litl- 011 -mev-204-i-3001-a

19
KORADI TPS EXPANSION PROJECT – 3X660 MW, (BOP) UNIT 8, 9 & 10 KORADI, NAGPUR, MAHARASHTRA (INDIA) OWNER MAHARASHTRA STATE POWER GENERATION CO. LTD. “PRAKASHGAD” (3RD FLOOR), BANDRA (EAST) MUMBAI-400 051 OWNER CONSULTANT DEVELOPMENT CONSULTANTS PRIVATE LIMITED CONSULTING ENGINEERS MUMBAI BOP CONTRACTOR LANCO INFRATECH LTD. (EPC DIVISION) 229, UDYOG VIHAR, PHASE-I GURGAON, HARYANA, INDIA ENERGO ENGINEERING PROJECTS LTD. DOCUMENT TITLE: PART LIST FOR BOTTOM ASH HANDLING SYSTEM LITL DOCUMENT NO. LITL-011-MEV-204-I-3001-A VENDOR DOCUMENT NO. E114-M-D-101

Upload: aashu-ranjan

Post on 06-Mar-2015

95 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: LITL- 011 -MEV-204-I-3001-A

KORADI TPS EXPANSION PROJECT – 3X660 MW, (BOP) UNIT 8, 9 & 10

KORADI, NAGPUR, MAHARASHTRA (INDIA)

OWNER

MAHARASHTRA STATE POWER GENERATION CO. LTD.

“PRAKASHGAD” (3RD FLOOR), BANDRA (EAST)

MUMBAI-400 051

OWNER CONSULTANT

DEVELOPMENT CONSULTANTS PRIVATE LIMITED

CONSULTING ENGINEERS

MUMBAI

BOP CONTRACTOR

LANCO INFRATECH LTD. (EPC DIVISION)

229, UDYOG VIHAR, PHASE-I

GURGAON, HARYANA, INDIA

ENERGO ENGINEERING PROJECTS LTD.

DOCUMENT TITLE: PART LIST FOR BOTTOM ASH HANDLING SYSTEM

LITL DOCUMENT NO.

LITL-011-MEV-204-I-3001-A

VENDOR DOCUMENT NO.

E114-M-D-101

Page 2: LITL- 011 -MEV-204-I-3001-A

LANCO INFRATECH LTD. - EPC DIVISION

229, UDYOG VIHAR, PHASE-I

GURGAON, HARYANA, INDIA

KORADI TPS EXPANSION PROJECT- 3X660 MW (BOP) UNIT 8, 9 &10

MAHARASHTRA STATE POWER GENERATION CO. LIMITED.

KORADI, NAGPUR, MAHARASHTRA

LITL-011-MEV-204-I-3001-A

5 11.08.2011 RS AR SA SA

4 27.06.2011 RS AR SA SA

3 01.06.2011 RS AR SA SA

2 16.05.2011 RS AR SA SA

1 07.05.2011 RS RAHUL AR AASHU SA SACHIN RNM RNM

0 09.04.2011 RS RAHUL AR AASHU SA SACHIN RNM RNM REV NO.

DATE STATUS INTLS SGN INTLS SGN INTLS SGN INTL

S SGN

PRPD. BY CHKD. BY APPR. BY ISSUE

AUTHORISATION

(This document is a property of LITL. This is not transferable and shall not be used for any purpose other than for which it is supplied)

Page 3: LITL- 011 -MEV-204-I-3001-A

KORADI TPS EXPANSION PROJECT – 3X660 MW Page

1 of 16 PART LIST OF BOTTOM ASH & COARSE ASH

HANDLING SYSTEM

LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5

SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3

TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH

HANDLING SYSTEM REV. 5

ENERGO ENGINEERING PROJECTS LTD.

PREPARED AASHU

CHECKED. Sachin

P a g e | 1

EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011

LEGEND LIST FOR REFERING PART LIST

SL.NO. LEGEND SYSTEM

B-01 BAH BOTTOM ASH SYSTEM

B-02 EAH COARSH ASH SYSTEM

B-03 BAD BOTTOM ASH DRAIN SYSTEM

B-04 SW SEAL WATER SYSTEM

B-05 HP HP ASH WATER SYSTEM

B-06 LP LP ASH WATER SYSTEM

B-07 SAS STACK ASH SYSTEM

B-08 IA INSTRUMENT AIR SYSTEM

B-09 AWCT AIR WATER CONVERTOR TANK

Page 4: LITL- 011 -MEV-204-I-3001-A

KORADI TPS EXPANSION PROJECT – 3X660 MW Page

2 of 16 PART LIST OF BOTTOM ASH & COARSE ASH

HANDLING SYSTEM

LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5

SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3

TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH

HANDLING SYSTEM REV. 5

ENERGO ENGINEERING PROJECTS LTD.

