ENERGO ENGINEERING PROJECTS LTD.
DOCUMENT TITLE: PART LIST FOR BOTTOM ASH HANDLING SYSTEM
LITL DOCUMENT NO.
LITL-011-MEV-204-I-3001-A
VENDOR DOCUMENT NO.
E114-M-D-101
LANCO INFRATECH LTD. - EPC DIVISION
229, UDYOG VIHAR, PHASE-I
GURGAON, HARYANA, INDIA
KORADI TPS EXPANSION PROJECT- 3X660 MW (BOP) UNIT 8, 9 &10
MAHARASHTRA STATE POWER GENERATION CO. LIMITED.
KORADI, NAGPUR, MAHARASHTRA
LITL-011-MEV-204-I-3001-A
5 11.08.2011 RS AR SA SA
4 27.06.2011 RS AR SA SA
3 01.06.2011 RS AR SA SA
2 16.05.2011 RS AR SA SA
1 07.05.2011 RS RAHUL AR AASHU SA SACHIN RNM RNM
0 09.04.2011 RS RAHUL AR AASHU SA SACHIN RNM RNM REV NO.
DATE STATUS INTLS SGN INTLS SGN INTLS SGN INTL
S SGN
PRPD. BY CHKD. BY APPR. BY ISSUE
AUTHORISATION
(This document is a property of LITL. This is not transferable and shall not be used for any purpose other than for which it is supplied)
KORADI TPS EXPANSION PROJECT – 3X660 MW Page
1 of 16 PART LIST OF BOTTOM ASH & COARSE ASH
HANDLING SYSTEM
LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5
SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3
TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH
HANDLING SYSTEM REV. 5
ENERGO ENGINEERING PROJECTS LTD.
PREPARED AASHU
CHECKED. Sachin
P a g e | 1
EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011
LEGEND LIST FOR REFERING PART LIST
SL.NO. LEGEND SYSTEM
B-01 BAH BOTTOM ASH SYSTEM
B-02 EAH COARSH ASH SYSTEM
B-03 BAD BOTTOM ASH DRAIN SYSTEM
B-04 SW SEAL WATER SYSTEM
B-05 HP HP ASH WATER SYSTEM
B-06 LP LP ASH WATER SYSTEM
B-07 SAS STACK ASH SYSTEM
B-08 IA INSTRUMENT AIR SYSTEM
B-09 AWCT AIR WATER CONVERTOR TANK
KORADI TPS EXPANSION PROJECT – 3X660 MW Page
2 of 16 PART LIST OF BOTTOM ASH & COARSE ASH
HANDLING SYSTEM
LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5
SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3
TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH
HANDLING SYSTEM REV. 5
ENERGO ENGINEERING PROJECTS LTD.
PREPARED AASHU
CHECKED. Sachin
P a g e | 2
EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011
B-01 BAH BOTTOM ASH HOPPER AREA
1 BAH-1 BOTTOM ASH HOPPER 296 MT ( DRY BASIS) 1 NOS 1 NOS 1 NOS
2 BAH-2 SEAL TROUGH SS-316 1 NOS 1 NOS. 1 NOS
3 BAH-3 DISCHARGE FEED
GATE WITH CYLINDER MS FABRICATED TO
IS 2062 6 NOS 6 NOS 6 NOS
4
BAH-4 AIR-OIL/WATER
CONVERTER MS FABRICATED TO
IS 2062 6 NOS 6 NOS 6 NOS
5 BAH-5
ENSLAG CRUSHER
(CLINKER GRINDER WITH DRIVE
ARRANGEMENT)
75 TPH 6 NOS 6 NOS 6 NOS
6 BAH-6 ENCYCRUBBER
(FEED SUMP)
MS FABRICATED IS 2062 WITH WEAR RESISTANT LINERS
6 NOS 6 NOS 6 NOS
7 BAH-7 OVERFLOW SEALBOX MS FABRICATED
IS 2062 2 NOS 2 NOS 2 NOS
8 BAH-8 REFRACTORY 230 MM THK CASTABLE
1 LOT 1 LOT 1 LOT
9 BAH-9 ENHYDROJET
(JET PUMP) SERIES-B
75 TPH 6 NOS 6 NOS 6 NOS
10 BAH-10 BA SLURRY LINE TO ASH SLURRY SUMP
MS ERW HEAVY CLASS TO IS
1 LOT 1 LOT 1 LOT
KORADI TPS EXPANSION PROJECT – 3X660 MW Page
3 of 16 PART LIST OF BOTTOM ASH & COARSE ASH
HANDLING SYSTEM
LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5
SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3
TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH
HANDLING SYSTEM REV. 5
ENERGO ENGINEERING PROJECTS LTD.
