MJB, PEP-II MAC Review, December 13-15, 2004 1 LLRF upgrades and new Comb-2 project Mike Browne D. Brown, R. Chestnut, J Dusatko, M. Laznovsky, W. Ross, W. Roster, C Yee

Upload: gezana

Post on 24-Jan-2016

39 views

Category:

Documents


0 download

DESCRIPTION

LLRF upgrades and new Comb-2 project. Mike Browne D. Brown, R. Chestnut, J Dusatko, M. Laznovsky, W. Ross, W. Roster, C Yee. Outline. System Performance Summary System Issues LLRF Module Status IOC CLOCK IQA AIM RFP COMB Other Status COMB-2 Project. LLRF. LLRF. LLRF?. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 20041

LLRF upgrades and new Comb-2 project

Mike Browne

D. Brown, R. Chestnut, J Dusatko, M. Laznovsky, W. Ross, W. Roster, C Yee

Page 2: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 20042

Outline

• System Performance Summary• System Issues• LLRF Module Status

• IOC• CLOCK• IQA• AIM• RFP• COMB

• Other Status• COMB-2 Project

Page 3: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 20043

RF Fault Summary for PEP-II RUN 4

RF fault analysis over 313 days (09/22/2003 - 07/30/2004) 1190 faults

Average of 3.8 aborts per day (2.9 without non-RF events)

Compiled by Dmitry Teytelman & Dan Van Winkle

LLRF

LLRF

LLRF?

Page 4: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 20044

LLRF System Issues• The Following Issues Surfaced During RUN 4:

– Station Phase Drifts - Lead to 47 Aborts

– COMB Module Overflow Faults - Lead to 34 Aborts

– Various VXI Module Failures (Clock, COMB, RFP, IQA)

• RUN 4 Also Saw Some System Improvements:– Upgraded to new RFP Modules in all stations

» 4 with new fixes

– Upgraded to new IOCs in all stations

– Upgraded to new IQAs for all cavity IQA locations• Used 8 channel scanning mode to obtain Fault data for all

channels.

– Tested new Arc Interlock Module new HVPS monitor channels• HVPS DC Voltage and current monitors

• HVPS Ripple and fast Current Transformer Monitor

• The Current Transformer will be helpful in analyzing station performance and trips

» tested on HR8-1

Page 5: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 20045

LLRF System Issues• Phase Drifts

– Isolated to 3 leading sources:• RFP Module Circuit Sensitivity

» Fixes Described later

• LLRF System Rack Temperature Instability• Clock Module RF Amplifier Failures

• COMB Overflow Faults– Developed Initial SW fix (“Band-Aid”)

– Developed HW FIX to Resolve Problem

• VXI Module Failures– Component Aging

– Connector Wear & Tear

– Random Failures on Some Modules

– Swap & Repair as we found them

Page 6: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 20046

LLRF Module Status - IOC

• Old NI 68030/40MHz IOCs were replaced with KSC PPC 350MHz Units

• The old IOCs were seriously performance limited – (80% – 90% loading)

• A MAJOR development effort was undertaken to adapt the new IOC for LLRF: This work was performed by John Dusatko

– Modified 63 LLRF VXI Modules last summer to fix design issue– Reverse-Engineered & Modified KSC IOCs to fix design bugs– Developed Special SW / Fixes to KSC SW as well– Had to adjust some LLRF system SW task timing for increased speed

RESULT: Tremendous Performance Increase < 8% loading (typ)As of 7-13-2004 ALL LLRF Station Have Been Upgraded

• Have 6 Spares / 2 destined for New LLRF Stations / Looking into getting more

• Motorola Has Informed us that the MVME2400 will go away in 2005! (We have a recommended substitute)

Page 7: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 20047

LLRF Module Status - IOC cont.

