed to the appropriate safety standards.

Environmental Regulation Community & Culture

To fulfil Council's appropriate regulatory authority responsibilities under the Protection of the Environment Operations Act.

Water & Waste

3 Penalty Infringement Notices were issued in relation to illegal dumping during the 2nd Quarter.

To prevent harm to human health and the environment from pollution.

Commence the preparation of a State of Environment Audit

Policy & Planning

An internal working party was convened to develop the 2009/10 State of Environment Report. The State of Environment Audit is scheduled to commence during the 4th Quarter.

Page 59: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 46

On-site Sewage Management

To implement the on-site sewage management strategy

Undertake activities identified in the on-site sewage management strategy.

Community & Culture

* Note: Program was suspended from March 2010 and is to

recommence in 3rd Quarter.

December Quarter 2009/10

December Quarter 2010/11

No. of inspections undertaken

93 0

No. of Licences Issued

70 0

No. of failures identified

46 0

No. of failures fixed. 18 0

No. of education materials distributed

103 0

Trade Waste To implement the Trade Waste Program

Undertake activities identified in Trade Waste Strategy

Community & Culture

December Quarter 2009/10

December Quarter 2010/11

No. of inspections undertaken

7 24

No. of Applications received

- 0

No. of approvals granted

1 0

No. of approvals not granted.

- 0

No. of education materials distributed

2 0

Weed Management To control environmental and noxious weeds.

Control environmental and/or noxious weeds on public land through Council and/or services provided by the Upper Macquarie County Council.

Operations Monthly reports are provided to council by the Upper Macquarie County Council.

Page 60: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 47

Water Quality

To provide a sewage system that is managed to provide environmental security and system reliability.

Provide a secure and reliable sewage reticulation system to residents of Lithgow, Lidsdale, Marrangaroo, Portland and Wallerawang.

Water & Waste Operation undertaken to an acceptable standard and within budget. Maintenance work progressed as per program.

Bad weather caused some damage to sewage pump stations.

Some problems were encountered with excessive inflow and infiltration and rectification has taken precedence over some other scheduled projects.

Waste Management Collect street litter bins in Lithgow, Portland and Wallerawang.

Waster & Waste

Collection service provided to an acceptable standard and within budget.

Collect park, lookouts and recreation area litter bins.

Operations Collection service provided to an acceptable standard and within budget.

Provide a green waste collection service to residents in Lithgow, Lidsdale, Marrangaroo, Portland, Rydal and Wallerawang.

Water & Waste A Greenwaste collection service was provided on 2 occasions during the 2nd Quarter.

To provide waste and recycling collection services that encourage a reduction in land filling.

Provide kerbside garbage and recycling collection service to all residents within the collection service area.

Water & Waste

December Quarter 2009/10

December Quarter 2010/11

Kerbside garbage collected

949 tonnes 925 tonnes

Recycling collected 80 tonnes 169 tonnes

Provide garbage disposal facilities within the LGA at:

Angus Place Capertee Cullen Bullen Glen Davis (until

reaches capacity) Lithgow Portland Wallerawang.

Water & Waste

December Quarter 2009/10 (tonnes)

December Quarter 2010/11 (tonnes)

Angus Place 227 236

Capertee 143 85

Cullen Bullen 282 121

Glen Davis 149 121

Lithgow 14,906 14,040

Portland 1,204 208

Wallerawang 543 253

Page 61: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 48

Assist the Sydney Catchment Authority with in kind contributions for a free chemical collection service for residents.

Water & Waste A Chemical collection service was not provided during the 2nd quarter.

Attend meetings and participate in Netwaste activities.

Water & Waste 2 Netwaste meetings were attended during the 2nd Quarter and the following activities were undertaken:

Waste 2 art Project. Tap Water Please Project. Greenwaste Mulching Contract. Organics Workshop.

2010/11 – 2013/14 Capital Works and New Initiatives – Environment

Project Name Description of Works Program/Key

Performance Indicator Department Quarterly Achievement

Waste Management Activate Blackmans Flat Waste Management Facility

Consent activation as per the requirements of the development agreement.

Water & Waste Site visits have been conducted and it is 50% complete by consultants who are preparing an activation plan. This was originally due for completion by October but because of problems with liability insurance this will now be extended to January.

Conduct community waste education campaigns

Provide information to the community on waste and recycling.

Water & Waste Distribute media letterbox information on home composting.

Conduct 2 home composting workshops

Provide free shopping carrier bags in conjunction with poster displays to divert plastic bags from landfills.

Waste and Recycling Strategy developed and adopted by council

Water & Waste The Waste and Recycling Strategy was completed in October in draft form. Final version will be presented to Council in 3rd quarter.

