logistical mill installations ltd. - joiner sales · bucked log sort gate, log conveyors • rework...

25
THE BOUNDARY GROUP INDUSTRIAL INSTALLATIONS MECHANICAL - STRUCTURAL - CIVIL - ELECTRICAL - PROJECT MANAGEMENT SERVICING - MINING - WOOD PROCESSING - MATERIAL HANDLING PREVENTIVE MAINTENANCE Box 245 3760 Hwy. 3 Rock Creek, British Columbia, V0H 1Y0 BMI LMI Phone: 250-446-2985 Fax: 250-446-2986 CORPORATE PROFILE

Upload: lythuy

Post on 08-May-2019

219 views

Category:

Documents


0 download

TRANSCRIPT

THE BOUNDARY GROUP

INDUSTRIAL INSTALLATIONS MECHANICAL - STRUCTURAL - CIVIL - ELECTRICAL - PROJECT MANAGEMENT

SERVICING - MINING - WOOD PROCESSING - MATERIAL HANDLING

PREVENTIVE MAINTENANCE

Box 245 – 3760 Hwy. 3

Rock Creek, British Columbia, V0H 1Y0

BMI LMI

Phone: 250-446-2985 Fax: 250-446-2986

CORPORATE PROFILE

The Boundary Group

The Boundary Group of Companies, established on Jan 3, 2003, began with a vision and goal to become a contender in the ever changing industrial world as a leading Industrial Installation Contractor.

As the Boundary Group’s experience and reputation for reliability grew, the need to expand and engage professionals for all aspects and phases for any Project became evident.

When first approached by a customer, steps are taken to ensure the New or Repeat Client will receive the best services that can be offered for his particular Project, what ever it may be.

Our experience has also enabled us to offer our Clients the option to contract out on a cost plus fixed fee, fixed price or cost plus basis.

With construction underway, one important practice has been maintained – every Major Project comes under the personal supervision of a Senior Supervisor dedicated solely to your Project

Boundary and the Client

BMI LMI

The Boundary Group

The Boundary Group of Companies is comprised of :

Logistical Mill Installations Ltd. (LMI) (our non-union division),

Boundary Mill Installations Ltd. (BMI) (our union operation)

The owner has many years of varied experience specializing in Sawmills, Pulp Mills, Plywood Plants, Mines and Recycling Facilities. We are able to service all aspects of various industries because of our experience, knowledge, personnel and unique company structure.

Logistical Mill Installations Ltd. owns all equipment which includes:

• Cranes and Forklifts

• Mobile welding trucks

• Service trucks and trailers for freighting of equipment

• Wire feed welders, inverter / rectifier welders, Mag drills, line cutters, plasma cutters

• A full complement of the tools and equipment required for virtually any project

On staff we have several qualified Supervisors that can oversee and manage all phases of a Construction Project. We also have a large pool of qualified Electricians, Plumbers, Welders, Millwrights, Pipe Fitters, Carpenters and Labourers. As well, we have formed strategic alliances with a variety of Companies to ensure our ability to complete Turnkey

Projects.

When working with the Boundary Group of Companies, not only do you get commitment from the very start, you also get quality to the very end.

We trust that the service capabilities we can provide will enable us to do business with you in the near future.

___________________ Gerry Dulyk

President /Owner

BMI ILM

The Boundary Group Project History - Partial list of Projects completed by the

Boundary Group of Companies

Thompson Creek Metals – Mt. Milligan Copper/Gold Mine:

LMI was awarded the Site Maintenance and Service Contract at the Milligan project for

Thompson Creek and after awarded L.M.I tasks greatly surpassed initial Contract.

L.M.I. on thas Site was responsible for many different tasks with little to no Supervision or

Micromanaging by the client, indicating the clients trust in L.M.I’s abilities while keeping

the budget in mind.

The entire Site had come to realize the need for L.M.I.’s Service and ability to juggle all

tasks which has been assigned. 175 Site Instructions had been issued such as :

Heating and Hording

Expansion of the Camp Gym

Temporary Maintenance Shop for Operations

Foundations and Enclosed Stair Case for Clients

Management team from Head Office to Process Plant

Lining of Sag Mill Ball Bin (Treated Lumber, Plywood and

1” Belting floor with ½” plate walls)

Ball Bunker for Ball Mills(Lock Block foundation, sloped

concrete floor with Cover All Buildings)

Lining and closing in of Ball Mill Ball Bin typical to Sag Mill

with structural and cladded walls

Pump House Building around Site for all ponds

Installation of Perimeter Lighting Pedestals and Poles

Protection Spill Walls for Primary Crusher

Various structures for Services, Company’s and Mine

Operations

BMI LMI

The Boundary Group Project History - Partial list of Projects continued…

Thompson Creek Metals – Mt. Milligan Copper/Gold Mine:

Because of our quality of tradesmen and consciousness to Safety L.M.I. was assigned to

take over the Lock Out Tag Out for the entire Site to assist the Commissioning Team

working directly with all the Contractors involved, supplying all required Journeymen,

Electricians and Millwrights.

