llc~e/locatio~ i 2. nrc/regional office j.e (l/a g c c{] pl cct… · 2019-12-15 · nrc form 591...

3
NRC FORM 591 PART 1 U.S. NUCLEAR REGULATORY COMMISSION (10-2011) 10CFR2.201 SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION 1. INSPECTED: I J.e S 0 (l/A g eiC v I C C{] 12/0 fltL-llO·v 2. NRC/REGIONAL OFFICE 3(£0 (js,rrJlfltV PL Cct(UJL (5712ul:h1, n G(j JBg REPORT NUMBER(S) 2012-001 Region III U. S. Nuclear Regulatory Conunission 2443 Warrenville Road, Suite 210 Lisle,IL 60532-4352 3. DOCKET NUMBER(S) 4. LICENSE NUMBER(S) 5. DATE(S) OF INSPECTION 030-3'd{@( /2.- 173 5/- CJ I r; /;;. -5/1'2-- LICENSEE: The inspection was an examination of the activities conducted under your license as they retate to radiation safety and to compliance with the Nuclear Regulatory Commission (NRC) rules and regulations and the conditions of your license. The inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. The inspection findings are as follows: ' 2S 1. - .. --. 2. L--.: -- 3. - Based on the inspection findings, no violations were identified. Previous violation(s) closed. The violations(s), specifically described to you by the inspector as non-cited violations, are not being cited because they were self-identified, non-repetitive, and corrective action was or is being taken, and the remaining criteria in the NRC Enforcement Policy, to exercise discretion, were satisfied. Non-cited violation(s) were discussed involving the following requirement(s) : During this inspection, certain of your activities, as described betow and/or attached, were in violation of NRC requirements and are being cited in accordance with NRC Enforcement Policy. This form is a NOTICE OF VIOLATION, which may be subject to posting in accordance with 10CFR 19.11 . (Violations and Corrective Actions) Statement of Corrective Actions I hereby state that, within 30 days, the actions described by me to the Inspector will be taken to correct the violations identified . This statement of corrective actions is made in accordance with the requirements of 10 CFR 2.201 (corrective steps already taken, corrective steps which will be taken, date when full compliance will be achieved ). I understand that no further written response to NRC will be required, unless specifically requested. TITLE PRINTED NAME SIGNATURE DATE LICENSEE'S REPRESENTATIVE NRC INSPECTOR E. L. Kulzer NRC FORM 591 PART 1 (10- 2011 )

Upload: others

Post on 15-Apr-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LlC~E/LOCATIO~ I 2. NRC/REGIONAL OFFICE J.e (l/A g C C{] PL Cct… · 2019-12-15 · NRC FORM 591 PART 1 U.S. NUCLEAR REGULATORY COMMISSION (10-2011) 10CFR2.201 SAFETY INSPECTION

NRC FORM 591 PART 1 U.S. NUCLEAR REGULATORY COMMISSION (10-2011)

10CFR2.201 SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION 1. LlC~E/LOCATIO~ INSPECTED: ~ I

J.e S 0 (l/A g eiC vI C~ C{]12/0 fltL-llO·v 2. NRC/REGIONAL OFFICE

3(£0 (js,rrJlfltV PL Cct(UJL (5712ul:h1, n G(j JBg

REPORT NUMBER(S) 2012-001

Region III U. S. Nuclear Regulatory Conunission 2443 Warrenville Road, Suite 210 Lisle,IL 60532-4352

3. DOCKET NUMBER(S) 4. LICENSE NUMBER(S) 5. DATE(S) OF INSPECTION

030-3'd{@( /2.- 173 5/- CJ I r; /;;. -5/1'2-­LICENSEE:

The inspection was an examination of the activities conducted under your license as they retate to radiation safety and to compliance with the Nuclear Regulatory Commission (NRC) rules and regulations and the conditions of your license. The inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. The inspection findings are as follows:

'2S 1.

- ..--. 2.

L--.: - ­

3. -

Based on the inspection findings, no violations were identified.

Previous violation(s) closed.

The violations(s), specifically described to you by the inspector as non-cited violations, are not being cited because they were self-identified, non-repetitive, and corrective action was or is being taken, and the remaining criteria in the NRC Enforcement Policy, to exercise discretion, were satisfied.

Non-cited violation(s) were discussed involving the following requirement(s) :

During this inspection, certain of your activities, as described betow and/or attached, were in violation of NRC requirements and are being cited in accordance with NRC Enforcement Policy. This form is a NOTICE OF VIOLATION, which may be subject to posting in accordance with 10CFR 19.11 . (Violations and Corrective Actions)

Statement of Corrective Actions I hereby state that , within 30 days , the actions described by me to the Inspector will be taken to correct the violations identified . This statement of corrective actions is made in accordance with the requirements of 10 CFR 2.201 (corrective steps already taken, corrective steps which will be taken, date when full compliance will be achieved ). I understand that no further written response to NRC will be required, unless specifically requested.