PREPARED AASHU

CHECKED. Sachin

P a g e | 2

EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011

B-01 BAH BOTTOM ASH HOPPER AREA

1 BAH-1 BOTTOM ASH HOPPER 296 MT ( DRY BASIS) 1 NOS 1 NOS 1 NOS

2 BAH-2 SEAL TROUGH SS-316 1 NOS 1 NOS. 1 NOS

3 BAH-3 DISCHARGE FEED

GATE WITH CYLINDER MS FABRICATED TO

IS 2062 6 NOS 6 NOS 6 NOS

4

BAH-4 AIR-OIL/WATER

CONVERTER MS FABRICATED TO

IS 2062 6 NOS 6 NOS 6 NOS

5 BAH-5

ENSLAG CRUSHER

(CLINKER GRINDER WITH DRIVE

ARRANGEMENT)

75 TPH 6 NOS 6 NOS 6 NOS

6 BAH-6 ENCYCRUBBER

(FEED SUMP)

MS FABRICATED IS 2062 WITH WEAR RESISTANT LINERS

6 NOS 6 NOS 6 NOS

7 BAH-7 OVERFLOW SEALBOX MS FABRICATED

IS 2062 2 NOS 2 NOS 2 NOS

8 BAH-8 REFRACTORY 230 MM THK CASTABLE

1 LOT 1 LOT 1 LOT

9 BAH-9 ENHYDROJET

(JET PUMP) SERIES-B

75 TPH 6 NOS 6 NOS 6 NOS

10 BAH-10 BA SLURRY LINE TO ASH SLURRY SUMP

MS ERW HEAVY CLASS TO IS

1 LOT 1 LOT 1 LOT

Page 5: LITL- 011 -MEV-204-I-3001-A

KORADI TPS EXPANSION PROJECT – 3X660 MW Page

3 of 16 PART LIST OF BOTTOM ASH & COARSE ASH

HANDLING SYSTEM

LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5

SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3

TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH

HANDLING SYSTEM REV. 5

ENERGO ENGINEERING PROJECTS LTD.

PREPARED AASHU

CHECKED. Sachin

P a g e | 3

EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011

1239/3589, 200 NB

11 BAH-11 BA OVERFLOW TANK CAPACITY-75 M3

RCC 1 NOS 1 NOS 1 NOS

12 BAH-12 LEVEL TRANSMITTER R/F TYPE 2 NOS 2 NOS 2 NOS

17 BAH-13 LEVEL INDICATOR R/F TYPE 2 NOS. 2 NOS 2 NOS.

13 BAH-14 AGITATION NOZZLE SS TYPE 4 NOS 4 NOS 4 NOS

14 BAH-15 BA OVERFLOW PUMP

WITH DRIVE 450 M3/HR,

HEAD – 30 MWC 2 NOS 2 NOS 2 NOS

15 BAH-16

ENMET (MANUAL OPERATED PLATE VALVE) AT BA

OVERFLOW PUMP SUCTION

300 NB 2 NOS. 2 NOS 2 NOS

16 BAH-17 PRESSURE INDICATOR 0-10 KG/CM2 2 NOS. 2 NOS 2 NOS.

18 BAH-18 PRESSURE SWITCH 0-10 KG/CM2 1 NOS. 1 NOS 1 NOS.

19 BAH-19 BALL VALVE FOR

ABOVE INSTRUMENT (BAH-16 & BAH-18)

15 NB 3 NOS 3 NOS 3 NOS

20 BAH-20 VENTING

ARRANGEMENT INCLUDING MS ERW

PIPE & LOUVER 1 SET 1 SET 1 SET

21 BAH-21 INSPECTION WINDOW MS FABRICATED TO

IS 2062 6 NOS 6 NOS 6 NOS

Page 6: LITL- 011 -MEV-204-I-3001-A

KORADI TPS EXPANSION PROJECT – 3X660 MW Page

4 of 16 PART LIST OF BOTTOM ASH & COARSE ASH

HANDLING SYSTEM

LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5

SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3

TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH

HANDLING SYSTEM REV. 5

ENERGO ENGINEERING PROJECTS LTD.