Develop Waste and Recycling Strategy

Strategy implement in accordance with the closure plan for Lithgow Waste Management Facility and landfill closure plans and included in Councils Delivery and Operations Plans

Water & Waste Scheduled for commencement pending approval of the Waste and Recycling Strategy and expected to commence in 3rd quarter.

Tender new garbage and recycling contracts

In accordance with the closure plan for Lithgow Waste Management Facility and landfill closure plans.

Water & Waste Scheduled from commencement in July 2011.

Flood Management Preparation of a Floodplain risk Management Plan

Commence Floodplain Risk Management Plan in accordance with the Flood Development Manual and relevant legislation and sustainability principles.

Policy & Planning Operations

Internal working party formed to review available information to determined data, gaps and scope of works to be undertaken.

State of Environment Audit completed and gap analysis Policy & Internal working party formed to review

Page 62: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 49

Report prepared. Identified actions incorporated into the Community Strategic Plan

Planning available information to determined data, gaps and future reporting requirements as part of Council Integrated Planning and Reporting Framework.

Trade Waste Install Grease Arrestors in Council Kitchens to achieve compliance

Identify priority program in accordance with Hall maintenance and refurbishment programs.

Development During the 1st Quarter Grease Arrestors were installed in:

Civic Ballroom Ashley Grandstand

Water Quality Complete construction of Lithgow Sewage Treatment Plant augmentation to improve the quality of effluent being discharged into the Sydney Drinking Water and Hawkesbury Nepean Catchments.

A major augmentation required to improve the performance as required by changes to licence

Water & Waste This project is now 75% complete however April is likely to be the date of commissioning as it has been subject to wet weather delays and also the inclusion of ultraviolet disinfection technology that was not part of the original design.

Commence construction of Wallerawang Sewage Treatment Plant augmentation to improve the quality of effluent being discharged into the Sydney Drinking Water and Hawkesbury Nepean Catchments.

A major augmentation required to improve the performance as required by changes to license.

Water & Waste Construction started in October. Project is due for completion in December 2011.

Commence De-sludge of selected lagoons at the Sewage Treatment Plants

Desludging program will commence following the construction of the biosolids dewatering system.

Water & Waste Scheduled to commence in 3rd quarter.

Construct the Lithgow STP effluent reuse project.

Commence construction of the Lithgow STP effluent reuse project

Water & Waste Scheduled to commence in 4th quarter

Commence South Bowenfels infrastructure augmentation program

Undertake tender process, award contracts and commence construction

Water & Waste Scheduled to commence in 3rd quarter

Provision of sewage service truck to replace gantry’s at pumping stations

OHS improvement designed to reduce operating and maintenance costs.

Water & Waste Service truck due for delivery in 3rd quarter.

Sewer Vent Replacement Program

Annual program as per adopted strategy

Water & Waste This year’s program will be completed in 4th quarter.

Sewer Overflow Protection

Works to prevent sewer overflows from reticulation network

Water & Waste This year’s program will be completed in 4th quarter.

Pump Stations Electrical Upgrades

Ongoing program Water & Waste This year’s program will be completed in 4th quarter.

2010/11 – Recommended Variations to Program of Works – Environment

There are no variations to the Program of Works for Environment as detailed in the Management Plan adopted by Council on 21 June 2010 (Min No. 10-245).

Page 63: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 50

2010/11 Financial Assistance – Environment

Financial Assistance Timeframe Quarterly Achievement

Recurrent Financial Assistance Solid Fuel Incentive Program 2010/11 – 2013/14 2 rebates were provided in 2nd

Quarter

Page 64: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 51

8. Arts and Culture

Statement of intent – Arts and Culture

Supporting, celebrating and expanding a diversity of cultural and creative adventures that explore and discover the richness in our society.

Strategy – Arts and Culture Preparing and implementing a cultural plan.

2010/11 Program of Works – Arts and Culture

Strategic Objective

2010-2014 Activity

2010-2011 Department Quarterly Achievement

Eskbank House Operate Eskbank House and Museum.

Community & Culture

December Quarter 2009/10

December Quarter 2010/11

Visitation 318 886

Conduct exhibitions and displays.

Community & Culture

December Quarter 2009/10

December Quarter 2010/11

No. of Exhibitions 1 3

Title of Exhibitions 2010/11

Waste to Art 10 Tunnels Frank Hurley

Photographic Exhibition

To develop and promote Eskbank House and Museum as a cultural heritage venue.

Development of Marketing materials and public programs at Eskbank House Museum.

Community & Culture

Deferred to 3rd Quarter.