TITLE PRINTED NAME SIGNATURE DATE

LICENSEE'S REPRESENTATIVE

NRC INSPECTOR E. L. Kulzer

NRC FORM 591 PART 1 (10-2011 )

Page 2: LlC~E/LOCATIO~ I 2. NRC/REGIONAL OFFICE J.e (l/A g C C{] PL Cct… · 2019-12-15 · NRC FORM 591 PART 1 U.S. NUCLEAR REGULATORY COMMISSION (10-2011) 10CFR2.201 SAFETY INSPECTION

NRC FORM 591M PART 3 (10-201 1) 10 CFR 2.201

U.S. NUCLEAR REGULATORY COMMISSION

Docket File Information SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION

1. LICENSEE/LOCATION INSPECTED:

Testing Service Corporation 360 S. Main St. Carol Stream, II 60188

REPORT NUMBER(S) 2012-001 3. DOCKET NUMBER(S)

030-32101

6. INSPECTION PROCEDURES USED

IP 87124

4. LICENSE NUMBER(S)

12-17951-01

2. NRC/REGIONAL OFFICE

Region III U. S. Nuclear Regulatory Commission 2443 Wan-enville Road, Suite 210 Lisle,IL 60532-4352

5. DATE(S) OF INSPECTION

6/25/2012

7. INSPECTION FOCUS AREAS

03.01-03 .07

SUPPLEMENTAL INSPECTION INFORMATION 1. PROGRAM CODE(S) 2. PRIORITY

3121 5

I Main Office Inspection

.-­Field Office Inspection

~

Temporary Job Site Inspection - "

-_ . .

_.

3. LICENSEE CONTACT

Lan­y Lockwood

Next Inspection Date:

PROGRAM SCOPE

4. TELEPHONE NUMBER

(630) 462-2600

6/25/2017

The licensee is an engineering firm that employs over 100 individuals. The licensee possesses 78 Troxler and Humbolt moisture density gauges, for use daily/weekly during the construction season (May-November) for soils engineering projects. The licensee does not perform any service or maintenance activities on its gauges; these services are performed by the manufacturer. Currently, the licensee employs sixty four authorized gauge users who have completed manufacturers training. Device is stored in a locked room in the licensee's office in Carol Stream, Illinois.

Performance Observations

At the time of thi s inspection, the gauges were not in use in NRC states. The operator possessed required shipping papers which contained all appropriate information and were accessible in the transport vehicle. Gauges/cases were locked and chained to the rear of the vehicle during transport_ The operator demonstrated an adequate level of understanding of emergency and handling procedures during job-site interviews. Security during transport and at the job-site was described with no problems noted . The inspector performed independent and confirmatory radiation measurements which indicated similar results as noted in the licensee's survey records . (The NRC survey meter used was Canben-a Model MRAP 213, SIN 13000314, calibrated on 10/18/2011.)

NRC FORM 591 M PART 3

Page 3: LlC~E/LOCATIO~ I 2. NRC/REGIONAL OFFICE J.e (l/A g C C{] PL Cct… · 2019-12-15 · NRC FORM 591 PART 1 U.S. NUCLEAR REGULATORY COMMISSION (10-2011) 10CFR2.201 SAFETY INSPECTION

NRC FORM 591M PART 3 (10·2011) 10 CFR 2.201

U.S. NUCLEAR REGULATORY COMMISSION

Docket File Information SAFETY INSPECTION REPORT AND COMPLIANCE INSPECTION

1. LICENSEE/LOCATION INSPECTED: 2. NRC/REGIONAL OFFICE

Testing Service Corporation Region III 360 S. Main St. U. S. Nuclear Regulatory Commission Carol Stream, II 60188 2443 Warrenville Road, Suite 210

Lisle, IL 60532-4352

REPORT NUMBER(S) 2012-00 I

3. DOCKET NUMBER(S)

030-32101

4. LICENSE NUMBER(S)

12-17951-01

5. DATE(S) OF INSPECTION

6/25/2012

6. INSPECTION PROCEDURES USED

IP 87124

7. INSPECTION FOCUS AREAS

03.01-03.07

SUPPLEMENTAL INSPECTION INFORMATION 1. PROGRAM CODE(S)

3121

2. PRIORITY

5

,( : Main Office Inspection

Field Office Inspection

Temporary Job Site Inspection

3. LICENSEE CONTACT

Larry Lockwood

4. TELEPHONE NUMBER

(630) 462-2600

Next Inspection Date: _ _ ~7 ~ 1.2~() () \~ 1

PROGRAM SCOPE

The I icensee is an engineering firm that employs over 100 individuals. The licensee possesses 78 Troxler and Humbolt moisture density gauges, for use daily/weekly during the constmction season (May-November) for soils engineering projects. The licensee does not perform any service or maintenance activities on its gauges; these services are performed by the manufacturer. Currently, the licensee employs sixty four authorized gauge users who have completed

manufacturers training. Device is stored in a locked room in the licensee's office in Carol Stream, lllin~1~

Perrormance Obmvarions ?j ~",.,.... At the time of this inspection, the gauges were not in use in NRC states. The operator possessed required sh' ping papers which contained all appropriate information and were accessible in the transport vehicle. Gauges/c' ses were locked and chained to the rear of the vehicle during transport. The operator demonstrated an ad quate Ie el of

~

~

-.. ~unde:rstanding of emergency and handling procedures during Job-site interviews. Security~; . S ort and at the jo -site was described with no problems noted. The inspector performed independent and ~firmato radiation

K a urements which indicated similar results" noted in the~nsee's sur~~ecords. (

~ Hfl-L. ~J~~I ,,-JJ , . .-J~ ~#, ~~.

M» .!i~f~(~ ~Nv~~) ' ;~~M1J, ~3'J ¥ fG-3~ 0 CJJ6(j'O

NRC FORM 591M PART 3