PREPARED AASHU

CHECKED. Sachin

P a g e | 4

EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011

22 BAH-22 NOZZLES DOOR TYPE 1 SET 1 SET 1 SET

23 BAH-23 NOZZLES SLOPE TYPE 1 SET 1 SET 1 SET

24 BAH-24 PRESSURE INDICATOR 0-20 KG/CM2 6 NOS. 6 NOS 6 NOS

25 BAH-25 PRESSURE

TRANSMITTER 0-20 KG/CM2 6 NOS 6 NOS 6 NOS

26 BAH-26 BALL VALVE FOR

ABOVE INSTRUMENTS 15 NB 6 NOS 6 NOS 6 NOS

27 BAH-27

ENMET (MANUALLY OPERATED PLATE

VALVE) FOR BA OVERFLOW PUMP

DISCHARGE

250 NB 4 NOS 4 NOS 4 NOS

28 BAH-28 GATE VALVE AT SEAL

TROUGH DRAIN 80 NB 4 NOS 4 NOS 4 NOS

28 BAH-28 KNIFE GATE VALVE BA OVERFLOW

PUMP RECIRCULATION

250 NB 1 NO 1NO 1 NO

29 BAH-29 BALL VALVE FOR BAH-25

15 NB 6 NOS 6 NOS 6 NOS

Page 7: LITL- 011 -MEV-204-I-3001-A

KORADI TPS EXPANSION PROJECT – 3X660 MW Page

5 of 16 PART LIST OF BOTTOM ASH & COARSE ASH

HANDLING SYSTEM

LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5

SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3

TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH

HANDLING SYSTEM REV. 5

ENERGO ENGINEERING PROJECTS LTD.

PREPARED AASHU

CHECKED. Sachin

P a g e | 5

EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011

B-02 EAH COARSE ASH SYSTEM

1 EAH-1 ENMET (MANUAL

OPERATED PLATE VALVE

300 NB 26 NOS 26 NOS. 26 NOS.

2 EAH-2 ADOPTER MS - IS 2062 26 NOS 26 NOS 26 NOS

3 EAH-3 CYLINDRICAL

OPERATED PLATE VALVE

200 NB 26 NOS 26 NOS 26 NOS

4 EAH-4 EXPANSION JOINT 200 NB 26 NOS 26 NOS 26 NOS

5 EAH-5 FEEDER EJECTOR 40 TPH 26 NOS 26 NOS 26 NOS

6 EAH-6 CYLINDRICALLY

OPERATED PLUG VALVE

100 NB 26 NOS 26 NOS 26 NOS

7 EAH-7 GLOBE VALVE FOR FEEDER EJECTOR

100 NB 26 NOS 26 NOS 26 NOS

8 EAH-8

GLOBE VALVE FOR SLURRY LINE FROM

ECO/APH HEADER TO COARSE ASH TANK

50 NB 4 NOS. 4 NOS. 4 NOS.

9 EAH-9 Y LATERAL ACI 26 NOS 26 NOS 26 NOS

Page 8: LITL- 011 -MEV-204-I-3001-A

KORADI TPS EXPANSION PROJECT – 3X660 MW Page

6 of 16 PART LIST OF BOTTOM ASH & COARSE ASH

HANDLING SYSTEM

LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5

SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3

TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH

HANDLING SYSTEM REV. 5

ENERGO ENGINEERING PROJECTS LTD.

PREPARED AASHU

CHECKED. Sachin

P a g e | 6

EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011

10 EAH-10 SLURRY LINE FROM

ECO /APH HOPPER TO COARSE TANK

200 NB 1 LOT 1 LOT 1 LOT

11 EAH-11 COARSE ASH TANK CAPACITY 100M3

RCC 1 NO. 1 NO. 1 NO.

