MEASURE U IMPLEMENTATION PLAN LODI UNIFIED SCHOOL DISTRICT “Educating Students for Success!” JANUARY 2018

Upload: others

Post on 06-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

MEASURE U IMPLEMENTATION PLAN

LODI UNIFIED

SCHOOL DISTRICT

“Educating Students for Success!”

JANUARY 2018

Page 2: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

OVERVIEW OF CONTENTSMeasure U Implementation Plan

Lodi Unified School District

1

Measure U Implementation Plan

Utilizing a collaborative consensus building planning process with school site and community

stakeholders, LPA developed a Facilities Master Plan for the Lodi Unified School District which

was completed in June 2016. Following engagement with the District’s Board of Education

to prioritize scopes-of-work to match potential dollars available, the master plan document

was then utilized to develop a proposed project list for the successful Measure U local bond

campaign that November. Eligible projects were grouped into Level One, Level Two and Level

Three categories of work. Of which Level One represents approximately $162.5 million available

from Measure U for future construction.

In July 2017, in order to facilitate an efficient and coordinated roll out of the program, LPA was

contracted by Lodi Unified School District for development of an Implementation Plan for each

of the school sites within the Measure U program. The process to develop the site-specific plans

included the following activities:

• Facilities, Maintenance & Operations Meeting – Reviewed Level One work proposed

against current improvements completed or in-progress.

• School Site Committee Meeting 01 – Explanation of Board approved priorities and

confirmation of scope in context with eligible site needs.

• Detailed Site Surveys – Completed by the LPA architectural, LP Engineering and

Cumming cost estimating team to verify existing on the ground conditions.

• Cost Estimating – Update of FMP cost estimates with new information and escalation of

Level One costs to projected mid-points of construction.

• School Site Committee Meeting 02 – Ranking of scopes through comparison of escalated

estimates to approved Measure U budget allocations.

• District Leadership Review and Board of Education Approval

TH

E P

RO

CE

SS

1.1

Page 3: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

OVERVIEW OF CONTENTS

TH

E P

UR

PO

SE

Measure U Implementation Plan Lodi Unified School District

2

Measure U Implementation Plan

The primary goal of the Lodi Unified School District, for the development of site-specific

Implementation Plans, was to facilitate implementation clarity and parity across the campuses

involved in the Measure U facilities improvement program. The intent of this document is to

provide a conceptual design for each school site with scopes-of-work and confirmed design-to

budgets specified. Supporting standards in addition to the school site Implementation Plans

developed by LPA include Learning Spaces Design Standards establishing spatial characteristics

and Technical Design Specifications for products/materials in CSI format. Together these three

Board approved documents provide each architect with the tools necessary to develop the

project design and documentation without the need for extensive meetings with District and/or

school site staff to program, budget or scope the work.

TH

E P

UR

PO

SE

1.2

Page 4: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

OVERVIEW OF CONTENTSMeasure U Implementation Plan

Lodi Unified School District

3

Measure U Implementation Plan

The individual school site Implementation Plan proposals have been organized into an easy to

use format. The document for each campus in the Measure U program contains the following

items:

• Planning Process Overview Description

• Purpose of the Document

• Detailed Scope of Work Description

• Budget Allocation/Cost Estimate (Escalated to Mid-Point of Construction)

• FMP Diagram (Overlay with Proposed Level One Scopes of Work Highlighted)

The purpose of the information contained in the school site plans is to guide the future

development of the design solution. As each project is executed, with more detailed information

becoming available as the documentation progresses, questions that arise regarding the work

or budgets specified in the Implementation Plan should be brought to the attention of the Lodi

Unified School District facilities leadership for review, evaluation and ultimately direction in

context with the overall District and Measure U program parameters.

HO

W T

O U

SE

1.3

Page 5: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

APPROVED SCOPE-OF-WORK

1. Safety Locks at Classroom Doors

2. Shade Structure

9275 Glacier Point Drive, Stockton, CA 95212

2.1ANSEL ADAMS ELEMENTARY

SCOPE-OF-WORKMeasure U Implementation Plan

Lodi Unified School District

4

Page 6: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

3.1ANSEL ADAMS ELEMENTARY

COST ESTIMATE SUMMARY

SCOPE OF WORK CATEGORIES COST

The following items are

excluded from this budget:

• Utility hook-up fees & City connection fees

• Off-site work and traffic signals

• Land acquisition costs

• Hazardous material surveys

• Abatement and disposal

1. Modernization

2. New Construction

3. Site Work

4. District Support Facilities

Total Construction Cost Subtotal in 2016 dollars

$ 18,000

$ 0

$ 216,000

$ 0

$ 234,000

$ 311,454Total Construction Cost Escalated to MOC - Phase 3

Measure U Implementation Plan Lodi Unified School District

5

Page 7: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

���������������� ������������ �������� �����������

���� ������������ ��������� �������������

�������������� � ����� !"�#���!$

���� ����%��

&�� '(������ ���� ��������� ( ���� ���� �����)*+�,-�!.//0

������������� ����������������������� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

������������������������������� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

� �����!����� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

�"������������#�$���������� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

�%���&����'�������������(�)� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

�*������+�� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

�,�-�������������.�'��+����� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

�/�����0-��'���� ����1�2�������+���.�'��+���������������3� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

�4�-5��������������.�'��+����� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

�����������������������''��� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

���()����������������''�������+��� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

���������6��������������'��������� !$23331���������������� )423331���������������������

� ��������������� ������� �������� �������������������� �� ������������������� ��������������������

� �3��������''����2������ �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

���%��������(������,)3!510������ �������� �����������

������(������������

�������������� ����������������

3.2ANSEL ADAMS ELEMENTARY

COST ESTIMATE DETAILMeasure U Implementation Plan

Lodi Unified School District

6

Page 8: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

���������������� ������������ �������� �����������

���� ������������ ��������� �������������

�������������� � ����� !"�#���!$

���� ����%��

&�� '(������ ���� ��������� ( ���� ���� �����)*+�,-�!.//0

���%��������(������,)3!510������ �������� �����������

������(������������

�"�7�������(������+���������8���� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

�%���������-�����'����6�-�����������9��������� ��������������������� )!523331������������� )$623331�������������������

�!"�#$�#����%���&�'������ ���������������������

�!"��������������� ������������������ � �������������������� ��(����������������

�*�#����:�����������������2���)����;2������< �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

�,����5������.������������ �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

���������������1-��=���������;���*>< )/423331������������� 1/!!2333

�������������������������������� /!!24*41������������� 14!/2"4!

