london city airport bernard lavelle sales director @bernardlavelle
TRANSCRIPT
London City Airport
Bernard LavelleSales Director @bernardlavelle
Where are we today?
Days before London City AirportLondon City Airport today
The ONLY Airport in London!
London City Airport: Connections
Service Features – 20/10
• No queues
• 20 minute check in
• Easy and quick access to London
• Business environment
• 10 minutes from plane to taxi
• Fastest processing times in Europe
• Quick, easy & efficient to get through LCY
• Fast track airport – no fuss, no bother, no reason not to use LCY
LCY v LHR/LGW – Typical Cost
• Waterloo – LHR/LGW• Tube £4.50• HEX/GEX £20.00 (£25.00
on board for HEX)• Total £24.50
• Waterloo – LCY• Tube/DLR £4.50• Difference £20.00• Assume 20,000
journeys pa• Minimum saving
£400,000
£ £ £ £ £ £ £ £ £
Add in time saving on top (c3 hours for a round trip)
LCY 2012
• 3.07m passengers in 2012
• 3.2M expectation 2013
• 10 Airlines, 44 destinations
• Largest airline by pax & Capacity is BA
Current Operators
Current Route Map
Connecting flight opportunities from LCY
Connect To 09.15 Dep
Aberdeen
Amsterdam
Antwerp
Basel
Dundee
Dublin
Edinburgh
Frankfurt
Glasgow
Geneva
Nuremburg
Rotterdam
Zurich
Connect To: 08.45 Arr
Arlanda (Stockholm)
Billund
Edinburgh
Glasgow
Linate (Milan)
Madrid
Orly (Paris)
Rotterdam
Zurich
Connect To 14.50 Dep
Orly (Paris)
Geneva
Connect To 14.15 Arr
Amsterdam
JFK (New York)
Luxembourg
Nante
Zurich
Connect To 19.30 Dep
Amsterdam
Arlanda (Stockholm)
Billund
Bern
Dresden
Dublin
Frankfurt
Geneva
Jersey
Luxembourg
Madrid
Rotterdam
Connect To 19.00 Arr
Antwerp
Dundee
Edinburgh
Glasgow
Kristiansand
Rotterdam
Assumes 30 MCT, 90 minute max wait
Min 24 Destinations
London City Airport: IOM-LCY History
0
1
2
3
4
5
6
7
8
9
10
Pax History IOM-LCY
• 2000-2004 Jersey European/British European• 2005-2008 Euromanx & VLM (Euromanx stops May’08)• 2009 Aer Arann & VLM (VLM stops July ‘09)• 2010- April 2012 Aer Arann• 2012 June - BA
Chequered History…..
Connection into London & the business & financial district important? Never been a better product!
London City Airport: Into The Future
LCY: City Airport Development Programme (CADP)
LCY: Vision for the FutureLCY: a Vision for the Future
• Permission granted for 120k movements per annum
• A vision of 6 million passengers by 2023
• Development of the airport to provide additional business & leisure destinations
• LCY as the gateway to London – as London moves east
Peaks - Optimising Runway Capacity
Current configuration – 38 movements per hour
Additional entry point – 42 movements per hour
Full parallel – c50 movements per hour
16
London City Airport 2020
East Development: Indicative Visualisations (WIP)
East Development: Indicative Visualisations (WIP)
East Development: Indicative Visualisations (WIP)
London City Airport: Divider2011
London City Airport
Thank you!