12 EAH-12 ENMET (MANUAL

OPERATED PLATE VALVE)

200 NB 3 NOS 3 NOS 3 NOS.

13 EAH-13

ENDIVAC ( ELASTOMER BASED KNIFE GATE VALVE) SOLENOID

OPERATED

200 NB 3 NOS 3 NOS 3 NOS

14 EAH-14 ENHYDROJET (JET

PUMP) 75 TPH 3 NOS 3 NOS 3 NOS

15 EAH-15 PRESSURE INDICATOR 0-20 KG/CM2 3 NOS 3 NOS 3 NOS

16 EAH-16 BALL VALVE FOR

EAH-15 15 NB 3 NOS 3 NOS 3 NOS

17 EAH-17 LEVEL TRANSMITTER

FOR COARSE ASH TANK

R/F TYPE 1 NO 1 NO 1 NO.

18 EAH-18 AGITATION NOZZLE FOR COARSE ASH

TANK SS TYPE 6 NOS 6 NOS 6 NOS.

Page 9: LITL- 011 -MEV-204-I-3001-A

KORADI TPS EXPANSION PROJECT – 3X660 MW Page

7 of 16 PART LIST OF BOTTOM ASH & COARSE ASH

HANDLING SYSTEM

LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5

SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3

TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH

HANDLING SYSTEM REV. 5

ENERGO ENGINEERING PROJECTS LTD.

PREPARED AASHU

CHECKED. Sachin

P a g e | 7

EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011

B-03 BAD BOTTOM ASH DRAIN SYSTEM

1 BAD-1 BA AREA DRAIN SUMP CAPACITY 8 M3 RCC 1 NOS 1 NOS 1 NOS

2 BAD-2 BA DRAIN PUMP WITH DRIVE ARRANGEMENT

CAPACITY: 50 M3/HR

HEAD: 20 MWC 2 NOS 2 NOS 2 NOS

3 BAD-3 ENHYDROJET (JET

PUMP) 20 TPH 1 NOS 1 NOS 1 NOS

4 BAD-4 CHECK VALVE IN DRAIN

PUMP DISCHARGE 100 NB MS ERW

PIPE IS:2062 2 NOS 2 NOS 2 NOS

5 BAD-5 PLUG VALVE IN DRAIN

PUMP DISCHARGE 100 NB MS ERW

PIPE IS:2062 2 NOS 2 NOS 2 NOS

6 BAD-6 PRESSURE INDICATOR 0-10 KG/CM2 2 NOS 2 NOS 2 NOS

7 BAD-7 PRESSURE SWITCH 0-10 KG/CM2 1 NO 1 NO 1 NO

8 BAD-8 BALL VALVE FOR

ABOVE INSTRUMENTS (BAD-6 & BAD-7)

15 NB 3 NOS 3 NOS 3 NOS

9 BAD-9 PLUG VALVE FOR JET PUMP DISCHARGE AT

BA DRAIN SUMP 25 NB 1 NOS 1 NOS 1 NOS

10 BAD-10 LEVEL TRANSMITTER R/F TYPE 1 NOS 1 NOS 1 NOS

Page 10: LITL- 011 -MEV-204-I-3001-A

KORADI TPS EXPANSION PROJECT – 3X660 MW Page

8 of 16 PART LIST OF BOTTOM ASH & COARSE ASH

HANDLING SYSTEM

LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5

SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3

TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH

HANDLING SYSTEM REV. 5

ENERGO ENGINEERING PROJECTS LTD.

PREPARED AASHU

CHECKED. Sachin

P a g e | 8

EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011

B-04 SW SEAL WATER SYSTEM

1 SW-1 SEAL WATER SUMP CAPACITY 24M3

RCC 1 NO

2 SW-2 LEVEL TRANSMITTER R/F TYPE 1 NO

3 SW-3 GATE VALVE AT

SUCTION OF SEAL WATER PUMP

100 NB 2 NOS.

4 SW-4 SEAL WATER PUMP

WITH DRIVE ARRANGEMENT

CAPCAITY: 37 M3/HR

HEAD: 30 MWC 2 NOS

5

SW-5

CHECK VALVE AT DISCHARGE OF PUMP

80 NB 2 NOS.

6

SW-6

GATE VALVE AT DISCHARGE OF SEAL

WATER PUMP 80 NB 2 NOS.

7

SW-7

SEAL WATER LINE FROM PUMP TO THREE

UNIT

MS ERW HEAVY CLASS TO IS 1239

1 LOT

8 SW-8 PRESSURE INDICATOR 0-10 KG/CM2 2 NOS.

9 SW-9 BALL VALVE FOR

INSTRUMENTS (SW-8) 15 NB 2 NOS.