PREPARED AASHU
CHECKED. Sachin
P a g e | 3
EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011
1239/3589, 200 NB
11 BAH-11 BA OVERFLOW TANK CAPACITY-75 M3
RCC 1 NOS 1 NOS 1 NOS
12 BAH-12 LEVEL TRANSMITTER R/F TYPE 2 NOS 2 NOS 2 NOS
17 BAH-13 LEVEL INDICATOR R/F TYPE 2 NOS. 2 NOS 2 NOS.
13 BAH-14 AGITATION NOZZLE SS TYPE 4 NOS 4 NOS 4 NOS
14 BAH-15 BA OVERFLOW PUMP
WITH DRIVE 450 M3/HR,
HEAD – 30 MWC 2 NOS 2 NOS 2 NOS
15 BAH-16
ENMET (MANUAL OPERATED PLATE VALVE) AT BA
OVERFLOW PUMP SUCTION
300 NB 2 NOS. 2 NOS 2 NOS
16 BAH-17 PRESSURE INDICATOR 0-10 KG/CM2 2 NOS. 2 NOS 2 NOS.
18 BAH-18 PRESSURE SWITCH 0-10 KG/CM2 1 NOS. 1 NOS 1 NOS.
19 BAH-19 BALL VALVE FOR
ABOVE INSTRUMENT (BAH-16 & BAH-18)
15 NB 3 NOS 3 NOS 3 NOS
20 BAH-20 VENTING
ARRANGEMENT INCLUDING MS ERW
PIPE & LOUVER 1 SET 1 SET 1 SET
21 BAH-21 INSPECTION WINDOW MS FABRICATED TO
IS 2062 6 NOS 6 NOS 6 NOS
KORADI TPS EXPANSION PROJECT – 3X660 MW Page
4 of 16 PART LIST OF BOTTOM ASH & COARSE ASH
HANDLING SYSTEM
LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5
SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3
TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH
HANDLING SYSTEM REV. 5
ENERGO ENGINEERING PROJECTS LTD.
PREPARED AASHU
CHECKED. Sachin
P a g e | 4
EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011
22 BAH-22 NOZZLES DOOR TYPE 1 SET 1 SET 1 SET
23 BAH-23 NOZZLES SLOPE TYPE 1 SET 1 SET 1 SET
24 BAH-24 PRESSURE INDICATOR 0-20 KG/CM2 6 NOS. 6 NOS 6 NOS
25 BAH-25 PRESSURE
TRANSMITTER 0-20 KG/CM2 6 NOS 6 NOS 6 NOS
26 BAH-26 BALL VALVE FOR
ABOVE INSTRUMENTS 15 NB 6 NOS 6 NOS 6 NOS
27 BAH-27
ENMET (MANUALLY OPERATED PLATE
VALVE) FOR BA OVERFLOW PUMP
DISCHARGE
250 NB 4 NOS 4 NOS 4 NOS
28 BAH-28 GATE VALVE AT SEAL
TROUGH DRAIN 80 NB 4 NOS 4 NOS 4 NOS
28 BAH-28 KNIFE GATE VALVE BA OVERFLOW
PUMP RECIRCULATION
250 NB 1 NO 1NO 1 NO
29 BAH-29 BALL VALVE FOR BAH-25
15 NB 6 NOS 6 NOS 6 NOS
KORADI TPS EXPANSION PROJECT – 3X660 MW Page
5 of 16 PART LIST OF BOTTOM ASH & COARSE ASH
HANDLING SYSTEM
LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5
SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3
TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH
HANDLING SYSTEM REV. 5
ENERGO ENGINEERING PROJECTS LTD.