Cultural Activities and Facilities To develop cultural facilities and activities across the Lithgow LGA

Implement key recommendations from the Cultural Plan subject to funding. See capital Works/Initiatives section.

Community & Culture

The following activities were undertaken during the 2nd Quarter:

Participated in Bi-Centenary of Blue Mountains Crossing Committee leading to a Forum in May 2011.

Provided support to Charlie Pinch Museum. Appointed Museums Advisor for Eskbank House,

Charlie Pinch and Small Arms Museums.

Page 65: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 52

To celebrate the cultural heritage of the LGA.

Coordinate Australia Day activities within the LGA.

Community & Culture

Preparation commenced during 2nd Quarter for Australia Day event at Eskbank House, Lithgow Swimming Pool and skate park. To be held in the 3rd Quarter. Planning underway to audit and catalogue Council’s art collection in 3rd Quarter.

Provide an opportunity for our community to enjoy Council's art collection.

Develop a program for exhibitions and conduct an exhibition of the Council art collection.

Community & Culture

December Quarter 2009/10

December Quarter 2010/11

No. of Exhibitions 0 0

Title of Exhibitions 2010/11

None to date. Awaiting audit and cataloguing.

Support and respond to requests from local artists in relation to

community arts funding programs

Networking programs.

Community & Culture

The following activities were undertaken during the 2nd Quarter:

Council worked with the Lithgow Creative Industries Forum to develop a shopfront Gallery concept for the Hartley building.

Cultural Development Officer attended the Regional Arts OutWest forum.

Establish a Cultural Industries Network

Community & Culture

The following activities were undertaken during the 2nd Quarter:

Cultural Development Officer consolidated the Lithgow Creative industries forum in consultation with Council’s Economic Development Officer.

To support local artists and cultural industries.

Supporting other local cultural initiatives

Community & Culture

The following activities were undertaken during the 2nd Quarter:

Liaised with Ironfest to plan 2011-12 Ironfest events.

Participated in planning for History Forum during May 2011 to celebrate Bicentenary of Blue Mountains Crossing.

Page 66: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 53

2010/11 – 2013/14 Capital Works and New Initiatives – Arts & Culture

Project Name Description of Works Program/Key

Performance Indicator Department Quarterly Achievement

Building Improvements Upgrade display and exhibition equipment at Eskbank House Museum.

Develop a program to upgrade exhibition equipment and storage solutions.

Community & Culture

In progress, with enhancements of display cabinets and storage completed in 1st and 2nd quarters. Programme to be integrated with overall strategic plan for museum and collections

Exhibition development of Eskbank House Museum.

Investigate the opportunity to undertake an internship with the Powerhouse Museum in exhibition development and interpretation.

Community & Culture

Internship which will take place in the 3rd Quarter of 2011/2012. Internship to include Strategic and Disaster Planning.

Develop a 10-year program of Capital Improvements for Eskbank House & Museum as part of the Conservation Management Plan and Landscape Strategy.

Community & Culture

Conservation Management Plan brief developed with funding being sought from NSW Heritage office.

Capital improvements to Eskbank House Museum from Eskbank House Trust reserves

Implement Capital improvements Including: external painting, structural repairs to stables, BBQ and shade shelter

Community & Culture

Works to be deferred until Conservation Management Plan has been completed.

Cultural Precinct Way finding and Signage Masterplan and interpretive signage Improvements to public spaces

Implement key strategies from the Cultural Precinct Study

Improvements to Lake Pillans Wetlands

Community & Culture

$100,000 funding received from Xstrata Coal to create Lithgow History Avenue along Inch Street. Signage and Wayfinding concepts being developed.

2010/11 – Recommended Variations to Program of Works – Arts & Culture

There are no variations to the Program of Works for Arts and Culture as detailed in the Management Plan adopted by Council on 21 June 2010 (Min No. 10-245).

Page 67: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 54

2010/11 Financial Assistance – Arts & Culture

Financial Assistance Timeframe Quarterly Achievement

Recurrent Financial Assistance Portland Art Show 2010/11 – 2013/14 Awaiting invoice Greater Lithgow Arts Council 2010/11 – 2013/14 Awaiting invoice Arts OutWest 2010/11 – 2013/14 Paid 1st Quarter

Non-Recurrent financial Assistance Non-Recurrent Financial Assistance requests determined in April and November 2010 in accordance with Council’s Financial Assistance Policy

2010/11 The following community groups have received financial assistance during the 2nd Quarter.

Portland pool Community Mural.

Mitchell Conservatorium.

Page 68: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 55

9. Youth

Statement of intent - Youth

Providing suitable entertainment and recreational facilities; education and employment opportunities and lifestyle choices for our valuable community of young people.

Strategy – Youth Improving the quality of life of the LGA's youth.