10 SW-10 PLUG VALVE AT SEAL

WATER LINE IN VARIOUS AREAS

20 NB 8 NOS. 8 NOS. 8 NOS

11 SW-11 Y STRAINER AT SEAL WATER LINE IN

20 NB 8 NOS. 8 NOS. 8 NOS

Page 11: LITL- 011 -MEV-204-I-3001-A

KORADI TPS EXPANSION PROJECT – 3X660 MW Page

9 of 16 PART LIST OF BOTTOM ASH & COARSE ASH

HANDLING SYSTEM

LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5

SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3

TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH

HANDLING SYSTEM REV. 5

ENERGO ENGINEERING PROJECTS LTD.

PREPARED AASHU

CHECKED. Sachin

P a g e | 9

EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011

VARIOUS AREA

12 SW-12 GLOBE VALVE AT SEAL

WATER LINE IN VARIOUS AREA

20 NB 16 NOS 16 NOS 16 NOS.

13 SW-13 FLOW GAUGE AT SEAL

WATER LINE IN VARIOUS AREA

20 NB 8 NOS. 8 NOS. 8 NOS

14 SW-14 CHECK VALVE AT SEAL

WATER LINE IN VARIOUS AREA

20 NB 8 NOS. 8 NOS. 8 NOS

15 SW-15 PRESSURE SWITCH AT

SEAL WATER LINE IN VARIOUS AREA

0-10 KG/CM2 8 NOS. 8 NOS. 8 NOS

16 SW-16 PRESSURE INDICATOR

AT SEAL WATER LINE IN VARIOUS AREA

0-10 KG/CM2 8 NOS. 8 NOS. 8 NOS

17 SW-17 BALL VALVE FOR

INSTRUMENTS (SW-15 & SW-16)

15 NB 16 NOS. 16 NOS. 16 NOS

18 SW-18 GATE VALVE IN DRAIN

SUMP AGITATION 20 NB 1 NOS. 1 NOS. 1 NOS

19 SW-19 GLOBE VALVE IN DRAIN

SUMP AGITATION 20 NB 1 NOS. 1 NOS. 1 NOS

20 SW-20 GATE VALVE AT DRAIN

PUMP SEALING STATION

20 NB 2 NOS 2 NOS 2 NOS

21 SW-21 Y-STAINER AT DRAIN

PUMP SEALING STATION

20 NB 2 NOS 2 NOS 2 NOS

Page 12: LITL- 011 -MEV-204-I-3001-A

KORADI TPS EXPANSION PROJECT – 3X660 MW Page

10 of 16 PART LIST OF BOTTOM ASH & COARSE ASH

HANDLING SYSTEM

LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5

SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3

TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH

HANDLING SYSTEM REV. 5

ENERGO ENGINEERING PROJECTS LTD.

PREPARED AASHU

CHECKED. Sachin

P a g e | 10

EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011

22

SW-22 CYLINDER OPERATED BALL VALVE AT DRAIN

PUMP SEALING STATION

20 NB 2 NOS 2 NOS 2 NOS

23 SW-23 BALL VALVE AT DRAIN

PUMP SEALING STATION

20 NB 4 NOS 4 NOS 4 NOS

24 SW-24 FLOW GAUGE AT

DRAIN PUMP SEALING STATION

20 NB 2 NOS 2 NOS 2 NOS

25 SW-25 PRESSURE INDICATOR

AT DRAIN PUMP SEALING STATION

0-5 KG/CM2 2 NOS 2 NOS 2 NOS

26 SW-26 PRESSURE GAUGE AT

DRAIN PUMP SEALING STATION

0-5 KG/CM2 2 NOS 2 NOS 2 NOS

27 SW-27 BALL VALVE FOR

(SW-25 & SW-26) 15 NB 4 NOS 4 NOS 4 NOS

28 SW-28 CHECK VALVE AT

DRAIN PUMP SEALING STATION

20 NB 2 NOS 2 NOS 2 NOS

29 SW-29 BALL VALVE AT FEED

GATE FLUSHING 20 NB 6 NOS 6 NOS 6 NOS

30 SW-30 PRESSURE

TRANSMITTER 0-5 KG/CM2 1 NO. 1 NO. 1 NO.