PREPARED AASHU
CHECKED. Sachin
P a g e | 5
EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011
B-02 EAH COARSE ASH SYSTEM
1 EAH-1 ENMET (MANUAL
OPERATED PLATE VALVE
300 NB 26 NOS 26 NOS. 26 NOS.
2 EAH-2 ADOPTER MS - IS 2062 26 NOS 26 NOS 26 NOS
3 EAH-3 CYLINDRICAL
OPERATED PLATE VALVE
200 NB 26 NOS 26 NOS 26 NOS
4 EAH-4 EXPANSION JOINT 200 NB 26 NOS 26 NOS 26 NOS
5 EAH-5 FEEDER EJECTOR 40 TPH 26 NOS 26 NOS 26 NOS
6 EAH-6 CYLINDRICALLY
OPERATED PLUG VALVE
100 NB 26 NOS 26 NOS 26 NOS
7 EAH-7 GLOBE VALVE FOR FEEDER EJECTOR
100 NB 26 NOS 26 NOS 26 NOS
8 EAH-8
GLOBE VALVE FOR SLURRY LINE FROM
ECO/APH HEADER TO COARSE ASH TANK
50 NB 4 NOS. 4 NOS. 4 NOS.
9 EAH-9 Y LATERAL ACI 26 NOS 26 NOS 26 NOS
KORADI TPS EXPANSION PROJECT – 3X660 MW Page
6 of 16 PART LIST OF BOTTOM ASH & COARSE ASH
HANDLING SYSTEM
LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5
SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3
TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH
HANDLING SYSTEM REV. 5
ENERGO ENGINEERING PROJECTS LTD.
PREPARED AASHU
CHECKED. Sachin
P a g e | 6
EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011
10 EAH-10 SLURRY LINE FROM
ECO /APH HOPPER TO COARSE TANK
200 NB 1 LOT 1 LOT 1 LOT
11 EAH-11 COARSE ASH TANK CAPACITY 100M3
RCC 1 NO. 1 NO. 1 NO.
12 EAH-12 ENMET (MANUAL
OPERATED PLATE VALVE)
200 NB 3 NOS 3 NOS 3 NOS.
13 EAH-13
ENDIVAC ( ELASTOMER BASED KNIFE GATE VALVE) SOLENOID
OPERATED
200 NB 3 NOS 3 NOS 3 NOS
14 EAH-14 ENHYDROJET (JET
PUMP) 75 TPH 3 NOS 3 NOS 3 NOS
15 EAH-15 PRESSURE INDICATOR 0-20 KG/CM2 3 NOS 3 NOS 3 NOS
16 EAH-16 BALL VALVE FOR
EAH-15 15 NB 3 NOS 3 NOS 3 NOS
17 EAH-17 LEVEL TRANSMITTER
FOR COARSE ASH TANK
R/F TYPE 1 NO 1 NO 1 NO.
18 EAH-18 AGITATION NOZZLE FOR COARSE ASH
TANK SS TYPE 6 NOS 6 NOS 6 NOS.
KORADI TPS EXPANSION PROJECT – 3X660 MW Page
7 of 16 PART LIST OF BOTTOM ASH & COARSE ASH
HANDLING SYSTEM
LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5
SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3
TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH
HANDLING SYSTEM REV. 5
ENERGO ENGINEERING PROJECTS LTD.