2010/11 Program of Works – Youth

Strategic Objective

2010-2014 Activity

2010-2011 Department Quarterly Achievement

Coordinate and provide support to the Youth Committee

3 meetings of the Youth Council were attended during the 2nd Quarter.

To enable young people to have a voice to Council.

Hold Youth Forums on issues of concern to young people

Community & Culture

The following activities were undertaken during the 2nd Quarter:

Newtons Nation event held at Lithgow skate park.

2010/11 – 2013/14 Capital Works and New Initiatives – Youth

Project Name Description of Works Program/Key

Performance Indicator Department Quarterly Achievement

Adventure Playground Investigate the feasibility of an adventure playground in Lithgow

Community & Culture

Investigations commenced in 2nd Quarter.

2010/11 – Recommended Variations to Program of Works – Youth

There are no variations to the Program of Works for Youth as detailed in the Management Plan adopted by Council on 21 June 2010 (Min No. 10-245).

Page 69: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 56

2010/11 Financial Assistance – Youth

Financial Assistance Timeframe Quarterly Achievement Recurrent Financial Assistance

Western Region Academy of Sport 2010/11 – 2013/14 Paid 1st Quarter Non-Recurrent financial Assistance

Non-Recurrent Financial Assistance requests determined in April and November 2010 in accordance with Council’s Financial Assistance Policy

2010/11 The following community groups have received financial assistance during the 2nd Quarter. Lithgow Community Projects and YouthWorx for: Community youth events

including band nights. Cinema under the stars. Art for youth Program. The Sail Program.

Page 70: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 57

10. Growth

Statement of intent - Growth

Providing for sustainable and planned growth, while enhancing the existing rural and village identity.

Strategies - Growth Planning for an annual growth rate of 1 to 2% for the LGA.

Planning growth in the towns and villages, followed by rural residential areas.

Facilitating the sustainable planning of land through assessment criteria.

Providing residential land to cater for future growth.

Providing for rural living in an appropriate development form that will minimise its impact and

maximise the concentration of population in and around existing towns and village.

Providing infrastructure for growth.

Budget – Growth Recurrent Budget for Community

Original 10/11

Revised Sept 10/11

Revised Dec 10/11

Revised March 10/11

Expenditure 3,061 3,066 3,066 Income -1,404 -1,405 -1,405 Result 1,657 1,661 1,660

Budget – Growth Capital

Budget for Community Original

10/11 Revised Sept

10/11 Revised Dec

10/11 Revised March

10/11 Expenditure 0 70 70 Income 0 -76 -76 Result 0 -6 -6

Page 71: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 58

2010/11 Program of Works – Growth

Strategic Objective

2010-2014 Activity

2010-2011 Department Quarterly Achievement

Planning Progress the preparation of Land Use Strategy informed by Local Profile and Issues Paper

Policy & Planning

The following activities were undertaken during the 2nd Quarter:

Work continuing on preparation of Draft Land Use Strategy. Target community engagement 3rd quarter and completion 4th quarter.

Series of councillor briefing sessions held to consider emerging trends and directions.

Commence the preparation of Local Environmental Plan to accord with the Standard Instrument (Local Environmental Plans) Order 2006 informed by an endorsed Land Use Strategy

Policy & Planning

Scheduled to commence during 4th quarter.

To provide comprehensive planning controls for the Lithgow City LGA

Commence the preparation of a Comprehensive Development Control Plan to support the comprehensive LEP

Policy & Planning

Scheduled to commence during 4th quarter.

Development Review and finalise Development Servicing Plans

Policy & Planning

The following activities were undertaken during the 2nd Quarter:

Not commenced. Requires the completion of the Strategic Water and Business Plans to inform development.

Prepare a development contributions system using one or more methods available under Section 94 of the Environmental Planning and Assessment Act, 1979

Policy & Planning

The following activities were undertaken during the 2nd Quarter:

Internal Working Party formed and working through a series of actions to develop a contributions system.

Councillor briefing session held to consider emerging directions.

To develop a fair and equitable development contributions system to meet the demands generated by development

Finalise Planning Agreements Policy

Policy & Planning

The following activities were undertaken during the 2nd Quarter:

Not commenced will be undertaken in conjunction with development contributions plan to enable full integration.

Page 72: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 59

Assess all applications including:

Development applications

Construction certificates

Complying development applications.

Development

December Quarter 2009/10

December Quarter 2010/11

No. applications received

95 98

Median time for processing

17 17

Undertake all development related inspections where Council is the consent authority and/or principal certifying authority.

Development Inspections undertaken within 48 hours of request.