The Original Tender awarded was for $697,594.32 to start August 2011 and to be

completed by May 31, 2013. Our portion concluded April 30, 2014 at $19,950,000.00,

with greatly increased crew and expansion of the contract. Our monthly invoicing

surpassed Original Tender Awarded.

BMI LMI

The Boundary Group Project History - Partial list of Projects continued…

Thompson Creek Metals – Mt. Milligan Copper/Gold Mine:

Various Site Instruction Projects.

BMI LMI

The Boundary Group Project History - Partial list of Projects continued…

Redfern Resources Ltd. – Tulsequah Chief Project:

LMI was tasked to provide all labour and required materials to

construct, operate and maintain camp facilities at Barge and

Shazah Sites including as follows:

• Installation and set up of camps

• Installation of roofs for camps – flat, trussed and coverall

• Install sewage treatment plant and tile field. Tie in sewage treatment plant to

existing system (supplier/vendor to assist with installation supervision)

• Installation of power and water

• Set up First Aid facilities

Camp Maintenance including as follows:

• Operate and service power, water and sewer systems

• General repairs to other camp equipment including plumbing (water, sewer &

propane), carpentry and electrical

• Snow removal around the camp facilities including roofing

• Receiving all incoming at Shazah airstrip and distribution to required sites

BMI LMI

The Boundary Group Project History - Partial list of Projects continued…

Merit Mining Corp.

Lexington Site – Shop for underground mine

Greenwood Gold Site – Processing Plant

Revelstoke J & L Site – Shop & Camp for underground mine

LMI was contracted to act as the General Contractor for Supply and Install on the Greenwood Gold

Project. LMI along with SCCL and Arbortec Design were able to construct this “As Built” processing

plant starting in late August 2007 with completion in mid March 2008, 6 weeks ahead of schedule.

All three sites were fixed price contracts and then cost plus for additional work required.

Major mill components were supplied by the client.

The total value of the projects to LMI was in excess of $3.25 M.

BMI LMI

Project History - Partial list of Projects continued…

The Boundary Group

Lexington Site - Shop for Underground Mine

Design and construct mobile shop, generator building, dry room & lunch room for

underground mine site. This was a fixed price contract completed on schedule and

on budget. Total value of projects at this site was $186,000

Revelstoke J & L Site – Shop & Camp for underground mine

Design and construct mobile shop, generator building, dry room/lunch room, camps,

kitchen and offices for Underground Mine. This was a fixed price contract completed

on schedule and on budget. Total value of projects at this site was $815,500

BMI LMI

Project History - Partial list of Projects continued…

The Boundary Group

• All concrete for entire site

• Purchase and erection of pre-engineered building

• Fabrication of all support & structural steel

• Installation of all equipment

• Electrical installation including MCC rooms

• All piping – High / low pressure, air and process water

• Supply and install of water tanks

Total value of projects at this site was $ 2.4 M

BMI LMI

Greenwood Gold – Processing Plant

The Boundary Group

NEMI – Northern Energy & Mining Inc.:

Phase 1 upgrades – Fines Circuit Building and Equipment Foundations - $468,000 project at the

Trend Mine Site South-East of Tumbler Ridge consisting of Excavation & Backfilling with:

• Compaction testing

• Form work

• Installation of all rebar for footings, pedestals, pilasters, slabs & walls

• Placing & finishing of concrete

• This was a hard number project with completion on schedule and on budget

Project History - Partial list of Projects continued…

BMI LMI

The Boundary Group Project History - Partial list of Projects continued…

Pope & Talbot (Grand Forks Division):

Merchandiser Upgrade consisting of the removal of all existing equipment, to be replaced with

new equipment as follows:

• Tree Deck, Linden 60’ double acting quad feeder, Ending roll case with lift gates,

Bucked log sort gate, Log conveyors

• Rework existing log infeed to mill conveyor

• Rework existing residual conveyor and install new conveyor

This project was completed in 2 phases with startup on schedule and on budget.

BMI LMI

The Boundary Group Project History - Partial list of Projects continued…

Federated Co-op ( Canoe B.C. ) / Seel Forest Products ( Edgewater B.C. )

Dismantle existing J bar sorter, stacker & grade station along with all structural support steel,

hydraulic system, un-scrambler, live fence, ending rolls, trim saws and waste conveyors.