PREPARED AASHU
CHECKED. Sachin
P a g e | 7
EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011
B-03 BAD BOTTOM ASH DRAIN SYSTEM
1 BAD-1 BA AREA DRAIN SUMP CAPACITY 8 M3 RCC 1 NOS 1 NOS 1 NOS
2 BAD-2 BA DRAIN PUMP WITH DRIVE ARRANGEMENT
CAPACITY: 50 M3/HR
HEAD: 20 MWC 2 NOS 2 NOS 2 NOS
3 BAD-3 ENHYDROJET (JET
PUMP) 20 TPH 1 NOS 1 NOS 1 NOS
4 BAD-4 CHECK VALVE IN DRAIN
PUMP DISCHARGE 100 NB MS ERW
PIPE IS:2062 2 NOS 2 NOS 2 NOS
5 BAD-5 PLUG VALVE IN DRAIN
PUMP DISCHARGE 100 NB MS ERW
PIPE IS:2062 2 NOS 2 NOS 2 NOS
6 BAD-6 PRESSURE INDICATOR 0-10 KG/CM2 2 NOS 2 NOS 2 NOS
7 BAD-7 PRESSURE SWITCH 0-10 KG/CM2 1 NO 1 NO 1 NO
8 BAD-8 BALL VALVE FOR
ABOVE INSTRUMENTS (BAD-6 & BAD-7)
15 NB 3 NOS 3 NOS 3 NOS
9 BAD-9 PLUG VALVE FOR JET PUMP DISCHARGE AT
BA DRAIN SUMP 25 NB 1 NOS 1 NOS 1 NOS
10 BAD-10 LEVEL TRANSMITTER R/F TYPE 1 NOS 1 NOS 1 NOS
KORADI TPS EXPANSION PROJECT – 3X660 MW Page
8 of 16 PART LIST OF BOTTOM ASH & COARSE ASH
HANDLING SYSTEM
LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5
SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3
TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH
HANDLING SYSTEM REV. 5
ENERGO ENGINEERING PROJECTS LTD.
PREPARED AASHU
CHECKED. Sachin
P a g e | 8
EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011
B-04 SW SEAL WATER SYSTEM
1 SW-1 SEAL WATER SUMP CAPACITY 24M3
RCC 1 NO
2 SW-2 LEVEL TRANSMITTER R/F TYPE 1 NO
3 SW-3 GATE VALVE AT
SUCTION OF SEAL WATER PUMP
100 NB 2 NOS.
4 SW-4 SEAL WATER PUMP
WITH DRIVE ARRANGEMENT
CAPCAITY: 37 M3/HR
HEAD: 30 MWC 2 NOS
5
SW-5
CHECK VALVE AT DISCHARGE OF PUMP
80 NB 2 NOS.
6
SW-6
GATE VALVE AT DISCHARGE OF SEAL
WATER PUMP 80 NB 2 NOS.
7
SW-7
SEAL WATER LINE FROM PUMP TO THREE
UNIT
MS ERW HEAVY CLASS TO IS 1239
1 LOT
8 SW-8 PRESSURE INDICATOR 0-10 KG/CM2 2 NOS.
9 SW-9 BALL VALVE FOR
INSTRUMENTS (SW-8) 15 NB 2 NOS.
10 SW-10 PLUG VALVE AT SEAL
WATER LINE IN VARIOUS AREAS
20 NB 8 NOS. 8 NOS. 8 NOS
11 SW-11 Y STRAINER AT SEAL WATER LINE IN
20 NB 8 NOS. 8 NOS. 8 NOS
KORADI TPS EXPANSION PROJECT – 3X660 MW Page
9 of 16 PART LIST OF BOTTOM ASH & COARSE ASH
HANDLING SYSTEM
LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5
SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3
TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH
HANDLING SYSTEM REV. 5
ENERGO ENGINEERING PROJECTS LTD.