No. of applications received

December Quarter 2009/10

December Quarter 2010/11

Planning Certificates 149 (2)

168 135

Planning Certificates 149 (5)

68 52

Building Certificates 15 13

To provide an assessment service for applications and constructions.

Process and issue:

Building certificates Planning certificates.

Development

Median Processing Days

December Quarter 2009/10

December Quarter 2010/11

Planning Certificates 149 (2)

5 5

Planning Certificates 149 (5)

5 5

Building Certificates 10 10

Subdivision Certificates

5 5

Undertake a review of Operational conditions of development consent and enforce compliance.

Development No notices or orders have been issued and no actions have been lodged in the Land and Environment Court.

To ensure compliance with legislative requirements.

Investigate non compliance with the Environmental Planning and Assessment Act.

Development 1 notice or order has been issued and no actions have been lodged in the Land and Environment Court.

Page 73: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 60

2010/11 – 2013/14 Capital Works and New Initiatives – Growth

Project Name Description of Works Program/Key

Performance Indicator Department Quarterly Achievement

Planning Continued review of Internal Development Assessment Process for development under both Part 1V and Part V of EP & A Act, 1979

Undertake an internal audit of existing processes.

Part IV and Part V Development Process developed.

Adoption of Part IV and Part V Development Process by Council.

See variations.

Undertake continued investigation of the Marrangaroo Study areas including categorisation of streams; risk assessment of a gas pipeline; flooding extent of Marrangaroo Creek and tributaries; stormwater, water and sewerage infrastructure requirements.

Completion of remaining investigation/studies.

Findings and actions included in the development of future plans and strategies.

Policy & Planning

Not commenced. Will be further progressed as part of the development of the Local Environmental Plan.

2010/11 – Recommended Variations to Program of Works – Growth

There is 1 variation to the Program of Works for Growth as detailed in the Management Plan adopted by Council on 21 June 2010 (Min No. 10-245).

Project Name Description of Works Program/Key Performance Indicator

Proposed Variation Reason

Continued review of Internal Development Assessment Process for development under both Part 1V and Part V of EP & A Act, 1979

Undertake an internal audit of existing processes.

Part IV and Part V Development Process developed.

Adoption of Part IV and Part V Development Process by Council.

Deferred to 2011/12 To enable integration with Comprehensive Local Environmental Plan and Development Control Plan.

Page 74: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 61

11. Governance and Administration Services

Statement of intent – Governance and Administration

Developing community confidence in the organisation by the way it is directed, controlled and managed.

Budget – Governance & Administration Recurrent Budget for Community

Original 10/11

Revised Sept 10/11

Revised Dec 10/11

Revised March 10/11

Expenditure 5,440 5,474 5,476 Income -24,909 -25,030 -25,058 Result -19,469 -19,556 -19,581

Budget – Governance & Administration Capital

Budget for Community Original

10/11 Revised Sept

10/11 Revised Dec

10/11 Revised March

10/11 Expenditure 206 257 257 Income 0 0 0 Result 206 257 257

2010/11 Program of Works – Governance and Administration Services

Strategic Objective

2010-2014 Activity

2010-2011 Department Quarterly Achievement

Council Memberships Attend meetings and support the Central Tablelands Alliance. Implement the Business Plan for the Central Tablelands Alliance.

Executive No meetings were held during the 2nd Quarter in Lithgow. Agendas are coordinated by Oberon Council.

To work together to interweave and optimise the sharing and coordination of resources and information.

Contribute to CENTROC and participate in its activities.

Executive During the 2nd Quarter the following CENTROC activities were participated in:

The Mayor continued in the position of Chairman with the General Manager as Secretary.

Secretarial support continued to be provided 1 Meeting was attended by the Mayor and

General Manager. 1 GMAC meeting was attended by the

General Manager.

Page 75: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 62

Participate in the activities of the Local Government and Shires Association.

Executive Council will be attending the LGSA Conference and has resolved to put a motion to the conference “That the LGA lobbies the NSW Government for increased and more streamlined powers to allow local councils to require owners and occupiers of commercial premises to improve the cleanliness and appearance of neglected shop fronts”.

Council Meetings Produce business papers and minutes for Council Meetings, Committee Meetings and Extraordinary Meetings.

Executive Business papers and minutes produced and delivered in accordance with the Local Government Act and Regulations and the Code of Meeting Practice.

To conduct the business of Council in an open and democratic manner.

Council and committee meetings are conducted regularly.

Executive 5 Ordinary Meetings of Council and No Extra Ordinary Meetings of Council were conducted during the 2nd Quarter.

Councillor Support Provide information to Councillors regularly.

Executive Information provided in the form of briefing sessions, memos, emails and meetings.