31 SW-31 CYLINDER OPERATED

PLUG VALVE AT VARIOUS AREA

20 NB 8 NOS. 8 NOS. 8 NOS.

32 SW-32 BALL VALVE

FOR SW-30 15 NB 1 NO

Page 13: LITL- 011 -MEV-204-I-3001-A

KORADI TPS EXPANSION PROJECT – 3X660 MW Page

11 of 16 PART LIST OF BOTTOM ASH & COARSE ASH

HANDLING SYSTEM

LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5

SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3

TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH

HANDLING SYSTEM REV. 5

ENERGO ENGINEERING PROJECTS LTD.

PREPARED AASHU

CHECKED. Sachin

P a g e | 11

EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011

B-05 HP HP ASH WATER SYSTEM

1 HP-1 PLUG VALVE AT HP

WATER LINE IN BA JET PUMP

150 NB 3 NOS. 3 NOS. 3 NOS

2 HP-2 CYLINDER OPTD. PLUG VALVE AT HP WATER LINE IN BA JET PUMP

150 NB 3 NOS. 3 NOS. 3 NOS

3 HP-3 GLOBE VALVE AT HP

WATER LINE IN BA JET PUMP

150 NB 6 NOS. 6 NOS. 6 NOS

4 HP-4 STACK ASH SUMP

AGGITATION NOZZLE 25 NB

SS 4 NOS

5 HP-5 PLUG VALVE AT THE INLET OF JET PUMP

150 NB 6 NOS. 6 NOS. 6 NOS

6 HP-6 GLOBE VALVE AT FEED SUMP AND JET PUMP

150 NB 12 NOS 12 NOS 12 NOS

7 HP-7 PRESSURE INDICATOR 0-15 KG/CM2 6 NOS 6 NOS 6 NOS

8 HP-8 PRESSURE SWITCH 0-15 KG/cm2 6 NOS 6 NOS 6 NOS

9 HP-9 BALL VALVES FOR

INSTRUMENTS ( HP-7 & HP-8)

15 NB 12 NOS 12 NOS 12 NOS

Page 14: LITL- 011 -MEV-204-I-3001-A

KORADI TPS EXPANSION PROJECT – 3X660 MW Page

12 of 16 PART LIST OF BOTTOM ASH & COARSE ASH

HANDLING SYSTEM

LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5

SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3

TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH

HANDLING SYSTEM REV. 5

ENERGO ENGINEERING PROJECTS LTD.

PREPARED AASHU

CHECKED. Sachin

P a g e | 12

EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011

10 HP-10 GLOBE VALVE FOR

SEAL TROUGH FLUSHING

40 NB 2 NOS 2 NOS 2 NOS

11 HP-11

GLOBE VALVE AT SUCTION OF

HYDROEJECTOR IN DRAIN SUMP

25 NB 1 NOS. 1 NOS. 1 NOS.

12 HP-12 GLOBE VALVE FOR

AGITATION LINE IN BA OVERFLOW TANK

40 NB 1 NOS. 1 NOS. 1 NOS

13 HP-13 GATE VALVE FOR

AGITATION LINE IN BA OVERFLOW TANK

40 NB 1 NO 1 NO 1 NO

14 HP-14

BALL VALVE FOR FLUSHING NOZZLE FOR BOTTOM ASH HOPPER

FLUSHING

32 NB 27 NOS 27 NOS 27 NOS

15 HP-15 PLUG VALVE AT HP

WATER LINE IN CA JET PUMP

100 NB 3 NOS. 3 NOS. 3 NOS

16 HP-16

CYLINDRICALLY OPTD. PLUG VALVE AT HP

WATER LINE IN CA JET PUMP

100 NB 3 NOS. 3 NOS. 3 NOS

17 HP-17 GLOBE VALVE AT HP

WATER LINE IN CA JET PUMP

100 NB 6 NOS. 6 NOS. 6 NOS

18 HP-18 PLUG VALVE AT HP

WATER HEADER FOR STACK HOPPER

150 NB 3 NOS.

19 HP-19 CYLINDER OPTD. PLUG VALVE AT HP WATER HEADER FOR STACK

150 NB 3 NOS.

Page 15: LITL- 011 -MEV-204-I-3001-A

KORADI TPS EXPANSION PROJECT – 3X660 MW Page

13 of 16 PART LIST OF BOTTOM ASH & COARSE ASH

HANDLING SYSTEM

LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5

SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3

TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH

HANDLING SYSTEM REV. 5

ENERGO ENGINEERING PROJECTS LTD.