PREPARED AASHU
CHECKED. Sachin
P a g e | 9
EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011
VARIOUS AREA
12 SW-12 GLOBE VALVE AT SEAL
WATER LINE IN VARIOUS AREA
20 NB 16 NOS 16 NOS 16 NOS.
13 SW-13 FLOW GAUGE AT SEAL
WATER LINE IN VARIOUS AREA
20 NB 8 NOS. 8 NOS. 8 NOS
14 SW-14 CHECK VALVE AT SEAL
WATER LINE IN VARIOUS AREA
20 NB 8 NOS. 8 NOS. 8 NOS
15 SW-15 PRESSURE SWITCH AT
SEAL WATER LINE IN VARIOUS AREA
0-10 KG/CM2 8 NOS. 8 NOS. 8 NOS
16 SW-16 PRESSURE INDICATOR
AT SEAL WATER LINE IN VARIOUS AREA
0-10 KG/CM2 8 NOS. 8 NOS. 8 NOS
17 SW-17 BALL VALVE FOR
INSTRUMENTS (SW-15 & SW-16)
15 NB 16 NOS. 16 NOS. 16 NOS
18 SW-18 GATE VALVE IN DRAIN
SUMP AGITATION 20 NB 1 NOS. 1 NOS. 1 NOS
19 SW-19 GLOBE VALVE IN DRAIN
SUMP AGITATION 20 NB 1 NOS. 1 NOS. 1 NOS
20 SW-20 GATE VALVE AT DRAIN
PUMP SEALING STATION
20 NB 2 NOS 2 NOS 2 NOS
21 SW-21 Y-STAINER AT DRAIN
PUMP SEALING STATION
20 NB 2 NOS 2 NOS 2 NOS
KORADI TPS EXPANSION PROJECT – 3X660 MW Page
10 of 16 PART LIST OF BOTTOM ASH & COARSE ASH
HANDLING SYSTEM
LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5
SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3
TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH
HANDLING SYSTEM REV. 5
ENERGO ENGINEERING PROJECTS LTD.
PREPARED AASHU
CHECKED. Sachin
P a g e | 10
EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011
22
SW-22 CYLINDER OPERATED BALL VALVE AT DRAIN
PUMP SEALING STATION
20 NB 2 NOS 2 NOS 2 NOS
23 SW-23 BALL VALVE AT DRAIN
PUMP SEALING STATION
20 NB 4 NOS 4 NOS 4 NOS
24 SW-24 FLOW GAUGE AT
DRAIN PUMP SEALING STATION
20 NB 2 NOS 2 NOS 2 NOS
25 SW-25 PRESSURE INDICATOR
AT DRAIN PUMP SEALING STATION
0-5 KG/CM2 2 NOS 2 NOS 2 NOS
26 SW-26 PRESSURE GAUGE AT
DRAIN PUMP SEALING STATION
0-5 KG/CM2 2 NOS 2 NOS 2 NOS
27 SW-27 BALL VALVE FOR
(SW-25 & SW-26) 15 NB 4 NOS 4 NOS 4 NOS
28 SW-28 CHECK VALVE AT
DRAIN PUMP SEALING STATION
20 NB 2 NOS 2 NOS 2 NOS
29 SW-29 BALL VALVE AT FEED
GATE FLUSHING 20 NB 6 NOS 6 NOS 6 NOS
30 SW-30 PRESSURE
TRANSMITTER 0-5 KG/CM2 1 NO. 1 NO. 1 NO.
31 SW-31 CYLINDER OPERATED
PLUG VALVE AT VARIOUS AREA
20 NB 8 NOS. 8 NOS. 8 NOS.
32 SW-32 BALL VALVE
FOR SW-30 15 NB 1 NO
KORADI TPS EXPANSION PROJECT – 3X660 MW Page
11 of 16 PART LIST OF BOTTOM ASH & COARSE ASH
HANDLING SYSTEM
LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5
SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3
TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH
HANDLING SYSTEM REV. 5
ENERGO ENGINEERING PROJECTS LTD.