Station with OLD IOC:

Station with NEW IOC:

Page 8: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 20048

LLRF Module Status - CLOCK

• Current System contains a mix of (8) old (R1) and (3) new (R2) modules

• Saw Several R1 Clock Failures This RUN– Mainly Due to RF Amplifier Death (selected different device for repairs)

– Some Bad RF Connectors as well (Wear & Tear)

– Bad Modules Were Swapped and repaired

• Amplifier Failures Prompted a system-wide measurement of Clock RF output power levels.

– We have replaced all old style RF Amps on all remaining Clock modules the during the downtime

• Originally only built (5) New Modules for Added Stations / Building qty = 10 more R2 Clock Modules

• We suspect that some old CLKs are contributing to Phase Drift Problem

– Considering replacing ALL clocks with R2 versions at some point

Page 9: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 20049

LLRF Module Status - IQA

• New Version (R3) of IQA was designed, built & installed (Built 23 / 20 Installed) The new version has an eight channel mode, for displaying fault histories of all channels.

• System now contains a mixture of old and new modules

• IQAs have been performing fairly well / no major problems

• We have seen several older modules with both intermittent and solid connector failures.

• Discussed creating a Design Proposal for new version (more robust / enhanced features / simplified design/very few connectors)– This is a long-term item:

• Not Terribly Critical at this point

Page 10: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 200410

LLRF Module Status - AIM

• More version 2 AIMs were built & installed in all stations during the summer down time.– Last run the system has mix of (3) old (R1) & (8) new (R2)

modules

• All stations were their HVPS channels wired to the new AIMs.

Page 11: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 200411

LLRF Module Status - RFP

• New RFPs were installed in all 11 LLRF stations during last run.

• Phase Stability Improvements:– Discovered that several RFP circuits were contributing to phase drift and

operating point errors• Reduce circuit impedance at coefficient input of the Gilbert-cell multipliers -reduced

offset 5 times• Made the comb multiplier signal capacitive-coupled.• Changing amplifier operating point to reduce D.C. drift by a factor of 2Replaced old difference amplifier in multiplier circuits with lower drift amplifiers (>20x

improvement)• Found bias current offset problems causing large “Tune” mode offset.

– Developed corrections and tested Successful: RFPs are now more stable, far less sensitive to temperature variation, smaller operating errors

– (4) RFPs were tested in PEP-II at the end of Run 4.– All other RFPs have been modified during the summer downtime

• Other Work– Mike Laznowsky rewrote the Calibration SW to accommodate new functions and

fix standing problems. His new code is much cleaner, compact and runs 10 times faster than the old version. 2 minutes verses 20.

Page 12: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 200412

LLRF Module Status - COMB

• We saw many COMB overflow faults this run– (this has been a known design flaw)

• Overflow typically causes spurs at ½ 136KHz rate that perturb the beam

• Created Two Fixes1. SW “Band-Aid”: alert operators to manually clear fault

2. HW Fix: Add-on daughterboard -- Corrects Design Flaw / Overflow is now handled correctly (D. Teytleman & D. Van Winkle)

• A prototype of fix #2 was created and tested: good results -overflows stopped

– A Production version of this Daughterboard has been created, fabbed and assembled (qty = 30)

• All COMBs were upgraded with these daughter boards during the downtime.

• Meanwhile a new COMB-2 Module is being designed (W. Ross)

– More on this later

Page 13: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 200413

Other Status - LLRF System Cooling

• In Investigating LLRF Phase Drift, we decided to look at the LLRF rack cooling system

• Discovered several issues:– ELMA VXI Crate airflow design is poor– A/C Units not operating efficiently / temperature not well-regulated /

most compressor control relays were welded ON– Overall thermal design is sub-optimal

• Devised Several Fixes1. Insulate The LLRF Rack2. Improve airflow steering in rack3. Enhance the A/C unit with PID Loop / Heater / Blower Control4. Modify the VXI crate for better airflow

• Have Tried first three fixes on LR4-5 and items 2 and 3 on LR4-3– Results show that the temperature is now much more stable

» See figure

• We plan to upgrade all LLRF stations at some point but, we did not do this during the summer down time due to limited resources

Page 14: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 200414

Ambient & Crate Temperature For Station with Enhanced Cooling System

Other Status - LLRF System Cooling

Page 15: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 200415

Other Status – Phase Reference System

RF Phase Reference Distribution System is being improved to reduce phase drift.