�5�������$��������������������������5��)�����?

)����������� *���� �&�+������������������ �

,�� ����-��������������� �.��� ��

/�����0� �������� � �

'�1��� ���������� �2�� ���"������������� *� ���

$ ���������3+� � �����������(��������������������������������4�

�������������� ����������������

3.2ANSEL ADAMS ELEMENTARY

COST ESTIMATE DETAILMeasure U Implementation Plan

Lodi Unified School District

7

Page 9: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

4.1ANSEL ADAMS ELEMENTARY

SCOPE-OF-WORK SITE DIAGRAM

Approved Scope

Not in Scope of Work

Learning Court | Quad

Play Apparatus Hardcourts

Kinder Play

Portable Classroom

Main Entry Fence/Gate

Modernization

Reconfigure

New Construction

Electives | LabsSL - Science Lab

PK - Preschool, K - Kindergarten, TK - Transitional Kindergarten

Classrooms, CR

S - Storage, T - Toilets, C - Custodial,KIT - Kitchen, U - Utility, EE - Elevator Equip.

Support Spaces

Administration / FacultyFW - Faculty Work, WR - Workroom,FL - Faculty Lounge, O - Office

IL - Innovation Lab, LC - Learning Center

Shared Spaces

Not to Scale

APPROVED SCOPE NOT

DEPICTED ON PLAN:

• Safety Locks at Classroom Doors

Note: The exact location of the shade

structure will be determined during

the design process.

Measure U Implementation Plan Lodi Unified School District

8

Page 10: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

2.1BECKMAN ELEMENTARY

SCOPE-OF-WORK

2201 Scarborough Drive, Lodi, CA 95240

APPROVED SCOPE-OF-WORK

1. Fire Alarm System + Emergency Lighting

2. New Public Address/Emergency Communication System

3. Reseal Brick, campus-wide

4. New Drop-off and Repair Existing Parking Lot, including:• New Concrete Walkways

5. New Parking Lot, including:• New Concrete Walkways

6. Safety Locks at Classroom Doors

7. Air Conditioning at MDF/IDF

Measure U Implementation Plan Lodi Unified School District

9

Page 11: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

3.1BECKMAN ELEMENTARY

COST ESTIMATE SUMMARY

SCOPE OF WORK CATEGORIES COST

The following items are

excluded from this budget:

• Utility hook-up fees & City connection fees

• Off-site work and traffic signals

• Land acquisition costs

• Hazardous material surveys

• Abatement and disposal

1. Modernization

2. New Construction

3. Site Work

4. District Support Facilities

Total Construction Cost Subtotal in 2016 dollars

$ 700,000

$ 297,000

$ 767,000

$ 0

$ 1,764,000

$ 2,347,884Total Construction Cost Escalated to MOC - Phase 3

Measure U Implementation Plan Lodi Unified School District

10

Page 12: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

���������������� ����������������� �����������

���� ������������ ��������� �������������

� ������������!�! ����� "#�$���"%

���� ����&��

'�� ()������ ���� ��������� )!���� ���� �����*+,�-.�"/001

������������� ����������������������� 0%234445������������� +""34445�������������������

������������� ��������� �������

� ����������������� ���������������� �� �������������������� �������������������

������������������������������� �5���������������������� �5����������������������������

� �������������� ���!���������������"��������

� �����!����� �5���������������������� �5����������������������������

� �������������� ���!���������������"��������

�"������������#�$���������� �5���������������������� �5����������������������������

� �������������� ���!���������������"��������

�%���&����'�������������(�)� �5���������������������� �5����������������������������

� �������������� ���!���������������"��������

�*������+�� �5���������������������� �5����������������������������

� �������������� ���!���������������"��������

�,�-�������������.�'��+����� �5���������������������� �5����������������������������

� �������������� ���!���������������"��������

�/�����0-��'���� ����1�2�������+���.�'��+���������������3� �5���������������������� �5����������������������������

� �������������� ���!���������������"��������

�4�-5��������������.�'��+����� �5���������������������� �5����������������������������

� �������������� ���!���������������"��������

�����������������������''��� �5���������������������� �5����������������������������

� �������������� ���!���������������"��������

���()����������������''�������+��� �5���������������������� �5����������������������������

� �������������� ���!���������������"��������

���&��������)������-*4"651����������� �����������

������)������������

�������������� ����������������

3.2BECKMAN ELEMENTARY

COST ESTIMATE DETAILMeasure U Implementation Plan

Lodi Unified School District

11

Page 13: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

���������������� ����������������� �����������

���� ������������ ��������� �������������

� ������������!�! ����� "#�$���"%

���� ����&��

'�� ()������ ���� ��������� )!���� ���� �����*+,�-.�"/001

���&��������)������-*4"651����������� �����������

������)������������

���������6��������������'��������� "302%34445���������� "37#034445����������������

����#����$���� %������� ����& ������������&������ �' ����������������(��)

����������*��(��)�+ � ���������������� �� �������������������� �������������������

����������,� �' ���"��� ���������������� �� �������������������� �������������������

����-���������.�����)�*��(��)�+ � �-�/������������ �� ��������������������� ��/����������������

����������� ���������(��$� ������������������ �� �������������������� ��������������������

� ����#����$�� (���������� �� �� �������������������� �� ��-���������������� ��������������������

����!���������$��0��������������������������)��$���) ���)

� ������!����"����#$��� �-��-����������� �� ��������������������� �������������������

� ������1��)��$�+�) ���) �-��-����������� �� ��������������������� ��������������������

��2������������������&���)��$� ������ ��

�$����� �-��-����������� �� /�������������������� �-/����������������

� �3��������''����2������ �5���������������������� �5����������������������������

� �������������� ���!���������������"��������

�"�7�������(������+���������8���� �5���������������������� �5����������������������������

� �������������� ���!���������������"��������

�%���������-�����'����6�-�����������9��������� �5���������������������� �5����������������������������

�� �������������� ���!���������������"���������

�*�#����:�����������������2���)����;2������< �5���������������������� �5����������������������������

� �������������� ���!���������������"��������

�,����5������.������������ 0*34445���������������� 0*34445���������������������

��/�3,!�����4,!������� ����� ���%�� ������� ��� ��

5������ ��� ��$6� ���������������������� �� ���������������� ��������������������

���������������1-��=���������;���*>< "376234445���������� 5*30063444

�������������������������������� *30273%%25���������� 503"4#3*"6

�5�������$��������������������������5��)�����?