PREPARED AASHU
CHECKED. Sachin
P a g e | 11
EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011
B-05 HP HP ASH WATER SYSTEM
1 HP-1 PLUG VALVE AT HP
WATER LINE IN BA JET PUMP
150 NB 3 NOS. 3 NOS. 3 NOS
2 HP-2 CYLINDER OPTD. PLUG VALVE AT HP WATER LINE IN BA JET PUMP
150 NB 3 NOS. 3 NOS. 3 NOS
3 HP-3 GLOBE VALVE AT HP
WATER LINE IN BA JET PUMP
150 NB 6 NOS. 6 NOS. 6 NOS
4 HP-4 STACK ASH SUMP
AGGITATION NOZZLE 25 NB
SS 4 NOS
5 HP-5 PLUG VALVE AT THE INLET OF JET PUMP
150 NB 6 NOS. 6 NOS. 6 NOS
6 HP-6 GLOBE VALVE AT FEED SUMP AND JET PUMP
150 NB 12 NOS 12 NOS 12 NOS
7 HP-7 PRESSURE INDICATOR 0-15 KG/CM2 6 NOS 6 NOS 6 NOS
8 HP-8 PRESSURE SWITCH 0-15 KG/cm2 6 NOS 6 NOS 6 NOS
9 HP-9 BALL VALVES FOR
INSTRUMENTS ( HP-7 & HP-8)
15 NB 12 NOS 12 NOS 12 NOS
KORADI TPS EXPANSION PROJECT – 3X660 MW Page
12 of 16 PART LIST OF BOTTOM ASH & COARSE ASH
HANDLING SYSTEM
LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5
SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3
TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH
HANDLING SYSTEM REV. 5
ENERGO ENGINEERING PROJECTS LTD.
PREPARED AASHU
CHECKED. Sachin
P a g e | 12
EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011
10 HP-10 GLOBE VALVE FOR
SEAL TROUGH FLUSHING
40 NB 2 NOS 2 NOS 2 NOS
11 HP-11
GLOBE VALVE AT SUCTION OF
HYDROEJECTOR IN DRAIN SUMP
25 NB 1 NOS. 1 NOS. 1 NOS.
12 HP-12 GLOBE VALVE FOR
AGITATION LINE IN BA OVERFLOW TANK
40 NB 1 NOS. 1 NOS. 1 NOS
13 HP-13 GATE VALVE FOR
AGITATION LINE IN BA OVERFLOW TANK
40 NB 1 NO 1 NO 1 NO
14 HP-14
BALL VALVE FOR FLUSHING NOZZLE FOR BOTTOM ASH HOPPER
FLUSHING
32 NB 27 NOS 27 NOS 27 NOS
15 HP-15 PLUG VALVE AT HP
WATER LINE IN CA JET PUMP
100 NB 3 NOS. 3 NOS. 3 NOS
16 HP-16
CYLINDRICALLY OPTD. PLUG VALVE AT HP
WATER LINE IN CA JET PUMP
100 NB 3 NOS. 3 NOS. 3 NOS
17 HP-17 GLOBE VALVE AT HP
WATER LINE IN CA JET PUMP
100 NB 6 NOS. 6 NOS. 6 NOS
18 HP-18 PLUG VALVE AT HP
WATER HEADER FOR STACK HOPPER
150 NB 3 NOS.
19 HP-19 CYLINDER OPTD. PLUG VALVE AT HP WATER HEADER FOR STACK
150 NB 3 NOS.
KORADI TPS EXPANSION PROJECT – 3X660 MW Page
13 of 16 PART LIST OF BOTTOM ASH & COARSE ASH
HANDLING SYSTEM
LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5
SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3
TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH
HANDLING SYSTEM REV. 5
ENERGO ENGINEERING PROJECTS LTD.