All electrical for the above including the Re & Re of MCC’s and PLC’s

This equipment was dismantled, loaded on trucks and transported for reassembly on owner supplied

slab & foundations. Tie in to existing mill including on site fabrication of all new components was

completed on a long weekend with no down time to operations.

This was a hard number project with no extras involved.

BMI LMI

Project History - Partial list of Projects continued…

The Boundary Group

Slocan Group (Vavenby Division):

Hog to Hog fuel conversion system – was complete turnkey project consisting of

• Surveying, design, electrical, fabrication and installation

• Large drive–on slabs and concrete bunkers

• Reworking of main Mill hog conveyor (raise & reversing)

• Supply & install of all outside hog conveyors

• Truck / Loader ramp and lock block walls

This project was planned and completed with no down time to the Mill, on schedule and on budget.

BMI LMI

The Boundary Group Project History - Partial list of Projects continued…

Edmonton Composting Facility (subcontractor to Earth Tech Canada Inc.):

Repair of mixing drums and baffle removal

• This $1.5 million project was completed by working around the clock for more than 10

weeks.

• The $813,000 installation labour contract portion of the project was completed working

two 12 hour shifts for the duration of project with 22 welders and 2 supervisors.

• Because of the intensive planning, more than 36,000 man hours of work was completed

without a single incident. The Safe Work Plan, and more than 140 Tailboard meetings

enabled us to quickly resolve any issues or concerns before they became a problem.

Remove and replace the In feed - Ram Feeder ends on 5 Rotary Digester drums

(16’ diameter x 240’ length). Approximate installation contract value of $600,000.

BMI LMI

The Boundary Group

Additional Projects and Installations

Mining Sector

Huckleberry Mines Ltd

A Capital Cost project completed on a cost plus

basis

-On-site fabrication and installation of NAG

Floatation System including reclamation

pumps, large bore piping and pump house.

Elk Valley Coal ( Fording River Division )

A Capital Cost project awarded on bid basis

- Dryer Feed Conveyor Tower Repairs:

All excavations, forms, reinforcing steel,

concrete, systematic removal of all sections

of support structure and replacement with

new components.

Completed on budget and on schedule Pulp Mills

Zellstoff -Celgar Ltd.

A Capital Cost project awarded on bid basis

44” Debarker Infeed and Conveyor Upgrade:

Included in project

- Structural support steel

- Oversize log unloader and hydraulic system

- Re & Re of Infeed Roll Case with new

conveyors

- Removal of 1st floor existing concrete

- Installation of all new drives

- Chuting, catwalks and hand rails

Completed on budget and on schedule

On completion of project we were tasked with the

rebuild of the overhead Colby Crane

( log bundle lift ) on a cost plus basis.

BMI LMI

The Boundary Group

Pope & Talbot Canada

Castlegar, BC Division

• Chip Screen Replacement project: Including

modifying infeed, fines, overs and outfeed conveyors

• Waste Dropout and Belt Conveyors project:

Including removal of all existing and installation of

structural support steel with modifications to transfer

decks and fences.

Midway, BC Division

• Remove and Relocate North / South Hog Conveyor

• Optimizer Transfer Belt / End Deck project

• Metriguard 7200 CLT removal

Grand Forks, BC Division

• Ongoing preventive maintenance and

maintenance overload

• Vibrating Conveyor removal

( from US mill for installation at Grand Forks )

• Installation of oil totes at one central location with

pumps, piping & filling stations throughout entire mill

• Supply and install waste oil storage and pumping

facility

• Chip-n-Saw overhead crane and crane rail including

support structure

• Rebuild of Chip-n-Saw and Twinband

• All P & T projects are fixed price with no additional costs to the client

BMI LMI

The Boundary Group

Additional Projects and Installations

Federated Co-p ( Canoe B.C.) A Capital Cost project awarded on a fixed price basis

Log Deck Cut off Saw and Measures Conveyor

project -This project was planned and executed with

no down time to the client and included:

• Modifications to existing structural steel along with

installation of all new structural and support steel

for equipment, overhead crane and crane rails.

• Modifications to existing equipment and building

including removal of roof & walls, cutoff saw,

infeed & outfeed conveyors and all related

components were required for installation of the

new cutoff saw, butt reducer, new measures

conveyor, MCC building, hydraulic system,

catwalks and handrail.

Completed on budget and on schedule with extra work

completed on a cost plus basis

Weyerhaueser ( Kamloops Division ) Maintenance and services contract

• On Site Maintenance and Services Contractor

providing ongoing service with certified IP

welders and millwrights on day to day

preventive maintenance, maintenance

overload, and maintenance projects.