7�����$� ('��������8�9��$� ����� �������

:�������� �(��������������)������

+�����0������ �� ����

;�<��� ��������������%�$��������������������� ����

1������ ��59 ��������������������������� �� ������ ��� ��$���6�

�������������� ����������������

3.2BECKMAN ELEMENTARY

COST ESTIMATE DETAILMeasure U Implementation Plan

Lodi Unified School District

12

Page 14: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

4.1BECKMAN ELEMENTARY

SCOPE-OF-WORK SITE DIAGRAM

Approved Scope

Not in Scope of Work

Learning Court | Quad

Play Apparatus Hardcourts

Kinder Play

Portable Classroom

Main Entry Fence/Gate

Modernization

Reconfigure

New Construction

Electives | LabsSL - Science Lab

PK - Preschool, K - Kindergarten, TK - Transitional Kindergarten

Classrooms, CR

S - Storage, T - Toilets, C - Custodial,KIT - Kitchen, U - Utility, EE - Elevator Equip.

Support Spaces

Administration / FacultyFW - Faculty Work, WR - Workroom,FL - Faculty Lounge, O - Office

IL - Innovation Lab, LC - Learning Center

Shared Spaces

Not to Scale

APPROVED SCOPE NOT

DEPICTED ON PLAN:

• Fire Alarm System + Emergency Lighting

• New Public Address/Emergency Communication System

• Reseal Brick, campus-wide

• Safety Locks at Classroom Doors

• Air Conditioning at MDF/IDF

Measure U Implementation Plan Lodi Unified School District

13

Page 15: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

2.1LOIS E. BORCHARDT ELEMENTARY

SCOPE-OF-WORK

375 Culbertson Drive, Lodi, CA 95242

APPROVED SCOPE-OF-WORK

1. Safety Locks at Classroom Doors

2. Signage for Emergency Response & Wayfinding

3. Exterior Lighting to Ensure Student Safety

4. Shade Structure

Measure U Implementation Plan Lodi Unified School District

14

Page 16: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

3.1LOIS E. BORCHARDT ELEMENTARY

COST ESTIMATE SUMMARY

SCOPE OF WORK CATEGORIES COST

The following items are

excluded from this budget:

• Utility hook-up fees & City connection fees

• Off-site work and traffic signals

• Land acquisition costs

• Hazardous material surveys

• Abatement and disposal

1. Modernization

2. New Construction

3. Site Work

4. District Support Facilities

Total Construction Cost Subtotal in 2016 dollars

$ 90,000

$ 0

$ 216,000

$ 0

$ 306,000

$ 407,286Total Construction Cost Escalated to MOC - Phase 3

Measure U Implementation Plan Lodi Unified School District

15

Page 17: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

���������������� ���������������������������� �����������

���� ������������ ��������� �������������

� ������������!�! ����� "#�$���"%

���� ����&��

'�� ()������ ���� ��������� )!���� ���� �����*+,�-.�"�//0

������������� ����������������������� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

������������������������������� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

� �����!����� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

�"������������#�$���������� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

�%���&����'�������������(�)� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

�*������+�� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

�,�-�������������.�'��+����� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

�/�����0-��'���� ����1�2�������+���.�'��+���������������3� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

�4�-5��������������.�'��+����� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

�����������������������''��� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

���()����������������''�������+��� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

���������6��������������'��������� #232221���������������� "*232221�������������������

� �������������������������� ��� ����� ����� ���������������������� � ���������������� ��������������������

� �������������� ������� �������� �������������������� �� ��!���������������� �"������������������

� ���������������������������� #�� �����$�������� ���������������������� � %��������������� %�������������������

� �3��������''����2������ �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

���&��������)������-*2"410���������������������� �����������

������)������������

�������������� ����������������

3.2LOIS E. BORCHARDT ELEMENTARY

COST ESTIMATE DETAILMeasure U Implementation Plan

Lodi Unified School District

16

Page 18: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

���������������� ���������������������������� �����������

���� ������������ ��������� �������������

� ������������!�! ����� "#�$���"%

���� ����&��

'�� ()������ ���� ��������� )!���� ���� �����*+,�-.�"�//0

���&��������)������-*2"410���������������������� �����������

������)������������

�"�7�������(������+���������8���� �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

�%���������-�����'����6�-�����������9��������� *"432221������������� *%532221�������������������

�&'�(��(����)���*�+������

�&'��������������� ������������������ � !������������������� ��,����������������

�*�#����:�����������������2���)����;2������< �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

�,����5������.������������ �1���������������������� �1����������������������������

���������������� ���������� ���� �� � ����

���������������1-��=���������;���*>< /2432221������������� 16253222

�������������������������������� 6253*%41������������� 1+6"35"5

�5�������$��������������������������5��)�����?

-���������� .#���� �*�/������������������ �

0�� ����$�� ������������ ����� ��

1�����2� �������� � �

+�3��� ���������� �4�� ���'������������� #� ���

� ���������5/� � �����������,��������������������������������6�

�������������� ����������������

3.2LOIS E. BORCHARDT ELEMENTARY

COST ESTIMATE DETAILMeasure U Implementation Plan

Lodi Unified School District

17

Page 19: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

4.1LOIS E. BORCHARDT ELEMENTARY

SCOPE-OF-WORK SITE DIAGRAM

Approved Scope

Not in Scope of Work

Learning Court | Quad

Play Apparatus Hardcourts

Kinder Play

Portable Classroom

Main Entry Fence/Gate

Modernization

Reconfigure

New Construction

Electives | LabsSL - Science Lab

PK - Preschool, K - Kindergarten, TK - Transitional Kindergarten

Classrooms, CR

S - Storage, T - Toilets, C - Custodial,KIT - Kitchen, U - Utility, EE - Elevator Equip.

Support Spaces

Administration / FacultyFW - Faculty Work, WR - Workroom,FL - Faculty Lounge, O - Office

IL - Innovation Lab, LC - Learning Center

Shared Spaces

Not to Scale

APPROVED SCOPE NOT

DEPICTED ON PLAN:

• Safety Locks at Classroom Doors

• Signage for Emergency Response & Wayfinding

• Exterior Lighting to Ensure Student Safety

Note: The exact location of the shade

structure will be determined during

the design process.