PREPARED AASHU
CHECKED. Sachin
P a g e | 13
EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011
HOPPER
20 HP-20 GLOBE VALVE AT HP WATER HEADER FOR
STACK HOPPER 150 NB 6 NOS.
21 HP-21 PLUG VALVE AT HP
WATER HEADER FOR ECONOMISER HOPPER
250 NB 1 NO 1 NO. 1 NO
22 HP-22
CYLINDER OPTD. PLUG VALVE AT HP WATER
HEADER FOR ECONOMISER HOPPER
250 NB 1 NO 1 NO. 1 NO
23 HP-23 GLOBE VALVE AT HP WATER HEADER FOR
ECONOMISER HOPPER 250 NB 2 NOS. 2 NOS. 2 NOS
24 HP-24 PRESSURE INDICATOR 0-15 KG/CM2 2 NOS 2 NOS 2 NOS
25 HP-25 PRESSURE SWITCH 0-15 KG/CM2 1 NO 1 NO 1 NO
26 HP-26 BALL VALVE FOR
INSTRUMENTS HP-24 & HP-25
15 NB 3 NOS 3 NOS. 3 NOS
27 HP-27 GLOBE VALVE FOR STACK HOPER JET
PUMP INLET 150 NB 2 NOS
28 HP-28
GLOBE VALVE FOR STACK ASH TANK
AGIATATION & FEEDER EJECTOR
80 NB 3 NOS
KORADI TPS EXPANSION PROJECT – 3X660 MW Page
14 of 16 PART LIST OF BOTTOM ASH & COARSE ASH
HANDLING SYSTEM
LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5
SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3
TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH
HANDLING SYSTEM REV. 5
ENERGO ENGINEERING PROJECTS LTD.
PREPARED AASHU
CHECKED. Sachin
P a g e | 14
EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011
29 HP-29 PRESSURE INDICATOR AT JET PUMP INLET AT
CT TANK 0-10 KG/CM2 3 NOS 3 NOS 3 NOS
30 HP-30 PRESSURE SWITCH AT JET PUMP INLET AT CT
TANK 0-10 KG/CM2 3 NOS 3 NOS 3 NOS
31 HP-31 BALL VALVE FOR
HP-30 &HP-29 15 NB 6 NOS 6 NOS 6 NOS
32 HP-32 PRESSURE INDICATOR
SEAL TROUGH FLUSHING HEADER
0-10 KG/CM2 1 NO. 1 NO. 1 NO.
33 HP-33 BALL VALVE FOR HP-32
15 NB 1 NO. 1 NO. 1 NO.
34 HP-34 ORIFICE PLATE SS 2 NOS 2 NOS 2 NOS
B-06 LP LP ASH WATER SYSTEM
1 LP-1 BALL VALVE FOR SEAL
TROUGH MAKEUP 40 NB 28 NOS 28 NOS 28 NOS.
2 LP-2 GLOBE VALVE FOR OVERFLOW TANK
MAKEUP 200 NB 1 NOS 1 NOS 1 NOS.
3 LP-3
CYLINDER OPTD. BUTTERFLY VALVE
FOR OVERFLOW TANK MAKEUP
200 NB 1 NOS 1 NOS 1 NOS.
4. LP-4 GLOBE VALVE FOR
REFRACTORY COOLING
25 NB 28 NOS 28 NOS 28 NOS.
KORADI TPS EXPANSION PROJECT – 3X660 MW Page
15 of 16 PART LIST OF BOTTOM ASH & COARSE ASH
HANDLING SYSTEM
LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5
SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3
TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH
HANDLING SYSTEM REV. 5
ENERGO ENGINEERING PROJECTS LTD.