PREPARED AASHU

CHECKED. Sachin

P a g e | 13

EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011

HOPPER

20 HP-20 GLOBE VALVE AT HP WATER HEADER FOR

STACK HOPPER 150 NB 6 NOS.

21 HP-21 PLUG VALVE AT HP

WATER HEADER FOR ECONOMISER HOPPER

250 NB 1 NO 1 NO. 1 NO

22 HP-22

CYLINDER OPTD. PLUG VALVE AT HP WATER

HEADER FOR ECONOMISER HOPPER

250 NB 1 NO 1 NO. 1 NO

23 HP-23 GLOBE VALVE AT HP WATER HEADER FOR

ECONOMISER HOPPER 250 NB 2 NOS. 2 NOS. 2 NOS

24 HP-24 PRESSURE INDICATOR 0-15 KG/CM2 2 NOS 2 NOS 2 NOS

25 HP-25 PRESSURE SWITCH 0-15 KG/CM2 1 NO 1 NO 1 NO

26 HP-26 BALL VALVE FOR

INSTRUMENTS HP-24 & HP-25

15 NB 3 NOS 3 NOS. 3 NOS

27 HP-27 GLOBE VALVE FOR STACK HOPER JET

PUMP INLET 150 NB 2 NOS

28 HP-28

GLOBE VALVE FOR STACK ASH TANK

AGIATATION & FEEDER EJECTOR

80 NB 3 NOS

Page 16: LITL- 011 -MEV-204-I-3001-A

KORADI TPS EXPANSION PROJECT – 3X660 MW Page

14 of 16 PART LIST OF BOTTOM ASH & COARSE ASH

HANDLING SYSTEM

LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5

SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3

TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH

HANDLING SYSTEM REV. 5

ENERGO ENGINEERING PROJECTS LTD.

PREPARED AASHU

CHECKED. Sachin

P a g e | 14

EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011

29 HP-29 PRESSURE INDICATOR AT JET PUMP INLET AT

CT TANK 0-10 KG/CM2 3 NOS 3 NOS 3 NOS

30 HP-30 PRESSURE SWITCH AT JET PUMP INLET AT CT

TANK 0-10 KG/CM2 3 NOS 3 NOS 3 NOS

31 HP-31 BALL VALVE FOR

HP-30 &HP-29 15 NB 6 NOS 6 NOS 6 NOS

32 HP-32 PRESSURE INDICATOR

SEAL TROUGH FLUSHING HEADER

0-10 KG/CM2 1 NO. 1 NO. 1 NO.

33 HP-33 BALL VALVE FOR HP-32

15 NB 1 NO. 1 NO. 1 NO.

34 HP-34 ORIFICE PLATE SS 2 NOS 2 NOS 2 NOS

B-06 LP LP ASH WATER SYSTEM

1 LP-1 BALL VALVE FOR SEAL

TROUGH MAKEUP 40 NB 28 NOS 28 NOS 28 NOS.

2 LP-2 GLOBE VALVE FOR OVERFLOW TANK

MAKEUP 200 NB 1 NOS 1 NOS 1 NOS.

3 LP-3

CYLINDER OPTD. BUTTERFLY VALVE

FOR OVERFLOW TANK MAKEUP

200 NB 1 NOS 1 NOS 1 NOS.

4. LP-4 GLOBE VALVE FOR

REFRACTORY COOLING

25 NB 28 NOS 28 NOS 28 NOS.

Page 17: LITL- 011 -MEV-204-I-3001-A

KORADI TPS EXPANSION PROJECT – 3X660 MW Page

15 of 16 PART LIST OF BOTTOM ASH & COARSE ASH

HANDLING SYSTEM

LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5

SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3

TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH

HANDLING SYSTEM REV. 5

ENERGO ENGINEERING PROJECTS LTD.