Provide Councillors with the payment of fees, expenses and the provision of facilities and support in relation to discharging the functions of civic office.

Executive Provided in accordance with Council’s policy.

To support Councillors in their role.

Provide training to Councillors

Executive 2 training activities were undertaken by Councillors in the 2nd Quarter.

Depot To provide a base for Council's Operations.

Provide depot buildings for the housing of stores, plant and workshop.

Operations Buildings provided for Council stores, plant and workshop operations.

Documents To ensure the integrity and security of Council's records.

Register, collate, archive and dispose of Council's records.

Internal Services

During the 2nd Quarter 100% of incoming mail was tasked to officers by 2pm on the day of receipt and 97% of the mail was tasked to officers within 4 hours. 4 GIPPA requests were received during the 2nd Quarter which was answered within the legislative timeframe.

To provide access to Council's records.

Assess, determine and respond to requests for Council information.

Internal Services

Sec 12 of the LG Act no longer applicable. Replaced by the GIPP Act from 1 July 2010

Provide training to staff. Internal Services

Training provided to all Council employees in June 2009 with regard to the collection, use and privacy of information and retraining is available on request.

To ensure information which Council collects is used lawfully and for the purpose it was collected.

Assess, determine and respond to complaints.

Internal Services

No privacy complaints were received.

Finance To provide sound financial advice and management of Council's finances.

Manage and monitor Council's finances.

Internal Services

Report to Council on the General Purpose Financial Report on 1 November 2010 for presentation to the Council Auditors, The Morse Group. Completion by 31 October for lodgement with the Department of Local Government.

Submissions received and forwarded to Auditors, The Morse Group on 6 December 2010. report of the response to Council meeting of 24 January 2011.

Page 76: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 63

The 2nd Rate instalment notice was issued by 31 July 2010 for payment due on 31 August 2010. Third rate notice issued by 31 January 2011 for payment due on 28 February 2011.

Model, levy, issue and recover rates, annual charges and sundry debtors including fees.

Internal Services

Correspondence regarding missed 2nd rate instalment was issued within timeframe 14 days of due date.

Finalise the revaluation and reporting of current assets at fair value as required by junction with the financial DLG requirements.

Internal Services

Completed on 30 June 2010 in conjunction with annual financial statements.

Invest in accordance with legislation and Council’s Policy.

Maximise and secure Council's Investment Portfolio through a variety of investment institutions, types and terms.

Internal Services

Investments as at 31 December 2010, $14,977,331.. Actual interest received to date $384,737 of an original budget estimate of $553,375.

Manage Council's loan portfolio.

Internal Services

Compliance with current Management Plan and in accordance with Council’s resolutions.

Repayment made in accordance with loan repayment schedules.

Assist in the external audit of Council's financial records.

Internal Services

First Interim Audit to be conducted 1st week of February 2011.

Review the 10 year financial plan and include strategies to improve Council's current financial ratios.

Internal Services

Reported improvement in financial ratios. In conjunction with the annual financial statements. Review of 10-year plan will be ongoing with the development of the Management Plan. .

Account for approved applications and monitor grant funding.

Internal Services

Grants administered in accordance with grant conditions.

Information Technology Manage and maintain the communications networks.

Information Technology

Networks operational and accessible greater than 98%.

To ensure high service levels of Council's information and communications network.

Manage the leases for copiers, personal computers and printers.

Information Technology

Machines operational and accessible greater than 98%.

To comply with current licensing requirements.

Renew software licenses. Information Technology

All software licensing is current.

To enhance Council's geographical information system.

Maintain and continue development of the geographical information system to ensure integrity with Council's Property system.

Information Technology

98% match of properties.

Insurance Secure adequate and cost effective insurance coverage.

Insurance renewals completed and submitted to broker JLT. Review of policies completed and policies received of which 95% are paid in 1st Quarter.

To provide insurance coverage of Council's activities and assets.

Liaise with the insurance company regarding claims.

Internal Services

Insurance claims provided to insurance company upon receipt and additional information requested provided within Council standard correspondence.

Page 77: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 64

Internal Auditing

To implement internal auditing programs.

Undertake activities identified in the Internal Audit Plan.

Internal Services

Activities are being undertaken as part of the Internal Audit Plan.

First Internal Audit conducted by Internal Audit Bureau (IAB) in December 2010 on procurement and contract management.

Legislation Monitor and pursue legislative changes.

Staff aware of legislative change. To understand and manage Council's statutory responsibilities.

Perform Council's legal responsibilities under applicable acts and regulations.

Internal Services

Compliance with legislation.

Local Government Week To celebrate Local Government Week.

Undertake activities focusing on Council in the community.

Executive Local Government Week celebrations to be held during 4th Quarter.

