LIU-IONS ECR L3-BCFAB-EC- 0001 (EDMS 1560207)LINAC3 Faraday Cups Upgrade Sergey Sadovich on behalf of BI-BE group

Upload: felicia-singleton

Post on 20-Jan-2018

212 views

Category:

Documents


0 download

DESCRIPTION

MFC01 potential

TRANSCRIPT

Page 1: LIU-IONS ECR L3-BCFAB- EC-0001 (EDMS 1560207)LINAC3 Faraday Cups Upgrade Sergey Sadovich on behalf of…

LIU-IONS ECR L3-BCFAB-EC-0001 (EDMS 1560207)LINAC3

Faraday Cups UpgradeSergey Sadovich on behalf of BI-BE group

Page 2: LIU-IONS ECR L3-BCFAB- EC-0001 (EDMS 1560207)LINAC3 Faraday Cups Upgrade Sergey Sadovich on behalf of…

MFC01 dimensions

Designed by Ivan FrancescutBE-BI-ML

Page 3: LIU-IONS ECR L3-BCFAB- EC-0001 (EDMS 1560207)LINAC3 Faraday Cups Upgrade Sergey Sadovich on behalf of…

MFC01 potential

50100

200300

400500

600700

800900

10001100

120080

85

90

95

100

% of electrons in different components for MFC01 vs SE energy, HV=-1000V

Cup Repeller Insulator Shielding Background

Page 4: LIU-IONS ECR L3-BCFAB- EC-0001 (EDMS 1560207)LINAC3 Faraday Cups Upgrade Sergey Sadovich on behalf of…

MFC02 dimensions

Designed by Ivan FrancescutBE-BI-ML

Page 5: LIU-IONS ECR L3-BCFAB- EC-0001 (EDMS 1560207)LINAC3 Faraday Cups Upgrade Sergey Sadovich on behalf of…

MFC02 potential

50 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 150060

65

70

75

80

85

90

95

100

% of electrons in different components for MFC02, vs SE energy, HV = -1000V

Cup Repeller Insulator Shielding Background

Page 6: LIU-IONS ECR L3-BCFAB- EC-0001 (EDMS 1560207)LINAC3 Faraday Cups Upgrade Sergey Sadovich on behalf of…

Conclusion• Better performance of FCs is expected:• Grounded shielding is added• Length of repeller is increased (30% of total length)• Electrons with energy less then 500kev for MFC01 and 300keV for MFC02 will

be captured and stay in FCs.• Connection wire is hidden (to avoid irradiation)

• Faraday Cups should arrive at CERN next week (7-11 December) and installed after cleaning and vacuum test