This work is being done by Bill Roster

• We have and fabricated new Tx boards for the phase controllers and Rx boards for the distribution units.

– These boards have been installed in all controllers and distribution units in the system.

• We are adding new RF detector boards with higher gain to improve the overall gain stability in the control path. These will be installed this week.

– We will monitor the system over the next few weeks to see whether if the system is more stable.

Page 16: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 200416

COMB-2 PROJECT

W.Ross , M. Browne

PRINCIPAL ENGINEER AND TASK LEADER

C Yee, M. LaznovskyMajor Contributors

Page 17: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 200417

COMB-2 PROJECT OUTLINE

• FEATURES

• BLOCK DIAGRAM

• DSP’ FPGA FIRMWARE

• ‘DSP’ FPGA UTILIZATION

• PROJECT TASKS

• PC PARTS PLACEMENT

• PC BOARD LAYER STACK

• PROJECT TASK LIST

• PRODJECT SCHEDULE

• PROJECT RESOURCE LIST

Page 18: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 200418

• Combined I Channel and Q Channel Processing in a Single Module

• Fixes Over-flow and VXI interface bugs present in old Combs

• Flexible ‘DSP’ FPGA design:The filtering algorithms can be changed in the future by re-programming the In-Circuit-Programmable Initialization ROMs. (J-tag port)

• Initial DSP Functionality:Initially, Comb 2 Module will be firmware programmed to perform the full 2-dimensional Comb Filter and Equalization processes, implementing the additional I to Q and Q to I filters which were not available in the earlier version Comb Modules.

• Inter- module Analog Connection:I/Q signals between the RFP module and the Comb Module will be differential analog via the VXI Backplane local bus lines for compatibility with current RFP

• Serial Data Link for a Possible Future Digital RFP ModuleVia an Infiniband connector on the front panel. The total serial bit-rate using 8/10-bit coding is 1.4 GBits/Sec in each direction. This link will be tested but not implemented in the initial design.

COMB-2 FEATURES

Page 19: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 200419

COMB-2 BLOCK DIAGRAM

Page 20: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 200420

Design implemented in the ‘DSP’ FPGA Firmware:

COMB-2 DSP’ FPGA FIRMWARE

Page 21: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 200421

FPGA Type Logic Cells

18x18 Mults .

1Kx18 bit BRAM

Blocks

Power-PCs

3.125 Gbps Ports

10.312 Gbps Ports

Avail wks

Price

XC2VP30-7C 30,816 136 136 2 8 0 5 $1,000

‘DSP’ FPGA

COMB-2 ‘DSP’ FPGA UTILIZATION

The initial design implementation uses approximately 30% of the resources of the XC2VP30. We are using the 896 pin BGA version of this part and the “– 7” the fastest speed grade. This should allow considerable flexibility for any future upgrade.

Page 22: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 200422

COMB-2 PC PARTS PLACEMENT

Page 23: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 200423

COMB-2 PC BOARD LAYER STACK

• 16 LAYER BOARD

• 10 TRACE LAYERS

• 6 POWER/GND BURRIED CAPACITANCE LAYERS 2/3, 8/9, 14/15

BC-24 MATERIAL

Page 24: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 200424

COMB-2 PROJECT TASK LIST

1. FUNCTIONAL SPECIFICATION DEVELOPMENT AND APPROVAL

2. INITIAL ALGORITHM / ARCHITECTURE DESIGN FOR DSP PROCESSES

3. DEVELOPE INITIAL VHDL FIRMWARE FOR “DSP” FPGA (to determine required DSP FPGA size)

3.1 VHDL CODE WRITING - “DSP” FPGA”3.2 SIMULATION OF VHDL SUB MODULES AND TOP LEVEL MODULE – EPD (to debug VHDL code)3.3: VIRTEX2-PRO PART IMPLEMENTATION - XILINX ALLIANCE