Corporate Planning and Reporting Report the outcome of a quarterly performance review of the management plan and provide a budget review statement.

Internal Services

Policy & Planning

Quarterly report for April – June 2010 was reported to Council on 23 August 2010.

Quarterly report for July – September was reported to Council on 22 November 2010.

Prepare management plan for 2011/12 to 2014/15 in accordance with the requirements of Local Government Act and Regulations.

Internal Services

Policy & Planning

Commenced preparation for Management Plan for 2011/12 to 2014/15 in 2nd Quarter for adoption by 30 June 2011.

Prepare Operational plans for all Divisions.

Policy & Planning

All Managers and relevant officers are maintaining operational plans in MS Project and providing monthly updates to the General Manager and Corporate Management Team.

Prepare the annual report for 2009/10 including the state of the environment report.

Internal Services Policy & Planning

Reports to be submitted to the Department of Local government by 30 November.

Complete a review of the 2007 Corporate Strategic Plan

Policy & Planning

A review of the 2007 Corporate Strategic Plan has commenced to identify achievements and gaps.

Develop a 10 year Community Strategic Plan for the Lithgow LGA

Policy & Planning

Development of the 10 Year Community Strategic Plan has commenced with a review of the 2007 Corporate Strategic Plan and draft community engagement policy.

To plan and report on activities of Council.

Prepare asset management plans for:

Buildings, Operational land and other assets

Roads, drainage, kerb and gutter and footpaths.

Internal Services

Completed as part of the Annual Financial Statements on 30 June 2010.

Page 78: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 65

Develop a long-term

Corporate Asset Management Strategy that satisfies the Integrated Planning Framework

Operations Assets Working Party has commenced working towards the development of an Asset Management Strategy.

Codes and Policies To develop, monitor and implement council’s internal and external communications.

Develop relevant policies and standard working procedures relating to communications practices.

Policy & Planning

Commenced development of a Draft Community Engagement Policy during 2nd Quarter.

Employees To develop modern and legislatively compliant codes and policies.

Develop, review and implement codes and policies.

Policy & Planning

Codes and policies developed and reviewed as required.

Attract and recruit staff on merit.

Organisation Development

Staff recruited in accordance with relevant legislation, procedures and the principles of equal employment opportunity.

Provide salary, benefits and favourable working conditions in accordance with the relevant industrial legislation.

Organisation Development

Award salary increase came in November 2010.

Conduct annual performance appraisals of staff.

Organisation Development

Appraisals are due to be completed by 31 October 2010.

Recognise long serving employees through the recognition of service procedure.

Organisation Development

Annual presentation was held in December 2010.

Conduct an Employee Opinion Survey

Organisation Development

Results received and presented to all Council employees during the 1st Quarter. Meetings being held within work teams to develop recommendations to Management on how we can improve communications within Council.

To implement procedures and practices which foster a desirable place of work.

Implementation of Workforce Plan

Organisation Development

Commenced during 2nd quarter for completion by during 3rd quarter.

To provide a workplace that promotes the principles of equal employment opportunity and is free of discrimination.

Implement the equal employment opportunity management plan through:

communication of policies and programs

collection and recording of appropriate information

review of personnel practices

Evaluate and review.

Organisation Development

EEO principles are integrated into the day to day activities of Council in accordance with the Management Plan.

Page 79: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 66

To implement, monitor and review the Occupational Health and Safety, Rehabilitation and Environment Management System.

Organisation Development

OH&S Action Plan developed and to be implemented in accordance with Statecover OH&S Audit results.

Provide access to external support and counselling service.

Organisation Development

Access to the employee assistance program is maintained.

Provide relevant immunisations to appropriate staff.

Organisation Development

Hepatitis A and B Immunisations are conducted for relevant staff and are undertaken as required in accordance with employee schedule.

Flu Immunisations are conducted for staff during 3rd quarter.

Provide a rehabilitation program for injured employees.

Organisation Development

The Rehabilitation Program is implemented. Return to work plans were implemented as required during the 1st Quarter.

The Occupational Health and Safety Committee meet and undertake activities.

Organisation Development

The Occupation Health and Safety Committee are convened every 6 weeks.

Undertake Noise monitoring and hearing tests for employees.

Organisation Development

Hearing tests are undertaken as part of pre-employment medicals.

Promote OHS within the workplace

Organisation Development

OHS is promoted through continual training and adherence to the Standard Working Procedures.

To provide a safe and healthy workplace.

Organise external audit on Council’s OHS Management system and work practices

Organisation Development

To be undertaken in 4th Quarter.

Implement the training plan.