Measure U Implementation Plan Lodi Unified School District

18

Page 20: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

2.1CLAIRMONT ELEMENTARY

SCOPE-OF-WORK

8282 Le Mans Avenue, Stockton, CA 95210

APPROVED SCOPE-OF-WORK

1. Safety Locks at Classroom Doors

2. Shade Structure

3. Reseal Brick, campus-wide

Measure U Implementation Plan Lodi Unified School District

19

Page 21: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

3.1CLAIRMONT ELEMENTARY

COST ESTIMATE SUMMARY

SCOPE OF WORK CATEGORIES COST

The following items are

excluded from this budget:

• Utility hook-up fees & City connection fees

• Off-site work and traffic signals

• Land acquisition costs

• Hazardous material surveys

• Abatement and disposal

1. Modernization

2. New Construction

3. Site Work

4. District Support Facilities

Total Construction Cost Subtotal in 2016 dollars

$ 311,000

$ 0

$ 216,000

$ 0

$ 527,000

$ 701,437Total Construction Cost Escalated to MOC - Phase 3

Measure U Implementation Plan Lodi Unified School District

20

Page 22: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

���������������� ���������� ��������� �����������

���� ������������ ��������� �������������

����������������� ����� !�"��� #

���� ����$��

%�� &'������ ���� ��������� '����� ���� �����()*�+,� -../

������������� ����������������������� (!)01112������������� .!(01112�������������������

������������� ��������� �������

� ����������������� ���������������� �� �������������������� �������������������

������������������������������� �2���������������������� �2����������������������������

� �������������� ���!���������������"��������

� �����!����� �2���������������������� �2����������������������������

� �������������� ���!���������������"��������

�"������������#�$���������� �2���������������������� �2����������������������������

� �������������� ���!���������������"��������

�%���&����'�������������(�)� �2���������������������� �2����������������������������

� �������������� ���!���������������"��������

�*������+�� �2���������������������� �2����������������������������

� �������������� ���!���������������"��������

�,�-�������������.�'��+����� �2���������������������� �2����������������������������

� �������������� ���!���������������"��������

�/�����0-��'���� ����1�2�������+���.�'��+���������������3� �2���������������������� �2����������������������������

� �������������� ���!���������������"��������

�4�-5��������������.�'��+����� �2���������������������� �2����������������������������

� �������������� ���!���������������"��������

�����������������������''��� �2���������������������� �2����������������������������

� �������������� ���!���������������"��������

���()����������������''�������+��� �2���������������������� �2����������������������������

� �������������� ���!���������������"��������

���������6��������������'��������� 301112���������������� ( 01112���������������������

� ����#����$�� %���������� �� �� �������������������� �� ������������������� ��������������������

� �3��������''����2������ �2���������������������� �2����������������������������

� �������������� ���!���������������"��������

���$��������'������+(1 32/���� ��������� �����������

������'������������

�������������� ����������������

3.2CLAIRMONT ELEMENTARY

COST ESTIMATE DETAILMeasure U Implementation Plan

Lodi Unified School District

21

Page 23: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

���������������� ���������� ��������� �����������

���� ������������ ��������� �������������

����������������� ����� !�"��� #

���� ����$��

%�� &'������ ���� ��������� '����� ���� �����()*�+,� -../

���$��������'������+(1 32/���� ��������� �����������

������'������������

�"�7�������(������+���������8���� �2���������������������� �2����������������������������

� �������������� ���!���������������"��������

�%���������-�����'����6�-�����������9��������� ( 301112������������� (#401112�������������������

����&'�&��$�(����)�*��� ����

������# ����#������� ������������������ �� �������������������� �������������������

�*�#����:�����������������2���)����;2������< �2���������������������� �2����������������������������

� �������������� ���!���������������"��������

�,����5������.������������ �2���������������������� �2����������������������������

� �������������� ���!���������������"��������

���������������1-��=���������;���*>< )(401112������������� 24110111

�������������������������������� 41 05.42������������� 2!. 0411

�5�������$��������������������������5��)�����?

+�����$� %,��������)�-��$� ����� �������

.�������� �%��������������/������

0�����1������ �� ����

*�2��� ��������������3�$��������������������� ����

'������ ��4- ��������������������������� �� ������ ��� ��$���5�

�������������� ����������������

3.2CLAIRMONT ELEMENTARY

COST ESTIMATE DETAILMeasure U Implementation Plan

Lodi Unified School District

22

Page 24: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

4.1CLAIRMONT ELEMENTARY

SCOPE-OF-WORK SITE DIAGRAM

Approved Scope

Not in Scope of Work

Learning Court | Quad

Play Apparatus Hardcourts

Kinder Play

Portable Classroom

Main Entry Fence/Gate

Modernization

Reconfigure

New Construction

Electives | LabsSL - Science Lab

PK - Preschool, K - Kindergarten, TK - Transitional Kindergarten

Classrooms, CR

S - Storage, T - Toilets, C - Custodial,KIT - Kitchen, U - Utility, EE - Elevator Equip.

Support Spaces

Administration / FacultyFW - Faculty Work, WR - Workroom,FL - Faculty Lounge, O - Office

IL - Innovation Lab, LC - Learning Center

Shared Spaces

Not to Scale

APPROVED SCOPE NOT

DEPICTED ON PLAN:

• Safety Locks at Classroom Doors

• Reseal Brick, campus-wide

Note: The exact location of the shade

structure will be determined during

the design process.

Measure U Implementation Plan Lodi Unified School District

23

Page 25: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

2.1CREEKSIDE ELEMENTARY

SCOPE-OF-WORK

2515 Estate Drive, Stockton, CA 95209

APPROVED SCOPE-OF-WORK

1. New Public Address/Emergency Communication System

2. Safety Locks at Classroom Doors

3. Resurface & Repair Hardcourts (western portion only - from the basketball courts to the west)

4. Reseal Brick, campus-wide

Measure U Implementation Plan Lodi Unified School District

24

Page 26: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

3.1CREEKSIDE ELEMENTARY

COST ESTIMATE SUMMARY

SCOPE OF WORK CATEGORIES COST

The following items are

excluded from this budget:

• Utility hook-up fees & City connection fees

• Off-site work and traffic signals

• Land acquisition costs

• Hazardous material surveys

• Abatement and disposal

1. Modernization

2. New Construction

3. Site Work

4. District Support Facilities

Total Construction Cost Subtotal in 2016 dollars

$ 120,000

$ 167,000

$ 171,000

$ 0

$ 458,000

$ 609,598Total Construction Cost Escalated to MOC - Phase 3

Measure U Implementation Plan Lodi Unified School District

25

Page 27: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

���������������� ����������������� �����������

���� ������������ ��������� �������������

�������������� � ����� !"�#���!$

���� ����%��

&�� '(������ ���� ��������� ( ���� ���� �����)*+�,-�!.//0

������������� ����������������������� !1231114������������� !5)31114�������������������

������������� ��������� �������

� ������������������������������ ������������������ �� �������������������� �������������������

������������������������������� �4���������������������� �4����������������������������

� �������������� ���!���������������"��������

� �����!����� �4���������������������� �4����������������������������

� �������������� ���!���������������"��������

�"������������#�$���������� �4���������������������� �4����������������������������

� �������������� ���!���������������"��������

�%���&����'�������������(�)� �4���������������������� �4����������������������������

� �������������� ���!���������������"��������

�*������+�� �4���������������������� �4����������������������������

� �������������� ���!���������������"��������

�,�-�������������.�'��+����� �4���������������������� �4����������������������������

� �������������� ���!���������������"��������

�/�����0-��'���� ����1�2�������+���.�'��+���������������3� �4���������������������� �4����������������������������

� �������������� ���!���������������"��������

�4�-5��������������.�'��+����� �4���������������������� �4����������������������������

� �������������� ���!���������������"��������

�����������������������''��� �4���������������������� �4����������������������������

� �������������� ���!���������������"��������

���()����������������''�������+��� �4���������������������� �4����������������������������

� �������������� ���!���������������"��������

���������6��������������'��������� !$131114������������� )/"31114�������������������

� ����#����$�� ����������� �� �� %������������������� �� ��&���������������� �%������������������

��'������������������(���)��$� ������ ��

�$����� ���&������������ �� ��������������������� �������������������

� �3��������''����2������ �4���������������������� �4����������������������������

� �������������� ���!���������������"��������

���%��������(������,)1!640����������� �����������

������(������������

�������������� ����������������

3.2CREEKSIDE ELEMENTARY

COST ESTIMATE DETAILMeasure U Implementation Plan

Lodi Unified School District

26

Page 28: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

���������������� ����������������� �����������

���� ������������ ��������� �������������

�������������� � ����� !"�#���!$

���� ����%��

&�� '(������ ���� ��������� ( ���� ���� �����)*+�,-�!.//0

���%��������(������,)1!640����������� �����������

������(������������

�"�7�������(������+���������8���� �4���������������������� �4����������������������������

� �������������� ���!���������������"��������

�%���������-�����'����6�-�����������9��������� !2!31114������������� ))231114�������������������

�*��+,�+��$�-����.�/��� ����

�*��*����������.��������/��� ���� %���*����������� �� *�������������������� �������������������

�*�#����:�����������������2���)����;2������< �4���������������������� �4����������������������������

� �������������� ���!���������������"��������

�,����5������.������������ �4���������������������� �4����������������������������

� �������������� ���!���������������"��������

���������������1-��=���������;���*>< 5*$31114������������� 461$3111

�������������������������������� 61"3*"$4������������� 4$1"3)5$

�5�������$��������������������������5��)�����?

0�����$� �1��������.�2��$� ����� �������

3�������� ����������������)������

4�����5������ �� ����

/�6��� ��������������7�$��������������������� ����

,������ ��82 ��������������������������� �� ������ ��� ��$���9�

�������������� ����������������

3.2CREEKSIDE ELEMENTARY

COST ESTIMATE DETAILMeasure U Implementation Plan

Lodi Unified School District

27

Page 29: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

4.1CREEKSIDE ELEMENTARY

SCOPE-OF-WORK SITE DIAGRAM

Approved Scope

Not in Scope of Work

Learning Court | Quad

Play Apparatus Hardcourts

Kinder Play

Portable Classroom

Main Entry Fence/Gate

Modernization

Reconfigure

New Construction

Electives | LabsSL - Science Lab

PK - Preschool, K - Kindergarten, TK - Transitional Kindergarten

Classrooms, CR

S - Storage, T - Toilets, C - Custodial,KIT - Kitchen, U - Utility, EE - Elevator Equip.

Support Spaces

Administration / FacultyFW - Faculty Work, WR - Workroom,FL - Faculty Lounge, O - Office

IL - Innovation Lab, LC - Learning Center

Shared Spaces

Not to Scale

APPROVED SCOPE NOT

DEPICTED ON PLAN:

• New Public Address/Emergency Communication System

• Safety Locks at Classroom Doors

• Reseal Brick, campus-wide

Measure U Implementation Plan Lodi Unified School District

28

Page 30: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

2.1DAVIS ELEMENTARY

SCOPE-OF-WORK

5224 E. Morada Lane, Stockton, CA 95212

APPROVED SCOPE-OF-WORK

1. Classroom (18 typical & 2 kinder) and Restroom Modernization, including:• Wall Strengthening at the (4) Classrooms experiencing a musty smell• Replace Windows• Replace Doors & Hardware• Replace Ceilings• Patch & Paint the Interior & Exterior• Patch Existing Roofing• Repair Existing Covered Walkways/Hallways• New Interior Lighting & Controls• Upgrade Electrical Wiring & Increase Electrical Outlets• Plumbing System Upgrades• Reconfigure Existing Restrooms• Asbestos Removal

2. Electrical Capacity Upgrade

3. Updated Electrical Mains & Distribution

4. New Public Address/Emergency Communication System

5. New Parking Lot, including:• New Concrete Walkways

6. Exterior Lighting to Ensure Student Safety

7. Signage for Emergency Response & Wayfinding

Measure U Implementation Plan Lodi Unified School District

29

Page 31: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

2.1DAVIS ELEMENTARY

SCOPE-OF-WORK

8. Safety Locks at Classroom Doors

9. Fire Alarm System + Emergency Lighting

Measure U Implementation Plan Lodi Unified School District

30

Page 32: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

3.1DAVIS ELEMENTARY

COST ESTIMATE SUMMARY

SCOPE OF WORK CATEGORIES COST

The following items are

excluded from this budget:

• Utility hook-up fees & City connection fees

• Off-site work and traffic signals

• Land acquisition costs

• Hazardous material surveys

• Abatement and disposal

1. Modernization

2. New Construction

3. Site Work

4. District Support Facilities

Total Construction Cost Subtotal in 2016 dollars

$ 3,088,000

$ 231,000

$ 867,000

$ 0

$ 4,186,000

$ 5,571,566Total Construction Cost Escalated to MOC - Phase 3

Measure U Implementation Plan Lodi Unified School District

31

Page 33: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

���������������� ���������������� �����������

���� ������������ ��������� �������������

�������������� � ����� !"�#���!$

���� ����%��

&�� '(������ ���� ��������� ( ���� ���� �����)*+�,-�!.//0

������������� ����������������������� !123!13334���������� )1)5)13334����������������

������������������� ����

� �������������� ���� ������������������ �� �������������������� ��������������������

�������������������������� ���

� ������������� ��� �!�!������������ �� �������������������� �"�����������������

� ��������������������� �����#�� ��� �������$���%��

&���������� ����'

� � �������� �����(� �� ��� �!�!������������ �� �������������������� �)�����������������

�����������������������������

� ���������������� �!�!������������ �� �)������������������ ��!����������������

���*��� �(�*�����+������,-.�����

� �����*��� �(�������������� �!�!������������ �� ��������������������� "�������������������

� �����*��� �(�������.����� �!�!������������ �� ��������������������� !�������������������

� ���*��� �-.�������������� ���������������� �� "�������������������� �������������������

� ���������-.�������/�0� ���%��$��,�1���$� ���������������� �� �������������������� �������������������

������������������������������� !13*313334���������� !1/"213334����������������

� �2�3�� ���������� ��4�������������� �����(�������� �!�!������������ �� �������������������� �������������������

� ���-������������ �

�����5���� ���������������(���������������

����� �!�!������������ �� !�������������������� �������������������

� � �*��2�����$��������� � �!�!������������ �� �������������������� �������������������

����������������2���������� ��� ,���.��� �

����������������

� ��������������-.�������������� ���)�������������� �� ������������������� �������������������

� �����!����� 5"$13334������������� ")$13334�������������������

#6����������������� ����'

� �5� �� ���������������� � �����2����� ����)���������� �� ��!������������������ �������������������

���-�������/������$�5���� � ���������������������� � �)������������� �)�����������������

�"������������#�$���������� �4���������������������� �4����������������������������

7������� ����� ���6��������7 ��8�������

�%���&����'�������������(�)� �4���������������������� �4����������������������������

7������� ����� ���6��������7 ��8�������

�*������+�� �4���������������������� �4����������������������������

7������� ����� ���6��������7 ��8�������

�,�-�������������.�'��+����� �4���������������������� �4����������������������������

7������� ����� ���6��������7 ��8�������

�/�����0-��'���� ����1�2�������+���.�'��+���������������3� �4���������������������� �4����������������������������

7������� ����� ���6��������7 ��8�������

���%��������(������,)3!540���������� �����������

������(������������

�������������� ����������������

3.2DAVIS ELEMENTARY

COST ESTIMATE DETAILMeasure U Implementation Plan

Lodi Unified School District

32

Page 34: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

���������������� ���������������� �����������

���� ������������ ��������� �������������

�������������� � ����� !"�#���!$

���� ����%��

&�� '(������ ���� ��������� ( ���� ���� �����)*+�,-�!.//0

���%��������(������,)3!540���������� �����������

������(������������

�4�-5��������������.�'��+����� �4���������������������� �4����������������������������

7������� ����� ���6��������7 ��8�������

�����������������������''��� �4���������������������� �4����������������������������

7������� ����� ���6��������7 ��8�������

���()����������������''�������+��� �4���������������������� �4����������������������������

7������� ����� ���6��������7 ��8�������

���������6��������������'��������� 2/213334������������� "$313334�������������������

� ����������������2��������0� ���������������� �� ��������������������� �"������������������

��2�����$������0���������� ,�����������,2��� ���4����������� ����%���

��2���7��*��%����3�� "����������������� �� �"������������������ !"������������������

��2����7�����������%��$� ������������������ �� �������������������� ��������������������

�� �-.�������� ���������������� �������$ ���������������������� � ���������������� ��������������������

� �������$���%�������������� ���� �)������������������ � ��!���������������� ��������������������

� ��������������������$���������� ���$��� ��� ���������������������� � ���������������� ��������������������

����6�������$�9�������������������� ������$��� ����

� ������6���8�����$��� ���������������� �� ��������������������� �"�����������������

� ������-�����$�3�� ���� ���������������� �� ��������������������� ��������������������

��:�7����2���� ���,�����$���������������

�$����� ���������������� �� )�"������������������ �������������������

� �3��������''����2������ �4���������������������� �4����������������������������

7������� ����� ���6��������7 ��8�������

�"�7�������(������+���������8���� �4���������������������� �4����������������������������

7������� ����� ���6��������7 ��8�������

�%���������-�����'����6�-�����������9��������� �4���������������������� �4����������������������������

�7������� ����� ���6��������7 ��8��������

�*�#����:�����������������2���)����;2������< �4���������������������� �4����������������������������

7������� ����� ���6��������7 ��8�������

�,����5������.������������ �4���������������������� �4����������������������������

7������� ����� ���6��������7 ��8�������

���������������1-��=���������;���*>< 61!$513334���������� 4*1*521333

�������������������������������� *1*2!1*554���������� 42163"1522

�������������� ����������������

3.2DAVIS ELEMENTARY

COST ESTIMATE DETAILMeasure U Implementation Plan

Lodi Unified School District

33

Page 35: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

���������������� ���������������� �����������

���� ������������ ��������� �������������

�������������� � ����� !"�#���!$

���� ����%��

&�� '(������ ���� ��������� ( ���� ���� �����)*+�,-�!.//0

���%��������(������,)3!540���������� �����������

������(������������

�5�������$��������������������������5��)�����?

5����$� ��%4������(�/��$��������������

;���������%��� �����������������

3�� ���9���������������

1�<�� ��������������0$����2��������� � �������

-���������#/��������������"�������� ����� �� ����� �$��'�

�������������� ����������������

3.2DAVIS ELEMENTARY

COST ESTIMATE DETAILMeasure U Implementation Plan

Lodi Unified School District

34

Page 36: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

4.1DAVIS ELEMENTARY

SCOPE-OF-WORK SITE DIAGRAM

Approved Scope

Not in Scope of Work

Learning Court | Quad

Play Apparatus Hardcourts

Kinder Play

Portable Classroom

Main Entry Fence/Gate

Modernization

Reconfigure

New Construction

Electives | LabsSL - Science Lab

PK - Preschool, K - Kindergarten, TK - Transitional Kindergarten

Classrooms, CR

S - Storage, T - Toilets, C - Custodial,KIT - Kitchen, U - Utility, EE - Elevator Equip.