PREPARED AASHU
CHECKED. Sachin
P a g e | 15
EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011
5 LP-5 GLOBE VALVE FOR
SEAL TROUGH MAKEUP HEADER
150 NB 1 NO 1 NO 1 NO
6. LP-6 CHECK VALVE FOR
SEAL TROUGH MAKEUP HEADER
150 NB 1 NO 1 NO 1 NO
7 LP-7 GLOBE VALVE FOR HOPPER MAKEUP
HEADER 250 NB 1 NO 1 NO 1 NO
8 LP-8 BALL VALVE FOR
HOPPER MAKEUP LINE 32 NB 12 NOS 12 NOS 12 NOS
B-07 SAS STACK ASH SYSTEM
1 SAS-1 ADAPTOR 300 NB 3 NO
2 SAS-2 ENMET- MANUAL
OPERATED PLATE VALVE
200 NB 3 NO
3 SAS-3 EXPANSION JOINT 200 NB 3 NO
4 SAS-4 CYLINDER OPERATED
PLATE VALVE 200 NB 3 NO
5 SAS-5 FEEDER EJECTOR 75 TPH 3 NO
6 SAS-6 STACK ASH TANK CAPACITY – 8.8 CUM 1 NO
R4
KORADI TPS EXPANSION PROJECT – 3X660 MW Page
16 of 16 PART LIST OF BOTTOM ASH & COARSE ASH
HANDLING SYSTEM
LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5
SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3
TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH
HANDLING SYSTEM REV. 5
ENERGO ENGINEERING PROJECTS LTD.
PREPARED AASHU
CHECKED. Sachin
P a g e | 16
EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011
B-08 IA INSTRUMENT AIR SYSTEM
1 IA-1 BALL VALVE FOR
INSTRUMENT AIR LINE AS PER FLOW
DIAGRAM LOT LOT LOT
2 IA-2 PRESSURE INDICATOR 0-10 KG/CM2 1 NO 1 NO 1 NO
3 IA-3 PRESSURE SWITCH 0-10 KG/CM2 1 NO 1 NO 1 NO
4 IA-4 BALL VALVE FOR
IA-2 & IA-3 15 NB 2 NOS 2 NOS 2 NOS
B-09 AWCT AIR WATER CONVERTOR TANK
1 AWCT-1
BALL VALVE FROM AIR WATER CONVERTER TANK TO FEED GATE
CYLINDER
20 NB 12 NOS 12 NOS 12 NOS
2 AWCT-2
CHECK VALVE FROM AIR WATER
CONVERTER TANK TO FEED GATE CYLINDER
20 NB 12 NOS 12 NOS 12 NOS
3. AWCT-3 GATE VALVE FOR VENT 20 NB 6 NOS 6 NOS 6 NOS
KORADI TPS EXPANSION PROJECT – 3X660 MW Page
1 of 1
COMPLIANCE REPORT FOR PART LIST FOR BOTTOM ASH & COARSE ASH HANDLING SYSTEM
LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5
TITLE : COMPLIANCE REPORT FOR PART LIST FOR BOTTOM ASH & COARSE ASH HANDLING SYSTEM
REV. 5
ENERGO ENGINEERING PROJECTS LTD.
PREPARED Aashu
CHECKED. Sachin
P a g e | 1
EEPL DOC.NO. E114-M-D-101 Dt. 27.06.2011
S.No. DCPL COMMENTS EEPL Clarification
1. As commented earlier, the valves marked as * in
the commented Flow diagram viz., flow control
valves at all the Feeder ejectors and Jet pump
control station and the valves in HP water lines
going to BA hopper, the valves at the suction
and discharge of BA overflow transfer pumps
and BA area drain pumps shall be ‘Plug valves’.
Please revise accordingly. Also for the valves at
suction of jet pumps for Coarse ash tank, please
indicate the make of the valves.
In line with MOM Dated 10.08.2011,
comments are noted and incorporated
2 As commented earlier, for detail-D, please show
the connecting line from HP water header
It’s a typographical error and deleted
3 As commented earlier, Please indicate under
Notes : “This drawing shows the arrangement
for one (1) unit unless noted otherwise”
Noted and Incorporated