(to determine part size for ‘DSP’ FPGA)3.4: MATLAB SIMULATION OF DSP SUB-MODULES (to assure transfer functions, sufficient dynamic range, decimal point

alignment, and overflow management)3.5 MODIFY VHDL CODE AS REQUIRED - FINALIZE VHDL CODE

4. DEVELOPE VHDL FIRMWARE FOR “VXI -INTERFACE” FPGA4.1 VHDL CODE WRITING - “VXI -INTERFACE”4.2 FUNC. SIMULATE - IMPLEMENT (FIT) FPGA - TIME SIMULATE

5. EPICS SOFTWARE DRIVER AND DIAGNOSTICS PANEL DEVELOPMENT

XX COMPLETE XX IN PROCESS XX NOT STARTED

Page 25: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 200425

COMB-2 PROJECT TASK LIST CONT.

6. DESIGN BOARD LEVEL SCHEMATICS– 6.1: SCHEMATICS DESIGN - EPD

– 6.2: SIMULATE AT SCHEMATIC LEVEL - EPD

7. WRITE MODULE DIAGNOSTICS SOFTWARE

8. PARTS ACQUISITION (all parts for prototypes, some parts for full production)

9. PC BOARD LAYOUT – PROTOTYPES

10. PC BOARD FABRICATION - PROTOTYPES

11. FRONT PANEL LAYOUT AND FABRICATE

12. PARTS KITTING AND PC BOARD ASSEMBLY - PROTOTYPES

13. HARDWARE PROGRAMMING, TESTING, TEST PLAN DOC - PROTOTYPES

14. SOFTWARE DRIVER TESTING AND INTEGRATION INTO LLRF SYSTEM

15. MODIFY DESIGN AND PC BOARD LAYOUT AS REQUIRED ( for production)

16. ADDITIONAL PARTS ACQUISITION (for production)

17. PC BOARD FAB (for production)

18. PARTS KITTING AND PC BOARD ASSEMBLY (for production)

19. PRODUCTION HARDWARE/SOFTWARE TESTING (production modules)

XX COMPLETE XX IN PROCESS XX NOT STARTED

Page 26: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 200426

COMB-2 PRODJECT SCHEDULE

W. Ross 11/15/04

Page 27: LLRF  upgrades  and new Comb-2  project

MJB, PEP-II MAC Review, December 13-15, 200427

COMB-2 PROJECT RESOURCE LIST

FUNCTION DECISION AUTHORITYRESPOSNIBILITY FOR

DELIVERABLES

PROJECT LEADER W. ROSS, M. BROWNE W. ROSS

BOARD LEVEL FUNTIONAL SPECIFICATION GROUP W. ROSS

DSP ALGORITHM DESIGN AND ARCHITECTURE W. ROSS W. ROSS

FIRMWARE DESIGN W. ROSS W. ROSS

MATLAB SIMULATIONS W. ROSS W. ROSS

SCHEMATICS DESIGN W. ROSS W. ROSS

PC BOARD LAYOUT C. YEE, W. ROSS C. YEE

PC BOARD FAB MANAGEMENT C. YEE C. YEE

PARTS ACQUISITION C. YEE C. YEE, J. RUSSELL

PARTS KITTING AND MODULE ASSEMBLY C. YEE C. YEE, (ASSOC. TBD)

MODULE HARDWARE TESTING W. ROSS W. ROSS, (ASSOC. TBD)

SOFTWARE DEVELOPMENT MIKE LAZNOVSKY, W. ROSS MIKE LAZNOVSKY

SOFTWARE TESTING MIKE LAZNOVSKY, W. ROSS MIKE LAZNOVSKY

SLAC, ESD, LLRF GROUP