Support Spaces

Administration / FacultyFW - Faculty Work, WR - Workroom,FL - Faculty Lounge, O - Office

IL - Innovation Lab, LC - Learning Center

Shared Spaces

Not to Scale

APPROVED SCOPE NOT

DEPICTED ON PLAN:

• Electrical Capacity Upgrade

• Updated Electrical Mains & Distribution

• New Public Address/Emergency Communication System

• Exterior Lighting to Ensure Student Safety

• Signage for Emergency Response & Wayfinding

• Safety Locks at Classroom Doors

• Fire Alarm System + Emergency Lighting

Measure U Implementation Plan Lodi Unified School District

35

Page 37: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

2.1ELKHORN SCHOOL

SCOPE-OF-WORK

10505 N. Davis Road, Stockton, CA 95209

APPROVED SCOPE-OF-WORK

1. New Classroom/Science/Library Building, including:• (6) Typical Classrooms• (2) Science/Elective Labs + Shared Prep Room• Collaboration Spaces• Library/Innovation Lab (footprint equal to the (2) Science/Elective Labs + Shared Prep Room• Sitework

2. Reconfigure (3) Existing Classrooms to New Administration Office, Faculty Work and Faculty Lounge, including:

• Remaining Asbestos Removal

3. Modernize Staff Restrooms, including:• Remaining Asbestos Removal

4. Demolish Existing Administration/Classroom Building, (1) 7/8 Classroom, Existing Music and Library Building, and District Storage Building

5. Update Electrical Mains

6. Electrical Capacity Upgrades 7. Fire Alarm System + Emergency Lighting

8. New Public Address/Emergency Communications System

9. Relocate Existing MDF/IDF

Measure U Implementation Plan Lodi Unified School District

36

Page 38: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

2.1ELKHORN SCHOOL

SCOPE-OF-WORK

10. New EMS System

11. Exterior Lighting to Ensure Student Safety

12. Safety Locks at Classroom Doors

13. Signage for Emergency Response & Wayfinding

14. Modernization of (4 typical) Classrooms (north building), including:• Repair Walls• Replace Windows• Replace Doors & Hardware• Repair Floors• Repair Ceilings• Patch & Paint Interior and Exterior• Replace Roofing• New Interior Lighting & Controls• Upgrade Electrical Wiring & Increase Electrical Outlets• Plumbing System Upgrades• Remaining Asbestos Removal

15. Shade Structure

16. Repair Existing Parking Lot, Slurry Coat and Stripe Existing Paving, Add ‘Right-Turn Only’

17. Resurface and Repair Access Road

Measure U Implementation Plan Lodi Unified School District

37

Page 39: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

3.1ELKHORN SCHOOL

COST ESTIMATE SUMMARY

SCOPE OF WORK CATEGORIES COST

The following items are

excluded from this budget:

• Utility hook-up fees & City connection fees

• Off-site work and traffic signals

• Land acquisition costs

• Hazardous material surveys

• Abatement and disposal

1. Modernization

2. New Construction

3. Site Work

4. District Support Facilities

Total Construction Cost Subtotal in 2016 dollars

$ 1,906,000

$ 7,515,000

$ 1,246,000

$ 0

$ 10,667,000

$ 11,883,038Total Construction Cost Escalated to MOC - Phase 1

Measure U Implementation Plan Lodi Unified School District

38

Page 40: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

���������������� ���������� ���������� �

���� ������������ ��������� �������������

����������������� ����� !�"��� #

���� ����$��

%�� &'�����( ���� ��������� '����� ���� �����)*+�,-� .//0

������������� ����������������������� 12)32224������������� */*32224�������������������

������������� ��������� �������

� ����������������� ������������������ �� �������������������� ��������������������

������������ ��������� ������ ��

� ��������������� �� ������������������ �� �������������������� ��������������������

������������� ��������� ��� ���� ��������������� �� !��

"������ �� ��#

� ������������� ���$��������� ������������������ �� ���%���������������� %�������������������

������������� ��������� ���� ��

� �������������� �� ������������������ �� �������������������� ��������������������

������������� ��������� �������&�

� �����������������&� ������������������ �� ��������������������� ��������������������

�&�'����$�'�����(����� �)*+���� �

� �&���'����$������������� � ������������������ �� ��������������������� ��������������������

� �&���'����$��������+���� � ������������������ �� ��%������������������ �,������������������

� � ��������*+�����&�� ���& ������������������ �� �������������������� �������������������

������������������������������� */!32224������������� 5 532224�������������������

� ���-./0�� ����1�&����� ��,�%������������� �� �������������������� �%�����������������

� ���2�&����&�1�&������3����������� ����&����&�$� ��� �� ������������������ �� �%������������������ %�������������������

��*��������1�&�����

����4�&�������������������&�$������������������

1����� ������������������ �� ��������������������� �%������������������

� ���'�1���&�� ����1�&����� ������������������ �� �������������������� ��������������������

�����������&��&���1���&��1�&��������) ���+�����

����� ����������

� ������� ���&1���*+�����&������ ������������������� �� ������������������� �,������������������

���*���& 3����������1�����&�� ��������� ��� ����*56�

� ������������ ��7��&# ���,�%���������� �� ,�������������������� �%������������������

� �����!����� 1#)32224������������� 61 32224�������������������

�8 �����������1����������#

���4��������������������������������1�� � �����%��������� �� ��������������������� �������������������

���*��������0����� �4�&����� ���������������������� �� �,��%���������� �,�����������������

�"������������#�$���������� 13/*632224���������� *35!/32224����������������

���9���0 ����1�� ��3�0����� � ��#�0�:� '�

� �����;� �����*+�����&�71�����&� ,���%������������� �� �������������������� �,�����������������

� ���,�9���5������6� ��0����� �71�����&���3�� � # ,����������������� �� ������������������� ������������������

������6���� �!�$�6����(�� <����� ������������������ �� �������������������� �������������������

���6�1�����0 ���� ���� ��2��

� �����9���6�1�����0 ���� ���� ��2�����3�6� � ���,,������������� �� ������������������� %,�����������������

�����6���� �!�$�6����(�� <����� ������������������� �� �������������������� ��������������������

�%���&����'�������������(�)� �4���������������������� �4����������������������������

9 �����1������������8���������9�����/��������

���$��������'����(�,)2 640���� ���������� �

������'������������

�������������� ����������������

3.2ELKHORN SCHOOL

COST ESTIMATE DETAILMeasure U Implementation Plan

Lodi Unified School District

39

Page 41: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

���������������� ���������� ���������� �

���� ������������ ��������� �������������

����������������� ����� !�"��� #

���� ����$��

%�� &'�����( ���� ��������� '����� ���� �����)*+�,-� .//0

���$��������'����(�,)2 640���� ���������� �

������'������������

�*������+�� 35/)32224���������� )3/2132224����������������

���56)-6�*����<��

� �����9���56)-6�*����<���71�����&� ��,��������������� �� ������������������� ������������������ �3�� � ��1�����&

���,�6���� �!�$�6����(�� <����� ������������������ �� �������������������� ,�������������������

�,�-�������������.�'��+����� �4���������������������� �4����������������������������

9 �����1������������8���������9�����/��������

�/�����0-��'���� ����1�2�������+���.�'��+���������������3� �4���������������������� �4����������������������������

9 �����1������������8���������9�����/��������

�4�-5��������������.�'��+����� �4���������������������� �4����������������������������

9 �����1������������8���������9�����/��������

�����������������������''��� 32#132224���������� 311)32224����������������

����*+���������� �&���=��� ����� ���������������� ��

�����

� �������� ���&1���/���������� � ������������������ �� ��%���������������� �%�����������������

����6�����0 ���� ���� �)> �!�� �

� �������� ���&1���6�����0 ���� ���� �)> �!�� � ������������������ �� ��%���������������� �������������������

� ������9���6�����0 ���� ���� �)> �!�� � ��%���������������� �� ������������������� �������������������

����%�6���� �!�$�6����(�� <����� ������������������� �� �������������������� ��������������������

���()����������������''�������+��� 31 532224���������� 3##*32224����������������

����5������6� �)-�&��6� ��2����� )(�� <��� ��2�� '���)�5'��6 ��

� ������9���2����� )(�� <��� ��2�� ������������������ �� ������������������� ������������������

����%�6���� �!�$�6����(�� <����� ������������������ �� �������������������� �������������������

���������6��������������'��������� 12532224������������� *1 32224�������������������

� ������������&������� ���� <�� ,�%��������������� �� ��������������������� ��������������������

����6���� ���� <������� ����) ������������)�1���� �3 ����������������!��&

���������1����������������/����� �� ���%�������������� �� ��������������������� ��������������������

��������������+�����&�'��!��&�2 � ,����������������� �� ��������������������� ��������������������

�������6�1�� �0 ���$�6������*+�����&�'�<��& �,��%����������� �� ��������������������� %�������������������

����*+���� ����&����&�� ����1�����1���������� ���������������������� �� ���������������� ��������������������

� ����6���� �� !���������� �� �� ���������������������� �� ������������������� ����������������������

� ����6�&��&��� �����&�� ����� ���������� ������& ���������������������� �� ���������������� ��������������������

����8��������� ��?1�������������������������&�� ���&����&

� ������8����/����6 ��� ���,�%���������� �� %�������������������� ��������������������

� ������*��&�� �2�&����& ���,�%���������� �� ��������������������� ��������������������

��@�9����1�����������)���&�� � 1����� ��

� ����� ���,�%���������� �� ,�������������������� ��������������������

�������������� ����������������

3.2ELKHORN SCHOOL

COST ESTIMATE DETAILMeasure U Implementation Plan

Lodi Unified School District

40

Page 42: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

���������������� ���������� ���������� �

���� ������������ ��������� �������������

����������������� ����� !�"��� #

���� ����$��

%�� &'�����( ���� ��������� '����� ���� �����)*+�,-� .//0

���$��������'����(�,)2 640���� ���������� �

������'������������

� �3��������''����2������ �4���������������������� �4����������������������������

9 �����1������������8���������9�����/��������

�"�7�������(������+���������8���� �4���������������������� �4����������������������������

9 �����1������������8���������9�����/��������

�%���������-�����'����6�-�����������9��������� ) 632224������������� )#532224�������������������

�%��'*�'�� �A����$�-��� 1���

�%����6�����6��1�1�� ������������������ �� �������������������� �������������������

�*�#����:�����������������2���)����;2������< �4���������������������� �4����������������������������

9 �����1������������8���������9�����/��������

�,����5������.������������ /)32224���������������� /)32224���������������������

��,�5;8�����(;8������� ���������<�� ������� ��� ��

������� ��� �� #� ���������������������� �� ���������������� ��������������������

���������������1-��=���������;���*>< 2366532224�������� 4 13 553222

�������������������������������� 3##/32/#4�������� 4 *35!/3 5#

�5�������$��������������������������5��)�����?

4����� �� !31�������$�0�� � ����� �������

B�������� �!��������������&������

2�����?1����� �� ����

-�=��� 1�����������1�<� ��������������������� ����

*������ ���0 �������������������1������� ��������� ������ ���#�

�������������� ����������������

3.2ELKHORN SCHOOL

COST ESTIMATE DETAILMeasure U Implementation Plan

Lodi Unified School District

41

Page 43: LODI UNIFIED SCHOOL DISTRICTesbagenda.lodiusd.net/Attachments/79eacd23-9418-458f-b8ed-42e43f515c43.pdfproject design and documentation without the need for extensive meetings with

4.1ELKHORN SCHOOL

SCOPE-OF-WORK SITE DIAGRAM

Approved Scope

Not in Scope of Work

Learning Court | Quad

Play Apparatus Hardcourts

Kinder Play

Portable Classroom

Main Entry Fence/Gate

Modernization

Reconfigure

New Construction

Electives | LabsSL - Science Lab

PK - Preschool, K - Kindergarten, TK - Transitional Kindergarten

Classrooms, CR

S - Storage, T - Toilets, C - Custodial,KIT - Kitchen, U - Utility, EE - Elevator Equip.

Support Spaces

Administration / FacultyFW - Faculty Work, WR - Workroom,FL - Faculty Lounge, O - Office

IL - Innovation Lab, LC - Learning Center

Shared Spaces

Not to Scale

APPROVED SCOPE NOT

DEPICTED ON PLAN:

• Update Electrical Mains

• Electrical Capacity Upgrades • Fire Alarm System + Emergency

Lighting

• New Public Address/Emergency Communications System

• Relocate Existing MDF/IDF

• New EMS System

• Exterior Lighting to Ensure Student Safety

• Safety Locks at Classroom Doors

• Signage for Emergency Response & Wayfinding

Note: The exact location of the shade

structure will be determined during

the design process.

Measure U Implementation Plan Lodi Unified School District