Organisation Development

The following training was undertaken during the 2nd Quarter:

Traffic Control – Stop/Slow Customer Service Training Drug and Alcohol Awareness Minute Taking First Aid Refresher Training Sustainability Training Fluoridation Course Traffic Control – Yellow Ticket

Prepare the draft training plan for 2011/12.

Organisation Development

Training objectives identified in the annual performance appraisals for staff for inclusion in the draft training plan which is to be completed by December 2010.

To enhance the skills and knowledge of the workforce.

Purchase training programs and materials.

Organisation Development

No programs and materials were purchased in the 2nd quarter.

Risk Management To manage Council's risk.

Develop and implement risk management strategies in the areas of corporate management.

Organisation Development

A Risk Management Action Plan is to be developed and implemented in accordance with the Statewide Public Liability Audit Results.

Page 80: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 67

Stores

December Quarter 2009/10

December Quarter 2010/11

Value of Stock as at 30 September

$374,865.71 $356,688.88

To maintain an adequate level of stock for internal supply to Operational programs.

Order and issue stock items as required.

Internal Services

Bi-annual stocktakes were conducted July 2010 and January 2011 and are completed.

To ensure efficient customer service standards.

Develop an internal Service Committee to review the level of service provided to council’s internal and external customers

Executive An initial meeting with the committee was held in 2009/10. A further meeting is scheduled to occur during 2nd Quarter.

2010/11 – 2013/14 Capital Works and New Initiatives – Governance and Administration Services

Project Name Description of Works Program/Key Performance Indicator

Department Quarterly Achievement

Building Improvements Continued refurbishment of the Administration Centre as required.

No funding provided

Upgrade Lift 3rd Quarter

Administration Centre Refurbishment

Upgrade air conditioner in the Council Chambers

No funding provided

Queen Elizabeth Park Greenhouse

Re-roof the greenhouse at Queen Elizabeth Park

Development

No funding provided

Depot Upgrade fuel bowsers at Lithgow Depot

EPA Compliance Fuel Tanks

Upgrade fuel bowser at Wallerawang Depot

Operations New overhead tanks to be installed to replace underground tanks during 3rd Quarter.

Information Technology Upgrade connectivity to the Hartley Building

Works ongoing. Network upgrade

Commence upgrade of switching and network cabling in Administration Centre

Works have commenced.

Replacement Program Replacement of Desktops/servers. 10 PCs replaced during this period. Software upgrade Electronic Document Management

System Upgrade (Dataworks)

Information Technology

Completed.

Personnel Commence design of a new salary system.

Research design options for new salary system

Organisational Development

To be investigated following the development of the Workforce Plan.

Page 81: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly

Principal Activities

1 October – 31 December 2010 Quarterly Report 2010 – 2014 68

Corporate Planning and Reporting

Undertake a review of the current 2007 Strategic Plan and develop a gap analysis

Develop a gap analysis of Councils Corporate Plans and present to Council and the community.

Review continued of progress with the implementation of the 2007 Strategic Plan during 2nd Quarter and is scheduled for completion during 3rd Quarter.

Undertake an extensive Community Engagement process as per the Community Engagement Strategy and develop Draft Community Strategic Plan

Scheduled for 3rd and 4th quarters. Develop a Community Strategic Plan and implement through Councils Delivery and Operations Plans.

Adopt Draft Community Strategic Plan and place on exhibition.

Policy & Planning

Scheduled for 4th Quarter.

Corporate Communications Service Standards Action Plan

Conduct an internal audit and community survey to identify gaps in Councils service standards. Develop and implement an action plan to improve service standards through training, ongoing monitoring and corporate publications/intranet development to inform and educate staff.

Executive

An initial meeting of the committee was held during 2009/10 with the committee to be reconvened during 2nd quarter.

2010/11 – Recommended Variations to Program of Works – Governance and Administration Services

There are no variations to the Program of Works for Governance and Administration as detailed in the Management Plan adopted by Council on 21 June 2010 (Min No. 10-245).

Page 82: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 83: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 84: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 85: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 86: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 87: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 88: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 89: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 90: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 91: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 92: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 93: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 94: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 95: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 96: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 97: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 98: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 99: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 100: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 101: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 102: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 103: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 104: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 105: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 106: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 107: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 108: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 109: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 110: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 111: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 112: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 113: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 114: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 115: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 116: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 117: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 118: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 119: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 120: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 121: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 122: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 123: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 124: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 125: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 126: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 127: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 128: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 129: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 130: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 131: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 132: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 133: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 134: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly
Page 135: Lithgow City Council Agenda Attachments 14 February 2011archive.lithgow.nsw.gov.au/agendas/11/110214_attachments.pdf · Principal Activities 1 October – 31 December 2010 Quarterly