LIU – TCDI . INTEGRATION STATUS 1ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS : 1502092

Upload: coral-banks

Post on 05-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS : 1502092

LIU – TCDI. INTEGRATION STATUS

1ST APRIL 2015

Frédéric Galleazzi EN/MEF/INTAntoine Kosmicki EN/MEF/INT

EDMS : 1502092

Page 2: LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS : 1502092

New TCDI in TI 2 – see drawing LHCLSI__0035-B

Page 3: LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS : 1502092

TI 2 – TCDIV 29011

TCDIV - 29011Same location as existing Collimator TCDIV 29012

No Integration Problem

Keep Metal Sheet Protection ?New Location for BLMI

NOTA : Beam Slope = 1,9% (Survey

data) Tilt (local) = 0 Tilt (CCS) = 0.0153 rad Beam Height = 1000mm

Page 4: LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS : 1502092

TI 2 – TCDIH 29049

TCDIH - 29049Same location as existing Collimator TCDIH 29050

No Integration Problem

Keep Metal Sheet Protection ?New Location for BLMI

NOTA : Beam Slope = 1,9% (Survey

data) Tilt (local) = 0 Tilt (CCS) = 0.0153 rad Beam Height = 1000mm

Page 5: LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS : 1502092

TI 2 – TCDIH 29206

TCDIH - 29206Same location as existing Collimator TCDIH 29205

No Integration Problem

Keep Shielding Protection ? New Location ?Location of BLMI ?

NOTA : Beam Slope = 1,5% (Survey

data) Tilt (local) = 0 Tilt (CCS) = 0.0153 rad Beam Height = 775mm

Page 6: LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS : 1502092

TI 2 – TCDIV 29233

TCDIV - 29233Same location as existing Collimator TCDIV 29234

No Integration Problem

Keep Shielding Protection ?Location of BLMI ?

NOTA : Beam Slope = 1,5% (Survey

data) Tilt (local) = 0 Tilt (CCS) = 0.0153 rad Beam Height = 850mm

Page 7: LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS : 1502092

TI 2 – TCDIH 29464

TCDIH - 29464Same location as existing Collimator TCDIH 29465

No Integration Problem

LHC Vacuum Chambers must be removed for InstallationNew Location for BLMI ?

NOTA : Beam Slope = 1,5% (Survey

data) Tilt (local) = 0 Tilt (CCS) = 0.0156 rad Beam Height = 1000mm

Page 8: LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS : 1502092

TI 2 – TCDIV 29508

TCDIV - 29508Same location as existing Collimator TCDIH 29465

No Integration Problem

LHC Vacuum Chambers must be removed for InstallationNew Location for BLMI ?

VPIAL Location ?

NOTA : Beam Slope = 1,5% (Survey

data) Tilt (local) = 0 Tilt (CCS) = 0.004 rad Beam Height = 1000mm

VPIAL ?VIPAL shifted, removed ?

Page 9: LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS : 1502092

New TCDI in TI 8 – see drawing LHCLSI__0034-C

Page 10: LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS : 1502092

TI 8 – TCDIH 87606

TCDIH - 87606Location in the TI8 TunnelNo Integration Problem

Location of BLMI ?

NOTA : Beam Slope = -1,7% (Survey

data) Tilt (local) = 0 Tilt (CCS) = -0.066 rad Beam Height = 1000mm

Page 11: LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS : 1502092

TI 8 – TCDIV 87644

TCDIV - 87644Same location as existing Collimator TCDIV 87645

No Integration Problem

Location of BLMI ?

NOTA : Beam Slope = -1,7% (Survey

data) Tilt (local) = 0 Tilt (CCS) = -0.066 rad Beam Height = 1000mm

Page 12: LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS : 1502092

TI 8 – TCDIV 87804

TCDIV - 87804Same location as existing Collimator TCDIV 87804

Position of Water Pipes to be checked

VPIAL to be shifted (1 meter)Location of BLMI ?

NOTA : Beam Slope = -0,2% (Survey

data) Tilt (local) = 0 Tilt (CCS) = -0.066 rad Beam Height = 890mm

Page 13: LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS : 1502092

TI 8 – TCDIH 87822

TCDIH - 87822Location in the UJ88 Cavern

No Integration Problem

Structure for bicycle to be movedHeight Beam very low – Short Support requested

Cable Trays Support to be modified ?

NOTA : Beam Slope = -0.2% (Survey

data) Tilt (local) = 0 Tilt (CCS) = -0.066 rad Beam Height = 730mm

Page 14: LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS : 1502092

TI 8 – TCDIH 87939

TCDIH - 87939Location in the UJ88 Cavern

Free Space for Collimator is OKThe problem is the installation…

TCDI under the QRL and behind le LHC machineHandling Study – Position of environment to be checked

NOTA : Beam Slope = -0,2% (Survey

data) Tilt (local) = 0 Tilt (CCS) = -0.066 rad Beam Height = 955mm

Page 15: LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS : 1502092

TI 8 – TCDIV 88121

TCDIV - 88121Same location as existing Collimator TCDIH 88121

No Important Problem of Integration detected

LHC Vacuum Chambers must be removed for InstallationLocation of Vacuum Chamber Support to be checked

NOTA : Beam Slope = -0,2% (Survey

data) Tilt (local) = 0 Tilt (CCS) = -0.013 rad Beam Height = 1045mm