PREPARED AASHU

CHECKED. Sachin

P a g e | 15

EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011

5 LP-5 GLOBE VALVE FOR

SEAL TROUGH MAKEUP HEADER

150 NB 1 NO 1 NO 1 NO

6. LP-6 CHECK VALVE FOR

SEAL TROUGH MAKEUP HEADER

150 NB 1 NO 1 NO 1 NO

7 LP-7 GLOBE VALVE FOR HOPPER MAKEUP

HEADER 250 NB 1 NO 1 NO 1 NO

8 LP-8 BALL VALVE FOR

HOPPER MAKEUP LINE 32 NB 12 NOS 12 NOS 12 NOS

B-07 SAS STACK ASH SYSTEM

1 SAS-1 ADAPTOR 300 NB 3 NO

2 SAS-2 ENMET- MANUAL

OPERATED PLATE VALVE

200 NB 3 NO

3 SAS-3 EXPANSION JOINT 200 NB 3 NO

4 SAS-4 CYLINDER OPERATED

PLATE VALVE 200 NB 3 NO

5 SAS-5 FEEDER EJECTOR 75 TPH 3 NO

6 SAS-6 STACK ASH TANK CAPACITY – 8.8 CUM 1 NO

R4

Page 18: LITL- 011 -MEV-204-I-3001-A

KORADI TPS EXPANSION PROJECT – 3X660 MW Page

16 of 16 PART LIST OF BOTTOM ASH & COARSE ASH

HANDLING SYSTEM

LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5

SL No. ITEM NO. Description SPECIFICATION Unit 1 Unit 2 Unit 3

TITLE : PART LIST FOR BOTTOM ASH & COARSE ASH

HANDLING SYSTEM REV. 5

ENERGO ENGINEERING PROJECTS LTD.

PREPARED AASHU

CHECKED. Sachin

P a g e | 16

EEPL Doc. No. E114-M-D-101 Dt. 11.08.2011

B-08 IA INSTRUMENT AIR SYSTEM

1 IA-1 BALL VALVE FOR

INSTRUMENT AIR LINE AS PER FLOW

DIAGRAM LOT LOT LOT

2 IA-2 PRESSURE INDICATOR 0-10 KG/CM2 1 NO 1 NO 1 NO

3 IA-3 PRESSURE SWITCH 0-10 KG/CM2 1 NO 1 NO 1 NO

4 IA-4 BALL VALVE FOR

IA-2 & IA-3 15 NB 2 NOS 2 NOS 2 NOS

B-09 AWCT AIR WATER CONVERTOR TANK

1 AWCT-1

BALL VALVE FROM AIR WATER CONVERTER TANK TO FEED GATE

CYLINDER

20 NB 12 NOS 12 NOS 12 NOS

2 AWCT-2

CHECK VALVE FROM AIR WATER

CONVERTER TANK TO FEED GATE CYLINDER

20 NB 12 NOS 12 NOS 12 NOS

3. AWCT-3 GATE VALVE FOR VENT 20 NB 6 NOS 6 NOS 6 NOS

Page 19: LITL- 011 -MEV-204-I-3001-A

KORADI TPS EXPANSION PROJECT – 3X660 MW Page

1 of 1

COMPLIANCE REPORT FOR PART LIST FOR BOTTOM ASH & COARSE ASH HANDLING SYSTEM

LITL DOCUMENT NO.: LITL- 011 -MEV-204-I-3001-A REV-5

TITLE : COMPLIANCE REPORT FOR PART LIST FOR BOTTOM ASH & COARSE ASH HANDLING SYSTEM

REV. 5

ENERGO ENGINEERING PROJECTS LTD.

PREPARED Aashu

CHECKED. Sachin

P a g e | 1

EEPL DOC.NO. E114-M-D-101 Dt. 27.06.2011

S.No. DCPL COMMENTS EEPL Clarification

1. As commented earlier, the valves marked as * in

the commented Flow diagram viz., flow control

valves at all the Feeder ejectors and Jet pump

control station and the valves in HP water lines

going to BA hopper, the valves at the suction

and discharge of BA overflow transfer pumps

and BA area drain pumps shall be ‘Plug valves’.

Please revise accordingly. Also for the valves at

suction of jet pumps for Coarse ash tank, please

indicate the make of the valves.

In line with MOM Dated 10.08.2011,

comments are noted and incorporated

2 As commented earlier, for detail-D, please show

the connecting line from HP water header

It’s a typographical error and deleted

3 As commented earlier, Please indicate under

Notes : “This drawing shows the arrangement

for one (1) unit unless noted otherwise”

Noted and Incorporated