Sawmills and Planer Mills

BMI LMI

The Boundary Group

Additional Projects and Installations

Slocan Forest Products – Vavenby Division ( Canfor Forest Products )

• Fabrication and supply of Log Decks project ( Included removal of existing decks )

Project was completed with no down time to production

• Merchandiser upgrade: Project completed working two 12 hour shifts per day from

start to finish of project

• Sawmill Trimsaw Un-scrambler retrofit Project

• Planermill LP Fan Support Structure retrofit including all excavations, forming, concrete and new

steel. This Project was completed without the shutdown of any equipment.

• Merchandiser Hydraulic room Re & Re: This Supply and Install Project was under the

Merchandiser deck during operations and included overhead protection, demo of existing and

installation of a new block building with a concrete roof. Modifications to the hydraulic and fire

suppression systems were completed on weekends so no downtime to production was incurred.

Also included installation of overhead cranes.

• Chip Conveyor fabrication and installation: Including design and engineering, removal of

existing and modifications to building wall

BMI LMI

The Boundary Group

Labour Rates available upon request

BMI Overtime & Premium rates apply as per Union Contract

Travel Time and Mileage as per Union Contract

LOA applies as per Union Contract

LMI Overtime & Premium rates apply as per Federal & Provincial Labour Law

Travel Time and Mileage - to be determined on a Site to Site basis

LOA - to be determined on a Site to Site basis

Labour Rates include:

• Electric Welders - if required

• All Consumables/Expendables

-Oxy/acetylene, welding supplies, torch tips, grinding disks, gloves, etc.

• All small tools & equipment

- Welding cables & hoses, power cords, grinders, torches, drills, rigging,

chain falls, come-a-longs, etc.

Service Vehicle/Supervisor Vehicle/Town Runner - $75.00 Flat Rate per day.

Other Equipment:

• Portable Welders

• Generators

• Cranes

- 8.5 ton Broderson Carry Deck

- 20 ton P&H RT

- 22 ton Grove AT

- Hourly, Daily, Weekly, Monthly Rates on request

• Forklifts

- Hourly, Daily, Weekly, Monthly Rates on request

• Freight & Fuels for above equipment to be billed as an additional cost

* All applicable taxes are extra upon invoicing*

BMI LMI

The Boundary Group WCB Clearance Letter

BMI LMI

The Boundary Group WCB Clearance Letter

BMI LMI

Insurance Coverage

The Boundary Group

BMI LMI

The Boundary Group

Reference Contacts

Please feel free to call any of the references listed below to confirm that not only do you get commitment

from the very start, you get quality to the very end.

Bert Jeffries (Retired) Jay Cairns

Construction Manager, Mt. Milligan Copper/Gold Project Contracts Manager,Mt. Milligan Copper/Gold

Thompson Creek Metals Thompson Creek Metals

[email protected] [email protected]

(208)756-4448 (250)996-2528

M.W. (Mel) Smale T.R. (Tom) Smale

Chairman & Director President / CEO

SCCL Construction Management SCCL Construction Management

Cell: (604) 302-7551 Cell: (604) 380-8314

Bill Kazakoff Mike Crondahl

Site Engineer / Project Superintendant President

Pope & Talbot (Castlegar, Grand Forks, Midway) Westmill Industries

Grand Forks, B.C. Aldergrove, B.C.

(250) 443-2407 (604) 607-7010

Mike Kazakoff Gerhard Mikolajczyk P.Eng.

Design Technologist Design Technologist

Arbortec Design Services Ltd. International Quest Engineering Ltd.

Christina Lake, B.C. Prince George, B.C.

(250) 447-6272 (250) 612-0246

Additional Clients

Westmill Industries………………….Project Consultants for Veneer Dryer Rebuilds

Canpar Industries…………………...Preventative Maintenance

Creekside Industries ……………….Minor project assistance

Interac ……………………………….Sawmill / Planermill / Reman Conversion Project

Roxul ………………………………...Re & Re of Melter Pot

Louisiana Pacific …………………...Crane & Crane Rails

Anglo Swiss Resources Inc………..Design, Fabrication and Installation for Crushing and

Grinding Plant and Flotation Circuit

BMI LMI

THE BOUNDARY

GROUP OF COMPANIES

BMI

LMI

Boundary Mill Installations Ltd. (Our Union Company)

Logistical Mill Installations Ltd. (Our Non - Union Company)

BMI LMI

PO Box 245 – 3760 Highway 3, Rock Creek, BC V0H 1Y0

Phone: 250-446-2985

Fax: 250-446-2986

Gerry Dulyk President

Cell: 250-868-7615

[email protected]

Kathy Baiton Head Office Admin/Project Coordinator

250-446-2985

[email protected]